Project funded by the European Commission under grant agreement n°604391 GRAPHENE Graphene-Based Revolutions in ICT and Beyond Combination of CP and CSA WP14 Management Deliverable 14.8 “Update of H2020 Implementation Model” Main Author(s): Jari Kinaret, CHALMERS Due date of deliverable: M30 Actual submission date: M30 Dissemination level: PU
Transcript
Page 1: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

Project funded by the European Commission under grant agreement n°604391

GRAPHENE Graphene-Based Revolutions in ICT and Beyond

Combination of CP and CSA

WP14 Management

Deliverable 14.8 “Update of H2020 Implementation Model”

Main Author(s): Jari Kinaret, CHALMERS

Due date of deliverable: M30

Actual submission date: M30

Dissemination level: PU

Page 2: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE D14.8 29 March 2016 2 / 9

LIST OF CONTRIBUTORS

Partner Acronym Partner Name Name of the contact

1 CUT Chalmers University of Technology Jari Kinaret,

Michelle Abraham,

Macarena Muñoz Ruiz

66 ESF Fondation Europeenne de la

Science

Ana Helman,

Ana Maria Ciubutaru

Page 3: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE D14.8 29 March 2016 3 / 9

TABLE OF CONTENTS Deliverable Summary ...........................................................................................................................4 Update of H2020 Implementation Model...............................................................................................5 Preparation of the Graphene Flagship H2020 Consortium Agreement ..................................................5

Page 4: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE D14.8 29 March 2016 4 / 9

Deliverable Summary

The Graphene Flagship has been continuously working towards a model to implement the Flagship in

its next phase under Horizon 2020. During the second reporting period, substantial efforts were placed

in negotiating the required Consortium Agreement. The negotiations were concluded in January 2016,

and it was agreed that any further issues would be resolved during the H2020 phase. A second issue

that has been addressed is the collaboration modalities with the Partnering Projects in the H2020

phase.

Page 5: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE D14.8 29 March 2016 5 / 9

Update of H2020 Implementation Model

Preparation of the Graphene Flagship H2020 Consortium Agreement The proposal for the Graphene Flagship’s Framework Partnership Agreement (FPA), a long-term

endeavour describing the consortium and the action plan to reach the objectives of the Graphene

Flagship, was submitted in June 2014, approved by the EC in September 2014, and signed by the EC

in February 2015. Furthermore, the FPA was amended in October and December 2015 to include the

new partners that joined the consortium after October 2014.

Under the umbrella of the FPA, subsequent Core Projects will have budgets to carry out research

actions. Two conditions are linked to the participation in a Core Project: 1) Only partners in the FPA

can participate in a Core Project; and 2) Partners of the FPA must participate in successive Core

Projects and carry out the research tasks described in them.

The Framework Partnership Agreement requires, according to the implementation model of the

Flagship, a Consortium Agreement, which covers both the FPA and the Core Projects (which will be

implemented through specific grant agreements). Furthermore, the Consortium Agreement cannot

contradict the EC grant agreement for the Framework Partnership Agreement (FPA), or the Specific

Grant Agreements.

This section describes the work developed by the Coordination team to prepare the Graphene Flagship

Consortium Agreement for the H2020 phase.

The Coordination team was composed by the Graphene Flagship Director Jari Kinaret, Chalmers’

lawyer Michelle Abrahams and Graphene Flagship Project Manager Macarena Muñoz. All

modifications to the Consortium Agreement main text and all replies to the partners’ comments were

coordinated by Michelle Abraham. She worked closely with the Director and the Project Manager,

attending periodic physical/phone meetings to discuss the changes and comments on the Consortium

Agreement.

The Coordination team chose to build up the Consortium Agreement in three different stages that can

be summarised as follows:

Stage 1 – Preparation of the base document to be discussed with the reference group

In November 2014 Chalmers’ Lawyer Michelle Abrahams, Chalmers’ external legal counsel von Lode

Advokat, the Graphene Flagship Director and two Project Managers started working on the first draft

version of the Consortium Agreement. The main text was based on the FP7 Consortium Agreement, a

document already signed by 142 partners. The result of this work was a starting point document that,

Page 6: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE D14.8 29 March 2016 6 / 9

keeping the line of the previous Consortium Agreement, was adapted to the FPA basis and the

extended consortium. This document was ready by January 2015.

Stage 2 – Discussion of the main text with the reference group

Since the Graphene Flagship consortium consists of more than 150 partners, it was not feasible to

open the agreement to a general re-negotiation. Therefore, in January 2015 the Coordination team

opened a negotiation of the main text with a representative group of partners from the academic,

institute and industrial sectors. This group comprised NOKIA R&D, NOKIA OYJ, CNRS, CEA, UCAM,

UNIMAN, IIT, ICFO, TUDelft, BASF, Fraunhofer, EPFL, DSM, Italcementi, IMEC and Ericsson. The

purpose of working with this reference group of partners was to discuss only the parts of the draft that

differed from the FP7 Consortium Agreement. There were four rounds of negotiations before reaching

an agreement on a common document:

- First round. The above-mentioned group of partners received the base document prepared by

the Coordination team. They were requested to consult their legal staff and send the

Coordinator any comments. Deadline for comments was 1 March 2015.

- Second round. The Coordinator compiled all the comments, modified the text where necessary

and provided answers to the comments/questions when needed. Partners received a new

version of the document and were requested to consult their legal staff and send the

Coordinator any comments. Deadline for comments was 17 April 2015.

- Third round. The Coordinator compiled all the comments, modified the text where necessary

and provided answers to the comments/questions when needed. This third round took more

time than expected due to the intensive activity period the Graphene Flagship was

experiencing (mainly due to the preparation and submission of the First Periodic Report and

the Core 1 proposal). Partners received a new version of the document and were again

requested to consult their legal staff and send the Coordinator any comments. Deadline for

commenting was 20 August 2015.

- Fourth round. The Coordinator compiled all the comments, modified the text where necessary

and provided answers to the comments/questions when needed. Partners received a new

version of the document and were requested to consult their legal staff and send the

Coordinator any comments. Deadline for comments was 9 October 2015. After the fourth

round, the group of partners agreed on a consolidated version of the Consortium Agreement,

which was ready by the 26 October 2015

Stage 3 – Last modifications to the Consortium Agreement

As the reference group reached consensus, the agreed text on the Consortium Agreement was sent to

all members of the partnership. Instructions were to consult the appropriate legal staff at their

organisation and, if needed, to send additional information concerning the Consortium Agreement’s

attachments 1, 2, 4, 5 and 6. Partners were also requested to send their comments on the H2020

Consortium Agreement, if any, only on the parts that differed from the FP7 Consortium Agreement and

only if the clause they referred to prevented their organisation of signing the H2020 Consortium

Page 7: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE D14.8 29 March 2016 7 / 9

Agreement. There were two rounds of comments before agreeing on the final version of the

document:

- First round. The partners received the text agreed by the reference group and were requested

to consult their legal staff and send the Coordinator any comments, with the instructions

previously described. Deadline for commenting was 27 November 2015.

- Second round. The Coordinator compiled all the comments, modified the text where necessary

and provided answers to the comments/questions when needed. Partners received a new

version of the document and were requested to consult their legal staff and send the

Coordinator any comments, before 13 January 2016. After this second round and the inclusion

of some extra information received after the deadline, no partner disagreed on the final text of

the Consortium Agreement, which was made available to all partners 1 February 2016.

On 1 February 2016 all partners were requested to sign the final version of the Consortium Agreement.

Partnering Projects under H2020 In order to prepare for the implementation of the partnering model under H2020, extensive negotiations

between the Graphene Flagships CP-CSA (in particular the Management and Alignment Work

Packages WP14 and 16), the national and regional funding agencies (NRFOs) within FLAG-ERA and

the European Commission have been conducted during the ramp-up phase. This has resulted in

defining the processes and modalities by which projects that are funded by NRFOs, EU Member States

governments or the private sector are integrated into the Graphene Flagship initiative following the

principles outlined in the EC Staff Working document1. In particular, we have developed a set of

procedures and documents that serve to implement the association which have been tested and used

to prepare for the association of the first Partnering Projects as of 1 April 2016.

Following the announcement in September 2015 of the outcome of the first FLAG-ERA Joint

Transnational Call, 13 collaborative projects have been selected for funding by the FLAG-ERA

consortium of funding agencies representing the first candidate Partnering Projects (PPs). These

projects have been submitted for approval as Partnering Project to the Graphene Flagship Executive

Board at the plenary meeting in November 2015 and were approved unanimously. The institutions

involved in these projects that are not part of Core 1 have been granted the status of Associated

Members. In order to encourage collaborations and synergies between these nationally funded

projects and the EC-funded Core Project, each PP has been allocated to a specific Core 1 Work

Package(s) and a communication between the respective scientific contacts has been established. The

final step that formalises the association of PPs to the Graphene Flagship is a signature of a

Memorandum of Understanding between representatives of the Core 1 WPs (typically a WP leader)

and the coordinator of the PP. This non-legally binding document describes the complementarities and

1 http://ec.europa.eu/programmes/horizon2020/en/news/fet-flagship-model-implementation-and-governance-model-horizon-2020-short-overview-presentation

Page 8: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE D14.8 29 March 2016 8 / 9

synergies between the Core and PPs and outlines the collaborations that will be carried out. It also

specifies the benefits of the new Associated Members.

The ramp-up phase was therefore very important to define and set-up all necessary steps to be able to

fully integrate new Partnering Projects and Associated Members under H2020. The current model is

based on discussions and requirements that align Core Project, EC and Member State’s expectations

at this point in time and may evolve and be refined depending on feedback and future developments.

Page 9: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE D14.8 29 March 2016 9 / 9

Annexes 1. Consortium Agreement

2. Memorandum of Understanding for partnering projects

Page 10: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

1

Memorandum of Understanding (MoU)

for association of a Partnering Project to the Graphene Flagship

Preamble

The Graphene Flagship is 10-years research initiative that is built around a large Core Project (CP) funded by the European Commission (EC) and a number of Partnering Projects (PPs) mainly funded by the Member States and Associated Countries.

In 2015, the Graphene CP consortium signed with the EC a Framework Partnership Agreement (FPA) which covers the duration of Horizon 2020 (H2020) and formalises the long-term commitment between the CP consortium and the EC. As the FPA does not include any budgetary commitment, the CP is funded by the EC in successive 2-years contract phases (i.e., Core 1 project - CP1, Core 2 project - CP2, etc.), which are defined in the FPA.1 Given such an implementation model and its associated contractual and financial aspects, the present MoU between a CP and a PP covers the duration of the CP1 Contract (01 April 2016 to 31 March 2018) or of the PP Contract, whatever is shorter, with the possibility for renewal.

Through its association to CP1 and its subsequent CPs, a PP is associating itself to the Graphene Flagship initiative.

Following the submitted application and the approval by the Graphene Flagship Executive Board/Management Panel, the project:

“TITLE OF THE PROJECT”

becomes associated to the Graphene Flagship initiative as a Partnering Project (PP).

The following organisations shall be granted the status of Associated Members:

Organisation 1 Organisation 2 … … …

The Associated Members of the PP intend to interact with the relevant Work Packages of the Graphene Flagship CP1 and contribute to the Graphene Flagship initiative by performing research and innovation activities in cooperation with the relevant CP1 Work Package(s).

1 Further details about this partnering model and its implementation are provided in the EC Staff Working

Document SWD (2014) 283.

Page 11: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

2

The aim is to provide flexible and efficient mechanisms to perform research and innovation activities that will be in line with the overall objectives of the Graphene Flagship initiative and be of mutual benefit to all parties of the PP and of the CP1.

The PP is associated to the CP1 for the period DD/MM/YYYY until DD/MM/YYYY, with the possibility for renewal.

Interactions between the PP and the relevant CP1 Work Package(s), as decided by common agreement, are detailed in Annex 1.

Benefits of the Associated Members are described in Annex 2.

The PP and the CP1 bear their own costs incurred in connection with this MoU.

All additions or amendments concerning this MoU must be made in writing. In case of change of the technical content of either the PP or the CP1, the corresponding party shall diligently inform the other party in writing. Such change may lead to reassess the terms of the collaboration or to terminate this MoU.

This MoU does not address issues related to the access and/or exchange of confidential information between the parties. If such a need exists, parties should arrange to establish a separate Non-Disclosure Agreement (NDA) or a similar written document governing these issues.

Any of the two parties may decide to terminate this MoU at any time, in writing (with date of effect the date of the notice letter).

On behalf of the Graphene Flagship Core 1 Project:

On behalf of the Partnering Project:

WP XXX Leader or Deputy Name and signature:

PP coordinator

Name and signature:

Commented [C41]: [PP Contract duration or CP1 Contract duration, whatever is shorter]

Page 12: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

3

Annex 1 – Information on Partnering Project (PP) and Core Project (CP) interactions

I. Contact information

Ia. Partnering Project Coordinator

First and Last Name

Organisation

Email

Ib. Core Project Contact Person(s) (WP Leader, Deputy or PI)

First and Last Name

Organisation

Email

Ic. Funding organisation (if applicable) If the PP was nominated by an EU or national/regional funding agency, please indicate below the contact details of the responsible project officer. Funding organisation contact person (first and last name)

Organisation Email II. Information on the Partnering Project Title Acronym IIa. Project funding Source of funding (FLAG-ERA, EC, national, regional, private, other)

Funding organisation(s) Total amount of funding (€) Duration (MM/YYYY - MM/YYYY)

IIb. Consortium Members Organisation Institute – Laboratory -

Department Principal Investigator (PI)

Status Organisation/PI within the GF

Page 13: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

4

III. Partnering Project objectives relevant to the Graphene Flagship IV. Complementarities and synergies between the Partnering Project and the Graphene Flagship Core Project V. Foreseen interactions between the Partnering Project and the Graphene Flagship Core Project Work Package(s)

Page 14: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

5

Annex 2 – List of benefits for Associated Members

Benefits Non- Member

Associated Member

Associated Member with additional collaborative agreement

Core Project Partner

Participation in open activities Yes Yes Yes Yes

Publications listed on web page No Yes Yes Yes

Job listings published on web page No Yes Yes Yes

Automatic subscription to newsletter No Yes Yes Yes

Coverage of activities by Flagship Science Writer/Communications Officer No Yes Yes Yes

Included in the Flagship mailing list No Yes Yes Yes

Direct invitation to industrial workshops (priority access) No Yes Yes Yes

Direct invitation to Flagship conferences and schools (priority access) No Yes Yes Yes

Inclusion of results in Deliverable Reports to the EU No Yes2 Yes2 Yes

Attendance at non-confidential part of the Flagship General Assembly No Yes Yes Yes

Participation in confidential S&T activities No No Yes Yes

Attendance at Core Project WP meetings No No Yes Yes

Access rights to foreground and background No No No3 Yes

Direct funding from the core project No No No Yes

2 Inclusion of published results by permission only. Work not funded by the CP will be clearly identified. 3 Unless otherwise agreed in the additional collaborative agreement.

Page 15: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE

CONSORTIUM AGREEMENT

Project acronym: GRAPHENE

Project title: “Graphene-­Driven Revolutions in ICT and Beyond”

Project number: 649953

Date of preparation: 1 February 2016

Page 16: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

2 (294)

Table of Contents

Section 1: Definitions .................................................................................................................................. 11 Section 2: Purpose ..................................................................................................................................... 14 Section 3: Entry into force, duration and termination ................................................................................. 14 3.1 Entry into force ................................................................................................................................. 14 3.2 Duration and termination .................................................................................................................. 15 3.3 Survival of rights and obligations ..................................................................................................... 15

Section 4: Responsibilities of Parties ......................................................................................................... 15 4.1 General principles ............................................................................................................................ 15 4.2 Breach .............................................................................................................................................. 16 4.3 Involvement of third parties .............................................................................................................. 17

Section 5: Liability towards each other ....................................................................................................... 17 5.1 No warranties ................................................................................................................................... 17 5.2 Limitations of contractual liability ...................................................................................................... 17 5.3 Damage caused to third parties ....................................................................................................... 18 5.4 Force Majeure .................................................................................................................................. 18 5.5 Export Rules and Regulations .......................................................................................................... 18

Section 6: Governance structure ................................................................................................................ 19 6.1 General structure ............................................................................................................................. 19 6.2 GA members .................................................................................................................................... 20 6.2.1 Operational procedures for the General Assembly .................................................................... 20 6.2.2 Decisions by the General Assembly (GA) .................................................................................. 23 6.2.3 Nomination Committee (NC) ...................................................................................................... 24

6.3 Executive Board (EB) ....................................................................................................................... 24 6.3.1 EB members .............................................................................................................................. 24 6.3.2 Tasks of the EB .......................................................................................................................... 24 6.3.3 Preparation and organisation of EB meetings ............................................................................ 26 6.3.4 Voting rules and quorum in the EB ............................................................................................ 26 6.3.5 Minutes of EB meetings ............................................................................................................. 27

6.4 Coordinator ...................................................................................................................................... 27 6.5 Director ............................................................................................................................................. 28 6.6 Work packages ................................................................................................................................ 29 6.7 Science and Technology Officer (STO) ........................................................................................... 29 6.8 Management Panel (MP) ................................................................................................................. 29 6.9 Science and Technology Forum (STF) ............................................................................................ 30 6.10 Research and Innovation Divisions (Divisions) .............................................................................. 30 6.11 Strategic Advisory Council ............................................................................................................. 30 6.12 Associated members ...................................................................................................................... 31

Section 7: Financial provisions ................................................................................................................... 32

Page 17: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

3 (294)

7.1 General Principles ............................................................................................................................ 32 7.1.1 Distribution of Financial Contribution ......................................................................................... 32 7.1.2 Late delivery ............................................................................................................................... 32 7.1.3 Justifying Costs .......................................................................................................................... 33 7.1.4 Funding Principles ...................................................................................................................... 33 7.1.5 Financial Consequences of the termination of the participation of a Party ................................ 33

7.2 Budgeting ......................................................................................................................................... 33 7.3 Payments ......................................................................................................................................... 33

Section 8: Results ...................................................................................................................................... 34 8.1 Joint ownership ................................................................................................................................ 35 8.2 Transfer of Results ........................................................................................................................... 37 8.3 Dissemination ................................................................................................................................... 38 8.3.1 Publication .................................................................................................................................. 38 8.3.2 Publication of another Party’s Results or Background ............................................................... 38 8.3.3 Cooperation obligations ............................................................................................................. 39 8.3.4 Use of names, logos or trademarks ........................................................................................... 39

8.4 Contribution to standards ................................................................................................................. 39 Section 9: Access Rights ............................................................................................................................ 39 9.1 Background covered ........................................................................................................................ 39 9.2 General Principles ............................................................................................................................ 40 9.3 Access Rights for implementation .................................................................................................... 41 9.4 Access Rights for Exploitation .......................................................................................................... 41 9.5 Access Rights for Affiliated Entities .................................................................................................. 41 9.6 Additional Access Rights .................................................................................................................. 42 9.7 Access Rights for Parties entering or leaving the Project ................................................................ 42 9.7.1 New Parties entering the Project ................................................................................................ 42 9.7.2 Parties leaving the Project ......................................................................................................... 43

Section 10 Specific Provisions for Access Rights to Software ................................................................... 43 Section 11: Non-­disclosure of information .................................................................................................. 43 Section 12: Miscellaneous .......................................................................................................................... 45 12.1 Attachments, inconsistencies and severability ............................................................................... 45 12.2 No representation, partnership or agency ...................................................................................... 46 12.3 Notices and other communication .................................................................................................. 46 12.4 Assignment and amendments ........................................................................................................ 46 12.5 Mandatory national law .................................................................................................................. 47 12.6 Language ....................................................................................................................................... 47 12.7 Applicable law ................................................................................................................................ 47 12.8 Settlement of disputes .................................................................................................................... 47

Section 13: Signatures ............................................................................................................................... 48 [Attachment 1: Background included] ....................................................................................................... 202

Page 18: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

4 (294)

[Attachment 2: Background excluded] ...................................................................................................... 223 [Attachment 3: Accession document] ....................................................................................................... 253 [Attachment 4: List of Affiliated Entities and Third Parties to which transfer of Results is possible without

prior notice ................................................................................................................................................ 254 [Attachment 5: List of Third parties linked to a Party:] .............................................................................. 257 [Attachment 6: Initial list of GA members and other contact persons] ...................................................... 258

Page 19: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

5 (294)

CONSORTIUM AGREEMENT

THIS CONSORTIUM AGREEMENT is based upon

REGULATION (EU) No 1290/2013 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 11

December 2013 laying down the rules for the participation and dissemination in “Horizon 2020 – the

Framework Programme for Research and Innovation (2014-­2020) and repealing Regulation (EC) No

1906/2006 hereinafter referred to as “Rules for Participation” and the European Commission Framework

Partnership Agreement FET Flagships, adopted on 1st April 2015, hereinafter referred to as the “Framework

Partnership Agreement” or “EU-­FPA”, and is made on 1st February 2016 with retroactive effect to the 1st

April 2015 (starting date of the EU-­FPA). Several Core Projects will be operated under the EU-­FPA and

governed by Specific Agreements (hereinafter referred to as “EU-­SGA” or “EU-­SGA´s”).

BETWEEN:

- CHALMERS -­ CHALMERS TEKNISKA HOEGSKOLA AB, the “Coordinator”,

- AALTO -­ AALTO-­KORKEAKOULUSAATIO

- ABB – ABB AB

- AERNNOVA -­ INTERNACIONAL DE COMPOSITES SA

- AIRBUS OPERATIONS SL -­ AIRBUS OPERATIONS SL

- AIXTRON LIMITED -­ AIXTRON LIMITED

- ALCATEL-­LUCENT DEUTSCHLAND AG -­ ALCATEL-­LUCENT DEUTSCHLAND AG

- ALU-­FR -­ ALBERT-­LUDWIGS-­UNIVERSITAET FREIBURG

- ALUI -­ ALCATEL-­LUCENT ITALIA S.P.A.

- Amalyst -­ AMALYST LTD

- AMO GMBH -­ GESELLSCHAFT FUR ANGEWANDTE MIKRO-­ UND OPTOELEKTRONIK MIT

BESCHRAENKTERHAFTUNG AMO GmbH

- AVANZARE -­ AVANZARE INNOVACION TECNOLOGICA SL

- BASF SE -­ BASF SE

- Breton -­ BRETON S.p.A.

- CAU -­ CHRISTIAN-­ALBRECHTS-­UNIVERSITÄT ZU KIEL

- CEA -­ COMMISSARIAT A L´ENERGIE ATOMIQUE ET AUX ENERGIES ALTERNATIVES

- CHALMERS INDUSTRITEKNIK -­ STIFTELSEN CHALMERS INDUSTRITEKNIK

- CIBER -­ CENTRO DE INVESTIGACION BIOMEDICA EN RED BIOINGENIERIA,

BIOMATERIALES Y NANOMEDICINA

- CIC BIOMAGUNE – ASOCIACION CENTRO DE INVESTIGACION COOPERATIVA EN

BIOMATERIALES

- CIC energiGUNE -­ CENTRO DE INVESTIGACION COOPERATIVA EN ENERGIAS

ALTERNATIVAS FUNDACION

Page 20: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

6 (294)

- CIC nanoGUNE -­ ASOCIACION – CENTRO DE INVESTIGACION COOPERATIVA EN

NANOCIENCIAS -­ CIC NANOGUNE

- CNIT -­ CONSORZIO NAZIONALE INTERUNIVERSITARIO PER LE TELECOMUNICAZIONI

- CNM -­ CNM TECHNOLOGIES GmbH

- CNR -­ CONSIGLIO NAZIONALE DELLE RICERCHE

- CNRS -­ CENTRE NATIONAL DE LA RECHERCHE SCIENTIFIQUE

- CRF -­ CENTRE RICERCHE FIAT S.C.p.A

- CSIC -­ AGENCIA ESTATAL CONSEJO SUPERIOR DE INVESTIGACIONES CIENTIFICAS

- DSM -­ DSM Ahead BV

- DTECH -­ DELTA-­TECH S.p.A

- DTU -­ DANMARKS TEKNISKE UNIVERSITET

- Dyesol Italia -­ DYESOL ITALIA S.R.L.

- EMPA -­ EIDGENOESSISCHE MATERIALPRUEFUNGS-­ UND FORSCHUNGSANSTALT

- EPCOS -­ EPCOS AG

- EPFL -­ ÉCOLE POLYTECHNIQUE FÉDÉRALE DE LAUSANNE

- Ericsson -­ ERICSSON AB

- ESF -­ FONDATION EUROPEENNE DE LA SCIENCE

- ETH Zurich -­ EIDGENOESSISCHE TECHNISCHE HOCHSCHULE ZURICH

- FAU -­ FRIEDRICH-­ALEXANDER-­UNIVERSITAT ERLANGEN NURNBERG

- FBK -­ FONDAZIONE BRUNO KESSLER

- FNM – FINMECCANICA SOCIETÀ PER AZIONI

- FE – FLEXENABLE LIMITED

- FIDAMC – FUNDACION PARA LA INVESTIGACION, DESARROLLO Y APLICACION DE

MATERIALES COMPUESTOS

- FORTH -­ FOUNDATION FOR RESEARCH AND TECHNOLOGY HELLAS

- Fraunhofer -­ FRAUNHOFER-­GESELLSCHAFT ZUR FOERDERUNG DER ANGEWANDTEN

FORSCHUNG E.V., Hansastr 27c, 80686 Munich, Germany, acting as legal entity for its institutes

IAF, ICT and ISI

- FSU – FRIEDRICH-­SCHILLER-­UNIVERSITAT JENA

- g.tec -­ GUGER TECHNOLOGIES OG

- G24 -­ G24 POWER LIMITED

- Graphenea -­ Graphenea S.A.

- GRINP -­ GRINP S.R.L.

- GRUPO ANTOLIN-­INGENIERIA SA

- GSK – GLAXOSMITHKLINE RESEARCH AND DEVELOPMENT LTD.

- HORIBAJY -­ HORIBA JOBIN YVON S.A.S.

- ICFO -­ FUNDACIO INSTITUT DE CIENCIES FOTONIQUES

- ICN2 -­ FUNDACIO INSTITUT CATALA DE NANOCIENCIA I NANOTECNOLOGIA

- IDIBAPS -­ CONSORCI INSTITUT D'INVESTIGACIONS BIOMÈDIQUES AUGUST PI I SUNYER

- IFX – INFINEON TECHNOLOGIES AG

Page 21: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

7 (294)

- IIT -­ FONDAZIONE ISTITUTO ITALIANO DI TECNOLOGIA

- IMDEA – FUNDACION IMDEA NANOCIENCIA

- IMEC -­ INTERUNIVERSITAIR MICRO-­ELECTRONICA CENTRUM VZW

- IMech-­BAS OLEM -­ BULGARIAN ACADEMY OF SCIENCES

- Imperial -­ IMPERIAL COLLEGE OF SCIENCE, TECHNOLOGY AND MEDICINE

- INFN -­ ISTITUTO NAZIONALE DI FISICA NUCLEARE

- INP BSU -­ BELARUSIAN STATE UNIVERSITY, INSTITUTE FOR NUCLEAR PROBLEMS

- INTER -­ INSTITUTO DE TECNOLOGIAS EMERGENTES DE LA RIOJA

- ITC -­ ITALCEMENTI Fabbriche Riunite Cemento S.p.A. Bergamo

- ITME -­ INSTYTUT TECHNOLOGII MATERIALOW ELEKTRONICZNYCH

- JHIPC J -­ HEYROVSKY INSTITUTE OF PHYSICAL CHEMISTRY

- KI -­ KAROLINSKA INSTITUTET

- KIT -­ KARLSRUHER INSTITUT FÜR TECHNOLOGIE

- LIB -­ LIBRE S.R.L.

