Department of EnergyNevada Operations Office
P O Box 98518Las Vegas, NV 89193-8518
JUL 17 189
WBS #1.2.9.3"QA"
Larry R. HayesTechnical Project Officer for Yucca Mountain ProjectU.S. Geological Survey101 Convention Center DriveSuite 860Las Vegas, NV 89109
CLOSURE OF STANDARD DEFICIENCY REPORTS (SDRs) 134, 136, 137, 138, and 139RESULTING FROM YUCCA MOUNTAIN PROJECT OFFICE QUALITY ASSURANCE AUDIT 88-03 OFU.S. GEOLOGICAL SURVEY
SDRs 134, 136, 137, 138, and 139 have been closed based on satisfactoryverification of completed corrective actions. Copies of the SDRs are enclosedfor your files.
If you have any questions, please contact Wendell B. Mansel of my staff at794-7945 or Daniel A. Klimas of Science Applications International Corporationat 794-7881.
Edwin L. Wilmot, Acting DirectorQuality Assurance DivisionYucca Mountain Project OfficeYMP:WBM-4878
Enclosure:SDRs 134, 136, 137, 138, . 139
cc w/encl:Ralph Stein, HO (RW-30) FORSDwight Shelor, HQ (RW-3) FORSJ. R. Willmon, USGS, Denver, COD. A. Klimas, SAIC, Las Vegas, NV, 517/T-08J. J. Brogan, SAIC, Las Vegas, NV, 517/T-12L. G. Scherr, SAIC, Las Vegas, NV, 517/T-06S. W. Zimmerman, NWPO, Carson City, NVJ. E. Kennedy, NRC, Washington,
cc w/o encl:K. G. Sommer, HQ (RW-3) FORSAlan Flint, USGS, NTSG. P. Fehr, SAIC, Las Vegas, NV, 517/T-12R. J. Bahorich, W, Las Vegas, NV, 517/T-37D. 0. Porter, SAIC, Golden, COJ. W. Gilray, NRC, Las Vegas, NV
WM-1 1 PDC
WMPO STANDARD EFICIENCY REPORT N-QA-038
date 4/28/88 2 Severity Level page of 2
United States Department of the InteriorGEOLOGICAL SURVEY
BOX 25046 421DENVER FEDERALCENTER
DENVER. COLORADO 80225-0O46
July 6, 1988
Dr. Carl Gertz, Project ManagerWaste Management Project OfficeU.S. Department of EnergyP.O. Box 98518Las Vegas, NV 89193-8518
ATTN: James Blaylock
SUBJECT: USGS Responses to WPO SDRs 132-1401861)
(WMPO Action Item 88-
Enclosed are the USGS responses to PO SDRs 132-140 that weregenerated during WMPO Audit 88-03 of the NNWSI-USGS activities inMenlo Park, CA.
If you have any questions or comments, please contact Joe Wllmon.
Sincerely,
L. R. HayesTechnical Project Officer, NWSIU.S. Geological Survey
LRH:BEL:hh
cc w/enclosures: J. Devine, USGS, Reston, VAV. Schneider, USGS, Reston, VAJ. R. Willmon, USGS, Denver, COR. B. Raup, Jr., USGS, Denver, COE. J. Helley, USGS, Menlo Park, CAJ. J. Brogan, SIC, Las Vegas, NV (original SDRs enclosed)H. H. Caldwell, SAIC, Las Vegas, NVUSGS RC 1293/1/QA File 3.16.02. SDRs
cc w/o enclosures: NNWSI Chron
WMPO STANDARD DEFICIENCY REPORT N-QA-038CONTINUATION SHEET 10/86
SOR 134 Rev. 0 Page 2 of 2
10 Recommended Actions ( continued )
aware of the error.3. Determine why the proper form was not used and if
additional training may be required.
SDR 134
21. VERIFICATION
As noted in the revised response dated march 28, 1989, the"Error Factor" discussed was a calculation "Error Factor"not a program software error. The program was changed toreflect the calculation error. Reference attached SoftwareSummary Forms dated February 16, 1988, and May 6, 1988, andletter from Stephen Harmsen to Dr. John Evans, subjectSoftware Summary Form for "Calibration For" dated May 2,1988.
QMP 3.03 Rev. 0 delineates the Control for Software ErrorsReport and Software Error User-Notification Form,attachedThis SDR is considered closed
12E9
Software Summary Form (SSF)
SGS Computer Program
SSF Verifcation
USGS COMPUTER PROGRAMTechnical Contact
Exceptions listed under A are of no substantive impact and do not require resubmission of the SSF. The Technn-ical Contact shall correct them at the next regular submission of the SSF.Exceptions listed under B do have substantive impact. For any entries under B the Technical Contact isintructed to submit a revised SSF correcting the defects in a timely manner.This page shall remain attached to the SSF permanently
QA
"BEST AVAILABLE copy
NNWSI-USGS-QMP.3.03 RDAttachement I SSF)
Page 1 of 1
Software Summary Form (SSF)
USGS Computer ProgramTechnical Contact:
address:
telephone:
.
.
Organization: U.S. Department of the Interior U.S. Geological surveyDivision, Branch of
OR Contractor:
SSF Verification
USGS Computer ProgramTechnical Contact
B (substantive):
Exceptions listed under A are of no substantive impact and do not require resubmission of the SSF. The Techn-ical Contact shall correct them at the next regular submission of the SSF.Exceptions listed under B do have substantive impact For any entries under B the Technical Contact isinstructed to submit a revised SSF correcting the defects in a timely manner.This page shall remain attached to the SSF permanently.
From: Stephen Harmsen May 2,1988U. S. G. S., Branch of Geologic Risk AssesmentP. O. Box 25046, MS 966Denver Federal CenterDenver, CO. 80225
To: Dr. John Evans, SeismologistU. S. Geological Survey - Branch of Seismology345 Middlefield Road M. S. 977Menlo Park, CA. 94025
Dear Dr. Evans:
After reviewing the software summary form for 'calibrate.for,' version 1.001, I noticed that I hadwritten an expression for error' correctly for version 1.001, but incorrectly for version 1.000. Theexpression for 'error' in the code of calibrate for,' version 1.000, is, and should read in the SSF,
Computed
Note that this definition is similar to the definition for version 1001,
when the expected and computed values are nearly equal, and that both definitions identify casesin which system response is 'low` or 'high'. For this reason, I do not believe that the version1.000 definition of error' resulted in any mistakes being committed in our assessment of problemswith seismographic system responses. The reason for the change is that the quantity that I havetermed 'expected' will sometimes be small when compared to 'computed,' resulting in a large(> 100%) error term if the version 1.000 definition is used. Using the revised definition, error willbe bounded by - 100%, a situation that would occur when the seismographic system is failing totransmit calibration sinusoids to the PDP 11/34 computer at Golden, Colorado, whereas, using theoriginal version 1.000 definition, a singularity in 'error' expression would occur under the samecircumstances.
