Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance Purpose Use this procedure to execute Cost Centers: Actual/Plan/ Variance report. In U2K2, various cost center reports have to be generated when planning is completed. Once the actual values are posted, comparison reports between plan and actual has to be generated to keep a track of the expense. Standard reports in cost center reporting are: 1. Cost Centers: Actual/Plan/ Variance (S_ALR_87013611) 2. Range: Cost Centers (S_ALR_87013612) 3. Range: Cost Elements (S_ALR_87013613) 4. Activity Types: Period Breakdown (S_ALR_87013646). Trigger Perform this procedure when you need to display Cost Centers: Actual/Plan/Variance Report. Menu Path Use the following SAP Easy Access menu path(s) to begin this transaction: Accounting > Controlling > Cost Center Accounting > Information System > Reports for Cost Centers > Plan/Actual Comparison > S_ALR_87013611 - Cost Centers: Actual/Plan/Variance Transaction Code S_ALR_87013611 Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display Cost Center Actual Plan Variance.udc 1/56
Transcript
Page 1: CO S ALR 87013611 JPN Display Cost Center Actual Plan Variance

Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance

Purpose

Use this procedure to execute Cost Centers: Actual/Plan/ Variance report.

In U2K2, various cost center reports have to be generated when planning is completed. Once the actual values are posted, comparison reports between plan and actual has to be generated to keep a track of the expense.

Standard reports in cost center reporting are:

1. Cost Centers: Actual/Plan/ Variance (S_ALR_87013611)

2. Range: Cost Centers (S_ALR_87013612)

3. Range: Cost Elements (S_ALR_87013613)

4. Activity Types: Period Breakdown (S_ALR_87013646).

Trigger

Perform this procedure when you need to display Cost Centers: Actual/Plan/Variance Report.

Menu Path

Use the following SAP Easy Access menu path(s) to begin this transaction:

Accounting > Controlling > Cost Center Accounting > Information System > Reports for Cost Centers > Plan/Actual Comparison > S_ALR_87013611 - Cost Centers: Actual/Plan/Variance

Transaction Code

S_ALR_87013611

Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display

Cost Center Actual Plan Variance.udc

1/49

Page 2: CO S ALR 87013611 JPN Display Cost Center Actual Plan Variance

Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance

Screen Flow

Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display

Cost Center Actual Plan Variance.udc

2/49

Page 3: CO S ALR 87013611 JPN Display Cost Center Actual Plan Variance

Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance

Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display

Cost Center Actual Plan Variance.udc

3/49

Page 4: CO S ALR 87013611 JPN Display Cost Center Actual Plan Variance

Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance

Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display

Cost Center Actual Plan Variance.udc

4/49

Page 5: CO S ALR 87013611 JPN Display Cost Center Actual Plan Variance

Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance

Procedure

1. In SAP, start the transaction using the menu path or transaction code.

SAP Easy Access

2. Double-click the Accounting node .

3. Double-click the Controlling node .

4. Double-click the Cost Center Accounting node .

5. Double-click the Information System node .

Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display

Cost Center Actual Plan Variance.udc

5/49

Page 6: CO S ALR 87013611 JPN Display Cost Center Actual Plan Variance

Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance

6. Double-click the Reports for Cost Center Accounting node .

7. Double-click the Plan/Actual Comparisons node .

8. Double-click the S_ALR_87013611 - Cost Centers:

Actual/Plan/Variance node .

You can also enter "S_ALR_87013611" in the command field "

" and click Enter " " to go directly to this transaction.

9. Start the transaction using the menu path or transaction code.

Cost Centers: Actual/Plan/Variance: Selection

Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display

Cost Center Actual Plan Variance.udc

6/49

Page 7: CO S ALR 87013611 JPN Display Cost Center Actual Plan Variance

Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance

Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display

Cost Center Actual Plan Variance.udc

7/49

Page 8: CO S ALR 87013611 JPN Display Cost Center Actual Plan Variance

Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance

10.

As required, complete/review the following fields:

Field R/O/C Description

Controlling Area

R Organizational unit within a company, used to represent a closed system for cost accounting purposes. A controlling area may include single or multiple company codes that may use different currencies. These company codes must use the same operative chart of accounts.All internal allocations refer exclusively to objects in the same controlling area.