- LIU -­ LINKOPINGS UNIVERSITET

- LNE -­ LABORATOIRE NATIONAL DE MÉTROLOGIE ET D’ESSAIS

- M-­SOLV – M-­SOLV LTD

- MFA EK MTA -­ CENTRE FOR ENERGY RESEARCH, HUNGARIAN ACADEMY OF SCIENCES

- MPG -­ MAX PLANCK GESELLSCHAFT ZUR FOERDERUNG DER WISSENSCHAFTEN E.V

- Nano Tech Lab -­ NANO TECH LAB LTD

- NanOsc AB – NANOSC AB

- NNsa -­ NANESA S.R.L.

- Nokia R&D (UK) Ltd -­ Nokia R&D (UK) LIMITED

- NOKIA OYJ -­ Nokia OYJ

- NOVALIA – NOVALIA LIMITED

- NPL MANAGEMENT LIMITED -­ NPL MANAGEMENT LIMITED

- NUID UCD -­ UNIVERSITY COLLEGE DUBLIN, NATIONAL UNIVERSITY OF IRELAND, DUBLIN

- OINT -­ OXFORD INSTRUMENTS NANOTECHNOLOGY TOOLS LIMITED

- Pixium -­ PIXIUM VISION

- PMI -­ POLITECNICO DI MILANO

- POLITO -­ POLITECNICO DI TORINO

- Polymem -­ POLYMEM S.A

- PROGNOMICS – PROGNOMICS LTD

- QMUL -­ QUEEN MARY UNIVERSITY OF LONDON

- REPSOL -­ REPSOL SA

- RIJKSUNIVERSITEIT GRONINGEN -­ RIJKSUNIVERSITEIT GRONINGEN

- RUN -­ STICHTING KATHOLIEKE UNIVERSITEIT

- RWTH AACHEN -­ RHEINISCH-­WESTFAELISCHE TECHNISCHE HOCHSCHULE AACHEN

- Sabanci University -­ SABANCI UNIVERSITY

- SISSA -­ SCUOLA INTERNAZIONALE SUPERIORE DI STUDI AVANZATI DI TRIESTE

Page 22: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

8 (294)

- ST-­I -­ STMICROELECTRONICS SRL

- TECNALIA -­ FUNDACION TECNALIA RESEARCH & INNOVATION

- TECHNION -­ TECHNION – ISRAEL INSTITUE OF TECHNOLOGY

- TEI of CRETE -­ TECHNOLOGICAL EDUCATIONAL INSTITUTE OF CRETE

- THALES -­ THALES SA

- Tor Vergata -­ UNIVERSITÀ DEGLI STUDI DI ROMA TOR VERGATA

- TRINITY COLLEGE DUBLIN -­ THE PROVOST, FELLOWS, FOUNDATION SCHOLARS & THE

OTHER MEMBERS OF BOARD OF THE COLLEGE OF THE HOLY AND UNDIVIDED TRINITY

OF QUEEN ELIZABETH NEAR DUBLIN

- TU Delft -­ TECHNISCHE UNIVERSITEIT DELFT

- TU WIEN -­ TECHNISCHE UNIVERSITAET WIEN

- TU/e -­ TECHNISCHE UNIVERSITEIT EINDHOVEN

- TUC -­ TECHNISCHE UNIVERSITAET CHEMNITZ

- TUD -­ TECHNISCHE UNIVERSITAET DRESDEN

- TUHH -­ TECHNISCHE UNIVERSITAET HAMBURG-­HARBURG

- TUM -­ TECHNISCHE UNIVERSITÄT MÜNCHEN

- UAB -­ UNIVERSITAT AUTÒNOMA DE BARCELONA

- UAU -­ UNIVERSITAT AUGSBURG

- UCAM -­ THE CHANCELLOR, MASTERS AND SCHOLARS OF THE UNIVERSITY OF

CAMBRIDGE

- UCdL -­ UNIVERSITE CATHOLIQUE DE LOUVAIN

- UCL -­ UNIVERSITY COLLEGE LONDON

- UCLM -­ UNIVERSIDAD DE CASTILLA -­ LA MANCHA

- UEF -­ ITA-­SUOMEN YLIOPISTO

- UHAM -­ UNIVERSITAET HAMBURG

- ULANC -­ LANCASTER UNIVERSITY

- ULB -­ UNIVERSITÉ LIBRE DE BRUXELLES

- ULM -­ UNIVERSITAET ULM

- UM -­ UNIVERSITÉ DE MONTPELLIER

- UMEA UNIVERSITET -­ UMEA UNIVERSITET

- UMINHO -­ UNIVERSIDADE DO MINHO

- UNamur -­ UNIVERSITÉ DE NAMUR ASBL

- UNIBAS -­ UNIVERSITAT BASEL

- UNIBI -­ UNIVERSITAET BIELEFELD

- UNIBO -­ ALMA MATER STUDIORUM-­UNIVERSITÀ DI BOLOGNA

- UNIPD -­ UNIVERSITÀ DEGLI STUDI DI PADOVA

- UNIPI -­ UNIVERSITÀ DI PISA

- UniSA -­ UNIVERSITÀ DEGLI STUDI DI SALERNO

- UNISTRA -­ UNIVERSITE DE STRASBOURG

- UNITS -­ UNIVERSITA DEGLI STUDI DI TRIESTE

Page 23: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

9 (294)

- UNIVERSITAET BREMEN -­ UNIVERSITAET BREMEN

- UNIGE -­ UNIVERSITE DE GENEVE

- UNIVERSITY OF MANCHESTER -­ THE UNIVERSITY OF MANCHESTER

- UNIWARSAW -­ UNIWERSYTET WARSZAWSKI

- UNIZAR -­ UNIVERSIDAD DE ZARAGOZA

- UNOTT -­ THE UNIVERSITY OF NOTTINGHAM

- UoC -­ PANEPISTIMIO KRITIS (University of Crete)

- UOI -­ PANEPISTIMIO IOANNINON

- UoS -­ UNIVERSITY OF SUNDERLAND

- UOXF -­ THE CHANCELLOR, MASTERS AND SCHOLARS OF THE UNIVERSITY OF OXFORD

- UPMC -­ UNIVERSITÉ PIERRE AND MARIE CURIE -­ PARIS 6

- UREG -­ UNIVERSITAET REGENSBURG

- USFD -­ THE UNIVERSITY OF SHEFFIELD

- USTL -­ UNIVERSITE DES SCIENCES ET TECHNOLOGIES DE LILLE -­ LILLE I

- UTARTU -­ TARTU ÜLIKOOL

- UZH -­ UNIVERSITAET ZUERICH

- VIS -­ N VISION SYSTEMS AND TECHNOLOGIES SL.

- VMI -­ VARTA MICRO INNOVATION GMBH

- VTT – TEKNOLOGIAN TUTKIMUSKESKUS VTT Oy

hereinafter, jointly or individually, referred to as ”Parties” or ”Party”

relating to the Project entitled

“Graphene-­based revolutions in ICT and beyond”, project number 649953, with starting 1-­st of April 2015 in short

GRAPHENE

hereinafter referred to as “Project”

WHEREAS:

The Parties, having considerable experience in the field concerned, have submitted a proposal for the

Project to the European Commission as part of the Horizon 2020 Framework Programme of the European

Union for Research and Innovation under the funding scheme of a combination of EU-­FPA and Core

Projects governed by EU-­SGA´s.

Page 24: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

10 (294)

The Parties wish to specify or supplement binding commitments among themselves in addition to the

provisions of the EU-­FPA and EU-­SGA´s.

NOW, THEREFORE, IT IS HEREBY AGREED AS FOLLOWS:

Page 25: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

11 (294)

Section 1: Definitions Words beginning with a capital letter shall have the meaning defined either herein or in the Rules for

Participation and/or in the FPA and/or in the H2020 Model Grant Agreements: H2020 General MGA —

Multi: v2.1 – 1 October 2015 including its Annexes that is in force at the effective date of this Consortium Agreement. In those cases where terms are defined in this CA and other aforementioned documents,

definitions in this Consortium Agreement have priority.

“Access Rights”

Access Rights means rights to use Results or Background under the terms and conditions laid down in the

rules for participation and dissemination in Horizon 2020, the EU-­FPA and this Consortium Agreement in

relation to the respective Core Project and the respective EU-­SGA.

“Affiliated Entity”

Affiliated Entity means an Affiliated Entity of a Party as defined in the rules for participation and

dissemination in Horizon 2020, the EU-­FPA and this Consortium Agreement, together with any legal entity

directly or indirectly Controlling, Controlled by or under common Control with that Party, for so long as such

Control lasts.

For the above purposes, “Control” of any entity shall exist through the direct or indirect:

- Ownership of more than 50% of the nominal value of the issued share capital of the entity or of

more than 50% of the issued share capital entitling the holders to vote for the election of directors

or persons performing similar functions, or

- Right by any other means to elect or appoint directors of the entity (or persons performing similar

functions) who have a majority vote.

For the purposes of this Consortium Agreement, NOKIA OYJ and Nokia R&D (UK) LIMITED declare the following: Affiliated Entities of Nokia Oyj and Nokia R&D (UK) LIMITED shall be considered to be Nokia

Technologies Oy , Nokia USA Inc. and any entity that is Controlled by Nokia Technologies Oy or Nokia

USA Inc. For the purposes of this Consortium Agreement, Alcatel-­Lucent Italia and Alcatel-­Lucent Deutschland

declare that Nokia Technologies Oy and Nokia USA Inc., as well as any entity directly or indirectly controlled

by Nokia Technologies Oy or Nokia USA Inc. shall not be considered an Affiliated Entity of Alcatel-­Lucent

Italia or Alcatel-­Lucent Deutschland.

“Background”

Page 26: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

12 (294)

Background means any data, know-­how or information held by a Party — whatever its form or nature

(tangible or intangible), including any rights such as Intellectual Property Rights — that:

(a) is held by the Parties before they entered into the Core Project concerned and (b) is Needed to implement the specific action under a Core Project or exploit the Results.

For the avoidance of doubt, Results generated within an earlier Core Project by a Party (before entering

into the Core Project concerned by such a Party) shall be considered as Background held by such Party

when Needed to implement the specific action under the Core Project concerned or exploit the Results

under the Core Project concerned.

“Consortium Budget”

Consortium Budget means the allocation of the EU financial contribution for the activities as defined in the

respective EU-­SGA´s and in the Consortium Plan thereafter.

“Consortium Plan”

Consortium Plan means the description of the work and the related agreed Consortium Budget, including

the payment schedule, as updated and approved by the General Assembly.

“Core Project”

Core Project means a project governed by an EU-­SGA.

“Defaulting Party”

Defaulting Party means a Party which the General Assembly has identified to be in breach of this

Consortium Agreement and/or the EU-­FPA and/or the specific EU-­SGA as specified in Section 4.2 of this

Consortium Agreement. For the avoidance of doubt, in case of Force Majeure, a Party shall not be

considered to be in breach of this Consortium Agreement as specified in Section 5.4.

“Effective Date”

Effective Date means the starting date of the Project, 1-­st of April 2015

“Flagship”

Flagship means the Graphene Flagship project as further described in the EU-­FPA.

“Indirect Utilisation”

Page 27: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

13 (294)

Indirect Utilisation means that Access Rights for Exploitation granted pursuant to this Consortium

Agreement and the EU-­FPA shall include the right for a Party and its Affiliated Entities to whom such Access

Rights are granted to have a third party make, only for the account of and for the use, sale or other disposal

by the Party and such Affiliated Entities, products and/or services, provided that the substantial portion of

the specifications of such products and/or services has been designed by or for such Party and such

Affiliated Entities.

“Intellectual Property Rights” or “IPR”

Intellectual Property Rights or IPR means patents, patent applications and other statutory rights in

inventions, copyrights (including without limitation copyrights in Software), registered design rights,

applications for registered design rights, unregistered design rights and other statutory rights in designs

and other similar or equivalent forms of statutory protection, wherever in the world arising or available;; but

excluding rights in Confidential Information or trade secrets.

“Legitimate Interest”

Legitimate Interest means a Party’s interests, including commercial, industrial or academic strategic

interests which may be claimed in the cases provided for in this Consortium Agreement where a failure to

take account of this interest would result in such Party’s suffering disproportionately great harm.

“Needed”

means:

For the implementation of the Core Project:

Access Rights are Needed if, without the grant of such Access Rights, carrying out the tasks assigned to

the recipient Party would be impossible, significantly delayed, or require significant additional financial or

human resources.

For Exploitation of own Results:

Access Rights are Needed if, without the grant of such Access Rights, the Exploitation of own Results

would be technically or legally impossible.

“Software”

Software means sequences of instructions to carry out a process in, or convertible into, a form executable

by a computer and fixed in any tangible medium of expression.

“Third party linked to a Party”

Page 28: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

14 (294)

Third party linked to a Party means legal entities, either public or private, represented in the EU-­FPA by a

Party under [the article 19 of] the EU-­FPA and the relevant EU-­SGA. The Third parties linked to a Party are

listed in Attachment 5 of this Consortium Agreement.

“Exploitation”

Exploitation means the use of Results in further research activities other than those covered by the action

concerned, or in developing, creating and marketing a technology, product or process, or in creating and

providing a service, or in standardisation activities.

“Results”

Results means any (tangible or intangible) output of the specific actions under a Core Project such as data,

knowledge or information — whatever its form or nature, whether it can be protected or not — that is

generated under the specific Core Project, as well as any rights attached to it, including Intellectual Property

Rights.

Section 2: Purpose The purpose of this Consortium Agreement is to specify with respect to the Project the relationship among

the Parties, in particular concerning the organisation of the work between the Parties, the Exploitation of

Results, the management of the Project and the rights and obligations of the Parties concerning inter alia

liability, Access Rights and dispute resolution.

Section 3: Entry into force, duration and termination

3.1 Entry into force

An entity becomes a Party to this Consortium Agreement upon signature of this Consortium Agreement by

a duly authorised representative.

This Consortium Agreement shall have effect from the Effective Date identified at the beginning of this

Consortium Agreement.

A new party enters the Consortium Agreement upon signature of the accession document Attachment 3 by

the new party and the Coordinator. Such accession shall have effect from the date identified in the

accession document.

Page 29: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

15 (294)

3.2 Duration and termination

This Consortium Agreement has the same duration as the EU-­FPA established with the European

Commission. The rights and obligations of the Parties stemming from this Consortium Agreement shall

continue in full force and effect until their complete fulfilment.

However, this Consortium Agreement or the participation of one or more Parties to it may be terminated in

accordance with the terms of this Consortium Agreement and the EU-­FPA.

If the Commission does not award the EU-­FPA or terminates the EU-­FPA or a Party’s participation in the

EU-­FPA/EU-­SGA is terminated, such as for not participating in the current Core Project, (i.e. not carrying

out tasks in the Core Project governed by an EU-­SGA), and thus its participation in the EU-­FPA is

terminated by decision of the General Assembly according to section 6.2 below, this Consortium Agreement

shall automatically terminate in respect of the affected Party, subject to the provisions surviving the

expiration or termination under Section 3.3 of this Consortium Agreement. For the avoidance of doubt

provisions surviving the expiration or termination under Section 3.3 of this Consortium Agreement apply in

the aforementioned case that a Party is not participating in the current Core Project and thus its participation

is terminated by decision of the General Assembly from the EU-­FPA but re-­enters to the Consortium by

participating in one of the following Core Projects.

3.3 Survival of rights and obligations

The provisions relating to Access Rights and Confidentiality Information, for the time period mentioned

therein, as well as for Liability, Applicable law and Settlement of disputes shall survive the expiration or

termination of this Consortium Agreement.

Termination shall not affect any rights or obligations of a Party leaving the Consortium Agreement incurred

prior to the date of termination, unless otherwise agreed between the General Assembly and the leaving

Party. This includes the obligation to provide all input, deliverables and documents for the period of its

participation.

Section 4: Responsibilities of Parties

4.1 General principles

Each Party undertakes to take part in the efficient implementation of the Project, and shall undertake

reasonable endeavours to cooperate, perform and fulfil, promptly and on time, all of its obligations under

the EU-­FPA, EU-­SGA and this Consortium Agreement as may be reasonably required from it and in a

manner of good faith as prescribed by Belgian law.

Page 30: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

16 (294)

Each Party shall undertake reasonable endeavours to notify promptly, in accordance with the governance

structure of the Project, any significant information, fact, problem or delay likely to affect the Project.

Each Party shall undertake reasonable endeavours to promptly provide all information within the Project

reasonably required by a Consortium body or by the Coordinator to carry out its tasks.

In addition to the requirements under the EU-­FPA, EU-­SGA and this Consortium Agreement, each work

package leader shall report succinctly to the Coordinator information with the content and in the format

requested by the European Commission at times agreed to by the European Commission and the

Coordinator, and using the templates provided by the Coordinator.

Each Party to the specific work package shall assist the respective work package leader to combine the

requested information.

In addition, each Party shall report the following information [to the Coordinator] every reporting period as

agreed with the European Commission:

-­ costs and staff effort statement;;

-­ explanation of the work carried out overview of the progress;;

-­ overview of the Results generated by that Party and a plan for the Exploitation and dissemination of

Results

-­ individual financial statement and related certifications from each Party and third party linked to a Party

which shall be based on the most up-­to-­date information available. The information shall be submitted by

each Party using through the EMDESK portal (http://www.emdesk.eu/) or other designated Project wide

online tools. This information will be used by the Coordinator to generate reports for use internally and by

the European Commission.

Each Party shall take reasonable measures to ensure the accuracy of any information or materials it

supplies to the other Parties.

4.2 Breach

In the event a responsible Consortium body identifies a breach by a Party of its obligations under this

Consortium Agreement, the EU-­FPA or any EU-­SGA the Coordinator or the Party appointed by the General

Assembly if the Coordinator is in breach of its obligations under this Consortium Agreement, the EU-­FPA

or any EU-­SGA will give written notice to such Party requiring that such breach be remedied within thirty

(30) calendar days.

If such breach is substantial and is not remedied within that period or is not capable of remedy, the General

Assembly may decide to declare the Party to be a Defaulting Party and to decide on the consequences

Page 31: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

17 (294)

thereof which may include termination of its participation. The Coordinator, taking advice from the General

Assembly, shall make an action plan within sixty (60) calendar days after the written notice to the Part, if

the Party is declared as a Defaulting Party.

4.3 Involvement of third parties

A Party that enters into a subcontract or otherwise involves third parties (including but not limited to Affiliated

Entities) in the Project remains solely responsible for carrying out its relevant part of the Project and for

such third party’s compliance with the provisions of this Consortium Agreement, the EU-­FPA and the EU-­

SGA. It has to ensure that the involvement of third parties does not affect the rights and obligations of the

other Parties under this Consortium Agreement, the EU-­FPA and the EU-­SGA’s. Accordingly, Parties that

list Third parties linked to a Party in Attachment 5 of this Consortium Agreement shall be solely responsible

for the acts/omissions of such Third parties towards another Party/other Parties.

Section 5: Liability towards each other

5.1 No warranties

In respect of any information or materials (incl. Results and Background) supplied by one Party to another

under the Project, no warranty or representation of any kind is made, given or implied as to the sufficiency

or fitness for purpose or as to the absence of any infringement of any proprietary rights of third parties.

Therefore,

- the recipient Party shall in all cases be entirely and solely liable for the use to which it puts such

information and materials, and

- no Party granting Access Rights shall be liable in case of infringement of proprietary rights of a

third party resulting from any other Party (or its Affiliated Entities) exercising its Access Rights.

Notwithstanding the above, each Party undertakes that it won´t knowingly and/ or intentionally make

available any proprietary rights of a third party for any Project activities for which it has not acquired the

corresponding right of use and to grant licenses.

5.2 Limitations of contractual liability

No Party shall be responsible to any other Party for (i) any indirect or consequential loss or similar damage;;

and (ii) loss of profit, loss of revenue or loss of contracts, provided such damage was not caused by fraud

,willful act or by gross negligent breach of confidentiality.

A Party’s aggregate liability towards the other Parties collectively shall be limited to the lower of the Party’s

share of its EU financial contribution under the Project as identified in the EU-­SGA´s or four hundred

Page 32: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

18 (294)

thousand (400.000,00) EURO. However, for those parties whose share of the EU financial contribution is

less than fifty thousand (50,000) EURO it is agreed that the limit of liability shall be 50,000 EURO and not

their respective share of the EU financial contribution. The exclusions and limitations of liability stated under

this subsection shall not apply if the damage was caused by fraud, gross negligence or wilful acts.

The terms of this Consortium Agreement shall not be construed to amend or limit any Party’s statutory

liability.

5.3 Damage caused to third parties

Each Party shall be solely liable for any loss, damage or injury to third parties resulting from the performance

of the said Party’s obligations by it or on its behalf under this Consortium Agreement or from its use of

Results or Background.

5.4 Force Majeure

No Party shall be considered to be in breach of this Consortium Agreement if such breach is caused by

Force Majeure. Each Party will notify the competent Consortium bodies of any Force Majeure without undue

delay. If the consequences of Force Majeure for the Project are not overcome within 6 weeks after such

notification, the transfer of tasks – if any – shall be decided by the competent Consortium bodies.

Compensation claims shall be excluded in case of Force Majeure or any restriction resulting from import or

export laws and regulations and/or any delay of the granting or extension of the import or export license or

any other governmental authorization in the event that a Party uses reasonable efforts to fulfil its tasks

properly and in time.

5.5 Export Rules and Regulations

Notwithstanding anything to the contrary contained in this Consortium Agreement it is understood that the

supply, export or transfer of goods, technologies, software, results, services and information under this

Consortium Agreement may be subject to import or export control laws and regulations or any other

governmental authorization.

In case any export control permissions or licenses are required for supplying, exporting or transferring

goods, technologies, software, results, services or information by a Party to an Affiliated Entity of another

Party the other Party to which such Affiliated Entity is related to is responsible to obtain such permissions

and licenses.

Page 33: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

19 (294)

The Parties do not warrant that if any import or export license or any other governmental authorization is

required for the fulfillment of any of its contractual obligations, such license or authorization will be issued

or extended in due time.

The Parties shall not be obliged to supply, export or transfer goods, technologies, software, results, services

and information or to perform other contractual obligations of this Consortium Agreement if such supply

would violate applicable import or export control laws or regulations of the Member States of the European

Union or another country.

In any such case, the Parties make every reasonable effort to resolve the matter in a way such that a

violation can be avoided. If this is not possible, and if the General Assembly decides that the affected tasks

form a substantial part of the tasks of the concerned Party, the Party concerned by import or export control

laws or regulations shall be entitled to terminate its participation in this Consortium with immediate effect

and the remaining Parties shall adapt the work to be performed under the SGA as may be required.

Section 6: Governance structure

6.1 General structure

The General Assembly (GA) is the decision-­making body of the Consortium. The General Assembly is the

key forum for strategic discussions about activities of the Flagship, and constitutes the principal channel of

communication between all stakeholders within the Consortium.

The Coordinator is the legal entity acting as the intermediary between the Parties and the European

Commission. The Coordinator shall, in addition to its responsibilities as a Party, perform the tasks assigned

to it as described in the EU-­FPA, EU-­SGA´s and this Consortium Agreement. The Coordinator shall appoint

a Director, who will have the functions as set out in the EU-­FPA and each EU-­SGA as well as this

Consortium Agreement.

The Executive Board (EB) is the steering group of the Consortium. It proposes decisions and prepares the

agenda of the General Assembly.

The Strategic Advisory Council (SAC) advices the Executive Board and the Director on strategic research

decisions.

The work package leaders monitor the progress of the work packages, ensure the fulfilment of the

objectives of the Project and report periodically to the Coordinator.

Page 34: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

20 (294)

6.2 GA members

The General Assembly shall consist of one duly authorised representative of each Party, whose name and

contact details have to be communicated in writing to the Coordinator through the administrative office

(hereinafter referred to as “GA member”).

Each GA member shall be deemed to be duly authorised to deliberate, negotiate and decide on all matters

listed in Section 6.2.2 of this Consortium Agreement. However, if a Party does not participate in the

implementation a specific Core Project, i.e. not carrying out action tasks in a Core Project governed by an

EU-­SGA, that Party’s participation in the EU-­FPA shall be terminated by decision of the GA.

The Parties agree to abide by all decisions of the General Assembly validly taken regarding the Project.

This does not prevent the Parties from submitting a dispute for resolution in accordance with the provisions

of settlement of disputes in Section 12.8 of this Consortium Agreement.

6.2.1 Operational procedures for the General Assembly

6.2.1.1 Representation in GA meetings

Any GA member:

- should be present or represented at any meeting;;

- may appoint a substitute or a proxy to attend and vote at any meeting;; and

- shall participate in a cooperative manner in the meetings.

6.2.1.2 Preparation and organisation of GA meetings

Convening meetings:

The first General Assembly meeting shall be held within one (1) month from the Effective Date and will be

convened by the Coordinator. At the beginning of the first GA meeting, a chairperson shall be elected, upon

proposal by the Coordinator. The Director shall not be the chairperson. This chairperson shall convene

ordinary meetings of the General Assembly at least once a year and shall also convene extraordinary

meetings at any time upon written request of at least twenty (20) % of the GA members.

Notice of a GA meeting:

The chairperson shall give notice in writing of a meeting to each GA member as soon as possible and no

later than thirty (30) calendar days preceding an ordinary meeting and fifteen (15) calendar days preceding

an extraordinary meeting.

Sending the agenda:

Page 35: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

21 (294)

The chairperson shall send each GA member a written original agenda no later than fourteen (14) calendar

days preceding the meeting, or seven (7) calendar days before an extraordinary meeting.

Adding agenda items:

Any agenda item requiring a decision by the GA members must be identified as such on the agenda.

Any GA member may add an item to the original agenda by written notification to all of the other GA

members no later than seven (7) calendar days preceding the meeting.

During a meeting the Members of the General Assembly present or represented can unanimously agree to

add a new item to the original agenda.

Any decision may also be taken without a meeting if the chairperson circulates to all GA members a written

document which is then signed by the defined majority of GA members (see Section 6.2.2 of this

Consortium Agreement).

Meetings of the General Assembly may also be held by teleconference or other telecommunication means.

Decisions will only be binding once the relevant part of the minutes has been accepted according to Section

6.2.1.5 of this Consortium Agreement.

6.2.1.3 Voting rules and quorum in the GA

The General Assembly shall not deliberate and decide validly unless two-­thirds (2/3) of its members are

present or represented (quorum).

Each GA member present or represented at the meeting shall have one (1) vote. Decisions by the GA shall

be taken by a majority of two-­thirds (2/3) of the votes. However, decisions by the GA to declare a Party to

be a Defaulting Party and to exclude a Defaulting Party, shall be taken by a majority of five-­sixths (5/6) of

the votes, where the Defaulting Party shall have no voting right. Furthermore, decision by the GA to propose

a change of Coordinator to the European Commission shall also be taken by a majority of five-­sixths (5/6)

of the votes, where the Coordinator shall have no voting right.

Defaulting Parties may not vote.

6.2.1.4 Veto rights in the GA

Page 36: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

22 (294)

A GA member who can show that its own work, time for performance, costs, liabilities, Intellectual Property

Rights or other Legitimate Interests would be severely affected by a decision of the General Assembly may

exercise a veto with respect to the corresponding decision or relevant part of the decision.