I am enclosing a revised SSF for version 1.001, but I am not changing the version number, sincethe error was in the wording of the SSF itself, not within the computer code of either version 1.000or version 1.001 calibratefor.'
EXAMPLE NNWSI-USGS-QMP-3.3 ROAttachment 4Page 1 of I
Software Error Report
USGS Computer Program "Technical Contact:
address:
Version:
telephone:
An error has been discovered in the above-named software/model/documentate). Describe the error (and name its discoverer if not the Technical Contact
(number of additional description sheets attached: . )
State any known effects of this error on information used in the NNWSI licensing process:
(number of additional effects sheets attached:
Sign: date:(whoever reports error)
Technical Contact shall respond in writing and make both this Software Error Report and theTCs responses a permanent part their files.
EXAMPLE NNWSI-USGS-QMP-3.0.RO`ATTACHMENT 6
- PAGE 1 OF 1
Software Error User-Notification Form
An error has been discovered i in the following computer prtion:
USGS Computer ProgramTechnical Contact:
address
telephone:
Description of error (see attached sheets):
General known NNWSI
Corrective action for user to
Sign:
United States Department of the InteriorGEOLOGICAL SURVEY
BOX M.S. 421DENVER FEDERAL CENTERDENVER. COLORADO 80225 WBS # :1. 2.9 .3
QA:QA
March 28, 1989
Blaylock, Project Quality ManagerU.S.S. DEPARTMENT of Energy
YUCCA Mountain Poject Office98518
Las Vegas, NV 89193-8518
ATTENTION: Nancy Voltura
SUBJECT: Amended Response to SDR-134
Jim:
As we discussed by elephone today (3/28/89), I am submittinga revised response for the subject SDR. This response should
suppercede all previous responses provided for block 14. Theoriginal responses to blocks 15 and 16 should remain as stated.
Sincerely,
J. R. Willmon ,Quality Assurance ManagerUSGS-YMP A Program
enclosure
cc:: E. H. Roseboom, USGS, Reston, VaL. R. Hayes, USGS, Denver, COR. B. Raup, USGS, Denver, COD. G. Jorgensen, USGS, Denver, COS. Metta SAIC, Las Vegas, NVH. E. Caldwell, SAIC, Las Vegas, NVJ. J. Brogan, SAIC, Las Vegas, NVR. W. Gray, ED, Las Vegas, NVA. D. Boyce, MED, Las Vegas, NVQA File 3.16.01 (SDR-134)Local Records Center
BEST AVAILABLE COPY
Revised response to SDR-134 3/28/89
Block 14 - The author of the software program CALIBRATE.FORincluded a correction factor in his calculations that heentitled an ERROR FACTOR. In examining the results ofthe calculations the author determined a differentcorrection factor was appropriate. As a result, theauthor changed the ERROR FACTOR" and as is required inQMP-3.03, RO, gave CALIBRATE.FOR a new version number andsubmitted a new SSF documenting the change. Acomparision by the author of the calibrations resultingfrom the 2 versions showed that the code change did notresult in a-significant change in the calibrations. Thisis indicated by change in the version number in that itdid not indicate a whole new version. The author'sproject is the only user of CALIBRATE.FOR and all userswithin the project were advised as appropriate.
SDR 134 -- Amended response:
The change in code did not have substantive impact on priorcalculations.
WMPO STANDARD DEFEICIENCY REPORT
WMPO STANDARD DEFICIENCY REPORT N-QA-038CONTINUATION SHEET 10/86
Page 2 of 2
10 Recommended Actions continued )
aware of the error.3. Determine why the proper form was not used and if
additional training can be required.
A
WMPO STANDARD DEFICIENCY REPORT 3/87
WMPO STANDARD DEFICIENCY REPORT N-QA-038CONTINUATION SHEET 10/86
SDR NO. 136 Rev. 0 Page 2 of 2
8 Requirement ( continued )
B) Paragraph 5.4.1, requires bid evaluations to be documented per Attachment 1, USCSBid Evaluation Summary.
C) Paragraph 5.5, requires-Supplier Performance Evaluation to be performed throughmeasures established by the USGS to interface with the supplier and to verifysupplier's performance, as necessary.
D) Paragraph 5.6, requires surveillances and/or audits to verify the suppliersperformance in accordance with the procurement documents.
E. Paragraph .7, requires an Approved Supplier's List to be preparedby the QA manager to identify all approved suppliers.
g Deficiency ( continued )
contracts for enlo Park.C) No Supplier Performance Evaluations have been performed by the USGS.D) Surveillances and/or audits have not been performed to verify the suppliersperformance in accordance with the procurement documents.E) An approved Suppliers List has not been prepared by the QA Manager.
10 Recommended Actions continued )
2. Actions should be taken to determine the imapct of the deficiencies noted on thework performed.3. Determine the cause of the conditions noted in this SDR and identify what will bedone to prevent recurrence.
SDR 136 (Continued)
14. Remedial Investigative Action
A. No remedial action is necessary.
B. No remedial action is necessary.
C, D. No remedial action is necessary.
E. No remedia1 action. is necessary.
16. cause of the Condition
A. QMP-7.03, RO, Section 5.5.3 allows the USGS to accept aservice procurement by review of objective evidence of thesupplier's conformance to the procurement document'srequirements. Petty Ray's work was accepted by supplyingobjective evidence that they satisfied contractual requirements.
B. Bid evaluations are not required of all USGS-NNWSIsuppliers; sole source justifications are an alternativemethod of selecting a supplier. No bid evaluations neededto be performed on contracts for Menlo Park.
C, D. A review of objective evidence for conformance to theprocurement document's requirements was conducted incompliance with QMP-7.03 R Section 5.5.3 to evaluate thesupplier's performance. In compliance with the USGStechnical procedure SP-10, R, Petty Ray's performance wasevaluated and documented by the USGS in the field (seeattached). Compliance with SP-10, RO is required by theprocurement documents.
E. Lack of implementation of the requirement.
16. Corrective Action to Prevent Recurrence
A. QMP-7.01, RO, and QMP 7.03, RO will be revised toeliminate the ambiguity in application of theirrequirements.
B. No corrective action is necessary.
C, D. QMP-7.01 and QMP-7.03 will be revised to eliminatethe ambiguity in application of their requirements.
E. The QA Manager has established an Approved SuppliersList, maintained in Denver.
SDR-136-
21. VERIFICATION
QMP-7.01 has been revised and QMP-7.03 has been deleted,Reference attached NWSI-USGS Document Transmittal Notice,dated November 11,1988.
The QA Manager has established an Approved Vendors List andAnalytical Services, dated April 18, 1989, attached, andPetty-Ray Geophysical is listed as an approved vendor. ThisSDR is considered closed.
