JobDriver / CONSTRUCTION PRODUCTIVITY SOFTWARE APPLICATION NARRATIVE DESCRIPTION DATE 8/19/19 – Author – (Trip) Syd W. Smith III ‐ CONFIDENTIAL
Page 1 of 1
Introduction
The names “JobDriver” and “software” are used interchangeably to describe the product throughout.
JobDriver is a construction productivity matrix. Construction is very limited when it comes to technical
tools in the industry. Data is collected at a selected interval and displayed over time to provide a visual
dashboard of jobsite or project production. JobDriver makes it easy to see a wide array of valuable
productivity information and importantly JobDriver highlights areas of inefficiency where work could be
happening, but is not.
How it works – ATTACHED EXHIBIT A
A basic template allows for information on an x, y and/or z axis to display production information in 2D,
3D or as a model. Area information at a minimum is populated on an x and y axis to provide coordinates
or detail for a location, or percent complete on y axis and plan numbers with activities for a trade on the
x axis. The display can mimic actual project shape, plan grid, thermometer style, or custom. Second tier
or additional location details are provided on an axis to help drill down specific locations. However the
template is set the productivity matrix is by trade and trade specific activities are populated along a
chosen axis to track for that trade. Field personnel verify the certain activities are complete for a trade.
By populating complete items over a selected time period represents production or measures
productivity for that trade. The trades are linked so that completion of one activity by a trade highlights
that work is available for another following trade. The software synchronizes trades and the flow of
work to produce a live productivity matrix. Parties can be notified that work is available. The software
tracks and creates a history of how long work is available. Notification can be shared over a project
group for accountability to the project. Few markets or industries lend themselves to such valuable,
actual measurable productivity as the construction industry.
Results
Productivity information in construction is paramount. The JobDriver dashboard allows management to
see an enormous amount of vital information all on one dashboard. All trades and their activities are
included for the entire project. Production rates are key to managing manpower at a cost‐effective
level. An all to common problem in construction projects are the items and areas of work that remain
stagnant or areas of work that could be completed and no one is working there. There is always an area
management walks by and thinks “why is this or that item not done”, or “why isn’t anyone working
here”. JobDriver creates a real productivity dashboard of what is happening and highlights what is not
happening. There is enormous value in the number of work areas that sit inactive for great lengths of
time. JobDriver can identify a problem area and provide a reason something has stopped. Moreover,
most importantly JobDriver highlights areas of work that could be progressing and are not.
Conclusion
JobDriver increases production exponentially. JobDriver is a unique tool in the construction industry,
which currently has limited technical tools. It can identify and highlight unproductive areas and activities
and cut them multifold. JobDriver provides a visual dashboard of the most vital project information
related to productivity in construction projects. JobDriver optimizes productivity and indisputably
increases profitability.
BAY PAINTING PROGRESS CHART
Prep
/ Po
int -
Agen
t
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
Prep
/ Po
int -
Agen
t
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
Prep
/ Po
int -
Agen
t
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
Prep
/ Po
int -
Agen
t
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
Prep
/ Po
int -
Agen
t
WC
DBL
Van
ity B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
Prep
/ Po
int -
Agen
t
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
Prep
/ Po
int -
Agen
t
WC
DBL
Van
ity B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
Prep
/ Po
int -
Agen
t
WC
DBL
Van
ity B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
Prep
/ Po
int -
Agen
t
WC
DBL
Van
ity B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12AREAS AVAILABLE FOR YOU TO WORK
* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES
20 Unit 21 Unit 23 Unit22 Unit 25 Unit
16
7
RUN DATE : 5/16/2019
26 Unit 24 Unit28 Unit 27 Unit
6
5
4
12
FLOOR18
17
N/A
N/A
N/A
2
11
10
9
3
15
14
13
8
JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
Prep
/ Po
int -
Agen
t
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
Prep
/ Po
int -
Agen
t
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
Prep
/ Po
int -
Agen
t
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
Prep
/ Po
int -
Agen
t
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
Prep
/ Po
int -
Agen
t
WC
DBL
Van
ity B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
Prep
/ Po
int -
Agen
t
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
Prep
/ Po
int -
Agen
t
WC
DBL
Van
ity B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
Prep
/ Po
int -
Agen
t
WC
DBL
Van
ity B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
Prep
/ Po
int -
Agen
t
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12AREAS AVAILABLE FOR YOU TO WORK
* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES
16
7
6
5
4
5/16/2019
26 Unit 24 Unit28 Unit 27 Unit 20 Unit 21 Unit 23 Unit22 Unit 25 Unit
10
9
3
15
14
RUN DATE :
13
8
12
FLOOR18
17
N/A
N/A
N/A
2
11
JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
Prep
/ Po
int -
Agen
t
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
Prep
/ Po
int -
Agen
t
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
Prep
/ Po
int -
Agen
t
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
Prep
/ Po
int -
Agen
t
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
Prep
/ Po
int -
Agen
t
WC
DBL
Van
ity B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
Prep
/ Po
int -
Agen
t
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
Prep
/ Po
int -
Agen
t
WC
DBL
Van
ity B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
Prep
/ Po
int -
Agen
t
WC
DBL
Van
ity B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
Prep
/ Po
int -
Agen
t
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12AREAS AVAILABLE FOR YOU TO WORK
* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATESWORK COMPLETE TO DATE 1/23/12
FLOOR18
17
N/A
N/A
N/A
2
11
15
14
RUN DATE :
13
8
12
24 Unit28 Unit 27 Unit 20 Unit 21 Unit 23 Unit22 Unit 25 Unit
16
7
6
5
4
5/16/2019
26 Unit
10
9
3
JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
* * * * * * * * * * * * * *
* * * * * * * * * * * * * *
* * * * * *
* * * * * *
* * * * * * * * * * * * * * * * * * *
* * * * * * * * * * * * * * * * * * *
* * * * * *
* * * * * *
* * * * * *
* * * * * *
* * * * * * * * *
* * * * * * * * *
* * * * * * *
* * * * * * *
Prep
/ Po
int -
Agen
t
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
Prep
/ Po
int -
Agen
t
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
Prep
/ Po
int -
Agen
t
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
Prep
/ Po
int -
Agen
t
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
Prep
/ Po
int -
Agen
t
WC
DBL
Van
ity B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
Prep
/ Po
int -
Agen
t
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
Prep
/ Po
int -
Agen
t
WC
DBL
Van
ity B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
Prep
/ Po
int -
Agen
t
WC
DBL
Van
ity B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
Prep
/ Po
int -
Agen
t
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12AREAS AVAILABLE FOR YOU TO WORK SHEET ROCK REWORK/NEEDS PRIMING
* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATESWORK COMPLETE TO DATE 1/23/12
FLOOR18
17
N/A
N/A
2
11
N/A N/A
15
14
RUN DATE :
13
8
12
24 Unit28 Unit 27 Unit 20 Unit 21 Unit 23 Unit22 Unit 25 Unit
16
7
6
5
4
1/30/2012
26 Unit
10
9
3
JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
2 2 2 2 2
2 2 2 2 2
2 2
2 2
2 2 2
2 2 2
4 4 5 4 4 5 4 4 2 5 4 4 5 3 5 2 2 4 5 3 5 3 3 * 5
4 4 5 4 4 5 4 4 2 5 4 4 5 3 5 2 2 4 5 3 5 3 3 * 5
2 2 2
2 2 2
2 2 2 2 2 5 2
2 2 2 2 2 5 2
2 2 2 4 2 2 2 2 5 2 2 2 2 2
2 2 2 4 2 2 2 2 5 2 2 2 2 2
3 5 3 3 4 3 2 3 5 3 2 5 2 2
3 5 3 3 4 3 2 3 5 3 2 5 2 2
4 5 4 4 4 5 4 5 3 4 5 4 5
4 5 4 4 4 5 4 5 3 4 5 4 5
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
WC
Hal
lway
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12AREAS AVAILABLE FOR YOU TO WORK SHEET ROCK REWORK/NEEDS PRIMING
* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/13/2011WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 2/20/2011
FLOOR18
17
N/A
2
11
15
14
unit 20unit 21unit 23unit 22unit 25
RUN DATE :
unit 24unit 28
1/30/2012
unit 26
9
3
unit 27
8
N/A
N/A
N/A
N/A
16
7
6
5
4
13
12
10
JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
2 3 2 3 2 3 2
2 3 2 3 2 3 2
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2
4 # 2 # 3 # 2 2 # # # # * #
4 # 2 # 3 # 2 2 # # # # * #
2 3
2 3
2 2
2 2
3 3 3 3 3 6 3
3 3 3 3 3 6 3
3 3 3 5 3 3 3 6 3 3 2 3 3 3
3 3 3 5 3 3 3 6 3 3 2 3 3 3
4 6 4 4 5 4 2 4 6 4 3 6 3 3
4 6 4 4 5 4 2 4 6 4 3 6 3 3
5 6 5 5 5 6 5 6 4 5 6 5 6
5 6 5 5 5 6 5 6 4 5 6 5 6
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
WC
Hal
lway
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12AREAS AVAILABLE FOR YOU TO WORK SHEET ROCK REWORK/NEEDS PRIMING
* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/13/2012WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 2/20/2012
FLOOR18
17
N/A
2
11
15
14
unit 20unit 21unit 23unit 22unit 25
RUN DATE :
unit 24unit 28
1/30/2012
unit 26
9
3
unit 27
8
N/A
N/A
N/A
N/A
16
7
6
5
4
13
12
10
JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
2 3 3 3 3
2 3 3 3 3
3 3 2 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 3 2 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 2 3 3 2 3 3 2
3 2 3 3 2 3 3 2
5 3 4 3 3 2 *
5 3 4 3 3 2 *
3 2 4 2 2 2 2 2 2 2 2 2
3 2 4 2 2 2 2 2 2 2 2 2
2 2 3 2 2 2 3 2 2 2 2 2
2 2 3 2 2 2 3 2 2 2 2 2
2 4 2 4 2 2 2 4 2 2 2 4 2 2 4
2 4 2 4 2 2 2 4 2 2 2 4 2 2 4
4 4 4 6 4 2 4 2 4 7 4 4 4
4 4 4 6 4 2 4 2 4 7 4 4 4
5 7 5 5 6 5 3 5 7 5 4 7 4 2 4 2
5 7 5 5 6 5 3 5 7 5 4 7 4 2 4 2
6 7 6 6 6 7 6 7 5 6 7 6 7
6 7 6 6 6 7 6 7 5 6 7 6 7
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
WC
Hal
lway
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12AREAS AVAILABLE FOR YOU TO WORK SHEET ROCK REWORK/NEEDS PRIMING
* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/13/2012WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 2/20/2012
FLOOR18
17
N/A
2
11
15
14
unit 20unit 21unit 23unit 22unit 25
RUN DATE :
unit 24unit 28
1/30/2012
unit 26
9
3
unit 27
8
N/A
N/A
N/A
N/A
16
7
6
5
4
13
12
10
JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
2 2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2 2
4 4 3 4 4 4 4 4 4 4 4 4 4 4
4 4 3 4 4 4 4 4 4 4 4 4 4 4
3 3 3
3 3 3
6 5 4 4 2 3 *
6 5 4 4 2 3 *
4 3 5 3 3 2 3 2 2 2 3 3 3 3 3 3
4 3 5 3 3 2 3 2 2 2 3 3 3 3 3 3
3 2 3 4 3 3 4 2 2 3 3 3 2 3 3
3 2 3 4 3 3 4 2 2 3 3 3 2 3 3
3 5 3 5 3 3 3 5 3 2 3 2 3 5 3 3 5
3 5 3 5 3 3 3 5 3 2 3 2 3 5 3 3 5
5 5 7 5 3 5 5 8 2 5 5 2 5
5 5 7 5 3 5 5 8 2 5 5 2 5
6 6 6 6 6 6 2 5 5 5
6 6 6 6 6 6 2 5 5 5
7 7 7 7 6 2 7 7
7 7 7 7 6 2 7 7
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
WC
Hal
lway
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12AREAS AVAILABLE FOR YOU TO WORK SHEET ROCK REWORK/NEEDS PRIMING WORK COMPLETE TO DATE 3/12/2012
* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/13/2012WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 2/20/2012
FLOOR18
17
N/A
2
11
15
14
unit 20unit 21unit 23unit 22unit 25
RUN DATE :
unit 24unit 28
1/30/2012
unit 26
9
3
unit 27
8
N/A
N/A
N/A
N/A
16
7
6
5
4
13
12
10
JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
2 2 2 2 2
2 2 2 2 2
3 3 2 3 3 2 3 2 3 2 3
3 3 2 3 3 2 3 2 3 2 3
2 3 3 2 2 3 3 2 3 2 2 3 2 2 3
2 3 3 2 2 3 3 2 3 2 2 3 2 2 3
2 3 3 3 3 3 3 3 3 3 2 2 3
2 3 3 3 3 3 3 3 3 3 2 2 3
2 5 5 4 5 5 5 5 5 5 5 5 5 5 5
2 5 5 4 5 5 5 5 5 5 5 5 5 5 5
4 4 4
4 4 4
7 6 5 3 4 *
7 6 5 3 4 *
5 4 6 4 4 3 4 3 2 3 4 4 4 4 4 4
5 4 6 4 4 3 4 3 2 3 4 4 4 4 4 4
4 2 3 2 4 5 4 2 4 5 3 2 3 4 4 4 3 4 4
4 2 3 2 4 5 4 2 4 5 3 2 3 4 4 4 3 4 4
4 6 4 6 4 4 4 4 3 4 3 4 4 2 4
4 6 4 6 4 4 4 4 3 4 3 4 4 2 4
4 6 6 6 6 2 6 6 6
4 6 6 6 6 2 6 6 6
7 7 2 7 2 7 2 7 2 7 6 2 6 2 6 2
7 7 2 7 2 7 2 7 2 7 6 2 6 2 6 2
8 2 8 2 8 2 8 2 7 2 8 2 8 2
8 2 8 2 8 2 8 2 7 2 8 2 8 2
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
WC
Hal
lway
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12AREAS AVAILABLE FOR YOU TO WORK SHEET ROCK REWORK/NEEDS PRIMING WORK COMPLETE TO DATE 3/12/2012
* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/13/2012 WORK COMPLETE TO DATE 3/19/2012WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 2/20/2012
FLOOR18
17
N/A
2
11
15
14
unit 20unit 21unit 23unit 22unit 25
RUN DATE :
unit 24unit 28
1/30/2012
unit 26
9
3
unit 27
8
N/A
N/A
N/A
N/A
16
7
6
5
4
13
12
10
JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
2 3 2 2 3 2 2 2 3 2 2 3 2 2 3 2
2 3 2 2 3 2 2 2 3 2 2 3 2 2 3 2
2 4 2 4 2 3 4 4 3 4 2 3 4 2 3 4
2 4 2 4 2 3 4 4 3 4 2 3 4 2 3 4
3 4 4 2 3 3 4 3 4 3 3 4 3 3 4
3 4 4 2 3 3 4 3 4 3 3 4 3 3 4
3 4 4 4 4 2 4 4 4 4 4 2 2 3 3 4 2
3 4 4 4 4 2 4 4 4 4 4 2 2 3 3 4 2
3 6 6 5 6 6 6 6 6 6 6 6 2 6 6 6 2
3 6 6 5 6 6 6 6 6 6 6 6 2 6 6 6 2
2 2 5 5 2 5 2
2 2 5 5 2 5 2
2 8 2 2 7 2 2 2 4 5 2 2 2
2 8 2 2 7 2 2 2 4 5 2 2 2
2 2 6 2 5 7 2 5 2 2 5 4 5 2 2 4 3 4 5 5 5 5 2 2 5 5 2
2 2 6 2 5 7 2 5 2 2 5 4 5 2 2 4 3 4 5 5 5 5 2 2 5 5 2
2 5 3 2 4 3 2 5 6 2 5 3 5 6 2 4 4 5 5 5 4 2 5 5
2 5 3 2 4 3 2 5 6 2 5 3 5 6 2 4 4 5 5 5 4 2 5 5
5 7 5 5 5 2 5 2 5 4 5 2 4 5 2 5 3 5 2
5 7 5 5 5 2 5 2 5 4 5 2 4 5 2 5 3 5 2
5 2 7 2 7 2 7 2 7 2 3 2 7 2 7 2 7
5 2 7 2 7 2 7 2 7 2 3 2 7 2 7 2 7
8 2 8 3 8 3 8 3 8 3 8 2 7 3 7 3 7 3
8 2 8 3 8 3 8 3 8 3 8 2 7 3 7 3 7 3
9 9 9 9 8 9 9
9 9 9 9 8 9 9
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
WC
Hal
lway
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12AREAS AVAILABLE FOR YOU TO WORK SHEET ROCK REWORK/NEEDS PRIMING WORK COMPLETE TO DATE 3/12/2012
* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/13/2012 WORK COMPLETE TO DATE 3/19/2012WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 2/20/2012 WORK COMPLETE TO DATE 3/26/2012
N/A
N/A
16
7
6
5
4
13
12
10
9
3
unit 27
8
N/A
N/A
unit 20unit 21unit 23unit 22unit 25
RUN DATE :
unit 24unit 28
1/30/2012
unit 26
FLOOR18
17
N/A
2
11
15
14
JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
2 2 2 2 2 2
2 2 2 2 2 2
5 3 4 5 3 5 5 3 3 5 3 4 5 3
5 3 4 5 3 5 5 3 3 5 3 4 5 3
5 7 5 7 5 6 7 7 6 7 5 6 7 4 5 6 7 4
5 7 5 7 5 6 7 7 6 7 5 6 7 4 5 6 7 4
6 7 7 5 6 6 2 7 6 7 6 6 7 4 6 6 7
6 7 7 5 6 6 2 7 6 7 6 6 7 4 6 6 7
6 7 7 7 7 2 7 6 7 7 7 5 5 6 6 7 5
6 7 7 7 7 2 7 6 7 7 7 5 5 6 6 7 5
6 9 9 8 9 9 9 9 9 9 9 9 5 9 9 9 5
6 9 9 8 9 9 9 9 9 9 9 9 5 9 9 9 5
5 4 5 8 8 5 8 5
5 4 5 8 8 5 8 5
5 4 11 2 5 4 3 5 4 10 5 4 5 4 3 5 4 4 4 4 7 4 8 4 2 5 5 4 4 5
5 4 11 2 5 4 3 5 4 10 5 4 5 4 3 5 4 4 4 4 7 4 8 4 2 5 5 4 4 5
5 5 9 5 8 10 5 8 5 5 8 8 5 5 7 3 7 8 8 8 8 5 5 8 8 5
5 5 9 5 8 10 5 8 5 5 8 8 5 5 7 3 7 8 8 8 8 5 5 8 8 5
5 8 6 5 7 6 5 8 9 5 8 6 8 9 5 7 7 8 8 8 7 5 8 3
5 8 6 5 7 6 5 8 9 5 8 6 8 9 5 7 7 8 8 8 7 5 8 3
8 8 3 8 3 5 8 3 8 3 8 3 7 8 3 8 3 8 3
8 8 3 8 3 5 8 3 8 3 8 3 7 8 3 8 3 8 3
8 5 10 5 10 5 10 5 10 5 6 5 10 5 10 5 10 3
8 5 10 5 10 5 10 5 10 5 6 5 10 5 10 5 10 3
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
WC
Hal
lway
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c. T
rim a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
Cor
ridor
s
BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12AREAS AVAILABLE FOR YOU TO WORK SHEET ROCK REWORK/NEEDS PRIMING WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/16/2012
* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/13/2012 WORK COMPLETE TO DATE 3/19/2012WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 2/20/2012 WORK COMPLETE TO DATE 3/26/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETE TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/2/2012
No items were completed this week WORK COMPLETE TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/9/2012WORK COMPLETE TO DATE 2/6/2012
N/A
N/A
N/A
16
7
6
5
4
13
12
10
9
3
unit 27
8
N/A
N/A
unit 20unit 21unit 23unit 22unit 25
RUN DATE :
unit 24unit 28
1/30/2012
unit 26
FLOOR18
17
N/A
2
11
15
14
JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
3 3 3 3 3
3 3 3 3 3
6 4 5 6 4 6 6 4 4 6 4 5 6 4
6 4 5 6 4 6 6 4 4 6 4 5 6 4
6 8 6 8 6 7 8 8 7 8 6 7 8 5 6 7 8
6 8 6 8 6 7 8 8 7 8 6 7 8 5 6 7 8
7 8 8 6 7 7 3 8 7 8 7 7 8 5 7 7 8
7 8 8 6 7 7 3 8 7 8 7 7 8 5 7 7 8
7 8 8 8 8 3 8 7 8 8 8 6 6 7 7 8
7 8 8 8 8 3 8 7 8 8 8 6 6 7 7 8
7 10 # 9 10 10 10 # 10 10 # 10 6 10 # 10
7 10 # 9 10 10 10 # 10 10 # 10 6 10 # 10
6 5 6 9 9 6 9
6 5 6 9 9 6 9
6 5 12 3 6 5 4 6 5 11 6 5 6 5 4 6 5 5 5 5 8 5 9 5 3 6 6 5 5
6 5 12 3 6 5 4 6 5 11 6 5 6 5 4 6 5 5 5 5 8 5 9 5 3 6 6 5 5
6 6 10 6 9 11 6 9 6 6 9 2 9 6 6 8 4 8 9 9 9 9 6 6 9 9
6 6 10 6 9 11 6 9 6 6 9 2 9 6 6 8 4 8 9 9 9 9 6 6 9 9
6 9 7 6 8 7 6 9 10 6 9 7 9 10 6 8 2 8 9 9 9 8 6 9 4
6 9 7 6 8 7 6 9 10 6 9 7 9 10 6 8 2 8 9 9 9 8 6 9 4
8
8
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
WC
Hal
lway
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c. T
rim a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12AREAS AVAILABLE FOR YOU TO WORK SHEET ROCK REWORK/NEEDS PRIMING WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/16/2012
* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/13/2012 WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/23/2012WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 2/20/2012 WORK COMPLETE TO DATE 3/26/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETE TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/2/2012
No items were completed this week WORK COMPLETE TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/9/2012WORK COMPLETE TO DATE 2/6/2012
FLOOR18
17
N/A
2
11
15
14
unit 20unit 21unit 23unit 22unit 25
RUN DATE :
unit 24unit 28
1/30/2012
unit 26
13
12
10
9
3
unit 27
8
N/A
N/A
N/A
N/A
N/A
16
7
6
5
4
JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
5
5
6
6
6
6
6
6
6
6
6
6
Balc
ony
Fini
sh C
oate
d
JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
3 3 3 3 3
3 3 3 3 3
6 4 5 6 4 6 6 4 4 6 4 5 6 4
6 4 5 6 4 6 6 4 4 6 4 5 6 4
6 8 6 8 6 7 8 8 7 8 6 7 8 5 6 7 8
6 8 6 8 6 7 8 8 7 8 6 7 8 5 6 7 8
7 8 8 6 7 7 3 8 7 8 7 7 8 5 7 7 8
7 8 8 6 7 7 3 8 7 8 7 7 8 5 7 7 8
7 8 8 8 8 3 8 7 8 8 8 6 6 7 7 8
7 8 8 8 8 3 8 7 8 8 8 6 6 7 7 8
7 10 # 9 10 10 10 # 10 10 # 10 6 10 # 10
7 10 # 9 10 10 10 # 10 10 # 10 6 10 # 10
6 5 6 9 9 6 9
6 5 6 9 9 6 9
6 5 12 3 6 5 4 6 5 11 6 5 6 5 4 6 5 5 5 5 8 5 9 5 3 6 6 5 5
6 5 12 3 6 5 4 6 5 11 6 5 6 5 4 6 5 5 5 5 8 5 9 5 3 6 6 5 5
6 6 10 6 9 11 6 9 6 6 9 2 9 6 6 8 4 8 9 9 9 9 6 6 9 9
6 6 10 6 9 11 6 9 6 6 9 2 9 6 6 8 4 8 9 9 9 9 6 6 9 9
6 9 8 9 9 9 8 8 9 9 9
6 9 8 9 9 9 8 8 9 9 9
8
8
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
WC
Hal
lway
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c. T
rim a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12AREAS AVAILABLE FOR YOU TO WORK SHEET ROCK REWORK/NEEDS PRIMING WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/16/2012
* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/13/2012 WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/23/2012WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 2/20/2012 WORK COMPLETE TO DATE 3/26/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETE TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/2/2012
No items were completed this week WORK COMPLETE TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/9/2012WORK COMPLETE TO DATE 2/6/2012
FLOOR18
17
N/A
2
11
15
14
unit 20unit 21unit 23unit 22unit 25
RUN DATE :
unit 24unit 28
1/30/2012
unit 26
13
12
10
9
3
unit 27
8
N/A
N/A
N/A
N/A
N/A
16
7
6
5
4
JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
5
5
6
6
6
6
6
6
6
6
6
6
Balc
ony
Fini
sh C
oate
d
JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
4 4 4 4 4
4 4 4 4 4
7 5 6 7 5 7 7 5 5 7 5 6 7 5
7 5 6 7 5 7 7 5 5 7 5 6 7 5
7 9 7 9 7 8 9 9 8 9 7 8 9 6 7 8 9
7 9 7 9 7 8 9 9 8 9 7 8 9 6 7 8 9
8 9 9 7 8 8 4 9 8 9 8 8 9 6 8 8 9
8 9 9 7 8 8 4 9 8 9 8 8 9 6 8 8 9
8 9 9 2 9 9 4 9 8 9 9 9 7 7 8 8 9
8 9 9 2 9 9 4 9 8 9 9 9 7 7 8 8 9
10 11 11 7 11
10 11 11 7 11
7 6 7 2 10 10 7 10
7 6 7 2 10 10 7 10
7 6 13 4 7 6 7 6 12 7 6 7 6 5 7 6 6 6 6 9 6 10 6 4 7 7 6 6
7 6 13 4 7 6 7 6 12 7 6 7 6 5 7 6 6 6 6 9 6 10 6 4 7 7 6 6
7 7 7 10 7 10 7 7 10 10 7 9 9 10 10 7 7 10
7 7 7 10 7 10 7 7 10 10 7 9 9 10 10 7 7 10
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
WC
Hal
lway
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c. T
rim a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
hal
lway
van
ity
WC
Sin
gle
Vani
ty
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
hal
lway
van
ity
WC
Sin
gle
Vani
ty
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12AREAS AVAILABLE FOR YOU TO WORK SHEET ROCK REWORK/NEEDS PRIMING WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/16/2012
* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/13/2012 WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/23/2012WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 2/20/2012 WORK COMPLETE TO DATE 3/26/2012 WORK COMPLETED TO DATE 4/30/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETE TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/2/2012
No items were completed this week WORK COMPLETE TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/9/2012WORK COMPLETE TO DATE 2/6/2012
14
unit 21unit 23unit 22unit 25
N/A
FLOOR18
17
N/A
2
11
RUN DATE :
unit 24unit 28
1/30/2012
unit 26
13
12
10
9
3
unit 27
8
N/A
N/A
N/A
N/A
unit 20
N/A
N/A
16
7
6
5
4
15
JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
6
6
7
7
7
7
7
7
7
7
7
7
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
2 2 2 2 2 2
2 2 2 2 2 2
5 2 5 2 5 2 5 2 5
5 2 5 2 5 2 5 2 5
8 6 7 8 6 8 8 6 8 6 7 8 6
8 6 7 8 6 8 8 6 8 6 7 8 6
8 10 7 10 8 9 10 10 9 10 8 9 10 7 8 9 10
8 10 7 10 8 9 10 10 9 10 8 9 10 7 8 9 10
9 10 9 8 9 9 5 10 9 10 9 9 10 7 9 9 10
9 10 9 8 9 9 5 10 9 10 9 9 10 7 9 9 10
9 10 9 3 10 10 5 10 9 10 10 # 8 8 9 9 10
9 10 9 3 10 10 5 10 9 10 10 # 8 8 9 9 10
11 12 12 8 12
11 12 12 8 12
8 7 8 3 11 11 8 11
8 7 8 3 11 11 8 11
8 7 8 7 8 7 8 7 7 6 8 7 7 7 10 7 7 5 8 8 7
8 7 8 7 8 7 8 7 7 6 8 7 7 7 10 7 7 5 8 8 7
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
WC
Hal
lway
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c. T
rim a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Hal
lway
bat
hroo
m
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
hal
lway
bat
hroo
m
WC
Sin
gle
Vani
ty
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12AREAS AVAILABLE FOR YOU TO WORK SHEET ROCK REWORK/NEEDS PRIMING WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/16/2012
* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/13/2012 WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/23/2012WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 2/20/2012 WORK COMPLETE TO DATE 3/26/2012 WORK COMPLETED TO DATE 4/30/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETE TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012
No items were completed this week WORK COMPLETE TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/9/2012WORK COMPLETE TO DATE 2/6/2012
14
N/A
N/A
N/A
N/A
unit 21unit 23unit 22unit 25
FLOOR18
17
N/A
2
11
RUN DATE :
unit 24unit 28
1/30/2012
unit 26
13
12
10
9
3
unit 27
8
N/A
N/A
unit 20
N/A
16
7
6
5
4
15
JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
7
7
8
8
8
8
8
8
8
8
8
8
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
3 3 3 3 3 3
3 3 3 3 3 3
6 2 6 3 6 3 6 3 6
6 2 6 3 6 3 6 3 6
9 7 8 9 7 9 9 7 9 7 8 9 7
9 7 8 9 7 9 9 7 9 7 8 9 7
9 11 8 11 9 10 11 11 # 11 9 # 11 8 9 # 11
9 11 8 11 9 10 11 11 # 11 9 # 11 8 9 # 11
10 11 # 9 10 10 6 11 # 11 10 # 11 8 10 # 11
10 11 # 9 10 10 6 11 # 11 10 # 11 8 10 # 11
10 11 # 4 11 11 6 11 # 11 11 # 9 9 10 # 11
10 11 # 4 11 11 6 11 # 11 11 # 9 9 10 # 11
12 13 13 9 13
12 13 13 9 13
9 8 9 4 12 12 9 12
9 8 9 4 12 12 9 12
8 2 8 2 9 8 2 8 2 8 9 8 8 11 8 2 8 9 8 2
8 2 8 2 9 8 2 8 2 8 9 8 8 11 8 2 8 9 8 2
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
WC
Hal
lway
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c. T
rim a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Hal
lway
bat
hroo
m
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
hal
lway
bat
hroo
m
WC
Sin
gle
Vani
ty
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/16/2012
* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/13/2012 WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/23/2012WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 2/20/2012 WORK COMPLETE TO DATE 3/26/2012 WORK COMPLETED TO DATE 4/30/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETE TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012
No items were completed this week WORK COMPLETE TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012WORK COMPLETE TO DATE 2/6/2012
unit 20
N/A
16
7
6
5
4
15
13
12
10
9
3
unit 27
8
N/A
N/A
FLOOR18
17
N/A
2
11
RUN DATE :
unit 24unit 28
1/30/2012
unit 26
14
N/A
N/A
N/A
N/A
unit 21unit 23unit 22unit 25
JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
2
2
8
8
9
9
9
9
9
9
9
9
9
9
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
5 5 5 5 5 5
5 5 5 5 5 5
2 2 8 4 2 8 5 2 2 8 5 8 5 8
2 2 8 4 2 8 5 2 2 8 5 8 5 8
2 11 9 10 11 9 11 # 9 # 9 10 # 9
2 11 9 10 11 9 11 # 9 # 9 10 # 9
11 13 10 13 11 12 13 13 # 13 11 # 13 10 11 # 13
11 13 10 13 11 12 13 13 # 13 11 # 13 10 11 # 13
12 13 12 11 12 12 8 13 # 13 12 # 13 10 12 # 13
12 13 12 11 12 12 8 13 # 13 12 # 13 10 12 # 13
12 13 12 2 13 8 13 11 11 13
12 13 12 2 13 8 13 11 11 13
2 14 2 3 2 15 2 15 11 2 15
2 14 2 3 2 15 2 15 11 2 15
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
WC
Hal
lway
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c. T
rim a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Hal
lway
bat
hroo
m
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
hal
lway
bat
hroo
m
WC
Sin
gle
Vani
ty
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012
* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/13/2012 WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 5/30/2012WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 2/20/2012 WORK COMPLETE TO DATE 3/26/2012 WORK COMPLETED TO DATE 4/30/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETE TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012
No items were completed this week WORK COMPLETE TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012WORK COMPLETE TO DATE 2/6/2012
14
N/A
N/A
N/A
N/A
unit 21unit 23unit 22unit 25
FLOOR18
17
N/A
2
11
RUN DATE :
unit 24unit 28
1/30/2012
unit 26
13
12
10
9
3
unit 27
8
N/A
N/A
unit 20
N/A
16
7
6
5
4
15
JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
4
4
3
3
3
3
10
10
11
11
11
11
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
6 6 6 6 6 6
6 6 6 6 6 6
3 9 5 3 9 6 3 9 6 2 2 9 6 2 9
3 9 5 3 9 6 3 9 6 2 2 9 6 2 9
3 12 10 11 12 10 12 # 10 # 10 11 # 10
3 12 10 11 12 10 12 # 10 # 10 11 # 10
12 14 11 14 12 13 14 14 # 14 12 # 14 11 12 # 14
12 14 11 14 12 13 14 14 # 14 12 # 14 11 12 # 14
13 14 13 12 13 13 9 14 # 14 14 11 14
13 14 13 12 13 13 9 14 # 14 14 11 14
3 9 14 12 12 14
3 9 14 12 12 14
3 15 3 4 3 16 3 12 3
3 15 3 4 3 16 3 12 3
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
WC
Hal
lway
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c. T
rim a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Hal
lway
bat
hroo
m
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
hal
lway
bat
hroo
m
WC
Sin
gle
Vani
ty
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012
* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/13/2012 WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 5/30/2012WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 2/20/2012 WORK COMPLETE TO DATE 3/26/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE 6/4/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETE TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012
No items were completed this week WORK COMPLETE TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012WORK COMPLETE TO DATE 2/6/2012
unit 20
N/A
16
7
6
5
4
15
13
12
10
9
3
unit 27
8
N/A
N/A
FLOOR18
17
N/A
2
11
RUN DATE :
unit 24unit 28
1/30/2012
unit 26
14
N/A
N/A
N/A
N/A
unit 21unit 23unit 22unit 25
JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
5
5
4
4
4
4
11
11
12
12
12
12
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
2 2 7 7 2 2 7 7 7 2 2 7
2 2 7 7 2 2 7 7 7 2 2 7
4 10 6 4 10 7 4 10 7 3 3 10 7 2 10
4 10 6 4 10 7 4 10 7 3 3 10 7 2 10
4 13 11 12 13 11 13 # 11 # 11 12 # 11
4 13 11 12 13 11 13 # 11 # 11 12 # 11
13 15 12 15 13 14 15 15 # 15 13 # 15 12 13 # 15
13 15 12 15 13 14 15 15 # 15 13 # 15 12 13 # 15
13 10 15 15 12 15
13 10 15 15 12 15
4 10 15 13 13 15
4 10 15 13 13 15
4 16 4 4 4 2 13 4
4 16 4 4 4 2 13 4
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
WC
Hal
lway
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c. T
rim a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Hal
lway
bat
hroo
m
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
hal
lway
bat
hroo
m
WC
Sin
gle
Vani
ty
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012
* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/13/2012 WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 5/30/2012WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 2/20/2012 WORK COMPLETE TO DATE 3/26/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE 6/4/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETE TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 6/11/2012
No items were completed this week WORK COMPLETE TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012WORK COMPLETE TO DATE 2/6/2012
N/A
16
7
6
5
4
12
10
9
3
unit 20unit 25unit 27
8
N/A
N/A
FLOOR18
17
14
15
13
2
11
RUN DATE :
unit 24unit 28
1/30/2012
unit 26
N/A
N/A
N/A
N/A
unit 21unit 23unit 22
N/A
JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
6
6
5
5
5
5
12
12
13
13
2 13
2 13
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
0
JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
3 3 2 8 8 3 3 8 8 8 3 3 8
3 3 2 8 8 3 3 8 8 8 3 3 8
5 11 7 5 11 8 5 11 8 4 4 11 8 3 11
5 11 7 5 11 8 5 11 8 4 4 11 8 3 11
5 14 12 13 14 12 14 # 2 12 # 12 13 # 12
5 14 12 13 14 12 14 # 2 12 # 12 13 # 12
14 16 13 16 14 15 16 16 # 16 14 # 16 13 14 # 16
14 16 13 16 14 15 16 16 # 16 14 # 16 13 14 # 16
14 2 11 16 16 13 16
14 2 11 16 16 13 16
14
14
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
WC
Hal
lway
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c. T
rim a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Hal
lway
bat
hroo
m
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
hal
lway
bat
hroo
m
WC
Sin
gle
Vani
ty
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012
* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/13/2012 WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 5/30/2012WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 2/20/2012 WORK COMPLETE TO DATE 3/26/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE 6/4/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETE TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 6/11/2012
No items were completed this week WORK COMPLETE TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/18/2012WORK COMPLETE TO DATE 2/6/2012
N/A
N/A
N/A
N/A
unit 21unit 23unit 22
N/A
RUN DATE :
unit 24unit 28
1/30/2012
unit 26
17
14
15
13
2
11
3
unit 20unit 25unit 27
8
N/A
N/A
FLOOR18
N/A
16
7
6
5
4
12
10
9
JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
7
7
6
6
6
6
13
13
14
14
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
0
JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
2 2 2 2
2 2 2 2
4 3 9 9 4 4 9 9 9 4 4
4 3 9 9 4 4 9 9 9 4 4
6 12 8 6 12 9 6 12 9 5 5 12 9 4
6 12 8 6 12 9 6 12 9 5 5 12 9 4
6 15 13 14 15 13 15 # 13 # 13 14 #
6 15 13 14 15 13 15 # 13 # 13 14 #
15 14 17 15 17 17 # 17 17 14
15 14 17 15 17 17 # 17 17 14
3 14
3 14
2
2
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
WC
Hal
lway
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c. T
rim a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Hal
lway
bat
hroo
m
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
hal
lway
bat
hroo
m
WC
Sin
gle
Vani
ty
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012 WORK COMPLETED TO DATE 6/25/2012
* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/13/2012 WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 7/2/2012WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 2/20/2012 WORK COMPLETE TO DATE 3/26/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE 6/4/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETE TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 6/11/2012
No items were completed this week WORK COMPLETE TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/18/2012WORK COMPLETE TO DATE 2/6/2012
9
N/A
N/A
FLOOR18
N/A
16
7
6
5
4
17
14
15
13
2
11
3
8
12
10
RUN DATE :
unit 24unit 28
1/30/2012
unit 26 unit 25unit 27
N/A
N/A
N/A
unit 21unit 23unit 22
N/A
N/A
JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
8
8
9 7
9 7
12 7
12 7
13
13
17 14
17 14
15
15
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