Example: TH01

Fiscal Year R Period, 12 months as a rule, for which the company is to create its inventory and balance sheet. The fiscal year can be the same as the calendar year, but does not have to be. Example: 2008

From Period

R Beginning value of a period/year to be entered when specifying a range. Example: 1

To Period R Ending value to be entered when specifying range. Example: 10

Plan Version

R A collection of functions for cost center planning, including: Writing of line items (plan) Generating a beginning inventory Copying or referencing plan data from a version

Example: 0

11.

Click the Cost Center Group edit field .

Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display

Cost Center Actual Plan Variance.udc

8/49

Page 9: CO S ALR 87013611 JPN Display Cost Center Actual Plan Variance

Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance

12.

Click the Cost Center Grouppossible entries button .

Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display

Cost Center Actual Plan Variance.udc

9/49

Page 10: CO S ALR 87013611 JPN Display Cost Center Actual Plan Variance

Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance

Cost Center Group

13.

As required, complete/review the following fields:

Field R/O/C Description

Controlling Area

R Organizational unit within a company, used to represent a closed system for cost accounting purposes. A controlling area may include single or multiple company codes that may use different currencies. These company codes must use the same operative chart of accounts.All internal allocations refer exclusively to objects in the same controlling area.

Example: TH01

Cost Center Group

R Hierarchical group of cost centers defined and organized according to selected criteria. Example: 0*

14.

Click the Enter button .

Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display

Cost Center Actual Plan Variance.udc

10/49

Page 11: CO S ALR 87013611 JPN Display Cost Center Actual Plan Variance

Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance

Selection Cost Center Group (1) 27 Entries found

15.

Double-click the 02SERVICE List item .

Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display

Cost Center Actual Plan Variance.udc

11/49

Page 12: CO S ALR 87013611 JPN Display Cost Center Actual Plan Variance

Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance

Cost Centers: Actual/Plan/Variance: Selection

16.

Click the Or value(s) edit field .

17.

Click the Or value(s) possible entries button .

Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display

Cost Center Actual Plan Variance.udc

12/49

Page 13: CO S ALR 87013611 JPN Display Cost Center Actual Plan Variance

Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance

Cost Element (1)

18.

As required, complete/review the following fields:

Field R/O/C Description

Cost Element

R Classification of the organization's valuated consumption of production factors within a controlling area. Each cost element corresponds to a cost-relevant item in the chart of accounts.

Example: 410*

19.

Click the Enter button .

Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display

Cost Center Actual Plan Variance.udc

13/49

Page 14: CO S ALR 87013611 JPN Display Cost Center Actual Plan Variance

Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance

Cost Element (1) 8 Entries found

20.

Double-click the 41001020 List item .

Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display

Cost Center Actual Plan Variance.udc

14/49

Page 15: CO S ALR 87013611 JPN Display Cost Center Actual Plan Variance

Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance

Cost Centers: Actual/Plan/Variance: Selection

21.

Click the Multiple selection button .

Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display

Cost Center Actual Plan Variance.udc

15/49

Page 16: CO S ALR 87013611 JPN Display Cost Center Actual Plan Variance

Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance

Multiple Selection for Or value(s)

22.

As required, complete/review the following fields:

Field R/O/C Description

Single value

R Key in single value for this parameter. Example: 70611001

Single value

R Key in single value for this parameter. Example: 41801010

Single value

R Key in single value for this parameter. Example: 41701010

Single value

R Key in single value for this parameter. Example: 31812001

Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display

Cost Center Actual Plan Variance.udc

16/49

Page 17: CO S ALR 87013611 JPN Display Cost Center Actual Plan Variance

Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance

23.

Click the Copy button .

Cost Centers: Actual/Plan/Variance: Selection

24.

Click the Execute button .

Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display

Cost Center Actual Plan Variance.udc

17/49

Page 18: CO S ALR 87013611 JPN Display Cost Center Actual Plan Variance

Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance

Cost Centers: Actual/Plan/Variance

25.

Double-click the 7,064,166.66 Plan Costs item .

Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display

Cost Center Actual Plan Variance.udc

18/49

Page 19: CO S ALR 87013611 JPN Display Cost Center Actual Plan Variance

Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance

Select Report

26.

Double-click the Cost Centers: Plan Line Items List item

.

Display Plan Cost Line Items for Cost Centers

Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display

Cost Center Actual Plan Variance.udc

19/49

Page 20: CO S ALR 87013611 JPN Display Cost Center Actual Plan Variance

Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance

Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display

Cost Center Actual Plan Variance.udc

20/49

Page 21: CO S ALR 87013611 JPN Display Cost Center Actual Plan Variance

Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance

27.