When the decision is foreseen on the original agenda, a GA member may veto a decision during the

meeting only. When a decision has been taken on a new item added to the agenda before or during the

meeting, a GA member may veto such decision during the meeting and within fifteen (15) calendar days

after the draft minutes of the meeting are sent. This veto right is also valid on EB decision (i.e reallocation

of budgets).

In case of exercise of veto, the GA members shall make every effort to resolve the matter which occasioned

the veto to the general satisfaction of all members.

A Party may not veto decisions relating to its identification as a Defaulting Party. The Defaulting Party may

not veto decisions relating to its participation and termination in the Project or the consequences of them.

A Party requesting to leave the Project and the Consortium Agreement may not veto decisions relating

thereto.

A Party that does not participate in the implementation of a specific Core Project, i.e. not carrying out action

tasks in a Core Project governed by an EU-­SGA and thus being excluded from the EU-­FPA according to

Section 6.2 of this Consortium Agreement, may not veto decisions relating to its exclusion from the EU-­

FPA.

6.2.1.5 Minutes of GA meetings

The chairperson shall produce written minutes of each meeting which shall be the formal record of all

decisions taken. He or she shall send draft minutes to all GA members within ten (10) calendar days of the

meeting.

The minutes shall be considered as accepted if, within fifteen (15) calendar days from sending by email, no

GA member has objected in writing to the chairperson with respect to the accuracy of the draft of the

minutes.

The chairperson shall send the accepted minutes to all the members of the General Assembly, and to the

Coordinator, who shall safeguard them. If requested the chairperson shall provide authenticated duplicates

to Parties requesting such authenticated duplicates.

Page 37: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

23 (294)

6.2.2 Decisions by the General Assembly (GA)

The General Assembly shall be free to act on its own initiative to formulate proposals and take decisions in

accordance with the procedures set out herein.

The following decisions shall be taken by the General Assembly:

- Proposals for changes to the EU-­FPA and its annexes, changes to Core Projects governed by EU-­

SGA´s and proposals for new Core Projects to be agreed by the European Commission

- Changes to the Consortium Plan (including the Consortium Budget)

- Withdrawals from Attachment 1 (Background included)

- Additions to Attachment 2 (Background excluded)

- Additions to Attachment 4 (List of Affiliated Entities and Third Parties to which transfer of Results

is possible without prior notice)

- Appointments of five (5) extra board members in the EB, on a yearly basis

- Upon mutual request of the disputing Parties, non-­binding suggestions regarding disputes between

Parties subject to settlement of disputes, Section 12.8 of this Consortium Agreement

- Appointment of members-­at-­large to the Executive Board and Chairperson of the Executive Board

(EB), members of the Strategic Advisory Council (SAC), and members of the Nomination

Committee.

Evolution of the Project:

- Entry of a new party to the consortium and approval of the settlement on the conditions of the

accession of such a new party under the EU-­FPA

- Withdrawal of a Party from the Consortium and the approval of the settlement on the conditions of

the withdrawal

- Identification of a Party to be in breach of its obligations under this Consortium Agreement as well

as the EU-­FPA and the EU-­SGA´s.

- Declaration of a Party to be a Defaulting Party

- Remedies to be performed by a Defaulting Party

- Termination of a Defaulting Party’s participation in the Consortium Agreement and measures

relating thereto

- Proposal to the European Commission for a change of the Coordinator

- Proposal to the European Commission for suspension of all or part of the Project

- Proposal to the European Commission for termination of the Project and the Consortium

Agreement

- Budget reallocations exceeding one hundred thousand (100.000,00) EURO in accordance with

rules applicable to the EU-­FPA

- Other major issues that affect the Project or the Core Project.

Page 38: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

24 (294)

Other appointments:

The work package leaders, the members of the Strategic Advisory Council, the Head of Innovation and the

Science and Technology Officer shall be appointed as set out in the EU-­FPA, each EU-­SGA and this

Consortium Agreement. In case of any changes in relation to such appointment, it shall be a matter for the

General Assembly to approve of such change.

6.2.3 Nomination Committee (NC)

The GA includes as its part a Nomination Committee (NC) who suggests candidates for the functions

elected by the GA. Members of the NC serve for one (1) year at a time. The NC should not nominate its

members or representatives of their own organisations to the EB. The persons nominated by the NC for

different functions shall be known to be honest and competent.

The NC suggests to the GA

- Members-­at-­large for Executive Board (EB), Strategic Advisory Council (SAC) and a new NC

- The chairperson and the vice chairperson of the EB. A current chairperson and vice chairperson of

the EB can be nominated for a second term

The nominees for member-­at-­large in the EB and NC shall come from the Parties in the Consortium. The

nominees for the SAC can come from inside as well as outside the Consortium.

6.3 Executive Board (EB)

6.3.1 EB members

The Executive Board (EB) will act as the steering committee of the Project. The EB shall consist of eighteen

(18) members of whom ten (10) members-­at-­large (having non-­operational tasks within the Project) are

elected by the GA, and the others are the Director, the Science and Technology Officer (STO, see section

6.7), Head of Innovation, and five Division Heads (see section 6.10). The Head of Administration and the

Head of Dissemination are expected to attend EB meetings but do not have voting rights. The members-­

at-­large must be chosen so that geographical, topical and gender balance is respected. In particular, at

least three (3) of the members-­at-­large must come from industry and at least three (3) from academia. At

the beginning of the Project, five (5) members-­at-­large are elected by the GA for a one-­year period and five

(5) members-­at-­large for a two-­year period. Each subsequent year, five (5) members-­at-­large are elected

by the GA for two-­year periods to replace those whose term has expired. Retiring EB members can be re-­

elected if nominated by the NC. The Director or the STO cannot serve as the EB chairperson.

6.3.2 Tasks of the EB

The EB shall prepare the meetings, propose decisions and prepare the agenda of the General Assembly

according to Sections 6.2.1.2 and 6.2.2 above.

Page 39: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

25 (294)

The EB shall report to the General Assembly and be responsible for the proper execution and

implementation of the decisions of the General Assembly.

The EB shall monitor the effective and efficient implementation of the Project.

In addition, the EB shall collect information from the work package leaders at least every six (6) months on

the progress of the Project, examine that information to assess the compliance of the Project with the

Consortium Plan and, if necessary, propose modifications of the Consortium Plan to the General Assembly.

The EB shall:

- enforce the GA decisions and deciding the agendas for GA meetings;;

- prepare decision points for the GA, together with the Director;;

- discuss strategic issues among itself and with the Management Panel, and then deciding the

direction and management principles of new Core Projects. The EB will also take into consideration

the recommendations of the SAC, the Flagship Governance Forum (FGF) and the Framework

Partnership Board (FPB) when making strategic decisions;;

- discuss and decide on strategy and new forms of international collaboration;;

- decide budget reallocations higher than thirty thousand (30.000,00) EURO and not exceeding one

hundred thousand (100.000,00) EURO;;

- solicit Expressions of Interest (EoIs) if needed for tasks in a new Core Project. The EB may consult

external expertise to evaluate received EoIs;;

- suggest consortium modifications based on, e.g., received EoIs to the General Assembly;;

- make proposals to the General Assembly for: allocating the Project’s budget in accordance with

the respective EU-­SGA/EU-­SGA´s;; reviewing and proposing budget reallocations to the Parties;;

and making proposals to the General Assembly for the creation, modalities of use, management

and release of the Consortium Budget;;

- support the Coordinator in preparing meetings with the European Commission;;

- make proposals to the General Assembly that the General Assembly should, within a period of

thirty (30) calendar days, propose to the Parties (other than the Defaulting Party) to serve notice

on a Defaulting Party in accordance with Section 4.2 and that the General Assembly decide to

assign the Defaulting Party’s tasks to specific entity(ies) (preferably chosen from the remaining

Parties);;

- decide upon the technical roadmaps with regard to the Project;;

- appoint WP leaders, the Science and Technology Officer (STO), and the Head of Innovation (HoI)

for each Core Project.

In the case of abolished tasks as a result of a decision of the General Assembly, the EB shall advise the

General Assembly on ways to rearrange tasks and budgets of the Parties concerned. Such rearrangement

Page 40: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

26 (294)

shall take into consideration the legitimate commitments taken prior to the decisions, which cannot be

cancelled.

6.3.3 Preparation and organisation of EB meetings

Convening meetings:

The chairperson of the EB shall convene meetings of the EB at least twice a year and at any time upon

written request of at least five (5) of the EB members.

Notice of a meeting:

The chairperson of the EB shall give notice in writing of a meeting to each EB member as soon as possible

and no later than fourteen (14) calendar days for ordinary meetings and seven (7) calendar days for

extraordinary meetings.

Sending the agenda:

The chairperson of the EB shall prepare and send each EB member a written (original) agenda no later

than seven (7) calendar days preceding the meeting.

Adding agenda items:

Any agenda item requiring a decision by the EB members must be identified as such on the agenda.

Any member of the EB may add an item to the original agenda by written notification to all of the other

members up to the minimum number of two (2) working days preceding the meeting.

Any decision may also be taken without a meeting if the chairperson circulates to all EB members a written

document which is then signed by the defined majority of all EB members.

Meetings of the EB may be held by teleconference or other telecommunication means.

Decisions will only be binding once the relevant part of the minutes has been accepted according to Section

6.3.5 of this Consortium Agreement.

6.3.4 Voting rules and quorum in the EB

The EB shall not deliberate and decide validly unless two-­thirds (2/3) of its members are present or

represented (quorum).

Each EB member present or represented in the meeting shall have one (1) vote.

Defaulting Parties may not vote.

Page 41: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

27 (294)

Decisions of the EB shall be taken by a majority of two-­thirds (2/3) of the votes.

6.3.5 Minutes of EB meetings

The chairperson of the EB shall produce written minutes of each meeting which shall be the formal record

of all decisions taken. He or she shall send the draft minutes to all EB members within ten (10) calendar

days of the meeting.

The minutes shall be considered as accepted if, within fifteen (15) calendar days from sending, no EB

member has objected in writing to the chairperson with respect to the accuracy of the draft of the minutes.

The chairperson shall send the accepted minutes to all the EB members and the Coordinator, who shall

safeguard them.

The Coordinator shall thereafter distribute the minutes from the EB meetings to all Parties.

6.4 Coordinator

6.4.1 The Coordinator shall be the intermediary between the Parties and the European Commission and

shall perform all tasks assigned to it as described in the EU-­FPA, the EU-­SGA´s and in this Consortium

Agreement. The Coordinator (represented by the Director) shall be the Project leader as further set out in

the EU-­FPA and each EU-­SGA. The Director will have administrative and managerial assistance as further

set out in the EU-­FPA and each EU-­SGA.

6.4.2 In particular, the Coordinator shall be responsible for:

- together with the Executive Board, the coordination of the scientific and technological work within

the Consortium

- together with the Executive Board, that the work within the Consortium is undertaken in an effective

manner and to a suitable standard of quality

- working with the Executive Board on the communication and the external relations of the Project

towards the EU

- monitoring compliance by the Parties with their obligations under the EU-­FPA and EU-­SGA´s.

- keeping the address list of GA and EB members and other contact persons updated and available

- collecting, reviewing and submitting information on the progress of the Project and reports and

other deliverables (including financial statements and related certification) to the European

Commission

- assist the EB in preparing the General Assembly meetings and providing someone to take the

minutes at such meetings

- transmitting promptly documents and information connected with the Project,

Page 42: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

28 (294)

- administering the EU financial contribution and fulfilling the financial tasks described in Section 7.3

of this Consortium Agreement.

- providing, upon request, the Parties with official copies or originals of documents which are in the

sole possession of the Coordinator when such copies or originals are necessary for the Parties to

present claims.

6.4.3 If the Coordinator fails in its coordination tasks, the General Assembly may propose to the European

Commission to change the Coordinator.

6.4.4 The Coordinator shall not be entitled to act or to make legally binding declarations on behalf of any

other Party, except as expressly stipulated under the EU-­FPA, this Consortium Agreement or the EU-­

SGA´s. However, prior to acting or making such legally binding declarations on behalf of any Party, the

Coordinator must in each case receive proper authorization from the relevant Consortium body (e.g. GA,

EB) as set out in Section 6 of this Consortium Agreement and/or the affected Party if none of the Consortium

bodies is entitled to give authorization in this matter according to Section 6. In case of authorization by the

competent Consortium body, the members of the Consortium body (where necessary) must have received

authorisation from their respective employers to bind the party to such decision.

6.4.5 The Coordinator shall not enlarge its role beyond the tasks specified in this Consortium Agreement

and in the EU-­FPA.

6.5 Director

The Director and Vice-­Director are appointed and employed by the Coordinator. The Director is the

spokesperson for the Project. He is the link between different Consortium bodies, and keeps the bodies

informed of EB and GA decisions, and informs EB of any relevant issues that arise within the Project’s

operation. The Director is the main contact point between the Project and the European Commission, as

well as between the Project and the National and Regional Funding Organizations.

The Director is supported by administrative functions, as described below. The administration is divided

into general administration, innovation and utilisation and dissemination, led by the Heads of Administration

(HoA), Innovation (HoI) and Dissemination (HoD), respectively. The HoA and HoD are appointed by the

Coordinator, and the HoI, being a voting member of the EB, is appointed by the EB.

The Director shall in particular be responsible for:

- together with the EB chairperson preparing the EB meetings by sending out [invitations and]

agenda [and arranging for minutes] to be kept

- deciding on budget reallocations not exceeding ten thousand (10.000,00) EURO,

- continually informing the Executive Board on the operations of the Project and maintaining

- a close dialogue with the chairperson of the Executive Board

Page 43: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

29 (294)

- leading and coordinating the scientific and technological work of the Project together with

- the work package leaders

- handling the administrative and legal matters of the Project

- handling communication between the Project and the European Commission

- being the spokesperson for the Project in different contexts

- mediating in any conflicts in the Project. Its suggestions are non-­binding.

6.6 Work packages

Work packages are topical research and innovation activities in a specific technology area. The work

packages will be defined in connection with each Core Project and governed by an EU-­SGA.

Each work package will be led by a work package leader. The work package leaders shall be appointed as

set out in the EU-­FPA, each EU-­SGA and this Consortium Agreement. In case of any changes in relation

to such appointment, it shall be a matter for the Executive Board to approve of such change.

The role of the work package leaders is to:

- monitor the progress of the work package against work plan and budget allocations

- ensure that the work package fulfils the objectives, milestones and deliverables

- deliver management reports to the Coordinator

6.7 Science and Technology Officer (STO)

The Science and Technology Officer (STO) is the chairperson of the Management Panel. Together, the

STO and the Director have the overarching responsibility of the scientific and technological aspects of the

Flagship. The STO may not be a work package leader. The STO has a wide view of the different topics of

each Research and Innovation Division (Division), which enables him to promote cross-­fertilization between

the various activities of the Flagship and incorporate feedback by the Science and Technology Forum

(STF).

6.8 Management Panel (MP)

The Management Panel (MP) is an implementing body that consists of the leaders of the research and

innovation divisions, the Director, the Science and Technology Officer, and the heads of the three

administrative units (HoI, HoA, and HoD). The MP implements the decisions of the EB and formulates

proposals in managing the Project. The MP shall meet as often as needed.

The tasks of the MP comprise

- Handling running issues that require scientific, technological and administrative competences,

including identification of Partnering Projects

Page 44: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

30 (294)

- Organising the writing of proposals for new Core Projects and updating the action plan of the EU-­

FPA based on input from the Science and Technology Forum and the SAC

- Deciding budget reallocations higher than ten thousand (10.000,00) EURO and not exceeding thirty

thousand (30.000,00) EURO with respect to the rules applicable to the EU-­FPA and EU-­SGA;;

- Approval of new Associated members and the terminations of Associate Memberships

- Inform the EB of all scientific or technical issues in the Divisions.

6.9 Science and Technology Forum (STF)

The Science and Technology Forum (STF) is a discussion forum in which all work package leaders, their

deputies, Vice-­Director, and other members of the Management Panel participate. The SAC is also invited

to attend the STF, and members of the EB may attend. The focus of the STF is science and technology

only. In the forum, Project progress is presented and cross-­pollination between different topics encouraged.

The outcome of the STF meetings serves as a basis for selecting topics and directions for new Core

Projects and other activities.

6.10 Research and Innovation Divisions (Divisions)

The Research and Innovation Divisions are collections of scientific and technical work packages on related

topics or on comparable technology readiness level. Each Division is headed by a Division Head, who is

elected for one (1) year at the time by and among the leaders of the work packages in the Division. Each

Division Head is a member of the MP.

Divisions in a Core Project is governed under each EU-­SGA.

The external Division is composed of Partnering Projects and Associated members who work towards goals

of the Flagship but who are not partners of the EU-­FPA or the EU-­SGA´s. The purpose of the external

Division is to provide a stronger interaction between the Core Project and related activities.

6.11 Strategic Advisory Council

The Consortium shall have a Strategic Advisory Council (SAC) consisting of experts within the science,

technology and industry concerning graphene. The key tasks for the SAC are to:

- advise the EB and the Director on strategic research decisions

- facilitate contacts with related national and international research programmes.

The membership of the SAC shall be personal and no substitutes shall be allowed. The SAC shall consist

of nine (9) members, which shall be appointed by the General Assembly, based on recommendations by

the NC Its members shall be at least three (3) from academia and at least three (3) from industry. The

members of the SAC shall serve three (3) year renewable terms.

Page 45: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

31 (294)

The SAC will meet at least twice a year.

The SAC may choose its work as it sees fit and may engage a permanent secretary if it deems appropriate.

The SAC shall, together with the Executive Board and the General Assembly, elaborate on the progression

of the Project by including new partners to the Consortium Agreement or developing new research

directions. Together with the Coordinator and the EB, the SAC will promote the Flagship.

For the avoidance of doubt, the members of the SAC shall have no voting rights. The SAC shall not make

any decisions but only recommendations to the decision making bodies of the Consortium.

If the members of the SAC are not a Party within the Consortium, they are required to sign a non-­disclosure

agreement with the Coordinator on behalf of the relevant Parties before any Confidential Information (see

Section 11 of this Consortium Agreement) is exchanged. The Coordinator is authorised to execute with

each of the members of the SAC a non-­disclosure agreement, which terms shall not be less stringent than

those stipulated under this Consortium Agreement. The template NDA to be used shall be made in

coordination with all Parties in advance. The template must be approved by the Parties and may then only

be signed by the Coordinator in the exact form that was approved. Any amendments shall require new

approval.

6.12 Associated members

Organisations that participate in related activities to the Project other than this Project itself, funded for

instance by national means (e.g. through an ERA-­NET project) may be invited to become “Associated

members” by the Executive Board. The Executive Board will appoint new Associated members upon

recommendation by national bodies or the European Commission or may itself identify new Associated

members. The Associated members may attend certain activities organised by the Project and take

advantage of some services provided by the Project, decided beforehand by the Executive Board, such as

list their publications and patents in the database maintained by the Project. Unless agreed explicitly in

advance in writing by the relevant Parties, no Confidential information of a Party under this Agreement may

be shared with the Associated Members. If agreed between the relevant Parties, the Associated members

may be requested to sign a confidentiality undertaking with the relevant Parties before participating in any

Project activities which terms shall not be less stringent than those stipulated under this Consortium

Agreement. Associated members and Parties to this Consortium Agreement may agree to have different

forms of collaboration on a case by case basis, provided that such agreements do not infringe on the rights

of other Parties, directly or indirectly, under this Consortium Agreement, the EU-­FPA or an EU-­SGA.

Page 46: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

32 (294)

For the avoidance of doubt, the Associated members shall have no voting rights and are not parties to this

Consortium Agreement. Accordingly, they shall not have any Access Rights under this Consortium

Agreement.

Section 7: Financial provisions

7.1 General Principles

7.1.1 Distribution of Financial Contribution

The EU financial contribution to the Project shall be distributed by the Coordinator according to:

- the Consortium Budget as included in the Consortium Plan

- the approval of reports by the European Commission, and

- the provisions of payment in Section 7.3 of this Consortium Agreement.

A Party shall be funded only for its tasks carried out in accordance with the Consortium Plan.

Financial provisions related to Core Projects are set out in the EU-­SGA´s.

7.1.2 Late delivery

All major agreed contributions to deliverables have to be submitted in the agreed time by the involved Party.

If, in the reasonable opinion of the Consortium body to whom delivery is made, the contribution is

unjustifiably late, such Consortium body may request the Coordinator to undertake any or all of the

following:

1) send an official letter to the responsible Party informing them of the late delivery and specifying

such late delivery is to be considered as not in accordance with the obligations herein, and/or

2) notify the European Commission and record the delay in the official management report to the

European Commission thirty (30) calendar days after the date the contribution is due;; and/or

3) raise the issue to the General Assembly and propose a vote to declare the Party to be a Defaulting

Party forty five (45) calendar days after the date the contribution is due and if applicable, impose a

delay in the payment to the Party in question.

Notwithstanding the aforementioned, it is expected that the Coordinator shall make a decision to withhold

or recover any payments to a Defaulting Party as provided for in Section 7.3.2 based upon the particulars

of the late delivery in question subject to the rights of the Coordinator under the EU-­FPA and the applicable

EU-­SGA. The Coordinator shall take into account any mitigating factors put forward by the Party responsible

for such late delivery. It is understood that the Coordinator would normally adopt a process of escalation

with regard to repeated instances of late delivery by the same Party.

Page 47: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

33 (294)

7.1.3 Justifying Costs

In accordance with its own usual accounting and management principles and practices, each Party shall

be solely responsible for justifying its costs with respect to the Project towards the European Commission.

Neither the Coordinator nor any of the other Parties shall be in any way liable or responsible for such

justification of costs towards the European Commission

7.1.4 Funding Principles

A Party which spends less than its allocated share of the Consortium Budget will be funded in accordance

with its actual duly justified eligible costs only.

A Party that spends more than its allocated share of the Consortium Budget will be funded only in respect

of duly justified eligible costs up to an amount not exceeding that share.

7.1.5 Financial Consequences of the termination of the participation of a Party

A Party leaving the Consortium shall refund all payments it has received except the amount of contribution

accepted by the European Commission or another contributor. Furthermore a Defaulting Party shall, within

the limits specified in Section 5.2 of this Consortium Agreement, bear any reasonable and justifiable

additional costs occurring to the other Parties in order to perform its and their tasks.

7.2 Budgeting

The Consortium Budget shall be valued in accordance with the usual accounting and management

principles and practices of the respective Parties.

7.3 Payments

7.3.1 Payments to Parties are the exclusive tasks of the Coordinator. In particular, the Coordinator shall:

- receive the EU financial contribution and distribute it in accordance with this Consortium Agreement

and the EU-­SGAs and notify the Party concerned promptly of the date and composition of the

amount transferred to its bank account, giving the relevant references

- perform diligently its tasks in the proper administration of any funds and in maintaining financial

accounts

- undertake to keep the European Union’s financial contribution to the Project separated from its

normal business accounts, its own assets and property, except if the Coordinator is a Public Body

or is not entitled to do so due to statutory legislation.

Page 48: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

34 (294)

7.3.2 All payments shall be made without undue delay by the Coordinator after receipt of funds from the

European Commission and shall be consistent with the accepted decisions of the General Assembly on

the Consortium Budget, which includes the payment distribution schedule. The payment distribution

schedule shall be provided by the Coordinator and shall contain the transfer of pre-­financing and interim

payments to the Parties.

Payments to Parties will be handled according to the principles and modalities described in each EU-­SGA.

The Coordinator is entitled to withhold any advances due to a Defaulting Party and to recover any payments

already paid to a Defaulting Party as per Section 7.1.2 above and subject to the rights of the Coordinator

under the EU-­SGAs.

In addition to the above, the Coordinator is entitled to withhold any payments due to a Party identified by

the General Assembly to be a Defaulting Party under this Consortium Agreement and/or the EU-­FPA,

and/or the EU-­SGAs, or to a Party which has not yet signed this Consortium Agreement or the Accession

document in Attachment 3 to this Consortium Agreement.

Section 8: Results Regarding Results, [Section 3 of] the EU-­FPA shall apply with the following additions:

Results shall be the property of the Party carrying out the work generating that Results.

Each Party undertakes to inform the Head of Innovation, of key performance indicators and Results

generated, which the Party reasonably deems to be of its current or future commercial interest. A general

overview of such Results shall be provided in writing. The Head of Innovation shall, subject to Confidentiality

obligations due to IPR protection or other Legitimate Interests of a Party inform the other Parties thereof.

For sake of clarity, no Access Rights are given through such communication;; the rules about granting of

Access Rights defined in Sections 8 and 9 shall apply.

The Parties’ attention is drawn to the fact that there are many other research programs funding projects

related to graphene (“Other Related Projects” or “ORPs”). Therefore, where research undertaken within the

Project involves Parties who are also working in research within the same or a similar area within an ORP,

the Parties concerned shall:

i) ensure they undertake reasonable efforts to clearly identify where and under which project

Results is created and undertake reasonable efforts to keep the Results of the Project and the

ORP clear and distinct from each other;;

Page 49: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

35 (294)

ii) inform the relevant Consortium body/ies (such as work package leaders, the EB and the GA)

of any existing or potential conflict and collaborate with such body/ies to try to minimise the

impact of such conflict and find a workable solution that is in accordance with the EU-­FPA, the

EU-­SGA´s, this Consortium Agreement and the terms of the ORP;;

iii) where a conflict is unavoidable, and having undertaken the process in ii) above, ensure that

any Access Rights granted under this Consortium Agreement do not conflict with the terms of

the ORP. For example no exclusive Access Rights shall be granted to Results under either this

Consortium Agreement, the EU-­FPA and/or the EU-­SGA´s or under the terms of the ORP

without the express prior written consent of all Parties being affected by the granting of an

exclusive license hereto and those affected by it of the ORP.

8.1 Joint ownership

8.1.1 Where several Parties have jointly carried out work generating Results and only where their respective

share to the Results cannot be ascertained for the purpose of applying for, obtaining and/or maintaining

the relevant patent protection or any other intellectual property right, they shall have joint ownership of such

jointly owned Results (hereinafter “Joint Results”). The joint owners shall, within a six (6) month period as from the date of the generation of such Result, establish a written separate joint ownership agreement

regarding the allocation of ownership and terms of exercising, protecting, the division of related costs and

exploiting such jointly owned Results on a case by case basis.

Until the time a joint ownership agreement has been concluded such Results shall be owned by the joint

owners concerned (“Joint Owners”) in equal parts unless a Joint Owner can provide reasonable justification

that the ownership shall instead reasonably be divided in another way (e.g.pro rata to the contribution of a

Joint Owner to an inventive step, the intellectual contribution of a Joint Owner, the person months, costs

spent on the respective work, other financial contribution to the respective work etc.). In accordance with

the rules of participation to the H2020 program, a Joint Owner can also assign its share of the Joint Results,

once the Joint Result has been generated, to one or some of the Joint Owners as long as the assignment

does not prejudice the rights granted under this Consortium Agreement.

8.1.2 The Joint Owners of Joint Results shall use good faith and reasonable endeavours to agree between

them a Joint Ownership agreement for the Exploitation of such Joint Results. However, (and subject strictly

to the obligations within this clause) in the event a Joint Ownership agreement (i) has not yet been agreed,

or (ii) the Joint Owners are unable to reach full agreement within six (6) months of initiating negotiations,

each of the Joint Owners and their Affiliated Entities shall be entitled to exploit their Joint Results for non-­

commercial research and teaching purposes on a royalty free basis and without requiring the prior consent

of the Joint Owners. Each of the Joint Owners and their Affiliated Entities shall be entitled to Exploit their

Page 50: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

36 (294)

Joint Results for commercial purposes including to grant non-­exclusive licenses to third parties but without

the right to sub-­license strictly subject to the following conditions:

- at least forty five (45) calendar days prior notice must be given to the other Joint Owners before

the granting of non-­exclusive licenses and

- a Fair and Reasonable compensation must be agreed with the other Joint Owner(s).

