Congestion management methods
CM guidelines, annex to Regulation (EC) 1228/2003, a legal framework for congestion management • No congestion – no restriction of access, CM methods shall be market based• Capacity shall be allocated only by using explicit or implicit auction• CM mechanism may need both long- and short-term allocation, in regions where forward financial market are well developed all capacity may be allocated through implicit auction day-ahead • For intra-day trade continuous trading may be used
24 April 2009
2
Jyrki Uusitalo
DEDE
RoI
RoI
UKUK
FRFR
ESESPTPTITIT
AUAUSISI
GR
GR
RO
RO
CZCZ SKSK
NLNL
DKDK
NO
NO SESE
FIFI
EST
ESTLVLVLTLT
BG
BG
Cro
Cro
ME
BABA
LULU
II
RSRS
CYCY
PLPLBEBE
FYROM
FYROM
HUHU
NINI
CHCH
Transmission capacity
Maximum capacity complying with secure network operation rules has to be made available for the market participants
Coordination between neighbouring TSOs is essential• Transmission model, capacity calculation, information exchange, real-time operation• Clear assignments of responsibility, identical timeframes and gate closures• Transmission outage planning and timing
24 April 2009
3
Jyrki Uusitalo
550
1000700
1750
600
16001200
1100
1500
1400
120
1400
2200
600
50
100
60
950
350800
700
600
1350
100
300
600
Transparency
TSO shall publish:• Data related to network availability, access and use, methods applied for congestion management• Scheme for the calculation of capacity for different timeframes, operational security standards• Data concerning cross-border trade, available and nominated capacity, physical flows
Transparency ensures credibility for TSO activities and electricity market
24 April 2009
4
Jyrki Uusitalo
TSO Experiences
Implicit auction is an efficient tool for TSO to handle congestions• Secure flow in congested cross-section combined with effective market solution• Capacity allocated with one auction by PX • Smooth coupling of different regions
Challenge to define appropriate network areas when developing market is using network more in it's capacity limits
Congestion management has a significant role when TSO promotes development of effective electricity market
24 April 2009
5
Jyrki Uusitalo
Keeping the lights on in Finland