12E9
NNWSI-USGS DOCUMENT TRANSMITTAL NOTICE
To: A.M. Whiteside Participant No. 252SAIC Suite 270 MS-4101626 Cole Blvd., Bldg. 7Golden, CO 80401
Date: November 11,
From: Joe R. Willmon, Quality Assurance Manager, U.S. Geological Survey
The following
DOCUMENTNo., Rev.
QMP-2.06,RO
QMP-3.07,Rl
QMP-5.02,R1
- QMP-6. 01,R2
QMP-7. 01,R1
QMP-8.03,RO
QMP-16 .02,RO
QMP-18 .01,.R2
QMP-18.02,RO
documents are being transmitted:
TITLE
Control of Readiness Reviews
Technical Review Procedure
Preparation and Control of Drawings and Sketches
Document Control
Control of Purchased Items and Services
Identification and Control of Transmitted Data
Control of Stop Work Orders
Audits
Surveillances
Replace pages ii through vi, viii, and ix, the Table of Contents and the Revision Recof the Management Procedures anual (MPM), with the corresponding pages dated 1l/ll/88.
Remove and dispose of the following QMPs which are being deleted from the USGS QA ProgrQMP-1.02, R0 Stop Work Authority
-QMP-7.02, R0 Receiving InspectionQMP-7.03,R0 Acceptance of Materials, Equipment and ServiceQMP-10. 01, R1 Surveillance ProcedureQMP-15.02. RO Control of Unusual Occurances
Instructions: All revisions numbered I or higher supersede an earlier revision whichto be removed from your files and destroyed or marked "superseded."
Participant's Remarks:
The material listed has been received and handled as instructed.
RETURN WITHIN 30 DAYS TO:Name USGS Q Manager, Branch of NN
(Signature of addressee or designee) U.S. Geological Survey, MS-421Denver Federal Center, Box 2'
Date Lakewood, Colorado 80225
Approved By: Effective Date:QA Manager
APPROVED VENDORS LIST--ANALYTICAL SERVICES
Vendor: National Water Quality Laboratory6293 Ward Rd.Arvada, CO 80002
Approved Services: Analysis of oxygen 16/ 18, Sulfur 32/34, Carbon12/ 13, and Deuterium (H1/2)
Qualification Date: 5/4/88
Qualified By: U.S. Geological Survey YMP QA Office
Method of Qualification: Site visit: Surveillance USGS-88-S016
Reevaluation Date: February 6-10, 1989.................................................................
Vendor: Reston Tritium LaboratoryUSGSNational CenterReston, VA 22092
Approved Services: Tritium analysis
Qualification Date: 6/4/88
Qualified By: U. S. Geological Survey YMP QA Office
Method of Qualification: Surveillance USGS-88-801 (Memorandumwith NWQL)
Reevaluation Date: 2/6-10/89.................................................................Vendor: Krueger Geochron Laboratories Division
Krueger Enterprise24 Blackstone StreetCambridge, Mass. 02139
Approved Services: Carbon 14 dating
Qualification Date: 5/488
Qualified By: U.S. Geological Survey YMP QA Office
Method of Qualification: Surveillance USGS-88-8016 (Contract withNWQL; on-site visit by NWQL)
Reevaluation Date: 2/6-10/89
Page 2 of 7Eff. Date: April 19, 1989
APPROVED VENDORS ANALYTICAL SERVICES
Vendor: Global Geochemistry, Inc.6919 Eton Ave.Canago Park, CA 91808
Approved Services: Carbon 12/13. Sulfur 32/34
Qualification Date: 6/4/88
Qualified By: U.S. Geological Survey YMP QA Office
Method of Qualification: Surveillance USGS-88-SO16 (Contract withNWQL)
Reevaluation Date: 2/6-10/89.................................................
Vendor: Dr. Ostland Rosenstiel School of Marine and AtmosphericScienceUniversity of MiamiMiami, Fla.
Approved Services: Deuterium (low level)
Qualification Date: 5/4/88
Qualified By: U.S. Geological Survey YMP QA Office
Method of Qualification: Surveillance U8GS-88-8O16 (Contract withNWQL)
Reevaluation Date: 26-10/89... ..............................................................
Vendor: Rolf KihlINSTAARUniversity of Colorado Campus Box 460Boulder CO 80309
Approved Services: Determination of: soluble salts and gypsum byelectroconductivity, fine organic content by Walkley-Black procedure, CaCO3content by Chittick apparatus, and particle size analysis by sedigraph analyzeror pipette analysis.
Qualification Date: 10/18/88
Qualified By: U.S. Geological Survey YP QA Office
Method of Qualification: Surveillance USGS-88-817
Reevaluation Date: 10/89
Page 3 of 7Eff. Date: April 19, 1989
APPROVED VENDORS--TECHNICAL SERVICES
Vendor: Bureau of Reclamation, Engineering and Research CenterP.O. Box 25007Code D 202Denver Federal CenterLakewood, CO 80225
Approved Services: Technical support
Qualification Date: 12/29/86
Qualified By: U.S. Geological Survey YP QA Office
Method of Qualification: Acceptance of USBR QA Program
Reevaluation Date: 76-9/87 (Audit No. USGS-BR87.01); 7119-21188 (Audit No.USGS-BR88-01); /27-4/4/89 (Audit No. USGS-BR8901)..........................................................................
Vendor: Petty-Ray Geophysical (name changed to Halliburton Geophysical)7961 East Maplewood AvenueSuite 328Englewood CO 80111
Approved Services: Field acquisition of seismic reflection dataincluding surveying locations of receivers, placement of geophones, and firingexplosive shots; processing field data into final reflection profiles.
Qualification Date: 10/26/87
Qualified By: U.S. Geological Survey YMP QA Office
Method of Qualification: Review of objective evidence of compliance toprocurement document requirements. A documented informal surveillance by PIof data processing was performed 5/16/88.
Reevaluation Date: N/A (field) data acquisition ended 1/24/88; data processingended 8/88. Surveillance performed May 16-17, 1988 of data processing activitydocumented by P)
Page 4 of 7Eff. Date: April 19, 1989
APPROVED VENDORS--TECHNICAL SERVICES
Vendor: Branch of Quality AssuranceU.S. Geological SurveyDenver Federal Center MS 401Lakewood, CO 80225William Shampine(3O3) 236 1940
Approved service: Evaluation of potential vendors of laboratory services toassess their capability to perform those services to the requirements of theYMP-USGS.
Qualification Date: April , 1989
Qualified By: YMP-USGS QA Office
Method of Qualification: Review of QA Laboratory Review Protocol and LabEvaluation Form (Effective Date 221/89); MOA
Reevaluation Date: 4/3/91
Page of 7Eff. Date: April 19, 1989
APPROVED VENDORS--CALIBRATION SERVICES
Vendor: Instrument Repair Laboratories2100 W. 6th Ave.Broomfield CO 80020(303) 469-5375
Approved Services: Approved by the following manufacturers for repair andcalibration of all equipment Fluke, Wavetech, Beckman, Hitachi, LogicalDevices, Intercolor Corp, and Kenwood.
