Codelco Financial Results 2013 2013 Thomas Keller L. CEO Iván Arriagada H. Vice-President, Administration & Finance Press Conference Press Conference 28 March 2014
Transcript
Page 1: Codelco Financial Results 2013 · 2014. 3. 31. · Claudio Olguín, General Manager at Ministro Hales, and Óscar Jiménez, General Manager at Gabriela Mistral. In December two new

Codelco Financial Results20132013Thomas Keller L. CEO

Iván Arriagada H.Vice-President, Administration & Finance

Press ConferencePress Conference 28 March 2014

Page 2: Codelco Financial Results 2013 · 2014. 3. 31. · Claudio Olguín, General Manager at Ministro Hales, and Óscar Jiménez, General Manager at Gabriela Mistral. In December two new

Accident Rate 2013

A id t F R t E l & C t t E l & C F li i

7

8

12

Accident Frequency Rate – Employees & Contractors (Lost Time Incidents / Million hours worked)

Employee & Contractor Fatalities(Fatal Accidents)

5

6

7

8

10

2

3

4

4

6

1,35 1,26

0

1

2000

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

2011

2012

2013

0

2

000

001

002

003

004

005

006

007

008

009

010

011

012

013

2 2 2 2 2 2 2 2 2 2 2 2 2 2 20 20 20 20 20 20 20 20 20 20 20 20 20 20

• Accident Frequency rate during this period was 1.26.U f t t l th 4 f t liti 3 t t d 1 l• Unfortunately, there were 4 fatalities, 3 contractors and 1 employee.

• In December the Health and Safety Structural Project implementation was completed. A corporate audit was conducted which showed an average92 per cent compliance in each key point.

• For 2014, key points shall be the implementation of critical risk controls identified at Codelco, in addition to work in Contractor and Subcontractorcompanies, through Occupational Health and Safety Standards.

Copyrights © 2012 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights © 2012 by CODELCO-CHILE. All Rights Reserved.

2

Press Conference | 28 March 2014

Page 3: Codelco Financial Results 2013 · 2014. 3. 31. · Claudio Olguín, General Manager at Ministro Hales, and Óscar Jiménez, General Manager at Gabriela Mistral. In December two new

Highlights 2013

• New Division: On 1st January Minera Gaby subsidiary became the new Gabriela Mistral Division.

• Change of Executives: In April new managers assumed positions at three North District divisions: Juan Medel, General Manager at Radomiro Tomic;Claudio Olguín General Manager at Ministro Hales and Óscar Jiménez General Manager at Gabriela Mistral In December two new vice presidentsClaudio Olguín, General Manager at Ministro Hales, and Óscar Jiménez, General Manager at Gabriela Mistral. In December two new vice-presidentsassumed positions: Jaime Pérez de Arce, Human Resources and Marcelo Villouta, North Operations, replacing Sebastián Conde and Julio Aranis,respectively.

• Employee Strike: There was a 7-day strike at Radomiro Tomic Division at the end of March; on 9 April another 24-hour strike hit all Codelco operations. InSeptember, after a 14-day legal strike at Salvador Division, a collective agreement was signed that benefits 1,122 employees.

• Production: During the first quarter, there was a 20-day port strike, delaying 60,000 tonnes of copper shipments, which were shipped over the followingmonths. During the second half of the year, Ministro Hales Division produced 30,000 tonnes of refined copper, which were processed at ChuquicamataDivision plants.

• Capitalisation: In July, the Government decided to raise capital charged to the 2012 retained earnings from Anglo American Sur: USD 1 billion and inD b th it li ti f USD 1 billi l th i dDecember another capitalisation for USD 1 billion was also authorized.

• Corporate Governance: In May, President Sebastián Piñera appointed Blas Tomic Errázuriz as a new Codelco director and reappointed Gerardo JofréMiranda for a new period; he was also ratified as Chairman of the Board. Both directors were appointed for a 4-year period until May 2017.

• International Bonds : In August, Codelco issued USD 750 million in 10-year bonds, with annual coupon of 4.5 % and annual yield of 4.517%. Subsequentlyin October the Company issued USD 950 million in 30 year bonds with annual coupon of 5 625 % and annual yield of 5 775%in October, the Company issued USD 950 million in 30-year bonds, with annual coupon of 5.625 % and annual yield of 5.775%.

• Energy: In April, Codelco and GNL Mejillones agreed on a contract to use the Natural Liquefied Gas Regasification Terminal at Mejillones.

