CNG in a Municipal FleetCNG in a Municipal Fleet
October 19, 2012October 19, 2012
Empire Clean CitiesEmpire Clean CitiesAVT Conference, Lehman College, NYAVT Conference, Lehman College, NY
Joseph (Bud) Nicoletti, Jr., P.EJoseph (Bud) Nicoletti, Jr., P.E. . Commissioner of Public Works/City EngineerCommissioner of Public Works/City Engineer
The City of White PlainsThe City of White Plains
Compressed Natural Gas
DGE of $1.90 vs. $3.00+ Lowered emissions Much quieter No underground fuel tank; liability or
operational issues Eliminates current diesel engine complexities
(DEF, exhaust regen, etc.) Stationary engines as well as vehicles
CNGCNG Refueling Station Refueling Station
More Info Needed?More Info Needed?
Joseph (Bud) Nicoletti, Jr., P.E.Joseph (Bud) Nicoletti, Jr., P.E.
Department of Public WorksDepartment of Public Works
The City of White Plains, NYThe City of White Plains, NY
914-422-1210914-422-1210
[email protected]@whiteplainsny.gov
FLNA Fleet2012 Strategy
Gino PorterSenior Fleet Manager, Fleet Operations
Frito Lay has Incredible Brands…
7th Largest Fleet in North America…
280 EV’s1 Million Miles
67 NGV900,000 Gallons Saved Annually
2013 Max MPG (30)
165 Propane
IMPLEMENT
High Efficiency Route Truck
Aerodynamic Tractor Trailer
PILOT
Next Gen Aero30 MPG Truck
Hydrogen Solar
CNG/LNG
PHEV Trailer Geometry
STUDY
In 2012 the pipeline grew stronger and the tactics are accelerating…
Electric GPS
Propane
47.8
45.7 43.
4 41.2
‘08 ‘09 ‘10 ‘11
50%
14%
39 3735
3331
2927
2523
‘12 ‘13 ‘14 ‘15 ‘16 ‘17 ‘18 ‘19 ‘20
Most Fuel-Efficient Fleet in Americathrough People, Process, & Technology…
2008 2012 20202010
GPS, Idle Reduction Tactics, Road To Green, Top Gun, Aero Dynamics, Aux Heaters, Idle Shutdowns, Tire Inflation, Rolling Resistance, RTRR.
Greg Brayman
Phoenix Beverage/Demon Logistics
ARRA Funded Vehicles
• 4-CNG 2011 F-550 • 2 CNG Freightliner M112
Joseph Berman
Price Chopper
PC EV Charging Station Ecosystem Development Project
• Goal: Most densely networked privately held EV charging station ecosystem in the Northeast.
• Motivations: public benefit, GHG reduction, technology transfer, green jobs
• PON 2301 NYSERDA grant funding for initial NYS deployment
• Pilot location in Niskayuna, NY – November 2012 anticipated activation
• PON 2301 First Round Funding: Capitol region cluster (4 Locations)
• PON 2301 Second Round Funding: Rt 90 and Syracuse Cluster (8 proposed locations)
• 6 State roll out strategy• Strategic Partnership with General
Electric
GE WattStation EVSE Technology• Retractable cord• Modular upgrades• Safety First: Features NEMA 3R
indoor/outdoor rating and meets all UL and fire safety standards
• Easy to Use: Level II charging with service needs of 208-240VAC at 40A.
• Manage, Monitor and Maintain: Web enabled (Cloud based) hosting
• PC EV Ecosystem usage will be free to the public for the foreseeable future.
Capitol Region Cluster
• 442 Balltown Rd. Schenectady, NY
• 1892 Central Ave., Albany, NY
• 15 Park Ave, Clifton Park, NY
• 1395, New Scottland Rd., Slingerlands
• 873 New Loudon Rd. Latham
Proposed I90/Syracuse Alternative Transportation Route Locations:
• 4731 Onondaga Blvd, Syracuse, NY
• 2515 Erie Blvd, East Syracuse, NY
• 5701 E. Circle Drive, Cicero, NY
• 3863 State Route 31, Liverpool, NY
• 1790 Black River Blvd, Rome, NY
• 1917 Genesee St., Utica, NY• 6025 NYS Route 5, Palatine
Bridge, NY• 139 Sanford Farms Plaza,
Amsterdam, NY