CMS PRODUCTION CENTER AT PINSTECH
PAEC1 is participating in CMS Collaborationprogramme by establishing its Production centre at
Computer Division, PINSTECH since September 2002.
Established Cluster of 10 PCs in July 2003
Members
[email protected]@cern.ch
1. Naheed Batool
[email protected]. Shahid Aslam
[email protected]. Asad Mahmood
[email protected]. Altaf Ahmed Huqqani
[email protected]. Asif Osman
e-mailName
18 CassettesDLT Tape Drive 40/80 GBBackup Device
6Pentium-IV 2.4 GHz512MB RAM, 80GB Disk
Cluster Nodes
5Pentium-IV 2.4 GHz512MB RAM, 80GB Disk
Grid Nodes
110
Dell Power Volt 320 GBIDE Drives
Storage Capacity
11 MbpsRadio Link
QuantitySpecificationItems
Hardware ResourcesHardware Resources
Production Activities
• Participated in LHC Data Challenges 2004 (DC-04)• Produced Simulated Data and Transferred to CERN• LCG Grid Deployment• Preparing our site for CMS production• Pre-release Testing of Production Tools• Published report on “Deployment of Grid Node”
April-2005
PAEC1 (PINSTECH) Production Center
No. of Assignments Completed = 79
•Data Produced = 370GB
•Total No. of Events produced = 654.2k
•No. of Files transferred to CERN= 5095
CMS Production
0.2K02
275.6 K22
30.1 K04
254.3 K30
94 K21
PINSTECHNo.Assign. =79
DSTDigitizationdigi
ReformattingOOHit
SimulationOSCAR/ CMSIM
Generation
Center
Pre-release testing
Participated in MCRunjob pre-releases testingTested McRunjob_fin050211b final releaseTested CMS Glide for Publishing service(Rel. Mon_Mar_28_09_35-25_2005)Tests based on full chain of productioncycle
Grid Deployment PAKGRID-LCG2
Yes2112PINSTECH
Registered WNSECEUICenter
CMKIN_4_1_0_dar
LCG-2_1_1
OSCAR_3_6_5_SLC3_dar
ORCA_8_7_1_SLC3_dar
Physics SWPackages
LCG-2_4_0LCG-2_3_1LCG-2_3_0LCGUpgraded
Feb-2005PAKGRID-LCG2 Uptime
743 hrs.CE Processing Hours4707No. of Jobs executed on PAKGRID- LCG2
6 Jobs176 Jobs1939 Jobs2459 Jobs 53.69 %LHCB
0.13 %ATLAS3.84 %CMS42.34 %DTEAM
CMS Production on LCG2CMS Production on LCG2
Used the LCG Tools: APTGET & YAIMUsed OS: Scientific Linux 3CMKIN test Assignment CompletedOSCAR test Assignment CompletedPublished Data for OSCARDigi step is in progress
PK Production Centers PK Production Centers
24.6K
0
24K
275.6 K
Digitisation DSTReConstructionOOHit
SimulationOSCAR
GenerationProduction Centers
Software DevelopmentNIIT
--4.5K154.9K655KNCP44
--0020.1KKINPO
--4K54.3K24.3KHMC3
0.2K30.1 K254.3 K94 KPINSTECH79