In March, Codelco successfully completed its ERNC Credit Tender Process for the 2013-2017 period, fully complying with ERNC legal requirements. Thecontracts were awarded to Norvind and Arauco.

I A t th P El i S l th l t i l t t t d ti it id l t G b i l Mi t l Di i i f it l t i iIn August, the Pampa Elvira Solar thermoelectric plant started operations, it provides clean energy to Gabriela Mistral Division for its electrowinningprocesses.

In 2013, the Luz Minera gas plant began its Environmental Impact Assessment, project located in Mejillones.

Copyrights © 2012 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights © 2012 by CODELCO-CHILE. All Rights Reserved.

3

Press Conference | 28 March 2014

Page 4: Codelco Financial Results 2013 · 2014. 3. 31. · Claudio Olguín, General Manager at Ministro Hales, and Óscar Jiménez, General Manager at Gabriela Mistral. In December two new

Key Events 2013 • Investments & Projects: Progress of structural growth projects in 2013 was as follows:

• Ministro Hales: successful start-up of mine and concentrator plant. The Roaster Plant started initial load operations at the end of 2013. Totalprogress was 99.9 %.

• New El Teniente Mine Level: Overall progress was 20.2% in its implementation phase, which consists of building the primary mine tunnels,ventilation adits, development of mine interior and Maitenes – Confluencia road.

• Chuquicamata Underground Mine: continued building main tunnels, and ventilations shafts, air extraction shafts and work inside mine, which arepart of permanent early works; total progress was 72.7 %.

• Andina Expansion 244: Environmental Impact Assessment is still being processed. On 16 December Codelco asked the Environmental AssessmentS i (SEA) t t d d i d t b it Add d til 31 J l 2014Service (SEA) to extended period to submit Addendum until 31 July 2014.

• RT Sulphide Expansion: Environmental Impact Assessment is still being processed; submitted to SEA in the II Region of Antofagasta.

• New uses for copper : In September, Codelco and the Ministry of Health delivered 70 complete modules equipped with antimicrobial copper at the intensivecare units at the former Santiago Posta Central. Also during this period the Intensive Care Unit at Roberto del Río Children’s Hospital was completed; 6 roomsand 2 ICU rooms were equipped with copper touch surfacesand 2 ICU rooms were equipped with copper touch surfaces.

In March, Codelco and Celulosa Arauco launched a new product that uses the antimicrobial properties of copper: Vesto melamine. In August, Codelco andTextil Monarch, launched launched antimicrobial copper clothes for Crystal Skin Children.

In October, antimicrobial copper was incorporated in one of the Valparaíso metro trains, which is a pilot plan to test this technology.

In December the Company announced an alliance with Mayo Clinic (USA) in order to conduct a study of orthopaedic implants treated with copper.

• Sustainability and CSR : Codelco announced it would invest more than USD 1 billion in its smelters, to adapt them to the new environmental regulations inthis zone.

Codelco promoted a new Children’s Symphony Orchestra in Diego de Almagro. This initiative is similar to those implemented in Los Andes, Mejillones and TilTilTil.

For the sixth consecutive year, Codelco awarded 2,150 higher education scholarships to the children of contractors.

In January, Codelco received the Sello Pro Pyme award, given by the Ministry of Economy to companies that have committed to pay its small and medium-sized enterprise suppliers within a period of 30 days. Codelco has more than 9,500 suppliers, 43% are SMEs.

Copyrights © 2012 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights © 2012 by CODELCO-CHILE. All Rights Reserved.

4

Press Conference | 28 March 2014

Page 5: Codelco Financial Results 2013 · 2014. 3. 31. · Claudio Olguín, General Manager at Ministro Hales, and Óscar Jiménez, General Manager at Gabriela Mistral. In December two new

Performance2012 vs. 2013

2013 2012 Var Var (%)

Producción de cobre ‐ miles de tmf 1.792 1.758 34 2%Own Copper Production (1,000 tonnes)

Producción de cobre Divisiones ‐ miles de tmf 1.622 1.647 ‐25 ‐2%

Producción de molibdeno Divisiones ‐ miles de tmf 23 20 3 17%

Producción de ácido Fundiciones ‐ miles de ton 2.767 3.130 ‐363 ‐12%

Producción de plata (*) ton 290 284 6 2%

Own Copper Production - Divisions (1,000 tonnes)

