Closing the Loop on NextGen Air-Ground Data Communications John Gonda SC 214/WG 78 U. S. Lead for Operational Requirements Tracing and Validation
Transcript
Page 1: Closing the Loop on NextGen Air- Ground Data Communications John Gonda SC 214/WG 78 U. S. Lead for Operational Requirements Tracing and Validation.

Closing the Loop on NextGen Air-Ground Data Communications

John Gonda

SC 214/WG 78

U. S. Lead for Operational Requirements

Tracing and Validation

Page 2: Closing the Loop on NextGen Air- Ground Data Communications John Gonda SC 214/WG 78 U. S. Lead for Operational Requirements Tracing and Validation.

Operational Services and Environment Definition (OSED)

Environment Review & Revision Operational

Service Definition Operational

Safety Analysis Operational

Performance Analysis

Global Safety & Performance Requirement DefinitionInteroperability Requirement Definition

- ATN- FANS Accommodation

Technology Independent & Portable Service Definition

Closing the Loop – Global StandardsRTCA – EUROCAE Joint Development

Validation and Tracing

Page 3: Closing the Loop on NextGen Air- Ground Data Communications John Gonda SC 214/WG 78 U. S. Lead for Operational Requirements Tracing and Validation.

Closing the Loop – Single ICAO Compliant Data Communications System

GOALHarmonization of Oceanic and Domestic

Dallas Fort Worth

Frankfurt

Page 4: Closing the Loop on NextGen Air- Ground Data Communications John Gonda SC 214/WG 78 U. S. Lead for Operational Requirements Tracing and Validation.

SC 214/WG 78 SPR

Two Environments (MidTerm = ENVA, High Perf Airspace = ENVB)

Joint (US, Eurocontrol) Converged (Surface, Terminal, Domestic Enroute,

Oceanic Enroute, Remote) New/Updated Software Applications

Context Management/ (CM - Log On) Controller Pilot Data Link Communications (CPDLC) Automatic Dependent Surveillance – Contract (ADS-C) Flight Information Services (D-FIS)

Interoperability ATS Interoperability Document

Page 5: Closing the Loop on NextGen Air- Ground Data Communications John Gonda SC 214/WG 78 U. S. Lead for Operational Requirements Tracing and Validation.

SC 214 Tracing Resources

Operational Requirements (MITRE C Team) John Gonda (Lead the work) Ron Tornese (Run the meatgrinder) Brent Blackwell (Review from Ops perspective - air) Ed Brestle (Review from Ops perspective – ground)

SRs and PRs Kathy Devito (Thane)

IRs Fred Picard (Egis)

Page 6: Closing the Loop on NextGen Air- Ground Data Communications John Gonda SC 214/WG 78 U. S. Lead for Operational Requirements Tracing and Validation.

Required by both the SC 214/WG 78 CSG and VSG

ORs to ORs (John and the C Team) Operating Method (OM) Tables to OM Tables

Section to Section (John and the C Team) ORs to sections where ORs do not exist

Safety Requirements (SRs) to SRs (Kathy) Performance Requirements (PRs) to PRs (Kathy) Interoperability Requirements (IRs) to IRs (Fred)

SC 214/WG 78 Requirement Tracing Guidelines

Page 6

Page 7: Closing the Loop on NextGen Air- Ground Data Communications John Gonda SC 214/WG 78 U. S. Lead for Operational Requirements Tracing and Validation.

Objective

Do one set of traces to suit the needs of the following: SC214/WG78 FAA DCP FAA AVS

Does not include Data Comm Program specification traces such as SSD to SC 214 etc

Use Excel to do the basic work Intent is to port over to DOORs at the appropriate time

Page 8: Closing the Loop on NextGen Air- Ground Data Communications John Gonda SC 214/WG 78 U. S. Lead for Operational Requirements Tracing and Validation.

Direction of Trace

Page 8

Page 9: Closing the Loop on NextGen Air- Ground Data Communications John Gonda SC 214/WG 78 U. S. Lead for Operational Requirements Tracing and Validation.