Qualification Date: 12/7/88
Qualified By: U.S. Geological Survey YMP QA Office
Method of Qualification: Site visit:Surveillance No. YMP-USGS-89-804
Reevaluation Date: 12/89
Vendor: State of Colorado Department of AgricultureInspection and Consumer Services, Measurement Standards Section8125 Wyandot St.Denver CO 80211(808) 866-2846
Approved Services: The Weights and Measure. Calibration Laboratoryis approved to calibrate M&TE Including but not limited to weights and steeltapes.
Qualification Date: 12/8/89
Qualified By: U.S. Geological Survey YP QA Office
Method of Qualification: Site visit: Surveillance No. YMP-USGS.89-805
Reevaluation Date: 12/89
Vendor: QA Balance Services. Inc.7812 . Newbern CircleAurora CO(803) 693-6419
Approved Services: Calibration of analytical balances
Qualification Date:12/ 12/88
Qualified By: U.S. Geological Survey WMP QA Office
Method of Qualification: Site visit: Surveillance YMP-USGS-89-808
Reevaluation Date: 12/89
Page 6 of 7Eff. Date: April 19, 1989
APPROVED VENDORS: CALIBRATION SERVICES
Vendor: Campbell Scientific, Inc.816 West 1800 NorthLogan, Utah 84321(801) 753-2842Contact: Tim Davenport
Approved Service: Repair.and calibration of Campbell Scientific dataloggers andtemperature sensors and air other instruments sold by Campbell Scientific.
Qualification Date: 1/26/89
Qualified By: U.S. Geological Survey YMP QA Office
Method of Qualification: Surveillance USGS-89-SIO
Reevaluation Date: 1/90
Vendor: LI-COR, Inc.4421 Superior StreetLincoln, Nebraska 68604
Approved Services: Calibration of LI-COR pyranometers
Qualification Date: 1/30/89
Qualified By: U.S. Geological Survey YMP QA Office
Method Of Qualification: Surveillance USGS-89-811
Reevaluation Date: 1/90
Vendor: USGS Hydrologic Instrumentation FacilityGulf Coast Hydroscience Center Bldg. 2101
Stennis Space CenterBay St. Louis, MS 89529
Approved service: calibration of flow meters
Qualification Date: 3/23/89
Qualified By: YMP-USGS QA Office
Method of Qualification: Surveillance
Reevaluation Date: 3/23/90
Page 7 of 7Eff. Date: April 19, 1989
APPROVED VENDORS--CALIBRATION SERVICES
Vendor: IFR Incorporated10200 West York StreetWichita, Kansas 67215(816) 622-4981
Approved Service: Calibration of IFR Model FM/AM.1200 communication test set
Qualification Date: 4/10/89
Qualified By: YMP-USGS QA Office
Method of Qualification: Supplier History
Reevaluation Date: 4/10/90
Vendor: Cushman Electronics2144 Bering DriveSan Jose, California 95131
(408) 432-8100
Approved Service: Calibration of Cushman communications test set
Qualification Date: April 12, 1989
Qualified By: YMP-USGS QA Office
Method of Qualification: Supplier History
Reevaluation Date: 4/10/90
WMPO STANDARD DEFICIENCY REPORT
United States Department of the InteriorGEOLOGICAL SURVEY
BOX 25046DENVER FEDERAL CENTER
DENVER. COLORADO 80225-0046
July 6. 1988
Dr. Carl Gertz, Project ManagerWaste Management Project OfficeU.S. Department of EnergyP.O. Box 98518Las Vegas, NV 89193-8518
ATTN: James Blaylock
SUBJECT: USGS Responses to WMPO SDRs 132-1401861)
(WMPO Action Item *88-
Enclosed are the USGS responses to WPO SDRs 132-140 that weregenerated during WMPO Audit 88-03 of the NNWSI-USGS activities inMenlo Park, CA.
If you have any questions or comments, please contact Joe Willmon
Sincerely,
L. R. HayesTechnical Project Officer. NNWSIU.S. Geological Survey
LRH:BEL:hh
cc w/enclosures: J. Devine, USGS, Reston, VAV. Schneider, USGS, Reston, VAJ. R. Wllmon, USGS, Denver, COR. B. Raup, Jr., USGS, Denver, COE. J. Helley, USGS, Menlo Park, CAJ. J. Brogan, SAIC, Las Vegas. NV (original SDRs enclosed)H. H. Caldwell, SAIC, Las Vegas, NVUSGS RC 1293/1/QA File 3.16.02, SDRs
cc w/o enclosures: NWSI Chron
SDR 137
21. VERIFICATION
Review of Denver/Menlo Park procurements for 988, disclosesthat there were no procurements from -Menlo Park that wereunder the auspices of the Yucca Mountain Project. Theprocedure in place at that time (QMP-702 Rev. 0) requiresthat procurement documents from Menlo Park be sent to the QAManager in Denver for review and acceptance prior toexecution and recording on MRIR Log at Denver. No MRIR Logis kept at Menlo Park.
Copies of the Denver Material Receiving Inspection ReportLog for 1988 and the Menlo Park requisitions, Baker Graphicsand Nora Van Houten No. 9380-1227 are attached. This SDR isconsidered closed.
(Note: QMP's 7.02 and 7.03 that require the MRIR Log havebeen deleted.)
12E9
WMPO STANDARD DEFICIENCY REPORT
MATERIAL RECEIVING INSPECTION REPORT LOG
3
MATERIAL RECEIVING INSPECTION REPORT LOG
MATERIAL RECEIVING INSPECTION REPORT LOG
` UNITED STATESDEPARTMENT OF THE INTERIOR
REQUISITION Requisition No.
TOPurchasing
BLANKET PURCHASE ORDER FOR T PEROD OFOCTOBER 1, 1988 THROUGH SEPTEMBER 30, 1989
REPRODUCTION SERVICES1. Xerox copies of opaque originals 2-3feet wide big any length made on ShacohMachine paper copies at $1.20 1 sq. ft.Frosted mylar or K & E clear Film, copiesat $3.00 sq. ft.
2. Diazo clear film, blue, red originalsof translucent originals 1-3 1/2 feet byany length made on blue line machine.$2.25/sq. ft. if vendor supplies copy film.$1.00/sq/ ft if USGS supplies copy film.Authorized contact: Howard Oliver (15)329-Invoice to: US Geological Survey, 345 Middlefield RoadMenlo Park, CA 94025, ATTN: Howard Oliver
Previous P.O. 087206
301
LOT
To Be Completed by Fiscal Authority Only
FUND CERTIFICATION: Funds in te amounts shown are availableand chargeable to the cost authorities shown above.