Molybdenum Production (1,000 tonnes)Acid Production – Smelters (1,000 tonnes)Silver Production (*) (tonnes)Producción de plata (*) ‐ ton 290 284 6 2%

Producción de oro  (*)  ‐ ton 2,3 2,4 ‐0,1 ‐3%

Ventas de cobre  (**) ‐ miles de tmf 1.723 1.740 ‐16 ‐1%

cobre de minerales propios 1.599 1.602 ‐3 0%

( ) ( )Gold Production (*) (tonnes)

Copper Sales (**) (1,000 tonnes)Own copper p p

cobre de minerales de terceros 124 137 ‐13 ‐9%

Ventas de molibdeno ‐ miles de tmf 22 19 3 14%

P i b BML ( l/lb) 332 1 360 6 28 5 8%

Third-party copper

Molybdenum Sales – (1,000 tonnes)

LME copper prices (cl/lb)Precio cobre  BML (cl/lb) 332,1 360,6 ‐28,5 ‐8%

Precio molibdeno Metals Week  (US$/kg)  22,7 28,1 ‐5,4 ‐19%

Precio Acido Sulfúrico (US$/ton) 92 147 ‐55 ‐38%Precio Oro  (US$/oz)  1.410 1.668 ‐259 ‐16%

Precio Plata (US$/oz)  24 31 ‐7 ‐24%

LME copper prices (cl/lb)Metals Week molybdenum prices (US$/kg) Sulphuric acid prices (US$/ton)Gold prices (US$/oz) Silver prices (US$/oz) Exchange rate ( $/ )

Tipo de cambio 495 487 8 2%

IPC 109,9 108,0 1,9 2%

  (*) Plata y Oro contenidos en barros anódicos, concentrados, ánodos y blister

 (**) Incluye minerales de terceros

Exchange rateCPI

(*) Gold and silver contained in anode slimes, concentrates, anodes and blister(**) Includes third-party mineral ore

Copyrights © 2012 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights © 2012 by CODELCO-CHILE. All Rights Reserved.

5

Press Conference | 28 March 2014

Page 6: Codelco Financial Results 2013 · 2014. 3. 31. · Claudio Olguín, General Manager at Ministro Hales, and Óscar Jiménez, General Manager at Gabriela Mistral. In December two new

Copper Price Chart (c/lb)2011-2013

500

399450

c/lb

361332

350

400

300

250

20132011 2012

200

Copyrights © 2012 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights © 2012 by CODELCO-CHILE. All Rights Reserved.

6

Press Conference | 28 March 2014

Page 7: Codelco Financial Results 2013 · 2014. 3. 31. · Claudio Olguín, General Manager at Ministro Hales, and Óscar Jiménez, General Manager at Gabriela Mistral. In December two new

Molybdenum Price Chart (US$/Kg)2011-2013

45

3435

40

S$/k

g 2830

35

US

23

20

25

15

20

20132011 201210

Copyrights © 2012 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights © 2012 by CODELCO-CHILE. All Rights Reserved.

7

Press Conference | 28 March 2014

Page 8: Codelco Financial Results 2013 · 2014. 3. 31. · Claudio Olguín, General Manager at Ministro Hales, and Óscar Jiménez, General Manager at Gabriela Mistral. In December two new

Codelco Financial Results

Copper Output

Copyrights © 2012 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights © 2012 by CODELCO-CHILE. All Rights Reserved.

8

Press Conference | 28 March 2014

Page 9: Codelco Financial Results 2013 · 2014. 3. 31. · Claudio Olguín, General Manager at Ministro Hales, and Óscar Jiménez, General Manager at Gabriela Mistral. In December two new

Copper Output2012 - 2013

2.000

Total Output2013 1 792 000 Mt1 400

1.5001.6001.7001.8001.900

2013: 1,792,000 Mt2012: 1,758,000 Mt

000

Mt

9001.0001.1001.2001.3001.400

10

400500600700800

0100200300

2013

2012

Copyrights © 2012 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights © 2012 by CODELCO-CHILE. All Rights Reserved.