unit 20
JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
3 3
3 3
5 4 10 5 5
5 4 10 5 5
2 7 9 2 7 10 2 7 10 6 6
2 7 9 2 7 10 2 7 10 6 6
14 14 2
14 14 2
2 2 2 2 2
2 2 2 2 2
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
WC
Hal
lway
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c. T
rim a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Hal
lway
bat
hroo
m
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
hal
lway
bat
hroo
m
WC
Sin
gle
Vani
ty
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty
BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012
* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/13/2012 WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 5/30/2012WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 2/20/2012 WORK COMPLETE TO DATE 3/26/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE 6/4/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETE TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 6/11/2012
No items were completed this week WORK COMPLETE TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/18/2012WORK COMPLETE TO DATE 2/6/2012
9
N/A
N/A
FLOOR18
N/A
16
7
6
5
4
17
14
15
13
2
11
3
8
12
N/A
unit 23unit 22
10
RUN DATE :
unit 24unit 28
1/30/2012
unit 26
N/
unit 25unit 27
N/A
N/A
JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
3 3 9
3 3 9
10 10 5 5 8
10 10 5 5 8
10 5 8
10 5 8
14 14
14 14
15 15
15 15
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WORK COMPLETED TO DATE 6/25/2012WORK COMPLETED TO DATE 7/6/2012WORK COMPLETED TO DATE 7/9/2012
unit 21
N/A
/A
unit 20
JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
2 2 4 4
2 2 4 4
6 5 2 6 6
6 5 2 6 6
3 8 2 3 8 2 3 8 2 7 7
3 8 2 3 8 2 3 8 2 7 7
15 15 3
15 15 3
2 2 2 2 2
2 2 2 2 2
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
WC
Hal
lway
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c. T
rim a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Hal
lway
bat
hroo
m
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
hal
lway
bat
hroo
m
WC
Sin
gle
Vani
ty
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty
BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012
* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/13/2012 WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 5/30/2012WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 2/20/2012 WORK COMPLETE TO DATE 3/26/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE 6/4/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETE TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 6/11/2012
No items were completed this week WORK COMPLETE TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/18/2012WORK COMPLETE TO DATE 2/6/2012
N/
unit 25unit 27
N/A
N/A
N/A
unit 23unit 22
10
RUN DATE :
unit 24unit 28
1/30/2012
unit 26
17
14
15
13
2
11
3
8
12
9
N/A
N/A
FLOOR18
N/A
16
7
6
5
4
JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
2 4 4 2 10
2 4 4 2 10
2 11 6 6 2
2 11 6 6 2
2 6 2
2 6 2
15 15
15 15
16 16
16 16
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WORK COMPLETED TO DATE 6/25/2012WORK COMPLETED TO DATE 7/6/2012WORK COMPLETED TO DATE 7/9/2012
N/A
/A
unit 20unit 21
JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
3 3 5 5
3 3 5 5
7 6 3 7 7
7 6 3 7 7
4 9 3 4 9 3 4 9 3 8 8
4 9 3 4 9 3 4 9 3 8 8
3 3 3
3 3 3
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
WC
Hal
lway
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c. T
rim a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Hal
lway
bat
hroo
m
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
hal
lway
bat
hroo
m
WC
Sin
gle
Vani
ty
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty
BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012
* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/13/2012 WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 5/30/2012WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 2/20/2012 WORK COMPLETE TO DATE 3/26/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE 6/4/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETE TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 6/11/2012
No items were completed this week WORK COMPLETE TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/18/2012WORK COMPLETE TO DATE 2/6/2012
N/
unit 25unit 27
N/A
N/A
N/A
unit 23unit 22
10
RUN DATE :
unit 24unit 28
1/30/2012
unit 26
17
14
15
13
2
11
3
8
12
9
N/A
N/A
FLOOR18
N/A
16
7
6
5
4
JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
3 5 5 3 11
3 5 5 3 11
3 12 7 7 3
3 12 7 7 3
3 7 3
3 7 3
2 2
2 2
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WORK COMPLETED TO DATE 6/25/2012WORK COMPLETED TO DATE 7/6/2012WORK COMPLETED TO DATE 7/9/2012WORK COMPELTED TO DATE 7/16/2012
N/A
/A
unit 20unit 21
JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
4 4 6 6
4 4 6 6
8 7 4 8 8
8 7 4 8 8
4 4 4
4 4 4
4 4 4
4 4 4
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
WC
Hal
lway
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c. T
rim a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Hal
lway
bat
hroo
m
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
hal
lway
bat
hroo
m
WC
Sin
gle
Vani
ty
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty
BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012
* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/13/2012 WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 5/30/2012WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 2/20/2012 WORK COMPLETE TO DATE 3/26/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE 6/4/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETE TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 6/11/2012
No items were completed this week WORK COMPLETE TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/18/2012WORK COMPLETE TO DATE 2/6/2012
9
N/A
N/A
FLOOR18
N/A
16
7
6
5
4
17
14
15
13
2
11
3
8
12
N/A
unit 23unit 22
10
RUN DATE :
unit 24unit 28
1/30/2012
unit 26
N/
unit 25unit 27
N/A
N/A
JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
4 6 6 4 12
4 6 6 4 12
4 13 8 8 4
4 13 8 8 4
4 4
4 4
3 3
3 3
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WORK COMPLETED TO DATE 6/25/2012WORK COMPLETED TO DATE 7/6/2012WORK COMPLETED TO DATE 7/9/2012WORK COMPELTED TO DATE 7/16/2012WORK COMPLETED TO DATE 7/23/2012
unit 21
N/A
/A
unit 20
JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
4 4 6 6
4 4 6 6
8 7 4 8 8
8 7 4 8 8
4 4 4
4 4 4
4 4 4
4 4 4
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
WC
Hal
lway
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c. T
rim a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Hal
lway
bat
hroo
m
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
hal
lway
bat
hroo
m
WC
Sin
gle
Vani
ty
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty
BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012
* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/13/2012 WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 5/30/2012WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 2/20/2012 WORK COMPLETE TO DATE 3/26/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE 6/4/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETE TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 6/11/2012
No items were completed this week WORK COMPLETE TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/18/2012WORK COMPLETE TO DATE 2/6/2012
9
N/A
N/A
FLOOR18
N/A
16
7
6
5
4
17
14
15
13
2
11
3
8
12
N/A
unit 23unit 22
10
RUN DATE :
unit 24unit 28
1/30/2012
unit 26
N/
unit 25unit 27
N/A
N/A
JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
4 6 6 4 12
4 6 6 4 12
4 13 8 8 4
4 13 8 8 4
4 4
4 4
3 3
3 3
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WORK COMPLETED TO DATE 6/25/2012WORK COMPLETED TO DATE 7/6/2012WORK COMPLETED TO DATE 7/9/2012WORK COMPELTED TO DATE 7/16/2012WORK COMPLETED TO DATE 7/23/2012
unit 21
N/A
/A
unit 20
JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
5 5 7 7
5 5 7 7
9 8 5 9 9
9 8 5 9 9
2 2
2 2
2 2 5 5 2 2 5
2 2 5 5 2 2 5
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
WC
Hal
lway
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c. T
rim a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Hal
lway
bat
hroo
m
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
hal
lway
bat
hroo
m
WC
Sin
gle
Vani
ty
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty
BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12 WORK COMPLETE TO DATE 2/13/2012 WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012 WORK COMPLETED TO DATE 6/25/2012 WORK COMP AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETE TO DATE 2/20/2012 WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 7/6/2012 WORK COMP
* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/27/2012 WORK COMPLETE TO DATE 3/26/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE 6/4/2012 WORK COMPLETED TO DATE 7/9/2012WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 6/11/2012 WORK COMPELTED TO DATE 7/16/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/18/2012 WORK COMPLETED TO DATE 7/23/2012
No items were completed this weekWORK COMPLETE TO DATE 2/6/2012
9
N/A
N/A
FLOOR18
N/A
16
7
6
5
4
17
14
15
13
2
11
3
8
12
N/A
unit 23unit 22
10
RUN DATE :
unit 24unit 28
1/30/2012
unit 26
N/
unit 25unit 27
N/A
N/A
JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
5 7 7 5 13
5 7 7 5 13
5 14 9 9 5
5 14 9 9 5
2
2
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
PLETED TO DATE 7/30/2012 PLETED TO DATE 8/6/2012
unit 21
N/A
/A
unit 20
JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
6 6 8 8
6 6 8 8
10 9 6 10 #
10 9 6 10 #
3 3 6 6 3 3 2 6
3 3 6 6 3 3 2 6
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
WC
Hal
lway
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c. T
rim a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Hal
lway
bat
hroo
m
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
hal
lway
bat
hroo
m
WC
Sin
gle
Vani
ty
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty
BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12 WORK COMPLETE TO DATE 2/13/2012 WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012 WORK COMPLETED TO DATE 6/25/2012 WORK COMP AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETE TO DATE 2/20/2012 WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 7/6/2012 WORK COMP
* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/27/2012 WORK COMPLETE TO DATE 3/26/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE 6/4/2012 WORK COMPLETED TO DATE 7/9/2012 WORK COMP WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 6/11/2012 WORK COMPELTED TO DATE 7/16/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/18/2012 WORK COMPLETED TO DATE 7/23/2012
No items were completed this weekWORK COMPLETE TO DATE 2/6/2012
N/
unit 25unit 27
N/A
N/A
N/A
unit 23unit 22
10
RUN DATE :
unit 24unit 28
1/30/2012
unit 26
17
14
15
13
2
11
3
8
12
9
N/A
N/A
FLOOR18
N/A
16
7
6
5
4
JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
6 8 8 6 14
6 8 8 6 14
6 15 10 # 6
6 15 10 # 6
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
PLETED TO DATE 7/30/2012 PLETED TO DATE 8/6/2012 PLETED TO DATE 8/13/2012
N/A
/A
unit 20unit 21
JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
7 7 9 9
7 7 9 9
7 11 11
7 11 11
4 4 7 7 4 4 3 7
4 4 7 7 4 4 3 7
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
WC
Hal
lway
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c. T
rim a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Hal
lway
bat
hroo
m
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
hal
lway
bat
hroo
m
WC
Sin
gle
Vani
ty
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty
BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12 WORK COMPLETE TO DATE 2/13/2012 WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012 WORK COMPLETED TO DATE 6/25/2012 WORK COMPL AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETE TO DATE 2/20/2012 WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 7/6/2012 WORK COMPL
* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/27/2012 WORK COMPLETE TO DATE 3/26/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE 6/4/2012 WORK COMPLETED TO DATE 7/9/2012 WORK COMPL WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 6/11/2012 WORK COMPELTED TO DATE 7/16/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/18/2012 WORK COMPLETED TO DATE 7/23/2012
No items were completed this weekWORK COMPLETE TO DATE 2/6/2012
9
N/A
N/A
FLOOR18
N/A
16
7
6
5
4
17
14
15
13
2
11
3
8
12
N/A
unit 23unit 22
10
RUN DATE :
unit 24unit 28
1/30/2012
unit 26
N/A
unit 25unit 27
N/A
N/A
JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
7 9 9 7 15
7 9 9 7 15
2 7 16 11 # 2 7
2 7 16 11 # 2 7
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
LETED TO DATE 7/30/2012 LETED TO DATE 8/6/2012 LETED TO DATE 8/13/2012
unit 21
N/A
A
unit 20
JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
8 8 10 10
8 8 10 10
8 2
8 2
8 4
8 4
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
WC
Hal
lway
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c. T
rim a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Hal
lway
bat
hroo
m
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
hal
lway
bat
hroo
m
WC
Sin
gle
Vani
ty
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty
BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12 WORK COMPLETE TO DATE 2/13/2012 WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012 WORK COMPLETED TO DATE 6/25/2012 WORK COMPL AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETE TO DATE 2/20/2012 WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 7/6/2012 WORK COMPL
* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/27/2012 WORK COMPLETE TO DATE 3/26/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE 6/4/2012 WORK COMPLETED TO DATE 7/9/2012 WORK COMPL WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 6/11/2012 WORK COMPELTED TO DATE 7/16/2012 WORK COMPL WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/18/2012 WORK COMPLETED TO DATE 7/23/2012
No items were completed this weekWORK COMPLETE TO DATE 2/6/2012
4
12
9
N/A
N/A
FLOOR18
N/A
16
7
6
5
RUN DATE :
unit 24unit 28
1/30/2012
unit 26
17
14
15
13
N/A
N/A
unit 23unit 22
10
2
11
3
8
N/A
unit 25unit 27
N/AJobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
8 10 # 8 16
8 10 # 8 16
3 17 3
3 17 3
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
LETED TO DATE 7/30/2012 LETED TO DATE 8/6/2012 LETED TO DATE 8/13/2012 LETED TO DATE 8/20/2012
unit 21
N/A
A
unit 20
JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
9 9 11 11
9 9 11 11
9 3
9 3
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
WC
Hal
lway
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c. T
rim a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Hal
lway
bat
hroo
m
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
hal
lway
bat
hroo
m
WC
Sin
gle
Vani
ty
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty
BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12 WORK COMPLETE TO DATE 2/13/2012 WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012 WORK COMPLETED TO DATE 6/25/2012 WORK COMPL AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETE TO DATE 2/20/2012 WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 7/6/2012 WORK COMPL
* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/27/2012 WORK COMPLETE TO DATE 3/26/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE 6/4/2012 WORK COMPLETED TO DATE 7/9/2012 WORK COMPL WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 6/11/2012 WORK COMPELTED TO DATE 7/16/2012 WORK COMPL WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/18/2012 WORK COMPLETED TO DATE 7/23/2012 WORK COMPL
No items were completed this weekWORK COMPLETE TO DATE 2/6/2012
N/A
unit 25unit 27
N/A
N/A
unit 23unit 22
10
2
11
3
8
17
14
15
13
N/A
5
RUN DATE :
unit 24unit 28
1/30/2012
unit 26
4
12
9
N/A
N/A
FLOOR18
N/A
16
7
6 JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
9 11 # 9 17
9 11 # 9 17
4 2 18 4 2
4 2 18 4 2
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
WC
DBL
Van
ity B
ath
WC
Sin
gle
Vani
ty B
ath
Acce
nt w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e Pa
int W
alls
Base
Coa
t Wal
ls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Popc
orn
Balc
ony
Fini
sh C
oate
d
LETED TO DATE 7/30/2012 LETED TO DATE 8/6/2012 LETED TO DATE 8/13/2012 LETED TO DATE 8/20/2012 LETED TO DATE 8/27/2012
N/A
A
unit 20unit 21
JobD
river
EXHIBIT A
Confid
entia
l
BAY PAINTING PROGRESS CHART
WC
DB
L V
anity
Bat
h
WC
Sin
gle
Van
ity B
ath
Acc
ent w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e P
aint
Wal
ls
Bas
e C
oat W
alls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Pop
corn
Bal
cony
Fin
ish
Coa
ted
WC
DB
L V
anity
Bat
h
WC
Sin
gle
Van
ity B
ath
Acc
ent w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e P
aint
Wal
ls
Bas
e C
oat W
alls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Pop
corn
Bal
cony
Fin
ish
Coa
ted
WC
DB
L V
anity
Bat
h
WC
Sin
gle
Van
ity B
ath
WC
Hal
lway
Acc
ent w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e P
aint
Wal
ls
Bas
e C
oat W
alls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Pop
corn
Bal
cony
Fin
ish
Coa
ted
WC
DB
L V
anity
Bat
h
WC
Sin
gle
Van
ity B
ath
Acc
ent w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e P
aint
Wal
ls
Bas
e C
oat W
alls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Pop
corn
Bal
cony
Fin
ish
Coa
ted
WC
DB
L V
anity
Bat
h
Doo
rs a
nd F
ram
es
Prim
e P
aint
Wal
ls
Bas
e C
oat W
alls
Fini
sh C
oat W
alls
Mis
c. T
rim a
nd V
alen
ce
Cau
lkin
g
Pop
corn
Bal
cony
Fin
ish
Coa
ted
WC
DB
L V
anity
Bat
h
WC
Hal
lway
bat
hroo
m
WC
Sin
gle
Van
ity B
ath
Acc
ent w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e P
aint
Wal
ls
Bas
e C
oat W
alls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Pop
corn
Bal
cony
Fin
ish
Coa
ted
WC
DB
L V
anity
Bat
h
WC
hal
lway
bat
hroo
m
WC
Sin
gle
Van
ity
Acc
ent w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e P
aint
Wal
ls
Bas
e C
oat W
alls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Pop
corn
Bal
cony
Fin
ish
Coa
ted
WC
DB
L V
anity
Bat
h
WC
Sin
gle
Van
ity
Acc
ent w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e P
aint
Wal
ls
Bas
e C
oat W
alls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Pop
corn
Bal
cony
Fin
ish
Coa
ted
WC
DB
L V
anity
Bat
h
WC
Sin
gle
Van
ity B
ath
Acc
ent w
all p
aint
ing
Doo
rs a
nd F
ram
es
Prim
e P
aint
Wal
ls
Bas
e C
oat W
alls
Fini
sh C
oat W
alls
Mis
c Tr
im a
nd V
alen
ce
Cau
lkin
g
Pop
corn
Bal
cony
Fin
ish
Coa
ted
Wal
lpap
er in
Cor
ridor
s
Pop
corn
in C
orrid
ors
BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12 WORK COMPLETE TO DATE 2/13/2012 WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012 WORK COMPLETED TO DATE 6/25/2012 WORK COMPLETED TO DATE 7/30/2012 9/3/2012 Labor dayAREAS AVAILABLE FOR YOU TO WORK WORK COMPLETE TO DATE 2/20/2012 WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 7/6/2012 WORK COMPLETED TO DATE 8/6/2012 WORK COMPLETED TO DATE 9/10/2012
* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/27/2012 WORK COMPLETE TO DATE 3/26/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE 6/4/2012 WORK COMPLETED TO DATE 7/9/2012 WORK COMPLETED TO DATE 8/13/2012 WORK COMPLETED TO DATE 9/17/2012
WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 6/11/2012 WORK COMPELTED TO DATE 7/16/2012 WORK COMPLETED TO DATE 8/20/2012 WORK COMPLETED TO DATE 9/24/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/18/2012 WORK COMPLETED TO DATE 7/23/2012 WORK COMPLETED TO DATE 8/27/2012 WORK COMPLETED TO DATE 10/1/2012No items were completed this weekWORK COMPLETE TO DATE 2/6/2012
3
RUN DATE :
unit 24unit 28
1/30/2012
unit 26
17
14
15
13
unit 21unit 23unit 22
10
2
FLOOR18
N/A
16
5
12
N/A
4
N/A
7
6
9
N/A
11
8
unit 20unit 25unit 27
N/A
N/A
N/A
N/A
N/A
JobD
river
EXHIBIT A
Confid
entia
l
PLEASANTS HARDWARE PROGRESS CHART
Mai
n&Lo
ckou
t Ent
ry D
oor
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
rL.
Rm
Clo
set H
ardw
are
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
PLEASANTS HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12AREAS AVAILABLE FOR YOU TO WORK
* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES
2
11
10
9
3
15
27 Unit
6
5
4
12
FLOOR18
17
N/A
N/A
N/A14
13
8
16
7
RUN DATE : 5/16/2019
26 Unit 24 Unit28 Unit 20 Unit 21 Unit 23 Unit22 Unit 25 Unit
JobD
river
EXHIBIT A
Confid
entia
l
PLEASANTS HARDWARE PROGRESS CHART
Mai
n&Lo
ckou
t Ent
ry D
oor
Ent
ry d
oor h
ardw
are
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bat
hroo
m P
ocke
t doo
r
Poc
ket d
oor h
ardw
are
Mas
ter B
ath
Sw
ing
Doo
r
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Ent
ry d
oor h
ardw
are
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bat
hroo
m P
ocke
t doo
r
Poc
ket d
oor h
ardw
are
Mas
ter B
ath
Sw
ing
Doo
r
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Ent
ry d
oor h
ardw
are
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bat
hroo
m P
ocke
t doo
r
Poc
ket d
oor h
ardw
are
Mas
ter B
ath
Sw
ing
Doo
rM
.B. S
win
g D
r. H
ardw
are
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Ent
ry d
oor h
ardw
are
Livi
ng R
m C
lose
t doo
rL.
Rm
Clo
set H
ardw
are
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bat
hroo
m P
ocke
t doo
r
Poc
ket d
oor h
ardw
are
Mas
ter B
ath
Sw
ing
Doo
r
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eE
ntry
Doo
r
Ent
ry D
oor h
ardw
are
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Bat
hroo
m P
ocke
t doo
r
Poc
ket d
oor h
ardw
are
Mas
ter B
ath
Sw
ing
Doo
r
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Ent
ry d
oor h
ardw
are
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bat
hroo
m P
ocke
t doo
r
Poc
ket d
oor h
ardw
are
Mas
ter B
ath
Sw
ing
Doo
r
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eE
ntry
Doo
r
Ent
ry D
oor h
ardw
are
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Bat
hroo
m P
ocke
t doo
r
Poc
ket d
oor h
ardw
are
Mas
ter B
ath
Sw
ing
Doo
r
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eE
ntry
Doo
r
Ent
ry D
oor h
ardw
are
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Bat
hroo
m P
ocke
t doo
r
Poc
ket d
oor h
ardw
are
Mas
ter B
ath
Sw
ing
Doo
r
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain
& L
ocko
ut E
ntry
Ent
ry D
oor h
ardw
are
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
ath
Sw
ing
Doo
r
L.O
Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set H
arew
are
Bat
hroo
m P
ocke
t doo
r
Poc
ket d
oor h
ardw
are
Mas
ter B
ath
Sw
ing
Doo
r
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12AREAS AVAILABLE FOR YOU TO WORK
* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES
16
7
6
5
4
5/16/2019
26 Unit 24 Unit28 Unit 27 Unit 20 Unit 21 Unit 23 Unit22 Unit 25 Unit
10
9
3
15
14
RUN DATE :
13
8
12
FLOOR18
17
N/A
N/A
N/A
2
11
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
3 3 3 3 3 2 3 2 3 3 3 3 3 3 2 3 3 3 3 3 3 2 3 2 3 3 3 2 3 3 3 3 2 3 3 3 3 3 3 3 2 3 3 3 2 3 3 3 2 2 3 2 3 3 3 3 3 2 3 3
3 3 3 3 3 2 3 2 3 3 3 3 3 3 2 3 3 3 3 3 3 2 3 2 3 3 3 2 3 3 3 3 2 3 3 3 3 3 3 3 2 3 3 3 2 3 3 3 2 2 3 2 3 3 3 3 3 2 3 3
3 3 3 3 3 2 3 2 3 3 3 3 3 2 2 3 3 3 3 2 3 3 2 3 2 3 3 3 3 3 2 3 4 3 2 3 2 2 3 2 3 3 3 3 3 2 3 3
3 3 3 3 3 2 3 2 3 3 3 3 3 2 2 3 3 3 3 2 3 3 2 3 2 3 3 3 3 3 2 3 4 3 2 3 2 2 3 2 3 3 3 3 3 2 3 3
3 3 3 2 3 3 3 3 2 3 3 3 2 3 3 3 2 4 2 4 3 2 4 4 2 4 2 2 2 4 2 2 2 2 2
3 3 3 2 3 3 3 3 2 3 3 3 2 3 3 3 2 4 2 4 3 2 4 4 2 4 2 2 2 4 2 2 2 2 2
2 4 2 2 2 2 2 2 4 2 2 2 2 2 2 2 4 2 2 2 2 2 2 2 4 2 2 2 2 2 2 2 2 2 2 2 3 2 2 2 2 2 2 2 2 2 2 2 2 2 4 2 2 2 2 2
2 4 2 2 2 2 2 2 4 2 2 2 2 2 2 2 4 2 2 2 2 2 2 2 4 2 2 2 2 2 2 2 2 2 2 2 3 2 2 2 2 2 2 2 2 2 2 2 2 2 4 2 2 2 2 2
3 3 3 2 2 2 2 2 3 3 3 2 2 2 2 2 3 2 4 2 2 2 2 3 3 2 4 2 2 2 2 2 3 2 2 2 2 3 3 3 3 3 2 3 3 3 2 2 2 2 3 3 2 3 3 3 2 4 2 2 2 2 2
3 3 3 2 2 2 2 2 3 3 3 2 2 2 2 2 3 2 4 2 2 2 2 3 3 2 4 2 2 2 2 2 3 2 2 2 2 3 3 3 3 3 2 3 3 3 2 2 2 2 3 3 2 3 3 3 2 4 2 2 2 2 2
4 4 3 2 4 4 3 2 3 3 4 2 2 3 2 4 3 2 3 3 4 4 3 2 4 3 3 4 4 3 2
4 4 3 2 4 4 3 2 3 3 4 2 2 3 2 4 3 2 3 3 4 4 3 2 4 3 3 4 4 3 2
4 4 3 3 4 4 2 4 3 4 4 3 4 3 4 4 4 4 4 3 3 4 4 3 4 4 4 4 4 4
4 4 3 3 4 4 2 4 3 4 4 3 4 3 4 4 4 4 4 3 3 4 4 3 4 4 4 4 4 4
Mai
n&Lo
ckou
t Ent
ry D
oor
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
eM
aste
r Bed
room
Doo
rM
aste
r Bed
room
Har
dwar
e
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
rL.
Rm
Clo
set H
ardw
are
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain
& Lo
ckou
t Ent
ry D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
ath
Swin
g D
oor
L.O
Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set H
arew
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK ! 5TH FLOOR COULD NOT BE WALKED DUE TO PAINTING 2/15/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATESWORK COMPLETED TO DATE 2/1/2012
20 Unit 21 Unit 23 Unit22 Unit 25 Unit
RUN DATE : 2/8/2012
26 Unit
13
8
12
7
6
4
9
N/A
N/A
N/A
2
11
24 Unit
14
28 Unit
3
27 Unit
15
5
16
10
FLOOR18
17
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
4 4 4 4 3 4 3 4 4 4 4 4 4 3 4 4 4 4 4 4 3 4 3 4 4 4 3 4 4 4 3 4 4 4 4 4 4 4 3 4 4 4 3 4 4 4 3 3 4 3 4 4 4 4 4 3 4 4
4 4 4 4 3 4 3 4 4 4 4 4 4 3 4 4 4 4 4 4 3 4 3 4 4 4 3 4 4 4 3 4 4 4 4 4 4 4 3 4 4 4 3 4 4 4 3 3 4 3 4 4 4 4 4 3 4 4
4 4 4 4 4 3 4 3 4 4 4 4 4 3 2 4 2 4 4 4 3 2 2 4 2 4 2 2 3 2 2 4 2 3 2 2 4 4 4 4 4 3 4 5 4 2 3 2 2 4 3 3 4 3 4 4 4 4 4 3 4 4
4 4 4 4 4 3 4 3 4 4 4 4 4 3 2 4 2 4 4 4 3 2 2 4 2 4 2 2 3 2 2 4 2 3 2 2 4 4 4 4 4 3 4 5 4 2 3 2 2 4 3 3 4 3 4 4 4 4 4 3 4 4
4 4 4 2 2 3 2 4 4 4 4 2 2 3 2 4 2 4 2 2 3 2 2 4 4 2 4 2 2 2 5 2 2 2 5 2 4 2 2 3 5 2 5 2 2 2 5 2 4 3 5 3 3 3 3
4 4 4 2 2 3 2 4 4 4 4 2 2 3 2 4 2 4 2 2 3 2 2 4 4 2 4 2 2 2 5 2 2 2 5 2 4 2 2 3 5 2 5 2 2 2 5 2 4 3 5 3 3 3 3
3 2 3 3 3 3 3 2 5 3 3 3 3 3 3 5 3 3 3 3 3 3 5 3 3 3 3 3 3 3 3 3 2 4 2 2 3 2 2 3 3 3 3 3 2 2 3 3 3 5 3 3 3 3
3 2 3 3 3 3 3 2 5 3 3 3 3 3 3 5 3 3 3 3 3 3 5 3 3 3 3 3 3 3 3 3 2 4 2 2 3 2 2 3 3 3 3 3 2 2 3 3 3 5 3 3 3 3
2 5 3 4 5 3 3 2 4 3 5 4 3 3 2 4 2 4 2 5 5 4 2 4 4 2 3 4 3 2
2 5 3 4 5 3 3 2 4 3 5 4 3 3 2 4 2 4 2 5 5 4 2 4 4 2 3 4 3 2
5 5 3 5 5 3 5 3 4 3 5 5 3 5 3 5 2 4 4 5 5 3
5 5 3 5 5 3 5 3 4 3 5 5 3 5 3 5 2 4 4 5 5 3
5 4 5 5 5 5 5 5 5 4 4 5 4 5 5
5 4 5 5 5 5 5 5 5 4 4 5 4 5 5
Mai
n&Lo
ckou
t Ent
ry D
oor
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
eM
aste
r Bed
room
Doo
rM
aste
r Bed
room
Har
dwar
e
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
rL.
Rm
Clo
set H
ardw
are
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain
& Lo
ckou
t Ent
ry D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
ath
Swin
g D
oor
L.O
Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set H
arew
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATESWORK COMPLETED TO DATE 2/1/2012
RUN DATE : 2/8/2012
26 Unit
12
7
6
4
9
20 Unit 21 Unit 23 Unit22 Unit 25 Unit
N/A
N/A
2
11
24 Unit
14
28 Unit
3
27 Unit
13
N/A N/A
N/A
15
5
16
10
FLOOR18
17
8
JobD
river
EXHIBIT A
Confid
entia
l
PLEASANTS HARDWARE PROGRESS CHART
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 22 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 22 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 22 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 22 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 22 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 22 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 22 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 22 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Mai
n&Lo
ckou
t Ent
ry D
oor
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
eM
aste
r Bed
room
Doo
rM
aste
r Bed
room
Har
dwar
e
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
rL.
Rm
Clo
set H
ardw
are
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain
& Lo
ckou
t Ent
ry D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
ath
Swin
g D
oor
L.O
Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set H
arew
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12AREAS AVAILABLE FOR YOU TO WORK
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATESWORK COMPLETED TO DATE 2/1/2012
2/1/2012
26 Unit
10
9
3
27 Unit 20 Unit 21 Unit 23 Unit22 Unit 25 Unit
RUN DATE :
13
8
12
24 Unit28 Unit
7
6
5
4
FLOOR18
17
N/A
N/A
N/A
2
11
15
14
16
JobD
river
EXHIBIT A
Confid
entia
l
PLEASANTS HARDWARE PROGRESS CHART
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 22 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 22 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 22 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 23 3 3 3 3 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 2 3 3 3 2 3 3 3 3 3 3 3 3 3 3 3 3 33 3 3 3 3 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 2 3 3 3 2 3 3 3 3 3 3 3 3 3 3 3 3 3
3 3 3 3 3 2 3 3 33 3 3 3 3 2 3 3 3
3 3 2 2 2 3 3 2 2 3 3 2 3 2 2 2 3 2 3 3 3 3 2 2 2 2 2 2 23 3 2 2 2 3 3 2 2 3 3 2 3 2 2 2 3 2 3 3 3 3 2 2 2 2 2 2 2
3 3 3 2 2 3 3 2 2 2 2 2 3 2 2 2 2 2 2 3 2 2 3 2 2 2 3 2 3 2 2 2 3 3 2 2 2 2 2 2 2 2 3 2 3 3 2 2 33 3 3 2 2 3 3 2 2 2 2 2 3 2 2 2 2 2 2 3 2 2 3 2 2 2 3 2 3 2 2 2 3 3 2 2 2 2 2 2 2 2 3 2 3 3 2 2 33 3 2 2 2 3 3 2 3 2 3 3 2 2 3 2 3 3 3 3 3 3 2 3 2 3 3 3 2 3 3 3 3 3 3 33 3 2 2 2 3 3 2 3 2 3 3 2 2 3 2 3 3 3 3 3 3 2 3 2 3 3 3 2 3 3 3 3 3 3 3
Mai
n&Lo
ckou
t Ent
ry D
oor
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
eM
aste
r Bed
room
Doo
rM
aste
r Bed
room
Har
dwar
e
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
rL.
Rm
Clo
set H
ardw
are
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain
& Lo
ckou
t Ent
ry D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
ath
Swin
g D
oor
L.O
Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set H
arew
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATESWORK COMPLETED TO DATE 2/1/2012
9
3
27 Unit 20 Unit 21 Unit 23 Unit22 Unit 25 Unit
RUN DATE : 2/8/2012
26 Unit
13
8
12
24 Unit28 Unit
7
6
5
4
10
FLOOR18
17
N/A
N/A
N/A
2
11
15
14
16
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
3 2 2 2 2 2 2 3 3 3 2 2 2 2 3 2 2 2 2 2 3 2 3 3 2 2 3 2 3 2 2 3 2 2
3 2 2 2 2 2 2 3 3 3 2 2 2 2 3 2 2 2 2 2 3 2 3 3 2 2 3 2 3 2 2 3 2 2
3 3 3 3 3 2 3 3 3 3 3 3 2 3 3 3 3 3 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 3 3 3 3 2 3 3 3 3 3 3 2 3 3 3 3 3 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 2 3 3 2 3 2 2 3 2 2 2 2 3 2 3 3 2 2 3 2 3 2 2 3 2 2 2
3 2 3 3 2 3 2 2 3 2 2 2 2 3 2 3 3 2 2 3 2 3 2 2 3 2 2 2
6 6 6 2 6 5 2 6 5 6 6 6 6 6 3 2 6 5 6 6 6 6 6 3 2 6 5 6 5 6 6 6 5 2 2 6 6 6 5 6 6 6 6 6 6 6 5 6 6 6 5 2 6 6 6 5 5 6 5 6 6 6 6 6 5 6 6
6 6 6 2 6 5 2 6 5 6 6 6 6 6 3 2 6 5 6 6 6 6 6 3 2 6 5 6 5 6 6 6 5 2 2 6 6 6 5 6 6 6 6 6 6 6 5 6 6 6 5 2 6 6 6 5 5 6 5 6 6 6 6 6 5 6 6
6 6 2 2 5 2 5 6 2 6 5 4 3 4 2 2 5 4 4 4 6 4 4 5 4 4 4 5 4 4 6 6 5 4 5 4 4 2 5 2 2 6 6 6 6 5 2
6 6 2 2 5 2 5 6 2 6 5 4 3 4 2 2 5 4 4 4 6 4 4 5 4 4 4 5 4 4 6 6 5 4 5 4 4 2 5 2 2 6 6 6 6 5 2
6 4 2 6 6 4 2 3 4 2 5 4 3 3 6 4 4 5 7 4 3 3 3 5 5 3 5
6 4 2 6 6 4 2 3 4 2 5 4 3 3 6 4 4 5 7 4 3 3 3 5 5 3 5
5 3 4 3 3 3 3 4 4 5 5 3 5 5 4 3 4 5 5 5 5 3 5 5
5 3 4 3 3 3 3 4 4 5 5 3 5 5 4 3 4 5 5 5 5 3 5 5
7 2 3 2 7 4 3 2 2 4 3 4 4 4 5 4 3
7 2 3 2 7 4 3 2 2 4 3 4 4 4 5 4 3
7 3 5 3 3 5 3 5 3 5 3 3 3 5 3
7 3 5 3 3 5 3 5 3 5 3 3 3 5 3
6 3 7 3 7 3 3 3 3 7 3
6 3 7 3 7 3 3 3 3 7 3
Mai
n&Lo
ckou
t Ent
ry D
oor
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Hal
lway
Bed
. Roo
m D
oor
Hal
lway
Bed
room
Doo
r har
dwar
e
Hal
lway
Bat
hroo
m D
oor
Hal
lway
Bat
hroo
m D
oor h
ardw
are
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
eM
aste
r Bed
room
Doo
rM
aste
r Bed
room
Har
dwar
e
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
rL.
Rm
Clo
set H
ardw
are
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
r
Com
mun
icat
ing
Doo
r har
dwar
e
L.O
. Bat
hroo
m S
win
g D
oor
ha
rdw
are
Lock
out C
lose
t Doo
r
hard
war
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
athr
oom
Sw
ing
Doo
r
hard
war
e
Lock
out C
lose
t doo
r
hard
war
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain
& Lo
ckou
t Ent
ry D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
ath
Swin
g D
oor
L.O
Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set H
arew
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 2/15/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 2/22/2012WORK COMPLETED TO DATE 2/1/2012 WORK COMPLETED TO DATE 2/29/2012WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/7/2012
16
10
FLOOR18
17
8
N/A
N/A N/A
N/A
N/A
N/A
27 Unit
13
N/A
20 Unit 21 Unit 23 Unit22 Unit 25 Unit
N/A2
N/A
24 Unit
14
28 Unit
3
15
RUN DATE : 2/8/2012
26 Unit
12
7
6
4
9
11
5
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
3 2 2 2 3 3 2 3 3
3 2 2 2 3 3 2 3 3
3 2 2 2 3 3 2 3 3
3 2 2 2 3 3 2 3 3
4 3 3 2 2 2 3 3 2 3
4 3 3 2 2 2 3 3 2 3
4 4 4 2 2 2 4 4 3 4 4
4 4 4 2 2 2 4 4 3 4 4
7 7 7 3 7 6 3 7 6 7 7 7 7 7 4 3 7 6 7 7 7 7 7 4 3 7 6 7 6 7 7 7 6 3 3 7 7 7 6
7 7 7 3 7 6 3 7 6 7 7 7 7 7 4 3 7 6 7 7 7 7 7 4 3 7 6 7 6 7 7 7 6 3 3 7 7 7 6
7 7 3 3 6 3 6 7 3 7 2 6 5 4 5 2 3 3 6 5 5 7 5 5 6 5 5 6
7 7 3 3 6 3 6 7 3 7 2 6 5 4 5 2 3 3 6 5 5 7 5 5 6 5 5 6
7 3 7 7 3 4 3 6 4
7 3 7 7 3 4 3 6 4
2 4 5 4 4 4
2 4 5 4 4 4
4 3 5 4 3 3 5 4
4 3 5 4 3 3 5 4
4 2 4 4 4
4 2 4 4 4
4 4 4
4 4 4
Mai
n&Lo
ckou
t Ent
ry D
oor
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Hal
lway
Bed
. Roo
m D
oor
Hal
lway
Bed
room
Doo
r har
dwar
e
Hal
lway
Bat
hroo
m D
oor
Hal
lway
Bat
hroo
m D
oor h
ardw
are
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
eM
aste
r Bed
room
Doo
rM
aste
r Bed
room
Har
dwar
e
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
rL.
