Coastal Use Permit Program Pipeline Permitting Scott Angelle, Secretary Louisiana Department of Natural Resources Coastal Management Division October, 2006
Transcript
Page 1: Coastal Use Permit Program Pipeline Permitting Coastal Use Permit Program Pipeline Permitting Scott Angelle, Secretary Louisiana Department of Natural.

Coastal Use Permit ProgramPipeline Permitting

Coastal Use Permit ProgramPipeline Permitting

Scott Angelle, SecretaryLouisiana Department of Natural Resources

Coastal Management DivisionOctober, 2006

Scott Angelle, SecretaryLouisiana Department of Natural Resources

Coastal Management DivisionOctober, 2006

Page 2: Coastal Use Permit Program Pipeline Permitting Coastal Use Permit Program Pipeline Permitting Scott Angelle, Secretary Louisiana Department of Natural.

Important Assumptions• Pipelines are necessary for our way of life.

safety and security of operations of pipelines.

Adequate maintenance and repair of pipelines

• We (government agencies and the industry) cannot afford a loss of confidence by the public in the pipeline system

• A coordinated response to the needs of maintenance and repairs of pipelines by government agencies, at all levels, and by the industry is needed

Page 3: Coastal Use Permit Program Pipeline Permitting Coastal Use Permit Program Pipeline Permitting Scott Angelle, Secretary Louisiana Department of Natural.

Urgency of Need

Emergency?

• Title of the Louisiana Administrative Code 43§723.

• Rules and Procedures for Coastal Use Permits

• 3. Emergency Uses• a. Coastal use permits are not

required in advance for conducting uses necessary to correct emergency situations.

Page 4: Coastal Use Permit Program Pipeline Permitting Coastal Use Permit Program Pipeline Permitting Scott Angelle, Secretary Louisiana Department of Natural.

Emergency Uses• i. Emergency situations are those

brought about by natural or man-made causes, such as storms, floods, fires, wrecks, explosions, spills, which would result in hazard to life, loss of property, or damage to the environment if immediate corrective action were not taken. This exemption applies only to those corrective actions which are immediately required for the protection of lives, property, or the environment necessitated by the emergency situation.

Page 5: Coastal Use Permit Program Pipeline Permitting Coastal Use Permit Program Pipeline Permitting Scott Angelle, Secretary Louisiana Department of Natural.

What is an EmergencyVarious agencies have various definitions

hazard to life, loss of property, or (does not include economic loss due to loss of production)

damage to the environment

Leaking pipeline is an emergencyPipeline that might leak might be an

emergency

Page 6: Coastal Use Permit Program Pipeline Permitting Coastal Use Permit Program Pipeline Permitting Scott Angelle, Secretary Louisiana Department of Natural.

Emergency uses Continued

• Prior to undertaking such emergency uses, or as soon as possible thereafter, the person carrying out the use shall notify the secretary and the local government, if the use is conducted in a parish with an approved local program, and give a brief description of the emergency use and the necessity for carrying it out without a coastal use permit.

Page 7: Coastal Use Permit Program Pipeline Permitting Coastal Use Permit Program Pipeline Permitting Scott Angelle, Secretary Louisiana Department of Natural.

Emergency Uses Continued

• As soon as possible after the emergency situation arises, any person who has conducted an emergency use shall report on the emergency use to the approved local program or to the administrator. A determination shall be made as to whether the emergency use will continue to have direct and significant impacts on coastal waters. If so, the user shall apply for an after-the-fact permit. The removal of any structure or works occasioned by the emergency and the restoration of the condition existing prior to the emergency use may be ordered if the permit is denied in whole or in part.

Page 8: Coastal Use Permit Program Pipeline Permitting Coastal Use Permit Program Pipeline Permitting Scott Angelle, Secretary Louisiana Department of Natural.

What if it is not an emergency

Apply for a permit

Page 9: Coastal Use Permit Program Pipeline Permitting Coastal Use Permit Program Pipeline Permitting Scott Angelle, Secretary Louisiana Department of Natural.

Coastal Use Permits

• Require a 25 day public notice period

• Require that all landowners be given a copy of the application

• Average issuance time is just over 45 days for the simpler Coastal Use Permits.

Page 10: Coastal Use Permit Program Pipeline Permitting Coastal Use Permit Program Pipeline Permitting Scott Angelle, Secretary Louisiana Department of Natural.

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

2001 2002 2003

NDSI/GP

CUP

Oil and Gas AuthorizationsOil and Gas AuthorizationsVery few oil and gas authorizations require individual permits

The use of standard methods by the industry has allowed the creation of general permits, which are themselves subject to the public notice and review process, in lieu of individual activities.

Very few oil and gas authorizations require individual permitsThe use of standard methods by the industry has allowed the creation of general permits, which are

themselves subject to the public notice and review process, in lieu of individual activities.

Page 11: Coastal Use Permit Program Pipeline Permitting Coastal Use Permit Program Pipeline Permitting Scott Angelle, Secretary Louisiana Department of Natural.

