+ All Categories
Home > Documents > Colorado’s Smoke Management Program and HB09-1199

Colorado’s Smoke Management Program and HB09-1199

Date post: 13-Jan-2016
Category:
Upload: giona
View: 38 times
Download: 1 times
Share this document with a friend
Description:
Colorado’s Smoke Management Program and HB09-1199. Pat McLaughlin, EPSII Air Pollution Control Division Colorado Department of Public Health and Environment, May 9, 2012. Overview of Presentation. Background on Colorado Smoke Management Program - PowerPoint PPT Presentation
Popular Tags:
20
Colorado’s Smoke Management Program and HB09-1199 Pat McLaughlin, EPSII Air Pollution Control Division Colorado Department of Public Health and Environment, May 9, 2012 4/24/2012
Transcript
Page 1: Colorado’s Smoke Management Program and HB09-1199

Colorado’s Smoke Management Program

and HB09-1199

Pat McLaughlin, EPSIIAir Pollution Control Division

Colorado Department of Public Health and Environment,

May 9, 20124/24/2012

Page 2: Colorado’s Smoke Management Program and HB09-1199

Overview of Presentation

• Background on Colorado Smoke Management Program

• HB09-1199: Colorado Healthy Forests and Vibrant Communities

• View Forward

204/21/23

Page 3: Colorado’s Smoke Management Program and HB09-1199

What is…• A Smoke Management Program (SMP)?

– Requirements & procedures for regulating & managing smoke from prescribed fires.

• Prescribed Fire (Rx fire)?– “Fire that is intentionally used for

grassland or forest management, including vegetative, habitat or fuel management, regardless of whether the fire is ignited by natural or human means.” (Reg. 9)

304/21/23

Page 4: Colorado’s Smoke Management Program and HB09-1199

What is…

• Smoke Management?– Defined in AQCC Regulation No. 9 as:

• “Use of techniques to – reduce smoke emissions,

– dilute smoke,

– identification and reduction of the impact of smoke on smoke sensitive areas,

– monitoring and evaluation of smoke impacts from individual and collective burns and

– coordination among land managers for these purposes.”

404/21/23

Page 5: Colorado’s Smoke Management Program and HB09-1199

Federal CAA and SMPs

• What requirements are in the federal Clean Air Act regarding SMPs?– Law predated the current understanding

of the ecological role of fire.– As such, EPA does not have prescribed

fire or SMP regulations.

• States develop SMPs based on different authorities

504/21/23

Page 6: Colorado’s Smoke Management Program and HB09-1199

Variability between State’s SMPs

• Stricture of state SMPs and amounts of prescribed fire vary considerably– For example:

• No SMPs in NE US and limited burning• Large amounts of burning in SE US

– Most differences can be explained by:• population density• meteorology/climate• topography/fuel types • special attention on burners• public acceptance of fire & smoke• land use where burning occurs

604/21/23

Page 7: Colorado’s Smoke Management Program and HB09-1199

7

Colorado Smoke Management Program (SMP)

• Began in 1990; largely voluntary

• Use of prescribed fire, especially broadcast burns, grew during 1990s– In response, Colorado legislature passed laws

(1999 & 2001) requiring more formal development of the SMP (CRS 25-7-106(7) & (8))

– Colorado Air Quality Control Commission adopted Regulation 9 (“Open Burning, Prescribed Fire, and Permitting”) in January 2002

04/21/23 7

Page 8: Colorado’s Smoke Management Program and HB09-1199

8

Regulation No. 9, Example Components

• Permittees shall use “best smoke management” practices

• In granting permits and designing permit conditions, the Air Division must consider 10 factors “necessary to protect public health and welfare.”

• The permit must show it will:“protect scenic and/or important vistas and visibility in Class I

areas, “minimize the impacts of emissions and smoke and

“not cause a violation of any ambient air quality standards.”

04/21/23 8

Page 9: Colorado’s Smoke Management Program and HB09-1199

9

Reg. 9, SMP Implementation Components

• Permits with appropriate conditions

• Site inspections to burn projects and visits to field offices across the state

• Communications and outreach including stakeholder meetings and newsletters

• Compliance assistance and enforcement

• Activity and emission inventory tracking

• Comprehensive web presence

• Fees (self-supporting program per CRS 25-7-106(7)(a))

04/21/23 9

Page 10: Colorado’s Smoke Management Program and HB09-1199

10

300-450 Permits/Year broadcast + pile burns

04/21/23

Page 11: Colorado’s Smoke Management Program and HB09-1199

How Does Colorado Compare to Other Western States (2008)?

NIFC data = mostly federal acres, broadcast + piles combined

04/21/23 11

Page 12: Colorado’s Smoke Management Program and HB09-1199

04/21/23 12

Page 13: Colorado’s Smoke Management Program and HB09-1199

Cu

bic F

eet of Piles (ft3)

How Does Broadcast and Pile Burns Trend Over Time?

04/21/23 13(Federal, State, Local and Private burners)

Page 14: Colorado’s Smoke Management Program and HB09-1199

–From Aerial Survey Data–1997

Page 15: Colorado’s Smoke Management Program and HB09-1199

–From Aerial Survey Data–2009

Page 16: Colorado’s Smoke Management Program and HB09-1199

HB09-1199CRS 25-7-111(5)

“The division shall… evaluate existing prescribed fire permit program rules and

implementationso as to support, and increase where

possible, appropriate responsible use of prescribed fire consistent with section 25-7-

106 (7) and (8).”

04/21/23 16

Page 17: Colorado’s Smoke Management Program and HB09-1199

Colorado’s SMP Structure = Hybrid of Decision-Based and

Outcome-Based

• Recommendations– Commit to continue hybrid program

• Focus on practical steps for implementation

• Participation/collaboration of fire managers

– Building infrastructure for monitoring, ongoing operation, and analysis

– Continue to evaluate computer dispersion models

– Collaboration1704/21/23

Page 18: Colorado’s Smoke Management Program and HB09-1199

View Forward

• Air Division believes the HB09-1199 report offers a responsible path forward

• Appropriate, increased use of Rx fire in CO can continue under Reg. 9 and CO’s SMP

1804/21/23

Page 19: Colorado’s Smoke Management Program and HB09-1199

View Forward…

• Challenges should not be minimized– Most land managers experience

considerable pressure to increase use of fire, especially broadcast

– At the same time the Air Division must contend with how to accommodate this within existing state and federal law

– Public attitudes towards increased use of fire in Colorado are now negative

04/21/23 19

Page 20: Colorado’s Smoke Management Program and HB09-1199

04/21/23 20

Questions?Comments?


Recommended