Notwithstanding the above, where such Joint Results incorporates registerable Intellectual Property Rights

(such as, but not limited to, a patentable technology) or a Party’s trade secrets or Confidential Information

the Joint Owners must establish a Joint Ownership agreement before any commercial Exploitation

(including research for the benefit of third parties) is made of the Joint Results.

8.1.3 Unless already agreed in a Joint Ownership agreement according to Section 8.1.2 and subject to

Section 8.1.4 below, protection measures, all costs related to applications for patents and other IPR

protection, maintenance, costs for bringing actions for infringements and division of related costs of Joint

Results shall be agreed between the Joint Owners in advance and all such costs shall be shared between

the Joint Owners pro rata to their share in the Joint Results. For the avoidance of doubt, a Joint Owner is

entitled to decide not to contribute to such costs for patent and/or other IPR protection. Any of the Joint

Owners may raise a request to the other Joint Owner(s). If such request is made, the Joint Owners shall

meet to discuss the drafting of the application and in which territories the rights shall be sought.

8.1.4

(a) If and when a Joint Owner decides not to contribute, or not to continue its contribution, as the case

may be, to the costs of application for or maintenance of patent or other IPR protection for the Joint

Results, for one or more countries or territories, it shall be entitled not to contribute, or to discontinue

its contribution, provided however that:

(i) it shall promptly notify the other Joint Owner(s) in writing of its decision;;

(ii) it shall forthwith, without any compensation other than what is regulated in (iii) below,

relinquish all its title to and interest in such jointly owned patents, patent applications or

other registered IPRs protecting such Joint Results for the countries or territories

concerned to the other owner(s) who contribute or continue their contribution, as the case

may be, to such costs in accordance with Section 8.1.3 above;; and

(iii) it shall lose its rights with respect to such jointly owned patents, patent applications or other

registered IPRs, related to the Joint Results, for the countries or territories concerned

(within the meaning of Section 8.1.4 (a)) as of the moment of notification, but subject,

however, to the retention of a non-­transferable, non-­exclusive, royalty free licence for

implementation of the Project and for Exploitation for the lifetime of the Intellectual Property

Right in or for the countries or territories concerned in favour of, and for the use by, such

Party as well as such Party’s Affiliated Entities

Page 51: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

37 (294)

(b) Each Joint Owner of patents or patent applications or other IPRs protecting Joint Results shall at

their own expense, have the right to seek or maintain IPR protection for any such jointly owned

IPRs if an agreement in accordance with Section 8.1.3 has not been reached within ninety (90)

calendar days of a Joint Owner having notified the other Joint Owner(s) of the fact of a joint

invention, or, if an agreement in accordance with Section 8.1.3 has been reached, beyond the

protection which is covered by such agreement, and will in such case have full control over its

preparation, prosecution and maintenance, even though title to any issuing patent or other IPR will

be joint.

(c) Each Joint Owner of patents or patent applications or other IPRs protecting Joint Results shall, at

their own risk and expense, have the right to bring an action for infringement of any such jointly

owned IPRs.

8.2 Transfer of Results

8.2.1 Each Party may assign ownership of its own Results (including without limitation its share in Joint

Results, and all rights and obligations attaching to it) to any of its Affiliated Entities, or to another Third Party

identified in Attachment 4 to this Consortium Agreement without prior notification to the other Parties.

However:

(a) any such assignment shall be made subject to the Access Rights, the rights to obtain Access Rights

and the right to disseminate Results that are granted to the other Parties and their Affiliated Entities

in the EU-­FPA, the EU-­SGA´s and/or this Consortium Agreement. Therefore, each assignor shall

ensure that such assignment does not prejudice such rights of the other Parties or their Affiliated

Entities. This may be done, for example, (i) by effecting such assignment subject to a license back

to the assigning Party that is sufficient for the assigning Party to grant to the other Parties and their

Affiliated Entities such Access Rights, or (ii) by the assigning Party obtaining from the assignee of

the Results legally binding undertakings (that can be enforced by the other Parties and their

Affiliated Entities) to grant such Access Rights;; and

(b) the assignor shall pass on its obligations regarding the assigned Results to the assignee, including

the obligation to pass them on to any subsequent assignee., The assigning Party shall, either

before or within a reasonable period following assignment of any rights in any Results, ensure that

such assignment is subject to the principles in 8.2.1 (a) above. For all other transfers than those to

a Third party linked to a Party and/or Affiliated Entities identified in Attachment 4, shall the assigning

Party notify the other Parties of the assignment, including details of the Results assigned and the

identity and contact details of the assignee.

Page 52: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

38 (294)

8.2.2 Each Party hereby waives any right to object to any assignment that is made in compliance with this

Section 8.2 and in accordance with the EU-­FPA and the EU-­SGA´s.

8.3 Dissemination

8.3.1 Publication

8.3.1.1 During the Project and for a period of 1 year after the end of the Project, dissemination activities

including but not restricted to publications and presentations shall be governed by the procedure [of Article

35] of the EU-­FPA subject to the following provisions.

Prior notice of any planned publication shall be made thirty (30) calendar days before the publication. Any

objection to the planned publication shall be made in accordance with the EU-­FPA in writing / email within

fifteen (15) calendar days after the notice. If no objection is made within the time limit stated above, the

publication is permitted.

The notices shall be made on the website of the Project at a restricted area and the planned publication

shall be included. The notices are deemed given when planned publications have been published on the

website at the restricted area and notifications have been sent to the other Parties.

8.3.1.2 An objection is justified if

(a) the objecting Party’s Legitimate Interests in relation to Background or Results or Confidential

Information are threatened or compromised by the publication;; or

(b) the protection of the objecting Party’s Results or Background is adversely affected.

The objection has to include a precise request for necessary modifications.

8.3.1.3 If an objection has been raised the involved Parties shall discuss how to overcome the justified

grounds for the objection on a timely basis (for example by amendment to the planned publication and/or

by protecting information before publication) and the objecting Party shall not unreasonably continue the

opposition if appropriate actions are performed following the discussion. Subject to the publishing Party

making reasonable requested amendments to the proposed publication under no circumstances may the

publication be delayed for more than sixty (60) calendar days following the objection.

8.3.2 Publication of another Party’s Results or Background

For the avoidance of doubt, a Party shall not publish Results or Background of another Party, even if such

Results or Background is amalgamated with the Party’s Results, without the other Party’s express prior

written approval. For the avoidance of doubt, the mere absence of an objection in accordance with Section

8.3.1 is not considered as an approval.

Page 53: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

39 (294)

8.3.3 Cooperation obligations

The Parties undertake to cooperate to allow the timely submission, examination, publication and defence

of any dissertation or thesis for a degree that includes their Results or Background. However, confidentiality

and publication clauses have to be respected.

8.3.4 Use of names, logos or trademarks

Nothing in this Consortium Agreement shall be construed as conferring rights to use in advertising, publicity

or otherwise the name of the Parties or any of their logos or trademarks without their prior written approval.

8.4 Contributions to standards

The Parties shall agree rules and working procedures for any standardization related activities (including

but not limited to preparation and review of proposed contributions to any standard’s organization) within

the Project and any such activities need to be implemented in a manner that does not violate any applicable

antitrust laws and regulations. For the avoidance of doubt, no Party shall have any obligation to make any

contribution for incorporation of its own Results, in any European or other standard. In addition, no Party

shall have the right to contribute to a standard or allow the contribution to a standard of any data which

constitutes Results, Background or Confidential Information of another Party, even where such data is

amalgamated with such first Party’s Results, Background, or Confidential Information or other information,

document or material, without such other Party’s prior written approval.

Section 9: Access Rights

9.1 Background covered

9.1.1 In Attachment 1, the Parties have identified and agreed on the Background that shall be included for

each of the planned Core Projects under the Project and have also, where relevant, informed each other

that Access Rights to specific Background is subject to legal restrictions or limits. In Attachment 2, the

Parties have identified and agreed on the Background that shall be excluded from each of the planned Core

Projects under the Project and have also, where relevant, informed each other that Access Rights to specific

Background that is explicitly excluded is subject to legal restrictions or limits. Each Party may choose

whether to identify its Background in Attachment 1 and/or Attachment 2.

Each Party may propose, during the term of the Project and not later than within the duration of the specific

Core Project it participates in to add into Attachment 1 and/or Attachment 2 a reference to any of its

Background not yet so listed.

Page 54: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

40 (294)

Anything that is not identified in Attachment 1 or that is excluded in Attachment 2 shall not be the object of

Access Right obligations regarding Background.

9.1.2 If a Party has chosen to identify its Background in Attachment 1 the following shall apply:

Notwithstanding anything else in this Consortium Agreement, there shall be no obligation to grant, and no

right to be granted, Access Rights to any Background that is not listed as included in Attachment 1 to this

Consortium Agreement (“Unlisted Background“).Each Party agrees not to use knowingly, in the

implementation of the Project, any Unlisted Background, if such use would result in such Unlisted

Background being Needed by any other Party for implementation of the Project or Exploitation of that other

Party’s own Results.

If a Party has chosen to identify its Background in Attachment 2 the following shall apply:

Notwithstanding anything to the contrary in the preceding paragraph or elsewhere in this Consortium

Agreement, there shall be no obligation to grant, and no right to be granted, Access Rights to any

Background that is listed as excluded in Attachment 2 to this Consortium Agreement (“Listed Background“).

9.2 General Principles

9.2.1 Each Party shall implement its tasks in accordance with the Consortium Plan and shall bear sole

responsibility for ensuring that its acts within the Project and the specific Core Project(s) do not knowingly

infringe third party property rights.

9.2.2 Any Access Rights granted expressly exclude any rights to sublicense unless expressly stated

otherwise.

9.2.3 Access Rights shall be free of any administrative transfer costs.

9.2.4 Access Rights are granted on a non-­exclusive basis.

9.2.5 Results and Background shall be used only for the purposes for which Access Rights to it have been

granted.

9.2.6 All requests for Access Rights shall be made in writing.

The granting of Access Rights may be made conditional on the acceptance of specific conditions aimed at

ensuring that these rights will be used only for the intended purpose and that appropriate confidentiality

obligations are in place.

Page 55: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

41 (294)

9.2.7 The requesting Party must show that the Access Rights are Needed in relation to the Core Project it

participates in.

9.2.8 The Access Rights provisions in this section 9 shall only apply between Parties working together in a

Core Project, where Need arises out of the individual Core Project context. As a principle, no Access Rights

are Needed between Parties that do not collaborate in a Core Project.

9.2.9 Any and all Access Rights for Exploitation granted pursuant to this Consortium Agreement include

the right of Indirect Utilisation as such term is defined in Section 1 of this Consortium Agreement.

9.2.10 Each Party will make its best efforts ensure that it can grant Access Rights and fulfil the obligations

under this CA. The Partners shall undertake to take any and all necessary actions to safeguard that the

other Parties´ Access Rights are observed and complied with by its employees, subcontractors or other

persons under its control directly or indirectly engaged for the purpose of the Project.

9.3 Access Rights for implementation

Access Rights to Results and Background Needed for the performance of the own work of a Party under

the specific Core Project shall be granted on a royalty-­free basis.

9.4 Access Rights for Exploitation

9.4.1 Access Rights to Results if Needed for Exploitation of a requesting Party’s own Results, including for

research on behalf of a third party, shall be granted on Fair and Reasonable conditions.

Access rights to Results for internal research activities and academic purposes shall be granted on a

royalty-­free basis.

9.4.2 Access Rights to Background if Needed for Exploitation of a requesting Party’s own Results, including

for research on behalf of a third party, shall be granted on Fair and Reasonable conditions.

9.4.3 A request for Access Rights may be made up to twentyfour (24) months after the end of the Core

Project or, in the case of Section 9.7.2.1.2, after the termination of the requesting Party’s participation in

the Core Project.

9.5 Access Rights for Affiliated Entities

Each Party shall grant on written request, according to the provisions of Sections 9.2 – 9.4, Access Rights

to Results and Background to any other Party Affiliated Entity as if such Affiliated Entity were a Party to this

Consortium Agreement and the respective Core Project, and subject to the condition that such Affiliated

Page 56: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

42 (294)

Entity undertakes to grant licenses and user rights, on terms identical to Access Rights granted under this

Consortium Agreement, to all Parties and their Affiliated Entities (subject to such Affiliated Entity also having

given such undertaking) and (without prejudice to the Parties’ obligations to carry out the Project and to

provide Project deliverables) to fulfil all confidentiality and other obligations towards the Commission and

the other Parties which were accepted by the Parties under the EU-­FPA , the respective SGA or this

Consortium Agreement as if such Affiliated Entity was a Party. Access Rights granted to any Affiliated Entity

are subject to the continuation of the Access Rights of the Party of which it is an Affiliated Entity, and shall

automatically terminate upon termination of the Access Rights granted to such Party. Further, if an Affiliated

Entity fails in any material respect to comply with the undertaking given by it as above, and fails to rectify

the non-­compliance after being given a reasonable opportunity to do so, all Access Rights granted to it

based upon that undertaking shall terminate.

For the avoidance of doubt, this Section 9.5 of this Consortium Agreement is intended to confer a benefit

on Affiliated Entities of the Parties by affording them the opportunity to obtain Access Rights, but it shall not

oblige any Affiliated Entity of any Party to accept the granting of any Access Rights.

Upon cessation of the status as an Affiliated Entity, any Access Rights granted to such former Affiliated

Entity shall lapse.

Further arrangements with Affiliated Entities may be negotiated in separate agreements.

For the avoidance of doubt, Access Rights must be requested in writing by the Affiliated Entity from the

Party that holds the Background or Results. Alternatively, the Party granting the Access Rights may

individually agree with the Party requesting the Access Rights to have the Access Rights include the right

to sublicense to the latter’s Affiliated Entities. Access Rights to Affiliated Entities shall be granted upon

written bilateral agreement in accordance with this Section and Sections 9.2 – 9.4.

9.6 Additional Access Rights

For the avoidance of doubt any grant of Access Rights not covered by the EU-­FPA, EU-­SGA´s or this

Consortium Agreement shall be at the absolute discretion of the owning Party and subject to such terms

and conditions as may be agreed between the owning and receiving Parties.

9.7 Access Rights for Parties entering or leaving the Project

9.7.1 New Parties entering the Project

As regards Results developed before the accession of the new Party, the new Party will be granted Access

Rights on the conditions applying for Access Rights to Background.

Page 57: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

43 (294)

9.7.2 Parties leaving the Project

9.7.2.1 Access Rights granted to a leaving Party

9.7.2.1.1 Defaulting Party

Access Rights granted to a Defaulting Party and such Party’s right to request Access Rights shall cease

immediately upon receipt by the Defaulting Party of the formal notice of the decision of the General

Assembly to terminate its participation in the Project.

9.7.2.1.2 Non-­defaulting Party/Non-­participating in a Project

A non-­defaulting Party

1) leaving voluntarily or

2) leaving due to its termination of participation from the EU-­FPA because of not participating in a

Core Project or any other reason

shall have Access Rights to the Results developed until the date of the termination of its participation. It

may request Access Rights within the period of time specified in Section 9.4.3.

9.7.2.2 Access Rights to be granted by any leaving Party

Any Party leaving the Project shall continue to grant Access Rights pursuant to the EU-­FPA, EU-­SGA´s

and this Consortium Agreement as if it had remained a Party for the whole duration of the Project.

Section 10 Specific Provisions for Access Rights to Software For the avoidance of doubt, the general provisions for Access Rights provided for in Section 9 above are

applicable also to Software.

Parties’ Access Rights to Software do not include any right to receive source code or object code ported to

a certain hardware platform or any right to receive Software documentation in any particular form or detail,

but only as available from the Party granting the Access Rights.

Section 11: Non-­disclosure of information 11.1 All information in whatever form or mode of transmission, which is disclosed by a Party (the “Disclosing

Party”) to any other Party (the “Recipient”) in connection with the Project or Core Project during its

implementation and which has been explicitly marked as “confidential”, or when disclosed orally, has been

Page 58: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

44 (294)

identified as confidential at the time of disclosure and has been confirmed and designated in writing within

fifteen (15) calendar days from oral disclosure at the latest as confidential information by the Disclosing

Party, is “Confidential Information”.

11.2 The Recipients hereby undertake in addition and without prejudice to any commitment of non-­

disclosure under the EU-­FPA, for a period of four (4) years after the end of the Project

- not to use Confidential Information otherwise than for the purpose for which it was disclosed;; - not to disclose Confidential Information to any third party without the prior written consent by the

Disclosing Party;;

- to ensure that internal distribution of Confidential Information by a Recipient shall take place on a

strict need-­to-­know basis;; and

- to return on Recipient’s cost to the Disclosing Party or to destroy all Confidential Information which

has been supplied to or acquired by the Recipients including all copies thereof and to delete all

information stored in a machine readable form. If needed for the recording of ongoing obligations,

the Recipients may however keep a copy for archival purposes only.

11.3 The Recipients shall be responsible for the fulfilment of the above obligations on the part of their

employees, subcontractors and shall ensure that their employees or subcontractor remain so obliged, as

far as legally possible, during and after the end of the Project and/or after the termination of employment

or subcontracting.

11.4 The above shall not apply for disclosure or use of Confidential Information, if and in so far as the

Recipient can show that:

- the Confidential Information becomes publicly available by means other than a breach of the

Recipient’s confidentiality obligations;;

- the Disclosing Party subsequently informs the Recipient that the Confidential Information is no

longer confidential;;

- the Confidential Information is communicated to the Recipient without any obligation of confidence

by a third party who is in lawful possession thereof and under no obligation of confidence to the

Disclosing Party;;

- the disclosure or communication of the Confidential Information is foreseen by provisions of the

EU-­FPA;;

- the disclosure is due to mandatory national laws or mandatory national regulations or a national

court order or administrative order;;

- the Confidential Information, at any time, was developed by the Recipient completely independently

of any such disclosure by the Disclosing Party which can be shown by written records;; or

- the Confidential Information was already known to the Recipient prior to disclosure and the

Recipient can demonstrate such through contemporaneous documentation.

Page 59: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

45 (294)

- the Recipient is required to disclose the Confidential Information in order to comply with applicable

national laws or regulations or with a court or administrative order, subject to the provision Section

11.7 hereunder.

11.5 The Recipient shall apply the same degree of care with regard to the Confidential Information disclosed

within the scope of the Project as with its own confidential and/or proprietary information, but in no case

less than reasonable care.

11.6 Each Party shall promptly advise the other Party in writing of any unauthorised disclosure,

misappropriation or misuse of Confidential Information after it becomes aware of such unauthorised

disclosure, misappropriation or misuse.

11.7 If any Party becomes aware that it will be required, or is likely to be required, to disclose Confidential

Information in order to comply with national laws or national regulations or with a national court or

administrative order, it shall, to the extent it is lawfully able to do so, prior to any such disclosure

(i) notify the Disclosing Party, and (ii) where it is legally possible comply with the Disclosing Party’s

reasonable instructions to protect the confidentiality of the information.

11.8 The confidentiality obligations under this Consortium Agreement and the EU-­FPA shall not prevent

the communication of Confidential Information to the European Commission.

Section 12: Miscellaneous

12.1 Attachments, inconsistencies and severability

This Consortium Agreement consists of this core text and

Attachment 1 (Background included)

Attachment 2 (Background excluded)

Attachment 3 (Accession document)

Attachment 4 (List of Affiliated Entities and Third Parties to which transfer of Results is possible without

prior notice)

Attachment 5 (List of Third parties linked to a Party)

Attachment 6 (Initial list of GA Members and other contact persons)

In case the terms of this Consortium Agreement are in conflict with the terms of the EU-­FPA or an EU-­SGA,

the terms of the EU-­FPA or the EU-­SGA shall prevail. In case of conflicts between the attachments and the

core text of this Consortium Agreement, the latter shall prevail.

Page 60: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

46 (294)

Should any provision of this Consortium Agreement become invalid, illegal or unenforceable, it shall not

affect the validity of the remaining provisions of this Consortium Agreement. In such a case, the Parties

concerned shall be entitled to request that a valid and practicable provision be negotiated which fulfils the

purpose of the original provision.

12.2 No representation, partnership or agency

The Parties shall not be entitled to act or to make legally binding declarations on behalf of any other Party.

Nothing in this Consortium Agreement shall be deemed to constitute a joint venture, agency, partnership,

interest grouping or any other kind of formal business grouping or entity between the Parties.

12.3 Notices and other communication

Any notice to be given under this Consortium Agreement shall be in writing to the addresses and recipients

as listed in the most current address list kept by the Coordinator based on the initial list of GA members

and other contact persons in Attachment 6.

Formal notices:

If it is required in this Consortium Agreement (Section 9.7.2.1.1) that a formal notice, consent or approval

shall be given, such notice shall be signed by an authorised representative of a Party and shall either be

served personally or sent by mail with recorded delivery.

Other communication:

Other communication between the Parties may also be effected by other means such as e-­mail with

acknowledgement of receipt, which fulfils the conditions of written form.

Any change of persons or contact details shall be notified immediately by the respective Party to the

Coordinator. The address list shall be accessible to all concerned.

12.4 Assignment and amendments

No rights or obligations of the Parties arising from this Consortium Agreement may be assigned or

transferred, in whole or in part, to any third party without the other Parties’ prior formal approval except for

Parties’ right under Section 8.2 to transfer their Results to Affiliated Entities or Third parties listed

specifically in Attachment 4.

Amendments and modifications to the text of this Consortium Agreement not explicitly listed in Section 6.2.2

require a separate agreement between all Parties.

Page 61: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

47 (294)

12.5 Mandatory national law

Nothing in this Consortium Agreement shall be deemed to require a Party to breach any mandatory

statutory law under which the Party is operating.

12.6 Language

This Consortium Agreement is drawn up in English, which language shall govern all documents, notices,

meetings, arbitral proceedings and processes relative thereto.

12.7 Applicable law

This Consortium Agreement shall be construed in accordance with and governed by the laws of Belgium

excluding its conflict of law provisions.

12.8 Settlement of disputes

Should the affected Parties mutually agree to do so, the first step to handle any conflict between the Parties

shall be taken at the work package level. If a solution cannot be found at such level, the work package

leader reports the conflict to the Coordinator, and the Coordinator attempts to find a proper solution. If this

fails, the issue is taken to the following General Assembly meeting or one Party may opt to make use of

this Section 12.8 Settlement of disputes instead.

All disputes other than disputes relating to infringement of and/or validity of Intellectual Property Rights

arising out of or in connection with this Consortium Agreement, which cannot be solved amicably, shall be

finally settled under the Rules of Arbitration of the International Chamber of Commerce by one or more

arbitrators appointed in accordance with the said Rules. The arbitration shall be conducted in English.

The place of arbitration shall be Brussels if not otherwise agreed by the conflicting Parties.

The award of the arbitration will be final and binding upon the Parties.

However, should any Party (e.g. a Public Body) provide reasonable justification that certain provisions of

its national law prevents it from submitting the relevant dispute to arbitration, the concerned Parties will

submit the dispute to the Courts of Brussels.

Nothing in this Consortium Agreement shall limit the Parties’ right to seek injunctive relief in any applicable

competent court of law.

Page 62: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

48 (294)

Section 13: Signatures 13.1 This Consortium Agreement shall be signed 152 counterparts, each of which shall be deemed to be

an original, but all of which, taken together, shall constitute one and the same agreement, it being

understood that all Parties need not sign the same counterpart. Every Party shall sign two (2) counterparts

of their respective signature page and shall send them to the Coordinator, which shall countersign them.

The Coordinator shall keep one (1) set of all the originals of the pages of signature for its records and shall

distribute one (1) electronic copy of all the signed counterparts to each Party together with one counterpart

of the respective signature page countersigned by the Coordinator within sixty (60) calendar days of receipt

of the last signed counterpart

13.2 AS WITNESS:

The Parties have caused this Consortium Agreement to be duly signed by the undersigned authorised

representatives in separate signature pages the day and year first above written.

Page 63: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

49 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of AALTO – AALTO-­KORKEAKOULUSAATIO

Signature(s):

Name(s):

Position(s):

Date:

Page 64: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

50 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of ABB – ABB AB

Signature(s):

Name(s):

Position(s):

Date:

Page 65: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

51 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of AERNNOVA – INTERNACIONAL DE COMPOSITES SA

Signature(s):

Name(s):

Position(s):

Date:

Page 66: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

52 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of AIRBUS OPERATIONS SL – AIRBUS OPERATIONS SL

Signature(s):

Name(s):

Position(s):

Date:

Page 67: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

53 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of AIXTRON LIMITED – AIXTRON LIMITED

Signature(s):

Name(s):

Position(s):

Date:

Page 68: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

54 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of ALCATEL-­LUCENT DEUTSCHLAND AG – ALCATEL-­LUCENT

DEUTSCHLAND AG

Signature(s):

Name(s):

Position(s):

Date:

Page 69: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

55 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of ALU-­FR – ALBERT-­LUDWIGS-­UNIVERSITAET FREIBURG

Signature(s):

Name(s):

Position(s):

Date:

Page 70: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

56 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of ALUI – ALCATEL-­LUCENT ITALIA S.P.A.

Signature(s):

Name(s):

Position(s):

Date:

Page 71: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

57 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of Amalyst – AMALYST LTD

Signature(s):

Name(s):

Position(s):

Date:

Page 72: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

58 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of AMO GMBH – GESELLSCHAFT FUR ANGEWANDTE MIKRO-­ UND

OPTOELEKTRONIK MIT BESCHRAENKTERHAFTUNG AMO GmbH

Signature(s):

Name(s):

Position(s):

Date:

Page 73: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

59 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of Atherm – ATHERM

Signature(s):

Name(s):

Position(s):

Date:

Page 74: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

60 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of AVANZARE – AVANZARE INNOVACION TECNOLOGICA SL

Signature(s):

Name(s):

Position(s):

Date:

Page 75: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

61 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of BASF SE – BASF SE

Signature(s):

Name(s):

Position(s):

Date:

Page 76: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

62 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of Breton – BRETON S.p.A.