Rm
Clo
set H
ardw
are
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Bath
room
Poc
ket d
oor
PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 WORK COMPLETED TO DATE 2/29/2012AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 3/7/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/14/2012WORK COMPLETED TO DATE 2/1/2012
N/A
N/A
16
10
FLOOR18
17
8
N/A
24 Unit
14
28 Unit
3
15
5
N/A
27 Unit
13
N/A
2
RUN DATE : 2/8/2012
26 Unit
12
7
6
4
9
11
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
3 3 3 3 2 3 2 2 3 3 3 3 2 2 3 3 3 3 3 3 3 3 3
3 3 3 3 2 3 2 2 3 3 3 3 2 2 3 3 3 3 3 3 3 3 3
3 3 3 3 3 2 3 2 2 3 3 3 3 2 2 3 3 3 3 3 3 3 3 3
3 3 3 3 3 2 3 2 2 3 3 3 3 2 2 3 3 3 3 3 3 3 3 3
4 4 4 3 3 3 2 4 3 2 2 3 3 3 3 4 3 4 2 2 4 3 3 4 3 4 3 3 4 3 3
4 4 4 3 3 3 2 4 3 2 2 3 3 3 3 4 3 4 2 2 4 3 3 4 3 4 3 3 4 3 3
4 2 4 4 4 3 4 3 4 4 2 2 4 3 4 4 4 4 4 2 2 4 4 4 4 4 4 4 4 4 4 4
4 2 4 4 4 3 4 3 4 4 2 2 4 3 4 4 4 4 4 2 2 4 4 4 4 4 4 4 4 4 4 4
4 3 4 4 3 4 3 2 4 3 3 3 3 4 3 4 2 2 4 3 3 4 3 4 3 3 4 3 3 3
4 3 4 4 3 4 3 2 4 3 3 3 3 4 3 4 2 2 4 3 3 4 3 4 3 3 4 3 3 3
7 7 7 7 7 7 7 6 6 7 7 6 3 7 7 7 6 6 7 6 7 7 7 7 7 6 7 7
7 7 7 7 7 7 7 6 6 7 7 6 3 7 7 7 6 6 7 6 7 7 7 7 7 6 7 7
7 2 7 7 2 6 2 2 5 6 5 5 3 6 3 3 7 7 7 7 6 2
7 2 7 7 2 6 2 2 5 6 5 5 3 6 3 3 7 7 7 7 6 2
4 7 6 5 4 4 4
4 7 6 5 4 4 4
4 5 5 6 2 4 5 4 5 6 6 6 6 4 6 6
4 5 5 6 2 4 5 4 5 6 6 6 6 4 6 6
5 2 5 6 5 4
5 2 5 6 5 4
4 4 4 4 4
4 4 4 4 4
4 4 4 4
4 4 4 4
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
r
Com
mun
icat
ing
Doo
r har
dwar
e
L.O
. Bat
hroo
m S
win
g D
oor
L.O
. Bat
hroo
m D
oor
hard
war
e
Lock
out C
lose
t Doo
roc
out C
oset
oo
ha
rdw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
athr
oom
Sw
ing
Doo
rLo
ckou
t Bat
h. D
oor
hard
war
e
Lock
out C
lose
t doo
roc
out C
oset
oo
ha
rdw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain
& Lo
ckou
t Ent
ry D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
ath
Swin
g D
oor
L.O
Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set H
arew
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
N/A N/A
N/A
20 Unit 21 Unit 23 Unit22 Unit 25 Unit
N/A
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
4 3 3 3 4 4 4 4 4 2 4 4 4 3 4 3 3 4 4 4 4 3 3 4 4 4 4 4 4 4 4 4
4 3 3 3 4 4 4 4 4 2 4 4 4 3 4 3 3 4 4 4 4 3 3 4 4 4 4 4 4 4 4 4
4 3 3 3 4 4 4 4 4 4 4 4 4 3 4 3 3 4 4 4 4 3 3 4 4 4 4 4 4 4 4 4
4 3 3 3 4 4 4 4 4 4 4 4 4 3 4 3 3 4 4 4 4 3 3 4 4 4 4 4 4 4 4 4
5 4 4 3 3 3 4 4 4 5 5 5 4 4 4 3 5 4 3 3 4 4 5 4 5 3 3 5 4 4 5 4 5 4 4 5 4 4
5 4 4 3 3 3 4 4 4 5 5 5 4 4 4 3 5 4 3 3 4 4 5 4 5 3 3 5 4 4 5 4 5 4 4 5 4 4
5 5 5 3 3 3 5 5 5 5 5 3 5 5 5 5 4 5 5 3 3 5 5 5 5 5 5 3 3 5 5 5 5 5 5 5 5 5 5 5
5 5 5 3 3 3 5 5 5 5 5 3 5 5 5 5 4 5 5 3 3 5 5 5 5 5 5 3 3 5 5 5 5 5 5 5 5 5 5 5
5 4 5 5 4 5 4 3 5 4 4 4 4 5 4 5 3 3 5 4 4 5 4 5 4 4 5 4 4 4
5 4 5 5 4 5 4 3 5 4 4 4 4 5 4 5 3 3 5 4 4 5 4 5 4 4 5 4 4 4
8 8 8 4 8 7 4 8 7 8 8 8 8 8 5 4 8 8 8 8 8 5 4 8 8 8 8 7 4 4 8 7 8 8 8 8 8 8 7 7 8 8 7 4 8 8 7 7 8 7 8 8 8 8 8 7 8 8
8 8 8 4 8 7 4 8 7 8 8 8 8 8 5 4 8 8 8 8 8 5 4 8 8 8 8 7 4 4 8 7 8 8 8 8 8 8 7 7 8 8 7 4 8 8 7 7 8 7 8 8 8 8 8 7 8 8
8 8 4 4 7 4 7 8 4 8 3 7 6 5 6 3 4 4 7 6 6 8 6 6 7 6 6 8 3 8 8 3 7 3 3 6 6 6 4 4 4 8 8 8 7 3
8 8 4 4 7 4 7 8 4 8 3 7 6 5 6 3 4 4 7 6 6 8 6 6 7 6 6 8 3 8 8 3 7 3 3 6 6 6 4 4 4 8 8 8 7 3
8 4 8 8 4 5 4 5 5 7 2 6 5 5 5
8 4 8 8 4 5 4 5 5 7 2 6 5 5 5
3 5 6 5 5 5 5 6 6 3 5 6 5 6 7 7 7 7 5 7 7
3 5 6 5 5 5 5 6 6 3 5 6 5 6 7 7 7 7 5 7 7
2 4 6 5 4 4 5 6 3 7 6 5
2 4 6 5 4 4 5 6 3 7 6 5
5 5 5 5 5 5 5 5 5
5 5 5 5 5 5 5 5 5
5 5 5 5 5 5 5
5 5 5 5 5 5 5
Mai
n&Lo
ckou
t Ent
ry D
oor
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Hal
lway
Bed
. Roo
m D
oor
Hal
lway
Bed
room
Doo
r har
dwar
e
Hal
lway
Bat
hroo
m D
oor
Hal
lway
Bat
hroo
m D
oor h
ardw
are
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
eM
aste
r Bed
room
Doo
rM
aste
r Bed
room
Har
dwar
e
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
rL.
Rm
Clo
set H
ardw
are
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
r
Com
mun
icat
ing
Doo
r har
dwar
e
L.O
. Bat
hroo
m S
win
g D
oor
ha
rdw
are
Lock
out C
lose
t Doo
r
hard
war
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
athr
oom
Sw
ing
Doo
r
hard
war
e
Lock
out C
lose
t doo
r
hard
war
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain
& Lo
ckou
t Ent
ry D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
ath
Swin
g D
oor
L.O
Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set H
arew
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 2/29/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/7/2012WORK COMPLETED TO DATE 2/1/2012 WORK COMPLETED TO DATE 3/14/2012
RUN DATE : 2/8/2012
26 Unit
12
7
6
4
9
11
27 Unit
13
N/A
20 Unit 21 Unit 23 Unit22 Unit 25 Unit
N/A2
N/A
24 Unit
14
28 Unit
3
15
5
N/A
N/A N/A
N/A
N/A
N/A
16
10
FLOOR18
17
8
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2
4 4 4 4 4 4 4 4
4 4 4 4 4 4 4 4
6 5 5 5 6 6 6 6
6 5 5 5 6 6 6 6
6 5 5 5 6 6 6 6
6 5 5 5 6 6 6 6
7 6 6 5 5 5 6 6 3 6
7 6 6 5 5 5 6 6 3 6
7 7 7 5 5 5 7 7 7 7
7 7 7 5 5 5 7 7 7 7
2 2 10 2 2 2 2 2 2 2 3 3 2 2 10 2 2 10 3 2 3 10 2 3 2 3 2 3
2 2 10 2 2 2 2 2 2 2 3 3 2 2 10 2 2 10 3 2 3 10 2 3 2 3 2 3
10 10 6 9 9 10 10 5 2 2 8 9 8
10 10 6 9 9 10 10 5 2 2 8 9 8
10 6 2 10 7
10 6 2 10 7
1 2 71 2 71
1
1
1
Mai
n&Lo
ckou
t Ent
ry D
oor
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Hal
lway
Bed
. Roo
m D
oor
Hal
lway
Bed
room
Doo
r har
dwar
e
Hal
lway
Bat
hroo
m D
oor
Hal
lway
Bat
hroo
m D
oor h
ardw
are
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
eM
aste
r Bed
room
Doo
rM
aste
r Bed
room
Har
dwar
e
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
rL.
Rm
Clo
set H
ardw
are
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Bath
room
Poc
ket d
oor
PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETED TO DATE 4/4/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/7/2012WORK COMPLETED TO DATE 2/1/2012 WORK COMPLETED TO DATE 3/14/2012
N/A
N/A
16
10
FLOOR18
17
8
N/A
N/A
24 Unit
14
28 Unit
3
15
5
N/A
27 Unit
13
N/A
2
RUN DATE : 2/8/2012
26 Unit
12
7
6
4
9
11
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
4 4 4 4 4 3 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
4 4 4 4 4 3 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
6 4 6 6 6 5 6 5 5 6 6 6 6 5 5 6 6 6 6 6 6 6 6 6
6 4 6 6 6 5 6 5 5 6 6 6 6 5 5 6 6 6 6 6 6 6 6 6
6 6 6 6 6 5 6 5 5 6 6 6 6 5 5 6 6 6 6 6 6 6 6 6
6 6 6 6 6 5 6 5 5 6 6 6 6 5 5 6 6 6 6 6 6 6 6 6
7 7 7 6 6 6 5 7 6 5 5 6 6 7 6 7 5 5 7 6 6 7 6 7 6 6 7 6 6
7 7 7 6 6 6 5 7 6 5 5 6 6 7 6 7 5 5 7 6 6 7 6 7 6 6 7 6 6
7 5 7 7 7 7 6 7 7 5 5 7 7 7 7 7 7 5 5 7 7 7 7 7 7 7 7 7 7 7
7 5 7 7 7 7 6 7 7 5 5 7 7 7 7 7 7 5 5 7 7 7 7 7 7 7 7 7 7 7
7 6 7 7 6 7 6 5 7 6 6 6 6 7 6 7 5 5 7 6 6 7 6 7 6 6 7 6 6
7 6 7 7 6 7 6 5 7 6 6 6 6 7 6 7 5 5 7 6 6 7 6 7 6 6 7 6 6
2 3 2 2 10 2 2 9 2 2 2 2 3 2 2 2 9 2 2 2 2 10 2 2 9 2 2
2 3 2 2 10 2 2 9 2 2 2 2 3 2 2 2 9 2 2 2 2 10 2 2 9 2 2
3 10 10 5 2 3 8 3 10 10 2
3 10 10 5 2 3 8 3 10 10 2
7 9 4 7 7
7 9 4 7 7
7
7
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
r
Com
mun
icat
ing
Doo
r har
dwar
e
L.O
. Bat
hroo
m S
win
g D
oor
L.O
. Bat
hroo
m D
oor
hard
war
e
Lock
out C
lose
t Doo
roc
out C
oset
oo
ha
rdw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
athr
oom
Sw
ing
Doo
rLo
ckou
t Bat
h. D
oor
hard
war
e
Lock
out C
lose
t doo
roc
out C
oset
oo
ha
rdw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain
& Lo
ckou
t Ent
ry D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
ath
Swin
g D
oor
L.O
Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set H
arew
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
N/A N/A
N/A
20 Unit 21 Unit 23 Unit22 Unit 25 Unit
N/A
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
3 3 3 3 3 3 3 3
3 3 3 3 3 3 3 3
5 5 5 5 5 5 5 5
5 5 5 5 5 5 5 5
7 6 6 6 7 7 7 7
7 6 6 6 7 7 7 7
7 6 6 6 7 7 7 7
7 6 6 6 7 7 7 7
8 7 7 6 6 6 7 7 4 7
8 7 7 6 6 6 7 7 4 7
8 8 8 6 6 6 8 8 8 8
8 8 8 6 6 6 8 8 8 8
3 3 11 3 3 2 2 3 3 2 3 2 3 3 2 2 4 4 3 3 11 3 3 2 2 11 4 3 4 11 3 4 2 2 3 4 3 4
3 3 11 3 3 2 2 3 3 2 3 2 3 3 2 2 4 4 3 3 11 3 3 2 2 11 4 3 4 11 3 4 2 2 3 4 3 4
7 10 11 11 6 3 2 3 2 9 10 2 3 9 4 2
7 10 11 11 6 3 2 3 2 9 10 2 3 9 4 2
11 3 7 11 5 2 4 3 2 3 3 8 3 2
11 3 7 11 5 2 4 3 2 3 3 8 3 2
2 3 8 2 2 2 2
2 3 8 2 2 2 2
2 2 2 2 2
2 2 2 2 2
Mai
n&Lo
ckou
t Ent
ry D
oor
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Hal
lway
Bed
. Roo
m D
oor
Hal
lway
Bed
room
Doo
r har
dwar
e
Hal
lway
Bat
hroo
m D
oor
Hal
lway
Bat
hroo
m D
oor h
ardw
are
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
eM
aste
r Bed
room
Doo
rM
aste
r Bed
room
Har
dwar
e
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
rL.
Rm
Clo
set H
ardw
are
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETED TO DATE 4/4/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/11/2012WORK COMPLETED TO DATE 2/1/2012 WORK COMPLETED TO DATE 3/14/2012WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/21/2012
WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 328.2012WORK COMPLETED TO DATE 2/22/2012
N/A
N/A
16
10
FLOOR18
17
8
N/A
N/A
24 Unit
14
28 Unit
3
15
5
N/A
27 Unit
13
N/A
25 Unit
2
RUN DATE : 2/8/2012
26 Unit
12
7
6
4
9
11
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
5 5 5 5 5 4 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
5 5 5 5 5 4 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
7 5 7 7 7 6 7 6 6 7 7 7 7 6 6 7 7 7 7 7 7 7 7 7
7 5 7 7 7 6 7 6 6 7 7 7 7 6 6 7 7 7 7 7 7 7 7 7
7 7 7 7 7 6 7 6 6 7 7 7 7 6 6 7 7 7 7 7 7 7 7 7
7 7 7 7 7 6 7 6 6 7 7 7 7 6 6 7 7 7 7 7 7 7 7 7
8 8 8 7 7 7 6 8 7 6 6 7 7 8 7 8 6 6 8 7 7 8 7 8 7 7 8 7 7
8 8 8 7 7 7 6 8 7 6 6 7 7 8 7 8 6 6 8 7 7 8 7 8 7 7 8 7 7
8 6 8 8 8 8 7 8 8 6 6 8 8 8 8 8 8 6 6 8 8 8 8 8 8 8 8 8 8 8
8 6 8 8 8 8 7 8 8 6 6 8 8 8 8 8 8 6 6 8 8 8 8 8 8 8 8 8 8 8
8 7 8 8 7 8 7 6 8 7 7 7 7 8 7 8 6 6 8 2 7 7 8 7 8 7 7 8 2 7 7
8 7 8 8 7 8 7 6 8 7 7 7 7 8 7 8 6 6 8 2 7 7 8 7 8 7 7 8 2 7 7
3 4 3 3 11 3 3 10 3 3 3 3 2 2 4 3 3 3 10 3 3 3 3 11 3 3 3 3
3 4 3 3 11 3 3 10 3 3 3 3 2 2 4 3 3 3 10 3 3 3 3 11 3 3 3 311 6 3 2 4 2 9 4 2 11 3 11 3 211 6 3 2 4 2 9 4 2 11 3 11 3 2
2 2 5 8 2 3 2 8 2
2 2 5 8 2 3 2 8 2
2 2 2 2
2 2 2 2
2 2 2 2
2 2 2 2
2
2
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
r
Com
mun
icat
ing
Doo
r har
dwar
e
L.O
. Bat
hroo
m S
win
g D
oor
L.O
. Bat
hroo
m D
oor
hard
war
e
Lock
out C
lose
t Doo
rLo
ckou
t Clo
set D
oor
hard
war
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
athr
oom
Sw
ing
Doo
rLo
ckou
t Bat
h. D
oor
hard
war
e
Lock
out C
lose
t doo
rLo
ckou
t Clo
set D
oor
hard
war
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain
& Lo
ckou
t Ent
ry D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
ath
Swin
g D
oor
L.O
Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set H
arew
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
N/A N/A
N/A
20 Unit 21 Unit 23 Unit22 Unit
N/A
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
4 4 4 4 4 4 4 4
4 4 4 4 4 4 4 4
6 6 6 6 6 6 6 6
6 6 6 6 6 6 6 6
8 7 7 7 8 8 8 8
8 7 7 7 8 8 8 8
8 7 7 7 8 8 8 8
8 7 7 7 8 8 8 8
9 8 8 7 7 7 8 8 5 8
9 8 8 7 7 7 8 8 5 8
9 9 9 7 7 7 9 9 9 9
9 9 9 7 7 7 9 9 9 9
4 4 4 3 3 4 4 4 3 4 4 3 3 5 5 4 4 4 3 3 12 5 5 4 5 3 3 4 5 5 5 2
4 4 4 3 3 4 4 4 3 4 4 3 3 5 5 4 4 4 3 3 12 5 5 4 5 3 3 4 5 5 5 2
2 2 2 8 2 2 4 12 3 12 7 4 3 3 4 3 4 3 3 2 2 10 11 3 5 3
2 2 2 8 2 2 4 12 3 12 7 4 3 3 4 3 4 3 3 2 2 10 11 3 5 3
12 4 8 2 6 3 5 4 3 4 4 9 4 3
12 4 8 2 6 3 5 4 3 4 4 9 4 3
3 4 9 3 3 3 3
3 4 9 3 3 3 3
Mai
n&Lo
ckou
t Ent
ry D
oor
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Hal
lway
Bed
. Roo
m D
oor
Hal
lway
Bed
room
Doo
r har
dwar
e
Hal
lway
Bat
hroo
m D
oor
Hal
lway
Bat
hroo
m D
oor h
ardw
are
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
eM
aste
r Bed
room
Doo
rM
aste
r Bed
room
Har
dwar
e
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
rL.
Rm
Clo
set H
ardw
are
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETED TO DATE 4/4/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/11/2012
WORK COMPLETED TO DATE 2/1/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/20/2012WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/21/2012
WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 328.2012WORK COMPLETED TO DATE 2/22/2012
N/A
N/A
FLOOR18
17
8
N/A
N/A
24 Unit
14
28 Unit
3
15
5
N/A
16
10
27 Unit
13
N/A
25 Unit
2
RUN DATE : 2/8/2012
26 Unit
12
7
6
4
9
11
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
6 6 6 6 6 5 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
6 6 6 6 6 5 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
8 6 8 8 8 7 8 7 7 8 8 8 8 7 7 8 8 8 8 8 8 8 8 8
8 6 8 8 8 7 8 7 7 8 8 8 8 7 7 8 8 8 8 8 8 8 8 8
8 8 8 8 8 7 8 7 7 8 8 8 8 7 7 8 8 8 8 8 8 8 8 8
8 8 8 8 8 7 8 7 7 8 8 8 8 7 7 8 8 8 8 8 8 8 8 8
9 9 9 8 8 8 7 9 8 7 7 8 8 9 8 9 7 7 9 2 8 8 9 8 9 8 8 9 2 8 8
9 9 9 8 8 8 7 9 8 7 7 8 8 9 8 9 7 7 9 2 8 8 9 8 9 8 8 9 2 8 8
9 7 9 9 9 8 9 9 7 7 9 9 9 9 9 9 7 7 9 2 9 9 9 9 9 9 9 9 2 9 9
9 7 9 9 9 8 9 9 7 7 9 9 9 9 9 9 7 7 9 2 9 9 9 9 9 9 9 9 2 9 9
9 8 9 9 3 9 3
9 8 9 9 3 9 3
4 5 4 12 4 4 4 4 4 3 3 5 4 4 11 2 4 4 4 4 4 2 2 4 4
4 5 4 12 4 4 4 4 4 3 3 5 4 4 11 2 4 4 4 4 4 2 2 4 4
4 12 7 4 3 5 3 10 5 3 3 12 4 12 4 3
4 12 7 4 3 5 3 10 5 3 3 12 4 12 4 3
3 2 3 6 9 3 4 3 3 9 3 3
3 2 3 6 9 3 4 3 3 9 3 3
3 3 3 3
3 3 3 3
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
r
Com
mun
icat
ing
Doo
r har
dwar
e
L.O
. Bat
hroo
m S
win
g D
oor
L.O
. Bat
hroo
m D
oor
hard
war
e
Lock
out C
lose
t Doo
rLo
ckou
t Clo
set D
oor
hard
war
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
athr
oom
Sw
ing
Doo
r
Lock
out B
ath.
Doo
r har
dwar
e
Lock
out C
lose
t doo
r
Lock
out C
lose
t Doo
r har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain
& Lo
ckou
t Ent
ry D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
ath
Swin
g D
oor
L.O
Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set H
arew
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
N/A
N/A
N/A
20 Unit 21 Unit 23 Unit22 Unit
N/A
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
5 5 5 5 5 5 2 5 5
5 5 5 5 5 5 2 5 5
7 7 7 7 7 7 2 7 7
7 7 7 7 7 7 2 7 7
9 8 8 8 9 9 2 9 9
9 8 8 8 9 9 2 9 9
9 8 8 8 9 9 2 9 9
9 8 8 8 9 9 2 9 910 9 9 8 8 8 9 9 2 6 910 9 9 8 8 8 9 9 2 6 910 10 10 8 8 8 10 10 2 10 1010 10 10 8 8 8 10 10 2 10 10
5 2 5 5 4 5 5 5 4 5 5 4 6 6 5 2 5 5 4 4 12 6 6 2 5 6 4 4 5 6 6 6 3
5 2 5 5 4 5 5 5 4 5 5 4 6 6 5 2 5 5 4 4 12 6 6 2 5 6 4 4 5 6 6 6 3
3 3 3 9 3 5 2 13 8 4 4 4 4 4 3 11 12 4 4
3 3 3 9 3 5 2 13 8 4 4 4 4 4 3 11 12 4 4
9 2 6 10
9 2 6 10
Mai
n&Lo
ckou
t Ent
ry D
oor
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Hal
lway
Bed
. Roo
m D
oor
Hal
lway
Bed
room
Doo
r har
dwar
e
Hal
lway
Bat
hroo
m D
oor
Hal
lway
Bat
hroo
m D
oor h
ardw
are
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
eM
aste
r Bed
room
Doo
rM
aste
r Bed
room
Har
dwar
e
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
rL.
Rm
Clo
set H
ardw
are
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETED TO DATE 4/4/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/11/2012
WORK COMPLETED TO DATE 2/1/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/20/2012WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/25/2012
WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 328.2012WORK COMPLETED TO DATE 2/22/2012
N/A
N/A
FLOOR18
17
8
N/A
N/A
24 Unit
14
28 Unit
3
15
5
N/A
16
10
27 Unit
13
N/A
25 Unit
2
RUN DATE : 2/8/2012
26 Unit
12
7
6
4
9
11
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
4 4 4 4 2 4 4 4 4 4 4 2 4 4 4 4 4 4 2 4 4 4 4 4 4 2 4 4
4 4 4 4 2 4 4 4 4 4 4 2 4 4 4 4 4 4 2 4 4 4 4 4 4 2 4 4
5 5 5 5 2 5 5 5 5 5 5 2 5 5 5 5 5 5 2 5 5 5 5 5 5 2 5 5
5 5 5 5 2 5 5 5 5 5 5 2 5 5 5 5 5 5 2 5 5 5 5 5 5 2 5 5
5 5 5 5 2 5 5 5 5 5 5 2 5 5 5 5 5 5 2 5 5 5 5 5 5 2 5 5
5 5 5 5 2 5 5 5 5 5 5 2 5 5 5 5 5 5 2 5 5 5 5 5 5 2 5 5
7 7 7 7 2 7 6 7 7 7 7 2 7 7 7 7 7 7 2 7 7 7 7 7 7 2 7 7
7 7 7 7 2 7 6 7 7 7 7 2 7 7 7 7 7 7 2 7 7 7 7 7 7 2 7 7
9 7 9 9 2 9 8 9 8 8 9 2 9 9 9 8 8 9 2 9 9 9 9 9 9 2 9 9
9 7 9 9 2 9 8 9 8 8 9 2 9 9 9 8 8 9 2 9 9 9 9 9 9 2 9 9
9 9 9 9 2 9 8 9 8 8 9 2 9 9 9 8 8 9 2 9 9 9 9 9 9 2 9 9
9 9 9 9 2 9 8 9 8 8 9 2 9 9 9 8 8 9 2 9 9 9 9 9 9 2 9 910 10 10 9 9 2 9 8 10 9 8 8 9 2 2 9 10 9 10 8 8 10 3 9 9 10 9 10 9 9 10 3 9 910 10 10 9 9 2 9 8 10 9 8 8 9 2 2 9 10 9 10 8 8 10 3 9 9 10 9 10 9 9 10 3 9 910 8 10 10 10 2 2 9 10 10 8 8 10 2 10 10 10 10 10 8 8 10 3 10 10 10 10 10 10 10 10 3 10 10
10 8 10 10 10 2 2 9 10 10 8 8 10 2 10 10 10 10 10 8 8 10 3 10 10 10 10 10 10 10 10 3 10 10
10 9 2 2 2 2 2 2 2 2 2 2 2 2 10 2 10 2 2 2 4 2 2 2 2 10 2 2 2 4 2 210 9 2 2 2 2 2 2 2 2 2 2 2 2 10 2 10 2 2 2 4 2 2 2 2 10 2 2 2 4 2 2
5 6 5 13 5 5 2 2 5 5 5 4 4 6 5 5 12 3 5 5 5 2 5 5 3 3 5 5
5 6 5 13 5 5 2 2 5 5 5 4 4 6 5 5 12 3 5 5 5 2 5 5 3 3 5 513 8 4 6 4 11 4 4 5 13 413 8 4 6 4 11 4 4 5 13 4
10 4 4 10
10 4 4 10
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
r
Com
mun
icat
ing
Doo
r har
dwar
e
L.O
. Bat
hroo
m S
win
g D
oor
L.O
. Bat
hroo
m D
oor
hard
war
e
Lock
out C
lose
t Doo
rLo
ckou
t Clo
set D
oor
hard
war
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
athr
oom
Sw
ing
Doo
r
Lock
out B
ath.
Doo
r har
dwar
e
Lock
out C
lose
t doo
r
Lock
out C
lose
t Doo
r har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain
& Lo
ckou
t Ent
ry D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
ath
Swin
g D
oor
L.O
Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set H
arew
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
N/A
N/A
N/A
20 Unit 21 Unit 23 Unit22 Unit
N/A
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
6 6 6 6 6 6 3 6 6
6 6 6 6 6 6 3 6 6
8 8 8 8 8 8 3 8 8
8 8 8 8 8 8 3 8 8
10 9 9 9 10 10 3 10 10
10 9 9 9 10 10 3 10 10
10 9 9 9 10 10 3 10 10
10 9 9 9 10 10 3 10 1011 10 10 9 9 9 10 10 3 7 1011 10 10 9 9 9 10 10 3 7 1011 11 11 9 9 9 11 11 3 11 1111 11 11 9 9 9 11 11 3 11 11
6 6 6 5 6 6 6 4 6 5 7 7 6 5 5 13 7 7 6 5 6 7 7
6 6 6 5 6 6 6 4 6 5 7 7 6 5 5 13 7 7 6 5 6 7 7
4 4 10 4 6 3 2 9 5 5 6 5 5 4 12 5
4 4 10 4 6 3 2 9 5 5 6 5 5 4 12 5
Mai
n&Lo
ckou
t Ent
ry D
oor
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Hal
lway
Bed
. Roo
m D
oor
Hal
lway
Bed
room
Doo
r har
dwar
e
Hal
lway
Bat
hroo
m D
oor
Hal
lway
Bat
hroo
m D
oor h
ardw
are
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
eM
aste
r Bed
room
Doo
rM
aste
r Bed
room
Har
dwar
e
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
rL.
Rm
Clo
set H
ardw
are
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETED TO DATE 4/4/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/11/2012
WORK COMPLETED TO DATE 2/1/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/20/2012WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/25/2012
WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 328.2012 WORK COMPLETED TO DATE 5/2/2012WORK COMPLETED TO DATE 2/22/2012
RUN DATE : 2/8/2012
26 Unit
12
7
6
4
9
11
27 Unit
13
N/A
25 Unit
2
24 Unit
14
28 Unit
3
15
5
N/A
16
10
N/A
N/A
FLOOR18
17
8
N/A
N/A
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
5 5 5 5 3 5 5 5 5 5 5 3 5 5 5 5 5 5 3 5 5 5 5 4 4 2 4 4
5 5 5 5 3 5 5 5 5 5 5 3 5 5 5 5 5 5 3 5 5 5 5 4 4 2 4 4
6 6 6 6 3 6 6 6 6 6 6 3 6 6 6 6 6 6 3 6 6 6 6 5 5 2 5 5
6 6 6 6 3 6 6 6 6 6 6 3 6 6 6 6 6 6 3 6 6 6 6 5 5 2 5 5
6 6 6 6 3 6 6 6 6 6 6 3 6 6 6 6 6 6 3 6 6 6 6 5 5 2 5 5
6 6 6 6 3 6 6 6 6 6 6 3 6 6 6 6 6 6 3 6 6 6 6 5 5 2 5 5
8 8 8 8 3 8 7 8 8 8 8 3 8 8 8 8 8 8 3 8 8 8 8 7 7 2 7 7
8 8 8 8 3 8 7 8 8 8 8 3 8 8 8 8 8 8 3 8 8 8 8 7 7 2 7 7
10 8 10 10 3 10 9 10 9 9 10 3 10 10 10 9 9 10 3 10 10 10 10 9 9 2 9 9
10 8 10 10 3 10 9 10 9 9 10 3 10 10 10 9 9 10 3 10 10 10 10 9 9 2 9 9
10 10 10 10 3 10 9 10 9 9 10 3 10 10 10 9 9 10 3 10 10 10 10 9 9 2 9 9
10 10 10 10 3 10 9 10 9 9 10 3 10 10 10 9 9 10 3 10 10 10 10 9 9 2 9 911 11 11 10 10 3 10 9 11 10 9 9 10 3 3 10 11 10 11 9 9 11 4 10 10 11 10 11 10 9 10 3 9 911 11 11 10 10 3 10 9 11 10 9 9 10 3 3 10 11 10 11 9 9 11 4 10 10 11 10 11 10 9 10 3 9 911 9 11 11 3 3 10 11 11 9 9 11 3 11 11 11 11 11 9 9 11 4 11 11 11 11 11 11 10 10 3 10 10
11 9 11 11 3 3 10 11 11 9 9 11 3 11 11 11 11 11 9 9 11 4 11 11 11 11 11 11 10 10 3 10 10
11 10 3 4 3 3 3 3 3 3 3 3 3 3 11 3 11 3 3 3 5 3 3 3 3 11 3 3 3 5 3 311 10 3 4 3 3 3 3 3 3 3 3 3 3 11 3 11 3 3 3 5 3 3 3 3 11 3 3 3 5 3 3
4 6 7 6 14 6 6 3 6 6 6 5 7 6 6 4 6 6 6 6 6 4 6 6
4 6 7 6 14 6 6 3 6 6 6 5 7 6 6 4 6 6 6 6 6 4 6 6
5 9 5 5 12 6
5 9 5 5 12 6
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
r
Com
mun
icat
ing
Doo
r har
dwar
e
L.O
. Bat
hroo
m S
win
g D
oor
L.O
. Bat
hroo
m D
oor
hard
war
e
Lock
out C
lose
t Doo
rLo
ckou
t Clo
set D
oor
hard
war
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
athr
oom
Sw
ing
Doo
r
Lock
out B
ath.
Doo
r har
dwar
e
Lock
out C
lose
t doo
r
Lock
out C
lose
t Doo
r har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain
& Lo
ckou
t Ent
ry D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
ath
Swin
g D
oor
L.O
Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set H
arew
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
20 Unit 21 Unit 23 Unit22 Unit
N/A
N/A N/A
N/A
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
7 7 7 7 7 7 4 7 7
7 7 7 7 7 7 4 7 7
9 9 9 9 9 9 4 9 9
9 9 9 9 9 9 4 9 9
11 10 10 10 11 11 4 11 11
11 10 10 10 11 11 4 11 11
11 10 10 10 11 11 4 11 11
11 10 10 10 11 11 4 11 1112 11 11 10 10 10 11 11 4 8 1112 11 11 10 10 10 11 11 4 8 11
12 10 4 12
12 10 4 12
7 7 7 7 5 7 8 7 14 8 8 8 8
7 7 7 7 5 7 8 7 14 8 8 8 8
Mai
n&Lo
ckou
t Ent
ry D
oor
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Hal
lway
Bed
. Roo
m D
oor
Hal
lway
Bed
room
Doo
r har
dwar
e
Hal
lway
Bat
hroo
m D
oor
Hal
lway
Bat
hroo
m D
oor h
ardw
are
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
eM
aste
r Bed
room
Doo
rM
aste
r Bed
room
Har
dwar
e
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
rL.
Rm
Clo
set H
ardw
are
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE 5/9/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/11/2012
WORK COMPLETED TO DATE 2/1/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/20/2012WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/25/2012
WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 328.2012 WORK COMPLETED TO DATE 5/2/2012WORK COMPLETED TO DATE 2/22/2012
RUN DATE : 2/8/2012
26 Unit
12
7
6
4
9
11
27 Unit
13
N/A
25 Unit
2
24 Unit
14
28 Unit
3
15
5
N/A
16
10
N/A
N/A
FLOOR18
17
8
N/A
N/A
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
6 6 6 6 4 6 6 6 6 6 6 4 6 6 6 6 6 6 4 6 6 6 6 5 5 3 5 5
6 6 6 6 4 6 6 6 6 6 6 4 6 6 6 6 6 6 4 6 6 6 6 5 5 3 5 5
7 7 7 7 4 7 7 7 7 7 7 4 7 7 7 7 7 7 4 7 7 7 7 6 6 3 6 6
7 7 7 7 4 7 7 7 7 7 7 4 7 7 7 7 7 7 4 7 7 7 7 6 6 3 6 6
7 7 7 7 4 7 7 7 7 7 7 4 7 7 7 7 7 7 4 7 7 7 7 6 6 3 6 6
7 7 7 7 4 7 7 7 7 7 7 4 7 7 7 7 7 7 4 7 7 7 7 6 6 3 6 6
9 9 9 9 4 9 8 9 9 9 9 4 9 9 9 9 9 9 4 9 9 9 9 8 8 3 8 8
9 9 9 9 4 9 8 9 9 9 9 4 9 9 9 9 9 9 4 9 9 9 9 8 8 3 8 8
11 9 11 11 4 11 10 11 10 10 11 4 11 11 11 10 10 11 4 11 11 11 11 10 10 3 10 10
11 9 11 11 4 11 10 11 10 10 11 4 11 11 11 10 10 11 4 11 11 11 11 10 10 3 10 10
11 11 11 11 4 11 10 11 10 10 11 4 11 11 11 10 10 11 4 11 11 11 11 10 10 3 10 10
11 11 11 11 4 11 10 11 10 10 11 4 11 11 11 10 10 11 4 11 11 11 11 10 10 3 10 10
12 12 12 11 11 4 11 10 12 11 10 10 11 4 4 11 12 11 12 10 10 12 5 11 11 12 11 12 11 10 11 4 10 10
12 12 12 11 11 4 11 10 12 11 10 10 11 4 4 11 12 11 12 10 10 12 5 11 11 12 11 12 11 10 11 4 10 10
10 12 2 12 4 4 12 4 12 12 10 10 5 12 4
10 12 2 12 4 4 12 4 12 12 10 10 5 12 412 4 5 4 4 4 4 4 4 4 4 12 4 12 4 4 6 4 4 4 4 12 4 4 6 4 412 4 5 4 4 4 4 4 4 4 4 12 4 12 4 4 6 4 4 4 4 12 4 4 6 4 4
8 7 15 7 7 7 7 7 7 7 7 7
8 7 15 7 7 7 7 7 7 7 7 7
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
r
Com
mun
icat
ing
Doo
r har
dwar
e
L.O
. Bat
hroo
m S
win
g D
oor
L.O
. Bat
hroo
m D
oor h
ardw
are
Lock
out C
lose
t Doo
rLo
ckou
t Clo
set D
oor
hard
war
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
athr
oom
Sw
ing
Doo
r
Lock
out B
ath.
Doo
r har
dwar
e
Lock
out C
lose
t doo
r
Lock
out C
lose
t Doo
r har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain
& Lo
ckou
t Ent
ry D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
ath
Swin
g D
oor
L.O
Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set H
arew
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
20 Unit 21 Unit 23 Unit22 Unit
N/A
N/A N/A
N/A
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
8 8 8 8 8 8 5 8 8
8 8 8 8 8 8 5 8 8
10 10 10 10 10 10 5 10 10
10 10 10 10 10 10 5 10 10
12 11 11 11 12 12 5 12 12
12 11 11 11 12 12 5 12 12
12 11 11 11 12 12 5 12 12
12 11 11 11 12 12 5 12 1213 12 12 11 11 11 12 12 5 9 1213 12 12 11 11 11 12 12 5 9 12
11 5 1311 5 13
15
15
Mai
n&Lo
ckou
t Ent
ry D
oor
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Hal
lway
Bed
. Roo
m D
oor
Hal
lway
Bed
room
Doo
r har
dwar
e
Hal
lway
Bat
hroo
m D
oor
Hal
lway
Bat
hroo
m D
oor h
ardw
are
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
eM
aste
r Bed
room
Doo
rM
aste
r Bed
room
Har
dwar
e
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
rL.
Rm
Clo
set H
ardw
are
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE 5/9/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE 5/16/2012
WORK COMPLETED TO DATE 2/1/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/20/2012WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/25/2012
WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 328.2012 WORK COMPLETED TO DATE 5/2/2012WORK COMPLETED TO DATE 2/22/2012
RUN DATE : 2/8/2012
26 Unit
12
7
6
4
9
11
27 Unit
13
N/A
25 Unit
2
24 Unit
14
28 Unit
3
15
5
N/A
16
10
N/A
N/A
FLOOR18
17
8
N/A
N/A
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
7 7 7 7 5 7 7 7 7 7 7 5 7 7 7 7 7 7 5 7 7 7 7 6 6 4 6 6
7 7 7 7 5 7 7 7 7 7 7 5 7 7 7 7 7 7 5 7 7 7 7 6 6 4 6 6
8 8 8 8 5 8 8 8 8 8 8 5 8 8 8 8 8 8 5 8 8 8 8 7 7 4 7 7
8 8 8 8 5 8 8 8 8 8 8 5 8 8 8 8 8 8 5 8 8 8 8 7 7 4 7 7
8 8 8 8 5 8 8 8 8 8 8 5 8 8 8 8 8 8 5 8 8 8 8 7 7 4 7 7
8 8 8 8 5 8 8 8 8 8 8 5 8 8 8 8 8 8 5 8 8 8 8 7 7 4 7 7
10 10 10 10 5 10 9 10 10 10 10 5 10 10 10 10 10 10 5 10 10 10 # 9 9 4 9 9
10 10 10 10 5 10 9 10 10 10 10 5 10 10 10 10 10 10 5 10 10 10 # 9 9 4 9 9
12 10 12 12 5 12 11 12 11 11 12 5 12 12 12 11 11 12 5 12 12 12 12 11 11 4 11 11
12 10 12 12 5 12 11 12 11 11 12 5 12 12 12 11 11 12 5 12 12 12 12 11 11 4 11 11
12 12 12 12 5 12 11 12 11 11 12 5 12 12 12 11 11 12 5 12 12 12 12 11 11 4 11 11
12 12 12 12 5 12 11 12 11 11 12 5 12 12 12 11 11 12 5 12 12 12 12 11 11 4 11 11
13 13 13 12 12 5 12 11 13 12 11 11 12 5 5 12 12 13 11 11 13 6 12 12 12 13 12 11 12 5 11 11
13 13 13 12 12 5 12 11 13 12 11 11 12 5 5 12 12 13 11 11 13 6 12 12 12 13 12 11 12 5 11 11
11 13 13 5 13 12 5 13 11 11 2 13 2
11 13 13 5 13 12 5 13 11 11 2 13 2
5
5
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
r
Com
mun
icat
ing
Doo
r har
dwar
e
L.O
. Bat
hroo
m S
win
g D
oor
L.O
. Bat
hroo
m D
oor h
ardw
are
Lock
out C
lose
t Doo
r
Lock
out C
lose
t Doo
r har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
athr
oom
Sw
ing
Doo
r
Lock
out B
ath.
Doo
r har
dwar
e
Lock
out C
lose
t doo
r
Lock
out C
lose
t Doo
r har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain
& Lo
ckou
t Ent
ry D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
ath
Swin
g D
oor
L.O
Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set H
arew
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
20 Unit 21 Unit 23 Unit22 Unit
N/A
N/A N/A
N/A
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
9 2 9 6 9
9 2 9 6 9
2 11 2 11 11 11 11 10 6 11
2 11 2 11 11 11 11 10 6 11
13 2 12 12 12 13 12 6 13 13
13 2 12 12 12 13 12 6 13 13
2 13 2 6 13
2 13 2 6 13
14 13 13 614 13 13 6
6 14
6 14
Mai
n&Lo
ckou
t Ent
ry D
oor
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Hal
lway
Bed
. Roo
m D
oor
Hal
lway
Bed
room
Doo
r har
dwar
e
Hal
lway
Bat
hroo
m D
oor
Hal
lway
Bat
hroo
m D
oor h
ardw
are
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
eM
aste
r Bed
room
Doo
rM
aste
r Bed
room
Har
dwar
e
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
rL.
