+ All Categories
Home > Documents > Colorado River Basin Long Lead Forecasting Research

Colorado River Basin Long Lead Forecasting Research

Date post: 23-Feb-2016
Category:
Upload: burke
View: 53 times
Download: 0 times
Share this document with a friend
Description:
Tom Piechota (UNLV) Kenneth Lamb (UNLV) Glenn Tootle (University of Tennessee) Tyrel Soukup (University of Tennessee) Oubeid Aziz (University of Tennessee). Colorado River Basin Long Lead Forecasting Research . U.S. Bureau of Reclamation National Oceanic and Atmospheric Administration - PowerPoint PPT Presentation
Popular Tags:
26
Colorado River Basin Long Lead Forecasting Research Tom Piechota (UNLV) Kenneth Lamb (UNLV) Glenn Tootle (University of Tennessee) Tyrel Soukup (University of Tennessee) Oubeid Aziz (University of Tennessee) U.S. Bureau of Reclamation National Oceanic and Atmospheric Administration National Science Foundation Wyoming Water Development Commission
Transcript
Page 1: Colorado River Basin  Long Lead Forecasting Research

Colorado River Basin Long Lead Forecasting Research

Tom Piechota (UNLV)

Kenneth Lamb (UNLV)

Glenn Tootle (University of Tennessee)

Tyrel Soukup (University of Tennessee)

Oubeid Aziz (University of Tennessee)

U.S. Bureau of ReclamationNational Oceanic and Atmospheric Administration

National Science FoundationWyoming Water Development Commission

Page 2: Colorado River Basin  Long Lead Forecasting Research

Tootle, G.A., A.K. Singh, T.C. Piechota and I. Farnham, 2007. Long Lead-Time Forecasting of U.S. Streamflow Using Partial Least Squares Regression. ASCE Journal of Hydrologic Engineering, 12(5), 442-451.

Soukup, T., O.A. Aziz, G.A. Tootle, S. Wulff and T. Piechota, 2009. Long-lead Time Streamflow Forecasting of the North Platte River Incorporating Oceanic-Atmospheric Climate Variability. Journal of Hydrology, 368(2009), 131-142.

Aziz, O.A., G.A. Tootle, S.T. Gray and T.C. Piechota, 2010. Identification of Pacific Ocean Sea Surface Temperatures influences of Upper Colorado River Basin Snowpack. Water Resources Research, 46, W07536.

Lamb, K., T. Piechota, O. Aziz, G. Tootle, 2011. Establishing A Basis For Extending Long-Term Streamflow Forecasts In The Colorado River Basin. ASCE Journal of Hydrologic Engineering (In Press).

Recent Publications

Page 3: Colorado River Basin  Long Lead Forecasting Research

Long Lead-Time Forecasting of U.S. Streamflow Using Partial Least Squares Regression

(Journal of Hydrologic Engineering, 2007)

• Data Sets- Pacific & Atlantic Ocean Sea Surface Temperatures (SSTs)

1950 -2001April – September of previous year (-)

- Continental U.S. streamflow from USGS Unimpaired data (1950 – 2002)

1951 – 2002Water year volume

• Methods- Partial Least Squares Regression (PLSR)- Based on optimized Principal Component Regression of two fields (SSTs and streamflow)

• Contributions- Skillful long lead-time forecast of continental U.S. streamflow using SSTs- Calibration, Cross-validation and Uncertainty in model development

Page 4: Colorado River Basin  Long Lead Forecasting Research

PLSR Calibration Model Results(Leading April – September SSTs, Water Year Streamflow)

Pacific Ocean SSTsStreamflow Stations

(R2 > 0.80)

Atlantic Ocean SSTsStreamflow Stations

(R2 > 0.80)

Upper Colorado River Basin(White River)

Page 5: Colorado River Basin  Long Lead Forecasting Research

PLSR Cross-validation Model Results – White River

Page 6: Colorado River Basin  Long Lead Forecasting Research
Page 7: Colorado River Basin  Long Lead Forecasting Research

Long Lead-Time Streamflow Forecasting of the North Platte River Incorporating Oceanic-Atmospheric Climate Variability

(Journal of Hydrology, 2009)

• Data Sets- Pacific Ocean Sea Surface Temperatures (SSTs) and 500 mb geopotential heights

1948 -2006July - September of previous year (-)

- North Platte River streamflow1948 – 2006April – July volume

• Methods- Singular Value Decomposition for diagnostics - Non parametric exceedance probablity forecasts (Piechota et al., 2001)

Page 8: Colorado River Basin  Long Lead Forecasting Research
Page 9: Colorado River Basin  Long Lead Forecasting Research

Figure 2: Heterogeneous correlation map showing significant SST regions as related to NPRB streamflow stations for JAS(-1) six month lead-time.

Figure 4: Heterogeneous correlation map showing significant Z500 regions as related to NPRB streamflow stations for OND(-1) three month lead-time.