Signature
Prepare in single space typing. Use double space between items. Fill outtop of requistion completely showing complete shipping instructionsand appropriation if different from that to which requisition is chargeable.
DEPARTMENT OF THE INTERIOR
REQUISITION
Date
Make inner-zone C-D terrain correctionsand process gravity stations as directedby L.W. OLiver 300 TC 3.50 $1050.
This work is similar to that completed byMs. Van outen in another area underPO #087623 dated 11/19/87 and needs tobegin 6/27/88
SIP 3221G-01, RO
To Be Completed by Fiscal Authority Only
FUND CERTIFICATION: Funds In the amounts shown are availableand chargeable to the cost authorities shown above.
Signature Date Approved by Date
Title Title
H.W. Oliver Geophysicist
Prepare In single space typing. Use double space between Items Fill out top of requisition completely. showing complete shipping instructionsand appropriation If different from that to which requisition is chargeable.
WMPO STANDARD DEFICIENCY REPORT N-QA-0383/87
Requirement (Audit Checklist Reference. if Applicable)(Refer to Audit Checklist Item No. 7-32) QMP 7.03 Section 3 Acceptance ofMaterials, Equipment and Services, Paragraph 5.5, requires that when aprocurement is for services only, the USGS shall accept the service b either
0 9 DeficiencyThe USGS as procured services from Petty Ray Geophysical but has not acceptedthe services using any of the stated methods.
o N/A
WMPO STANDARD DEFICIENCY REPORT N-OA-038CONTINUATION SHEET 10/86
138 Rev. 0 Page 2 of 2
B Requirement continued )
any one or all three methods identified.
10 Recommended Actions ( continued )
2. Determine if there are similar conditions in existence.3. Identify the cause of the condition(s) and what will be done to preventrecurrence.4. Determine the impact of the deficiency on the work performed.
14. Remedial Investigative Action(s) (continued)
no further action is required to resolve this SDR
United States Department of the InteriorGEOLOGICAL SURVEY
BOX 250-46DENVER FEDERAL CENTER
DENVER, COLORADO 80225-00-46
July 6, 1988
Dr. Carl Gertz, Project ManagerWaste Management Project OfficeU.S. Department of EnergyP.O. Box 98518Las Vegas, NV 89193-8518
ATTN: James Blaylock
SUBJECT: USGS Responses to WMPO SDRs 132-1401861)
(WMPO Action Item #88-
Enclosed are the USGS responses to WMPO SDRs 132-140 that weregenerated during WPO Audit 88-03 of the NNWSI-USGS activities inMenlo Park, CA.
If you have any questions or comments, please contact Joe Willmon.
Sincerely,
L. R. HayesTechnical Project Officer, NNWSIU.S. Geological Survey
LRH:BEL:hh
cc w/enclosures: J. Devine, USGS, Reston, VAV. Schneider, USGS, Reston, VAJ. R. illmon, USGS, Denver, COR. B. Raup, Jr., USGS, Denver, COE. J. Helley, USGS, Menlo Park, CAJ. J. Brogan, SAIC, Las Vegas, NV (original SDRs enclosed)H. H. Caldwell, SAIC, Las Vegas, NVUSGS RC 1293/1/QA File 3.16.02, SDRs
cc w/o enclosures: NNWSI Chron
SDR 138
21. VERIFICATION
Attached QA Managers Approved Vendors List - analyticalservices of which Petty-Ray Geophysical is listed as anapproved vendor. This SDR is considered closed.
12E9
WMPO STANDARD DEFICIENCY REPORT N-QA-0383/87
a Requirement (Audit Checklist Reference. if Applicable)(Refer to Audit Checklist Item o. 7-32) QMP 7.03 Section 3, Acceptance ofMaterials, Equipment and Services, Paragraph 5.5, requires that when aprocurement is for services only, the USGS shall accept the service by either
deficiencyThe USGS has procured services from Petty Ray Ceophysical but has not acceptedthe services using any of the stated methods.
1. Identify the action(s) to be taken to correct the specific deficiencynoted on this SDR.
One of the acceptable methods set forth in QMP- i5 Effective Date N/A7.03, RO, Para. 5.5 for the acceptance of procuredservices is the review of objective evidence for conformance to the procurementdocument's requirements. This was the method selected by the QA Manager foracceptance of services conducted by Petty Ray Geophysical. Since the method ofacceptance is within the constraints of the USGS QA Program, (continued on page 2
16 Cause of the Condition & Corrective Action to Prevent Recurrence17 Effective Date
N/A
Signature/Date
WMPO STANDARD DEFICIENCY REPORT N-QA-038CONTINUATION SHEET 10/86
138 Rev. Page 2 of 2
8 Requirement ( continued )
any one or all three methods identified.
10 Recommended Actions ( continued )
2. Determine if there are similar conditions in existence.3. Identify the cause of the condition(s) and what will be done to preventrecurrence.4. Determine the impact of the deficiency on the work performed.
14. Remedial Investigative Action(s) (continued)
no further action is required to resolve this SDR
United States Department of the InteriorGEOLOGICAL SURVEY
BOX 25046 M S 421DENVER FEDERAL CENTER
DENVER COLORADO
July 6, 1988
Dr. Carl Gertz, Project ManagerWaste Management Project OfficeU.S. Department of EnergyP.O. Box 98518Las Vegas, V 89193-8518
ATTN: James Blaylock
SUBJECT: USGS Responses to WMPO SDRs 132-140 (WMPO Action Item *88-1861)
Enclosed are the USGS responses to WMPO SDRs 132-140 that weregenerated during WMPO Audit 88-03 of the NNWSI-USGS activities inMenlo Park, CA.
If you have any questions or comments, please contact Joe illmon.
Sincerely,
L. R. HayesTechnical Project Officer, NNWSIU.S. Geological Survey
LRH:BEL:hh
cc w/enclosures: J. Devine, USGS, Reston, VAV. Schneider, USGS, Reston, VAJ. R. Willmon, USGS, Denver, COR. B. Raup. Jr., USGS, Denver, COE. J. Helley, USGS, enlo Park, CAJ. J. Brogan, SAIC. Las Vegas, NV (original SDRs enclosed)H. H. Caldwell, SAIC, Las Vegas, NVUSGS RC 1293/1/QA File 3.16.02, SDRs
cc v/o enclosures: NWSI Chron
United States Department of the InteriorGEOLOGICAL SURVEY
BOX 23046 M.S. 421DENVER FEDERAL CENTERDENVER, COLORADO 80225
January 9, 1989
Mr. Jim Blaylock, Project Quality Assurance ManagerU.S. Department of EnergyYucca Mountain Project OfficeP. 0. Box 98518Las Vegas, NV 89193-8518
SUBJECTs Reference Letter Blaylock to Hayes, YMP:JB-948,dated 12/12/88
Dear Jims
Attached please find amended responses to YP SDRs asrequested in the above referenced letter.