Rm
Clo
set H
ardw
are
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE 5/9/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE 5/16/2012
WORK COMPLETED TO DATE 2/1/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE 5/23/2012WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/25/2012
WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 328.2012 WORK COMPLETED TO DATE 5/2/2012WORK COMPLETED TO DATE 2/22/2012
N/A
15
5
N/A
16
10
N/A
N/A
FLOOR18
17
2
24 Unit
14
28 Unit
3
8
N/A
9
11
27 Unit
13
N/A
25 Unit
RUN DATE : 2/8/2012
26 Unit
12
7
6
4
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
2 8 2 8 8 8 6 8 8 2 8 2 8 8 8 6 8 8 8 2 8 8 8 8 8 2 7
2 8 2 8 8 8 6 8 8 2 8 2 8 8 8 6 8 8 8 2 8 8 8 8 8 2 7
2 9 2 9 9 6 9 9 2 9 2 9 9 9 6 9 9 2 9 9 2 8
2 9 2 9 9 6 9 9 2 9 2 9 9 9 6 9 9 2 9 9 2 8
9 2 9 9 6 9 2 9 2 9 9 6 9 2 2 9 9 9 2 8 5 8
9 2 9 9 6 9 2 9 2 9 9 6 9 2 2 9 9 9 2 8 5 8
2 11 2 11 11 11 6 2 11 2 11 11 11 6 2 2 11 11 11 6 11 2 11 10 10 5
2 11 2 11 11 11 6 2 11 2 11 11 11 6 2 2 11 11 11 6 11 2 11 10 10 5
13 2 11 13 13 6 13 12 13 2 12 12 13 6 13 13 2 13 2 12 12 13 6 13 13 13 2 13 12 12 5 12
13 2 11 13 13 6 13 12 13 2 12 12 13 6 13 13 2 13 2 12 12 13 6 13 13 13 2 13 12 12 5 12
2 13 6 12 2 13 2 6 2 13 2 12 12 13 6 13 13 2 12 12 5
2 13 6 12 2 13 2 6 2 13 2 12 12 13 6 13 13 2 12 12 514 2 6 13 2 6 2 14 7 2 14 614 2 6 13 2 6 2 14 7 2 14 6
12 2 14 14 6 14 14 12 12 3 14 3
12 2 14 14 6 14 14 12 12 3 14 3
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Hal
lway
Bed
. Roo
m d
oor
Hal
lway
Bed
. Roo
m d
oor h
ardw
are
Hal
lway
Bat
hroo
m d
oor
Hal
lway
Bat
h. R
oom
doo
r har
dwar
e
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Hal
lway
Bed
. Roo
m d
oor
Hal
lway
Bed
. Roo
m d
oor h
ardw
are
Hal
lway
Bat
hroo
m d
oor
Hal
lway
Bat
h. R
oom
doo
r har
dwar
e
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Com
mun
icat
ing
Doo
r
Com
mun
icat
ing
Doo
r har
dwar
e
L.O
. Bat
hroo
m S
win
g D
oor
L.O
. Bat
hroo
m D
oor h
ardw
are
Lock
out C
lose
t Doo
r
Lock
out C
lose
t Doo
r har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
athr
oom
Sw
ing
Doo
r
Lock
out B
ath.
Doo
r har
dwar
e
Lock
out C
lose
t doo
r
Lock
out C
lose
t Doo
r har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain
& Lo
ckou
t Ent
ry D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
ath
Swin
g D
oor
L.O
Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set H
arew
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
N/A
N/A
N/A
20 Unit 21 Unit 23 Unit22 Unit
N/A
N/AJobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
12
12
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
2 10 3 2 10 2 2 2 7 2 10
2 10 3 2 10 2 2 2 7 2 10
3 12 3 12 12 12 12 11 7 2 12
3 12 3 12 12 12 12 11 7 2 12
2 14 3 7 14
2 14 3 7 14
3 14 3 7 14
3 14 3 7 14
15 14 715 14 7
7 15
7 15
Mai
n&Lo
ckou
t Ent
ry D
oor
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Hal
lway
Bed
. Roo
m D
oor
Hal
lway
Bed
room
Doo
r har
dwar
e
Hal
lway
Bat
hroo
m D
oor
Hal
lway
Bat
hroo
m D
oor h
ardw
are
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
eM
aste
r Bed
room
Doo
rM
aste
r Bed
room
Har
dwar
e
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
rL.
Rm
Clo
set H
ardw
are
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE 5/9/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE 5/16/2012
WORK COMPLETED TO DATE 2/1/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE 5/23/2012WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE 5/30/2012
WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 328.2012 WORK COMPLETED TO DATE 5/2/2012WORK COMPLETED TO DATE 2/22/2012
RUN DATE : 2/8/2012
26 Unit
12
7
6
4
25 Unit24 Unit
14
28 Unit
3
8
N/A
9
11
27 Unit
N/A
N/A
FLOOR18
17
2
13
N/A
N/A
15
5
16
10
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
3 3 9 2 2 9 7 9 9 3 2 3 9 7 9 2 3 9 9 2 9 2 2 3 2 2 8 2
3 3 9 2 2 9 7 9 9 3 2 3 9 7 9 2 2 9 9 2 9 2 2 3 2 2 8 2
3 10 3 10 2 2 2 10 7 10 10 3 10 2 2 2 3 10 10 10 7 10 10 2 2 3 2 2 10 2 10 2 2 2 3 2 2 9 2
3 10 3 10 2 2 2 10 7 10 10 3 10 2 2 2 3 10 10 10 7 10 10 2 2 3 2 2 10 2 10 2 2 2 3 2 2 9 2
2 10 3 10 2 10 7 10 2 3 10 3 10 2 10 7 10 2 3 2 3 10 2 10 2 10 2 2 2 3 2 2 9 6 9
2 10 3 10 2 10 7 10 2 3 10 3 10 2 10 7 10 2 3 2 3 10 2 10 2 10 2 2 2 3 2 2 9 6 9
3 12 3 12 12 12 7 2 2 3 12 3 12 12 12 7 2 2 3 2 3 12 12 7 12 2 2 2 3 12 11 6
3 12 3 12 12 12 7 2 2 3 12 3 12 12 12 7 2 2 3 2 3 12 12 7 12 2 2 2 3 12 11 6
2 14 3 14 7 2 14 3 14 7 3 3 2 3 13 6
2 14 3 14 7 2 14 3 14 7 3 3 2 3 13 6
2 3 7 3 14 3 2 7 3 3 14 14 14 2 3 13 13
2 3 7 3 14 3 2 7 3 3 14 14 14 2 3 13 1315 2 7 2 14 2 7 3 15 2 3 15 2 715 2 7 2 14 2 7 3 15 2 3 15 2 7
3 15 15 15 15 13 13 4 15 4
3 15 15 15 15 13 13 4 15 4
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Hal
lway
Bed
. Roo
m d
oor
Hal
lway
Bed
. Roo
m d
oor h
ardw
are
Hal
lway
Bat
hroo
m d
oor
Hal
lway
Bat
h. R
oom
doo
r har
dwar
e
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Hal
lway
Bed
. Roo
m d
oor
Hal
lway
Bed
. Roo
m d
oor h
ardw
are
Hal
lway
Bat
hroo
m d
oor
Hal
lway
Bat
h. R
oom
doo
r har
dwar
e
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Com
mun
icat
ing
Doo
r
Com
mun
icat
ing
Doo
r har
dwar
e
L.O
. Bat
hroo
m S
win
g D
oor
L.O
. Bat
hroo
m D
oor h
ardw
are
Lock
out C
lose
t Doo
r
Lock
out C
lose
t Doo
r har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
athr
oom
Sw
ing
Doo
r
Lock
out B
ath.
Doo
r har
dwar
e
Lock
out C
lose
t doo
r
Lock
out C
lose
t Doo
r har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain
& Lo
ckou
t Ent
ry D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
ath
Swin
g D
oor
L.O
Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set H
arew
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
20 Unit 21 Unit 23 Unit22 Unit
N/A
N/A
N/A
N/A
N/A
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
2 2
2 2
2 2
2 2
2
2
2 2
2 2
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
11 4 3 11 3 3 3 8 3 11
11 4 3 11 3 3 3 8 3 11
4 8 3
4 8 3
15 2 2 2 2 8 15 2
15 2 2 2 2 8 15 2
15 2 8 15
15 2 8 15
16 2 2 816 2 2 8
16
16
Mai
n&Lo
ckou
t Ent
ry D
oor
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Hal
lway
Bed
. Roo
m D
oor
Hal
lway
Bed
room
Doo
r har
dwar
e
Hal
lway
Bat
hroo
m D
oor
Hal
lway
Bat
hroo
m D
oor h
ardw
are
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
eM
aste
r Bed
room
Doo
rM
aste
r Bed
room
Har
dwar
e
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
rL.
Rm
Clo
set H
ardw
are
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE 5/9/2012 WORK COMPLETED TO DATE 6/13/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE 5/16/2012
WORK COMPLETED TO DATE 2/1/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE 5/23/2012WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE 5/30/2012
WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 328.2012 WORK COMPLETED TO DATE 5/2/2012 WORK COMPLETED TO DATE 6/6/2012WORK COMPLETED TO DATE 2/22/2012
17
2
13
N/A
15
5
16
8
N/A
9
11
27 Unit
N/A
N/A
FLOOR18
24 Unit
14
28 Unit
3
10
12
7
6
4
N/A
25 Unit
N/A N/A N/A
RUN DATE : 2/8/2012
26 Unit
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
4 2 4 10 2 3 3 2 10 8 10 10 4 2 2 3 2 4 2 2 10 8 2 10 2 3 10 2 10 3 2 10 3 4 3 3 9 3
4 2 4 10 2 3 3 2 10 8 10 10 4 2 2 3 2 4 2 2 10 8 2 10 2 3 10 2 10 3 2 10 3 4 3 3 9 3
4 11 4 11 3 3 3 2 11 8 11 11 4 11 3 3 3 4 11 11 11 8 11 11 3 3 4 3 3 11 3 11 3 3 3 4 3 3 10 3
4 11 4 11 3 3 3 2 11 8 11 11 4 11 3 3 3 4 11 11 11 8 11 11 3 3 4 3 3 11 3 11 3 3 3 4 3 3 10 3
11 4 11 3 11 8 11 3 11 4 11 3 11 8 11 3 4 3 4 11 3 11 3 11 3 3 4 3 3 10 7 10
11 4 11 3 11 8 11 3 11 4 11 3 11 8 11 3 4 3 4 11 3 11 3 11 3 3 4 3 3 10 7 10
4 13 13 13 8 13 8 3 4 8 13 4
4 13 13 13 8 13 8 3 4 8 13 4
15 4 2 15 8 15 2 15 8 4 4 2 4 2 14
15 4 2 15 8 15 2 15 8 4 4 2 4 2 14
2 8 15 3 8 4 15 15 4 14
2 8 15 3 8 4 15 15 4 14
16 2 3 15 2 3 8 16 3 16 316 2 3 15 2 3 8 16 3 16 3
16 14
16 14
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Hal
lway
Bed
. Roo
m d
oor
Hal
lway
Bed
. Roo
m d
oor h
ardw
are
Hal
lway
Bat
hroo
m d
oor
Hal
lway
Bat
h. R
oom
doo
r har
dwar
e
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Hal
lway
Bed
. Roo
m d
oor
Hal
lway
Bed
. Roo
m d
oor h
ardw
are
Hal
lway
Bat
hroo
m d
oor
Hal
lway
Bat
h. R
oom
doo
r har
dwar
e
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Com
mun
icat
ing
Doo
r
Com
mun
icat
ing
Doo
r har
dwar
e
L.O
. Bat
hroo
m S
win
g D
oor
L.O
. Bat
hroo
m D
oor h
ardw
are
Lock
out C
lose
t Doo
r
Lock
out C
lose
t Doo
r har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
athr
oom
Sw
ing
Doo
r
Lock
out B
ath.
Doo
r har
dwar
e
Lock
out C
lose
t doo
r
Lock
out C
lose
t Doo
r har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain
& Lo
ckou
t Ent
ry D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
ath
Swin
g D
oor
L.O
Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set H
arew
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
N/A
N/A
N/A
N/A
N/A
20 Unit 21 Unit 23 Unit22 Unit
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
3 3
3 3
3 3
3 3
3
3
2
2
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
12 5 4 12 4 4 4 9 4 12
12 5 4 12 4 4 4 9 4 12
2 5 2 2 2 2 9 4
2 5 2 2 2 2 9 4
16 2 3 3 3 3 9 16 3
16 2 3 3 3 3 9 16 3
2 3 9 16
2 3 9 16
2 3
2 3
Mai
n&Lo
ckou
t Ent
ry D
oor
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Hal
lway
Bed
. Roo
m D
oor
Hal
lway
Bed
room
Doo
r har
dwar
e
Hal
lway
Bat
hroo
m D
oor
Hal
lway
Bat
hroo
m D
oor h
ardw
are
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
eM
aste
r Bed
room
Doo
rM
aste
r Bed
room
Har
dwar
e
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
rL.
Rm
Clo
set H
ardw
are
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE 5/9/2012 WORK COMPLETED TO DATE 6/13/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE 5/16/2012
WORK COMPLETED TO DATE 2/1/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE 5/23/2012WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE 5/30/2012
WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 328.2012 WORK COMPLETED TO DATE 5/2/2012 WORK COMPLETED TO DATE 6/6/2012WORK COMPLETED TO DATE 2/22/2012
N/A
RUN DATE : 2/8/2012
26 Unit
6
4
N/A
25 Unit
N/A N/A
24 Unit
14
28 Unit
3
10
12
7
8
N/A
9
11
27 Unit
N/A
N/A
FLOOR18
17
2
13
N/A
15
5
16
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
5 2 5 11 3 4 4 3 11 9 11 11 5 3 3 4 3 5 3 3 11 9 3 11 3 4 10 4 11 4 3 11 3 5 4 4 10 4
5 2 5 11 3 4 4 3 11 9 11 11 5 3 3 4 3 5 3 3 11 9 3 11 3 4 10 4 11 4 3 11 3 5 4 4 10 4
5 12 5 12 4 4 4 3 12 9 12 12 5 12 4 4 5 12 12 12 9 12 12 4 4 5 4 4 12 4 12 4 4 3 5 4 4 11 4
5 12 5 12 4 4 4 3 12 9 12 12 5 12 4 4 5 12 12 12 9 12 12 4 4 5 4 4 12 4 12 4 4 3 5 4 4 11 4
12 5 12 12 9 12 4 12 12 12 9 12 4 5 4 5 4 12 4 12 4 3 5 4 4 11 8 11
12 5 12 12 9 12 4 12 12 12 9 12 4 5 4 5 4 12 4 12 4 3 5 4 4 11 8 11
5 14 14 14 9 14 2 2 2 2 9 4 5 2 9 14 5
5 14 14 14 9 14 2 2 2 2 9 4 5 2 9 14 5
16 5 3 16 9 16 2 3 9 5 5 2 2 5 3 15
16 5 3 16 9 16 2 3 9 5 5 2 2 5 3 15
2 3 2 4 5 15 5 15 2
2 3 2 4 5 15 5 15 2
16 4 17 17
16 4 17 17
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Hal
lway
Bed
. Roo
m d
oor
Hal
lway
Bed
. Roo
m d
oor h
ardw
are
Hal
lway
Bat
hroo
m d
oor
Hal
lway
Bat
h. R
oom
doo
r har
dwar
e
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Hal
lway
Bed
. Roo
m d
oor
Hal
lway
Bed
. Roo
m d
oor h
ardw
are
Hal
lway
Bat
hroo
m d
oor
Hal
lway
Bat
h. R
oom
doo
r har
dwar
e
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Com
mun
icat
ing
Doo
r
Com
mun
icat
ing
Doo
r har
dwar
e
L.O
. Bat
hroo
m S
win
g D
oor
L.O
. Bat
hroo
m D
oor h
ardw
are
Lock
out C
lose
t Doo
r
Lock
out C
lose
t Doo
r har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
athr
oom
Sw
ing
Doo
r
Lock
out B
ath.
Doo
r har
dwar
e
Lock
out C
lose
t doo
r
Lock
out C
lose
t Doo
r har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain
& Lo
ckou
t Ent
ry D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
ath
Swin
g D
oor
L.O
Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set H
arew
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
20 Unit 21 Unit 23 Unit22 Unit
N/A
N/A
N/A
N/A
N/A
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
4 3
4 3
4 3
4 3
3
3
2
2
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
13 13 5 5 2 10 13
13 13 5 5 2 10 13
6 3 3 10
6 3 3 10
3 4 10
3 4 10
3 4
3 4
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
Mai
n&Lo
ckou
t Ent
ry D
oor
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Hal
lway
Bed
. Roo
m D
oor
Hal
lway
Bed
room
Doo
r har
dwar
e
Hal
lway
Bat
hroo
m D
oor
Hal
lway
Bat
hroo
m D
oor h
ardw
are
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
eM
aste
r Bed
room
Doo
rM
aste
r Bed
room
Har
dwar
e
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
rL.
Rm
Clo
set H
ardw
are
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE 5/9/2012 WORK COMPLETED TO DATE 6/13/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE 5/16/2012 WORK COMPLETED TO DATE 6/20/2012
WORK COMPLETED TO DATE 2/1/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE 5/23/2012WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE 5/30/2012
WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 328.2012 WORK COMPLETED TO DATE 5/2/2012 WORK COMPLETED TO DATE 6/6/2012WORK COMPLETED TO DATE 2/22/2012
17
2
13
N/A
15
5
16
8
N/A
9
11
27 Unit
N/A
N/A
FLOOR18
24 Unit
14
28 Unit
3
10
12
7
25 Unit
N/A N/A N/A
RUN DATE : 2/8/2012
26 Unit
6
4
N/A
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
6 2 6 12 4 5 5 4 12 10 12 12 6 4 4 5 4 6 4 4 12 10 4 12 4 5 11 5 12 5 4 12 4 6 5 5 11 5
6 2 6 12 4 5 5 4 12 10 12 12 6 4 4 5 4 6 4 4 12 10 4 12 4 5 11 5 12 5 4 12 4 6 5 5 11 5
6 13 13 5 5 5 4 13 10 13 13 6 13 5 5 6 13 13 13 10 13 13 5 5 6 5 5 13 5 13 5 5 4 6 5 5 12 5
6 13 13 5 5 5 4 13 10 13 13 6 13 5 5 6 13 13 13 10 13 13 5 5 6 5 5 13 5 13 5 5 4 6 5 5 12 5
13 13 13 10 13 5 13 13 13 10 13 5 6 5 6 2 5 13 5 13 5 4 6 5 5 12 9 12
13 13 13 10 13 5 13 13 13 10 13 5 6 5 6 2 5 13 5 13 5 4 6 5 5 12 9 12
6 15 10 15 3 10 6 3 15 6 2
6 15 10 15 3 10 6 3 15 6 2
17 6 4 10 3 2 10 6 6 3 6 16
17 6 4 10 3 2 10 6 6 3 6 16
3 5 2 6 2 16 6
3 5 2 6 2 16 618 18
18 18
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Hal
lway
Bed
. Roo
m d
oor
Hal
lway
Bed
. Roo
m d
oor h
ardw
are
Hal
lway
Bat
hroo
m d
oor
Hal
lway
Bat
h. R
oom
doo
r har
dwar
e
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Hal
lway
Bed
. Roo
m d
oor
Hal
lway
Bed
. Roo
m d
oor h
ardw
are
Hal
lway
Bat
hroo
m d
oor
Hal
lway
Bat
h. R
oom
doo
r har
dwar
e
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Com
mun
icat
ing
Doo
r
Com
mun
icat
ing
Doo
r har
dwar
e
L.O
. Bat
hroo
m S
win
g D
oor
L.O
. Bat
hroo
m D
oor h
ardw
are
Lock
out C
lose
t Doo
r
Lock
out C
lose
t Doo
r har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
athr
oom
Sw
ing
Doo
r
Lock
out B
ath.
Doo
r har
dwar
e
Lock
out C
lose
t doo
r
Lock
out C
lose
t Doo
r har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain
& Lo
ckou
t Ent
ry D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
ath
Swin
g D
oor
L.O
Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set H
arew
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
N/A
N/A
N/A
N/A
N/A
20 Unit 21 Unit 23 Unit22 Unit
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
5 4
5 4
5 4
5 4
4
4
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
14 2 14 6 6 3 11 14
14 2 14 6 6 3 11 14
7 4 4 11
7 4 4 11
4 5 11 2
4 5 11 2
5
5
3 2 3 3 3 3
3 2 3 3 3 3
Mai
n&Lo
ckou
t Ent
ry D
oor
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Hal
lway
Bed
. Roo
m D
oor
Hal
lway
Bed
room
Doo
r har
dwar
e
Hal
lway
Bat
hroo
m D
oor
Hal
lway
Bat
hroo
m D
oor h
ardw
are
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
eM
aste
r Bed
room
Doo
rM
aste
r Bed
room
Har
dwar
e
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
rL.
Rm
Clo
set H
ardw
are
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE 5/9/2012 WORK COMPLETED TO DATE 6/13/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE 5/16/2012 WORK COMPLETED TO DATE 6/20/2012
WORK COMPLETED TO DATE 2/1/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE 5/23/2012 WORK COMPLETED TO DATE 6/27/2012WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE 5/30/2012
WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 328.2012 WORK COMPLETED TO DATE 5/2/2012 WORK COMPLETED TO DATE 6/6/2012WORK COMPLETED TO DATE 2/22/2012
RUN DATE : 2/8/2012
26 Unit
6
4
N/A
25 Unit
N/A N/A N/A
24 Unit
14
28 Unit
3
10
12
7
8
N/A
9
11
27 Unit
N/A
N/A
FLOOR18
17
2
13
N/A
15
5
16
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
7 3 13 5 6 6 5 13 11 13 13 7 5 5 6 5 7 5 5 13 11 5 13 5 6 12 6 13 6 5 13 5 7 6 6 12 6
7 3 13 5 6 6 5 13 11 13 13 7 5 5 6 5 7 5 5 13 11 5 13 5 6 12 6 13 6 5 13 5 7 6 6 12 6
7 14 2 14 6 6 6 5 14 11 14 14 7 14 6 6 2 7 14 14 14 11 14 14 6 6 7 6 6 14 6 14 6 6 5 7 6 6 13 6
7 14 2 14 6 6 6 5 14 11 14 14 7 14 6 6 2 7 14 14 14 11 14 14 6 6 7 6 6 14 6 14 6 6 5 7 6 6 13 6
14 2 14 14 11 14 6 14 14 14 11 14 6 7 6 7 3 6 14 6 14 6 5 7 6 6 13 10
14 2 14 14 11 14 6 14 14 14 11 14 6 7 6 7 3 6 14 6 14 6 5 7 6 6 13 10
16 2 11 16 4 11 7 4 16 7 3
16 2 11 16 4 11 7 4 16 7 3
18 7 5 2 2 4 3 11 7 4 7
18 7 5 2 2 4 3 11 7 4 7
3 7 17 7
3 7 17 7
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Hal
lway
Bed
. Roo
m d
oor
Hal
lway
Bed
. Roo
m d
oor h
ardw
are
Hal
lway
Bat
hroo
m d
oor
Hal
lway
Bat
h. R
oom
doo
r har
dwar
e
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Hal
lway
Bed
. Roo
m d
oor
Hal
lway
Bed
. Roo
m d
oor h
ardw
are
Hal
lway
Bat
hroo
m d
oor
Hal
lway
Bat
h. R
oom
doo
r har
dwar
e
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Com
mun
icat
ing
Doo
r
Com
mun
icat
ing
Doo
r har
dwar
e
L.O
. Bat
hroo
m S
win
g D
oor
L.O
. Bat
hroo
m D
oor h
ardw
are
Lock
out C
lose
t Doo
r
Lock
out C
lose
t Doo
r har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
athr
oom
Sw
ing
Doo
r
Lock
out B
ath.
Doo
r har
dwar
e
Lock
out C
lose
t doo
r
Lock
out C
lose
t Doo
r har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain
& Lo
ckou
t Ent
ry D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
ath
Swin
g D
oor
L.O
Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set H
arew
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
20 Unit 21 Unit 23 Unit22 Unit
N/A
N/A
N/A
N/A
N/A
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
6 5
6 5
6 5
6 5
13 5
13 5
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
15 3 15 7 7 4 12 15
15 3 15 7 7 4 12 15
5 5 12
5 5 12
6 3
6 3
4 3 4 4 4 4
4 3 4 4 4 4
Mai
n&Lo
ckou
t Ent
ry D
oor
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Hal
lway
Bed
. Roo
m D
oor
Hal
lway
Bed
room
Doo
r har
dwar
e
Hal
lway
Bat
hroo
m D
oor
Hal
lway
Bat
hroo
m D
oor h
ardw
are
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
eM
aste
r Bed
room
Doo
rM
aste
r Bed
room
Har
dwar
e
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
rL.
Rm
Clo
set H
ardw
are
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE 5/9/2012 WORK COMPLETED TO DATE 6/13/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE 5/16/2012 WORK COMPLETED TO DATE 6/20/2012
WORK COMPLETED TO DATE 2/1/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE 5/23/2012 WORK COMPLETED TO DATE 6/27/2012WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 7/6/2012
WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 328.2012 WORK COMPLETED TO DATE 5/2/2012 WORK COMPLETED TO DATE 6/6/2012WORK COMPLETED TO DATE 2/22/2012
17
2
13
N/A
15
5
16
8
N/A
9
11
27 Unit
N/A
N/A
FLOOR18
24 Unit
14
28 Unit
3
10
12
7
25 Unit
N/A N/A N/A
RUN DATE : 2/8/2012
26 Unit
6
4
N/A
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
8 4 2 14 6 7 7 6 14 12 14 14 8 6 6 7 6 8 6 6 14 12 6 14 6 7 13 7 14 7 6 14 6 8 7 7 13 7
8 4 2 14 6 7 7 6 14 12 14 14 8 6 6 7 6 8 6 6 14 12 6 14 6 7 13 7 14 7 6 14 6 8 7 7 13 7
8 3 7 7 15 12 15 15 8 15 7 6 3 8 15 15 15 12 15 15 7 7 8 7 7 15 7 15 7 7 6 7 7 14 7
8 3 7 7 15 12 15 15 8 15 7 6 3 8 15 15 15 12 15 15 7 7 8 7 7 15 7 15 7 7 6 7 7 14 7
15 3 15 15 12 15 7 15 15 15 12 15 7 8 7 8 4 7 15 7 15 7 6 8 7 7 14 11
15 3 15 15 12 15 7 15 15 15 12 15 7 8 7 8 4 7 15 7 15 7 6 8 7 7 14 11
3 17 3 12 17 5 12 8 5 4
3 17 3 12 17 5 12 8 5 4
8 6 3 2 3 2 5
8 6 3 2 3 2 5
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Hal
lway
Bed
. Roo
m d
oor
Hal
lway
Bed
. Roo
m d
oor h
ardw
are
Hal
lway
Bat
hroo
m d
oor
Hal
lway
Bat
h. R
oom
doo
r har
dwar
e
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Hal
lway
Bed
. Roo
m d
oor
Hal
lway
Bed
. Roo
m d
oor h
ardw
are
Hal
lway
Bat
hroo
m d
oor
Hal
lway
Bat
h. R
oom
doo
r har
dwar
e
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Com
mun
icat
ing
Doo
r
Com
mun
icat
ing
Doo
r har
dwar
e
L.O
. Bat
hroo
m S
win
g D
oor
L.O
. Bat
hroo
m D
oor h
ardw
are
Lock
out C
lose
t Doo
r
Lock
out C
lose
t Doo
r har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
athr
oom
Sw
ing
Doo
r
Lock
out B
ath.
Doo
r har
dwar
e
Lock
out C
lose
t doo
r
Lock
out C
lose
t Doo
r har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain
& Lo
ckou
t Ent
ry D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
ath
Swin
g D
oor
L.O
Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set H
arew
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
N/A
N/A
N/A
N/A
N/A
20 Unit 21 Unit 23 Unit22 Unit
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
7 6
7 6
7 6
7 6
14 6
14 6
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
16 4 16 8 8 5 13 16
16 4 16 8 8 5 13 16
6 6 13
6 6 13
7
7
2 2 2 2 2 4 5 5
2 2 2 2 2 4 5 5
Mai
n&Lo
ckou
t Ent
ry D
oor
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Hal
lway
Bed
. Roo
m D
oor
Hal
lway
Bed
room
Doo
r har
dwar
e
Hal
lway
Bat
hroo
m D
oor
Hal
lway
Bat
hroo
m D
oor h
ardw
are
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
eM
aste
r Bed
room
Doo
rM
aste
r Bed
room
Har
dwar
e
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
rL.
Rm
Clo
set H
ardw
are
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE 5/9/2012 WORK COMPLETED TO DATE 6/13/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE 5/16/2012 WORK COMPLETED TO DATE 6/20/2012
WORK COMPLETED TO DATE 2/1/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE 5/23/2012 WORK COMPLETED TO DATE 6/27/2012WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 7/6/2012
WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 328.2012 WORK COMPLETED TO DATE 5/2/2012 WORK COMPLETED TO DATE 6/6/2012 WORK COMPLETED TO DATE 7/11/2012WORK COMPLETED TO DATE 2/22/2012
RUN DATE : 2/8/2012
26 Unit
6
4
N/A
25 Unit
N/A N/A N/A
24 Unit
14
28 Unit
3
10
12
7
8
N/A
9
11
27 Unit
N/A
N/A
FLOOR18
17
2
13
N/A
15
5
16
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
9 5 3 15 7 7 8 7 15 13 15 15 9 7 7 8 7 9 7 7 15 13 7 15 7 8 14 8 15 8 7 15 7 9 8 8 14 8
9 5 3 15 7 7 8 7 15 13 15 15 9 7 7 8 7 9 7 7 15 13 7 15 7 8 14 8 15 8 7 15 7 9 8 8 14 8
9 2 4 2 8 2 8 2 16 13 16 16 9 16 8 7 4 9 16 16 16 13 16 16 8 8 9 8 8 16 8 16 8 8 7 2 8 8 15 8
9 2 4 2 8 2 8 2 16 13 16 16 9 16 8 7 4 9 16 16 16 13 16 16 8 8 9 8 8 16 8 16 8 8 7 2 8 8 15 8
16 4 16 16 13 16 8 16 16 16 13 16 8 9 8 9 5 8 16 8 16 8 7 9 8 8 15 12
16 4 16 16 13 16 8 16 16 16 13 16 8 9 8 9 5 8 16 8 16 8 7 9 8 8 15 12
4 13 6 13 9 6 2 5
4 13 6 13 9 6 2 5
2 7 4 3 4 6
2 7 4 3 4 6
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Hal
lway
Bed
. Roo
m d
oor
Hal
lway
Bed
. Roo
m d
oor h
ardw
are
Hal
lway
Bat
hroo
m d
oor
Hal
lway
Bat
h. R
oom
doo
r har
dwar
e
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Hal
lway
Bed
. Roo
m d
oor
Hal
lway
Bed
. Roo
m d
oor h
ardw
are
Hal
lway
Bat
hroo
m d
oor
Hal
lway
Bat
h. R
oom
doo
r har
dwar
e
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Com
mun
icat
ing
Doo
r
Com
mun
icat
ing
Doo
r har
dwar
e
L.O
. Bat
hroo
m S
win
g D
oor
L.O
. Bat
hroo
m D
oor h
ardw
are
Lock
out C
lose
t Doo
r
Lock
out C
lose
t Doo
r har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
athr
oom
Sw
ing
Doo
r
Lock
out B
ath.
Doo
r har
dwar
e
Lock
out C
lose
t doo
r
Lock
out C
lose
t Doo
r har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain
& Lo
ckou
t Ent
ry D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
ath
Swin
g D
oor
L.O
Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set H
arew
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
20 Unit 21 Unit 23 Unit22 Unit
N/A
N/A
N/A
N/A
N/A
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
8 7
8 7
8 7
8 7
15 7
15 7
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
17 5 17 9 9 6 14 17
17 5 17 9 9 6 14 17
7 7
7 7
3 3 3 3 3 5 6 6 2 2
3 3 3 3 3 5 6 6 2 2
Mai
n&Lo
ckou
t Ent
ry D
oor
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Hal
lway
Bed
. Roo
m D
oor
Hal
lway
Bed
room
Doo
r har
dwar
e
Hal
lway
Bat
hroo
m D
oor
Hal
lway
Bat
hroo
m D
oor h
ardw
are
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
eM
aste
r Bed
room
Doo
rM
aste
r Bed
room
Har
dwar
e
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
rL.
Rm
Clo
set H
ardw
are
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE 5/9/2012 WORK COMPLETED TO DATE 6/13/2012 WORK COMPLETED TO DATE
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE 5/16/2012 WORK COMPLETED TO DATE 6/20/2012
WORK COMPLETED TO DATE 2/1/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE 5/23/2012 WORK COMPLETED TO DATE 6/27/2012WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 7/6/2012
WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 328.2012 WORK COMPLETED TO DATE 5/2/2012 WORK COMPLETED TO DATE 6/6/2012 WORK COMPLETED TO DATE 7/11/2012WORK COMPLETED TO DATE 2/22/2012
RUN DATE : 2/8/2012
26 Unit
6
4
N/A
25 Unit
N/A N/A N/A
24 Unit
14
28 Unit
3
10
12
7
8
N/A
9
11
27 Unit
N/A
N/A
FLOOR18
17
2
13
N/A
15
5
16
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
10 6 4 16 8 8 9 8 16 14 16 16 10 8 8 9 8 10 8 8 16 14 8 16 8 9 15 9 16 9 8 16 8 10 9 9 15
10 6 4 16 8 8 9 8 16 14 16 16 10 8 8 9 8 10 8 8 16 14 8 16 8 9 15 9 16 9 8 16 8 10 9 9 15
10 3 5 3 9 3 9 3 17 14 17 17 10 17 9 8 5 10 17 17 17 14 17 17 9 9 10 9 9 17 9 17 9 9 8 3 9 9 16
10 3 5 3 9 3 9 3 17 14 17 17 10 17 9 8 5 10 17 17 17 14 17 17 9 9 10 9 9 17 9 17 9 9 8 3 9 9 16
5 17 14 9 17 17 17 17 9 10 9 10 6 9 17 9 17 9 8 10 9 9 16 13
5 17 14 9 17 17 17 17 9 10 9 10 6 9 17 9 17 9 8 10 9 9 16 13
2 5 7 10 7 3 6
2 5 7 10 7 3 6
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
Mai
n&Lo
ckou
t Ent
ry D
oor
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Hal
lway
Bed
. Roo
m d
oor
Hal
lway
Bed
. Roo
m d
oor h
ardw
are
Hal
lway
Bat
hroo
m d
oor
Hal
lway
Bat
h. R
oom
doo
r har
dwar
e
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
Entry
Doo
r
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Hal
lway
Bed
. Roo
m d
oor
Hal
lway
Bed
. Roo
m d
oor h
ardw
are
Hal
lway
Bat
hroo
m d
oor
Hal
lway
Bat
h. R
oom
doo
r har
dwar
e
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Com
mun
icat
ing
Doo
r
Com
mun
icat
ing
Doo
r har
dwar
e
L.O
. Bat
hroo
m S
win
g D
oor
L.O
. Bat
hroo
m D
oor h
ardw
are
Lock
out C
lose
t Doo
r
Lock
out C
lose
t Doo
r har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
Entry
Doo
r
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
athr
oom
Sw
ing
Doo
r
Lock
out B
ath.
Doo
r har
dwar
e
Lock
out C
lose
t doo
r
Lock
out C
lose
t Doo
r har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain
& Lo
ckou
t Ent
ry D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
ath
Swin
g D
oor
L.O
Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set H
arew
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
E 7/18/2012
20 Unit 21 Unit 23 Unit22 Unit
N/A
N/A
N/A
N/A
N/A
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
9 9 8
9 9 8
9 9 8
9 9 8
16 8
16 8
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
Mai
n&Lo
ckou
t Ent
ry D
oor
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Hal
lway
Bed
. Roo
m D
oor
Hal
lway
Bed
room
Doo
r har
dwar
e
Hal
lway
Bat
hroo
m D
oor
Hal
lway
Bat
hroo
m D
oor h
ardw
are
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
eM
aste
r Bed
room
Doo
rM
aste
r Bed
room
Har
dwar
e
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
rL.
Rm
Clo
set H
ardw
are
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE 5/9/2012 WORK COMPLETED TO DATE 6/13/2012 WORK COMPLETED TO DATE
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE 5/16/2012 WORK COMPLETED TO DATE 6/20/2012 WORK COMPLETED TO DATE
WORK COMPLETED TO DATE 2/1/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE 5/23/2012 WORK COMPLETED TO DATE 6/27/2012 WORK COMPLETED TO DATE WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 7/6/2012 WORK COMPLETED TO DATE
WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 328.2012 WORK COMPLETED TO DATE 5/2/2012 WORK COMPLETED TO DATE 6/6/2012 WORK COMPLETED TO DATE 7/11/2012WORK COMPLETED TO DATE 2/22/2012
17
2
13
N/A
15
5
16
8
N/A
9
11
27 Unit
N/A
N/A
FLOOR18
24 Unit
14
28 Unit
3
10
12
7
25 Unit
N/A N/A N/A
RUN DATE : 2/8/2012
26 Unit
6
4
N/A
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
9 7 11 11 12 11 19 17 19 19 11 11 12 11 13 11 11 19 17 11 19 11 18 12 19 12 11 11 13 12
9 7 11 11 12 11 19 17 19 19 11 11 12 11 13 11 11 19 17 11 19 11 18 12 19 12 11 11 13 12
2 6 8 6 12 6 2 6 20 17 2 20 2 2 2 11 2 2 2 2 20 17 2 20 12 13 12 2 12 6
2 6 8 6 12 6 2 6 20 17 2 20 2 2 2 11 2 2 2 2 20 17 2 20 12 13 12 2 12 6
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
Mai
n&Lo
ckou
t Ent
ry D
oor
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Hal
lway
Bed
. Roo
m d
oor
Hal
lway
Bed
. Roo
m d
oor h
ardw
are
Hal
lway
Bat
hroo
m d
oor
Hal
lway
Bat
h. R
oom
doo
r har
dwar
e
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
Entry
Doo
r
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Hal
lway
Bed
. Roo
m d
oor
Hal
lway
Bed
. Roo
m d
oor h
ardw
are
Hal
lway
Bat
hroo
m d
oor
Hal
lway
Bat
h. R
oom
doo
r har
dwar
e
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Com
mun
icat
ing
Doo
r
Com
mun
icat
ing
Doo
r har
dwar
e
L.O
. Bat
hroo
m S
win
g D
oor
L.O
. Bat
hroo
m D
oor h
ardw
are
Lock
out C
lose
t Doo
r
Lock
out C
lose
t Doo
r har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
Entry
Doo
r
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
athr
oom
Sw
ing
Doo
r
Lock
out B
ath.
Doo
r har
dwar
e
Lock
out C
lose
t doo
r
Lock
out C
lose
t Doo
r har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain
& Lo
ckou
t Ent
ry D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
ath
Swin
g D
oor
L.O
Bat
h H
ardw
are
L.O
. Clo
set D
oor
E 7/18/2012
E 7/25/2012
E 8/1/2012 E 8/8/2012
N/A
N/A
N/A
N/A
N/A
20 21 Unit 23 Unit22 Unit
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
12 12 12 11
12 12 12 11
12 2
12 2
L.O
. Clo
set H
arew
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
Unit
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
Mai
n&Lo
ckou
t Ent
ry D
oor
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Hal
lway
Bed
. Roo
m D
oor
Hal
lway
Bed
room
Doo
r har
dwar
e
Hal
lway
Bat
hroo
m D
oor
Hal
lway
Bat
hroo
m D
oor h
ardw
are
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
eM
aste
r Bed
room
Doo
rM
aste
r Bed
room
Har
dwar
e
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
rL.