Coastal Use General PermitsGeneral Permits relevant to the oil and gas industry

Coastal Use General PermitsGeneral Permits relevant to the oil and gas industry

•GP 5 - ring levees and board roads•GP 6 - pipeline installation, maintenance and repair•GP 7 - parallel slips•GP 10 - maintenance dredging of existing channels and canals•GP 11 - mitigation projects•GP 12 – maintenance dredging strategy permit•GP 16 – new oil and gas channels up to 1500’ long•GP 19 - small oil and gas projects •GP 21 - shell pads•GP 22 - seismic survey activities

•GP 5 - ring levees and board roads•GP 6 - pipeline installation, maintenance and repair•GP 7 - parallel slips•GP 10 - maintenance dredging of existing channels and canals•GP 11 - mitigation projects•GP 12 – maintenance dredging strategy permit•GP 16 – new oil and gas channels up to 1500’ long•GP 19 - small oil and gas projects •GP 21 - shell pads•GP 22 - seismic survey activities

Page 12: Coastal Use Permit Program Pipeline Permitting Coastal Use Permit Program Pipeline Permitting Scott Angelle, Secretary Louisiana Department of Natural.

What is a General Permit• Louisiana Revised Statute 49:214.30.E

“a general coastal use permit is an authorization to prospective users to perform specific uses within prescribed areas of the coastal zone”

• Louisiana Administrative Code 43§723.E.1.b

• General permits may be issued only for those uses that are substantially similar in nature, that cause only minimal adverse impacts when performed separately, that will have only minimal adverse cumulative impacts and that otherwise do not impair the fulfillment of the objectives and policies of the coastal management program.

Page 13: Coastal Use Permit Program Pipeline Permitting Coastal Use Permit Program Pipeline Permitting Scott Angelle, Secretary Louisiana Department of Natural.

What is an Area Permit?• an authorization to a prospective user to perform

specific uses within prescribed areas of the coastal zone

Characteristics of Area Permits (Activities to be authorized under the authority of an area

permit)

• Are substantially similar in nature,• Will cause only minimal adverse impacts when

performed separately, • will have only minimal adverse cumulative impacts • do not impair the fulfillment of the objectives and

policies of the coastal management program• Issued to a prospective user in a prescribed area of

the coastal zone

• Area is pre-determined by the location of existing structures

Page 14: Coastal Use Permit Program Pipeline Permitting Coastal Use Permit Program Pipeline Permitting Scott Angelle, Secretary Louisiana Department of Natural.

Area Pipeline Maintenance and Repair Permits

Two Phases

1. The Area Permit

2. Individual Authorizations

Area Pipeline Maintenance and Repair Permits

Two Phases

1. The Area Permit

2. Individual Authorizations

Page 15: Coastal Use Permit Program Pipeline Permitting Coastal Use Permit Program Pipeline Permitting Scott Angelle, Secretary Louisiana Department of Natural.

Area Permit

Invokes the Public Notice ProcessObtains special features input

(government agencies and interested individuals)

Does not require landowner notification Does not authorize individual work items

Does not obligate the applicantProvides a mechanism for expedited authorization

of maintenance and repair activities.

Page 16: Coastal Use Permit Program Pipeline Permitting Coastal Use Permit Program Pipeline Permitting Scott Angelle, Secretary Louisiana Department of Natural.

The Area PermitThe Area Permit

A general Plan for working in a specific area

Ideally it contains;

A vicinity map that shows the layout of the pipeline

Plan view (s) showing how the pipeline fits into the landmarks(roads, streams, communities, pastures, and etc.)

Typical cross sections of work for the major types of terrains that are involved(marsh, open water areas, upland areas, and etc)

A general Plan for working in a specific area

Ideally it contains;

A vicinity map that shows the layout of the pipeline

Plan view (s) showing how the pipeline fits into the landmarks(roads, streams, communities, pastures, and etc.)

Typical cross sections of work for the major types of terrains that are involved(marsh, open water areas, upland areas, and etc)

Page 17: Coastal Use Permit Program Pipeline Permitting Coastal Use Permit Program Pipeline Permitting Scott Angelle, Secretary Louisiana Department of Natural.

Individual AuthorizationsIndividual Authorizations

Requires a Complete Application

Requires a Complete Application

Does not require a Public NoticeThe area permit took care of the public notice process

Does not require a Public NoticeThe area permit took care of the public notice process

May or may not require interagency Coordination depending on agency comments for the area permitMay or may not require interagency Coordination depending on agency comments for the area permit

Requires that Landowners be NotifiedRequires that Landowners be Notified

Page 18: Coastal Use Permit Program Pipeline Permitting Coastal Use Permit Program Pipeline Permitting Scott Angelle, Secretary Louisiana Department of Natural.

Advantages to the Public• Increased safety and security of oil

and gas supplies

• Advanced notification that inspection and possibly maintenance and or repair may occur on a particular segment of pipeline

Page 19: Coastal Use Permit Program Pipeline Permitting Coastal Use Permit Program Pipeline Permitting Scott Angelle, Secretary Louisiana Department of Natural.

Advantages to the industry

• Should provide the applicant with advanced warning of any regulatory, resource, or landowner issues.

• Should provide the applicant with a plan to conduct maintenance and repair activities that is acceptable to regulatory agencies and the general public

Page 20: Coastal Use Permit Program Pipeline Permitting Coastal Use Permit Program Pipeline Permitting Scott Angelle, Secretary Louisiana Department of Natural.

Coming Soon

Although this would have little effect on an applicant for an Area Permit,

We have had internal discussions about drafting a general permit document much like GP-12 to better define the parameters of this class of Area Permits and Area Permits that apply to Utility Lines and rights-of-way.