Dover’s Waterfront Progress Report
Cochecho Waterfront Development
Presentation To:Dover City Council
March 21, 2018
Dover’s Waterfront Progress Report
The Vision Provide vibrant waterfrontwith public gathering places and access to the water.
Social & economic benefits derived from a revitalized waterfront are shared by all Dover’s residents.
Develop mix of uses
Continue Riverwalk
Provide opportunity for public access to water including boating facilities
Create public gathering places-pedestrian friendly
Develop housing clusters
Overview of 2016-2018 Efforts
Planning and Design Construction Project Management
Site Concept Plan
Waterfront Park
Design Guidelines
Engineering & Permitting
Planning and Design
P A G E 2
C O C H E C H O WATERFRONTSITE L A Y O U TA P R I L 25, 2017SCALE : 1”=200’-0”0 100’ 200’ 300’ 400’ 500’
Program -Proposed Scheme
Restaurant
North
4,000sf
South
0sf
Overall
4,000sf
9,000sf 0sf 9,000sfMixed-Use Retail
Total Commercial 13,000sf 0sf 13,000sf
52 Units 0 Units 52 UnitsMixed-Use Residential
Multi-family 46 Units 40 Units 86 Units
Townhouses 58 Units 18Units 76 Units
Single Family 0 Units 12Units 12Units
Total Residential 156 Units 70 Units 226 Units
N
P A G E 3
C O C H E C H O WATERFRONTSITE L A Y O U TA P R I L 25, 2017SCALE : 1”=100’-0”0 50’ 100’ 150’ 200’ 250’ 300’
46 Apartments on 3 Flrs 64 Covered Spaces +/-(1.4/du)
4,000 sf Restaurant on 1 Flr 16 On-Street Spaces (4/1,000)
4,500gsf Retail on First 18 On-Street Spaces (4/1,000)
26 Apartments on 2nd & 3rd 36 Off-Street Spaces (1.4/du)
4,500 sf Retail on First18 On-Street Spaces(4/1,000) 26 Apartmentson 2nd & 3rd 36 Off-Street Spaces (1.4/du)
58 Townhouses (29 @24’, 29 @ 16’) 116 Off-Street Spaces (2/du)
40 Apartments on 3 Flrs 60 Off-Street Spaces (1.5/du)
18 Townhouses (6 @24’, 12 @ 16’) 36 Off-Street Spaces (2/du)
12 Single Family Homes) 24 Off-Street Spaces (2/du)
P A G E 4NOT TO S C A L E
C O C H E C H O WATERFRONTP E R S P E C T I V E V I E W #1A P R I L 25, 2017
P A G E 5NOT TO S C A L E
C O C H E C H O WATERFRONTP E R S P E C T I V E V I E W #2A P R I L 25, 2017
Conceptual Park Site Plans with public engagement
Results of online survey
Conceptual Park Site Design
C O C H E C H O WAT E R F R ON T PA R K A M E N I T Y B U I L D I N G
S C H E M ATIC D E S I G N PA C K A G E
F E B R U A R Y 16, 2018
I
Example of 75% Design Plans
Public Paddlesports Dock
Bluff Excavation
Construction Activity
COCHECHO WATERFRONTPA D D L ES PORTS D OC K
ADA Kayak Launch:• Assist Bars and Transfer Platform• Wheel-stops at bottom of ramp
Float Configuration:
Bluff Excavation
Project ManagementDeveloper RFQ Process
RFP Preparation
Thank YouQuestions ?