Rm
Clo
set H
ardw
are
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE 5/9/2012 WORK COMPLETED TO DATE 6/13/2012 WORK COMPLETED TO DATE
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE 5/16/2012 WORK COMPLETED TO DATE 6/20/2012 WORK COMPLETED TO DATE
WORK COMPLETED TO DATE 2/1/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE 5/23/2012 WORK COMPLETED TO DATE 6/27/2012 WORK COMPLETED TO DATE WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 7/6/2012 WORK COMPLETED TO DATE
WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 328.2012 WORK COMPLETED TO DATE 5/2/2012 WORK COMPLETED TO DATE 6/6/2012 WORK COMPLETED TO DATE 7/11/2012 WORK COMPLETED TO DATE WORK COMPLETED TO DATE 2/22/2012
RUN DATE : 2/8/2012
26 Unit
6
4
N/A
25 Unit
N/A N/A N/A
24 Unit
14
28 Unit
3
10
12
7
8
N/A
9
11
27 Unit
N/A
N/A
FLOOR18
17
2
13
N/A
15
5
16
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
8 12 13 13 12 12 2 13 20 13 12 2 12 14 13
8 12 13 13 12 12 2 13 20 13 12 2 12 14 13
3 7 18 21 3 3 3 12 3 3 3 3 18 3 21 13 13 3 13
3 7 18 21 3 3 3 12 3 3 3 3 18 3 21 13 13 3 13
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
Mai
n&Lo
ckou
t Ent
ry D
oor
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Hal
lway
Bed
. Roo
m d
oor
Hal
lway
Bed
. Roo
m d
oor h
ardw
are
Hal
lway
Bat
hroo
m d
oor
Hal
lway
Bat
h. R
oom
doo
r har
dwar
e
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
Entry
Doo
r
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Hal
lway
Bed
. Roo
m d
oor
Hal
lway
Bed
. Roo
m d
oor h
ardw
are
Hal
lway
Bat
hroo
m d
oor
Hal
lway
Bat
h. R
oom
doo
r har
dwar
e
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Com
mun
icat
ing
Doo
r
Com
mun
icat
ing
Doo
r har
dwar
e
L.O
. Bat
hroo
m S
win
g D
oor
L.O
. Bat
hroo
m D
oor h
ardw
are
Lock
out C
lose
t Doo
r
Lock
out C
lose
t Doo
r har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
Entry
Doo
r
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
athr
oom
Sw
ing
Doo
r
Lock
out B
ath.
Doo
r har
dwar
e
Lock
out C
lose
t doo
r
Lock
out C
lose
t Doo
r har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain
& Lo
ckou
t Ent
ry D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
ath
Swin
g D
oor
L.O
Bat
h H
ardw
are
L.O
. Clo
set D
oor
E 7/18/2012
E 7/25/2012
E 8/1/2012 E 8/8/2012 E 8/15/2012
20 21 Unit 23 Unit22 Unit
N/A
N/A
N/A
N/A
N/A
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
13 2 13 12
13 2 13 12
13 3
13 3
L.O
. Clo
set H
arew
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
Unit
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
Mai
n&Lo
ckou
t Ent
ry D
oor
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Hal
lway
Bed
. Roo
m D
oor
Hal
lway
Bed
room
Doo
r har
dwar
e
Hal
lway
Bat
hroo
m D
oor
Hal
lway
Bat
hroo
m D
oor h
ardw
are
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
eM
aste
r Bed
room
Doo
rM
aste
r Bed
room
Har
dwar
e
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
rL.
Rm
Clo
set H
ardw
are
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE 5/9/2012 WORK COMPLETED TO DATE 6/13/2012 WORK COMPLETED TO DATE
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE 5/16/2012 WORK COMPLETED TO DATE 6/20/2012 WORK COMPLETED TO DATE
WORK COMPLETED TO DATE 2/1/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE 5/23/2012 WORK COMPLETED TO DATE 6/27/2012 WORK COMPLETED TO DATE WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 7/6/2012 WORK COMPLETED TO DATE
WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 328.2012 WORK COMPLETED TO DATE 5/2/2012 WORK COMPLETED TO DATE 6/6/2012 WORK COMPLETED TO DATE 7/11/2012 WORK COMPLETED TO DATE WORK COMPLETED TO DATE 2/22/2012
RUN DATE : 2/8/2012
26 Unit
6
4
N/A
25 Unit
N/A N/A N/A
24 Unit
14
28 Unit
3
10
12
7
8
N/A
9
11
27 Unit
N/A
N/A
FLOOR18
17
2
13
N/A
15
5
16
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
2 13 2 3 2 14 21 14 15
2 13 2 3 2 14 21 14 15
19 4 4 4 4 2 4
19 4 4 4 4 2 4
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
Mai
n&Lo
ckou
t Ent
ry D
oor
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Hal
lway
Bed
. Roo
m d
oor
Hal
lway
Bed
. Roo
m d
oor h
ardw
are
Hal
lway
Bat
hroo
m d
oor
Hal
lway
Bat
h. R
oom
doo
r har
dwar
e
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
Entry
Doo
r
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Hal
lway
Bed
. Roo
m d
oor
Hal
lway
Bed
. Roo
m d
oor h
ardw
are
Hal
lway
Bat
hroo
m d
oor
Hal
lway
Bat
h. R
oom
doo
r har
dwar
e
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Com
mun
icat
ing
Doo
r
Com
mun
icat
ing
Doo
r har
dwar
e
L.O
. Bat
hroo
m S
win
g D
oor
L.O
. Bat
hroo
m D
oor h
ardw
are
Lock
out C
lose
t Doo
r
Lock
out C
lose
t Doo
r har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
Entry
Doo
r
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
athr
oom
Sw
ing
Doo
r
Lock
out B
ath.
Doo
r har
dwar
e
Lock
out C
lose
t doo
r
Lock
out C
lose
t Doo
r har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain
& Lo
ckou
t Ent
ry D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
ath
Swin
g D
oor
L.O
Bat
h H
ardw
are
L.O
. Clo
set D
oor
E 7/18/2012 WORK COMPLETED TO DATE 8/22/2012
E 7/25/2012
E 8/1/2012 E 8/8/2012 E 8/15/2012
20 21 Unit 23 Unit22 Unit
N/A
N/A
N/A
N/A
N/A
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
14 3 14
14 3 14
L.O
. Clo
set H
arew
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
Unit
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
Mai
n&Lo
ckou
t Ent
ry D
oor
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Hal
lway
Bed
. Roo
m D
oor
Hal
lway
Bed
room
Doo
r har
dwar
e
Hal
lway
Bat
hroo
m D
oor
Hal
lway
Bat
hroo
m D
oor h
ardw
are
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
eM
aste
r Bed
room
Doo
rM
aste
r Bed
room
Har
dwar
e
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
rL.
Rm
Clo
set H
ardw
are
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE 5/9/2012 WORK COMPLETED TO DATE 6/13/2012 WORK COMPLETED TO DATE
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE 5/16/2012 WORK COMPLETED TO DATE 6/20/2012 WORK COMPLETED TO DATE
WORK COMPLETED TO DATE 2/1/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE 5/23/2012 WORK COMPLETED TO DATE 6/27/2012 WORK COMPLETED TO DATE WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 7/6/2012 WORK COMPLETED TO DATE
WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 328.2012 WORK COMPLETED TO DATE 5/2/2012 WORK COMPLETED TO DATE 6/6/2012 WORK COMPLETED TO DATE 7/11/2012 WORK COMPLETED TO DATE WORK COMPLETED TO DATE 2/22/2012
17
2
13
N/A
15
5
16
8
N/A
9
11
27 Unit
N/A
N/A
FLOOR18
24 Unit
14
28 Unit
3
10
12
7
25 Unit
N/A N/A N/A
RUN DATE : 2/8/2012
26 Unit
6
4
N/A
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
2 3 14 3 4 3 15 15
2 3 14 3 4 3 15 15
20
20
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
Mai
n&Lo
ckou
t Ent
ry D
oor
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Hal
lway
Bed
. Roo
m d
oor
Hal
lway
Bed
. Roo
m d
oor h
ardw
are
Hal
lway
Bat
hroo
m d
oor
Hal
lway
Bat
h. R
oom
doo
r har
dwar
e
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
Entry
Doo
r
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Hal
lway
Bed
. Roo
m d
oor
Hal
lway
Bed
. Roo
m d
oor h
ardw
are
Hal
lway
Bat
hroo
m d
oor
Hal
lway
Bat
h. R
oom
doo
r har
dwar
e
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Com
mun
icat
ing
Doo
r
Com
mun
icat
ing
Doo
r har
dwar
e
L.O
. Bat
hroo
m S
win
g D
oor
L.O
. Bat
hroo
m D
oor h
ardw
are
Lock
out C
lose
t Doo
r
Lock
out C
lose
t Doo
r har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
Entry
Doo
r
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
athr
oom
Sw
ing
Doo
r
Lock
out B
ath.
Doo
r har
dwar
e
Lock
out C
lose
t doo
r
Lock
out C
lose
t Doo
r har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain
& Lo
ckou
t Ent
ry D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
ath
Swin
g D
oor
L.O
Bat
h H
ardw
are
L.O
. Clo
set D
oor
E 7/18/2012 WORK COMPLETED TO DATE 8/22/2012
E 7/25/2012 WORK COMPLETEED TO DATE 8/29/2012
E 8/1/2012 E 8/8/2012 E 8/15/2012
N/A
N/A
N/A
N/A
N/A
20 21 Unit 23 Unit22 Unit
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
15 4 15
15 4 15
L.O
. Clo
set H
arew
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
Unit
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
Mai
n&Lo
ckou
t Ent
ry D
oor
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Hal
lway
Bed
. Roo
m D
oor
Hal
lway
Bed
room
Doo
r har
dwar
e
Hal
lway
Bat
hroo
m D
oor
Hal
lway
Bat
hroo
m D
oor h
ardw
are
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
eM
aste
r Bed
room
Doo
rM
aste
r Bed
room
Har
dwar
e
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
rL.
Rm
Clo
set H
ardw
are
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE 5/9/2012 WORK COMPLETED TO DATE 6/13/2012 WORK COMPLETED TO DATE
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE 5/16/2012 WORK COMPLETED TO DATE 6/20/2012 WORK COMPLETED TO DATE
WORK COMPLETED TO DATE 2/1/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE 5/23/2012 WORK COMPLETED TO DATE 6/27/2012 WORK COMPLETED TO DATE WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 7/6/2012 WORK COMPLETED TO DATE
WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 328.2012 WORK COMPLETED TO DATE 5/2/2012 WORK COMPLETED TO DATE 6/6/2012 WORK COMPLETED TO DATE 7/11/2012 WORK COMPLETED TO DATE WORK COMPLETED TO DATE 2/22/2012
RUN DATE : 2/8/2012
26 Unit
6
4
N/A
25 Unit
N/A N/A N/A
24 Unit
14
28 Unit
3
10
12
7
8
N/A
9
11
27 Unit
N/A
N/A
FLOOR18
17
2
13
N/A
15
5
16
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
3 4 15 4 5 4 16 2 16 2
3 4 15 4 5 4 16 2 16 2
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
Mai
n&Lo
ckou
t Ent
ry D
oor
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Hal
lway
Bed
. Roo
m d
oor
Hal
lway
Bed
. Roo
m d
oor h
ardw
are
Hal
lway
Bat
hroo
m d
oor
Hal
lway
Bat
h. R
oom
doo
r har
dwar
e
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
Entry
Doo
r
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Hal
lway
Bed
. Roo
m d
oor
Hal
lway
Bed
. Roo
m d
oor h
ardw
are
Hal
lway
Bat
hroo
m d
oor
Hal
lway
Bat
h. R
oom
doo
r har
dwar
e
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Com
mun
icat
ing
Doo
r
Com
mun
icat
ing
Doo
r har
dwar
e
L.O
. Bat
hroo
m S
win
g D
oor
L.O
. Bat
hroo
m D
oor h
ardw
are
Lock
out C
lose
t Doo
r
Lock
out C
lose
t Doo
r har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
Entry
Doo
r
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
athr
oom
Sw
ing
Doo
r
Lock
out B
ath.
Doo
r har
dwar
e
Lock
out C
lose
t doo
r
Lock
out C
lose
t Doo
r har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain
& Lo
ckou
t Ent
ry D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
ath
Swin
g D
oor
L.O
Bat
h H
ardw
are
L.O
. Clo
set D
oor
E 7/18/2012 WORK COMPLETED TO DATE 8/22/2012
E 7/25/2012 WORK COMPLETEED TO DATE 8/29/2012
E 8/1/2012 9/5/2012- In the process of clearing out the diplomat E 8/8/2012 WORK COMPLETED TO DATE 9/12/2012 E 8/15/2012
20 21 Unit 23 Unit22 Unit
N/A
N/A
N/A
N/A
N/A
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
16 5 16
16 5 16
L.O
. Clo
set H
arew
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
Unit
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants Hardware
Mai
n&Lo
ckou
t Ent
ry D
oor
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Hal
lway
Bed
. Roo
m D
oor
Hal
lway
Bed
room
Doo
r har
dwar
e
Hal
lway
Bat
hroo
m D
oor
Hal
lway
Bat
hroo
m D
oor h
ardw
are
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
eM
aste
r Bed
room
Doo
rM
aste
r Bed
room
Har
dwar
e
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain&
Lock
out E
ntry
Doo
r
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
rL.
Rm
Clo
set H
ardw
are
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eEn
try D
oor
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
Mai
n&Lo
ckou
t Ent
ry D
oor
Entry
doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
door
s
Com
m. d
oor h
ardw
are
Lock
out B
ath
swin
g do
or
L.O
. Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set h
ardw
are
Hal
lway
Bed
. Roo
m d
oor
Hal
lway
Bed
. Roo
m d
oor h
ardw
are
Hal
lway
Bat
hroo
m d
oor
Hal
lway
Bat
h. R
oom
doo
r har
dwar
e
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
Entry
Doo
r
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Hal
lway
Bed
. Roo
m d
oor
Hal
lway
Bed
. Roo
m d
oor h
ardw
are
Hal
lway
Bat
hroo
m d
oor
Hal
lway
Bat
h. R
oom
doo
r har
dwar
e
Hal
lway
Clo
set D
oor
Hal
lway
Clo
set D
oor h
ardw
are
Com
mun
icat
ing
Doo
r
Com
mun
icat
ing
Doo
r har
dwar
e
L.O
. Bat
hroo
m S
win
g
L.O
. Bat
hroo
m D
oor h
ardw
are
Lock
out C
lose
t Doo
r
Lock
out C
lose
t Doo
r har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
Entry
Doo
r
Entry
Doo
r har
dwar
e
Livi
ng R
m C
lose
t doo
r
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
athr
oom
Sw
ing
Doo
r
Lock
out B
ath.
Doo
r har
dwar
e
Lock
out C
lose
t doo
r
Lock
out C
lose
t Doo
r har
dwar
e
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
eM
ain
& Lo
ckou
t Ent
ry
Entry
Doo
r har
dwar
e
PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE 5/9/2012 WORK COMPLETED TO DATE 6/13/2012 WORK COMPLETED TO DATE 7/18/2012 WORK COMPLETED TO DATE 8/22/2012 WORK COMPLETED TO DATE 9/26/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/11/2012WORK COMPLETED TO DATE 5/16/2012 WORK COMPLETED TO DATE 6/20/2012
WORK COMPLETED TO DATE 7/25/2012WORK COMPLETEED TO DATE 8/29/2012
WORK COMPLETED TO DATE 2/1/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/20/2012WORK COMPLETED TO DATE 5/23/2012 WORK COMPLETED TO DATE 6/27/2012
WORK COMPLETED TO DATE 8/1/20129/5/2012- In the process of clearing out the diplomat
WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 7/6/2012 WORK COMPLETED TO DATE 8/8/2012 WORK COMPLETED TO DATE 9/12/2012
WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 328.2012 WORK COMPLETED TO DATE 5/2/2012WORK COMPLETED TO DATE 6/6/2012
WORK COMPLETED TO DATE 7/11/2012WORK COMPLETED TO DATE 8/15/2012 WORK COMPLETED TO DATE 9/19/2012
WORK COMPLETED TO DATE 2/22/2012
17
N/A2
13
N/A
15
5
16
N/A
8
N/A
9
11
27 Unit
N/A
N/A
N/A
FLOOR18
N/A
N/A
24 Unit
14
28 Unit
3
10
12
7
21 Unit 23 Unit22 Unit 25 Unit
N/A N/A N/A
RUN DATE : 2/8/2012
26 Unit
6
4
N/A
JobD
river
EXHIBIT A
Confid
entia
l
Pleasants HardwareLi
ving
Rm
Clo
set d
oor
L. R
m C
lose
t Har
dwar
e
Com
mun
icat
ing
Doo
rs
Com
m. D
oor H
ardw
are
Lock
out B
ath
Swin
g D
oor
L.O
Bat
h H
ardw
are
L.O
. Clo
set D
oor
L.O
. Clo
set H
arew
are
Bath
room
Poc
ket d
oor
Pock
et d
oor h
ardw
are
Mas
ter B
ath
Swin
g D
oor
M.B
. Sw
ing
Dr.
Har
dwar
e
Mas
ter B
edro
om D
oor
Mas
ter B
edro
om H
ardw
are
M.B
ed C
lose
t Doo
rs
M. B
ed C
lose
t Har
dwar
e
20 Unit
JobD
river
EXHIBIT A
Confid
entia
l
POMPEI TILE PROGRESS CHART
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
POMPEI TILE PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12AREAS AVAILABLE FOR YOU TO WORK
* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES
3
15
14
13
8
12
FLOOR18
17
N/A
N/A
N/A
2
11
10
9
RUN DATE : 5/16/2019
26 Unit 24 Unit28 Unit 27 Unit 20 Unit 21 Unit 23 Unit22 Unit 25 Unit
16
7
6
5
4
JobD
river
EXHIBIT A
Confid
entia
l
POMPEI TILE PROGRESS CHART
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
POMPEI TILE PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12AREAS AVAILABLE FOR YOU TO WORK
* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES
16
7
6
5
4
5/16/2019
26 Unit 24 Unit28 Unit 27 Unit 20 Unit 21 Unit 23 Unit22 Unit 25 Unit
10
9
3
15
14
RUN DATE :
13
8
12
FLOOR18
17
N/A
N/A
N/A
2
11
JobD
river
EXHIBIT A
Confid
entia
l
POMPEI TILE PROGRESS CHART
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
HAL
L BA
TH S
HO
WER
HAL
L BA
TH F
LOO
R
HAL
L BA
TH B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
POMPEI TILE PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED TO DATE 1/10/2012 MASTER BATHROOM IN UNITS 1124 AND 1224 ARE BEING REWORKED. UNIT 1023 BATHROOM BEING REWORKED.AREAS AVAILABLE FOR YOU TO WORK 14TH FLOOR NOT READY FOR TILE INSTALLATION. MUDDING CEILINGS AND WALLS.
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATESWORK COMPLETED TO DATE 2/3/2012
25 Unit
16
7
RUN DATE : 5/16/2019
26 Unit
9
3
6
5
21 Unit
N/A
N/A
20 Unit 23 Unit22 Unit
2
11
10
FLOOR18
17
N/A
N/AN/A
12
N/A
N/A
24 Unit28 Unit 27 Unit
14
N/A
15
N/A
13
8
4
JobD
river
EXHIBIT A
Confid
entia
l
POMPEI TILE PROGRESS CHART
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
POMPEI TILE PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12AREAS AVAILABLE FOR YOU TO WORK
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATESWORK COMPLETED TO DATE 2/3/2012
24 Unit28 Unit 27 Unit
14
N/A
15
N/A
N/A
13
8
4
FLOOR18
17
N/A
N/AN/A
12
21 Unit
N/A
N/A
20 Unit 23 Unit22 Unit
2
11
10
25 Unit
16
7
RUN DATE : 5/16/2019
26 Unit
9
3
6
5
JobD
river
EXHIBIT A
Confid
entia
l
POMPEI TILE PROGRESS CHART
14
15
13
8
17
N/A
N/AN/A
12
N/A
N/A
11
10
FLOOR18
16
7
9
6
5
JobD
river
EXHIBIT A
Confid
entia
l
POMPEI TILE PROGRESS CHART
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
HAL
L BA
TH S
HO
WER
HAL
L BA
TH F
LOO
R
HAL
L BA
TH B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
POMPEI TILE PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED TO DATE 1/10/2012 Tile required at door jams that are installed in all units in bathrooms from the 3rd through the 8th floorsAREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 3/9/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/16/2012WORK COMPLETED TO DATE 2/3/2012
24 Unit28 Unit 27 Unit
N/A
N/A
4
N/A
21 Unit 20 Unit 23 Unit22 Unit
2
25 Unit
RUN DATE : 5/16/2019
26 Unit
3
5
JobD
river
EXHIBIT A
Confid
entia
l
POMPEI TILE PROGRESS CHART
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
HAL
L BA
TH S
HO
WER
HAL
L BA
TH F
LOO
R
HAL
L BA
TH B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
POMPEI TILE PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED TO DATE 1/10/2012 Tile required at door jams that are installed in all units in bathrooms from the 3rd through the 8th floorsAREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 3/9/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/16/2012WORK COMPLETED TO DATE 2/3/2012
24 Unit28 Unit 27 Unit
14
N/A
15
N/A
13
8
4
17
N/A
N/AN/A
12
N/A
N/A
21 Unit
N/A
20 Unit 23 Unit22 Unit
2
11
10
FLOOR18
25 Unit
16
7
RUN DATE : 5/16/2019
26 Unit
9
3
6
5
JobD
river
EXHIBIT A
Confid
entia
l
POMPEI TILE PROGRESS CHART
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
HAL
L BA
TH S
HO
WER
HAL
L BA
TH F
LOO
R
HAL
L BA
TH B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
POMPEI TILE PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED TO DATE 1/10/2012 Tile required at door jams that are installed in all units in bathrooms from the 3rd through the 8th floorsAREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 3/9/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/16/2012WORK COMPLETED TO DATE 2/3/2012
25 Unit
16
7
RUN DATE : 5/16/2019
26 Unit
9
3
6
5
21 Unit
N/A
20 Unit 23 Unit22 Unit
2
11
10
FLOOR18
17
N/A
N/AN/A
12
N/A
N/A
24 Unit28 Unit 27 Unit
14
N/A
15
N/A
13
8
4
JobD
river
EXHIBIT A
Confid
entia
l
POMPEI TILE PROGRESS CHART
2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2
2 2
2 2
2
2
2 2 2
2 2 2
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
HAL
L BA
TH S
HO
WER
HAL
L BA
TH F
LOO
R
HAL
L BA
TH B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
POMPEI TILE PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED TO DATE 1/10/2012 Tile required at door jams that are installed in all units in bathrooms from the 3rd through the 8th floorsAREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 3/9/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/16/2012WORK COMPLETED TO DATE 2/3/2012 WORK COMPLETED TO DATE 3/23/2012
24 Unit28 Unit 27 Unit
14
N/A
15
N/A
13
8
4
17
N/A
N/AN/A
12
N/A
N/A
21 Unit
N/A
20 Unit 23 Unit22 Unit
2
11
10
FLOOR18
25 Unit
16
7
RUN DATE : 5/16/2019
26 Unit
9
3
6
5
JobD
river
EXHIBIT A
Confid
entia
l
POMPEI TILE PROGRESS CHART
2
2
3 3
3 3
2
2
2 3
2 3
2
2
3 3 3
3 3 3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
HAL
L BA
TH S
HO
WER
HAL
L BA
TH F
LOO
R
HAL
L BA
TH B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
ELEV
ATO
R C
OR
RID
OR
POMPEI TILE PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED TO DATE 1/10/2012 Tile required at door jams that are installed in all units in bathrooms from the 3rd through the 8th floorsAREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 3/9/2012 WORK COMPLETED TO DATE 3-30-2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/16/2012WORK COMPLETED TO DATE 2/3/2012 WORK COMPLETED TO DATE 3/23/2012
24 Unit28 Unit 27 Unit
14
15
N/A
13
8
4
21 Unit
FLOOR18
17
N/A
N/AN/A
12
N/A
N/A
5
16
N/A
20 Unit 23 Unit22 Unit
2
11
10
N/A
25 Unit
7
RUN DATE : 5/16/2019
26 Unit
9
3
6 JobD
river
EXHIBIT A
Confid
entia
l
POMPEI TILE PROGRESS CHART
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
2 3
2 3
2 2 4
2 2 4
3 2
3 2
3 2 4
3 2 4
3 2 2
3 2 2
4 4 4
4 4 4
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
HAL
L BA
TH S
HO
WER
HAL
L BA
TH F
LOO
R
HAL
L BA
TH B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
ELEV
ATO
R C
OR
RID
OR
POMPEI TILE PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED TO DATE 1/10/2012 Tile required at door jams that are installed in all units in bathrooms from the 3rd through the 9th floorsAREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 3/9/2012 WORK COMPLETED TO DATE 3/30/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/16/2012 WORK COMPLETED TO DATE 4/6/2012WORK COMPLETED TO DATE 2/3/2012 WORK COMPLETED TO DATE 3/23/2012
24 Unit28 Unit 27 Unit
14
15
N/A
13
8
4
21 Unit
FLOOR18
17
N/A
N/AN/A
12
N/A
N/A
5
16
N/A
20 Unit 23 Unit22 Unit
2
11
10
N/A
25 Unit
7
RUN DATE : 5/16/2019
26 Unit
9
3
6 JobD
river
EXHIBIT A
Confid
entia
l
POMPEI TILE PROGRESS CHART
3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 4
3 4
3 3 5
3 3 5
4 3
4 3
4 2 3 2
4 2 3 2
4 3 3
4 3 3
5 5 5
5 5 5
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
HAL
L BA
TH S
HO
WER
HAL
L BA
TH F
LOO
R
HAL
L BA
TH B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
ELEV
ATO
R C
OR
RID
OR
POMPEI TILE PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED TO DATE 1/10/2012 Tile required at door jams that are installed in all units in bathrooms from the 3rd through the 9th floorsAREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 3/9/2012 WORK COMPLETED TO DATE 3/30/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/16/2012 WORK COMPLETED TO DATE 4/6/2012WORK COMPLETED TO DATE 2/3/2012 WORK COMPLETED TO DATE 3/23/2012 WORK COMPLETED TO DATE 4/13/2012
24 Unit28 Unit 27 Unit
14
15
N/A
13
8
4
21 Unit
FLOOR18
17
N/A
N/AN/A
12
N/A
N/A
5
16
N/A
20 Unit 23 Unit22 Unit
2
11
10
N/A
25 Unit
7
RUN DATE : 5/16/2019
26 Unit
9
3
6 JobD
river
EXHIBIT A
Confid
entia
l
POMPEI TILE PROGRESS CHART
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
4 5
4 5
4 4
4 4
5 4
5 4
5 3 4 3
5 3 4 3
5 4 4
5 4 4
6 6 6
6 6 6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
HAL
L BA
TH S
HO
WER
HAL
L BA
TH F
LOO
R
HAL
L BA
TH B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
HAL
L BA
TH S
HO
WER
HAL
L BA
TH F
LOO
R
HAL
L BA
TH B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
HAL
L BA
TH S
HO
WER
HAL
L BA
TH F
LOO
R
HAL
L BA
TH B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
POMPEI TILE PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED TO DATE 1/10/2012 Tile required at door jams that are installed in all units in bathrooms from the 3rd through the 9th floorsAREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 3/9/2012 WORK COMPLETED TO DATE 3/30/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/16/2012 WORK COMPLETED TO DATE 4/6/2012WORK COMPLETED TO DATE 2/3/2012 WORK COMPLETED TO DATE 3/23/2012 WORK COMPLETED TO DATE 4/13/2012
N/A
N/A N/A
24 Unit28 Unit 27 Unit 25 Unit
14
15
N/A
13
8
4
7
21 Unit
FLOOR18
17
N/A
N/AN/A
12
N/A
N/A
5
16
N/A
23 Unit22 Unit
2
11
10
N/A
RUN DATE : 5/16/2019
26 Unit
9
3
6 JobD
river
EXHIBIT A
Confid
entia
l
POMPEI TILE PROGRESS CHART
2
2
2
2
4 4 2
4 4 2
2
2
6 2
6 2
2
2
2
2
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
ELEV
ATO
R C
OR
RID
OR
20 Unit
JobD
river
EXHIBIT A
Confid
entia
l
POMPEI TILE PROGRESS CHART
2 2 2 2 2 2 3
2 2 2 2 2 2 3
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 3
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 3
5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 3
5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 3
5 6 3
5 6 3
5 5 7 3
5 5 7 3
6 5 3
6 5 3
6 4 5 4
6 4 5 4
6 5 5
6 5 5
7 7 7
7 7 7
3
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
HAL
L BA
TH S
HO
WER
HAL
L BA
TH F
LOO
R
HAL
L BA
TH B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
HAL
L BA
TH S
HO
WER
HAL
L BA
TH F
LOO
R
HAL
L BA
TH B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
HAL
L BA
TH S
HO
WER
HAL
L BA
TH F
LOO
R
HAL
L BA
TH B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
ELEV
ATO
R C
OR
RID
OR
POMPEI TILE PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED TO DATE 1/10/2012 WORK COMPLETED TO DATE 3/30/2012AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 3/9/2012 WORK COMPLETED TO DATE 4/6/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/16/2012 WORK COMPLETED TO DATE 4/13/2012WORK COMPLETED TO DATE 2/3/2012 WORK COMPLETED TO DATE 3/23/2012 WORK COMPLETED TO DATE 4/27/2012
N/A
N/A N/A
24 Unit28 Unit 27 Unit 25 Unit
14
15
N/A
13
8
4
7
21 Unit
FLOOR18
17
N/A
N/AN/A
12
N/A
N/A
5
16
N/A
20 Unit 23 Unit22 Unit
2
11
10
N/A
RUN DATE : 5/16/2019
26 Unit
9
3
6 JobD
river
EXHIBIT A
Confid
entia
l
POMPEI TILE PROGRESS CHART
2 5
2 5
2 2 4 2 4 4 3 3 4 4 4 4 3 3 4 4 4 4 5
2 2 4 2 4 4 3 3 4 4 4 4 3 3 4 4 4 4 5
3 3 7 7 7 7 7 7 2 2 7 7 7 7 7 7 2 2 7 7 7 7 7 7 3 3 7 7 7 7 7 7 3 3 7 7 7 2 2 2 5
3 3 7 7 7 7 7 7 2 2 7 7 7 7 7 7 2 2 7 7 7 7 7 7 3 3 7 7 7 7 7 7 3 3 7 7 7 2 2 2 5
8
8
7 9
7 9
7
7
7 6
7 6
7 3
7 3
9 9 8
9 9 8
3
3
5
5
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
HAL
L BA
TH S
HO
WER
HAL
L BA
TH F
LOO
R
HAL
L BA
TH B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
HAL
L BA
TH S
HO
WER
HAL
L BA
TH F
LOO
R
HAL
L BA
TH B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
HAL
L BA
TH S
HO
WER
HAL
L BA
TH F
LOO
R
HAL
L BA
TH B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
ELEV
ATO
R C
OR
RID
OR
POMPEI TILE PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED TO DATE 1/10/2012 WORK COMPLETED TO DATE 3/30/2012 WORK COMPLETED TO DATE 5/4/2012AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 3/9/2012 WORK COMPLETED TO DATE 4/6/2012 POMPEI WAS ON FIRST FLOOR ALL WEEK
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/16/2012 WORK COMPLETED TO DATE 4/13/2012WORK COMPLETED TO DATE 2/3/2012 WORK COMPLETED TO DATE 3/23/2012 WORK COMPLETED TO DATE 4/27/2012
RUN DATE : 5/16/2019
26 Unit
9
3
6
5
N/A
20 Unit 23 Unit22 Unit
2
11
10
N/A
21 Unit
FLOOR18
17
N/AN/A
12
N/A
N/A
16
14
15
N/A
13
8
4
7
N/A N/A
24 Unit28 Unit 27 Unit 25 Unit
N/A
N/AJobD
river
EXHIBIT A
Confid
entia
l
POMPEI TILE PROGRESS CHART
7
7
4 4 6 6 3 6 5 5 6 6 6 6 6 6 6 6 7
4 4 6 6 3 6 5 5 6 6 6 6 6 6 6 6 7
9 9 9 9 9 9
9 9 9 9 9 9
10
10
9 11
9 11
9
9
9 8
9 8
9 5
9 5
7
7
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
HAL
L BA
TH S
HO
WER
HAL
L BA
TH F
LOO
R
HAL
L BA
TH B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
HAL
L BA
TH S
HO
WER
HAL
L BA
TH F
LOO
R
HAL
L BA
TH B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
HAL
L BA
TH S
HO
WER
HAL
L BA
TH F
LOO
R
HAL
L BA
TH B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
ELEV
ATO
R C
OR
RID
OR
POMPEI TILE PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED TO DATE 1/10/2012 WORK COMPLETED TO DATE 3/30/2012 WORK COMPLETED TO DATE 5/4/2012AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 3/9/2012 WORK COMPLETED TO DATE 4/6/2012 POMPEI WAS ON FIRST FLOOR ALL WEEK 5/11/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/16/2012 WORK COMPLETED TO DATE 4/13/2012 POMPEI WAS ON FIRST FLOOR ALL WEEK 5/18/2012 Completed elevator 1 and 2 tileWORK COMPLETED TO DATE 2/3/2012 WORK COMPLETED TO DATE 3/23/2012 WORK COMPLETED TO DATE 4/27/2012 WORK COMPLETED TO DATE 5/25/2012
24 Unit28 Unit 27 Unit 25 Unit
N/A
N/A
N/A
13
8
4
7
N/A N/A
FLOOR18
17
N/AN/A
12
N/A
N/A
16
14
15
N/A
20 Unit 23 Unit22 Unit
2
11
10
N/A
21 Unit
RUN DATE : 5/16/2019
26 Unit
9
3
6
5 JobD
river
EXHIBIT A
Confid
entia
l
POMPEI TILE PROGRESS CHART
3 3 2 2 2 2 2 9
3 3 2 2 2 2 2 9
8 8 5 8 9
8 8 5 8 9
11 11 3 11 11 11 11 2
11 11 3 11 11 11 11 2
11
11
11 13
11 13
11
11
9
9
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
HAL
L BA
TH S
HO
WER
HAL
L BA
TH F
LOO
R
HAL
L BA
TH B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
HAL
L BA
TH S
HO
WER
HAL
L BA
TH F
LOO
R
HAL
L BA
TH B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
HAL
L BA
TH S
HO
WER
HAL
L BA
TH F
LOO
R
HAL
L BA
TH B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
ELEV
ATO
R C
OR
RID
OR
POMPEI TILE PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED TO DATE 1/10/2012 WORK COMPLETED TO DATE 3/30/2012 WORK COMPLETED TO DATE 5/4/2012 Working on floors with no completion 6/1/2012AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 3/9/2012 WORK COMPLETED TO DATE 4/6/2012 POMPEI WAS ON FIRST FLOOR ALL WEEK 5/11/2012 Working on floors with no completion 6/8/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/16/2012 WORK COMPLETED TO DATE 4/13/2012 POMPEI WAS ON FIRST FLOOR ALL WEEK 5/18/2012 Completed elevator 1 and 2 tileWORK COMPLETED TO DATE 2/3/2012 WORK COMPLETED TO DATE 3/23/2012 WORK COMPLETED TO DATE 4/27/2012 WORK COMPLETED TO DATE 5/25/2012
24 Unit28 Unit 27 Unit 25 Unit
N/A
N/A
N/A
13
8
4
7
N/A N/A
FLOOR18
17
N/AN/A
12
N/A
N/A
16
14
15
N/A
20 Unit 23 Unit22 Unit
2
11
10
N/A
21 Unit
RUN DATE : 5/16/2019
26 Unit
9
3
6
5 JobD
river
EXHIBIT A
Confid
entia
l
POMPEI TILE PROGRESS CHART
2 5 2 5 2 4 2 2 2 2 2 2 2 10
2 5 2 5 2 4 2 2 2 2 2 2 2 10
10 2 2 10 2 2 7 2 2 2 10 2 2 2 10
10 2 2 10 2 2 7 2 2 2 10 2 2 2 10
5 3
5 3
13
13
13 14
13 14
13
13
10
10
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
HAL
L BA
TH S
HO
WER
HAL
L BA
TH F
LOO
R
HAL
L BA
TH B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
HAL
L BA
TH S
HO
WER
HAL
L BA
TH F
LOO
R
HAL
L BA
TH B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
HAL
L BA
TH S
HO
WER
HAL
L BA
TH F
LOO
R
HAL
L BA
TH B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
ELEV
ATO
R C
OR
RID
OR
POMPEI TILE PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED TO DATE 1/10/2012 WORK COMPLETED TO DATE 3/30/2012 WORK COMPLETED TO DATE 5/4/2012 Working on floors with no completion 6/1/2012 WORK COMPLETED TO DATE 6/22/
AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 3/9/2012 WORK COMPLETED TO DATE 4/6/2012 POMPEI WAS ON FIRST FLOOR ALL WEEK 5/11/2012 Working on floors with no completion 6/8/2012# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/16/2012 WORK COMPLETED TO DATE 4/13/2012 POMPEI WAS ON FIRST FLOOR ALL WEEK 5/18/2012 Completed elevator 1 and 2 tile
WORK COMPLETED TO DATE 2/3/2012 WORK COMPLETED TO DATE 3/23/2012 WORK COMPLETED TO DATE 4/27/2012 WORK COMPLETED TO DATE 5/25/2012 Work Completed To Date 6/14/2012
24 Unit28 Unit 27 Unit 25 Unit
N/A
N/A
N/A
13
8
4
7
N/A N/A
FLOOR18
17
N/AN/A
12
N/A
N/A
16
14
15
N/A
20 Unit 23 Unit22 Unit
2
11
10
N/A
21 Unit
RUN DATE : 5/16/2019
26 Unit
9
3
6
5 JobD
river
EXHIBIT A
Confid
entia
l
POMPEI TILE PROGRESS CHART
4 7 4 3 7 3 3 4 6 4 4 4 4 4 4 4
4 7 4 3 7 3 3 4 6 4 4 4 4 4 4 4
12 4 3 4 12 4 4 9 4 4 4 12 4 4 4
12 4 3 4 12 4 4 9 4 4 4 12 4 4 4
7
7
2 2 2 2 2 2
2 2 2 2 2 2
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
HAL
L BA
TH S
HO
WER
HAL
L BA
TH F
LOO
R
HAL
L BA
TH B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
HAL
L BA
TH S
HO
WER
HAL
L BA
TH F
LOO
R
HAL
L BA
TH B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
HAL
L BA
TH S
HO
WER
HAL
L BA
TH F
LOO
R
HAL
L BA
TH B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
POMPEI TILE PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED TO DATE 1/10/2012 WORK COMPLETED TO DATE 3/30/2012 WORK COMPLETED TO DATE 5/4/2012 Working on floors with no completion 6/1/2AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 3/9/2012 WORK COMPLETED TO DATE 4/6/2012 POMPEI WAS ON FIRST FLOOR ALL WEEK 5/11/2012 Working on floors with no completion 6/8/2