9

(*) Output reflects Codelco’s interest : El Abra 49%, Anglo American 20%

Press Conference | 28 March 2014

Page 10: Codelco Financial Results 2013 · 2014. 3. 31. · Claudio Olguín, General Manager at Ministro Hales, and Óscar Jiménez, General Manager at Gabriela Mistral. In December two new

Copper Output (1,000 Mt refined copper) Last 5 years – 2009-2013 Period

1.9001 782 1 760 1.796 1.7921 758

1.702 1.689 1.735 1.647 1 622 0 83

0,88

1.500

1.7001.782 1.760 1.758

1.622

0 79

0,84

0,78

0,83

1 100

1.300

K to

nnes

%

0,790,80

0 73 0 730,73

700

900

1.100

0,73 0,73

0,68500

700

2009 2010 2011 2012 2013

Codelco El Abra AAS  Ley de Mineral (*)

(*) Ore Grade at Codelco DivisionsCopyrights © 2012 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights © 2012 by CODELCO-CHILE. All Rights Reserved.

10

Press Conference | 28 March 2014

( ) Ore Grade at Codelco Divisions

Page 11: Codelco Financial Results 2013 · 2014. 3. 31. · Claudio Olguín, General Manager at Ministro Hales, and Óscar Jiménez, General Manager at Gabriela Mistral. In December two new

Financial Results

Costs

Copyrights © 2012 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights © 2012 by CODELCO-CHILE. All Rights Reserved.

11

Press Conference | 28 March 2014

Page 12: Codelco Financial Results 2013 · 2014. 3. 31. · Claudio Olguín, General Manager at Ministro Hales, and Óscar Jiménez, General Manager at Gabriela Mistral. In December two new

CostsItems

Total Net Direct 

Items  included 

Total Expenses Cathode

CostsC3

CashCosts C1

Operating Costs (*) Non‐Operating Costs -p gCorporate Office Expenses -Financial Expense -Depreciation & Amortisation -Depreciation & AmortisationTC/RC Cost - By‐product Credit -

(*)    Applying IFRSs changes, from 2013 reporting period, Codelco has complied with IFRIC 20 to account for mine developments.

Copyrights © 2012 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights © 2012 by CODELCO-CHILE. All Rights Reserved.

12

Press Conference | 28 March 2014

Page 13: Codelco Financial Results 2013 · 2014. 3. 31. · Claudio Olguín, General Manager at Ministro Hales, and Óscar Jiménez, General Manager at Gabriela Mistral. In December two new

Codelco Unit Costs - 2013 vs 2012(US c/lb of copper)

2013 (c/lb)

2012 (c/lb)

Var (%)

Var Mill. US$

Total costos y gastos 231 5 264 5 ‐12 5% ‐1 324Total ExpensesTotal costos y gastos 231,5 264,5 ‐12,5% ‐1.324

Costo Neto a Cátodos (C3) 217,0 241,7 ‐10,2%Net Cathode Cost (C3)

Costo C1 163,1 163,5 ‐0,3%Cost (C1)

Copyrights © 2012 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights © 2012 by CODELCO-CHILE. All Rights Reserved.

13

Press Conference | 28 March 2014

Page 14: Codelco Financial Results 2013 · 2014. 3. 31. · Claudio Olguín, General Manager at Ministro Hales, and Óscar Jiménez, General Manager at Gabriela Mistral. In December two new

Codelco Total Expenses 2013 vs. 2012(US$ billions)

9.602

 10.000

 9.500

482

385

 9.000- 1.324

$ bi

llion)

8.278385

132

159

166

 8.500(US

7 500

 8.000

 7.500Total costos ygastos 2012

Reducción engastos deInsumos yServicios

Efecto T/C enPasivos en

Moneda Local

NormativaContable (IFRIC 20)

Menor Preciode Energía eInsumos

Otros Total costos ygastos 2013

Total Expenses Reduction in T/C Effect on Accounting Lower Energy Others Total Expenses2012 Supply & Liabilities in Standard & Supply 2013

Service expenses Local Currency (IFRIC 20) Costs

Copyrights © 2012 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights © 2012 by CODELCO-CHILE. All Rights Reserved.

14

Servicios

Press Conference | 28 March 2014

Page 15: Codelco Financial Results 2013 · 2014. 3. 31. · Claudio Olguín, General Manager at Ministro Hales, and Óscar Jiménez, General Manager at Gabriela Mistral. In December two new

C1 Cost Chart(US$ c/lb of copper)

190

200

177,3171,2

170

180

190

2013 163.1

147,7155,9

150

160

170

c/lb

130

140

110

120

100S1 2012 S2 2012 S1 2013 S2 20131H 2012 2H 2012 1H 2013 2H 2013

Copyrights © 2012 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights © 2012 by CODELCO-CHILE. All Rights Reserved.