214SPRDO290/LINK DO280/

LINK

DO306 SARPs214ATN

INTEROP214FANSINTEROP DO305

A TraceJohn

A1 A2 A3 A4 A5

B TraceFred

B1 B2

C TraceFred

C4 C2 C3 C1

D TraceJohn

D1 D2

E TraceFred

E3 E2 E1

SC 214/WG78 Tracing Requirements

Page 10: Closing the Loop on NextGen Air- Ground Data Communications John Gonda SC 214/WG 78 U. S. Lead for Operational Requirements Tracing and Validation.

Internal Validation Activities

Validation projectID

Creation IdentificationSC214/WG78

Point of contactFrame

Validation Activity

Begin End Comments

VSG-VA1 7-May-2010 Traceability SC214-WG78 SPR with ED120/DO290 (OR/SR/PR)

John GONDA CSG 15-May-2010 30-Jun-2010 A1 to A2 DO-290 as LINK 2000+

VSG-VA2 7-May-2010 Traceability SC214-WG78 SPR with ED122/DO306 (OR/SR/PR)

John GONDA CSG 30-Jun-2010 30-Jul-2010 A1 to A4

VSG-VA3 7-May-2010 Traceability SC214-WG78 Standards with ICAO Doc 9880

Fred PICARD & Thierry LELIEVRE

CSG  7-May-2010  Sept-2010 Does this include all ICAO requirements?C3 to C1, C4

VSG-VA4 7-May-2010 Traceability SC214-WG78 Standards with ED110B/DO280B

Fred PICARD & Thierry LELIEVRE

CSG 7-May-2010 

 Sept-2010   C2 to C1, C4

VSG-VA5 7-May-2010 Traceability SC214-WG78 SPR with SC214-WG78 ATS Interop

Fred Picard & Thierry LELIEVRE

CSG 7-May-2010 

 Sept-2010   E2 to/from E3

VSG-VA6 7-May-2010 Traceability SC214-WG78 SPR with SC214-WG78 Mixed ATS Interop

Fred Picard & Thierry LELIEVRE

CSG Not Started  ???  B1 to B2=> NOE3 to E1

Page 11: Closing the Loop on NextGen Air- Ground Data Communications John Gonda SC 214/WG 78 U. S. Lead for Operational Requirements Tracing and Validation.

Internal Validation Activities (cont)

VSG-VA7 3-Jun-2010 ORs Requirements assessment during Validation Objectives drafting

John GONDA &Dijana PASIC

VSG      

VSG-VA8 3-Jun-2010 SRs & PRs Requirements assessment during Validation Objectives drafting

Kathy DEVITO &Wim

BRONDSEMA

VSG      

VSG-VA9 3-Jun-2010 IRs Requirements assessment during Validation Objectives drafting

Fred PICARD (ATS)

& Pascal ROHAUT (L2K+) & Chris Collings

(FANS)

VSG 3-Jun-2010   Sept-2010  -

VSG-VA10 21-Jun-2010 Traceability SC214-WH78 SPR with DO280/ED110

John Gonda CSG 30-Jul-2010 30-Aug-2010 A1-A3

VSG-VA11 21-Jun-2010 Traceability SC 214-WG78 SPR with SARPs

John Gonda CSG 30-Aug-2010 30-Oct-2010 A1-A5

VSG-VA12 21-Jun-2010 Traceability SC 214 FANS Interop with DO 305/EDXXX

John Gonda CSG 1-Feb-2010 5-Mar-2010 OR Complete

Page 12: Closing the Loop on NextGen Air- Ground Data Communications John Gonda SC 214/WG 78 U. S. Lead for Operational Requirements Tracing and Validation.

RTCA SC 214/EUROCAE WG 78 SPR Status

Draft Version H (incl ATN/FANS Interops) posted on a public websitehttp://www.faa.gov/about/office_org/headquarters_offices/ato/service_units/techops/atc_comms_services/sc214/

OEMs are building the SW applications Configuration control has been instituted Validation of the SPR is underway Oceanic/Domestic Integration target - Version I Green/Grey cover documents planned by December

2011


Recommended