Signature(s):

Name(s):

Position(s):

Date:

Page 77: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

63 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of CAU – CHRISTIAN-­ALBRECHTS-­UNIVERSITÄT ZU KIEL

Signature(s):

Name(s):

Position(s):

Date:

Page 78: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

64 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of CEA – COMMISSARIAT A L´ENERGIE ATOMIQUE ET AUX ENERGIES

ALTERNATIVES

Signature(s):

Name(s):

Position(s):

Date:

Page 79: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

65 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of CHALMERS INDUSTRITEKNIK – STIFTELSEN CHALMERS

INDUSTRITEKNIK

Signature(s):

Name(s):

Position(s):

Date:

Page 80: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

66 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of CIBER – CENTRO DE INVESTIGACION BIOMEDICA EN RED

BIOINGENIERIA, BIOMATERIALES Y NANOMEDICINA

Signature(s):

Name(s):

Position(s):

Date:

Page 81: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

67 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of CIC BIOMAGUNE – ASOCIACION CENTRO DE INVESTIGACION

COOPERATIVA EN BIOMATERIALES

Signature(s):

Name(s):

Position(s):

Date:

Page 82: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

68 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of CIC energiGUNE – CENTRO DE INVESTIGACION COOPERATIVA EN

ENERGIAS ALTERNATIVAS FUNDACION

Signature(s):

Name(s):

Position(s):

Date:

Page 83: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

69 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of CIC nanoGUNE – ASOCIACION – CENTRO DE INVESTIGACION

COOPERATIVA EN NANOCIENCIAS – CIC NANOGUNE

Signature(s):

Name(s):

Position(s):

Date:

Page 84: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

70 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of CNIT – CONSORZIO NAZIONALE INTERUNIVERSITARIO PER LE

TELECOMUNICAZIONI

Signature(s):

Name(s):

Position(s):

Date:

Page 85: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

71 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of CNM – CNM TECHNOLOGIES GmbH

Signature(s):

Name(s):

Position(s):

Date:

Page 86: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

72 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of CNR – CONSIGLIO NAZIONALE DELLE RICERCHE

Signature(s):

Name(s):

Position(s):

Date:

Page 87: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

73 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of CNRS – CENTRE NATIONAL DE LA RECHERCHE SCIENTIFIQUE

Signature(s):

Name(s):

Position(s):

Date:

Page 88: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

74 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of CRF – CENTRE RICERCHE FIAT S.C.p.A

Signature(s):

Name(s):

Position(s):

Date:

Page 89: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

75 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of CSIC – AGENCIA ESTATAL CONSEJO SUPERIOR DE

INVESTIGACIONES CIENTIFICAS

Signature(s):

Name(s):

Position(s):

Date:

Page 90: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

76 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of DSM – DSM Ahead BV

Signature(s):

Name(s):

Position(s):

Date:

Page 91: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

77 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of DTECH – DELTA-­TECH S.p.A

Signature(s):

Name(s):

Position(s):

Date:

Page 92: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

78 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of DTU – DANMARKS TEKNISKE UNIVERSITET

Signature(s):

Name(s):

Position(s):

Date:

Page 93: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

79 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of Dyesol Italia – DYESOL ITALIA S.R.L.

Signature(s):

Name(s):

Position(s):

Date:

Page 94: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

80 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of EMPA – EIDGENOESSISCHE MATERIALPRUEFUNGS-­ UND

FORSCHUNGSANSTALT

Signature(s):

Name(s):

Position(s):

Date:

Page 95: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

81 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of EPCOS – EPCOS AG

Signature(s):

Name(s):

Position(s):

Date:

Page 96: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

82 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of EPFL – ÉCOLE POLYTECHNIQUE FÉDÉRALE DE LAUSANNE

Signature(s):

Name(s):

Position(s):

Date:

Page 97: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

83 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of Ericsson – ERICSSON AB

Signature(s):

Name(s):

Position(s):

Date:

Page 98: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

84 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of ESF – FONDATION EUROPEENNE DE LA SCIENCE

Signature(s):

Name(s):

Position(s):

Date:

Page 99: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

85 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of ETH Zurich – EIDGENOESSISCHE TECHNISCHE HOCHSCHULE

ZURICH

Signature(s):

Name(s):

Position(s):

Date:

Page 100: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

86 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of FAU – FRIEDRICH-­ALEXANDER-­UNIVERSITAT ERLANGEN NURNBERG

Signature(s):

Name(s):

Position(s):

Date:

Page 101: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

87 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of FBK – FONDAZIONE BRUNO KESSLER

Signature(s):

Name(s):

Position(s):

Date:

Page 102: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

88 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of FE – FLEXENABLE LIMITED

Signature(s):

Name(s):

Position(s):

Date:

Page 103: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

89 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of FIDAMC – FUNDACION PARA LA INVESTIGACION, DESARROLLO Y

APLICACION DE MATERIALES COMPUESTOS

Signature(s):

Name(s):

Position(s):

Date:

Page 104: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

90 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of FORTH – FOUNDATION FOR RESEARCH AND TECHNOLOGY HELLAS

Signature(s):

Name(s):

Position(s):

Date:

Page 105: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

91 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of Fraunhofer – FRAUNHOFER-­GESELLSCHAFT ZUR FOERDERUNG DER

ANGEWANDTEN FORSCHUNG E.V., Hansastr 27c, 80686 Munich, Germany, acting as legal entity for its

institutes IAF, ICT and ISI

Signature(s):

Name(s):

Position(s):

Date:

Page 106: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

92 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of FSU – FRIEDRICH-­SCHILLER-­UNIVERSITAT JENA

Signature(s):

Name(s):

Position(s):

Date:

Page 107: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

93 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of g.tec – GUGER TECHNOLOGIES OG

Signature(s):

Name(s):

Position(s):

Date:

Page 108: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

94 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of G24 – G24 POWER LIMITED

Signature(s):

Name(s):

Position(s):

Date:

Page 109: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

95 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of Graphenea – Graphenea S.A.

Signature(s):

Name(s):

Position(s):

Date:

Page 110: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

96 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of GRINP – GRINP S.R.L.

Signature(s):

Name(s):

Position(s):

Date:

Page 111: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

97 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of GRUPO ANTOLIN-­INGENIERIA SA

Signature(s):

Name(s):

Position(s):

Date:

Page 112: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

98 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of GSK – GLAXOSMITHKLINE RESEARCH AND DEVELOPMENT LTD.

Signature(s):

Name(s):

Position(s):

Date:

Page 113: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

99 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of HORIBAJY – HORIBA JOBIN YVON S.A.S.

Signature(s):

Name(s):

Position(s):

Date:

Page 114: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

100 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of ICFO – FUNDACIO INSTITUT DE CIENCIES FOTONIQUES

Signature(s):

Name(s):

Position(s):

Date:

Page 115: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

101 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of ICN2 – FUNDACIO INSTITUT CATALA DE NANOCIENCIA I

NANOTECNOLOGIA

Signature(s):

Name(s):

Position(s):

Date:

Page 116: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

102 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of IDIBAPS – CONSORCI INSTITUT D’INVESTIGACIONS BIOMÈDIQUES

AUGUST PI I SUNYER

Signature(s):

Name(s):

Position(s):

Date:

Page 117: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

103 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of IFX – INFINEON TECHNOLOGIES AG

Signature(s):

Name(s):

Position(s):

Date:

Page 118: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

104 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of IIT – FONDAZIONE ISTITUTO ITALIANO DI TECNOLOGIA

Signature(s):

Name(s):

Position(s):

Date:

Page 119: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

105 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of IMDEA – FUNDACION IMDEA NANOCIENCIA

Signature(s):

Name(s):

Position(s):

Date:

Page 120: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

106 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of IMEC – INTERUNIVERSITAIR MICRO-­ELECTRONICA CENTRUM VZW

Signature(s):

Name(s):

Position(s):

Date:

Page 121: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

107 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of Imech-­BAS OLEM – BULGARIAN ACADEMY OF SCIENCES

Signature(s):

Name(s):

Position(s):

Date:

Page 122: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

108 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of Imperial – IMPERIAL COLLEGE OF SCIENCE, TECHNOLOGY AND

MEDICINE

Signature(s):

Name(s):

Position(s):

Date:

Page 123: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

109 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of INFN – ISTITUTO NAZIONALE DI FISICA NUCLEARE

Signature(s):

Name(s):

Position(s):

Date:

Page 124: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

110 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of INP BSU – BELARUSIAN STATE UNIVERSITY, INSTITUTE FOR

NUCLEAR PROBLEMS

Signature(s):

Name(s):

Position(s):

Date:

Page 125: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

111 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of INTER – INSTITUTO DE TECNOLOGIAS EMERGENTES DE LA RIOJA

Signature(s):

Name(s):

Position(s):

Date:

Page 126: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

112 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of ITC – ITALCEMENTI Fabbriche Riunite Cemento S.p.A. Bergamo

Signature(s):

Name(s):

Position(s):

Date:

Page 127: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

113 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of ITME – INSTYTUT TECHNOLOGII MATERIALOW ELEKTRONICZNYCH

Signature(s):

Name(s):

Position(s):

Date:

Page 128: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

114 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of JHIPC J – HEYROVSKY INSTITUTE OF PHYSICAL CHEMISTRY

Signature(s):

Name(s):

Position(s):

Date:

Page 129: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

115 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of KI – KAROLINSKA INSTITUTET

Signature(s):

Name(s):

Position(s):

Date:

Page 130: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

116 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of KIT – KARLSRUHER INSTITUT FÜR TECHNOLOGIE

Signature(s):

Name(s):

Position(s):

Date:

Page 131: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

117 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of LIB – LIBRE S.R.L.

Signature(s):

Name(s):

Position(s):

Date:

Page 132: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

118 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of LIU – LINKOPINGS UNIVERSITET

Signature(s):

Name(s):

Position(s):

Date:

Page 133: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

119 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of LNE – LABORATOIRE NATIONAL DE MÉTROLOGIE ET D’ESSAIS

Signature(s):

Name(s):

Position(s):

Date:

Page 134: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

120 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of M-­SOLV – M-­SOLV LTD

Signature(s):

Name(s):

Position(s):

Date:

Page 135: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

121 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of MFA EK MTA – CENTRE FOR ENERGY RESEARCH, HUNGARIAN

ACADEMY OF SCIENCES

Signature(s):

Name(s):

Position(s):

Date:

Page 136: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

122 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of MPG – MAX PLANCK GESELLSCHAFT ZUR FOERDERUNG DER

WISSENSCHAFTEN E.V

Signature(s):

Name(s):

Position(s):

Date:

Page 137: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

123 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of Nano Tech Lab – NANO TECH LAB LTD

Signature(s):

Name(s):

Position(s):

Date:

Page 138: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

124 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of NanOsc AB – NANOSC AB

Signature(s):

Name(s):

Position(s):

Date:

Page 139: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

125 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of Nnsa – NANESA S.R.L.

Signature(s):

Name(s):

Position(s):

Date:

Page 140: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

126 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of Nokia R&D (UK) Ltd – Nokia R&D (UK) LIMITED

Signature(s):

Name(s):

Position(s):

Date:

Page 141: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

127 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of NOKIA OYJ – Nokia OYJ

Signature(s):

Name(s):

Position(s):

Date:

Page 142: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

128 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of NOVALIA – NOVALIA LIMITED

Signature(s):

Name(s):

Position(s):

Date:

Page 143: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

129 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of NPL MANAGEMENT LIMITED – NPL MANAGEMENT LIMITED

Signature(s):

Name(s):

Position(s):

Date:

Page 144: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

130 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of NUID UCD – UNIVERSITY COLLEGE DUBLIN, NATIONAL UNIVERSITY

OF IRELAND, DUBLIN

Signature(s):

Name(s):

Position(s):

Date:

Page 145: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

131 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of OINT – OXFORD INSTRUMENTS NANOTECHNOLOGY TOOLS LIMITED

Signature(s):

Name(s):

Position(s):

Date:

Page 146: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

132 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of Pixium -­ PIXIUM VISION

Signature(s):

Name(s):

Position(s):

Date:

Page 147: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

133 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of PMI – POLITECNICO DI MILANO

Signature(s):

Name(s):

Position(s):

Date:

Page 148: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

134 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of POLITO – POLITECNICO DI TORINO

Signature(s):

Name(s):

Position(s):

Date:

Page 149: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

135 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of Polymem – POLYMEM S.A

Signature(s):

Name(s):

Position(s):

Date:

Page 150: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

136 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of PROGNOMICS – PROGNOMICS LTD

Signature(s):

Name(s):

Position(s):

Date:

Page 151: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

137 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of QMUL – QUEEN MARY UNIVERSITY OF LONDON

Signature(s):

Name(s):

Position(s):

Date:

Page 152: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

138 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of REPSOL – REPSOL SA

Signature(s):

Name(s):

Position(s):

Date:

Page 153: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

139 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of RIJKSUNIVERSITEIT GRONINGEN – RIJKSUNIVERSITEIT GRONINGEN

Signature(s):

Name(s):

Position(s):

Date:

Page 154: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

140 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of RUN – STICHTING KATHOLIEKE UNIVERSITEIT

Signature(s):

Name(s):

Position(s):

Date:

Page 155: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

141 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of RWTH AACHEN – RHEINISCH-­WESTFAELISCHE TECHNISCHE

HOCHSCHULE AACHEN

Signature(s):

Name(s):

Position(s):

Date:

Page 156: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

142 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of Sabanci University – SABANCI UNIVERSITY

Signature(s):

Name(s):

Position(s):

Date:

Page 157: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

143 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of SES – SELEX ES S.p.A

Signature(s):

Name(s):

Position(s):

Date:

Page 158: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

144 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of SISSA – SCUOLA INTERNAZIONALE SUPERIORE DI STUDI AVANZATI

DI TRIESTE

Signature(s):

Name(s):

Position(s):

Date:

Page 159: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

145 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of ST-­I – STMICROELECTRONICS SRL

Signature(s):

Name(s):

Position(s):

Date:

Page 160: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

146 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of TECNALIA – FUNDACION TECNALIA RESEARCH & INNOVATION

Signature(s):

Name(s):

Position(s):

Date:

Page 161: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

147 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of TECHNION – TECHNION – ISRAEL INSTITUE OF TECHNOLOGY

Signature(s):

Name(s):

Position(s):

Date:

Page 162: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

148 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of TEI of CRETE – TECHNOLOGICAL EDUCATIONAL INSTITUTE OF

CRETE

Signature(s):

Name(s):

Position(s):

Date:

Page 163: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

149 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of THALES – THALES SA

Signature(s):

Name(s):

Position(s):

Date:

Page 164: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

150 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of Tor Vergata – UNIVERSITÀ DEGLI STUDI DI ROMA TOR VERGATA

Signature(s):

Name(s):

Position(s):

Date:

Page 165: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

151 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of TRINITY COLLEGE DUBLIN – THE PROVOST, FELLOWS, FOUNDATION

SCHOLARS & THE OTHER MEMBERS OF BOARD OF THE COLLEGE OF THE HOLY AND UNDIVIDED

TRINITY OF QUEEN ELIZABETH NEAR DUBLIN

Signature(s):

Name(s):

Position(s):

Date:

Page 166: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

152 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of TU Delft – TECHNISCHE UNIVERSITEIT DELFT

Signature(s):

Name(s):

Position(s):

Date:

Page 167: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

153 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of TU WIEN – TECHNISCHE UNIVERSITAET WIEN

Signature(s):

Name(s):

Position(s):

Date:

Page 168: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

154 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of TU/e – TECHNISCHE UNIVERSITEIT EINDHOVEN

Signature(s):

Name(s):

Position(s):

Date:

Page 169: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

155 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of TUC – TECHNISCHE UNIVERSITAET CHEMNITZ

Signature(s):

Name(s):

Position(s):

Date:

Page 170: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

156 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of TUD – TECHNISCHE UNIVERSITAET DRESDEN

Signature(s):

Name(s):

Position(s):

Date:

Page 171: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

157 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of TUHH – TECHNISCHE UNIVERSITAET HAMBURG-­HARBURG

Signature(s):

Name(s):

Position(s):

Date:

Page 172: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

158 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of TUM – TECHNISCHE UNIVERSITÄT MÜNCHEN

Signature(s):

Name(s):

Position(s):

Date:

Page 173: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

159 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of UAB – UNIVERSITAT AUTÒNOMA DE BARCELONA

Signature(s):

Name(s):

Position(s):

Date:

Page 174: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

160 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of UAU – UNIVERSITAT AUGSBURG

Signature(s):

Name(s):

Position(s):

Date:

Page 175: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

161 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of UCAM – THE CHANCELLOR, MASTERS AND SCHOLARS OF THE

UNIVERSITY OF CAMBRIDGE

Signature(s):

Name(s):

Position(s):

Date:

Page 176: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

162 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of UCdL – UNIVERSITE CATHOLIQUE DE LOUVAIN

Signature(s):

Name(s):

Position(s):

Date:

Page 177: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

163 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of UCL – UNIVERSITY COLLEGE LONDON

Signature(s):

Name(s):

Position(s):

Date:

Page 178: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

164 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of UCLM – UNIVERSIDAD DE CASTILLA – LA MANCHA

Signature(s):

Name(s):

Position(s):

Date:

Page 179: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

165 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of UEF – ITA-­SUOMEN YLIOPISTO

Signature(s):

Name(s):

Position(s):

Date:

Page 180: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

166 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of UHAM – UNIVERSITAET HAMBURG

Signature(s):

Name(s):

Position(s):

Date:

Page 181: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

167 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of ULANC – LANCASTER UNIVERSITY

Signature(s):

Name(s):

Position(s):

Date:

Page 182: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

168 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of ULB – UNIVERSITÉ LIBRE DE BRUXELLES

Signature(s):

Name(s):

Position(s):

Date:

Page 183: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

169 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of ULM – UNIVERSITAET ULM

Signature(s):

Name(s):

Position(s):

Date:

Page 184: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

170 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of UM – UNIVERSITÉ DE MONTPELLIER

Signature(s):

Name(s):

Position(s):

Date:

Page 185: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

171 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of UMEA UNIVERSITET – UMEA UNIVERSITET

Signature(s):

Name(s):

Position(s):

Date:

Page 186: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

172 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of UMINHO – UNIVERSIDADE DO MINHO

Signature(s):

Name(s):

Position(s):

Date:

Page 187: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

173 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of Unamur – UNIVERSITÉ DE NAMUR ASBL

Signature(s):

Name(s):

Position(s):

Date:

Page 188: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

174 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of UNIBAS – UNIVERSITAT BASEL

Signature(s):

Name(s):

Position(s):

Date:

Page 189: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

175 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of UNIBI – UNIVERSITAET BIELEFELD

Signature(s):

Name(s):

Position(s):

Date:

Page 190: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

176 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of UNIBO – ALMA MATER STUDIORUM-­UNIVERSITÀ DI BOLOGNA

Signature(s):

Name(s):

Position(s):

Date:

Page 191: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

177 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of UNIPD – UNIVERSITÀ DEGLI STUDI DI PADOVA

Signature(s):

Name(s):

Position(s):

Date:

Page 192: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

178 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of UNIPI – UNIVERSITÀ DI PISA

Signature(s):

Name(s):

Position(s):

Date:

Page 193: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

179 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of UniSA – UNIVERSITÀ DEGLI STUDI DI SALERNO

Signature(s):

Name(s):

Position(s):

Date:

Page 194: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

180 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of UNISTRA – UNIVERSITE DE STRASBOURG

Signature(s):

Name(s):

Position(s):

Date:

Page 195: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

181 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of UNITS – UNIVERSITA DEGLI STUDI DI TRIESTE

Signature(s):

Name(s):

Position(s):

Date:

Page 196: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

182 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of UNIVERSITAET BREMEN – UNIVERSITAET BREMEN

Signature(s):

Name(s):

Position(s):

Date:

Page 197: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

183 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of UNIGE – UNIVERSITE DE GENEVE

Signature(s):

Name(s):

Position(s):

Date:

Page 198: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

184 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of UNIVERSITY OF MANCHESTER – THE UNIVERSITY OF MANCHESTER

Signature(s):

Name(s):

Position(s):

Date:

Page 199: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

185 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of UNIWARSAW – UNIWERSYTET WARSZAWSKI

Signature(s):

Name(s):

Position(s):

Date:

Page 200: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

186 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of UNIZAR – UNIVERSIDAD DE ZARAGOZA

Signature(s):

Name(s):

Position(s):

Date:

Page 201: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

187 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of UNOTT – THE UNIVERSITY OF NOTTINGHAM

Signature(s):

Name(s):

Position(s):

Date:

Page 202: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

188 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of UoC – PANEPISTIMIO KRITIS (University of Crete)

Signature(s):

Name(s):

Position(s):

Date:

Page 203: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

189 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of UOI – PANEPISTIMIO IOANNINON

Signature(s):

Name(s):

Position(s):

Date:

Page 204: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

190 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of UoS – UNIVERSITY OF SUNDERLAND

Signature(s):

Name(s):

Position(s):

Date:

Page 205: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

191 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of UOXF – THE CHANCELLOR, MASTERS AND SCHOLARS OF THE

UNIVERSITY OF OXFORD

Signature(s):

Name(s):

Position(s):

Date:

Page 206: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

192 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of UPMC – UNIVERSITÉ PIERRE AND MARIE CURIE – PARIS 6

Signature(s):

Name(s):

Position(s):

Date:

Page 207: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

193 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of UREG – UNIVERSITAET REGENSBURG

Signature(s):

Name(s):

Position(s):

Date:

Page 208: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

194 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of USFD – THE UNIVERSITY OF SHEFFIELD

Signature(s):

Name(s):

Position(s):

Date:

Page 209: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

195 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of USTL – UNIVERSITE DES SCIENCES ET TECHNOLOGIES DE LILLE –

LILLE I

Signature(s):

Name(s):

Position(s):

Date:

Page 210: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

196 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of UTARTU – TARTU ÜLIKOOL

Signature(s):

Name(s):

Position(s):

Date:

Page 211: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

197 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of UZH – UNIVERSITAET ZUERICH

Signature(s):

Name(s):

Position(s):

Date:

Page 212: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

198 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of VIS – N VISION SYSTEMS AND TECHNOLOGIES SL.

Signature(s):

Name(s):

Position(s):

Date:

Page 213: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

199 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of VMI – VARTA MICRO INNOVATION GMBH

Signature(s):

Name(s):

Position(s):

Date:

Page 214: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

200 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of VTT – TEKNOLOGIAN TUTKIMUSKESKUS VTT Oy

Signature(s):

Name(s):

Position(s):

Date:

Page 215: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

201 (294)

Authorised to sign on behalf of CHALMERS – CHALMERS TEKNISKA HOEGSKOLA AB

Signature(s):

Name(s): Peter Apell

Position(s): Professor and Head of Department at Department of Physics

Date:

Authorised to sign on behalf of FNM – FINMECCANICA SOCIETÀ PER AZIONI

Signature(s):

Name(s):

Position(s):

Date:

Page 216: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

202 (294)

[Attachment 1: Background included] Access Rights to Background made available to the Parties:

CHALMERS -­ CHALMERS TEKNISKA HOEGSKOLA AB -­ No background included

AALTO -­ AALTO-­KORKEAKOULUSAATIO -­ No background included

ABB – ABB AB -­ No background included AERNNOVA -­ INTERNACIONAL DE COMPOSITES SA -­ No background included AIRBUS OPERATIONS SL -­ AIRBUS OPERATIONS SL -­ No background included AIXTRON LIMITED -­ AIXTRON LIMITED -­ No background included ALCATEL-­LUCENT DEUTSCHLAND AG -­ ALCATEL-­LUCENT DEUTSCHLAND AG -­ No background included

ALU-­FR -­ ALBERT-­LUDWIGS-­UNIVERSITAET FREIBURG -­ No background included

ALUI -­ ALCATEL-­LUCENT ITALIA S.P.A. – No background included

Amalyst -­ AMALYST LTD -­ No background included AMO GMBH -­ GESELLSCHAFT FUR ANGEWANDTE MIKRO-­ UND OPTOELEKTRONIK MIT BESCHRAENKTERHAFTUNG AMO GmbH -­ No background included AVANZARE -­ AVANZARE INNOVACION TECNOLOGICA SL -­ Background is restricted to the Background that the research group participating in the GRAPHENE

Flagship project, which will bring to the project all his Background which is public domain and his

Background which is not subject to third party rights.

BASF SE -­ BASF SE -­ No background included Breton -­ BRETON S.p.A. -­ Breton SPA grants Access Rights to only Background which has been generated by the Breton research group directly involved in carrying out the Project, only if directly needed

to carry out the tasks in the Project. Provided however those Rights are granted only if Breton ability to

Page 217: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

203 (294)

grant such Access Rights is not restrict by third parts. Further, Access Right will only be provided upon

written request if needed for the Project and may be subject to special conditions (i.e., Material Transfer

Agreement, Confidential Disclosure Agreement, etc.).

CAU -­ CHRISTIAN-­ALBRECHTS-­UNIVERSITÄT ZU KIEL -­ No background included CEA -­ COMMISSARIAT A L´ENERGIE ATOMIQUE ET AUX ENERGIES ALTERNATIVES -­ CEA’s Background included:

-­‐ Simulation of electronic band structure properties of graphene or magnetic materials from first

principles (using open or commercialized codes).

-­‐ Spin dependent transport properties using ab-­initio and tight-­binding approaches (using open or

commercialized codes).

-­‐ Simulation of spintronic phenomena (magnetoresistance, spin transfer, exchange coupling,

magnetic anisotropy, spin Hall, spin Seebeck, spin Peltier etc.) in graphene based structures (using

open or commercialized codes).

-­‐ Simulation of magnetization dynamics properties (using open or commercialized codes)

-­‐ Know-­how on CIGS and CZTS solar cell and module fabrication

-­‐ Know-­how relative to the chemical reduction process of graphene compatible with Silicon-­based

materials for battery application. Formulation of inks based on organic and inorganic materials

-­‐ Know-­how on Organic Light Emitting Devices (OLED) technology and related device fabrication.

-­‐ Know-­how on printed organic electronic on plastic foil and on associated devices: organic

transistors, pressure sensors, temperature sensors, OLED, photo detectors.

CHALMERS INDUSTRITEKNIK -­ STIFTELSEN CHALMERS INDUSTRITEKNIK -­ No background included

CIBER -­ CENTRO DE INVESTIGACION BIOMEDICA EN RED BIOINGENIERIA, BIOMATERIALES Y NANOMEDICINA -­ CIBER grants Access Rights to only that background which has been generated by the GBIO research group involved in Graphene Flagship Project and which is directly needed to carry out the

project. Its background is not subject to third party rights.

-­‐ Graphene growth by chemical vapour deposition,

-­‐ Clean room technological processes (photolitography, wet etching, dry etching, metallization)

-­‐ Graphene deposition or transference

-­‐ Functionalization of carbon nanomaterials

-­‐ Background on materials & device characterization techniques: optical microscopy, SEM, AFM,

Raman, electrical properties measurements, impedance spectroscopy, electrochemical

characterization

Any background, outside the scope and field of this project, other than the aforesaid Background, is hereby

Page 218: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

204 (294)

excluded.

CIC BIOMAGUNE – ASOCIACION CENTRO DE INVESTIGACION COOPERATIVA EN BIOMATERIALES -­ No background included CIC energiGUNE -­ CENTRO DE INVESTIGACION COOPERATIVA EN ENERGIAS ALTERNATIVAS FUNDACION – Background is restricted to the Background that the research group participating in the Project,will bring

to the project all its Background which is public domain and his Background which is not subject to third

party rights.

Any Background other than the aforesaid Background is hereby excluded.

CIC nanoGUNE -­ ASOCIACION – CENTRO DE INVESTIGACION COOPERATIVA EN NANOCIENCIAS -­ CIC NANOGUNE -­ • infrared scattering-­type scanning near-­field optical microscopy (IR s-­SNOM)

-­‐ IR s-­SNOM of graphene and particularly graphene plasmons

-­‐ infrared nanospectroscopy (nano-­FTIR)

-­‐ chemical and structural mapping by IR s-­SNOM

-­‐ mapping near-­field distributions of plasmonic antennas with IR s-­SNOM

CNIT -­ CONSORZIO NAZIONALE INTERUNIVERSITARIO PER LE TELECOMUNICAZIONI -­ No background included

CNM -­ CNM TECHNOLOGIES GmbH -­ No background included CNR -­ CONSIGLIO NAZIONALE DELLE RICERCHE -­ No background included CNRS -­ CENTRE NATIONAL DE LA RECHERCHE SCIENTIFIQUE -­ CNRS Background included:

For ICT Laboratory

-­‐ Manipulation of carbon nanomaterials (carbon nanotubes, fullerenes, carbon nanohorns,

graphene) to improve their dispersibility/solubility into different types of organic and aqueous

solvents

-­‐ Oxidation of carbon nanomaterials using strong acid conditions

-­‐ Modulation of the dimensions of carbon nanomaterials for integration into cells and organs

-­‐ Mono-­functionalization of carbon nanomaterials using different synthetic strategies

-­‐ Multi-­functionalization of carbon nanomaterials with targeting agents, fluorescent probes, chelating

agents for radionuclides, therapeutic molecules

-­‐ Peptide synthesis

-­‐ Protocols of purification of carbon nanomaterials before and after functionalization

Page 219: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

205 (294)

-­‐ Characterization of carbon nanomaterials using spectroscopic and microscopic techniques (i.e.