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/16/2012 WORK COMPLETED TO DATE 4/13/2012 POMPEI WAS ON FIRST FLOOR ALL WEEK 5/18/2012 Completed elevator 1 and 2 tileWORK COMPLETED TO DATE 2/3/2012 WORK COMPLETED TO DATE 3/23/2012 WORK COMPLETED TO DATE 4/27/2012 WORK COMPLETED TO DATE 5/25/2012 Work Completed To Date 6/14/2012
RUN DATE : 5/16/2019
26 Unit
9
3
6
5
N/A
23 Unit22 Unit
2
11
10
N/A
21 Unit
FLOOR18
17
N/AN/A
12
N/A
N/A
16
14
15
N/A
13
8
4
7
N/A N/A
24 Unit28 Unit 27 Unit 25 Unit
N/A
N/AJobD
river
EXHIBIT A
Confid
entia
l
POMPEI TILE PROGRESS CHART
12
12
12
12
5
5
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
ELEV
ATO
R C
OR
RID
OR
2012 WORK COMPLETED TO DATE 6/22/
2012 WORK COMPLETED TO DATE 7/2/27/6 Tile was installed on the 2nd floor m
WORK COMPLETED TO DATE 7/13/
20 Unit
JobD
river
EXHIBIT A
Confid
entia
l
POMPEI TILE PROGRESS CHART
5 8 5 4 8 4 4 5 7 5 5 5 5 5 5 5
5 8 5 4 8 4 4 5 7 5 5 5 5 5 5 5
13 5 4 5 13 5 5 10 5 5 5 13 5 5 5
13 5 4 5 13 5 5 10 5 5 5 13 5 5 5
8
8
2 3 3 3
2 3 3 3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
HAL
L BA
TH S
HO
WER
HAL
L BA
TH F
LOO
R
HAL
L BA
TH B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
HAL
L BA
TH S
HO
WER
HAL
L BA
TH F
LOO
R
HAL
L BA
TH B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
HAL
L BA
TH S
HO
WER
HAL
L BA
TH F
LOO
R
HAL
L BA
TH B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
POMPEI TILE PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED TO DATE 1/10/2012 WORK COMPLETED TO DATE 3/30/2012 WORK COMPLETED TO DATE 5/4/2012 Working on floors with no completion 6/1/2012AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 3/9/2012 WORK COMPLETED TO DATE 4/6/2012 POMPEI WAS ON FIRST FLOOR ALL WEEK 5/11/2012 Working on floors with no completion 6/8/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/16/2012 WORK COMPLETED TO DATE 4/13/2012 POMPEI WAS ON FIRST FLOOR ALL WEEK 5/18/2012 Completed elevator 1 and 2 tileWORK COMPLETED TO DATE 2/3/2012 WORK COMPLETED TO DATE 3/23/2012 WORK COMPLETED TO DATE 4/27/2012 WORK COMPLETED TO DATE 5/25/2012 Work Completed To Date 6/14/2012
RUN DATE : 5/16/2019
26 Unit
9
3
6
5
N/A
23 Unit22 Unit
2
11
10
N/A
21 Unit
FLOOR18
17
N/AN/A
12
N/A
N/A
16
14
15
N/A
13
8
4
7
N/A N/A
24 Unit28 Unit 27 Unit 25 Unit
N/A
N/AJobD
river
EXHIBIT A
Confid
entia
l
POMPEI TILE PROGRESS CHART
13
13
13
13
6
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
ELEV
ATO
R C
OR
RID
OR
2 WORK COMPLETED TO DATE 6/22/
2 WORK COMPLETED TO DATE 7/2/27/6 Tile was installed on the 2nd floor m
WORK COMPLETED TO DATE 7/13/
20 Unit
JobD
river
EXHIBIT A
Confid
entia
l
POMPEI TILE PROGRESS CHART
6 9 6 5 9 5 5 6 8 6 6 6 6 6 6 6
6 9 6 5 9 5 5 6 8 6 6 6 6 6 6 6
14 6 5 6 14 6 6 11 6 6 6 14 6 6 6
14 6 5 6 14 6 6 11 6 6 6 14 6 6 6
9
9
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
HAL
L BA
TH S
HO
WER
HAL
L BA
TH F
LOO
R
HAL
L BA
TH B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
HAL
L BA
TH S
HO
WER
HAL
L BA
TH F
LOO
R
HAL
L BA
TH B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
HAL
L BA
TH S
HO
WER
HAL
L BA
TH F
LOO
R
HAL
L BA
TH B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
POMPEI TILE PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED TO DATE 1/10/2012 WORK COMPLETED TO DATE 3/30/2012 WORK COMPLETED TO DATE 5/4/2012 Working on floors with no completion 6/1/2012AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 3/9/2012 WORK COMPLETED TO DATE 4/6/2012 POMPEI WAS ON FIRST FLOOR ALL WEEK 5/11/2012 Working on floors with no completion 6/8/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/16/2012 WORK COMPLETED TO DATE 4/13/2012 POMPEI WAS ON FIRST FLOOR ALL WEEK 5/18/2012 Completed elevator 1 and 2 tileWORK COMPLETED TO DATE 2/3/2012 WORK COMPLETED TO DATE 3/23/2012 WORK COMPLETED TO DATE 4/27/2012 WORK COMPLETED TO DATE 5/25/2012 Work Completed To Date 6/14/2012
24 Unit28 Unit 27 Unit 25 Unit
N/A
N/A
N/A
13
8
4
7
N/A N/A
FLOOR18
17
N/AN/A
12
N/A
N/A
16
14
15
N/A
23 Unit22 Unit
2
11
10
N/A
21 Unit
RUN DATE : 5/16/2019
26 Unit
9
3
6
5
JobD
river
EXHIBIT A
Confid
entia
l
POMPEI TILE PROGRESS CHART
14
14
14
14
2 2 2 7
2 2 2 7
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
ELEV
ATO
R C
OR
RID
OR
2 WORK COMPLETED TO DATE 6/22/
2 WORK COMPLETED TO DATE 7/2/27/6 Tile was installed on the 2nd floor m
WORK COMPLETED TO DATE 7/13/
20 Unit
JobD
river
EXHIBIT A
Confid
entia
l
POMPEI TILE PROGRESS CHART
7 10 7 6 10 6 6 7 9 7 7 7 7 7 7 7
7 10 7 6 10 6 6 7 9 7 7 7 7 7 7 7
15 7 6 7 15 7 7 12 7 7 7 15 7 7 7
15 7 6 7 15 7 7 12 7 7 7 15 7 7 7
10
10
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
HAL
L BA
TH S
HO
WER
HAL
L BA
TH F
LOO
R
HAL
L BA
TH B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
HAL
L BA
TH S
HO
WER
HAL
L BA
TH F
LOO
R
HAL
L BA
TH B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
HAL
L BA
TH S
HO
WER
HAL
L BA
TH F
LOO
R
HAL
L BA
TH B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
POMPEI TILE PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED TO DATE 1/10/2012 WORK COMPLETED TO DATE 3/30/2012 WORK COMPLETED TO DATE 5/4/2012 Working on floors with no completion 6/1/2012AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 3/9/2012 WORK COMPLETED TO DATE 4/6/2012 POMPEI WAS ON FIRST FLOOR ALL WEEK 5/11/2012 Working on floors with no completion 6/8/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/16/2012 WORK COMPLETED TO DATE 4/13/2012 POMPEI WAS ON FIRST FLOOR ALL WEEK 5/18/2012 Completed elevator 1 and 2 tileWORK COMPLETED TO DATE 2/3/2012 WORK COMPLETED TO DATE 3/23/2012 WORK COMPLETED TO DATE 4/27/2012 WORK COMPLETED TO DATE 5/25/2012 Work Completed To Date 6/14/2012
24 Unit28 Unit 27 Unit 25 Unit
N/A
N/A
N/A
13
8
4
7
N/A N/A
FLOOR18
17
N/AN/A
12
N/A
N/A
16
14
15
N/A
23 Unit22 Unit
2
11
10
N/A
21 Unit
RUN DATE : 5/16/2019
26 Unit
9
3
6
5
JobD
river
EXHIBIT A
Confid
entia
l
POMPEI TILE PROGRESS CHART
15
15
15
15
3 3 3 8
3 3 3 8
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
ELEV
ATO
R C
OR
RID
OR
2 WORK COMPLETED TO DATE 6/22/
2 WORK COMPLETED TO DATE 7/2/27/6 Tile was installed on the 2nd floor m
WORK COMPLETED TO DATE 7/13/
20 Unit
JobD
river
EXHIBIT A
Confid
entia
l
POMPEI TILE PROGRESS CHART
9 12 9 8 2 12 8 8 9 11 9 9 9 9 9 9 9
9 12 9 8 2 12 8 8 9 11 9 9 9 9 9 9 9
17 9 8 9 17 9 9 13 9 9 9 17 9 9 9
17 9 8 9 17 9 9 13 9 9 9 17 9 9 9
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
HAL
L BA
TH S
HO
WER
HAL
L BA
TH F
LOO
R
HAL
L BA
TH B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
HAL
L BA
TH S
HO
WER
HAL
L BA
TH F
LOO
R
HAL
L BA
TH B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
HAL
L BA
TH S
HO
WER
HAL
L BA
TH F
LOO
R
HAL
L BA
TH B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
POMPEI TILE PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED TO DATE 1/10/2012 WORK COMPLETED TO DATE 3/30/2012 WORK COMPLETED TO DATE 5/4/2012 Working on floors with no completion 6/1/2AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 3/9/2012 WORK COMPLETED TO DATE 4/6/2012 POMPEI WAS ON FIRST FLOOR ALL WEEK 5/11/2012 Working on floors with no completion 6/8/2
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/16/2012 WORK COMPLETED TO DATE 4/13/2012 POMPEI WAS ON FIRST FLOOR ALL WEEK 5/18/2012 Completed elevator 1 and 2 tileWORK COMPLETED TO DATE 2/3/2012 WORK COMPLETED TO DATE 3/23/2012 WORK COMPLETED TO DATE 4/27/2012 WORK COMPLETED TO DATE 5/25/2012 Work Completed To Date 6/14/2012
24 Unit28 Unit 27 Unit 25 Unit
N/A
N/A
N/A
13
8
4
7
N/A N/A
FLOOR18
17
N/AN/A
12
N/A
N/A
16
14
15
N/A
23 Unit22 Unit
2
11
10
N/A
21 Unit
RUN DATE : 5/16/2019
26 Unit
9
3
6
5
JobD
river
EXHIBIT A
Confid
entia
l
POMPEI TILE PROGRESS CHART
17
17
17
17
5 5 5 10
5 5 5 10
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
ELEV
ATO
R C
OR
RID
OR
2012 WORK COMPLETED TO DATE 6/22/
2012 WORK COMPLETED TO DATE 7/2/27/6 Tile was installed on the 2nd floor m
WORK COMPLETED TO DATE 7/13/
20 Unit
JobD
river
EXHIBIT A
Confid
entia
l
POMPEI TILE PROGRESS CHART
14 11 4 14 10 10 13 11 11 11 11
14 11 4 14 10 10 13 11 11 11 11
10 11 11
10 11 11
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
HAL
L BA
TH S
HO
WER
HAL
L BA
TH F
LOO
R
HAL
L BA
TH B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
HAL
L BA
TH S
HO
WER
HAL
L BA
TH F
LOO
R
HAL
L BA
TH B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
HAL
L BA
TH S
HO
WER
HAL
L BA
TH F
LOO
R
HAL
L BA
TH B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
POMPEI TILE PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED TO DATE 1/10/2012 WORK COMPLETED TO DATE 3/30/2012 WORK COMPLETED TO DATE 5/4/2012 Working on floors with no completion 6/AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 3/9/2012 WORK COMPLETED TO DATE 4/6/2012 POMPEI WAS ON FIRST FLOOR ALL WEEK 5/11/2012 Working on floors with no completion 6/
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/16/2012 WORK COMPLETED TO DATE 4/13/2012 POMPEI WAS ON FIRST FLOOR ALL WEEK 5/18/2012 Completed elevator 1 and 2 tileWORK COMPLETED TO DATE 2/3/2012 WORK COMPLETED TO DATE 3/23/2012 WORK COMPLETED TO DATE 4/27/2012 WORK COMPLETED TO DATE 5/25/2012 Work Completed To Date 6/14/2012
24 Unit28 Unit 27 Unit 25 Unit
N/A
N/A
N/A
13
8
4
7
N/A N/A
FLOOR18
17
N/AN/A
12
N/A
N/A
16
14
15
N/A
23 Unit22 Unit
2
11
10
N/A
21 Unit
RUN DATE : 5/16/2019
26 Unit
9
3
6
5
JobD
river
EXHIBIT A
Confid
entia
l
POMPEI TILE PROGRESS CHART
19
19
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
ELEV
ATO
R C
OR
RID
OR
/1/2012 WORK COMPLETED TO DATE 6/22/
/8/2012 WORK COMPLETED TO DATE 7/2/27/6 Tile was installed on the 2nd floor m
WORK COMPLETED TO DATE 7/13/
20 Unit
JobD
river
EXHIBIT A
Confid
entia
l
POMPEI TILE PROGRESS CHART
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
HAL
L BA
TH S
HO
WER
HAL
L BA
TH F
LOO
R
HAL
L BA
TH B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
HAL
L BA
TH S
HO
WER
HAL
L BA
TH F
LOO
R
HAL
L BA
TH B
ASE
THR
ESH
OLD
S X
6
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
HAL
L BA
TH S
HO
WER
HAL
L BA
TH F
LOO
R
HAL
L BA
TH B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
3
FOYE
R T
ILE
KITC
HEN
TIL
E
LOC
KOU
T BA
TH S
HO
WER
LOC
KOU
T BA
TH F
LOO
R
LOC
KOU
T BA
TH B
ASE
MAS
TER
BAT
H S
HO
WER
MAS
TER
BAT
H F
LOO
R
MAS
TER
BAT
H B
ASE
THR
ESH
OLD
S X
6
ELEV
ATO
R C
OR
RID
OR
POMPEI TILE PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED TO DATE 1/10/2012 WORK COMPLETED TO DATE 3/30/2012 WORK COMPLETED TO DATE 5/4/2012 Working on floors with no completion 6/1/2012 WORK COMPLETED TO DATE 6/22/
AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 3/9/2012 WORK COMPLETED TO DATE 4/6/2012 POMPEI WAS ON FIRST FLOOR ALL WEEK 5/11/2012 Working on floors with no completion 6/8/2012 WORK COMPLETED TO DATE 7/2/2# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/16/2012 WORK COMPLETED TO DATE 4/13/2012 POMPEI WAS ON FIRST FLOOR ALL WEEK 5/18/2012 Completed elevator 1 and 2 tile 7/6 Tile was installed on the 2nd f loor
WORK COMPLETED TO DATE 2/3/2012 WORK COMPLETED TO DATE 3/23/2012 WORK COMPLETED TO DATE 4/27/2012 WORK COMPLETED TO DATE 5/25/2012 Work Completed To Date 6/14/2012 WORK COMPLETED TO DATE 7/13/
WORK COMPLETED TO DATE 7/20/
WORK COMPLETED TO DATE 7/27/2012 WORK COMPLETED TO DATE 8/24/2012 WORK COMPLETED TO DATE 9/21/2012WORK COMPLETED TO DATE 8/3/2012 8/31/2012 No internet access or printer accessWORK COMPLETED TO DATE 8/10/2012 9/7/2012 In the process of clearing out the diplomatWORK COMPLETED TO DATE 8/17/2012 WORK COMPLETED TO DATE 9/14/2012
RUN DATE : 5/16/2019
26 Unit
9
3
6
5
POMPEI
N/A
20 Unit 23 Unit22 Unit
2
11
10
N/A
21 Unit
FLOOR18
17
N/AN/A
12
N/A
N/A
16
14
15
N/A
13
8
4
7
N/A N/A
24 Unit28 Unit 27 Unit 25 Unit
N/A
N/A
JobD
river
EXHIBIT A
Confid
entia
l
PREMIER MILLWORK PROGRESS CHART
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Mas
ter B
ath
Cas
ing
& J
amb
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Mas
ter B
ath
Cas
ing
& J
amb
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Mas
ter B
ath
Cas
ing
& J
amb
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Mas
ter B
ath
Cas
ing
& J
amb
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Mas
ter B
ath
Cas
ing
& J
amb
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Mas
ter B
ath
Cas
ing
& J
amb
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Mas
ter B
ath
Cas
ing
& J
amb
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Mas
ter B
ath
Cas
ing
& J
amb
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Mas
ter B
ath
Cas
ing
& J
amb
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12AREAS AVAILABLE FOR YOU TO WORK
* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES
20 Unit 21 Unit 23 Unit22 Unit 25 Unit
16
7
RUN DATE : 5/16/2019
26 Unit 24 Unit28 Unit 27 Unit
6
5
4
12
FLOOR18
17
N/A
N/A
N/A
2
11
10
9
3
15
14
13
8
JobD
river
EXHIBIT A
Confid
entia
l
PREMIER MILLWORK PROGRESS CHART
Kitch
en
Ca
bin
ets
Co
un
tert
op
fu
rrin
g
Un
de
rca
bin
et lig
ht va
len
ce
Win
do
w V
ale
nce
Do
ub
le V
an
ity
Sin
gle
Va
nity
Lo
cko
ut K
itch
en
Ma
ste
r B
ath
Ca
sin
g &
Ja
mb
Liv
ing
Ro
om
Mir
ror
Kn
ee
wa
ll W
oo
d P
an
els
Kitch
en
Ca
bin
ets
Co
un
tert
op
fu
rrin
g
Un
de
rca
bin
et lig
ht va
len
ce
Win
do
w V
ale
nce
Do
ub
le V
an
ity
Sin
gle
Va
nity
Lo
cko
ut K
itch
en
Ma
ste
r B
ath
Ca
sin
g &
Ja
mb
Liv
ing
Ro
om
Mir
ror
Kn
ee
wa
ll W
oo
d P
an
els
Kitch
en
Ca
bin
ets
Co
un
tert
op
fu
rrin
g
Un
de
rca
bin
et lig
ht va
len
ce
Win
do
w V
ale
nce
Do
ub
le V
an
ity
Sin
gle
Va
nity
Lo
cko
ut K
itch
en
Ma
ste
r B
ath
Ca
sin
g &
Ja
mb
Liv
ing
Ro
om
Mir
ror
Kn
ee
wa
ll W
oo
d P
an
els
Kitch
en
Ca
bin
ets
Co
un
tert
op
fu
rrin
g
Un
de
rca
bin
et lig
ht va
len
ce
Win
do
w V
ale
nce
Do
ub
le V
an
ity
Sin
gle
Va
nity
Lo
cko
ut K
itch
en
Ma
ste
r B
ath
Ca
sin
g &
Ja
mb
Liv
ing
Ro
om
Mir
ror
Kn
ee
wa
ll W
oo
d P
an
els
Kitch
en
Ca
bin
ets
Co
un
tert
op
fu
rrin
g
Un
de
rca
bin
et lig
ht va
len
ce
Win
do
w V
ale
nce
Do
ub
le V
an
ity
Ma
ste
r B
ath
Ca
sin
g &
Ja
mb
Liv
ing
Ro
om
Mir
ror
Kn
ee
wa
ll W
oo
d P
an
els
Kitch
en
Ca
bin
ets
Co
un
tert
op
fu
rrin
g
Un
de
rca
bin
et lig
ht va
len
ce
Win
do
w V
ala
nce
Do
ub
le V
an
ity
Sin
gle
Va
nity
Lo
cko
ut K
itch
en
Ma
ste
r B
ath
Ca
sin
g &
Ja
mb
Liv
ing
Ro
om
Mir
ror
Kn
ee
wa
ll W
oo
d P
an
els
Kitch
en
Ca
bin
ets
Co
un
tert
op
fu
rrin
g
Un
de
rca
bin
et lig
ht va
len
ce
Win
do
w V
ale
nce
Do
ub
le V
an
ity
Ma
ste
r B
ath
Ca
sin
g &
Ja
mb
Liv
ing
Ro
om
Mir
ror
Kn
ee
wa
ll W
oo
d P
an
els
Kitch
en
Ca
bin
ets
Co
un
tert
op
fu
rrin
g
Un
de
rca
bin
et lig
ht va
len
ce
Win
do
w V
ale
nce
Do
ub
le V
an
ity
Ma
ste
r B
ath
Ca
sin
g &
Ja
mb
Liv
ing
Ro
om
Mir
ror
Kn
ee
wa
ll W
oo
d P
an
els
Kitch
en
Ca
bin
ets
Co
un
tert
op
fu
rrin
g
Un
de
rca
bin
et lig
ht va
len
ce
Win
do
w V
ale
nce
Do
ub
le V
an
ity
Sin
gle
Va
nity
Ma
ste
r B
ath
Ca
sin
g &
Ja
mb
Liv
ing
Ro
om
Mir
ror
Kn
ee
wa
ll W
oo
d P
an
els
PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12
AREAS AVAILABLE FOR YOU TO WORK
* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES
7
6
5
4
27 Unit 20 Unit 21 Unit 23 Unit22 Unit 25 Unit
RUN DATE : 1/18/2012
26 Unit 24 Unit28 Unit
N/A
N/A
N/A
2
11
10
9
3
15
14
13
8
12
FLOOR
18
17
16
JobD
river
EXHIBIT A
Confid
entia
l
PREMIER MILLWORK PROGRESS CHART
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Mas
ter B
ath
Cas
ing
& J
amb
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Mas
ter B
ath
Cas
ing
& J
amb
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Mas
ter B
ath
Cas
ing
& J
amb
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Mas
ter B
ath
Cas
ing
& J
amb
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Mas
ter B
ath
Cas
ing
& J
amb
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ance
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Mas
ter B
ath
Cas
ing
& J
amb
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Mas
ter B
ath
Cas
ing
& J
amb
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Mas
ter B
ath
Cas
ing
& J
amb
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Mas
ter B
ath
Cas
ing
& J
amb
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12AREAS AVAILABLE FOR YOU TO WORK
* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATESWORK COMPLETED TO DATE 1/23/2012
FLOOR18
17
N/A
N/A
N/A
2
11
15
14
RUN DATE :
13
8
12
24 Unit28 Unit 27 Unit 20 Unit 21 Unit 23 Unit22 Unit 25 Unit
16
7
6
5
4
1/24/2012
26 Unit
10
9
3
JobD
river
EXHIBIT A
Confid
entia
l
PREMIER MILLWORK PROGRESS CHART
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Mas
ter B
ath
Cas
ing
& J
amb
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Mas
ter B
ath
Cas
ing
& J
amb
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Mas
ter B
ath
Cas
ing
& J
amb
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Mas
ter B
ath
Cas
ing
& J
amb
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Mas
ter B
ath
Cas
ing
& J
amb
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ance
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Mas
ter B
ath
Cas
ing
& J
amb
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Mas
ter B
ath
Cas
ing
& J
amb
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Mas
ter B
ath
Cas
ing
& J
amb
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Mas
ter B
ath
Cas
ing
& J
amb
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12AREAS AVAILABLE FOR YOU TO WORK
* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATESWORK COMPLETED TO DATE 1/23/2012
FLOOR18
17
N/A
N/A
2
11
N/A
N/A N/A
15
14
RUN DATE :
13
8
12
24 Unit28 Unit 27 Unit 20 Unit 21 Unit 23 Unit22 Unit 25 Unit
16
7
6
5
4
1/31/2012
26 Unit
10
9
3
JobD
river
EXHIBIT A
Confid
entia
l
PREMIER MILLWORK PROGRESS CHART
3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 3 3 3 3
3 3 3 3 3
3
3
3 D/H D/H
3 D/H D/H
3 2 D/H 2 D/H D/H 2 2 D/H 2 D/H 2 2 2
3 2 D/H 2 D/H D/H 2 2 D/H 2 D/H 2 2 2
2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2
2 2 2 2 2 2 2
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ance
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATESWORK COMPLETED TO DATE 1/23/2012
11
N/A
N/A N/A
15
17
27 Unit
RUN DATE :
28 Unit
N/A
20 Unit 21 Unit 23 Unit22 Unit 25 Unit24 Unit
2/6/2012
26 Unit
10
9
3
14
13
8
12
2
N/A
N/A
N/A
16
7
6
5
4
FLOOR18
JobD
river
EXHIBIT A
Confid
entia
l
PREMIER MILLWORK PROGRESS CHART
5 2 5 5 D/H 5 5 D/H 5 5 D/H D/H 2 5 5 5 D/H D/H 5
5 2 5 5 D/H 5 5 D/H 5 5 D/H D/H 2 5 5 5 D/H D/H 5
D/H D/H D/H
D/H D/H D/H
D/H
D/H
D/H D/H
D/H D/H
4 4 D/H 4 3
4 4 D/H 4 3
4 4 4
4 4 4
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ance
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012WORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012
N/A
N/A
N/A
16
7
6
5
4
FLOOR18
5/16/2019
26 Unit
10
9
3
14
13
8
12
2
27 Unit
RUN DATE :
28 Unit
N/A
20 Unit 21 Unit 23 Unit22 Unit 25 Unit24 Unit
11
N/A
N/A N/A
15
17
JobD
river
EXHIBIT A
Confid
entia
l
PREMIER MILLWORK PROGRESS CHART
PREMIER
2 2 2
2 2 2
D/H D/H
D/H D/H
6 3 D/H 6 D/H 6 D/H D/H D/H D/H 3 6 6 6 2 D/H D/H
6 3 D/H 6 D/H 6 D/H D/H D/H D/H 3 6 6 6 2 D/H D/H
D/H
D/H
D/H D/H
D/H D/H
2
2
2
2
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ance
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED TO DATE 2/6/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 2/13/2012WORK COMPLETED TO DATE 1/23/2012 WORK COMPLETEDTO DATE 2/20/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 2-27-2012
11
N/A
N/A N/A
15
17
27 Unit
RUN DATE :
28 Unit
N/A
20 Unit 21 Unit 23 Unit22 Unit 25 Unit24 Unit
2/27/2012
26 Unit
10
9
3
14
13
8
12
2
N/A
N/A
N/A
16
7
6
5
4
FLOOR18
JobD
river
EXHIBIT A
Confid
entia
l
PREMIER MILLWORK PROGRESS CHART
D/H D/H
D/H D/H
2 3 3 D/H D/H
2 3 3 D/H D/H
2 D/H
2 D/H
7 5 D/H 7 D/H 7 D/H D/H D/H D/H 4 7 7 7 3 2 D/H
7 5 D/H 7 D/H 7 D/H D/H D/H D/H 4 7 7 7 3 2 D/H
2 D/H
2 D/H
2 2 2
2 2 2
D/H D/H
D/H D/H
3
3
3
3
3
3
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ance
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
PREMIER PROGRESS CHART WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 2/27/2012WORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETED TO DATE 3/5/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012WORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012
N/A
N/A
N/A
16
7
6
5
4
FLOOR18
5/16/2019
26 Unit
10
9
3
14
13
8
12
2
27 Unit
RUN DATE :
28 Unit
N/A
20 Unit 21 Unit 23 Unit22 Unit 25 Unit24 Unit
11
N/A N/A
15
17
N/A
JobD
river
EXHIBIT A
Confid
entia
l
PREMIER MILLWORK PROGRESS CHART
3 3 3 3 3 3 3 3 3 3 3 3 3
3 3 3 3 3 3 3 3 3 3 3 3 3
2 2 3 3 D/H 3 2 2 2
2 2 3 3 D/H 3 2 2 2
2 2 5 2
2 2 5 2
4 4 2 2 2 2 2 D/H 2 2
4 4 2 2 2 2 2 D/H 2 2
6 9 5 2
6 9 5 2
2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2
4 2 4 2 2 2 2 3
4 2 4 2 2 2 2 3
D/H D/H 3 3
D/H D/H 3 3
3
3
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ance
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012WORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012
N/A
N/A
N/A
16
7
6
5
4
FLOOR18
5/16/2019
26 Unit
10
9
3
14
13
8
12
2
27 Unit
RUN DATE :
28 Unit
N/A
20 Unit 21 Unit 23 Unit22 Unit 25 Unit24 Unit
11
N/A N/A
15
17
N/A
JobD
river
EXHIBIT A
Confid
entia
l
PREMIER MILLWORK PROGRESS CHART
D/H D/H
D/H D/H
2 3 3 D/H D/H
2 3 3 D/H D/H
2 D/H
2 D/H
7 5 D/H 7 D/H 7 D/H D/H D/H D/H 4 7 7 7 3 2 D/H
7 5 D/H 7 D/H 7 D/H D/H D/H D/H 4 7 7 7 3 2 D/H
2 D/H
2 D/H
2 2 2
2 2 2
D/H D/H
D/H D/H
3
3
3
3
3
3
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ance
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012WORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012
11
N/A N/A
15
17
N/A
27 Unit
RUN DATE :
28 Unit
N/A
20 Unit 21 Unit 23 Unit22 Unit 25 Unit24 Unit
5/16/2019
26 Unit
10
9
3
14
13
8
12
2
N/A
N/A
N/A
16
7
6
5
4
FLOOR18
JobD
river
EXHIBIT A
Confid
entia
l
PREMIER MILLWORK PROGRESS CHART
2 2 2 2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 D/H 2 2 2
2 2 2 2 2 2 2 D/H 2 2 2
2 2 4
2 2 4
3 3 D/H 2 2 D/H
3 3 D/H 2 2 D/H
8 6 8 8 D/H 5 8 D/H 4
8 6 8 8 D/H 5 8 D/H 4
D/H D/H
D/H D/H
D/H 3 3
D/H 3 3
D/H D/H 2 2 2
D/H D/H 2 2 2
2 4
2 4
3
3
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ance
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012WORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012
11
N/A N/A
15
17
N/A
27 Unit
RUN DATE :
28 Unit
N/A
20 Unit 21 Unit 23 Unit22 Unit 25 Unit24 Unit
5/16/2019
26 Unit
10
9
3
14
13
8
12
2
N/A
N/A
N/A
16
7
6
5
4
FLOOR18
JobD
river
EXHIBIT A
Confid
entia
l
PREMIER MILLWORK PROGRESS CHART
3 3 3 3 3 3 3 3 3 3 3 3 3
3 3 3 3 3 3 3 3 3 3 3 3 3
2 2 3 3 D/H 3 2 2 2
2 2 3 3 D/H 3 2 2 2
2 2 5 2
2 2 5 2
4 4 2 2 2 2 2 D/H 2 2
4 4 2 2 2 2 2 D/H 2 2
6 9 5 2
6 9 5 2
2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2
4 2 4 2 2 2 2 3
4 2 4 2 2 2 2 3
D/H D/H 3 3
D/H D/H 3 3
3
3
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ance
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012WORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012
11
N/A N/A
15
17
N/A
27 Unit
RUN DATE :
28 Unit
N/A
20 Unit 21 Unit 23 Unit22 Unit 25 Unit24 Unit
5/16/2019
26 Unit
10
9
3
14
13
8
12
2
N/A
N/A
N/A
16
7
6
5
4
FLOOR18
JobD
river
EXHIBIT A
Confid
entia
l
PREMIER MILLWORK PROGRESS CHART
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
4 4 4 4 4 4 4 4 4 4 D/H
4 4 4 4 4 4 4 4 4 4 D/H
3 3 4 2 2 D/H 4 3 3 3
3 3 4 2 2 D/H 4 3 3 3
2 2 3 3 6 3
2 2 3 3 6 3
5 D/H 3 D/H D/H
5 D/H 3 D/H D/H
7 10 6
7 10 6
3 3 3 3 3 3 3 3 3
3 3 3 3 3 3 3 3 3
5 5 3 3 3 3 4
5 5 3 3 3 3 4
D/H D/H 4 4
D/H D/H 4 4
4
4
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ance
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012 WORK COMPLETE TO DATE 3/26/2012WORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012
N/A
N/A
N/A
16
7
6
5
4
FLOOR18
5/16/2019
26 Unit
10
9
3
14
13
8
12
2
27 Unit
RUN DATE :
28 Unit
N/A
20 Unit 21 Unit 23 Unit22 Unit 25 Unit24 Unit
11
N/A N/A
15
17
N/A
JobD
river
EXHIBIT A
Confid
entia
l
PREMIER MILLWORK PROGRESS CHART
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
D/H 5 5 5 2 2
D/H 5 5 5 2 2
4 4 5 4
4 4 5 4
7
7
2 D/H D/H
2 D/H D/H
2 11 2 7
2 11 2 7
4 4 4 4 4 4 4 4 4
4 4 4 4 4 4 4 4 4
6 4 4
6 4 4
D/H D/H 5 5 2
D/H D/H 5 5 2
5
5
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ance
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012 WORK COMPLETE TO DATE 3/26/2012WORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012 WORK COMPLETED TO DATE 4/2/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 2/27/2012
WORK COMPLETED TO DATE 3/5/2012
11
N/A N/A
15
17
N/A
27 Unit
RUN DATE :
28 Unit
N/A
20 Unit 21 Unit 23 Unit22 Unit 25 Unit24 Unit
5/16/2019
26 Unit
10
9
3
14
13
8
12
2
N/A
N/A
N/A
16
7
6
5
4
FLOOR18
JobD
river
EXHIBIT A
Confid
entia
l
PREMIER MILLWORK PROGRESS CHART
3 3 3 3 3 3 3 3 3 3 3 2 3 3 3
3 3 3 3 3 3 3 3 3 3 3 2 3 3 3
4 4 4 4 4 4 4 4 4 4 4 3 4 4 4
4 4 4 4 4 4 4 4 4 4 4 3 4 4 4
D/H 6 6 2 3 3 2 2
D/H 6 6 2 3 3 2 2
5 5 D/H 6 5
5 5 D/H 6 5
2 8
2 8
3 D/H D/H D/H
3 D/H D/H D/H
3 12 3 8
3 12 3 8
5 5 5 5 5 5 5
5 5 5 5 5 5 5
7 5 5
7 5 5
D/H D/H 6 6 3
D/H D/H 6 6 3
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ance
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012 WORK COMPLETE TO DATE 3/26/2012WORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012 WORK COMPLETED TO DATE 4/2/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/9/2012
WORK COMPLETED TO DATE 3/5/2012
11
N/A N/A
15
17
N/A
27 Unit
RUN DATE :
28 Unit
N/A
20 Unit 21 Unit 23 Unit22 Unit 25 Unit24 Unit
5/16/2019
26 Unit
10
9
3
14
13
8
12
2
N/A
N/A
N/A
16
7
6
5
4
FLOOR18
JobD
river
EXHIBIT A
Confid
entia
l
PREMIER MILLWORK PROGRESS CHART
4 4 4 4 4 4 4 4 3 4 4
4 4 4 4 4 4 4 4 3 4 4
5 5 5 5 5 5 5 5 4 5 5
5 5 5 5 5 5 5 5 4 5 5
D/H 7 7 3 4 4 3 3
D/H 7 7 3 4 4 3 3
6 6 D/H 7 6
6 6 D/H 7 6
3 9
3 9
4 D/H D/H D/H
4 D/H D/H D/H
4 13 4 9
4 13 4 9
6 6 6 6 6 6 6
6 6 6 6 6 6 6
8 6 6
8 6 6
D/H 7 7 4
D/H 7 7 4
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ance
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012 WORK COMPLETE TO DATE 3/26/2012WORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012 WORK COMPLETED TO DATE 4/2/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/9/2012
WORK COMPLETED TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/16/2012
11
N/A N/A
15
17
N/A
N/A
27 Unit
RUN DATE :
28 Unit
N/A
20 Unit 21 Unit 23 Unit22 Unit 25 Unit24 Unit
5/16/2019
26 Unit
10
9
3
14
13
8
12
2
N/A
N/A
N/A
16
7
6
5
4
FLOOR18
JobD
river
EXHIBIT A
Confid
entia
l
PREMIER MILLWORK PROGRESS CHART
5 5 5 5 5 5 5 5 4 5 5
5 5 5 5 5 5 5 5 4 5 5
6 6 6 6 6 6 6 6 5 6 6
6 6 6 6 6 6 6 6 5 6 6
D/H 8 8 3 5 5 4 4
D/H 8 8 3 5 5 4 4
7 7 D/H 8 7
7 7 D/H 8 7
4 9
4 10
5 D/H D/H D/H
5 D/H D/H D/H
5 14 5 10
5 14 5 10
7 7 7 7 7 7 7
7 7 7 7 7 7 7
9 7 7
9 7 7
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ance
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/23/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012 WORK COMPLETE TO DATE 3/26/2012WORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012 WORK COMPLETED TO DATE 4/2/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/9/2012
WORK COMPLETED TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/16/2012
11
N/A N/A
15
17
N/A
N/A
27 Unit
RUN DATE :
28 Unit
N/A
20 Unit 21 Unit 23 Unit22 Unit 25 Unit24 Unit
5/16/2019
26 Unit
10
9
3
14
13
8
12
2
N/A
N/A
N/A
16
7
6
5
4
FLOOR18
JobD
river
EXHIBIT A
Confid
entia
l
PREMIER MILLWORK PROGRESS CHART
6 6 6 6 6 6 6 6 5 6 6
6 6 6 6 6 6 6 6 5 6 6
7 7 7 7 7 7 7 7 6 7 7
7 7 7 7 7 7 7 7 6 7 7
D/H 9 9 4 6 6 5 5
D/H 9 9 4 6 6 5 5
8 8 D/H 9 8
8 8 D/H 9 8
5 11
5 11
6 D/H D/H D/H
6 D/H D/H D/H
6 15 6 11
6 15 6 11
8 8 8 8
8 8 8 8
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Hal
lway
van
ity
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ance
Dou
ble
Vani
ty
Hal
lway
van
ity
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Hal
lway
van
ity
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/23/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/30/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012 WORK COMPLETE TO DATE 3/26/2012 CONTINUE WORKING ON THE 1ST FLOOR INSTALLING CABINETS, CEILINGS AND TRIMWORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012 WORK COMPLETED TO DATE 4/2/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/9/2012
WORK COMPLETED TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/16/2012
N/A
N/A
N/A N/A
N/A
N/A
N/A
2
16
7
6
5
4
FLOOR18
11
N/A
10
9
3
14
13
8
12
23 Unit22 Unit 25 Unit24 Unit
5/16/2019
26 Unit
15
17
N/A
N/A
27 Unit
RUN DATE :
28 Unit
N/A
20 Unit 21 Unit
JobD
river
EXHIBIT A
Confid
entia
l
PREMIER MILLWORK PROGRESS CHART
7 7 7 7 7 7 7 7 6 7 7
7 7 7 7 7 7 7 7 6 7 7
8 8 8 8 8 8 8 8 7 8 8
8 8 8 8 8 8 8 8 7 8 8
D/H 10 10 5 7 7 6 6
D/H 10 10 5 7 7 6 6
9 9 D/H 10 9
9 9 D/H 10 9
6 2 2 2 2 2 12 2 2 2 2
6 2 2 2 2 2 12 2 2 2 2
7 D/H D/H D/H
7 D/H D/H D/H
7 D/H 7 12
7 D/H 7 12
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Hal
lway
van
ity
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ance
Dou
ble
Vani
ty
Hal
lway
van
ity
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Hal
lway
van
ity
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/23/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/30/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012 WORK COMPLETE TO DATE 3/26/2012 CONTINUE WORKING ON THE 1ST FLOOR INSTALLING CABINETS, CEILINGS AND TRIMWORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/9/2012
WORK COMPLETED TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/16/2012
N/A
N/A
N/A N/A
N/A
N/A
N/A
2
16
7
6
5
4
FLOOR18
11
N/A
10
9
3
14
13
8
12
23 Unit22 Unit 25 Unit24 Unit
5/16/2019
26 Unit
15
17
N/A
N/A
27 Unit
RUN DATE :
28 Unit
N/A
20 Unit 21 Unit
JobD
river
EXHIBIT A
Confid
entia
l
PREMIER MILLWORK PROGRESS CHART
8 8 8 8 8 8 8 8 7 8 8
8 8 8 8 8 8 8 8 7 8 8
9 9 9 9 9 9 9 9 8 9 9
9 9 9 9 9 9 9 9 8 9 9
D/H 11 11 6 8 8 7 7
D/H 11 11 6 8 8 7 7
10 10 D/H 11 10
10 10 D/H 11 10
7 3 3 3 3 3 13 3 3 3 3
7 3 3 3 3 3 13 3 3 3 3
D/H D/H D/H
D/H D/H D/H
8 D/H 8 13
8 D/H 8 13
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Hal
lway
van
ity
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ance
Dou
ble
Vani
ty
Hal
lway
van
ity
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Hal
lway
van
ity
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/23/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/30/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012 WORK COMPLETE TO DATE 3/26/2012 CONTINUE WORKING ON THE 1ST FLOOR INSTALLING CABINETS, CEILINGS AND TRIMWORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012
WORK COMPLETED TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/16/2012
N/A
N/A
N/A N/A
N/A
N/A
N/A
2
16
7
6
5
4
FLOOR18
11
N/A
10
9
3
14
13
8
12
23 Unit22 Unit 25 Unit24 Unit
5/16/2019
26 Unit
15
17
N/A
N/A
27 Unit
RUN DATE :
28 Unit
N/A
20 Unit 21 Unit
JobD
river
EXHIBIT A
Confid
entia
l
PREMIER MILLWORK PROGRESS CHART
2 2 2 2 2
2 2 2 2 2
10 10 10 10 10 10 9 10 9 10 10
10 10 10 10 10 10 9 10 9 10 10
11 11 11 11 11 11 10 11 10 11 11
11 11 11 11 11 11 10 11 10 11 11
D/H 13 13 8 10 10 9 9
D/H 13 13 8 10 10 9 9
12 12 D/H 13 12
12 12 D/H 13 12
9 5 5 5 5 15 5
9 5 5 5 5 15 5
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Hal
lway
van
ity
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ance
Dou
ble
Vani
ty
Hal
lway
van
ity
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Hal
lway
van
ity
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 5/30/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/30/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012 WORK COMPLETE TO DATE 3/26/2012 CONTINUE WORKING ON THE 1ST FLOOR INSTALLING CABINETS, CEILINGS AND TRIMWORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012
WORK COMPLETED TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012/ Pool Area
15
17
N/A
N/A
27 Unit
RUN DATE :
28 Unit
N/A
20 Unit 21 Unit 23 Unit22 Unit 25 Unit24 Unit
5/16/2019
26 Unit
10
9
3
14
13
8
12
2
16
7
6
5
4
FLOOR18
11
N/A N/A
N/A
N/A N/A
N/A
N/A
N/AJobD
river
EXHIBIT A
Confid
entia
l
PREMIER MILLWORK PROGRESS CHART
3 3 3 3 3 2 2 2 2 2
3 3 3 3 3 2 2 2 2 2
11 11 11 11 11 11 10 11 10 11 11
11 11 11 11 11 11 10 11 10 11 11
12 12 12 12 12 12 11 12 11 12 12
12 12 12 12 12 12 11 12 11 12 12
D/H 14 14 9 11 11 10 10
D/H 14 14 9 11 11 10 10
13 13 2 2 2 D/H 14 2 2 13 2 2
13 13 2 2 2 D/H 14 2 2 13 2 2
10 6 6 6
10 6 6 6
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Hal
lway
van
ity
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ance
Dou
ble
Vani
ty
Hal
lway
van
ity
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Hal
lway
van
ity
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 5/30/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE 6/4/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012 WORK COMPLETE TO DATE 3/26/2012 CONTINUE WORKING ON THE 1ST FLOOR INSTALLING CABINETS, CEILINGS AND TRIMWORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012