15

Press Conference | 28 March 2014

Page 16: Codelco Financial Results 2013 · 2014. 3. 31. · Claudio Olguín, General Manager at Ministro Hales, and Óscar Jiménez, General Manager at Gabriela Mistral. In December two new

Cost Positioning : Codelco & Industry Quartiles c/lb, currency each year

340 340

Net Cathode Cost

340

Total Cathode Cost Cash Cost (C1)

260280300320 Cut 3rd quartile

Cut 2ndquartile

260280300320

260280300320

180200220240 Cut 1st

quartile

180200220240

180200220240

100120140160

100120140160

100120140160

20406080

CODELCO 20406080

20406080

CODELCO CODELCO

0

2008

2009

2010

2011

2012

2013

0

2008

2009

2010

2011

2012

2013

0

2008

2009

2010

2011

2012

2013

Copyrights © 2012 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights © 2012 by CODELCO-CHILE. All Rights Reserved.

16

.Source: Wood Mackenzie & Codelco

Press Conference | 28 March 2014

Page 17: Codelco Financial Results 2013 · 2014. 3. 31. · Claudio Olguín, General Manager at Ministro Hales, and Óscar Jiménez, General Manager at Gabriela Mistral. In December two new

Productivity & Costs 2013 - Examples

Rise in molybdenum output at El Teniente

Division

Molybdenum recovery rose from 60% to 69.5% in 2013

PerformanceOptimisation

More copper output at ElTeniente Division, up 9 000 Mt

More mineral ore extracted from underground and open-pit mine

Service Cost O ti i ti More than 250 contracts

Eliminated, renegotiated and merged contracts

9,000 Mt

Optimisation o e t a 50 co t actsnegotiated in 2013

O ti i ti fMore than USD 150

Optimisation of critical input use:• Reduced use of sulphuric acid• Reduced use of explosives• Reduced use of fuel

Optimisation of supplies and

materials

million saved in supplies and materials in 2013 with no impact

production

• Increased performance of tyres

Reduction of consulting

& support services

Optimised services & Consultancies; saved USD 20 million in 2013

Optimisation of activities and internal processes,simplification of activities

Copyrights © 2012 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights © 2012 by CODELCO-CHILE. All Rights Reserved.

17

Press Conference | 28 March 2014

Page 18: Codelco Financial Results 2013 · 2014. 3. 31. · Claudio Olguín, General Manager at Ministro Hales, and Óscar Jiménez, General Manager at Gabriela Mistral. In December two new

Codelco Financial Results

Pre-Tax Profit and Net Profit

Copyrights © 2012 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights © 2012 by CODELCO-CHILE. All Rights Reserved.

18

Press Conference | 28 March 2014

Page 19: Codelco Financial Results 2013 · 2014. 3. 31. · Claudio Olguín, General Manager at Ministro Hales, and Óscar Jiménez, General Manager at Gabriela Mistral. In December two new

Pre-Tax Profit 2012 vs. 2013, excl. AASUS$ millions

 4.500

4.014 3.889832 4.000 -125

ions

)

65835

264 3.000

 3.500

MU

SD (U

S$

mill

 2.500

 2.000Excedentes 2012

Sin AASPrecio cobre Menor Venta

CobrePrecio y CantidadSubproductos

Menores Costos,Gastos y Otros

Excedentes 2013

US$ millones 2012 2013 Var

Pre-tax Profit 2012 Copper Price Lower Copper By-product Lower Costs Pre-Tax ProfitsExcl. AAS Sales Prices & Quantity & Other Expenses 2013

US$ millionsUS$ millones 2012 2013 Var

EXCEDENTES SIN AAS 4.014 3.889 ‐125GANANCIA COMPARABLE SIN AAS (*) 2.915 3.009 94

(*) Equivalent to Codelco’s profit applying the same tax requirements as private-sector companies.

US$ millions

PRETAX PROFIT, excl. AASCOMPARABLE PROFT, excl. AAS (*)

Copyrights © 2012 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights © 2012 by CODELCO-CHILE. All Rights Reserved.