Raman spectroscopy, thermogravimetric analysis, transmission electron microscopy, atomic force

microscopy, etc.)

-­‐ Identification and quantification of the functional groups on the surface of carbon nanomaterials

-­‐ Analysis of cell penetration of carbon nanomaterials

-­‐ Subcellular localization using microscopy techniques and florescent spectroscopy

-­‐ Mechanisms of cell uptake

-­‐ Evaluation of biocompatibility of carbon nanomaterials in vitro (i.e. cytotoxicity, oxidative stress,

inflammatory cytokines, depolarization of mitochondrial membrane, etc.)

-­‐ Characterization of cell phenotypes using flow cytometry, ELISA test, etc.

-­‐ Measurements of the ligand/receptor interactions using surface plasmon resonance (SPR, Biacore

technology)

-­‐ In vivo administration of carbon nanomaterials using mice or rat models (i.e. intravenous,

subcutaneous)

-­‐ Biocompatibility of carbon nanomaterials in vivo measuring blood biochemical parameters, survival

and organ integrity

For LNCMI

-­‐ Optical magneto-­spectroscopy (up to 35 T and down to 2K): FIR transmission, micro-­optics in the

visible spectral range and micro-­Raman scattering

-­‐ Electronic transport including low temperatures and high magnetic fields

For Institut Néel

-­‐ Ultra high vacuum (UHV) STM/STS (300K and 8K): atomic scale resolution images and

spectroscopy

-­‐ Graphene growth by SiC decomposition in UHV, characterization by STM/STS (300K)

-­‐ Electronic transport including low temperatures and high magnetic fields (same as the LNCMI)

For CIRIMAT Laboratory

-­‐ E. Flahaut, Ch. Vieu, F. Seichepine, A. Beduer, FR N°11 00934 (CNRS), "Procédé de formation

de motifs d'objets sur la surface d'un substrat" (Process for the formation of patterns of objects on

the surface of a substrate), deposited by CNRS in 2011.

For IMPMC Laboratory

-­‐ Prediction of properties of materials by first-­principles electronic structure methods.

-­‐ Simulation of spectroscopy data (Raman, IR, Xanes, Arpes).

-­‐ Vibrational and electronic properties.

-­‐ Electron-­phonon and phonon-­phonon interaction.

-­‐ Kohn anomalies and charge density waves in 2D materials.

-­‐ Phonon mediated superconductivity.

Page 220: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

206 (294)

-­‐ Simulation of thermal and electrical transport.

-­‐ Simulation of 2D materials in field effect transistors.

-­‐ Edge chemistry and functionalization of graphene.

-­‐ Characterisation of defect in graphene and 2D materials.

-­‐ Graphene/ surface interaction.

-­‐ 2D materials beyond graphene.

-­‐ Graphene/BN hetero-­structures.

For LEM

The Background of LEM is all Know-­how generated within the research groups of Dr. Annick Loiseau’s

from the Joint Research Units Laboratoire d’étude des microstructures (LEM – UPR3321) subject to third

parties’ rights, as far as Needed by the members of said Joint Research Units, which are directly involved

in carrying out the Project, to duly perform their work thereunder.

CRF -­ CENTRE RICERCHE FIAT S.C.p.A -­ Background related to the assessment of polymer-­based materials in terms of mechanical characterization (quasi-­static tests).

CSIC -­ AGENCIA ESTATAL CONSEJO SUPERIOR DE INVESTIGACIONES CIENTIFICAS -­ CSIC Background included:

CSIC agrees to grant Access rights to the Background directly generated or accumulated by their research

team directly participating in the Project subject to the provisions of the Grant Agreement and Section 9

and Attachment 2 of this Consortium Agreement. For the avoidance of doubt, the Background mentioned

above is the following:

Theoretical work on Graphene and other 2D systems

Strain effects, gauge fields, deformations, vacancies, defects, topological insulating phases,

renormalization group aspects in graphene.

Calculation of electronic properties of superlattices that combine graphene with other two dimensional

materials in heterostructures. Study of the vertical tunneling in these heterostructures. Study of Moire

structures.

Theory on the plasmon dispersion in graphene ribbons and graphene based heterostrucures.

Theory on the external control of spin-­orbit coupling in carbon based materials. Study of the energy gap in

graphene as function of curvature and exchange fields. Theory on the electromagnetic properties of

structures containing graphene. This includes both finite and periodic systems, and both in the linear and

non-­linear regimes. The expertise includes the computation of electromagnetic fields via the solution of (i)

on-­shell integral equations both in real and Fourier space (with both commercial and home-­made computer

codes) and (ii) home-­made frequency-­domain (finite difference time domain) codes.

Page 221: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

207 (294)

Background on surface growth and characterization techniques.

UHV thermal decomposition, CVD and CVD plasma assisted.

Optical spectroscopies (10K to 600K) in graphene, graphene oxide and related materials.

Micro-­Raman and micro-­photoluminescence, FTIR, UV-­Vis-­IR transmittance and reflectance.

Reduction processes of graphene oxide.

Electronic transport.

Magnetic properties of carbonous materials.

SPM characterization of bidimensional materials.

Any Background other than the aforesaid Background is hereby excluded.

DSM -­ DSM Ahead BV -­ Background included: -­‐ property requirements, processing requirements, testing protocols and fail criteria for solar

backsheets

-­‐ property and processing requirements for integrated solar backsheets (including conductivity of

electrical circuits for metal wrap through technology).

DTECH -­ DELTA-­TECH S.p.A -­ In the scope of the project Graphene Flagship, the Delta-­Tech company, in the person of its chief scientist of the project, Eng. Antonio Nieri and his work team, make available the

background that mature later in the project, in terms of the definition of the optimal parameters for

impregnation of carbon fibers, in the form of fabrics and unidirectional tapes, with thermosetting epoxy

matrices containing graphene nano-­particles, also in terms of set up of curing parameters of the laminates.

DTU -­ DANMARKS TEKNISKE UNIVERSITET -­ The Background which would be available to Project partners, where ‘needed’ for Project purposes, shall be the information, results, technology, confidential

know-­how or intellectual property rights generated by either Professor Antti-­Pekka Jauho or Associate

Professor Peter Bøggild of the Department of Micro-­ and Nanotechnology at DTU or members of their

research teams. This Background will be made available, when not subject to a valid obligation of non-­

disclosure.

The included background:

-­‐ Nanopatterning of graphene using electron beam lithography

-­‐ Electronic transport at low or room temperatures

Dyesol Italia -­ DYESOL ITALIA S.R.L. -­ No background included EMPA -­ EIDGENOESSISCHE MATERIALPRUEFUNGS-­ UND FORSCHUNGSANSTALT -­ No background included

Page 222: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

208 (294)

EPCOS -­ EPCOS AG -­ EPCOS AG does not grant any Access Rights to any of its Background but may add Background during the Project by written notice.

EPFL -­ ÉCOLE POLYTECHNIQUE FÉDÉRALE DE LAUSANNE -­ No background included Ericsson -­ ERICSSON AB -­ No background included ESF -­ FONDATION EUROPEENNE DE LA SCIENCE -­ No background included ETH Zurich -­ EIDGENOESSISCHE TECHNISCHE HOCHSCHULE ZURICH -­ The Eidgenössische Technische Hochschule Zürich (ETH Zurich) herby makes available Access Rights to all Background

generated by the research group of Prof. Ensslin, other than such Background that has been and/or will be

created and developed by personnel and/or scientists and/or students at ETH Zurich not directly involved

in the Project as well as Background that has been, and/or will be derived outside the Project and/or which

ETH Zurich due to third party rights is not able to grant access rights to.

FAU -­ FRIEDRICH-­ALEXANDER-­UNIVERSITAT ERLANGEN NURNBERG -­ No background included FBK -­ FONDAZIONE BRUNO KESSLER -­ No background included

FNM – FINMECCANICA SOCIETÀ PER AZIONI – No background included FE – FLEXENABLE LIMITED – FlexEnable Limited does not grant any Access Rights to any of its Background, but may add Background

during the Project by written notice.

FIDAMC – FUNDACION PARA LA INVESTIGACION, DESARROLLO Y APLICACION DE MATERIALES COMPUESTOS -­ No background included FORTH -­ FOUNDATION FOR RESEARCH AND TECHNOLOGY HELLAS -­ No background included Fraunhofer -­ FRAUNHOFER-­GESELLSCHAFT ZUR FOERDERUNG DER ANGEWANDTEN FORSCHUNG E.V. -­ No data, know-­how or information of Fraunhofer shall be Needed by another Party for implementation of the Project (Article 25.2 Grant Agreement) or exploitation of that other Party’s Results

(Article 25.3 Grant Agreement).

FSU – FRIEDRICH-­SCHILLER-­UNIVERSITAT JENA -­ No background included g.tec -­ GUGER TECHNOLOGIES OG -­ No background included

Page 223: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

209 (294)

G24 -­ G24 POWER LIMITED -­ G24 Power limited hereby makes available Access Rights to all Background generated by personnel involved in Perhene project, other than such Background that has been and/or will

be created/developed by G24 Power personnel not directly involved in the Project as well as Background

that has been and/or will be derived outside the scope of the Project.

Graphenea -­ Graphenea S.A.) -­ No background included GRINP -­ GRINP S.R.L. -­ No background included GRUPO ANTOLIN-­INGENIERIA SA -­ GRUPO ANTOLIN-­INGENIERIA SA – Background is restricted to the Background that the research group participating in the GRAPHENE

Flagship project, which will bring to the project all his Background which is public domain and his

Background which is not subject to third party rights

GSK – GLAXOSMITHKLINE RESEARCH AND DEVELOPMENT LTD. -­ No background included HORIBAJY -­ HORIBA JOBIN YVON S.A.S. -­ No background included ICFO -­ FUNDACIO INSTITUT DE CIENCIES FOTONIQUES -­ ICFO makes available all Background owned by ICFO which is created during the project by ICFO employees, agents and representatives that

are directly involved in the Project with the exceptions specified in Attachment 2.

ICN2 -­ FUNDACIO INSTITUT CATALA DE NANOCIENCIA I NANOTECNOLOGIA -­ IDIBAPS -­ CONSORCI INSTITUT D'INVESTIGACIONS BIOMÈDIQUES AUGUST PI I SUNYER -­ Tools, techniques, results, expertise and methods from the research group/s of IDIBAPS directly involved in

carrying out the Project and which are necessary for the development of the Project will be made available

for the duration of the Project itself, for research purposes. In case a Party/ies wishes to use the Background

aforementioned for another project, or beyond the duration of the Project or for non-­research or educational

purposes, its use will be subject to specific agreements between IDIBAPS and the Party/ies. Access to

certain Background and/or Material may be subject to special conditions (Material Transfer Agreements,

terms of use, etc.).

IFX – INFINEON TECHNOLOGIES AG -­ No background included IIT -­ FONDAZIONE ISTITUTO ITALIANO DI TECNOLOGIA -­ No background included IMDEA – FUNDACION IMDEA NANOCIENCIA – IMDEA Nanociencia has a broad and extensive background in Graphene as it was founded and created by

a group of scientists with a long tradition in the field of surface science and a proven track record in STM,

including pioneer work in the graphene imaging. In the course of its still short history a group of talented

Page 224: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

210 (294)

scientist coming from various fields have joint forces with these pioneers and today the institute has already

accumulated and extensive background and IP in Graphene research. Most of IMDEA Nanociencia’s

background on graphene is either published under the institute affiliation, it has been defended as a Ph.D.

Thesis, or patented either under the SPTO EPO or PCT schemes, although in the following lists we detail

the most relevant aspects

GRAPHENE RESEARCH TOPICS -­‐ Theoretical advanced studies and modelling of graphene and its electronic wave function

-­‐ Electronic properties of graphene and electronic transport.

-­‐ Electronic structure, properties and modulation of transition metal dichalcogenides and black

phosphorus by structural deformations

-­‐ Heterostructures and hybrid devices

-­‐ Graphene-­superconductor junctions.

-­‐ Structural and mechanical properties of graphene and other two dimensional materials.

-­‐ Strain graphene engineering.

-­‐ Spin-­orbit coupling in graphene and other two dimensional materials and Spin transport.

-­‐ Magnetism in graphene analysis of impurity related magnetism.

-­‐ Optical properties of graphene

-­‐ Plasmons and Faraday rotation.

-­‐ Gap modulation and localized excitons in dichalcogenides.

-­‐ Graphene based organic solar cells

-­‐ Graphene alternative 2D polymers based on MOFs and COFs

-­‐ Epitaxial growth of graphene and advanced imaging using STM and other technics, especially the

study of the influence of substrate,

-­‐ Advanced studies of graphene and semiconducting atomically-­thin crystals, on their magnetic

properties using STM at low temperature

-­‐ Local electronic structure of metal supported graphene

-­‐ Magnetic functionalization of graphene for its potential use in the field of spintronic.

-­‐ Metal-­supported graphene, allowing certain amount of charge transfer from the underlying metal to

the preserved molecular orbitals

-­‐ Intercalation of heavy metal atoms between graphene and the underlying metallic substrate, in order

to enhance the weak Spin-­Orbit coupling present in carbon atoms.

-­‐ Graphene grown on different transition metals studying the crystallographic and electronic properties.

-­‐ Molecular deposition on graphene and various substrates and molecular self-­assembly and reactivity

on metal surfaces and graphene.

-­‐ Devices based on graphene nanostructures or transport through single molecules

-­‐ Electronic properties of graphene and dichalcogenide crystals, using STM and AFM

-­‐ Mechanical properties of atomically thin 2D materials by scanning probe microscopy techniques

-­‐ Design and study of long range magnetic order on nanostructured Graphene

-­‐ Supramolecular Functionalization of Graphene with a nonplanar recognition motif

Page 225: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

211 (294)

-­‐ Adding Magnetic Functionalities to Epitaxial Graphene

-­‐ Atom intercalation underneath graphene and organic molecules self-­assembled on crystal surfaces.

-­‐ Graphene for the further study and use in the fabrication of organic photovoltaic devices.

-­‐ The properties of graphene and other bidimensional materials, with on the development of devices

and the storage and generation of energy.

GRAPHENE PUBLICATIONS RELEVANT FOR BACKGROUND

• Long Range Magnetic Order in a Purely Organic 2D Layer Adsorbed on Epitaxial Graphene et col. Nature Physics 9, 368-­374 (2013).

• Periodically rippled Graphene: Growth and Spatially Resolved Electronic Structure. A.L. Vazquez de Parga et col. Phys. Rev. Lett. 100, 056807 (7pp) (2008)

• Spatial Variation of a Giant Spin–Orbit Effect Induces Electron Confinement in Graphene On Pb Islands F. Calleja, et col. Nature Physics 11, 43-­47 (2015).

• Probing the Site-­Dependent Kondo Response of Nanostructured Graphene With Organic Molecules M. Garnica et col. Nano Lett., 2014, 14,4560-­4567

• Elastic Response of Graphene Nanodomes S. Koch et col. ACS Nano, 2013, 7, pp 2927–2934

• Spatially Resolved, Site-­Dependent Charge Transfer and Induced Magnetic Moment In TCNQ Adsorbed on Graphene D. Maccariello et col. Chem. Mater., 2014, 26, pp 2883–2890

• Electrografting of N’, N’-­dimethylphenothiazin-­5-­ium-­3,7-­diamine (Azure A) diazonium salt forming electrocatalytic organic films on gold or graphene oxide gold hybrid electrodes. Gómez-­Anquela, C., Revenga-­Parra, M., Abad, J., Marín, A. G., Pau, J., Pariente, F., Piqueras, J. &

Lorenzo, Electrochim. Acta (2014). 116, 59-­-­68. (Doi: 10.1016/j.electacta.2013.11.021.)

• Electron-­donating behavior of few-­layer graphenein covalent ensembles with electron accepting phthalocyanines. Ragoussi, M.-­E., Katsukis, G., Roth, A., Malig, J., de la Torre, G., Guldi, D. M. & Torres, T. J. Am. Chem. Soc. (2014). 136 (12), 4593-­-­8. (Doi: 10.1021/ja411830x.)

• Electron-­accepting phthalocyanine–pyrene conjugates: towards liquid phase exfoliation of graphite and photoactive nanohybrid formation with graphene. Roth, A., Ragoussi, M.-­E., Wibmer, L., Katsukis, G., de la Torre, G., Torres, T. & Guldi, D. M. Chem. Sci. (2014). 5 (9), 3432. (Doi:

10.1039/C4SC00709C.)

• The competition for graphene formation on Re (0001): A complex interplay between carbon segregation, dissolution and carburization. Miniussi, E., Pozzo, M., Menteş, T., Niño, M.A, Locatelli, A., Vesselli, E., Comelli, G., Lizzit, S., Alfè, D. & Baraldi, A. Carbon (2014). 73, 389-­-­402. (Doi:

10.1016/j.carbon.2014.02.081.)

• Water-­Soluble Reduced Graphene Oxide-­ Carboxymethylcellulose Hybrid Nanomaterial for Electrochemical Biosensor Design. Araque, E., Villalonga, R., Gamella, M., Martínez-­Ruíz, P. Sánchez, A., García-­Baonza, V. & Pingarrón, J. M. ChemPlusChem (2014). 79 (9), 1334-­-­ 1341. (Doi:

10.1002/cplu.201402017.)

• Spatial variation of a giant spin-­orbit effect induces electron confinement in graphene on Pb islands. Calleja, F., Ochoa, H., Garnica, M., Barja, S., Navarro, J. J., Black, A., Otrokov, M. M.,

Page 226: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

212 (294)

Chulkov, E. V., Arnau, A., Vázquez de Parga, A. L., Guinea, F. & Miranda, R. Nature Physics (2014).

(Doi: 10.1038/nphys3173.)

• Mapping spin distributions in electron acceptor molecules adsorbed on nanostructured graphene by the Kondo effect. Garnica, M., Calleja, F., Vázquez de Parga, A. L. & Miranda, R. Surf. Sci. (2014). 630, 356-­-­ 360. (Doi: 10.1016/j. susc.2014.07.028.)

• Controlling the spatial arrangement of organic magnetic anions adsorbed on epitaxial graphene on Ru (0001). Stradi, D., Garnica, M., Diaz, C., Calleja, F., Barja, S., Martín, N., Alcamí, M., Vázquez de Parga, A.L., Miranda, R., Martín, F. Nanoscale (2014). 6 (24), 615271-­9 (DOI:10.1039/c4nr02917h)

• Scanning tunneling microscopy (STM) of graphene. Vázquez de Parga, A.L. and Miranda, R. in Graphene: properties, preparation, characterization and devices, Edited by V. Skákalová and A.B.

Kaiser, ISBN: 978-­0-­85709-­508-­4 Woodhead Publisingh Group, Cambridge, United Kingdom

(doi:10.1533/9780857099334 .2.124)

• Spatial variation of a giant spin-­orbit effect induces electron confinement in graphene on pb islands. Calleja, F., Ochoa, H., Garnica, M., Barja, S., Navarro, J. J., Black, A., Otrokov, M. M., Chulkov, E. V., Arnau, A., Vázquez De Parga, A. L., Guinea, F., & Miranda, R. Nature Physics 11, 43-­47 (2015). doi:10.1038/nphys3173

• Decorating graphene nanosheets with electron accepting pyridyl-­phthalocyanines. Wibmer, L., Lourenço, L. M. O., Roth, A., Katsukis, G., Neves, M. G. P. M. S., Cavaleiro, J. A. S., Tomé, J. P. C.,

Torres, T., & Guldi, D. M. Nanoscale, 2015,7, 5674-­5682. doi:10.1039/c4nr05719h

• Decorating graphene oxide/nanogold with dextran-­based polymer brushes for the construction of ultrasensitive electrochemical enzyme biosensors. Boujakhrout, A., Sánchez, A., Díez, P., Jiménez-­Falcao, S., Martínez-­Ruiz, P., Peña-­Álvarez, M., Pingarrón, J. M., & Villalonga,

R. J. Mater. Chem. B, 2015, 3, 3518-­3524. doi:10.1039/c5tb00451a

• Single-­Molecule Junctions with Epitaxial Graphene Nanoelectrodes. Ullmann, K., Coto, P. B., Leitherer, S., Molina-­Ontoria, A., Martín, N., Thoss, M., & Weber, H. B. (2015). Nano Letters, 2015,

15(5), pp 3512–3518. doi:10.1021/acs.nanolett.5b00877

• Low-­energy excitations of graphene on Ru (0 0 0 1). Maccariello, D., Campi, D., Al Taleb, A., Benedek, G., Farías, D., Bernasconi, M., & Miranda, R. (2015). Carbon, 93, 1-­10.

doi:10.1016/j.carbon.2015.05.028

• One-­pot exfoliation of graphite and synthesis of nanographene/dimesitylporphyrin hybrids. Mar Bernal, M., & Pérez, E. M. Int. J. Mol. Sci. 2015, 16, 10704-­doi:10.3390/ijms160510704

• Observation of Localized Vibrational Modes of Graphene Nanodomes by Inelastic Atom Scattering. D. Maccariello, A. Al Taleb, F. Calleja A. L. Vázquez de Parga, P. Perna, J. Camarero, E. Gnecco, D. Farías, and R. Miranda Nano Lett. Online 10 December 2015

doi:10.1021/acs.nanolett.5b02887

• Organic Covalent Patterning of Nanostructured Graphene with Selectivity at the Atomic Level. Juan Jesús Navarro, Sofía Leret, Fabián Calleja, Daniele Stradi, André Black, Ramón Bernardo-­

Gavito, Manuela Garnica, Daniel Granados, Amadeo L. Vázquez de Parga, Emilio M. Pérez and

Rodolfo Miranda Nano Lett. Online 10 December 2015 doi: 10.1021/acs.nanolett.5b03928

Page 227: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

213 (294)

Relevant Patents for Background

• New method for the synthesis of Graphene Inks (PCT/EP2014/066316)

• Preparation of Porous Corrugated Graphene from Covalent Organic Frameworks for Super

Capacitor (WO 2015075294 A1)

• Covalent Modified Graphene (P201530126) IMEC -­ INTERUNIVERSITAIR MICRO ELECTRONICA CENTRUM VZW -­ • Imec Background included

-­‐ IPR and know-­how in graphene growth and transfer

-­‐ IPR and know-­how in contacting, doping and gating of graphene devices

-­‐ IPR and know-­how in BEOL metallization processes

-­‐ IPR and knowhow in Silicon Photonics integration platform

-­‐ IPR and know-­how in Silicon Photonics device design

-­‐ IPR and know-­how in nonlinear optics.

IMech-­BAS OLEM -­ BULGARIAN ACADEMY OF SCIENCES -­ IMech-­BAS OLEM -­ Bulgarian Academy of Sciences

• IMech-­BAS agrees to grant Access rights to Background generated by the research group of Prof.

R. Kotsilkova, which is directly involved in carrying out the project as far as needed to perform the

work in the project and not subjected to third party’s rights. Background includes:

• Processing of nano composites and carbon nanofiller dispersion into different polymeric and liquid

matrices;;

• Rheological control on the degree of nanofiller dispersion;;

• Background on mechanical characterization of nanomaterials, thin films and devices at macro,

micro and nanoscale: nanoindentation, nanoscratch, nanotribology and wear, atomic force

microscopy, mechanical strength, stiffness and toughness, rheology.

Further, Access Right will only be provided upon written request if needed for the Project and may be

subject to special conditions (i.e., Material & Technology Transfer Agreement, Confidential Disclosure

Agreement, etc.).

Imperial -­ IMPERIAL COLLEGE OF SCIENCE, TECHNOLOGY AND MEDICINE – No background included

INFN -­ ISTITUTO NAZIONALE DI FISICA NUCLEARE -­ No background included

Page 228: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

214 (294)

INP BSU -­ BELARUSIAN STATE UNIVERSITY, INSTITUTE FOR NUCLEAR PROBLEMS -­ No background included

INTER -­ INSTITUTO DE TECNOLOGIAS EMERGENTES DE LA RIOJA -­ • Preparation of graphene oxide, reduced graphene oxide and graphene.

-­‐ Functionalization of graphene oxide, reduced graphene oxide, graphene and nanoplatelets of

graphene.

-­‐ Characterization of graphene oxide, reduced graphene oxide, graphene and nanoplatelets of

graphene.

-­‐ Preparation of thermoplastic composites of graphene and graphene derivatives

-­‐ Preparation of thermosets composites of graphene and graphene derivatives

-­‐ Studies of dispersion of graphene

-­‐ Characterization of composites of graphene.

ITC -­ ITALCEMENTI Fabbriche Riunite Cemento S.p.A. Bergamo -­ All background generated and developed at ITALCEMENTI laboratories based in Brindisi, Calusco and Bergamo concerning

photocatalytic products is available to the public provided that it is not covered by existing patents.

ITME -­ INSTYTUT TECHNOLOGII MATERIALOW ELEKTRONICZNYCH -­ No background included JHIPC -­ J. HEYROVSKY INSTITUTE OF PHYSICAL CHEMISTRY -­ No background included KI -­ KAROLINSKA INSTITUTET -­ Karolinska Institutet will only make available the Background generated by the Bengt Fadeel, Institute of Environmental Medicine other than such Background that has been created

and developed by personnel and/or scientists and/or students at Karolinska Institutet not directly involved

in the Project as well as Background that has been derived outside the Project and which Karolinska

Institutet due to third party rights is not able to grant access rights to.

KIT -­ KARLSRUHER INSTITUT FÜR TECHNOLOGIE -­ No background included LIB -­ LIBRE S.R.L. -­ No background included LIU -­ LINKOPINGS UNIVERSITET -­ No background included LNE -­ LABORATOIRE NATIONAL DE MÉTROLOGIE ET D’ESSAIS -­ The LABORATOIRE NATIONAL DE METROLOGIE ET D’ESSAIS (LNE), hereby makes available Access Rights to all Background, know-­

how, information, results, generated by the members of the following research groups which are directly

involved in carrying out the Project: mainly the Quantum electrical metrology team/LNE (Dr. F. Schopfer

and Dr. W. Poirier), RF electrical metrology team/LNE (Dr. M. Charles), Nanometrology team/LNE (Dr. N.

Feltin and Dr. S. Ducourtieux), and any other persons or teams at LNE whose skills could be judged

Page 229: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

215 (294)

required for the progress of the Project by the aforementioned main LNE members involved, and this as far

as needed to duly perform the work in the Project.

M-­SOLV – M-­SOLV LTD -­ No background included MFA EK MTA -­ CENTRE FOR ENERGY RESEARCH, HUNGARIAN ACADEMY OF SCIENCES -­ No background included

MPG -­ MAX PLANCK GESELLSCHAFT ZUR FOERDERUNG DER WISSENSCHAFTEN E.V. -­ No background included

Nano Tech Lab -­ NANO TECH LAB LTD -­ NanoTechLab” Ltd. grants Access Rights to only that Background which is directly needed to carry out the Project.