If you have any questions, please call me at TS-8-776-0516.
Sincerely,
Project OfficerUSGS-Yucca Mountain Project
SS/LRH/aaEnclosures
cc wo/enclo. J. W. Willmon, USGS, Denver, COR. B. Raup, USGS, Denver, COC. Bufe, USGS, Denver, COT. . Brocher, USGS, Menlo Park, CA,D. D. Porter, SAIC, Golden, COLocal Record Center
cc w/encl. Amended Responses only:QA File 3.16.01 - SDR 132 -134 -136 -138 and -140
SDR - 138 Amended response:
Attached are copies of objective evidence of the vendor'sconformance to the contract amendment. All equipment requiringcalibration was controlled in accordance with QMP-12.0l, R. Thecollimators used by WESCOR to adjust the theodolite and distancemeasurer do not require traceability to known standards; accuracyis maintained through adjustment of collimators to each other atWESCOR. The remaining equipment was calibrated in the field underthe supervision of the PI.
Approved By: Effective Date:QA Manager
APPROVED VENDORS LIST--ANALYTICAL SERVICES
Vendor: National Water Quality Laboratory5298 Ward Rd.Arvada, CO 80002
Approved Services: Analysis of Oxygen 16/18, Sulfur 82/ 84, Carbon12/18, and Deuterium (H1/2)
Qualification Date: 5/4/88
Qualified By: U.S. Geological Survey YMP QA Office
Method of Qualification: Site visit: Surveillance USGS-88-S016
Reevaluation Date:.. .. ...... ............ .. .. . ....... ... ..... . ... .. .......
Vendor: Reston Tritium LaboratoryUSGSNational CenterReston, VA 22092
Approved Services: Tritium analysis
Qualification Date: 5/4/88
Qualified By: U. S. Geological Survey YMP QA Office
Method of Qualification: Surveillance USGS-88-S016 (Memorandumwith NWQL)
Reevaluation Date:................. .............................................
Vendor: Krueger Geochron Laboratories DivisionKrueger Enterprise24 Blackstone StreetCambridge, Mass. 02139
Approved Services: Carbon 14 dating
Qualification Date: 5/4/88
Qualified By: U.S. Geological Survey YMP QA Office
Method of Qualification: Surveillance USGS-88-8O16 (Contract withNWQL; on-site visit by NWQL)
Reevaluation Date:
Page 2 of 7Eff. Date: April 19, 189
APPROVED VENDORS--ANALYTICAL SERVICES
Vendor: Global Geochemistry, Inc.6919 Eton Ave.Canago Park, CA 91303
Approved Services: Carbon 12/13, Sulfur 32/84
Qualification Date: 5/4/88
Qualified By: U.S. Geological Survey YMP QA Office
Method of Qualification: Surveillance USGS-88-SO16 (Contract withNWQL)
Reevaluation Date:.................................................................
Vendor: Dr. Otland Rosenstiel School of Marine and AtmosphericScienceUniversity of MiamiMiami, Fla.
Approved Services: Deuterium (low level)
Qualification Date: 5/4/88
Qualified By: U.S. Geological Survey YMP QA Office
Method of Qualification: Surveillance USGS-88-8O16 (Contract withNWQL)
Reevaluation Date: 2/6-10/89........................... .................................................... ..................
Vendor: Rolf KihlINSTAARUniversity of Colorado Campus Box 450Boulder CO 80309
Approved Services: Determination of: soluble salts and gypsum byelectroconductivity, fine organic content by Walkley-Black procedure, CaCOScontent by Chittick apparatus, and particle size analysis by sedigraph analyzeror pipette analysis.
Qualification Date: 10/18/88
Qualified By: U.S. Geological Survey YMP Q Office
Method of Qualification: Surveillance USGS-88-S17
Reevaluation Date: 10/89
Page 3 of 7Eff. Date: April 19, 1989
APPROVED VENDORS--TECHNICAL SERVICES
Vendor: Bureau of Reclamation, Engineering and Research CenterP.O. Box 25007Code D 202Denver Federal CenterLakewood, CO 80225
Approved Services: Technical support
Qualification Date: 12129/86
Qualified By: U.S. Geological Survey YMP QA Office
Method of Qualification: Acceptance of USBR QA Program
Reevaluation Date: 7/6-9/87 (Audit No. USGS-BR87-01); 7/19-21/88 (Audit No.USGS-BR88-01); 27-4/4/89 (Audit No. USGS-BR89-01)
Vendor: Petty-Ray Geophysical (name changed to Halliburton Geophysical)7951 East Maplewood AvenueSuite 28Englewood CO 80111
Approved Services: Field acquisition of seismic reflection dataincluding surveying locations of receivers, placement of geophones, and firingexplosive shots; processing field data into final reflection profiles.
Qualification Date: 10/26/87
Qualified By: U.S. Geological Survey YMP QA Office
Method of Qualification: Review of objective evidence of compliance toprocurement document requirements. A documented informal surveillance by PIof data processing was performed /16/88.
Reevaluation Date: N/A (field data acquisition ended 1/24/88; data processingended 8/88. Surveillance performed May 16-17, 1988 of data processing activitydocumented by PI.)
Page 4 of 7Eff. Date: April 19, 1989
APPROVED VENDORS--TECHNICAL SERVICES
Vendor: Branch of Quality AssuranceU.S. Geological SurveyDenver Federal Center MS 401Lakewood, CO 80225William Shampine(308) 26 1940
Approved service: Evaluation of potential vendors of laboratory services toassess their capability to perform those services to the requirements of theYMP-USGS.
Qualification Date: April 3, 1989
Qualified By: YMP-USGS QA Office
Method of Qualification: Review of BQA Laboratory Review Protocol and LabEvaluation Form (Effective Date 2/21/89); MOA
Reevaluation Date: 4/3/91
Page 5 of 7Eff. Date: April 19, 1989
APPROVED VENDORS--CALIBRATION SERVICES
Vendor: Instrument Repair Laboratories2100 W. 6th Ave.Broomfield CO 80020(303) 469-5375
Approved Services: Approved by the following manufacturers for repair andcalibration of all equipment John Fluke, Wavetech, Beckman, Hitachi, LogicalDevices, Intercolor Corp, and Kenwood.
Qualification Date: 12/7/88
Qualified By: U.S. Geological Survey YMP QA Office
Method of Qualification: Site visit:Surveillance No. YMP-USGS-89-S04
Reevaluation Date: 12/89
Vendor: State of Colorado Department of AgricultureInspection and Consumer Services, Measurement Standards Section3125 Wyandot St.Denver CO 80211(303) 866-2845
Approved Services: The Weights and Measures Calibration Laboratoryis approved to calibrate M&TE including but not limited to weights and steeltapes.
