Environmental issues in Mongolian coal mining sector Ulaanbaatar 2014 Ministry of environment and green development Head of Environment and Natural resources department D.Enkhbat
Transcript
Page 1: Coal mongolia (eng) final_2014

Environmental issues in Mongolian coal mining sector

Ulaanbaatar 2014

Ministry of environment and green developmentHead of Environment andNatural resources department D.Enkhbat

Page 2: Coal mongolia (eng) final_2014

Content

1. Changes of environmental policy

2. Conservation – Coal mining

3. Requirement

Page 3: Coal mongolia (eng) final_2014

1. Changes of environmental policy

Environmental sector Mining sector

24Law

17Law

120By-lawGuideline

12By-law

Guideline

338Standards

17Standards

Page 4: Coal mongolia (eng) final_2014

1. Baseline study of environment

CHANGES OF ENVIRONMENTAL POLICY

Requirements on environmental impact

assessment

Planning

=Assessment

2. Strategically assessment

3. Cumulative Impact Assessment

4. EIA for project

5. Environmental audit

PUBLIC MONITORING, LIABILITY

Page 5: Coal mongolia (eng) final_2014

• Avoidance and minimization of impacts

• Impact mitigation

Environment management plan

Planning=

Monitoring

MONITORING

• Biodiversity offset

• Environmental friendly technology

• Chemical usage, storage and disposal

• Waste management

CHANGES OF ENVIRONMENTAL POLICY

Page 6: Coal mongolia (eng) final_2014

2. Environmental pollution from coal mining activity

• Habitat lost, fragmentation

• Pollution and Decrease of surface and groundwater resources

• Air pollution

Mining impact to ECOSYSTEM:

Page 7: Coal mongolia (eng) final_2014

Coal deposit 62%Dry steppe and desert

ecosystem

Page 8: Coal mongolia (eng) final_2014

• Open plains and steppe support movement and corridor of migration species

• Limited surface water resource

• Biodiversity rehabilitation requires long-term

PARTICULARITY OF STEPPE AND DESERT ECOSYSTEM

Page 9: Coal mongolia (eng) final_2014

Ecologically important areas andPlanned infrastructure

Current railroad

Mining road

Planned SAINSHAND-TT railroad

Planned Bayangobi -Shivee railroad

PlannedTavannuur-Burgastai railroad

Other proposed railroad

Other proposed highway

Transportation infrastructure

Provincial bordersState Protected areaBorder portPotential Habitat of wildlife movement

Potential prioirity haibtat

Page 10: Coal mongolia (eng) final_2014

Under passages and green bridgeImpact mitigation of wildlife movement and habitat

Impact mitigation ofwildlife movement and

habitat fromtransportationinfrastucture

SOLUTION

Page 11: Coal mongolia (eng) final_2014

Biodiversity off-set

Avoidance

Mitigation

Rehabilitation

Biodiversity off-set

Impact mitigation steps

Page 12: Coal mongolia (eng) final_2014

Prohibited zones - Mining activity by Laws 39,8%

Page 13: Coal mongolia (eng) final_2014

Biodiversity important hot spotsand mining license areas

Page 14: Coal mongolia (eng) final_2014

Conclusion• Introduction of environmentally friendly

technologies

• Improvement of environmental protection and control

• Linear infrastructure (transportation and power-line and etc.) design should be developed no barrier for migration species in open area

Requirements

Page 15: Coal mongolia (eng) final_2014

THANK YOU.