Background included:

-­‐ Characterization of mechanical properties of nanocomposites and multilayered nanostructures:

-­‐ Nano mechanics: nanoindentation;;

-­‐ Micro mechanics: tribology, wear, scratch, friction and rheology;;

-­‐ Macro mechanics: deformation and fracture, stress, strain, stiffness, toughness, fatigue, creep,

relaxation and strength (tension, torsion, bending and compressive mode).

-­‐ Nanostructure and surfaces: Atom Force Microscopy, 3D profilometer.

NanOsc AB – NANOSC AB -­ No background included NNsa -­ NANESA S.R.L. -­ Background is restricted to the work group involved in project related to Graphene Flagship. This group will give to the project all the developed background, related to the properties of new

graphene based nanoparticles, which is public and his Background which is not subject to third party rights.

Nokia R&D (UK) Ltd -­ Nokia R&D (UK) LIMITED -­ No background included NOKIA. OYJ – NOKIA OYJ -­ No background included NOVALIA – NOVALIA LIMITED -­ No background included NPL MANAGEMENT LIMITED -­ NPL MANAGEMENT LIMITED -­ No background included NUID UCD -­ UNIVERSITY COLLEGE DUBLIN, NATIONAL UNIVERSITY OF IRELAND, DUBLIN -­ No background included

OINT -­ OXFORD INSTRUMENTS NANOTECHNOLOGY TOOLS LIMITED -­ No background included

Page 230: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

216 (294)

Pixium -­ PIXIUM VISION -­ No background included PMI -­ POLITECNICO DI MILANO -­ No background included POLITO -­ POLITECNICO DI TORINO -­ No background included Polymem -­ POLYMEM S.A -­ Access Rights to Background made available to the Parties. Polymem agrees to grant Access rights to the Background directly generated or accumulated by their

research team directly participating in the Graphene Flagship Project. The research team included in the

Project will bring all his Background which is public domain and his Background which is not subject to third

party rights.

PROGNOMICS – PROGNOMICS LTD -­ No data, know-­how or information of PROGNOMICS shall be Needed by another Party for implementation of the Project (Article 25.2 Grant Agreement) or Exploitation

of that other Party’s Results (Article 25.3 Grant Agreement).

QMUL -­ QUEEN MARY UNIVERSITY OF LONDON -­ No background included REPSOL -­ REPSOL SA -­ No background included RIJKSUNIVERSITEIT GRONINGEN -­ RIJKSUNIVERSITEIT GRONINGEN -­ No background included RUN -­ STICHTING KATHOLIEKE UNIVERSITEIT -­ SKU/RU grants Access rights to all Background which has been accumulated in the field of the Project and which has been developed by personnel of the specific

research group directly involved in carrying out the Project (i.c. the Department of Theory of Condensed

Matter headed by Prof. dr. M.I. Katsnelson (of the Institute for Molecules and Materials)). Access to certain

Background and/or Material may be subject to special conditions (MTA, terms of use, etc.).

RWTH AACHEN -­ RHEINISCH-­WESTFAELISCHE TECHNISCHE HOCHSCHULE AACHEN (”RWTH”) -­ No background included Sabanci University -­ SABANCI UNIVERSITY -­ No background included SISSA -­ SCUOLA INTERNAZIONALE SUPERIORE DI STUDI AVANZATI DI TRIESTE -­ No background included ST-­I -­ STMICROELECTRONICS SRL -­ No background included TECNALIA -­ FUNDACION TECNALIA RESEARCH & INNOVATION (TECNALIA) -­ Access Rights to Rights to Background made available to the Parties:

Page 231: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

217 (294)

Tecnalia agrees to grant Access rights to the Background directly generated or accumulated by their

research team directly participating in the Graphene Flagship Project. The research team included in the

Project will bring all his Background which is public domain and his Background which is not subject to third

party rights.

TECHNION -­ TECHNION – ISRAEL INSTITUE OF TECHNOLOGY -­ No background included TEI of CRETE -­ TECHNOLOGICAL EDUCATIONAL INSTITUTE OF CRETE -­ No background included THALES -­ THALES SA -­ Process of fabrication of electrodes using a dynamic spray-­gun deposition method.

Tor Vergata -­ UNIVERSITÀ DEGLI STUDI DI ROMA TOR VERGATA -­ No background included TRINITY COLLEGE DUBLIN -­ THE PROVOST, FELLOWS, FOUNDATION SCHOLARS & THE OTHER MEMBERS OF BOARD OF THE COLLEGE OF THE HOLY AND UNDIVIDED TRINITY OF QUEEN ELIZABETH NEAR DUBLIN -­ For the avoidance of doubt, The Provost, Fellows, Foundation Scholars, and the other members of Board, of the College of the Holy and Undivided Trinity of Queen Elizabeth near

Dublin (“TCD”) excludes from its obligations to grant Access Rights to Background, all Background owned

and developed by TCD except that developed by Professor Jonathan Coleman and his research group in

the School of Physics, TCD which relates directly to the GRAPHENE project.

TU Delft -­ TECHNISCHE UNIVERSITEIT DELFT -­ Background included is restricted to Background as specified in the proposal and Needed for the implementation of the GRAPHENE Project to the extent

generated by the members of the Research Groups of Prof. Dr. Herre van der Zant, Prof. Dr. Lieven

Vandersypen, and Prof. Dr. Cees Dekker (departments of Quantum NanoScience and BionanoScience/

Faculty of Applied Sciences) which are directly involved in the Project and is public domain and TU Delft,

due to third party rights, is able to grant access rights to.

TU WIEN -­ TECHNISCHE UNIVERSITAET WIEN -­ TUW includes the Background that was derived within Photonics Institute E387, by researchers directly involved in the Project.

This Background includes results on Graphene optoelectronics and spectroscopy.

TU/e -­ TECHNISCHE UNIVERSITEIT EINDHOVEN -­ No background included TUC -­ TECHNISCHE UNIVERSITAET CHEMNITZ -­ TUC states hereby that in the event that TUC should make available Background, this shall be only the Background generated or accumulated by the TUC

Research Group directly participating in the Project provided it is Needed under the terms of this Consortium

Agreement or the Grant Agreement. Consequently, all and any Background from TUC other than the

aforementioned Background is hereby excluded.

Page 232: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

218 (294)

TUD -­ TECHNISCHE UNIVERSITAET DRESDEN -­ TUD grants Access Rights to only that Background which has been generated by the TUD research group of Prof. Seifert involved in the Project and which is

directly needed to carry out the Project;; provided, however, that such Access Rights are granted only if

TUD ability to grant such Access Rights is not restrict by third party rights. Further, Access Rights will only

be provided upon written request if needed for the Project, and may be subject to special conditions (i.e.,

Material Transfer Agreement, Confidential Disclosure Agreement, etc.).

TUHH -­ TECHNISCHE UNIVERSITAET HAMBURG-­HARBURG -­ Samples of Aerographit material, according to Partners’ needs and TUHH’s capacities.

TUM -­ TECHNISCHE UNIVERSITÄT MÜNCHEN -­ Technische Universität München (TUM) contributes to the Project the knowledge and expertise of the Lehrstuhl für Experimentelle Halbleiter Physik (E25) (Prof.

Martin Stutzmann) subject to the expressly stated exclusion of TUM in Attachment 2.

UAB -­ UNIVERSITAT AUTÒNOMA DE BARCELONA -­ UAB makes available all background generated during the project Graphene and in relation with the project objectives owned and/or created by Prof. David

Jiménez and by UAB's employees, agents and/or representatives that are directly involved in the project

with the exceptions specified in Attachment 2.

UAU -­ UNIVERSITAT AUGSBURG -­ No background included UCAM -­ THE CHANCELLOR, MASTERS AND SCHOLARS OF THE UNIVERSITY OF CAMBRIDGE -­ No background included

UCdL -­ UNIVERSITE CATHOLIQUE DE LOUVAIN -­ Background and know-­how generated by the members of the research group of Prof. J.-­C. Charlier which is directly involved in carrying out the Project

as far as needed to duly perform the work in the project and subject to third party’s rights. This represents

the status at the time of signature of this Consortium Agreement.

UCL -­ UNIVERSITY COLLEGE LONDON -­ UCL will make available for access rights the Background knowledge which is: a) Needed and relevant to the work packages in which UCL is involved in the

GRAPHENE and b) developed by either Paul McMillan at Materials and Inorganic Chemistry, Dan Brett at

UCl Chemical Engineering or Chris Howard at the Department of Physics and Astronomy and c) which is

not subject to third party’s rights.

UCLM -­ UNIVERSIDAD DE CASTILLA -­ LA MANCHA -­ No background included UEF -­ ITA-­SUOMEN YLIOPISTO -­ No background included

Page 233: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

219 (294)

UHAM -­ UNIVERSITAET HAMBURG -­ No background included ULANC -­ LANCASTER UNIVERSITY -­ No background included ULB -­ UNIVERSITÉ LIBRE DE BRUXELLES -­ The Université libre de Bruxelles (ULB) hereby makes available Access Rights to the Background directly related to the GRAPHENE project and strictly Needed

for the purpose of carrying out the project, generated by the members of the Research group of Prof. Frank

Dubois which are directly involved in carrying out the Project, and which the ULB, due to third party rights,

is able to grant Access Rights to.

ULM -­ UNIVERSITAET ULM -­ No background included UM -­ UNIVERSITÉ DE MONTPELLIER Background which UM grants

Access rights, is restricted to the Background of scientists and/or students involved in the Project which will

bring to the Project all its Background which is public domain and which is not subject to Third Party rights.

This represents the status at the time of signature of this Consortium Agreement.

UMEA UNIVERSITET -­ UMEA UNIVERSITET -­ No background included UMINHO -­ UNIVERSIDADE DO MINHO -­ No background included UNamur -­ UNIVERSITÉ DE NAMUR ASBL -­ The background included is restricted to all background that the CABONNAGE group will bring to the GRAPHENE flagship project, provided it is public domain and not

subject to third party rights. This represents the status at the time of signature of this Consortium

Agreement.

UNIBAS -­ UNIVERSITAT BASEL -­ The Universitaet Basel hereby makes available Access Rights to all Background generated by the research group of Prof. Christian Schoenenberger, other than such

Background that has been and/or will be created and developed by personnel and/or scientists and/or

students at UBas not directly involved in the Project as well as Background that has been, and/or will be

derived outside the Project and/or which UBAS due to third party rights is not able to grant access rights

to.

UNIBI -­ UNIVERSITAET BIELEFELD -­ No background included UNIBO -­ ALMA MATER STUDIORUM-­UNIVERSITÀ DI BOLOGNA -­ No background included UNIPD -­ UNIVERSITÀ DEGLI STUDI DI PADOVA -­ UNIPD makes available Access rights to Background in the field of the GRAPHENE Project generated by the research group of prof. Di Noto directly involved in

Page 234: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

220 (294)

carrying out the Project, only if directly needed to carry out the tasks in the Project.

UNIPI -­ UNIVERSITÀ DI PISA -­ UNIPI will bring into the network the Background in terms of scientific and technical knowledge regarding device characterization and simulation.

UniSA -­ UNIVERSITÀ DEGLI STUDI DI SALERNO -­ Background generated by the members of the research group of the Laboratory of Electromagnetic characterization of material (LCEM) belonging the

Department of Information Engineering, Electrical Engineering and Applied Mathematics (DIEM) that is

directly connected with the activity carried out by the team in the Project and not subjected to third party

rights or to the other restriction reported in the “background excluded”.

UNISTRA -­ UNIVERSITE DE STRASBOURG -­ No background included UNITS -­ UNIVERSITA DEGLI STUDI DI TRIESTE -­ No background included UNIVERSITAET BREMEN -­ UNIVERSITAET BREMEN -­ No background included UNIGE -­ UNIVERSITE DE GENEVE -­ No background included UNIVERSITY OF MANCHESTER -­ THE UNIVERSITY OF MANCHESTER -­ No background included UNIWARSAW -­ UNIWERSYTET WARSZAWSKI University of Warsaw (UW) hereby reserves the right to grant Access Rights only to Background generated

by the core research team led by Prof. Pawel J. Kulesza, Faculty of Chemistry, directly involved in carrying

out activities under this very Project.

UNIZAR -­ UNIVERSIDAD DE ZARAGOZA -­ Background and know-­how by the group of Dr. Raul Arenal, concerning different transmission electron microscopy (TEM) techniques, SEM and X-­ray photoelectron

spectroscopy (XPS). In particular high resolution imaging (HRTEM), electron diffraction and electron energy

loss spectroscopy (EELS) that will be employed for developing the different tasks specified in the project

concerning the activities of this group.

UNOTT -­ THE UNIVERSITY OF NOTTINGHAM -­ UNOTT includes only such Background which has been generated by those members of Prof. Amalia Patanè’s research group who are involved in the Graphene

Flagship Project and which is Needed directly to carry out the Graphene Flagship Project, provided that

grant of such Access Rights does not conflict with existing or pending third party rights.

UoC -­ PANEPISTIMIO KRITIS (University of Crete) -­ No background included UOI -­ PANEPISTIMIO IOANNINON -­ The University of Ioannina (UOI) grants Access Rights to all

Page 235: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

221 (294)

Background generated and developed by Professor Elefterios Lidorikis and his research group in the

Department of Materials Science and Engineering -­ UOI, directly relating to the GRAPHENE project.

Any other background is hereby excluded.

UoS -­ UNIVERSITY OF SUNDERLAND -­ University of Sunderland (UoS) hereby makes available Access Rights to all Background generated by the research group of Prof. Ahmed Elmarakbi directly involved in

carrying out the Project. This includes Background on developing, modeling, simulating the new graphene

composite materials and also optimization, applications, and validation of the developed materials including

Life Cycle Analysis (LCA). This represents the status at the time of signature of this Consortium Agreement.

UOXF -­ THE CHANCELLOR, MASTERS AND SCHOLARS OF THE UNIVERSITY OF OXFORD -­ No background included

UPMC -­ UNIVERSITÉ PIERRE AND MARIE CURIE -­ PARIS 6 -­ Skills and expertise:

-­‐ Mixed neuronal culture

-­‐ Pure culture of neurons

-­‐ Physiopatholgy of the retina

-­‐ Surgery of the retinal implants

-­‐ Histopathology of the retinal issue

-­‐ Electrophysiological recordings of retinal neurons

-­‐ Functional measure in vivo on the visual system (rat, mouse, big animal)

UREG -­ UNIVERSITAET REGENSBURG -­ No background included USFD -­ THE UNIVERSITY OF SHEFFIELD -­ The University of Sheffield Background includes:

-­‐ Cw and time-­resolved optical spectroscopy, including low temperature techniques

-­‐ Micro-­photoluminescence spectroscopy, including low temperature techniques

-­‐ Design and fabrication of optical microcavities.

USTL -­ UNIVERSITE DES SCIENCES ET TECHNOLOGIES DE LILLE -­ LILLE I -­ UniLille background included

-­‐ Graphene nanoribbons FET devices

-­‐ High frequency characterization of GFET on rigid and flexible substrates

-­‐ Extraction of small signal equivalent circuit of GFET

-­‐ High frequency circuit design.

This represents the status at the time of signature of this Consortium Agreement.

If necessary, USTL informs the parties that they could be caused to enter into relations with SATT Nord,

technology transfer operator of the UNIVERSITE LILLE 1, to conclude contracts relating to patents or

software, etc. belonging to the UNIVERSITE LILLE 1.

Page 236: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

222 (294)

UTARTU -­ TARTU ÜLIKOOL -­ No background included UZH -­ UNIVERSITAET ZUERICH -­ The Universitaet Zuerich (UZH) herby makes available Access Rights to all Background generated by the research group of Prof. Thomas Greber, other than such Background

that has been and/or will be created and developed by personnel and/or scientists and/or students at UZH

not directly involved in the Project as well as Background that has been, and/or will be derived outside the

Project and/or which UZH due to third party rights is not able to grant access rights to.

VIS -­ N VISION SYSTEMS AND TECHNOLOGIES SL. -­ No background included VMI -­ VARTA MICRO INNOVATION GMBH -­ No background included VTT -­ TEKNOLOGIAN TUTKIMUSKESKUS VTT Oy -­ No background included

This represents the status at the time of signature of this Consortium Agreement.

Page 237: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

223 (294)

[Attachment 2: Background excluded]

Background excluded from Access Rights: CHALMERS -­ CHALMERS TEKNISKA HOEGSKOLA AB CHALMERS hereby informs, in accordance with the Grant Agreement Annex II, article II.33.2, that the

following information is excluded:

all Background generated by personnel, scientists or students at Chalmers other than that generated

within the research groups of Prof. Herbert Zirath, Prof. Jan Stake and Prof. Sergey Kubatkin of the

Department of Microtechnology and Nanoscience and the research group of Prof. Jari Kinaret of the

Department of Applied Physics.

all Background which CUT, due to existing or pending third party rights, is unable to grant Access Rights

to.

AALTO -­ AALTO-­KORKEAKOULUSAATIO all materials, software, results, data, tests and information from other departments and laboratories of

Aalto University than the ones involved in the GRAPHENE project are fully excluded and no Access Rights

are granted

all commercial and third party software is excluded and no Access Rights are granted

any Background which has been developed by researchers who do not participate in GRAPHENE are

excluded and no Access Rights are granted

ABB – ABB AB ABB AB excludes the following Background from any obligation to grant Access Rights:

• Any Background not expressly identified in Attachment 1 (or not introduced in the Project in

accordance with the procedure set out in the Consortium Agreement);;

• Background generated by ABB employees not participating in the Project;;

• Background generated by ABB employees participating in the Project but in parallel with the

Project and outside the tasks described in the Description of Work;;

• Any and all know-­how part of existing patents and/or ongoing patent applications;; and

• Background to which ABB, due to mandatory law and/or any third party rights, is unable to grant

Access Rights.

This represents the status at the time of signature of this Consortium Agreement.

AERNNOVA -­ INTERNACIONAL DE COMPOSITES SA. – No background excluded

Page 238: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

224 (294)

AIRBUS OPERATIONS SL -­ AIRBUS OPERATIONS SL No background excluded

AIXTRON LIMITED -­ AIXTRON LIMITED AIXTRON will exclude all IP and know how in CVD technology.

ALCATEL-­LUCENT DEUTSCHLAND AG -­ ALCATEL-­LUCENT DEUTSCHLAND AG Alcatel-­Lucent Deutschland excludes all Background not owned by it as well as any Background which it

has not itself introduced into the Project at its sole discretion for use in the execution of the Project.

ALU-­FR -­ ALBERT-­LUDWIGS-­UNIVERSITAET FREIBURG No background excluded

ALUI -­ ALCATEL-­LUCENT ITALIA S.P.A. – Alcatel-­Lucent Italia excludes all Background not owned by it as well as any Background which it has not

itself introduced into the Project at its sole discretion for use in the execution of the Project.

Amalyst -­ AMALYST LTD Amalyst Ltd excludes all Background which it has not itself introduced into the Project at its sole discretion

for use in execution of the Project.

AMO GMBH -­ GESELLSCHAFT FUR ANGEWANDTE MIKRO-­ UND OPTOELEKTRONIK MIT BESCHRAENKTERHAFTUNG AMO GmbH

AMO GmbH hereby excludes from its obligations to grant Access Rights to:

all Background generated by scientists and/or technicians other than by the members of the research

team Graphene

all Background that has been created or obtained outside the scope and field of this Project, and

all Background to which AMO GmbH is not able to grant access rights due to third party rights.

AVANZARE -­ AVANZARE INNOVACION TECNOLOGICA SL AVANZARE will exclude all its IP and know how in the preparation of graphene and its functionalization,

production of graphene composites and also the graphene oxide, reduced graphene oxide, production

develop previously to the graphene FLAGSHIP.

We also exclude:

Background developed by in the project NANOMASTER

Background developed by in the project GRAFENPLAST

all know-­how in patents and current patents applications.

any unpublished work that has been carried out which is not already in the public domain.

Page 239: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

225 (294)

know-­how that is covered under specific research agreements and confidentiality agreements and

therefore subject to third party rights.

BASF SE -­ BASF SE No background excluded

Breton -­ BRETON S.p.A. The following information is expressly excluded from Access Rights within the Project:

all Background generated by personnel at Breton other than those directly involved in the Project;;

all Background generated by personnel at Breton that are directly involved in the Project, which is outside

the scope of the Project;;

all Background which Breton is unable to grant access rights to due to existing or pending third party

rights.

CAU -­ CHRISTIAN-­ALBRECHTS-­UNIVERSITÄT ZU KIEL CAU excludes all background deriving from other departments and working groups other than the working

group of Prof. Rainer Adelung, Institute for Functional Nanomaterials of the Christian-­Albrechts-­

Universität zu Kiel. Further on, CAU excludes all Know-­how developed by scientists participating in the

Project but which is outside the scope of the Project and all Know-­how in patents and current patent

applications with the named Research Group.

For the avoidance of doubt all Background is excluded which CAU due to third party rights is not able to

grant access rights to.

CEA -­ COMMISSARIAT A L´ENERGIE ATOMIQUE ET AUX ENERGIES ALTERNATIVES CEA excludes from its obligation to grant Access Rights to Background all Background owned and

developed by CEA outside the Project/ Flagship not listed in Attachment 1, even if such Background is

about graphene (notably all background and results from the Neurocare Project).

CHALMERS INDUSTRITEKNIK -­ STIFTELSEN CHALMERS INDUSTRITEKNIK No background excluded

CIBER -­ CENTRO DE INVESTIGACION BIOMEDICA EN RED BIOINGENIERIA, BIOMATERIALES Y NANOMEDICINA No background excluded

CIC BIOMAGUNE – ASOCIACION CENTRO DE INVESTIGACION COOPERATIVA EN BIOMATERIALES – For the purpose of the Project, the following Background of CIC biomaGUNE will be excluded from the

requirement to grant Access Rights:

-­ Expertise on functionalization of nanomaterials;;

Page 240: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

226 (294)

-­ Any background developed by personnel, scientists or students not participating in the Project;;

-­ Any background developed by personnel, scientists or students participating in the Project which

is outside the scope of jointly executed research activities of the Project as detailed out in Annex I

of the Grant Agreement;;

-­ Any background in patents and current patent applications;;

-­ Any background that is covered under specific research agreements and confidentiality

agreements and therefore subject to third party rights.

-­ Any other Background derived outside the Project, to which the Party, due to third party rights, is

not able to grant Access Rights

CIC energiGUNE -­ CENTRO DE INVESTIGACION COOPERATIVA EN ENERGIAS ALTERNATIVAS FUNDACION Background is restricted to the Background that the research group participating in the Project, will bring

to the project all its Background which is public domain and his Background which is not subject to third

party rights.

We exclude:

-­ Background developed by scientists and / or technicians not participating in the Project belonging

to CIC energiGUNE.

-­ Background developed by the scientists and / or technicians participating in the Project which is

outside the scope of the Project.

-­ all know-­how from existing patents and current patents applications.

-­ any unpublished work that has been carried out which is not already in the public domain and

-­ all know-­how that is covered under specific research agreements and confidentiality agreements

and therefore subject to third party rights.

CIC nanoGUNE -­ ASOCIACION – CENTRO DE INVESTIGACION COOPERATIVA EN NANOCIENCIAS -­ CIC NANOGUNE all Background and/or material deriving from researchers, research groups, departments or any other

personnel of Asociación Centro de Investigación Cooperativa en Nanociencias – CIC nanoGUNE which

is not relevant to or Needed for the Project;;

all Background that has been and/or will be created and developed by personnel, researcher and/or

scientists of Asociación Centro de Investigación Cooperativa en Nanociencias – CIC nanoGUNE not

directly involved in the Project;;

all Background to which Asociación Centro de Investigación Cooperativa en Nanociencias – CIC

nanoGUNE, due to any kind of duty of confidentiality and/or existing or pending third party rights or legal

obligations, is unable to grant access rights to;;

all Background related to existing patents and/or ongoing patent applications;;

any pre-­existing Know-­How of Asociación Centro de Investigación Cooperativa en Nanociencias -­ CIC

nanoGUNE about (i) materials, (ii) processes, (iii) modeling, (iv) designs and (v) manufacturing methods

Page 241: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

227 (294)

and tools generated by Asociación Centro de Investigación Cooperativa en Nanociencias -­ CIC

nanoGUNE, that is not in the public as well as any proprietary and non-­public information of Asociación

Centro de Investigación Cooperativa en Nanociencias -­ CIC nanoGUNE’s business and related market

domain. This refers in particular to knowledge generated within other EU-­funded or national-­funded R&D

projects, knowledge generated within industry-­funded collaborations (research and services) that are not

part of the Project and other knowledge that is confidential due to other reasons.

CNIT -­ CONSORZIO NAZIONALE INTERUNIVERSITARIO PER LE TELECOMUNICAZIONI No background excluded

CNM -­ CNM TECHNOLOGIES GmbH No background excluded

CNR -­ CONSIGLIO NAZIONALE DELLE RICERCHE Hereby excludes from its obligation to grant Access Rights the following Background:

Background developed by researchers working in the laboratories of Consiglio Nazionale delle Ricerche

not participating in the GRAPHENE project.

CNRS -­ CENTRE NATIONAL DE LA RECHERCHE SCIENTIFIQUE For the avoidance of doubt, all other background not listed in attachment 1 is excluded.

CRF -­ CENTRE RICERCHE FIAT S.C.p.A No background excluded

CSIC -­ AGENCIA ESTATAL CONSEJO SUPERIOR DE INVESTIGACIONES CIENTIFICAS CSIC hereby excludes from its obligation to grant Access Rights to Background:

all Background generated by personnel, scientists or students at CSIC other than those directly involved

in the Project;;

all Background generated by personnel, scientists or students at CSIC that are directly involved in the

Project, which is outside the scope of the tasks to be performed by CSIC according to Annex I to the Grant

Agreement;;

all Background which CSIC, due to existing, pending or future third party rights, is unable to grant access

rights to or for which the CSIC needs to get permission to grant Access Rights;;

all Background which was funded in full or in part by third parties, or which was generated in collaboration

with third parties, or which is otherwise subject to a third party agreement, including but not limited to

confidentiality agreements, or Background which CSIC is not free to provide.

any know-­how in patents, current and future patent applications filed in the name of CSIC.

Page 242: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

228 (294)

DSM -­ DSM Ahead BV Excluded background:

polyamide foil processing and (surface / bulk) properties

multilaminar solar backsheet concepts

characterization of polyamide foils as part of integrated backsheets

industrial solvent-­borne inking processes on polymer foils

Background developed by DSM Ahead scientists not participating in the Project;;

Background developed by DSM Ahead scientists participating in the Project but which is outside the scope

of the Project;;

Background that is generated by DSM Ahead employees and that is not necessary to undertake the

Project in which DSM Ahead is participating;;

Background that is covered under specific research agreements and confidentiality agreements and

therefore subject to third party rights;;

Background that DSM Ahead due to existing rights is unable to grant Access Rights to.

DTECH -­ DELTA-­TECH S.p.A The company Delta-­Tech excludes the background that might arise later in the project Graphene Flagship,

with regard to:

criteria and methods of dispersion / homogenization of nano-­particles in graphene, in the base of the

epoxy matrix liquid from bis-­phenol A.

electro-­magnetic characterization of laminate samples

thermo-­mechanical characterization of laminates

any other characterization and / or surveys which do not fall within the "background included" and which

are not relevant to the activities of Delta-­Tech mentioned in the project.

DTU -­ DANMARKS TEKNISKE UNIVERSITET DTU hereby excludes from its obligation to grant access rights to all Background generated by DTU other

than that generated by Peter Bøggild and Antti-­Pekka Jauho of the DTU Nanotech, Department of Micro-­

and Nanotechnology, or members of their research teams.