ResultsSSTs

Z500

Page 10: Colorado River Basin  Long Lead Forecasting Research

JAS(-1) Q1 (AMJJ) Q2 (AMJJ) Q3 (AMJJ) Q4 (AMJJ) OND(-1) Q1 (AMJJ) Q2 (AMJJ) Q3 (AMJJ) Q4 (AMJJ)

Nino 3.4 0% 0% 0% 0% Nino 3.4 33% 95% 77% 0%

PDO 0% 0% 0% 0% PDO 0% 0% 3% 2%

AMO 100% 100% 100% 100% AMO 67% 5% 20% 98%

Cal Skill 9.2% 11.6% 8.9% 13.8% Cal Skill 5.0% 6.1% 5.2% 8.8%

CV Skill 1.0% 0.7% -1.4% 1.4% CV Skill -8.6% -4.5% -9.6% -0.7%

SST1 100% 100% 100% 100% SST1 100% 100% 100% 100%

SST2 0% 0% 0% 0% SST2 0% 0% 0% 0%

SST3 0% 0% 0% 0% SST3 0% 0% 0% 0%

Cal Skill 16.4% 21.4% 18.2% 20.6% Cal Skill 16.5% 21.4% 18.1% 16.6%

CV Skill 7.3% 8.5% 8.1% 10.2% CV Skill 2.9% 6.2% 5.7% 4.7%

500mb1 100% 100% 100% 100% 500mb1 100% 100% 100% 100%

500mb2 0% 0% 0% 0% 500mb2 0% 0% 0% 0%

500mb3 0% 0% 0% 0% 500mb3 0% 0% 0% 0%

Cal Skill 16.7% 15.4% 15.3% 14.3% Cal Skill 23.9% 25.1% 25.0% 20.3%

CV Skill 3.6% 3.3% 5.7% 4.5% CV Skill 12.8% 14.6% 13.7% 10.4%

Page 11: Colorado River Basin  Long Lead Forecasting Research

Example: 20% chance (80% risk) of exceeding 190,000 acre-feet (Average monthly volume summed for the 4 months of interest)

Streamflow Forecast Example

Research Question #3

Page 12: Colorado River Basin  Long Lead Forecasting Research

Research Question #1

Page 13: Colorado River Basin  Long Lead Forecasting Research

McCabe and Dettinger (2002)

Upper Colorado River Basin (UT, CO) Snowpack

Aziz et al. (2010)

?

Page 14: Colorado River Basin  Long Lead Forecasting Research

0 – 2 Year Forecasting of Colorado RiverWater Volume

14

Prepared byKenneth Lamb, Tom Piechota, Simon Wang,

Sajjad Ahmad, AJ Kahlra

Page 15: Colorado River Basin  Long Lead Forecasting Research

Statistical Forecast Model

Support Vector Machine (SVM) Neural Network – Statistical Learning Model Inputs: Calendar year mean SOI, PDO, NAO, AMOPredictand: Following year precipitationPerformance Measure: RMSE Standard

Ratio of Deviation (RSR)

Page 16: Colorado River Basin  Long Lead Forecasting Research

SVM Results – Upper CRB

Page 17: Colorado River Basin  Long Lead Forecasting Research

SVM Results – Lower CRB

Page 18: Colorado River Basin  Long Lead Forecasting Research

Ocean-Atmosphere-Streamflow

During the winter months …

L

Page 19: Colorado River Basin  Long Lead Forecasting Research

SVD/Correlation Results

19

Simultaneous Year 1 Year Lag 2 Year Lag 3 Year Lag

500mb Geopotential Height

200mb Zonal Wind

Page 20: Colorado River Basin  Long Lead Forecasting Research

Forecast Method

Weighted Resampling of Observed Naturalized StreamflowSplit sample forecast verification alternatives

• 1st ~ 1976-2005 used to forecast 1906-1975• 2nd ~1956-2005 used to forecast 1906-1955• 3rd ~ 1906-1945 used to forecast 1956-2005

Weight based upon 3-month avg. SST of Hondo region

Page 21: Colorado River Basin  Long Lead Forecasting Research

21

0 Lag 1-yr Lag 2-yr Lag

Alternative 1

Alternative 2

Alternative 3

Forecast Skill Maps – LEPS

Page 22: Colorado River Basin  Long Lead Forecasting Research

22

Relative Error ~ Drought Comparison

Page 23: Colorado River Basin  Long Lead Forecasting Research

Identifying Climate Cycles

23

10-20 year cycle in dataPDO leads precipitation by 3 yearsSST cycle highly correlated with Nino4

region

References: Wang et al, 2009; Wang et al 2010a.

Page 24: Colorado River Basin  Long Lead Forecasting Research

Pacific Ocean – Precipitation Lag

24Figure 2 - Wang et al (2010a). A transition-phase Teleconnection of the Pacific Quasi-Decadal Oscillation. Clim Dyn DOI 10.10007/s00382-009-0722-5.

Page 25: Colorado River Basin  Long Lead Forecasting Research

Ocean-Atmosphere-Streamflow

Another physical basis for long-lead forecasting

L

NINO 4

Page 26: Colorado River Basin  Long Lead Forecasting Research

Questions

26


Recommended