WORK COMPLETED TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012/ Pool Area
N/A
N/A
N/A N/A
N/A
N/A
N/A
2
16
7
6
5
4
FLOOR18
11
N/A
10
9
3
14
13
8
12
23 Unit22 Unit 25 Unit24 Unit
5/16/2019
26 Unit
15
17
N/A
N/A
27 Unit
RUN DATE :
28 Unit
N/A
20 Unit 21 Unit
JobD
river
EXHIBIT A
Confid
entia
l
PREMIER MILLWORK PROGRESS CHART
2 2 2 2 2
2 2 2 2 2
4 4 4 4 4 3 3 3 3 3
4 4 4 4 4 3 3 3 3 3
12 12 12 12 12 12 11 12 11 12 12
12 12 12 12 12 12 11 12 11 12 12
13 13 13 13 13 13 12 13 12 13 13
13 13 13 13 13 13 12 13 12 13 13
D/H 15 15 10 2 2 2 2
D/H 15 15 10 2 2 2 2
D/H D/H D/H D/H 15 D/H 14 D/H
D/H D/H D/H D/H 15 D/H 14 D/H
11 2 D/H 2 7 2
11 2 D/H 2 7 2
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Hal
lway
van
ity
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ance
Dou
ble
Vani
ty
Hal
lway
van
ity
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Hal
lway
van
ity
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 6/1 WORK COMPLETED TO DATE 5/30/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE 6/4/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012 WORK COMPLETE TO DATE 3/26/2012 CONTINUE WORKING ON THE 1ST FLOOR INSTALLING CABINETS, CEILINGS AND TRIMWORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012
WORK COMPLETED TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012/ Pool Area
N/A
N/A
N/A N/A
N/A
N/A
N/A
2
16
7
6
5
4
FLOOR18
11
N/A
10
9
3
14
13
8
12
23 Unit22 Unit 25 Unit24 Unit
5/16/2019
26 Unit
15
17
N/A
N/A
27 Unit
RUN DATE :
28 Unit
N/A
20 Unit 21 Unit
JobD
river
EXHIBIT A
Confid
entia
l
PREMIER MILLWORK PROGRESS CHART
3 2 3 3 3 3
3 2 3 3 3 3
5 5 5 5 5 4 4 4 4 4
5 5 5 5 5 4 4 4 4 4
13 13 13 13 13 13 12 13 12 13 13
13 13 13 13 13 13 12 13 12 13 13
14 14 14 14 14 13 14 13 D/H
14 14 14 14 14 13 14 13 D/H
2 2 2 2 2 11 2 2 3 3 3 3
2 2 2 2 2 11 2 2 3 3 3 3
2 D/H
2 D/H
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Hal
lway
van
ity
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ance
Dou
ble
Vani
ty
Hal
lway
van
ity
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Hal
lway
van
ity
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 6/11/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/30/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012 WORK COMPLETE TO DATE 3/26/2012 CONTINUE WORKING ON THE 1ST FLOOR INSTALLING CABINETS, CEILINGS AND TRIMWORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 5/30/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/4/2012
WORK COMPLETED TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012/ Pool Area WORK COMPLETED TO DATE 6/18/2012
15
17
N/A
N/A
27 Unit
RUN DATE :
28 Unit
N/A
20 Unit 21 Unit 23 Unit22 Unit 25 Unit24 Unit
5/16/2019
26 Unit
10
9
3
14
13
8
12
2
16
7
6
5
4
FLOOR18
11
N/A N/A
N/A
N/A N/A
N/A
N/A
N/AJobD
river
EXHIBIT A
Confid
entia
l
PREMIER MILLWORK PROGRESS CHART
2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2
4 3 4 4 4 4
4 3 4 4 4 4
6 6 6 6 6 5 5 5 5 5
6 6 6 6 6 5 5 5 5 5
14 14 14 14 14 13 14 13 14 14
14 14 14 14 14 13 14 13 14 14
2 2 15 15 15 15 14
2 2 15 15 15 15 14
2 3 3 3 2 3 3 3 4 4 4 4
2 3 3 3 2 3 3 3 4 4 4 4
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Hal
lway
van
ity
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ance
Dou
ble
Vani
ty
Hal
lway
van
ity
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Hal
lway
van
ity
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 6/11/2012 WORK COMPLETED TO DATE AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012 WORK COMPLETE TO DATE 3/26/2012 CONTINUE WORKING ON THE 1ST FLOOR INSTALLING CABINETS, CEILINGS AND TRIMWORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 5/30/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/4/2012
WORK COMPLETED TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012/ Pool Area WORK COMPLETED TO DATE 6/18/2012
N/A
N/A
N/A N/A
N/A
N/A
N/A
2
16
7
6
5
4
FLOOR18
11
N/A
10
9
3
14
13
8
12
23 Unit22 Unit 25 Unit24 Unit
5/16/2019
26 Unit
15
17
N/A
N/A
27 Unit
RUN DATE :
28 Unit
N/A
20 Unit 21 Unit
JobD
river
EXHIBIT A
Confid
entia
l
PREMIER MILLWORK PROGRESS CHART
3 3 3 3 3 3 3 3
3 3 3 3 3 3 3 3
5 4 5 5 5 5
5 4 5 5 5 5
7 7 7 7 7 6 6 6 6 6
7 7 7 7 7 6 6 6 6 6
15 15 15 15 15 14 15 14 15 15
15 15 15 15 15 14 15 14 15 15
3 3 2 16 16 2 16 16 15 2 2 2 2 2 2 2
3 3 2 16 16 2 16 16 15 2 2 2 2 2 2 2
2
2
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Hal
lway
van
ity
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ance
Dou
ble
Vani
ty
Hal
lway
van
ity
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Hal
lway
van
ity
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 6/11/2012 WORK COMPLETED TO DATE AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012 WORK COMPLETE TO DATE 3/26/2012 CONTINUE WORKING ON THE 1ST FLOOR INSTALLING CABINETS, CEILINGS AND TRIM WORK COMPLETED TO DATE WORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 5/30/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/4/2012
WORK COMPLETED TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012/ Pool Area WORK COMPLETED TO DATE 6/18/2012
N/A
N/A
N/A N/A
N/A
N/A
N/A
2
16
7
6
5
4
FLOOR18
11
N/A
10
9
3
14
13
8
12
23 Unit22 Unit 25 Unit24 Unit
5/16/2019
26 Unit
15
17
N/A
N/A
27 Unit
RUN DATE :
28 Unit
7/6 Installing cabinets on the 2nd floor in meeting rooms
20 Unit 21 Unit
JobD
river
EXHIBIT A
Confid
entia
l
PREMIER MILLWORK PROGRESS CHART
5 5 5 5 5 5 5 4
5 5 5 5 5 5 5 4
7 6 7 7 7 6
7 6 7 7 7 6
9 9 9 9 9 8 8 8 8 7
9 9 9 9 9 8 8 8 8 7
D/H 2 2 2 17 D/H 2 2 2 2 D/H 2 2 D/H D/H 2 2 16
D/H 2 2 2 17 D/H 2 2 2 2 D/H 2 2 D/H D/H 2 2 16
D/H D/H
D/H D/H
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Hal
lway
van
ity
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ance
Dou
ble
Vani
ty
Hal
lway
van
ity
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Hal
lway
van
ity
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 6/11/2012 WORK COMPLETED TO DATE AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012 WORK COMPLETE TO DATE 3/26/2012 CONTINUE WORKING ON THE 1ST FLOOR INSTALLING CABINETS, CEILINGS AND TRIM WORK COMPLETED TO DATE WORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/4/2012
WORK COMPLETED TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012/ Pool Area WORK COMPLETED TO DATE 6/18/2012
N/A
N/A
N/A N/A
N/A
N/A
N/A
2
16
7
6
5
4
FLOOR18
11
N/A
10
9
3
14
13
8
12
23 Unit22 Unit 25 Unit24 Unit
5/16/2019
26 Unit
15
17
N/A
N/A
27 Unit
RUN DATE :
28 Unit
7/6 Installing cabinets on the 2nd floor in meeting rooms
20 Unit 21 Unit
JobD
river
EXHIBIT A
Confid
entia
l
PREMIER MILLWORK PROGRESS CHART
6 6 6 6 6 6 6 5
6 6 6 6 6 6 6 5
8 7 8 8 8 7
8 7 8 8 8 7
10 10 10 10 10 D/H D/H 9 D/H
10 10 10 10 10 D/H D/H 9 D/H
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Hal
lway
van
ity
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ance
Dou
ble
Vani
ty
Hal
lway
van
ity
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Hal
lway
van
ity
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 6/11/2012 WORK COMPLETED TO DATE AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012 WORK COMPLETE TO DATE 3/26/2012 CONTINUE WORKING ON THE 1ST FLOOR INSTALLING CABINETS, CEILINGS AND TRIM WORK COMPLETED TO DATE WORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/4/2012 WORK COMPLETED TO DATE
WORK COMPLETED TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012/ Pool Area WORK COMPLETED TO DATE 6/18/2012
N/A
N/A
N/A
N/A N/A
5
4
FLOOR18
11
N/A N/A
5/16/2019
26 Unit
10
9
3
14
13
8
12
2
27 Unit
RUN DATE :
28 Unit
7/6 Installing cabinets on the 2nd floor in meeting rooms
20 Unit 21 Unit 23 Unit22 Unit 25 Unit24 Unit
15
17
N/A
N/A
N/A
16
7
6 JobD
river
EXHIBIT A
Confid
entia
l
PREMIER MILLWORK PROGRESS CHART
6 6 6 6 6 6 6 5
6 6 6 6 6 6 6 5
8 7 8 8 8 7
8 7 8 8 8 7
10 10 10 10 10 D/H D/H 9 D/H
10 10 10 10 10 D/H D/H 9 D/H
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Hal
lway
van
ity
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ance
Dou
ble
Vani
ty
Hal
lway
van
ity
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Hal
lway
van
ity
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 6/11/2012 WORK COMPLETED TO DATE AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012 WORK COMPLETE TO DATE 3/26/2012 CONTINUE WORKING ON THE 1ST FLOOR INSTALLING CABINETS, CEILINGS AND TRIM WORK COMPLETED TO DATE WORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/4/2012 WORK COMPLETED TO DATE
WORK COMPLETED TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012/ Pool Area WORK COMPLETED TO DATE 6/18/2012
N/A
N/A
N/A
N/A N/A
5
4
FLOOR18
11
N/A N/A
5/16/2019
26 Unit
10
9
3
14
13
8
12
2
27 Unit
RUN DATE :
28 Unit
7/6 Installing cabinets on the 2nd floor in meeting rooms
20 Unit 21 Unit 23 Unit22 Unit 25 Unit24 Unit
15
17
N/A
N/A
N/A
16
7
6 JobD
river
EXHIBIT A
Confid
entia
l
PREMIER MILLWORK PROGRESS CHART
7 7 7 7 7 7 7 6
7 7 7 7 7 7 7 6
9 8 9 9 D/H D/H
9 8 9 9 D/H D/H
D/H D/H D/H
D/H D/H D/H
D/H D/H
D/H D/H
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Hal
lway
van
ity
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ance
Dou
ble
Vani
ty
Hal
lway
van
ity
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Hal
lway
van
ity
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 6/11/2012 WORK COMPLETED TO DATE 7/6/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 7/9/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012 WORK COMPLETE TO DATE 3/26/2012 CONTINUE WORKING ON THE 1ST FLOOR INSTALLING CABINETS, CEILINGS AND TRIM WORK COMPLETED TO DATE 7/16/201WORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 6/4/2012 WORK COMPLETED TO DATE 7/23/201WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/18/2012 WORK COMPLETED TO DATE 7/30/201
WORK COMPLETED TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012/ Pool Area WORK COMPLETED TO DATE 6/25/2012 WORK COMPLETED TO DATE 8/6/2012
15
17
N/A
N/A
N/A
16
7
6
27 Unit
RUN DATE :
28 Unit
7/6 Installing cabinets on the 2nd floor in meeting rooms
20 Unit 21 Unit 23 Unit22 Unit 25 Unit24 Unit
5/16/2019
26 Unit
10
9
3
14
13
8
12
2
5
4
FLOOR18
11
N/A N/A
N/A
N/A
N/A
N/A N/A
JobD
river
EXHIBIT A
Confid
entia
l
PREMIER MILLWORK PROGRESS CHART
8 8 8 8 D/H D/H D/H D/H
8 8 8 8 D/H D/H D/H D/H
10 D/H D/H D/H D/H 2 D/H
10 D/H D/H D/H D/H 2 D/H
D/H D/H D/H
D/H D/H D/H
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Hal
lway
van
ity
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ance
Dou
ble
Vani
ty
Hal
lway
van
ity
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Hal
lway
van
ity
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 6/11/2012 WORK COMPLETED TO DATE 7/6/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 7/9/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012 WORK COMPLETE TO DATE 3/26/2012 CONTINUE WORKING ON THE 1ST FLOOR INSTALLING CABINETS, CEILINGS AND TRIM WORK COMPLETED TO DATE 7/16/201WORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 6/4/2012 WORK COMPLETED TO DATE 7/23/201WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/18/2012 WORK COMPLETED TO DATE 7/30/201
WORK COMPLETED TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012/ Pool Area WORK COMPLETED TO DATE 6/25/2012 WORK COMPLETED TO DATE 8/6/2012
N/A
N/A
N/A
N/A N/A
5
4
FLOOR18
11
N/A N/A
5/16/2019
26 Unit
10
9
3
14
13
8
12
2
27 Unit
RUN DATE :
28 Unit
7/6 Installing cabinets on the 2nd floor in meeting rooms
20 Unit 21 Unit 23 Unit22 Unit 25 Unit24 Unit
15
17
N/A
N/A
N/A
16
7
6 JobD
river
EXHIBIT A
Confid
entia
l
PREMIER MILLWORK PROGRESS CHART
9 D/H 9 9 D/H D/H D/H 2 D/H
9 D/H 9 9 D/H D/H D/H 2 D/H
11 D/H 2 2 D/H 2 2 D/H D/H 3 D/H
11 D/H 2 2 D/H 2 2 D/H D/H 3 D/H
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Hal
lway
van
ity
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ance
Dou
ble
Vani
ty
Hal
lway
van
ity
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Hal
lway
van
ity
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 6/11/2012 WORK COMPLETED TO DATE 7/6/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 7/9/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012 WORK COMPLETE TO DATE 3/26/2012 CONTINUE WORKING ON THE 1ST FLOOR INSTALLING CABINETS, CEILINGS AND TRIM WORK COMPLETED TO DATE 7/16/201WORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 6/4/2012 WORK COMPLETED TO DATE 7/23/201WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/18/2012 WORK COMPLETED TO DATE 7/30/201
WORK COMPLETED TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012/ Pool Area WORK COMPLETED TO DATE 6/25/2012 WORK COMPLETED TO DATE 8/6/2012
15
17
N/A
N/A
N/A
16
7
6
27 Unit
RUN DATE :
28 Unit
7/6 Installing cabinets on the 2nd floor in meeting rooms
20 Unit 21 Unit 23 Unit22 Unit 25 Unit24 Unit
5/16/2019
26 Unit
10
9
3
14
13
8
12
2
5
4
FLOOR18
11
N/A N/A
N/A
N/A
N/A
N/A N/A
JobD
river
EXHIBIT A
Confid
entia
l
PREMIER MILLWORK PROGRESS CHART
10 D/H D/H 3
10 D/H D/H 3
D/H 3 3 D/H 3 3 D/H D/H 4 D/H
D/H 3 3 D/H 3 3 D/H D/H 4 D/H
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Hal
lway
van
ity
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ance
Dou
ble
Vani
ty
Hal
lway
van
ity
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Hal
lway
van
ity
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 6/11/2012 WORK COMPLETED TO DATE 7/6/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 7/9/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012 WORK COMPLETE TO DATE 3/26/2012 CONTINUE WORKING ON THE 1ST FLOOR INSTALLING CABINETS, CEILINGS AND TRIM WORK COMPLETED TO DATE 7/16/201WORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 6/4/2012 WORK COMPLETED TO DATE 7/23/201WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/18/2012 WORK COMPLETED TO DATE 7/30/201
WORK COMPLETED TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012/ Pool Area WORK COMPLETED TO DATE 6/25/2012 WORK COMPLETED TO DATE 8/6/2012
N/AN/A
15
17
N/A
N/A
N/A
16
7
6
27 Unit
RUN DATE :
28 Unit
7/6 Installing cabinets on the 2nd floor in meeting rooms
20 Unit 21 Unit 23 Unit22 Unit 25 Unit24 Unit
5/16/2019
26 Unit
10
9
3
14
13
8
12
2
5
4
FLOOR18
11
N/A N/A
N/A
N/A
N/A
N/A N/A
JobD
river
EXHIBIT A
Confid
entia
l
PREMIER MILLWORK PROGRESS CHART
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Hal
lway
van
ity
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012 WORK COMPLETE TO DATE 3/26/2012WORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012 WORK COMPLETED TO DATE 4/2/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/9/2012
WORK COMPLETED TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/16/2012
N/A N/A
5
4
FLOOR18
11
5/16/2019
26 Unit
10
9
3
14
13
8
12
2
27 Unit
RUN DATE :
28 Unit
7/6 Installing c
25 Unit24 Unit
N/AN/A
15
17
N/A
N/A
N/A
16
7
6 JobD
river
EXHIBIT A
Confid
entia
l
PREMIER MILLWORK PROGRESS CHARTC
ount
erto
p fu
rring
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ance
Dou
ble
Vani
ty
Hal
lway
van
ity
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Hal
lway
van
ity
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 6/11/2012 WORK COMPLETED TO DATE 7/6/2012WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 7/9/2012
CONTINUE WORKING ON THE 1ST FLOOR INSTALLING CABINETS, CEILINGS AND TRIM WORK COMPLETED TO DATE 7/16/201WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 6/4/2012 WORK COMPLETED TO DATE 7/23/201WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/18/2012 WORK COMPLETED TO DATE 7/30/201WORK COMPLETED TO DATE 5/21/2012/ Pool Area WORK COMPLETED TO DATE 6/25/2012 WORK COMPLETED TO DATE 8/6/2012
N/A
N/A
N/A
N/A N/A
abinets on the 2nd floor in meeting rooms
20 Unit 21 Unit 23 Unit22 Unit
JobD
river
EXHIBIT A
Confid
entia
l
PREMIER MILLWORK PROGRESS CHART
PREMIER
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Hal
lway
van
ity
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ance
Dou
ble
Vani
ty
Hal
lway
van
ity
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Hal
lway
van
ity
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
Kitc
hen
Cab
inet
s
Cou
nter
top
furri
ng
Und
erca
bine
t lig
ht v
alen
ce
Win
dow
Val
ence
Dou
ble
Vani
ty
Sing
le V
anity
Lock
out K
itche
n
Livi
ng R
oom
Mirr
or
Knee
wal
l Woo
d Pa
nels
PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 6/11/2012 WORK COMPLETED TO DATE 7/6/2012AREAS AVAILABLE FOR YOU TO WORK D/ DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 7/9/2012
# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012 WORK COMPLETE TO DATE 3/26/2012 CONTINUE WORKING ON THE 1ST FLOOR INSTALLING CABINETS CEILINGS AND TRIM WORK COMPLETED TO DATE 7/16/201WORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 6/4/2012 WORK COMPLETED TO DATE 7/23/201WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/18/2012 WORK COMPLETED TO DATE 7/30/201
WORK COMPLETED TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012/ Pool Area WORK COMPLETED TO DATE 6/25/2012 WORK COMPLETED TO DATE 8/6/2012WORK COMPLETED TO DATE 8/13/2012 9/3/2012 LABOR DAYWORK COMPLETED TO DATE 8/20/2012 WORK COMPLETED TO DATE 9/10/2012 WORK COMPLETED TO DATE 9/24/2012WORK COMPLETED TO DATE 8/27/2012 WORK COMPLETED TO DATE 9/17/2012
N/AN/A
15
17
N/A
N/A
N/A
16
7
6
27 Unit
RUN DATE :
28 Unit
7/6 Installing cabinets on the 2nd floor in meeting rooms
20 Unit 21 Unit 23 Unit22 Unit 25 Unit24 Unit
5/16/2019
26 Unit
10
9
3
14
13
8
12
2
5
4
FLOOR18
11
N/A N/A
N/A
N/A
N/A
N/A N/A
JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHART
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Lock
out S
ink
Lock
out F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Lock
out S
ink
Lock
out F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Lock
out S
ink
Lock
out F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Lock
out S
ink
Lock
out F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Lock
out S
ink
Lock
out F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
BAY MECHANICAL PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/13/12AREAS AVAILABLE FOR YOU TO WORK
* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES
15
27 Unit
6
5
4
12
16
7
11
10
9
3
2
FLOOR18
17
N/A
N/A
N/A14
13
8
RUN DATE : 5/16/2019
26 Unit 24 Unit28 Unit 20 Unit 21 Unit 23 Unit22 Unit 25 Unit
JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHART
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Lock
out S
ink
Lock
out F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Lock
out S
ink
Lock
out F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Lock
out S
ink
Lock
out F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Lock
out S
ink
Lock
out F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Lock
out S
ink
Lock
out F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
BAY MECHANICAL PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/13/12AREAS AVAILABLE FOR YOU TO WORK
* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES
20 Unit 21 Unit 23 Unit22 Unit 25 Unit
16
7
6
5
4
RUN DATE : 5/16/2019
26 Unit 24 Unit28 Unit 27 Unit
N/A
N/A
N/A
2
11
10
9
3
15
14
13
8
12
FLOOR18
17
JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHART
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
Fauc
et
Cau
lkin
g
Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 INCOMPLETE ITEMSAreas Available For You To Work
* Areas if Work Available For Multiple UpdatesWork Completed to Date 1/18/2012
1/13/2012
26 Unit
10
9
3
27 Unit 20 Unit 21 Unit 23 Unit22 Unit 25 Unit
RUN DATE :
13
8
12
24 Unit28 Unit
7
6
5
4
FLOOR18
17
N/A
N/A
N/A
2
11
15
14
16
JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHART
* * * * * * * * * * * * * * *
* * * * * * * * * * * * * * *
* * * * * * * * * * * * * * *
* * * * * * * * * * * * * * *
* * * * * * * * * * * * * * *
* * * * * * * * * * * * * * *
* * * * * * * * * * * * * * *
* * * * * * * * * * * * * * *
* * * * * * * * * * * * * * * * * * * * * * * *
* * * * * * * * * * * * * * * * * * * * * * * *
* * * * * * * * * * * * * * * * * * * * * * * * * *
* * * * * * * * * * * * * * * * * * * * * * * * * *
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
Fauc
et
Cau
lkin
g
Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 INCOMPLETE ITEMSAreas Available For You To Work
* Areas if Work Available For Multiple Updates * ROOM 327 TOILET WATER LINE NEEDS REPAIRWork Completed to Date 1/18/2012WORK COMPLETED TO DATE 1/25/2012
16
7
6
5
4
1/13/2012
26 Unit
10
9
3
27 Unit 20 Unit 21 Unit 23 Unit22 Unit 25 Unit
RUN DATE :
13
8
12
24 Unit28 Unit
FLOOR18
17
N/A
N/A
2
11
N/A N/A
15
14
JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHART
2 2 2 5 2
2 2 2 5 2
2 5 5 2 5 5 2 5 5 2 5 5 2 5 5 2 5 2 5 2 2 5 2 2 2 5 2 5
2 5 5 2 5 5 2 5 5 2 5 5 2 5 5 2 5 2 5 2 2 5 2 2 2 5 2 5
2 5 5 2 5 5 2 5 5 2 5 5 2 5 5 2 5 2 5 2 5 2 5 5
2 5 5 2 5 5 2 5 5 2 5 5 2 5 5 2 5 2 5 2 5 2 5 5
5 2 5 5 5 5 5 5 2 5 2 5 2 2 5 2 5 2 2 5 5 5 2 5 2 2 5 2 2 5 5
5 2 5 5 5 5 5 5 2 5 2 5 2 2 5 2 5 2 2 5 5 5 2 5 2 2 5 2 2 5 5
2 5 2 5 2 2 2 4 4 4 4 4 4 4 4 4 4 4 4 4 2 4 2 4 2 4 4
2 5 2 5 2 2 2 4 4 4 4 4 4 4 4 4 4 4 4 4 2 4 2 4 2 4 4
4 4 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 2 4 4
4 4 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 2 4 4
5 5 5 5 5 2 5 6 5
5 5 5 5 5 2 5 6 5
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
l Van
ity F
auce
t
Hal
l W
C
Hal
l Tub
Fau
cet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
Fauc
et
Cau
lkin
g
Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 INCOMPLETE ITEMSAreas Available For You To Work S/H SHOWER HEAD MISSING
# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/15/2012 ! 5TH FLOOR COULD NOT BE WALKED DUE TO PAINTING 2/15/2012Work Completed to Date 1/18/2012WORK COMPLETED TO DATE 1/25/2012
N/AN/A
N/A
N/A
N/A
2
10
3
4
N/A
16
7
6
5
12
9
11
N/A
8
15
14
FLOOR18
17
RUN DATE :
24 Unit28 Unit26 Unit
13
20 Unit 21 Unit 23 Unit22 Unit 25 Unit
2/1/2012
27 Unit
JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHART
3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 3 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 3 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 2 3 3 3 3 3 3 3 3 3 3 3 2 3 3 3 3 3 3 3 3 3 2 3 3 3 3 3 3 3 3 3
3 2 3 3 3 3 3 3 3 3 3 3 3 2 3 3 3 3 3 3 3 3 3 2 3 3 3 3 3 3 3 3 3
4 3 3 3 4 2 3 3 2 3 3 3 3 2 3 3 2 3 3 3 3 2 2 2 2 3 3 2 3 2 2 2 2 2 3 2 2 2 3 2 3 2 3 2 2 2 2 3 3 2 2 2 3 3 3 3 3 3 3 3 3 3 3 2 2 2 2
4 3 3 3 4 2 3 3 2 3 3 3 3 2 3 3 2 3 3 3 3 2 2 2 2 3 3 2 3 2 2 2 2 2 3 2 2 2 3 2 3 2 3 2 2 2 2 3 3 2 2 2 3 3 3 3 3 3 3 3 3 3 3 2 2 2 2
4 4 4 3 4 4 3 4 4 4 4 3 4 4 3 4 3 4 2 4 3 3 3 4 3 4 4 3 4 3 4 3 4 4 4 3 4 3
4 4 4 3 4 4 3 4 4 4 4 3 4 4 3 4 3 4 2 4 3 3 3 4 3 4 4 3 4 3 4 3 4 4 4 3 4 3
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
Fauc
et
Cau
lkin
g
Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 1/25/2012 INCOMPLETE ITEMSAreas Available For You To Work WORK COMPLETED 2/1/2012 * ROOM 327 TOILET WATER LINE NEEDS REPAIR
# # of weeks work has been available to install REPAIR COMPLETEDWork Completed to Date 1/18/2012
20 Unit 21 Unit 23 Unit22 Unit 25 Unit
2/1/2012
27 Unit
N/A
15
14
FLOOR18
17
RUN DATE :
24 Unit28 Unit26 Unit
13
12
9
3
4
11
N/A
8
N/A
N/A
2
10
16
7
6
5
JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHART
2 2 2 2 2 2 2
2 2 2 2 2 2 2
2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2
2 2 2 2 2 2 2
2 2 2 2 2 2 2
3 3 3 6 3
3 3 3 6 3
3 2 6 2 6 2 2 3 2 6 2 6 2 3 2 6 2 6 2 2 3 6 2 6 3 2 6 6 2 6 2 3 6 2 2 3 2 6 2 6 2 3 6 2 6 2 2
3 2 6 2 6 2 2 3 2 6 2 6 2 3 2 6 2 6 2 2 3 6 2 6 3 2 6 6 2 6 2 3 6 2 2 3 2 6 2 6 2 3 6 2 6 2 2
3 2 6 2 6 2 2 3 2 6 2 6 2 3 2 6 2 6 2 2 3 2 6 2 6 3 6 6 2 2 6 2 3 6 2 2 3 2 6 2 3 2 6 2 3 2 6 2 6 2 2
3 2 6 2 6 2 2 3 2 6 2 6 2 3 2 6 2 6 2 2 3 2 6 2 6 3 6 6 2 2 6 2 3 6 2 2 3 2 6 2 3 2 6 2 3 2 6 2 6 2 2
6 6 2 6 2 6 6 3 3 2 3 3 3 3
6 6 2 6 2 6 6 3 3 2 3 3 3 3
2 2 2 2
2 2 2 2
5 5 5 5 5 5 5 5 5 5 5 5 5 5 6 6 6 6 3 5 5
5 5 5 5 5 5 5 5 5 5 5 5 5 5 6 6 6 6 3 5 5
6 6 6 6 6 3 6 6
6 6 6 6 6 3 6 6
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
l Van
ity F
auce
t
Hal
l W
C
Hal
l Tub
Fau
cet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
Fauc
et
Cau
lkin
g
Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 INCOMPLETE ITEMSAreas Available For You To Work S/H SHOWER HEAD MISSING
# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/15/2012Work Completed to Date 1/18/2012 WORK COMPLETED TO DATE 2/22/2012WORK COMPLETED TO DATE 1/25/2012
N/A
8
N/AN/A
N/A
N/A
N/A
2
10
3
4
13
16
7
6
5
12
9
11
N/A
2/1/2012
27 Unit
15
14
FLOOR18
17
RUN DATE :
24 Unit28 Unit26 Unit
N/A
20 Unit 21 Unit 23 Unit22 Unit 25 Unit
JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHART
4 4 4 4 4
4 4 4 4 4
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 2 4 2 4 2 4 4
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 2 4 2 4 2 4 4
4 S/H 4 S/H 3 4 4 3 4 S/H 4 S/H 3 4 4 3 4 S/H 4 S/H 3 3 3 3 4 S/H 3 S/H 3 3 3 3 3 S/H 3 3 3 3 S/H 3 S/H 3 3 3 3 4 S/H 3 3 3 4 4 S/H 4 4 4 S/H S/H 3 3
4 S/H 4 S/H 3 4 4 3 4 S/H 4 S/H 3 4 4 3 4 S/H 4 S/H 3 3 3 3 4 S/H 3 S/H 3 3 3 3 3 S/H 3 3 3 3 S/H 3 S/H 3 3 3 3 4 S/H 3 3 3 4 4 S/H 4 4 4 S/H S/H 3 3
4 4 4 5 4 3 4 4 4 4 4 5 4 4
4 4 4 5 4 3 4 4 4 4 4 5 4 4
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
Fauc
et
Cau
lkin
g
Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 INCOMPLETE ITEMSAreas Available For You To Work S/H SHOWER HEAD MISSING
# Areas if Work Available For Multiple UpdatesWork Completed to Date 1/18/2012WORK COMPLETED TO DATE 1/25/2012
20 Unit 21 Unit 23 Unit22 Unit 25 Unit
2/1/2012
27 Unit
N/A
15
14
FLOOR18
17
RUN DATE :
24 Unit28 Unit26 Unit
13
9
3
4
11
N/A
8
N/A
N/A
2
10
16
7
6
5
12
JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHART
2 2 2
2 2 2
2 4 4 2 4 2 5 5 2 5 5 5 5
2 4 4 2 4 2 5 5 2 5 5 5 5
4 4 5 4 5 5 4 5 5 4 5 5
4 4 5 4 5 5 4 5 5 4 5 5
5 4 3 3 5 5 3 5 5
5 4 3 3 5 5 3 5 5
6 3 3 3 3 6 3 3 3 6 3 3 3 3 3 3 3 4 3 3 3 9 3 3 3 4 3 3 6 3 3 3 4 3 3 3 3 2 3
6 3 3 3 3 6 3 3 3 6 3 3 3 3 3 3 3 4 3 3 3 9 3 3 3 4 3 3 6 3 3 3 4 3 3 3 3 2 3
9 9
9 9
2 2 2 3 3 3 2 2
2 2 2 3 3 3 2 2
4 3 4 4 3 4 3 4 4 4
4 3 4 4 3 4 3 4 4 4
4
4
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
l Van
ity F
auce
t
Hal
l W
C
Hal
l Tub
Fau
cet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
Fauc
et
Cau
lkin
g
Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 INCOMPLETE ITEMSAreas Available For You To Work WORK COMPLETED TO DATE 2/15/2012 Missing soap dispensor in kitchen in unit 726
# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/22/2012 WORK COMPLETED TO DATE 3/7/2012Work Completed to Date 1/18/2012 WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETED TO DATE 3/14/2012WORK COMPLETED TO DATE 1/25/2012
N/A
8
N/AN/A
N/A
N/A
N/A
2
10
3
4
13
16
7
6
5
12
9
11
N/A
2/1/2012
27 Unit
15
14
FLOOR18
17
RUN DATE :
24 Unit28 Unit26 Unit
N/A
20 Unit 21 Unit 23 Unit22 Unit 25 Unit
JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHART
2 2 2 2 2
2 2 2 2 2
2 2 2 2 2 3 2 2 3 2 2 3 2 2
2 2 2 2 2 3 2 2 3 2 2 3 2 2
3 5 5 3 5 3 6 6 3 6 6 2 6 6
3 5 5 3 5 3 6 6 3 6 6 2 6 6
2 5 5 2 6 5 2 6 6 5 6 6 5 6 6
2 5 5 2 6 5 2 6 6 5 6 6 5 6 6
2 6 5 4 4 6 6 4 6 6
2 6 5 4 4 6 6 4 6 6
7 4 4 4 4 7 4 4 4 7 4 4 4 4 4 5 2 10 5 7 5
7 4 4 4 4 7 4 4 4 7 4 4 4 4 4 5 2 10 5 7 5
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
3 3 3 4 4 2 2 4 3 3
3 3 3 4 4 2 2 4 3 3
5 4 5 5 4 5 4 5 5 5
5 4 5 5 4 5 4 5 5 5
5
5
2
2
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
l Van
ity F
auce
t
Hal
l W
C
Hal
l Tub
Fau
cet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
Fauc
et
Cau
lkin
g
Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 INCOMPLETE ITEMSAreas Available For You To Work WORK COMPLETED TO DATE 2/15/2012 Missing soap dispensor in kitchen in unit 726
# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/22/2012 WORK COMPLETED TO DATE 3/7/2012Work Completed to Date 1/18/2012 WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETED TO DATE 3/14/2012WORK COMPLETED TO DATE 1/25/2012 WORK COMPLETED TO DATE 3/21/2012
26 Unit
N/A
20 Unit 21 Unit 23 Unit22 Unit 25 Unit
N/A
2/1/2012
27 Unit
15
14
FLOOR18
17
RUN DATE :
24 Unit28 Unit
4
13
16
7
6
5
12
9
11
N/A
8
N/AN/A
N/A
N/A
N/A
2
10
3 JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHART
3 3 4 4 4 4 4 4 4
3 3 4 4 4 4 4 4 4
3 3 4 4 4 4 3 4 4 3 4 4
3 3 4 4 4 4 3 4 4 3 4 4
4 4 2 2 4 4 2 4 4
4 4 2 2 4 4 2 4 4
5 2 2 2 2 5 2 2 2 5 2 2 2 2 2 2 2 3 2 2 2 8 2 2 2 3 2 2 5 2 2 2 3 2 2 2 2 2
5 2 2 2 2 5 2 2 2 5 2 2 2 2 2 2 2 3 2 2 2 8 2 2 2 3 2 2 5 2 2 2 3 2 2 2 2 2
4 8 4 8 4 4 3 8 4 8 4 3 4 8 4 8 4 4 3 8 4 8 3 3 8 8 4 3 8 4 5 8 4 4 4 8 4 3 8 4 8 4 4
4 8 4 8 4 4 3 8 4 8 4 3 4 8 4 8 4 4 3 8 4 8 3 3 8 8 4 3 8 4 5 8 4 4 4 8 4 3 8 4 8 4 4
5 2 2 5 2 2
5 2 2 5 2 2
3 8 2 5 3 3 2 3 2 3 3 3
3 8 2 5 3 3 2 3 2 3 3 3
3 3 3 3 3 3 3 3 3 3
3 3 3 3 3 3 3 3 3 3
7 7 8 8 5 7 7
7 7 8 8 5 7 7
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
l Van
ity F
auce
t
Hal
l W
C
Hal
l Tub
Fau
cet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
Fauc
et
Cau
lkin
g
Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 INCOMPLETE ITEMSAreas Available For You To Work WORK COMPLETED TO DATE 2/15/2012 Missing soap dispensor in kitchen in unit 726
# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/22/2012Work Completed to Date 1/18/2012 WORK COMPLETED TO DATE 2/29/2012WORK COMPLETED TO DATE 1/25/2012 WORK COMPLETED TO DATE 3/7/2012
26 Unit
N/A
20 Unit 21 Unit 23 Unit22 Unit 25 Unit
N/A
2/1/2012
27 Unit
15
14
FLOOR18
17
RUN DATE :
24 Unit28 Unit
4
13
16
7
6
5
12
9
11
N/A
8
N/AN/A
N/A
N/A
N/A
2
10
3 JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHART
3 3 3 3 3
3 3 3 3 3
3 3 3 3 3 2 4 3 3 4 3 3 4 3 3
3 3 3 3 3 2 4 3 3 4 3 3 4 3 3
4 6 6 4 6 4 7 7 4 7 7 3 7 7
4 6 6 4 6 4 7 7 4 7 7 3 7 7
3 6 6 3 7 6 3 7 7 6 7 7 6 7 7
3 6 6 3 7 6 3 7 7 6 7 7 6 7 7
3 7 6 5 5 7 7 5 7 7
3 7 6 5 5 7 7 5 7 7
8 8 5 8 8 8 5 6 2 3 2 6 2 6 2 8 2 6 6 2
8 8 5 8 8 8 5 6 2 3 2 6 2 6 2 8 2 6 6 2
3 3 3 3 3 3 3 3 3 3 3 3
3 3 3 3 3 3 3 3 3 3 3 3
4 4 4 5 5 3 3 5 4 4
4 4 4 5 5 3 3 5 4 4
6 5 6 6 5 6 5 6 6 6
6 5 6 6 5 6 5 6 6 6
6
6
3
3
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
l Van
ity F
auce
t
Hal
l W
C
Hal
l Tub
Fau
cet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte s
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
Fauc
et
Cau
lkin
g
Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/7/2012Areas Available For You To Work WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 3/14/2012
# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/22/2012 WORK COMPLETED TO DATE 3/21/2012Work Completed to Date 1/18/2012 WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETEED TO DATE 3/28/2012WORK COMPLETED TO DATE 1/25/2012
N/A
8
N/AN/A
N/A
N/A
N/A
2
10
3
4
13
16
7
6
5
12
9
11
N/A
2/1/2012
27 Unit
15
14
FLOOR18
17
RUN DATE :
24 Unit28 Unit26 Unit
N/A
20 Unit 21 Unit 23 Unit22 Unit 25 Unit
N/A
JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHART
4 4
4 4
4 4 4 3 4 4
4 4 4 3 4 4
7 7 7 8 8
7 7 7 8 8
7 7 8 7 8 8
7 7 8 7 8 8
2 8 2 7 2 2 6 2
2 8 2 7 2 2 6 2
9 6 2 9 2 2 3 7 3
9 6 2 9 2 2 3 7 3
4 4 4 4 4 4 4 4 4
4 4 4 4 4 4 4 4 4
5 5
5 5
7
7
7
7
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
l Van
ity F
auce
t
Hal
l W
C
Hal
l Tub
Fau
cet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/4/2012Areas Available For You To Work WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 3/14/2012
# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/22/2012 WORK COMPLETED TO DATE 3/21/2012Work Completed to Date 1/18/2012 WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETEED TO DATE 3/28/2012WORK COMPLETED TO DATE 1/25/2012
N/A
8
N/AN/A
N/A
N/A2
10
3
4
13
16
7
6
5
12
9
11
N/A
2/1/2012
27 Unit
15
14
FLOOR18
17
RUN DATE :
24 Unit28 Unit26 Unit 23 Unit22 Unit 25 Unit
JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHART
4 4
4 4
4 4 4 4
4 4 4 4
8 8 8 8
8 8 8 8
8 8 8 8
8 8 8 8
8 8 2 2 8 8 2 2
8 8 2 2 8 8 2 2
3 3 7 3
3 3 7 3
4 4 4
4 4 4
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte s
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
Fauc
et
Cau
lkin
g
N/A
N/A
20 Unit 21 Unit
N/A JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHART
2 2
2 2
2 2
2 2
3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 3 3 3 3 3 6 3 3 3 6 3
3 3 3 3 3 3 6 3 3 3 6 3
3 6 6 3 6 5 3 6 6 3
3 6 6 3 6 5 3 6 6 3
2 3 9 9 3 2 9 3 10 10 3
2 3 9 9 3 2 9 3 10 10 3
2 3 9 9 3 10 9 3 10 10 3
2 3 9 9 3 10 9 3 10 10 3
4 2 3 3
4 2 3 3
11 8 3 4 11 3 4 4 5 9 5 5
11 8 3 4 11 3 4 4 5 9 5 5
6
6
7
7
9
9
9
9
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
l Van
ity F
auce
t
Hal
l W
C
Hal
l Tub
Fau