19

Press Conference | 28 March 2014

Page 20: Codelco Financial Results 2013 · 2014. 3. 31. · Claudio Olguín, General Manager at Ministro Hales, and Óscar Jiménez, General Manager at Gabriela Mistral. In December two new

Income Statement 2012 vs. 2013(US$ millions)

2013 2012 Var

Ingresos por venta de cobre propio 12 021 12 792 771C lIngresos por venta de cobre propio 12.021 12.792 ‐771

Costos de venta de cobre propio ‐8.299 ‐8.235 ‐64

Ganancia bruta en venta de cobre 3 722 4 557 ‐835

Copper sales revenue

Copper sales cost

Gross profit – copper salesGanancia bruta en venta de cobre 3.722 4.557 ‐835

Ganancia bruta en ventas de  subproductos y otros 433 696 ‐263

Gross profit – copper sales

Gross profit – by-product & other product sales

Ganancia Bruta 4.154 5.253 ‐1.099

Resultados No Operacional ‐265 2.552 ‐2.817

GROSS PROFIT

Non-operating income

Excedentes 3.889 7.805 ‐3.916

Excedentes sin AAS 3.889 4.014 ‐125

Ganancia Comparable sin AAS (*) 3 009 2 915 94

PRE-TAX PROFIT

Excluding Anglo American SurCOMPARABLE PROFIT excluding AAS (*)Ganancia Comparable sin AAS ( ) 3.009 2.915 94

(*) Equivalent to Codelco’s earnings, applying the same tax requirements as private-sector companies.(**) 2012 Financial Results are updated applying IFRIC 20 (accounting for mine developments), to compare to 2013 financial results.

g ( )

Copyrights © 2012 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights © 2012 by CODELCO-CHILE. All Rights Reserved.

20

( ) p pp y g ( g p ), p

Press Conference | 28 March 2014

Page 21: Codelco Financial Results 2013 · 2014. 3. 31. · Claudio Olguín, General Manager at Ministro Hales, and Óscar Jiménez, General Manager at Gabriela Mistral. In December two new

Pre-Tax Profit Distribution 2012 vs. 2013(US$ millions)

2013 2012I t L R d Nº 13 196 1 157 1 270

( )

Reserve Tax Law No 13 196Impuesto Ley Reservada Nº 13.196 1.157 1.270

Impuestos a la Renta 1.486 2.304

Reserve Tax Law No.13.196

Income Tax

Impuesto específico a la minería 131 241

Ganancia 1.115 3.990

Specific Mining Tax

Net ProfitGanancia 1.115 3.990

TOTAL EXCEDENTE 3.889 7.805TOTAL PRE-TAX PROFIT

GANANCIA COMPARABLE (*) 3.009 5.947

(*) Equivale a la ganancia que obtendría Codelco aplicando igual tributo que la empresa privada (*) Equivalent to Codelco’s earnings applying the same tax requirements as private-sector companies.

COMPARABLE PROFIT (*)

Copyrights © 2012 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights © 2012 by CODELCO-CHILE. All Rights Reserved.

21

Press Conference | 28 March 2014

Page 22: Codelco Financial Results 2013 · 2014. 3. 31. · Claudio Olguín, General Manager at Ministro Hales, and Óscar Jiménez, General Manager at Gabriela Mistral. In December two new

Codelco Financial Results

Investments

Copyrights © 2012 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights © 2012 by CODELCO-CHILE. All Rights Reserved.

22

Press Conference | 28 March 2014

Page 23: Codelco Financial Results 2013 · 2014. 3. 31. · Claudio Olguín, General Manager at Ministro Hales, and Óscar Jiménez, General Manager at Gabriela Mistral. In December two new

Investments 2009-2013US$ billions

4.500

5.000

4.093  4.178 

3 500

4.000

4.500

2.560  2.627 3.000

3.500

MU

SD

2.119 2.000

2.500

1.000

1.500

2009 2010 2011 2012 2013

Proyectos Aporte Sociedades Desarrollo MinasProjects Company Contributions

Mine Developments

Copyrights © 2012 CODELCO-CHILE. Todos los Derechos Reservados. | Copyrights © 2012 by CODELCO-CHILE. All Rights Reserved.

23

Press Conference | 28 March 2014

Page 24: Codelco Financial Results 2013 · 2014. 3. 31. · Claudio Olguín, General Manager at Ministro Hales, and Óscar Jiménez, General Manager at Gabriela Mistral. In December two new

C d l Fi i l R ltCodelco Financial Results2013

Thomas Keller L. CEO

Iván Arriagada H.Vice-President, Administration & Finance

Press ConferencePress Conference28 March 2014