Click the Change Layout button .

Change layout

28.

Click the Document Number List item .

29.

Click the Show Selected Fields button .

30.

Click the Cost Center List item .

31.

Click the Show Selected Fields button .

32.

Click the Cost Center List item .

Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display

Cost Center Actual Plan Variance.udc

21/49

Page 22: CO S ALR 87013611 JPN Display Cost Center Actual Plan Variance

Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance

33.

Click the Selected Row(s) to Top button .

Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display

Cost Center Actual Plan Variance.udc

22/49

Page 23: CO S ALR 87013611 JPN Display Cost Center Actual Plan Variance

Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance

34.

Click the Document Number List item .

35.

Click the Selected Row(s) to Top button .

36.

Click the Selected row(s) down one position button .

37.

Click the Unit of Measure List item .

38.

Click the Hide Selected Fields button .

39.

Click the Enter button .

Display Plan Cost Line Items for Cost Centers

Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display

Cost Center Actual Plan Variance.udc

23/49

Page 24: CO S ALR 87013611 JPN Display Cost Center Actual Plan Variance

Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance

40.

Click the Cost Center column header .

Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display

Cost Center Actual Plan Variance.udc

24/49

Page 25: CO S ALR 87013611 JPN Display Cost Center Actual Plan Variance

Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance

41.

Click the Sort in Ascending Order button .

42.

Click the 251 List item .

43.

Click the Details button .

Details

44.

Click the Enter button .

Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display

Cost Center Actual Plan Variance.udc

25/49

Page 26: CO S ALR 87013611 JPN Display Cost Center Actual Plan Variance

Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance

Display Plan Cost Line Items for Cost Centers

45.

Click the Back button .

Display Plan Cost Line Items for Cost Centers

46.

Click the Yes button .

Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display

Cost Center Actual Plan Variance.udc

26/49

Page 27: CO S ALR 87013611 JPN Display Cost Center Actual Plan Variance

Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance

Cost Centers: Actual/Plan/Variance

47.

Double-click the 2,041,091.21 Act. Costs item .

Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display

Cost Center Actual Plan Variance.udc

27/49

Page 28: CO S ALR 87013611 JPN Display Cost Center Actual Plan Variance

Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance

Select Report

48.

Double-click the Cost Centers: Actual Line Items list item

.

Display Actual Cost Line Items for Cost Centers

Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display

Cost Center Actual Plan Variance.udc

28/49

Page 29: CO S ALR 87013611 JPN Display Cost Center Actual Plan Variance

Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance

Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display

Cost Center Actual Plan Variance.udc

29/49

Page 30: CO S ALR 87013611 JPN Display Cost Center Actual Plan Variance

Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance

49.

Click the Cost Ctr column header .

50.

Click the Sort in Ascending Order button .

51.

Click the Subtotals button .

Define sorting/subtotals

52.

Click the Calculate subtotals / Cost Center check box .

53.

Click the Enter button .

Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display

Cost Center Actual Plan Variance.udc

30/49

Page 31: CO S ALR 87013611 JPN Display Cost Center Actual Plan Variance

Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance

Display Actual Cost Line Items for Cost Centers

54.

Click the 800000272 List item .

55.

Click the Document button .

Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display

Cost Center Actual Plan Variance.udc

31/49

Page 32: CO S ALR 87013611 JPN Display Cost Center Actual Plan Variance

Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance

List of Documents in Accounting

56.

Double-click the 0800000272 List item .

Display Actual Cost Documents

Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display

Cost Center Actual Plan Variance.udc

32/49

Page 33: CO S ALR 87013611 JPN Display Cost Center Actual Plan Variance

Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance

Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display

Cost Center Actual Plan Variance.udc

33/49

Page 34: CO S ALR 87013611 JPN Display Cost Center Actual Plan Variance

Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance

57.

Click the Expand icon .

58.

Click the 800000272 List item .

59.

Click the Details button .

Detail: Display

60.

Click the Overview list button .

Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display

Cost Center Actual Plan Variance.udc

34/49

Page 35: CO S ALR 87013611 JPN Display Cost Center Actual Plan Variance

Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance

Display Actual Cost Documents

61.

Click the Document button .

Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display

Cost Center Actual Plan Variance.udc

35/49

Page 36: CO S ALR 87013611 JPN Display Cost Center Actual Plan Variance

Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance

List of Documents in Accounting

62.

Double-click the 1200000005 List item .

Document Overview - Display

Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display

Cost Center Actual Plan Variance.udc

36/49

Page 37: CO S ALR 87013611 JPN Display Cost Center Actual Plan Variance

Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance

Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display

Cost Center Actual Plan Variance.udc

37/49

Page 38: CO S ALR 87013611 JPN Display Cost Center Actual Plan Variance

Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance

63.

Click the Display document header button .

Document Header: Company Code 2632

64.

Click the Enter button .

Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display

Cost Center Actual Plan Variance.udc

38/49

Page 39: CO S ALR 87013611 JPN Display Cost Center Actual Plan Variance

Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance

Document Overview - Display

65.

Click the Back button .

Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display

Cost Center Actual Plan Variance.udc

39/49

Page 40: CO S ALR 87013611 JPN Display Cost Center Actual Plan Variance

Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance

List of Documents in Accounting

66.

Click the Cancel button .

Display Actual Cost Documents

Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display

Cost Center Actual Plan Variance.udc

40/49

Page 41: CO S ALR 87013611 JPN Display Cost Center Actual Plan Variance

Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance

Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display

Cost Center Actual Plan Variance.udc

41/49

Page 42: CO S ALR 87013611 JPN Display Cost Center Actual Plan Variance

Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance

67.

Click the Back button .

Display Actual Cost Documents

68.

Click the Yes button .

List of Documents in Accounting

69.

Click the Cancel button .

Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display

Cost Center Actual Plan Variance.udc

42/49

Page 43: CO S ALR 87013611 JPN Display Cost Center Actual Plan Variance

Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance

Display Actual Cost Line Items for Cost Centers

70.

Click the Back button .

Display Actual Cost Line Items for Cost Centers

71.

Click the Yes button .

Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display

Cost Center Actual Plan Variance.udc

43/49

Page 44: CO S ALR 87013611 JPN Display Cost Center Actual Plan Variance

Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance

Cost Centers: Actual/Plan/Variance

72.

Click the 2549904 node .

73.

Click the 2549905 node .

74.

Click the 2549906 node .

75.

Click the 02SERVICE node .

76.

Click the Scroll right button .

Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display

Cost Center Actual Plan Variance.udc

44/49

Page 45: CO S ALR 87013611 JPN Display Cost Center Actual Plan Variance

Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance

77.

Click the Scroll right button .

78.

Click the Exit button .

Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display

Cost Center Actual Plan Variance.udc

45/49

Page 46: CO S ALR 87013611 JPN Display Cost Center Actual Plan Variance

Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance

Exit Report

79.

Click the Yes button .

Cost Centers: Actual/Plan/Variance: Selection

80.

Click the Exit button .

Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display

Cost Center Actual Plan Variance.udc

46/49

Page 47: CO S ALR 87013611 JPN Display Cost Center Actual Plan Variance

Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance

Note: You can also run the report using these steps on other Cost Center Reporting transactions.

You can either use the following transactions to execute:

"S_ALR_87013612", "S_ALR_87013613",and "S_ALR_87013646"

Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display

Cost Center Actual Plan Variance.udc

47/49

Page 48: CO S ALR 87013611 JPN Display Cost Center Actual Plan Variance

Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance

Result

You have displayed Cost Centers: Actual/Plan/ Variance report.

Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display

Cost Center Actual Plan Variance.udc

48/49

Page 49: CO S ALR 87013611 JPN Display Cost Center Actual Plan Variance

Work Instruction S_ALR_87013611 - JPN - Display Cost Center Actual Plan Variance

Scenario

Instructions

In this simulation you are required to: Display Cost Center: Actual/Plan/Variance Report in SAP ECC 6.0.

Required Data

This section provides the field data required to complete this exercise. Refer to this data sheet as necessary while performing the exercise.

Field Value

Controlling Area TH01

Fiscal Year 2008

From Period 1

To Period 10

Plan Version 0

Cost Center Group 02SERVICE

Cost Element 41001020

Cost Element 70611001

Cost Element 41801010

Cost Element 41701010

Cost Element 31812001

Thursday, July 16, 2009 CO_S_ALR_87013611_JPN_Display

Cost Center Actual Plan Variance.udc

49/49


Recommended