Qualification Date: 12/8/89
Qualified By: U.S. Geological Survey YMP QA Office
Method of Qualification: Site visit: Surveillance No. YMP-USGS-89-805
Reevaluation Date: 12/89
Vendor: QA Balance Services, Inc.7812 . Newbern CircleAurora CO(808) 698-6419
Approved Services: Calibration of analytical balances
Qualification Date:12/ 12/88
Qualified By: U.S. Geological Survey YMP QA Office
Method of Qualification: Site visit: Surveillance YMP-USGS-89-806
Reevaluation Date: 12/89
Page 6 of 7Eff. Date: April 19, 1989
APPROVED VENDORS: CALIBRATION SERVICES
Vendor: Campbell Scientific, Inc.816 West 1800 NorthLogan, Utah 84821(801) 753-2342Contact: Tim Davenport
Approved Service: Repair and calibration of Campbell Scientific dataloggers andtemperature sensors and all other instruments sold by Campbell Scientific.
Qualification Date: 1/26/89
Qualified By: U.S. Geological Survey YMP QA Office
Method of Qualification: Surveillance USGS-89-S10
Reevaluation Date: 1/90
Vendor: LI-COR, Inc.4421 Superior StreetLincoln, Nebraska 68504
Approved Services: Calibration of LI-COR pyranometers
Qualification Date: 1/30/89
Qualified By: U.S. Geological Survey YMP QA Office
Method Of Qualification: Surveillance USGS-89-S11
Reevaluation Date: 1/80
Vendor: USGS Hydrologic Instrumentation FacilityGulf Coast Hydroscience Center Bldg. 2101
Stennis Space CenterBay St. Louis, MS 39529
Approved service: calibration of flow meters
Qualification Date: 3/23/89
Qualified By: YMP-USGS QA Office
Method of Qualification: Surveillance
Reevaluation Date: 8/23/90
Page 7 of 7Eff. Date: April 19, 1989
APPROVED VENDORS--CALIBRATION SERVICES
Vendor: IFR Incorporated10200 West York StreetWichita, Kansas 67215(316) 522-4981
Approved Service: Calibration of IFR Model M/AM-1200 communication test set
Qualification Date: 4/10/89
Qualified By: YP-USGS QA Office
Method of Qualification: Supplier History
Reevaluation Date: 4/10/90
Vendor: Cushman Electronics2144 Bering DriveSan Jose, California 95131
(408) 42-8100
Approved Service: Calibration of Cushman communications test set
Qualification Date: April 12, 1989
Qualified By: YMP-USGS QA Office
Method of Qualification: Supplier History
Reevaluation Date: 4/10/90
U. S. Geological Survey345 Middlefield RD.Manlo Park C 94025
YMP-USGS.QMP-12.Ol. R2Attachment 1
YMP-USGS QA CALIBRATION FORM
Instrument Description Soltec C/CCS
Unique Identification Number (i.e. Model# , Serial , and/or other ID #)
Model 6141, SN #17580403
Calibration Date 6-24-87 Calibration Expiration Date 6-24-89
Technical Procedure Used for Calibration GPP-21
Instrument Location Menlo Park
Organizational Unit (i.e. NHP) GD
Calibrated By Intertyme Metrology
Required Range and Accuracy Mfgs. Specs
Calibration Standard Used NBS Traceable
Comments Inactive as of 3-15-89
Name of Responsible PI John Sass (E. Smith)
Signature Person Completing form
YMP-USGS-QMP-12.01 R2Attachment 1
YMP_USGS QA CALIBRATION FORM
Instrument Description Mettler Balance
Unique Identification Number (i.e. Model , Serial #, and/or other ID# )
Model H-18 SN 503969
Calibration Date 12-7-88 Calibration Expiration Date 12-7-89
Technica1 Procedure Used for Calibration GPP-22 _
Instrument Location Menlo Park
organizational Unit (i.e. NP, GD) GD
Calibrated By A. A. Balance Co
Required Range and Accuracy NBS Traceability, per GPP-22
Calibration Standard Used NBS Traced weights
Coments Inactive as of 3-15-89
Name of Responsible PI John Sass (E. Smith)
...
YMP-USGS-QMP-12.01, R2Attachment 1
YMP_USGS QA CALIBRATION FORM
Instrument Description
Unique Identification Number (i.e. Model #, Serial .and/or other ID )
Calibration Date Calilration Expiration ate
Technical Procedure Used for Calibration
Instrument Location
Organizational Unit (i.e. NHP, CD)
Calibrated By
Required Range and Accuracy
Calibration Standard Used
Comments
Name of Responsible PI
Signature of Person Completing Form Date
"BEST AVAILABLE COPY"
U. S. Goologlcal Survey345 Middlefield Rd.Manlo Park, CA 94025
RECEIPT FOR CASH-SUBVOUCHER
YMP-USGS-QMP-12.01 R2Attachment 1
YMP-USCS QA CALIBRATION FORM
Instrument Description Soltec C/CCS
Unique Identification Number (i.e. Model *, Serial #, and/or other ID #)
Model 6141, S #17580403
Calibration Date 6-24-87 Calibration Expiration Date 6-24-89
Technical Procedure Used for Calibration GPP-21
Instrument Location Menlo Park
Organizational Unit (i.e. NHP, GD) GD
Calibrated By Intertyme Metrology
Required Range and Accuracy Mfqs. Specs
Calibration Standard Used NBS Traceable
Comments Inactive as of 3-15-89
Name of Responsible P1 John Sass (E. Smith)
SIGNATURE Person Completing Form Date
YMP USGSQMP-12.0l. R2Attachment 1
YMP-USGS QA CALIBRATION FORM
Instrument Description Mettler Balance
Unique, Identification Number (i.e. Model #, Serial #, and/or other ID #)
Model H-18, SN 503969
Calibration Date 12-7-88 Calibration Expiration Date 12-7-89
Technical Procedure Used for Calibration GPP-22
Instrument Location Menlo Park
Organizational Unit (i.e. NHP, GD) GD
Calibrated By A. A. Balance Co
Reqired Range and Accuracy NBS Traceability, per GPP-22
Calibration Standard Used NBS Traced weights
Comments Inactive as of 3-15-89
Name of Responsible PI John Sass (E. Smith)
YMP-USGS-QMP-l2.01, R2Attachment 1
YMP-USGS QA CALIBRATION FORM
Instrument Description
Unique Identification Number (i.e. odel #, Serial and/or other ID *)
Calibration Date Calibration Expiration Date
Technical Procedure Used for Calibration
Instrument Location
Organizational Unit (i.e. NHP, GD)
Calibrated By
Required Range and Accuracy
Calibration Standard Used
Comments
Name of Responsible
Signature of Person Completing Form Date
-
WMPO STANDARD DEFICIENCY REPORT N-QA-0383/87
a Requirement (Audit Checklist Reference. if Applicable)(Audit Item Nos. 12.2, 12.3, 12.4, 12.5, 12.7, 12.9, 12.12, 12.13)A. -NNWSI-USGS-QMP-12.01, Rev.- 1, Para. 5.A-a, requires that all equipmentused be marked indicating the calibration statue showing unique equipment
DeficiencyContrary to the above listed requirements, during the review of USGS measuringand test equipment the following deficiencies were observed:
Recommended Action(s)1. Correct the deficiencies identified.2. Determine if similar deficiences exist for other M&TE or the associated
l6 Cause of the Condition & Corrective Action to Prevent RecurrenceWhen QMP-12.01 is next revised, language will 17 Effective Date 9-30-88be incorporated to identify methods appropriatefor control of inactive instruments. In addition the readiness reviews that arebeing conducted at this time will identify the need for equipment calibrationprior to any equipment being used to collect NWSI data.