cet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/4/2012Areas Available For You To Work WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/11/2012
# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/22/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/20/2012Work Completed to Date 1/18/2012 WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETEED TO DATE 3/28/2012WORK COMPLETED TO DATE 1/25/2012WORK COMPLETED TO DATE 2/1/2012
23 Unit22 Unit 25 Unit
2/1/2012
27 Unit
15
14
FLOOR18
17
RUN DATE :
24 Unit28 Unit26 Unit
16
7
6
5
12
9
11
N/A
N/A2
10
3
4
N/A
N/A
8
N/AN/A
N/A
13
JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHART
2
2
2
2
3 3 3 2 3 3
3 3 3 2 3 3
3 3 6 2 3 3
3 3 6 2 3 3
6 6 2 6 6
6 6 2 6 6
10 10 2 10 10
10 10 2 10 10
10 10 2 10 10
10 10 2 10 10
4
4
5 9 5
5 9 5
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte s
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
Fauc
et
Cau
lkin
g
20 Unit 21 Unit
N/A
N/A
N/A JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHART
4 2 5
4 2 5
6 6 6 6 6 6 6 6 6 6 6 6
6 6 6 6 6 6 6 6 6 6 6 6
6 6 6 6 6 6 9 6 6 6
6 6 6 6 6 6 9 6 6 6
6 9 9 6 8 8 6 9 9
6 9 9 6 8 8 6 9 9
5 6 12 12 6 4 12 6 13 13
5 6 12 12 6 4 12 6 13 13
5 6 2 2 12 2 12 6 2 12 12 6 2 13 2 13
5 6 2 2 12 2 12 6 2 12 12 6 2 13 2 13
7 4 4 6
7 4 4 6
12 8
12 8
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
l Van
ity F
auce
t
Hal
l W
C
Hal
l Tub
Fau
cet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
lway
van
ity fa
ucet
Hal
lway
van
ity W
C
H.w
ay v
anity
Tub
fauc
et
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE Areas Available For You To Work WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE
# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/22/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/20/2012Work Completed to Date 1/18/2012 WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETEED TO DATE 3/28/2012 WORK COMPLETED TO DATE 4/25/2012WORK COMPLETED TO DATE 1/25/2012WORK COMPLETED TO DATE 2/1/2012
25 Unit24 Unit28 Unit
N/A
26 Unit 23 Unit22 Unit
11
N/A
N/A
N/A
2/1/2012
27 Unit
15
14
FLOOR18
17
RUN DATE :
N/A
N/A
13
16
7
6
5
12
9
2
10
3
4
N/A
8
JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHART
5 5
5 5
6 6 6 6 6 5 6 6
6 6 6 6 6 5 6 6
9 6 6 6 9 5 6 6
9 6 6 6 9 5 6 6
6 9 9 5 9 9
6 9 9 5 9 9
6 13 13 5 13 13
6 13 13 5 13 13
6 2 13 2 13 5 2 13 2 13
6 2 13 2 13 5 2 13 2 13
7
7
8
8
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
lway
van
ity fa
ucet
Hal
lway
van
ity W
C
H.w
ay v
anity
Tub
fauc
et
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte s
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
Fauc
et
Cau
lkin
g
E 5/2/2012 E 5/9/2012
N/A
N/A
N/A
20 Unit 21 Unit
JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHART
2 2
2 2
2
2
5 2 3 6
5 2 3 6
7 7 2 7 7 7 7 7 7 7 7 7
7 7 2 7 7 7 7 7 7 7 7 7
7 2 7 7 7 7 7 10 7 7 7
7 2 7 7 7 7 7 10 7 7 7
7 2 10 10 7 9 9 7 10 10
7 2 10 10 7 9 9 7 10 10
6 7 2 13 13 7 5 13 7 14 14
6 7 2 13 13 7 5 13 7 14 14
6 7 3 2 3 13 3 13 7 3 13 2 13 7 3 14 3 14
6 7 3 2 3 13 3 13 7 3 13 2 13 7 3 14 3 14
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
l Van
ity F
auce
t
Hal
l W
C
Hal
l Tub
Fau
cet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
lway
van
ity fa
ucet
Hal
lway
van
ity W
C
H.w
ay v
anity
Tub
fauc
et
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE Areas Available For You To Work WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE
# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/22/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE Work Completed to Date 1/18/2012 WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETEED TO DATE 3/28/2012 WORK COMPLETED TO DATE 4/25/2012WORK COMPLETED TO DATE 1/25/2012WORK COMPLETED TO DATE 2/1/2012
2
10
3
4
N/A
8
16
7
6
5
12
9
2/1/2012
27 Unit
15
14
FLOOR18
17
RUN DATE :
N/A
N/A
13
26 Unit 23 Unit22 Unit
11
N/A
N/A
N/A
25 Unit24 Unit28 Unit
N/A
JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHART
2
2
2
2
6 6
6 6
7 7 7 7 7 6 7 7
7 7 7 7 7 6 7 7
10 7 7 7 10 6 7 7
10 7 7 7 10 6 7 7
7 10 10 6 10 10
7 10 10 6 10 10
7 14 14 6 14 14
7 14 14 6 14 14
7 3 14 3 14 6 3 14 3 14
7 3 14 3 14 6 3 14 3 14
8
8
9
9
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
lway
van
ity fa
ucet
Hal
lway
van
ity W
C
H.w
ay v
anity
Tub
fauc
et
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte s
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
Fauc
et
Cau
lkin
g
E 5/2/2012 E 5/9/2012 E 5/16/2012
20 Unit 21 Unit
N/A
N/A
N/A JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHART
3 3
3 3
3
3
6 3 4 7
6 3 4 7
8 8 3 8 8 8 8 8 8 8 8 8
8 8 3 8 8 8 8 8 8 8 8 8
8 3 8 8 8 8 8 11 8 8 8
8 3 8 8 8 8 8 11 8 8 8
8 3 11 11 8 10 10 8 11 11
8 3 11 11 8 10 10 8 11 11
7 8 3 14 14 8 6 14 8 15 15
7 8 3 14 14 8 6 14 8 15 15
7 4 3 4 14 4 14 4 14 3 14 4 15 4 15
7 4 3 4 14 4 14 4 14 3 14 4 15 4 15
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
l Van
ity F
auce
t
Hal
l W
C
Hal
l Tub
Fau
cet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
lway
van
ity fa
ucet
Hal
lway
van
ity W
C
H.w
ay v
anity
Tub
fauc
et
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE Areas Available For You To Work WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE
# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/22/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE Work Completed to Date 1/18/2012 WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETEED TO DATE 3/28/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE WORK COMPLETED TO DATE 1/25/2012WORK COMPLETED TO DATE 2/1/2012
25 Unit24 Unit28 Unit
N/A
26 Unit 23 Unit22 Unit
11
N/A
N/A
N/A
2/1/2012
27 Unit
15
14
FLOOR18
17
RUN DATE :
N/A
N/A
13
16
7
6
5
12
9
2
10
3
4
N/A
8
JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHART
3 2
3 2
3
3
7 7
7 7
8 8 8 8 8 7 8 8
8 8 8 8 8 7 8 8
11 8 8 8 11 7 8 8
11 8 8 8 11 7 8 8
8 11 11 7 11 11
8 11 11 7 11 11
8 15 15 7 15 15
8 15 15 7 15 15
4 15 15 4 15
4 15 15 4 15
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
lway
van
ity fa
ucet
Hal
lway
van
ity W
C
H.w
ay v
anity
Tub
fauc
et
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte s
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
Fauc
et
Cau
lkin
g
E 5/2/2012 E 5/9/2012 E 5/16/2012 E 5/23/2012
N/A
N/A
N/A
20 Unit 21 Unit
JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHART
4 4
4 4
4
4
7 4 2 5 2 2 8 2 2
7 4 2 5 2 2 8 2 2
9 9 4 9 9 9 9 9 9 2 9 9 9
9 9 4 9 9 9 9 9 9 2 9 9 9
9 4 9 9 9 9 9 12 9 9 9
9 4 9 9 9 9 9 12 9 9 9
9 4 12 12 9 11 11 9 12 12
9 4 12 12 9 11 11 9 12 12
8 9 4 15 15 9 7 15 9 16 16
8 9 4 15 15 9 7 15 9 16 16
8 5 4 15 5 15 15 15 16 16
8 5 4 15 5 15 15 15 16 16
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
l Van
ity F
auce
t
Hal
l W
C
Hal
l Tub
Fau
cet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
lway
van
ity fa
ucet
Hal
lway
van
ity W
C
H.w
ay v
anity
Tub
fauc
et
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE Areas Available For You To Work WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE
# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/22/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE Work Completed to Date 1/18/2012 WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETEED TO DATE 3/28/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE WORK COMPLETED TO DATE 1/25/2012WORK COMPLETED TO DATE 2/1/2012
25 Unit24 Unit28 Unit
N/A
26 Unit 23 Unit22 Unit
11
N/A
N/A
N/A
2/1/2012
27 Unit
15
14
FLOOR18
17
RUN DATE :
N/A
N/A
13
16
7
6
5
12
9
2
10
3
4
N/A
8
JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHART
4 3
4 3
4 2
4 2
8 2 2 8 2
8 2 2 8 2
9 9 9 9 9 8 9 9
9 9 9 9 9 8 9 9
12 9 9 9 12 8 9 9
12 9 9 9 12 8 9 9
9 12 12 8 12 12
9 12 12 8 12 12
9 16 16 8 16 16
9 16 16 8 16 16
16 16 16
16 16 16
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
lway
van
ity fa
ucet
Hal
lway
van
ity W
C
H.w
ay v
anity
Tub
fauc
et
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte s
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
Fauc
et
Cau
lkin
g
E 5/2/2012 WORK COMPLETED TO DATE 5/30/2012 E 5/9/2012 E 5/16/2012 E 5/23/2012
N/A
N/A
N/A
20 Unit 21 Unit
JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHART
5 5
5 5
5
5
8 5 3 6 3 3 9 3 3
8 5 3 6 3 3 9 3 3
10 10 5 10 10 10 10 10 10 3 10 10 10
10 10 5 10 10 10 10 10 10 3 10 10 10
10 5 10 10 10 10 10 13 10 10 10
10 5 10 10 10 10 10 13 10 10 10
10 5 13 13 10 12 12 10 13 13
10 5 13 13 10 12 12 10 13 13
9 5 16 16 8 2 16 2 17 2 17
9 5 16 16 8 2 16 2 17 2 17
9 5
9 5
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
l Van
ity F
auce
t
Hal
l W
C
Hal
l Tub
Fau
cet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
lway
van
ity fa
ucet
Hal
lway
van
ity W
C
H.w
ay v
anity
Tub
fauc
et
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE Areas Available For You To Work WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE
# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/22/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE Work Completed to Date 1/18/2012 WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETEED TO DATE 3/28/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE WORK COMPLETED TO DATE 1/25/2012WORK COMPLETED TO DATE 2/1/2012
2
10
3
4
N/A
8
16
7
6
5
12
9
2/1/2012
27 Unit
15
14
FLOOR18
17
RUN DATE :
N/A
N/A
13
26 Unit 23 Unit22 Unit
11
N/A
N/A
N/A
25 Unit24 Unit28 Unit
N/A
JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHART
5 4
5 4
5 3
5 3
9 3 3 9 3 2
9 3 3 9 3 2
10 10 10 10 10 9 10 10
10 10 10 10 10 9 10 10
13 10 10 10 13 9 10 10
13 10 10 10 13 9 10 10
10 13 13 9 13 13
10 13 13 9 13 13
2 17 2 17 2 17 17
2 17 2 17 2 17 17
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
lway
van
ity fa
ucet
Hal
lway
van
ity W
C
H.w
ay v
anity
Tub
fauc
et
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte s
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
Fauc
et
Cau
lkin
g
E 5/2/2012 WORK COMPLETED TO DATE 5/30/2012 E 5/9/2012 WORK COMPLETED TO DATE 6/6/2012 E 5/16/2012 WORK COMPLETED TO DATE 6/13/2012 E 5/23/2012
20 Unit 21 Unit
N/A
N/A
N/AN/A JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHART
6 6
6 6
6
6
9 6 4 7 3 4 10 3 4
9 6 4 7 3 4 10 3 4
11 11 6 11 11 11 10 11 11 4 10 11 11
11 11 6 11 11 11 10 11 11 4 10 11 11
11 6 11 11 10 11 11 14 10 11 11
11 6 11 11 10 11 11 14 10 11 11
11 2 6 2 14 2 14 10 13 13 10 2 14 2 14
11 2 6 2 14 2 14 10 13 13 10 2 14 2 14
10 2 6 2 17 2 17 2 9 4 17 4 17 4 18
10 2 6 2 17 2 17 2 9 4 17 4 17 4 18
6
6
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
l Van
ity F
auce
t
Hal
l W
C
Hal
l Tub
Fau
cet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
lway
van
ity fa
ucet
Hal
lway
van
ity W
C
H.w
ay v
anity
Tub
fauc
et
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE Areas Available For You To Work WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE
# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/22/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE Work Completed to Date 1/18/2012 WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETEED TO DATE 3/28/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE WORK COMPLETED TO DATE 1/25/2012WORK COMPLETED TO DATE 2/1/2012
25 Unit24 Unit28 Unit
N/A
26 Unit 23 Unit22 Unit
11
N/A
N/A
N/A
2/1/2012
27 Unit
15
14
FLOOR18
17
RUN DATE :
N/A
N/A
13
16
7
6
5
12
9
2
10
3
4
N/A
8
JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHART
6 5
6 5
6 3 3 4 3 3
6 3 3 4 3 3
10 4 3 3 10 3 3
10 4 3 3 10 3 3
11 11 11 11 11 9 11 11
11 11 11 11 11 9 11 11
14 11 11 11 14 9 11 11
14 11 11 11 14 9 11 11
11 2 14 3 14 9 2 14 2 14
11 2 14 3 14 9 2 14 2 14
3 18 3 18 4 18 2 18
3 18 3 18 4 18 2 18
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
lway
van
ity fa
ucet
Hal
lway
van
ity W
C
H.w
ay v
anity
Tub
fauc
et
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte s
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
Fauc
et
Cau
lkin
g
E 5/2/2012 WORK COMPLETED TO DATE 5/30/2012 E 5/9/2012 WORK COMPLETED TO DATE 6/6/2012 E 5/16/2012 WORK COMPLETED TO DATE 6/13/2012 E 5/23/2012
N/A
N/A
N/AN/A
20 Unit 21 Unit
JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHART
7 7
7 7
7
7
10 7 5 8 4 2 5 11 4 2 5
10 7 5 8 4 2 5 11 4 2 5
12 12 7 12 12 12 11 12 12 5 11 12 12
12 12 7 12 12 12 11 12 12 5 11 12 12
7 12 12 11 12 12 15 11 12 12
7 12 12 11 12 12 15 11 12 12
3 7 3 15 3 15 2 14 14 3 15 3 15
3 7 3 15 3 15 2 14 14 3 15 3 15
11 3 7 3 18 18 5
11 3 7 3 18 18 5
2 2
2 2
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
l Van
ity F
auce
t
Hal
l W
C
Hal
l Tub
Fau
cet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
lway
van
ity fa
ucet
Hal
lway
van
ity W
C
H.w
ay v
anity
Tub
fauc
et
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE Areas Available For You To Work WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE
# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/22/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE Work Completed to Date 1/18/2012 WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETEED TO DATE 3/28/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE WORK COMPLETED TO DATE 1/25/2012WORK COMPLETED TO DATE 2/1/2012
25 Unit24 Unit28 Unit
N/A
26 Unit 23 Unit22 Unit
11
N/A
N/A
N/A
2/1/2012
27 Unit
15
14
FLOOR18
17
RUN DATE :
N/A
N/A
13
16
7
6
5
12
9
2
10
3
4
N/A
8
JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHART
7 6
7 6
7 4 4 5 4 4
7 4 4 5 4 4
11 5 4 4 11 4 4
11 5 4 4 11 4 4
12 12 12 12 12 10 12 12
12 12 12 12 12 10 12 12
15 12 12 12 15 10 12 12
15 12 12 12 15 10 12 12
3 15 4 15 3 15 3 15
3 15 4 15 3 15 3 15
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
lway
van
ity fa
ucet
Hal
lway
van
ity W
C
H.w
ay v
anity
Tub
fauc
et
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte s
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
Fauc
et
Cau
lkin
g
E 5/2/2012 WORK COMPLETED TO DATE 5/30/2012 E 5/9/2012 WORK COMPLETED TO DATE 6/6/2012 E 5/16/2012 WORK COMPLETED TO DATE 6/13/2012 E 5/23/2012 WORK COMPLETED TO DATE 6/20/2012
N/A
N/A
N/AN/A
20 Unit 21 Unit
JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHART
8 8
8 8
8
8
11 8 2 6 9 5 3 6 12 5 3 6
11 8 2 6 9 5 3 6 12 5 3 6
13 13 8 13 13 13 12 13 13 6 12 13 13
13 13 8 13 13 13 12 13 13 6 12 13 13
12 12 8 13 13 12 12 13 13 16 12 13 13
12 12 8 13 13 12 12 13 13 16 12 13 13
16 16
16 16
3 3
3 3
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
l Van
ity F
auce
t
Hal
l W
C
Hal
l Tub
Fau
cet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
lway
van
ity fa
ucet
Hal
lway
van
ity W
C
H.w
ay v
anity
Tub
fauc
et
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE Areas Available For You To Work WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE
# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/22/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE Work Completed to Date 1/18/2012 WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETEED TO DATE 3/28/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE WORK COMPLETED TO DATE 1/25/2012WORK COMPLETED TO DATE 2/1/2012
25 Unit24 Unit28 Unit
N/A
26 Unit 23 Unit22 Unit
11
N/A
N/A
N/A
2/1/2012
27 Unit
15
14
FLOOR18
17
RUN DATE :
N/A
N/A
13
16
7
6
5
12
9
2
10
3
4
N/A
8
JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHART
8 2 2 7 2 2
8 2 2 7 2 2
8 5 5 6 5 5
8 5 5 6 5 5
12 6 5 5 12 5 5
12 6 5 5 12 5 5
13 13 13 13 13 11 13 13
13 13 13 13 13 11 13 13
16 13 13 13 16 11 13 13
16 13 13 13 16 11 13 13
4 5 4 4
4 5 4 4
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
lway
van
ity fa
ucet
Hal
lway
van
ity W
C
H.w
ay v
anity
Tub
fauc
et
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte s
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
Fauc
et
Cau
lkin
g
E 5/2/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 6/27/2012 E 5/9/2012 WORK COMPLETED TO DATE 6/6/2012 E 5/16/2012 WORK COMPLETED TO DATE 6/13/2012 E 5/23/2012 WORK COMPLETED TO DATE 6/20/2012
N/A
N/A
N/AN/A
20 Unit 21 Unit
JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHART
9 9
9 9
9
9
12 9 3 7 10 6 4 7 13 6 4 7
12 9 3 7 10 6 4 7 13 6 4 7
14 14 9 14 14 14 13 14 14 7 13 14 14
14 14 9 14 14 14 13 14 14 7 13 14 14
13 2 9 2 14 2 14 13 2 14 2 14 17 2 14 2 14
13 2 9 2 14 2 14 13 2 14 2 14 17 2 14 2 14
4 2 4 2
4 2 4 2
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
l Van
ity F
auce
t
Hal
l W
C
Hal
l Tub
Fau
cet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
lway
van
ity fa
ucet
Hal
lway
van
ity W
C
H.w
ay v
anity
Tub
fauc
et
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE Areas Available For You To Work WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE
# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/22/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE Work Completed to Date 1/18/2012 WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETEED TO DATE 3/28/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE WORK COMPLETED TO DATE 1/25/2012WORK COMPLETED TO DATE 2/1/2012
25 Unit24 Unit28 Unit
N/A
26 Unit 23 Unit22 Unit
11
N/A
N/A
N/A
2/1/2012
27 Unit
15
14
FLOOR18
17
RUN DATE :
N/A
N/A
13
16
7
6
5
12
9
2
10
3
4
N/A
8
JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHART
9 3 3 8 3 3
9 3 3 8 3 3
9 6 6 7 6 6
9 6 6 7 6 6
13 7 6 6 13 6 6
13 7 6 6 13 6 6
14 14 14 14 14 12 14 14
14 14 14 14 14 12 14 14
17 17
17 17
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
lway
van
ity fa
ucet
Hal
lway
van
ity W
C
H.w
ay v
anity
Tub
fauc
et
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte s
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
Fauc
et
Cau
lkin
g
E 5/2/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 6/27/2012 E 5/9/2012 WORK COMPLETED TO DATE 6/6/2012 WORK COMPLETED TO DATE 7/6/2012 E 5/16/2012 WORK COMPLETED TO DATE 6/13/2012 WORK COMPLETED TO DATE 7/9/2012 E 5/23/2012 WORK COMPLETED TO DATE 6/20/2012
N/A
N/A
N/AN/A
20 Unit 21 Unit
JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHART
10 10
10 10
10
10
13 10 4 8 11 7 5 8 14 7 5 8
13 10 4 8 11 7 5 8 14 7 5 8
15 15 2 10 2 15 2 15 15 14 2 15 2 15 8 14 2 15 2 15
15 15 2 10 2 15 2 15 15 14 2 15 2 15 8 14 2 15 2 15
4 2 4 2
4 2 4 2
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
l Van
ity F
auce
t
Hal
l W
C
Hal
l Tub
Fau
cet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
lway
van
ity fa
ucet
Hal
lway
van
ity W
C
H.w
ay v
anity
Tub
fauc
et
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE Areas Available For You To Work WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE
# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/22/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE Work Completed to Date 1/18/2012 WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETEED TO DATE 3/28/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE WORK COMPLETED TO DATE 1/25/2012WORK COMPLETED TO DATE 2/1/2012
2
10
3
4
N/A
8
16
7
6
5
12
9
2/1/2012
27 Unit
15
14
FLOOR18
17
RUN DATE :
N/A
N/A
13
26 Unit 23 Unit22 Unit
11
N/A
N/A
N/A
25 Unit24 Unit28 Unit
N/A
JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHART
10 4 4 9 4 4
10 4 4 9 4 4
10 7 7 8 7 7
10 7 7 8 7 7
14 8 7 7 14 7 7
14 8 7 7 14 7 7
15 15 2 15 2 15 15 13 2 15 2 15
15 15 2 15 2 15 15 13 2 15 2 15
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
lway
van
ity fa
ucet
Hal
lway
van
ity W
C
H.w
ay v
anity
Tub
fauc
et
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte s
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
Fauc
et
Cau
lkin
g
E 5/2/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 6/27/2012 E 5/9/2012 WORK COMPLETED TO DATE 6/6/2012 WORK COMPLETED TO DATE 7/4/2012 E 5/16/2012 WORK COMPLETED TO DATE 6/13/2012 WORK COMPLETED TO DATE 7/11/2012 E 5/23/2012 WORK COMPLETED TO DATE 6/20/2012
20 Unit 21 Unit
N/A
N/A
N/AN/A JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHART
11 11
11 11
11
11
14 11 5 5 12 8 6 9 15 8 6 9
14 11 5 5 12 8 6 9 15 8 6 9
16 16 3 11 3 16 3 16 16 15 3 16 3 16 9 15 3 16 3 16
16 16 3 11 3 16 3 16 16 15 3 16 3 16 9 15 3 16 3 16
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
l Van
ity F
auce
t
Hal
l W
C
Hal
l Tub
Fau
cet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
lway
van
ity fa
ucet
Hal
lway
van
ity W
C
H.w
ay v
anity
Tub
fauc
et
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE Areas Available For You To Work WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE
# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/22/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE Work Completed to Date 1/18/2012 WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETEED TO DATE 3/28/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE WORK COMPLETED TO DATE 1/25/2012WORK COMPLETED TO DATE 2/1/2012
2
10
3
4
N/A
8
16
7
6
5
12
9
2/1/2012
27 Unit
15
14
FLOOR18
17
RUN DATE :
N/A
N/A
13
26 Unit 23 Unit22 Unit
11
N/A
N/A
N/A
25 Unit24 Unit28 Unit
N/A
JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHART
11 5 5 10 5 5
11 5 5 10 5 5
11 8 8 9 8 8
11 8 8 9 8 8
15 9 8 8 15 8 8
15 9 8 8 15 8 8
16 16 3 16 3 16 16 14 3 16 3 16
16 16 3 16 3 16 16 14 3 16 3 16
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
lway
van
ity fa
ucet
Hal
lway
van
ity W
C
H.w
ay v
anity
Tub
fauc
et
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte s
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
Fauc
et
Cau
lkin
g
E 5/2/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 6/27/2012 E 5/9/2012 WORK COMPLETED TO DATE 6/6/2012 WORK COMPLETED TO DATE 7/4/2012 E 5/16/2012 WORK COMPLETED TO DATE 6/13/2012 WORK COMPLETED TO DATE 7/11/2012 E 5/23/2012 WORK COMPLETED TO DATE 6/20/2012 WORK COMPLETED TO DATE 7/18/2012
20 Unit 21 Unit
N/A
N/A
N/AN/A JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHART
14 14
14 14
14 2
14 2
17 8 15 11 18 11
17 8 15 11 18 11
3 3 3 3
3 3 3 3
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
l Van
ity F
auce
t
Hal
l W
C
Hal
l Tub
Fau
cet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
lway
van
ity fa
ucet
Hal
lway
van
ity W
C
H.w
ay v
anity
Tub
fauc
et
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE Areas Available For You To Work WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE
# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/22/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE Work Completed to Date 1/18/2012 WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETEED TO DATE 3/28/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE WORK COMPLETED TO DATE 1/25/2012WORK COMPLETED TO DATE 2/1/2012
25 Unit24 Unit28 Unit
N/A
26 Unit 23 Unit22 Unit
11
N/A
N/A
N/A
2/1/2012
27 Unit
15
14
FLOOR18
17
RUN DATE :
N/A
N/A
13
16
7
6
5
12
9
2
10
3
4
N/A
8
JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHART
14 8 8 13 8 8
14 8 8 13 8 8
14 11 11 12 11 11
14 11 11 12 11 11
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
lway
van
ity fa
ucet
Hal
lway
van
ity W
C
H.w
ay v
anity
Tub
fauc
et
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte s
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
Fauc
et
Cau
lkin
g
E 5/2/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 6/27/2012 E 5/9/2012 WORK COMPLETED TO DATE 6/6/2012 WORK COMPLETED TO DATE 7/4/2012 E 5/16/2012 WORK COMPLETED TO DATE 6/13/2012 WORK COMPLETED TO DATE 7/11/2012 E 5/23/2012 WORK COMPLETED TO DATE 6/20/2012 WORK COMPLETED TO DATE 7/18/2012
WORK COMPLETED TO DATE 7/25/2012
N/A
N/A
N/AN/A
20 Unit 21 Unit
JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHART
15 15
15 15
15 3
15 3
18 16 12 19 12
18 16 12 19 12
4 4 4 4
4 4 4 4
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
l Van
ity F
auce
t
Hal
l W
C
Hal
l Tub
Fau
cet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
lway
van
ity fa
ucet
Hal
lway
van
ity W
C
H.w
ay v
anity
Tub
fauc
et
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE Areas Available For You To Work WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE
# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/22/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE Work Completed to Date 1/18/2012 WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETEED TO DATE 3/28/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE WORK COMPLETED TO DATE 1/25/2012WORK COMPLETED TO DATE 2/1/2012
2
10
3
4
N/A
8
N/A
16
7
6
5
12
9
2/1/2012
27 Unit
15
14
FLOOR18
17
RUN DATE :
N/A
N/A
13
26 Unit 23 Unit22 Unit
11
N/A
N/A
N/A
25 Unit24 Unit28 Unit
N/AN/A
JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHART
15 9 9 14 9 9
15 9 9 14 9 9
15 12 12 13 12 12
15 12 12 13 12 12
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
lway
van
ity fa
ucet
Hal
lway
van
ity W
C
H.w
ay v
anity
Tub
fauc
et
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte s
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
Fauc
et
Cau
lkin
g
E 5/2/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 6/27/2012 WORK COMPLETED TO DATE 8/1/2012 E 5/9/2012 WORK COMPLETED TO DATE 6/6/2012 WORK COMPLETED TO DATE 7/4/2012 WORK COMPLETED TO DATE 8/8/2012 E 5/16/2012 WORK COMPLETED TO DATE 6/13/2012 WORK COMPLETED TO DATE 7/11/2012 WORK COMPLETED TO DATE 8/15/2012 E 5/23/2012 WORK COMPLETED TO DATE 6/20/2012 WORK COMPLETED TO DATE 7/18/2012
WORK COMPLETED TO DATE 7/25/2012
20 Unit 21 Unit
N/A
N/A
N/AN/A JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHART
16 16
16 16
16 4
16 4
5 5 5 5
5 5 5 5
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
l Van
ity F
auce
t
Hal
l W
C
Hal
l Tub
Fau
cet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
lway
van
ity fa
ucet
Hal
lway
van
ity W
C
H.w
ay v
anity
Tub
fauc
et
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
lway
van
ity fa
ucet
Hal
lway
van
ity W
C
Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE 5/2/2012 WORK COMPLET Areas Available For You To Work WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE 5/9/2012 WORK COMPLET
# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/22/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE 5/16/2012 WORK COMPLET Work Completed to Date 1/18/2012 WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETEED TO DATE 3/28/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE 5/23/2012 WORK COMPLET WORK COMPLETED TO DATE 1/25/2012WORK COMPLETED TO DATE 2/1/2012
2
10
3
4
N/A
8
N/A
16
7
6
5
12
9
N/A
2/1/2012
27 Unit
15
14
FLOOR18
17
RUN DATE :
N/A
N/A
13
26 Unit 23 Unit22 Unit
11
N/A
N/A
N/A
25 Unit24 Unit28 Unit
N/AN/A
JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHART
16 10 10 15 10 10
16 10 10 15 10 10
16 13 13 14 13 13 2
16 13 13 14 13 13 2
H.w
ay v
anity
Tub
fauc
et
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte s
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
Fauc
et
Cau
lkin
g
TED TO DATE 5/30/2012 WORK COMPLETED TO DATE 6/27/2012 WORK COMPLETED TO DATE 8/1/2012 TED TO DATE 6/6/2012 WORK COMPLETED TO DATE 7/4/2012 WORK COMPLETED TO DATE 8/8/2012 TED TO DATE 6/13/2012 WORK COMPLETED TO DATE 7/11/2012 WORK COMPLETED TO DATE 8/15/2012 TED TO DATE 6/20/2012 WORK COMPLETED TO DATE 7/18/2012 WORK COMPLETED TO DATE 8/22/2012
WORK COMPLETED TO DATE 7/25/2012
20 Unit 21 Unit
N/A
N/A
N/AN/A JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHART
2 2
2 2
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
l Van
ity F
auce
t
Hal
l W
C
Hal
l Tub
Fau
cet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
lway
van
ity fa
ucet
Hal
lway
van
ity W
C
H.w
ay v
anity
Tub
fauc
et
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
lway
van
ity fa
ucet
Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE 5/2/2012 WORK COMP Areas Available For You To Work WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE 5/9/2012 WORK COMP
# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/22/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE 5/16/2012 WORK COMP Work Completed to Date 1/18/2012 WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETEED TO DATE 3/28/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE 5/23/2012 WORK COMP WORK COMPLETED TO DATE 1/25/2012WORK COMPLETED TO DATE 2/1/2012
25 Unit24 Unit28 Unit
N/AN/A
26 Unit 23 Unit22 Unit
11
N/A
N/A
N/A
2/1/2012
27 Unit
15
14
FLOOR18
17
RUN DATE :
N/A
N/A
13
16
7
6
5
12
9
N/A
2
10
3
4
N/A
8
N/A
JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHART
2
2
Hal
lway
van
ity W
C
H.w
ay v
anity
Tub
fauc
et
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte s
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
Fauc
et
Cau
lkin
g
PLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 6/27/2012 WORK COMPLETED TO DATE 8/1/2012 PLETED TO DATE 6/6/2012 WORK COMPLETED TO DATE 7/4/2012 WORK COMPLETED TO DATE 8/8/2012 PLETED TO DATE 6/13/2012 WORK COMPLETED TO DATE 7/11/2012 WORK COMPLETED TO DATE 8/15/2012 PLETED TO DATE 6/20/2012 WORK COMPLETED TO DATE 7/18/2012 WORK COMPLETED TO DATE 8/22/2012
WORK COMPLETED TO DATE 7/25/2012 WORK COMPLETED TO DATE 8/29/2012
N/A
N/A
N/AN/A
20 Unit 21 Unit
JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHART
2 2 2
2 2 2
5 5 5 5
5 5 5 5
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
l Van
ity F
auce
t
Hal
l W
C
Hal
l Tub
Fau
cet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
lway
van
ity fa
ucet
Hal
lway
van
ity W
C
H.w
ay v
anity
Tub
fauc
et
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
lway
van
ity fa
ucet
Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE 5/2/2012 WORK COMP Areas Available For You To Work WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE 5/9/2012 WORK COMP
# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/22/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE 5/16/2012 WORK COMP Work Completed to Date 1/18/2012 WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETEED TO DATE 3/28/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE 5/23/2012 WORK COMP WORK COMPLETED TO DATE 1/25/2012WORK COMPLETED TO DATE 2/1/2012
25 Unit24 Unit28 Unit
N/AN/A
26 Unit 23 Unit22 Unit
11
N/A
N/A
N/A
2/1/2012
27 Unit
15
14
FLOOR18
17
RUN DATE :
N/A
N/A
13
16
7
6
5
12
9
N/A
2
10
3
4
N/A
8
N/A
JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHART
12 12 12 12
12 12 12 12
Hal
lway
van
ity W
C
H.w
ay v
anity
Tub
fauc
et
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte s
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
Fauc
et
Cau
lkin
g
PLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 6/27/2012 WORK COMPLETED TO DATE 8/1/2012 PLETED TO DATE 6/6/2012 WORK COMPLETED TO DATE 7/4/2012 WORK COMPLETED TO DATE 8/8/2012 PLETED TO DATE 6/13/2012 WORK COMPLETED TO DATE 7/11/2012 WORK COMPLETED TO DATE 8/15/2012 PLETED TO DATE 6/20/2012 WORK COMPLETED TO DATE 7/18/2012 WORK COMPLETED TO DATE 8/22/2012
WORK COMPLETED TO DATE 7/25/2012 WORK COMPLETED TO DATE 8/29/2012
N/A
N/A
N/AN/A
20 Unit 21 Unit
JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHART
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
l Van
ity F
auce
t
Hal
l W
C
Hal
l Tub
Fau
cet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
lway
van
ity fa
ucet
Hal
lway
van
ity W
C
H.w
ay v
anity
Tub
fauc
et
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty fa
ucet
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Hal
lway
van
ity fa
ucet
Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE 5/2/2012 WORK COMP Areas Available For You To Work WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE 5/9/2012 WORK COMP
# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/22/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE 5/16/2012 WORK COMP Work Completed to Date 1/18/2012 WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETEED TO DATE 3/28/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE 5/23/2012 WORK COMP WORK COMPLETED TO DATE 1/25/2012WORK COMPLETED TO DATE 2/1/2012
25 Unit24 Unit28 Unit
N/AN/A
26 Unit 23 Unit22 Unit
11
N/A
N/A
N/A
2/1/2012
27 Unit
15
14
FLOOR18
17
RUN DATE :
N/A
N/A
13
16
7
6
5
12
9
N/A
2
10
3
4
N/A
8
N/A
JobD
river
EXHIBIT A
Confid
entia
l
BAY MECHANICAL PROGRESS CHARTH
allw
ay v
anity
WC
H.w
ay v
anity
Tub
fauc
et
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte s
ink
fauc
et
Cau
lkin
g
HVA
C G
rille
s, D
iffus
ers
VTAC
acc
ess
pane
l
DBL
Van
ity fa
ucet
s
DBL
Van
ity W
C
DBL
Van
ity T
ub fa
ucet
SGL
Vani
ty F
auce
t
SGL
Vani
ty W
C
SGL
Vani
ty T
ub F
auce
t
Trim
wor
k
Kitc
hen
Fauc
et &
Dis
pl
Kitc
hene
tte S
ink
Fauc
et
Cau
lkin
g
PLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 6/27/2012 WORK COMPLETED TO DATE 8/1/2012 PLETED TO DATE 6/6/2012 WORK COMPLETED TO DATE 7/4/2012 WORK COMPLETED TO DATE 8/8/2012 PLETED TO DATE 6/13/2012 WORK COMPLETED TO DATE 7/11/2012 WORK COMPLETED TO DATE 8/15/2012 PLETED TO DATE 6/20/2012 WORK COMPLETED TO DATE 7/18/2012 WORK COMPLETED TO DATE 8/22/2012
WORK COMPLETED TO DATE 7/25/2012 WORK COMPLETED TO DATE 8/29/2012
N/A
N/A
N/AN/A
20 Unit 21 Unit
JobD
river
EXHIBIT A
Confid
entia
l