WMPO STANDARD DEFICIENCY REPORT N-QA-038CONTINUATION SHEET 10/86
8 Requirement ( continued )
identification, date calibrated, date recalibration is due, procedure number andcalibrator.
B. NSI-USGS-QMP-12.01, Rev. 1, Para. 5.3, requires that standards used forcalibration of instruments be raceable to the National Bureau of Standards (S) orother known standards; this includes primary and working standards. If BS standardsdo not exist, the reference standard used is to be supported by certificates,reports, or data sheets attesting to the date, accuracy, and conditions under whichthe results were obtained. If reference standards are used, they are required to bestored and handled in such a way as to maintain the required accuracy andcharacteristics of the standard.
C. NNWSI-USGS-QAPP-01, Rev. 4, Para. 12.2.2, requires measuring and test equipmentto be calibrated, adjusted, and maintained at prescribed intervals. In addition,NNWSI-USGS-QMP-12.01, Rev. 1, Para. 5.4.2, requires that instruments that are out ofcalibration be tagged by attaching a hold-tag, or otherwise segregated and not useduntil recalibrated.
D. NNWSI-USGS-QMP-12.01, Rev. 1, Para. 5.8, requires that up-to-date records bemaintained by the QA office of all equipment calibrations and their status.
E. NNWSI-USGS-QMP-12.01, Rev. 1, Para. 5.8.2 and 5.8.3, require that the USGS QAoffice to enter the information into a calibration tracking system and provide theoriginating PI a copy, along with quarterly listings of instruments in thecalibration register and their calibration status.
9 Deficiency ( continued )
A. Tag identification did not correspond to the serial number that was on the actualmanufacturers tag. For example, A. C. Voltmeter SN O9B6A27296, -425078.
B. NBS test numbers or other acceptable references to provide traceability to knownstandards were not observed on the majority of records reviewed. Examples include,Mettler Balance, model #5-18, S/N-503969; Soltec Constant Current Source, model#6141, S/N-17580403; A/C Voltmeter, S/X-0985A27296. Note: This was previouslyidentified via SDR 070 during the performance of WMPO Audit 7-6/87-7.
C. A/C Voltmeter, S/N-0986A27296 was due for calibraaticn 3/5/88 and was found in ancn-segregrated area with no hold tag attached; Magnetometer, model #G-816, S/N-1011due 3/5/88- no hold tag;. Note: This was previously identified via WMPOSurveillance SR-88-001 s an Observation 2. The USGS response indicated that allthe PIs would be reminded that calibration records should indicate periods whenProject equipment is removed from the calibration program. Also noted was that theUSGS-Menlo Park personnel were not appraised of the commitment made via theUSGS-Denver, CO. office.
WMPO STANDARD DEFICIENCY REPORT N-QA-038CONTINUATION SHEET 10/86
9 Deficiency ( continued )
D. Not all the required information was contained on the Q calibration formsreviewed, missing information included the range and accuracy, calibration date,calibration procedure and the responsible PI.
E. The USGS M&TE tracking system has not been fully developed, nor have quarterlyupdates been provided to the responsible Is. No master list of USGS-M&TE wasavailable so it was impossible to determine what M&TE was used/might be used on theNNWSI Project.
10 Recommended Actions continued )
records.3. Determine the impact of these deficienices on the validity of any data collected.4. Review procurement document requirements to determine if adequate requirementsfor calibration certifications are specified. Develop a minimum requirements list forcertifications submitted to USGS.5. Develop the required calibration tracking system as identified in QMP-12.01 andprovide the Is with the updates as stipulated.6. Provide appropriate training to all affected USGS personnel to ensure theirunderstanding of the QA program requirements.
16. Cause of the Condition & Corrective Action to Prevent Recurrence (continued)
A calibration tracking system has been implemented in accordance with QMP-12.01,R1, with the first calibration register delivered to the PIs on 4-5-88.
United States Department of the IteriorGEOLOGICAL SURVEY
BOX 25046 MS 421DENVER FEDERALCENTER
DENVER, COLORADO 80225-0046
July 6, 1988
Dr. Carl Gertz, Project anagerWaste Management Project OfficeU.S. Department of EnergyP.O. Box 8518Las Vegas, NV 9193-8518
ATTN: James Blaylock
SUBJECT: USGS Responses to WMPO SDRs 132-140 (WMPO Action Item 88-1861)
Enclosed are the USGS responses to WMPO SDRs 132-140 that weregenerated during WMPO Audit 88-03 of the NNWSI-USGS activities inMenlo Park, CA.
If you have any questions or comments, please contact Joe Willmon.
Sincerely,
L. R. HayesTehnica1 Project Officer. NNWSIU.S. Geological Survey
LRH: BEL: hh
cc w/enclosures: J. Devine, USGS, Reston, VAV. Schneider, USGS, Reston, VAJ. R. Willmon, USGS, Denver, COR. B. Raup. Jr., USGS, Denver, COE. J. Helley, USGS, Menlo Park, CAJ. J. Brogan, SAIC, Las Vegas, NV (original SDRs enclosed)H. H. Caldwell, SAIC, Las Vegas, NVUSGS RC 1293/1/QA File 3.16.02, SDRs
cc w/o enclosures: NNWSI Chron
Page..of7
SDR 139 Rev. 0
Verification of Remedial, Investigative and Corrective Actions.
A. Tag identification was verified to be correct for AC Voltmeter S/N0986A27296.
B. Calibration records were reviewed to verify traceability to NIST (NBS)standards for Mettler Balance Model H-18, SN 503969 and SoltecConstant Current Source, Model 6141 S/N 17580403.
C. AC Voltmeter SN 0986A27296 and Magnetometer Model G-816, S/N 1011 wereverified to be tagged as being in an inactive status for YMPactivities. Calibration is required prior to use for YMP activities.
D. QA Calibration Forms for Mettler Balance and Soltec Constant CurrentSource cited were verified to be filled out as required by procedure.The Q Calibration form for the cited AC Voltmeter is filled toindicate that the instrument is in an inactive status for YMPactivities.
E. The USGS QA Calibration Tracking System was verified to be developedand in place.