DTU also hereby excludes specifically from its obligation to grant access rights to the following

Background:

all data, materials, methodologies and know-­how not generated through the direct participation in the

Project or which DTU is not free to provide.

databases and software not generated through the direct participation in the Project or which DTU is not

free to provide.

all Background resulting from research carried out by Peter Bøggild and Antti-­Pekka Jauho of the

Department of Micro-­ and Nanotechnology or members of their research teams which was funded in full

or in part by industrial, charitable and government sponsors and access to which DTU is not free to

Page 243: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

229 (294)

provide.

Excluded background in particular:

Block copolymer lithography technique developed by Prof K. Almdal, S. N’Doni and P. Boggild, graphene

transfer procedure developed by F. Pizzocchero funded by G-­MOL, and micro four point probe

Conductance mapping developed by D. H. Petersen and CAPRES A/S, and THZ-­TDS conductance

mapping developed by P. U. Jepsen of DTU Fotonik.

DTU also hereby excludes from its obligation to grant access rights to Background that has been and/or

will be derived outside the Project which DTU, due to third party rights, is not able to grant access rights

to, or for whom DTU needs to get permission to grant access rights.

Dyesol Italia -­ DYESOL ITALIA S.R.L. No background excluded

EMPA -­ EIDGENOESSISCHE MATERIALPRUEFUNGS-­ UND FORSCHUNGSANSTALT Any Pre-­Existing Know-­How of EMPA about (i) materials, (ii) process, (iii) modeling, (iv) design and (v)

manufacturing methods and tools generated by the Section Materials-­Biology Interactions that is not in

the public as well as any proprietary information in EMPA´s business and related market domain is

expressly excluded. This refers in particular to knowledge generated within other EU-­funded or national-­

funded R&D projects, knowledge generated within industry-­funded collaborations (research and services)

that are not part of the network and knowledge that is confidential due to other reasons.

EPCOS -­ EPCOS AG EPCOS AG excludes any of its and its Affiliated Entities’ Background. For clarity, and not limitation,

Background for which the grant of a license would require the consent of or compensation to a third party,

and Background that is jointly owned with a third party are also hereby excluded

EPFL -­ ÉCOLE POLYTECHNIQUE FÉDÉRALE DE LAUSANNE EPFL excludes:

a) any EPFL Background developed and generated by scientists and employees not

participating directly in the Project;;

b) any EPFL Background developed and generated by scientists and employees

participating in the Project which is outside the scope of the Project;;

c) any patent or other Intellectual property rights or application filed before the Effective Date

and owned by EPFL;;

d) any EPFL’s Background which is related to existing or future licenses given by EPFL to

other partners;;

e) any Background that is covered under specific research agreements and confidentiality

agreements and therefore subject to third party rights;;

Page 244: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

230 (294)

f) all Background to which EPFL due to existing or pending third party rights, is unable to

grant Access Rights

g) any Software created prior to the Effective Date and identified as owned by EPFL, or

created by an employee of EPFL.

h) The following patent application:

Semiconductor device PCT/IB2012/050036,

EUROPEAN PATENT APPLICATION n° EP 12708058.8

US Patent application n° US 13/976,757

ENGINEERING POLAR DISCONTINUITIES IN NON-­CENTROSYMMETRIC

HONEYCOMB LATTICES

International Patent Application n° PCT/IB2014/059471 filed on March 5, 2014.

Ericsson -­ ERICSSON AB Background excluded:

Background developed by scientists not participating in the Project.

Knowledge developed by scientists participating in the Project which is outside the scope of the Project.

all know-­how in patents and current patent applications.

all know-­how that is covered under other specific agreements and confidentiality agreements and

therefore subject to third party rights.

ESF -­ FONDATION EUROPEENNE DE LA SCIENCE No background excluded

ETH Zurich -­ EIDGENOESSISCHE TECHNISCHE HOCHSCHULE ZURICH Background of ETH Zurich excluded from Access Rights:

Background developed by scientists not participating in the Project;;

Background developed by scientists participating in the Project which is outside the scope of the Project;;

All Background in patents and current patent applications;;

All Background that is covered under other specific research agreements and confidentiality agreements

and therefore subject to third party rights.

FAU -­ FRIEDRICH-­ALEXANDER-­UNIVERSITAT ERLANGEN NURNBERG FAU hereby excludes from its obligation to grant Access Rights to Background all Background generated

by the FAU, other than that generated by the members/employees of the research group of Prof. Dr.

Andreas Hirsch which are directly involved in carrying out the Project FET Flagship Graphene. FAU

excludes all Background that is outside the scope of the project FET Flagship Graphene. Furthermore

FAU excludes all background that is covered under specific agreements (including but not limited to

research agreements, first option license agreements, and confidentiality agreements) which is subject to

third party rights and therefore would prevent FAU from granting Access Rights.

Page 245: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

231 (294)

FBK -­ FONDAZIONE BRUNO KESSLER No background excluded

FNM – FINMECCANICA SOCIETÀ PER AZIONI No background excluded.

FE – FLEXENABLE LIMITED – FlexEnable Limited excludes all of its Background. FIDAMC – FUNDACION PARA LA INVESTIGACION, DESARROLLO Y APLICACION DE MATERIALES COMPUESTOS – No background excluded FORTH -­ FOUNDATION FOR RESEARCH AND TECHNOLOGY HELLAS No background excluded

Fraunhofer -­ FRAUNHOFER-­GESELLSCHAFT ZUR FOERDERUNG DER ANGEWANDTEN FORSCHUNG E.V. Background excluded from Access Rights:

Background generated by scientists and/or technicians other than the ones involved in the respective

projects

Background to which Fraunhofer is not able to grant access due to third party rights

Background that has been created or obtained outside the scope and field of the respective projects

Additional specific exclusions:

Any Background that is not listed as included in Attachment 1

Fraunhofer excludes access to background concerning graphene flake production and graphene

hydrogenation

Fraunhofer excludes access to background concerning piezoelectric membrane-­based and flexural beam

resonator technologies.

FSU – FRIEDRICH-­SCHILLER-­UNIVERSITAT JENA – The Friedrich Schiller University Jena hereby excludes all Background of its participating institutes or

organisation, included but not limited to:

-­ all Background developed by Friedrich Schiller University Jena researchers not participating in the

Project

-­ all Background developed by Friedrich Schiller University Jena researchers participating in the

Project which is outside the scope of the work allocated to the Friedrich Schiller University Jena

under the Project.

Page 246: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

232 (294)

g.tec -­ GUGER TECHNOLOGIES OG No background excluded

G24 -­ G24 POWER LIMITED Background excluded from the project:

all background developed by personnel not participating in the project;;

all background developed by personnel participating in the project, which is outside the scope of the

project;;

all background in patents and current patent applications

any unpublished work that we want to publish before disclosure to the project

all background on Roll-­to-­Roll coating and encapsulation technologies

all background that is covered under other commercial and research agreements and confidentiality

agreements, which is subject to third party rights.

Graphenea -­ Graphenea S.A.) No background excluded

GRINP -­ GRINP S.R.L. No background excluded

GRUPO ANTOLIN-­INGENIERIA SA -­ GRUPO ANTOLIN-­INGENIERIA SA ANTOLIN will exclude all its IP and know how in graphene oxide, reduced graphene oxide, graphene and

carbon nanofibres production and post-­treatment technologies, as well as technologies related to the

exfoliation and dispersion of those materials in different solvents, resins, inks, polymers, ceramics and

organic materials.

GSK – GLAXOSMITHKLINE RESEARCH AND DEVELOPMENT LTD. – All background not expressly identified in Attachment 1

HORIBAJY -­ HORIBA JOBIN YVON S.A.S. No background excluded.

ICFO -­ FUNDACIO INSTITUT DE CIENCIES FOTONIQUES ICFO specifically excludes from the Access Rights granted under this Consortium Agreement or under

the EU-­FPA:

all Background developed outside the groups directly involved in this project

all Background developed by scientists participating in the project in fields unrelated to the aims and

objectives of this Project;;

Background developed as a result of third-­party funding, where third-­party obligations exist;;

Page 247: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

233 (294)

Background which forms the subject of granted patents/patent application;;

all know-­how held by ICFO employees related to items above.

Where Background excluded is required, it may in some circumstances be made available subject to the

conclusion of successful negotiation between the relevant parties.

ICN2 -­ FUNDACIO INSTITUT CATALA DE NANOCIENCIA I NANOTECNOLOGIA No background excluded

IDIBAPS -­ CONSORCI INSTITUT D'INVESTIGACIONS BIOMÈDIQUES AUGUST PI I SUNYER Background excluded:

All Background, pre-­existing know-­how, reagents, software, methodologies, databases, data or biological

samples:

generated by research groups, departments, institutes, personnel, scientists and/or students of IDIBAPS

that is not directly involved in the Project, and which is outside the scope of the tasks to be performed by

IDIBAPS within the Project, as specified in the Description of Work.

resulting from research carried out by the members of the research group of IDIBAPS directly involved in

carrying out the Project which was and/or is funded in full or in part by industrial, charitable, military or

government sponsors, including, but not limited to, national charities and Non-­profit foundations. IDIBAPS

will not be able to grant access rights due to contractual obligations and/or third party rights or which

IDIBAPS is not free to provide.

which IDIBAPS is contractually obliged to keep confidential or is the subject of any other obligation of

confidentiality.

IFX – INFINEON TECHNOLOGIES AG – Any Background generated by individuals other than those directly involved in the Graphene Flagship

Project;;

Any Background generated by individuals who are directly involved in the Graphene Flagship Project, which

is outside the scope and field of the tasks of the Graphene Flagship Project, even if such background

relates to graphene;;

Any Background that has been created or obtained outside the scope and field of this Project;;

Any Background in patents and current patent applications”

IIT -­ FONDAZIONE ISTITUTO ITALIANO DI TECNOLOGIA Background developed by researchers working in the laboratories of Fondazione Istituto Italiano di

Tecnologia not participating in the GRAPHENE project.

IMDEA – FUNDACION IMDEA NANOCIENCIA – No background excluded IMEC -­ INTERUNIVERSITAIR MICRO ELECTRONICA CENTRUM VZW

Page 248: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

234 (294)

No background excluded

IMech-­BAS OLEM -­ BULGARIAN ACADEMY OF SCIENCES IMech-­BAS hereby excludes from its obligation to grant Access Rights to:

• Background developed by personal and scientists not participating in the GRAPHENE project;;

• all Background in patents and current patent applications;;

• all Background that is covered under other specific research agreements and confidentiality

agreements and therefore subjected to third party rights

Imperial -­ IMPERIAL COLLEGE OF SCIENCE, TECHNOLOGY AND MEDICINE Imperial hereby excludes from its obligation to grant Access Rights to Background all Background

generated by Imperial other than that generated by Imperial personnel directly involved in carrying out the

Project. Imperial further hereby specifically excludes any Background that has been funded by a third

party under terms which are incompatible with providing Access Rights, or which Imperial is otherwise not

free to provide.

INFN -­ ISTITUTO NAZIONALE DI FISICA NUCLEARE No background excluded

INP BSU -­ BELARUSIAN STATE UNIVERSITY, INSTITUTE FOR NUCLEAR PROBLEMS No background excluded

INTER -­ INSTITUTO DE TECNOLOGIAS EMERGENTES DE LA RIOJA Background excluded:

Not previously published results.

ITC -­ ITALCEMENTI Fabbriche Riunite Cemento S.p.A. Bergamo Background excluded from the project:

all background developed by personnel not participating in the project;;

all background developed by personnel participating in the project, which is outside the scope of the

project;;

all background in patents and current patent applications

any unpublished work that we want to publish before disclosure to the project

all background that is covered under other commercial and research agreements and confidentiality

agreements, which is subject to third party rights..

ITME -­ INSTYTUT TECHNOLOGII MATERIALOW ELEKTRONICZNYCH Background excluded from the project:

Page 249: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

235 (294)

all Background generated by the employees of ITME not taking part in the Project, including scientists,

students and other personnel,

all Background exceeding the scope of the Project,

all previously awarded patents and patents pending,

all Background that will be made public before launching the Project,

all Background subject to third party rights.

JHIPC -­ J. HEYROVSKY INSTITUTE OF PHYSICAL CHEMISTRY No background excluded

KI -­ KAROLINSKA INSTITUTET Karolinska Institutet hereby excludes specifically from its obligation to grant Access Rights to the

Background, all Background which was not generated by the research group led by Bengt Fadeel, Institute

of Environmental Medicine.

Furthermore excluded is Background, which is;;

a result from other projects of the above research groups;;

generated by individuals of a Party that are directly involved in the project, but which is unrelated to the

work plan, aims and objectives of the project;;

in all know-­how in patents and current patents applications;;

in any unpublished work the Party wants to publish before disclosure to the Consortium;;and

subject to specific research agreements and confidentiality agreements and therefore subject to third

party rights;;

all other background which the Party, due to third party rights, is unable to grant access rights to.

For the avoidance of doubt, all materials, software, results, data and tests from other research groups and

of Karolinska Institutet is fully excluded and no Access Rights are granted.

KIT -­ KARLSRUHER INSTITUT FÜR TECHNOLOGIE No background excluded.

LIB -­ LIBRE S.R.L. No background excluded

LIU -­ LINKOPINGS UNIVERSITET Background excluded from the Project:

all Background developed by personnel, scientists or students at LiU not participating in the Project

all Background developed by personnel, scientists or students at LiU participating in the Project which is

Page 250: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

236 (294)

outside the scope of the Project.

all Background in patents and current patent applications.

any unpublished work that we want to publish before disclosure to the project.

all Background that is covered under other specific research agreements and confidentiality agreements

and therefore subject to third party rights.

LNE -­ LABORATOIRE NATIONAL DE MÉTROLOGIE ET D’ESSAIS The LABORATOIRE NATIONAL DE METROLOGIE ET D’ESSAIS (LNE), hereby excludes Background

from Access Rights to all, know-­how, information, results, generated by the LABORATOIRE NATIONAL

DE METROLOGIE ET D’ESSAIS (LNE), other than those generated by the members of the following

research groups which are directly involved in carrying out the Project: mainly the Quantum electrical

metrology team/LNE (Dr. F. Schopfer and Dr. W. Poirier), RF electrical metrology team/LNE (Dr. M.

Charles), Nanometrology team/LNE (Dr. N. Feltin and Dr. S. Ducourtieux), and any other persons or teams

at LNE whose skills could be judged required for the progress of the Project by the aforementioned main

LNE members involved, and described in Attachment 1.

The LABORATOIRE NATIONAL DE METROLOGIE ET D’ESSAIS (LNE) also excludes specifically from

its obligation to grant Access Rights to the following, even if such Backgrouond is about graphene:

-­ Background developed by LNE’s researchers not participating in the Project,

-­ Background developed by LNE’s researchers participating in the Project which lies outside the scope of

the work allocated to LNE under this project,

-­ Background which LNE due to existing or future third party rights is unable to grant access right to.

M-­SOLV – M-­SOLV LTD – No background excluded MFA EK MTA -­ CENTRE FOR ENERGY RESEARCH, HUNGARIAN ACADEMY OF SCIENCES Background excluded from the Project:

all Background developed by personnel, scientists or students at MFA EK MTA not participating in the

Project;;

all Background developed by personnel, scientists or students at MFA EK MTA participating in the Project

which is outside the scope of the Project;;

all Background in patents and current patent applications;;

any unpublished work that we want to publish before disclosure to the project;;

all Background that is covered under other specific research agreements and confidentiality agreements

and therefore subject to third party rights.

Page 251: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

237 (294)

MPG -­ MAX PLANCK GESELLSCHAFT ZUR FOERDERUNG DER WISSENSCHAFTEN E.V. MPG hereby excludes all Background generated by MPG other than that generated within the groups of

Prof. Klaus Müllen and Dr. Xinliang Feng of the Max Planck Institute for Polymer Research and the groups

of Prof. Klaus von Klitzing and Dr. Jürgen Smet of the Max-­Planck-­Institute for Solid State Research, as

well as Background which MPG is not able to grant access to, due to existing third party rights.

Nano Tech Lab -­ NANO TECH LAB LTD Background excluded:

all Background that has been created or obtained outside the scope and field of this Project;;

all Background to which “NanoTechLab” Ltd. is not able to grant access rights due to third party rights;;

all Background in patents and current patent applications.

NanOsc AB – NANOSC AB – NANOSC AB excludes from its obligation to grant Access Rights any Background not listed in Attachment 1, even if such Background is about graphene. NNsa -­ NANESA S.R.L. Nanesa will exclude every information which is strictly part of its previous IP, and in particular related to

the preparations of graphene and graphene based materials, its funtionalization, production of graphene

oxide, graphene composites and any graphene based products developed by Nanesa before the

beginning of Graphene Flagship project. Nanesa also exclude any work that has been carried out which

is not in the public domain and any know-­how previously developed.

Nokia R&D (UK) Ltd -­ Nokia R&D (UK) LIMITED Nokia R&D (UK) LIMITED and its Affiliated Entities hereby exclude from its obligation to grant access

rights:

Background that is necessarily infringed by implementing a standard,

Background for which the grant of a license would require the consent of or compensation to a third party;;

Background that is jointly owned with a third party to the extent that the participant has no free right to

grant licenses to third parties;;

Background that is part of Nokia’s licensing programs. License may be provided however, on the

conditions of the respective licensing program.

Furthermore, Nokia explicitly excludes from its obligation to grant access right to information other than

Results developed or otherwise acquired after entering into the first Core Project under the EU-­FPA, as

well as copyright or other IPRs pertaining to such information.

NOKIA OYJ – NOKIA OYJ Nokia OYJ and its Affiliated Entities hereby exclude from its obligation to grant access rights:

Page 252: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

238 (294)

Background that is necessarily infringed by implementing a standard,

Background for which the grant of a license would require the consent of or compensation to a third party;;

Background that is jointly owned with a third party to the extent that the participant has no free right to

grant licenses to third parties;;

Background that is part of Nokia’s licensing programs. License may be provided however, on the

conditions of the respective licensing program.

Furthermore, Nokia explicitly excludes from its obligation to grant access right to information other than

Results developed or otherwise acquired after entering into the first Core Project under the EU-­FPA, as

well as copyright or other IPRs pertaining to such information.

NOVALIA – NOVALIA LIMITED Background excluded from the project:

• All background not relating specifically to graphene materials

• All background developed by personnel not participating directly in the project

• All background developed by personnel participating in the project, which is outside the scope of

the project

• All background in patents and current patent applications

• All background that is covered under other commercial and research agreements and

confidentiality agreements, which is subject to third party rights

• Where Background excluded is required, it may in some circumstances be made available subject

to the conclusion of successful negotiation between the relevant parties.

NPL MANAGEMENT LIMITED -­ NPL MANAGEMENT LIMITED No background excluded

NUID UCD -­ UNIVERSITY COLLEGE DUBLIN, NATIONAL UNIVERSITY OF IRELAND, DUBLIN That NUID UCD specifically excludes the granting of access rights to the following:

NUID UCD background created by NUI UCD researchers not participating in the Project;;

NUID UCD background created by researchers participating in the Project but in parallel with the Project

and outside the scope of the Project;;

NUID UCD background to which NUID UCD is prohibited to grant access or otherwise make available

due to contractual obligations.

OINT -­ OXFORD INSTRUMENTS NANOTECHNOLOGY TOOLS LIMITED No background excluded

Pixium -­ PIXIUM VISION

Page 253: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

239 (294)

No background excluded

POLITO -­ POLITECNICO DI TORINO No background excluded

Polymem -­ POLYMEM S.A Background excluded from Access Rights. Hereby excludes from its obligation to grant Access Rights the

following Background:

all Background developed by researchers working in the researchers groups of Polymem not participating

in the Graphene project

all Background in patents and current patent applications

all Background that is covered under other specific research agreements and confidentially agreements

and therefore subject to third party rights.

PROGNOMICS – PROGNOMICS LTD – No background excluded QMUL -­ QUEEN MARY UNIVERSITY OF LONDON No background excluded

REPSOL -­ REPSOL SA No background excluded

RIJKSUNIVERSITEIT GRONINGEN -­ RIJKSUNIVERSITEIT GRONINGEN The Rijksuniversiteit Groningen hereby excludes from its obligations to grant Access Rights.

all Background generated by scientists and/or students other than by the members of the research team

of prof.dr.ir. B.J. van Wees

all Background that has been created or obtained outside the scope and field of this Project, and

all Background to which the Rijksuniversiteit Groningen is not able to grant access rights due to third party

rights.

RUN -­ STICHTING KATHOLIEKE UNIVERSITEIT RUN excludes from Access Rights

all Background owned by RUN or in possession by RUN ànd in whole owned by third parties or in part

owned by RUN and third parties.

Background that has been developed by personnel at other sections than the Department of Theory of

Condensed Matter headed by Prof. dr. M.I. Katsnelson (of the Institute for Molecules and Materials) and

that is not participating in the Project.

Page 254: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

240 (294)

Background that has been developed by personnel at the Department of Theory of Condensed Matter

headed by Prof. dr. M.I. Katsnelson (of the Institute for Molecules and Materials) and that is not

participating in the Project.

Background that has been developed by students at RUN and who are not participating in the Project.

Background that has been or will be derived outside the Project to which RUN is not able to grant Access

Rights due to third party rights.

all Background which is knowhow in patents and in current applications.

all Background that is unpublished work that has been carried out which is not already in the public

domain.

RWTH AACHEN -­ RHEINISCH-­WESTFAELISCHE TECHNISCHE HOCHSCHULE AACHEN (”RWTH”) RWTH Aachen herby excludes from its obligation to grant Access Rights to Background all Background

generated by RWTH Aachen other than that generated by RWTH Aachen´s personnel which is directly

involved in carrying out the Project. RWTH Aachen also hereby excludes specifically from its obligation

to grant Access Rights to Background to the following: all data, methodologies, know-­how, Databases

and software not generated through the direct participation in the project or which RWTH Aachen is not

free to provide.

Sabanci University -­ SABANCI UNIVERSITY No background excluded

SISSA -­ SCUOLA INTERNAZIONALE SUPERIORE DI STUDI AVANZATI DI TRIESTE – No background excluded

ST-­I -­ STMICROELECTRONICS SRL No background excluded

TECNALIA -­ FUNDACION TECNALIA RESEARCH & INNOVATION (TECNALIA) Background excluded from Access Rights:

Hereby excludes from its obligation to grant Access Rights the following Background:

all Background developed by researchers working in the researchers groups of Tecnalia not participating

in the Graphene project

all Background in patents and current patent applications

all Background that is covered under other specific research agreements and confidentially agreements

and therefore subject to third party rights.

TECHNION -­ TECHNION – ISRAEL INSTITUE OF TECHNOLOGY All Background generated by personnel, scientists or students at Technion, other than that generated within

the research group of Technion directly participating at the GRAPHENE project.

Page 255: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

241 (294)

Access Rights to Background will only be granted to the extent is not subject to terms and conditions in

other agreements.

TEI of CRETE -­ TECHNOLOGICAL EDUCATIONAL INSTITUTE OF CRETE No background excluded

THALES -­ THALES SA THALES excludes from its obligation to grant Access Rights any Background not listed in Attachment 1,

even if such Background is about graphene.

Tor Vergata -­ UNIVERSITÀ DEGLI STUDI DI ROMA TOR VERGATA Background of UNIVERSITA' DEGLI STUDI DI ROMA TOR VERGATA excluded from Access Rights:

Background developed by scientists not participating in the Project;;

Background developed by scientists participating in the Project which is outside the scope of the Project;;

all Background in patents and current patent applications;;

all Background that is covered under other specific research agreements and confidentiality agreements

and therefore subject to third party rights.

TRINITY COLLEGE DUBLIN -­ THE PROVOST, FELLOWS, FOUNDATION SCHOLARS & THE OTHER MEMBERS OF BOARD OF THE COLLEGE OF THE HOLY AND UNDIVIDED TRINITY OF QUEEN ELIZABETH NEAR DUBLIN The Provost, Fellows, Foundation Scholars, and the other members of Board, of the College of the Holy

and Undivided Trinity of Queen Elizabeth near Dublin (“TCD”) excludes from its obligations to grant

Access Rights to Background, all Background owned and developed by TCD except that developed by

Professor Jonathan Coleman and his research group in the School of Physics, TCD which relates directly

to the GRAPHENE project.

TU Delft -­ TECHNISCHE UNIVERSITEIT DELFT TU Delft hereby excludes from its obligation to grant Access Rights all Background generated by TU Delft

other than that generated by the research groups of TU Delft involved in the Project.

TU Delft excludes as Background, especially the following items:

Background developed by TU Delft scientists not participating in the Project;;

Background developed by TU Delft scientists participating in the Project but which is outside the scope of

the Project;;

Background that is generated by TU Delft employees and that is not necessary to undertake the Project

in which TU Delft is participating;;

Background that is covered under specific research agreements and confidentiality agreements and

therefore subject to third party rights;;

Background that TU Delft due to existing rights is unable to grant Access Rights to.

Page 256: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

242 (294)

TU WIEN -­ TECHNISCHE UNIVERSITAET WIEN TUW excludes all Background derived outside of Photonics Institute E387 or by researchers not directly

involved in the Project.

In addition, all Background is excluded which, due to confidentiality agreements or other third partyrights,

TUW is not entitled to grant Access Rights to.

TU/e -­ TECHNISCHE UNIVERSITEIT EINDHOVEN Specific Excluded Background

TU/e graphene functionalization/synthesis protocol as detailed in the grant proposal

TU/e functionalized graphene ink formulation as detailed in the grant proposal

General Excluded Background

TU/e hereby excludes from its obligation to grant Access Rights all Background generated by TU/e other

than that generated by the research groups of TU/e involved in the Project. (tbc)

TU/e excludes as Background, especially the following items:

Background developed by TU/e scientists not participating in the Project;;

Background developed by TU/e scientists participating in the Project but which is outside the scope of the

Project;;

Background that is generated by TU/e employees and that is not necessary to undertake the Project in

which TU/e is participating;;

Background that is covered under specific research agreements and confidentiality agreements and

therefore subject to third party rights;;

Background that TU/e due to existing rights is unable to grant Access Rights to.

TUC -­ TECHNISCHE UNIVERSITAET CHEMNITZ TUC excludes explicitly from granting Access Rights all Background matters (especially but not limited to

all kinds of intellectual property rights, data, methodologies, know-­how, database, and software) of the

TUC which is not generated or not held by the research team of TUC directly participating in the project

or which is outside the scope of the project. TUC also excludes explicitly from granting Access Rights all

Background that is subject to prior commitments with third parties where such commitments would prevent

TUC from granting Access Rights or make Background available under the Grant Agreement or this

Consortium Agreement. TUC also excludes explicitly from granting Access Rights all Background

generated by personnel or scientists from TUC -­ research group that are directly involved in the Project,

which is outside the scope of the tasks to be performed by TU Chemnitz.

TUD -­ TECHNISCHE UNIVERSITAET DRESDEN TUD excludes any Background which has been developed by any personnel, scientists or students other

than the members of the research group of Prof. Seifert involved in the Project as specified in the

Page 257: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

243 (294)

Description of Work (Annex I to the Grant Agreement).

Any Background developed by members of the research group of Prof. Seifert involved in the Project on

research topics which are not specifically subject of the Project activities, as described in the Description

of Work.

Sideground is not considered part of Background, and is explicitly excluded from Access Rights. Any

Background which is legally bound by contract with other third parties or any Background resulting from

co-­operation agreements/commissioned research.

TUHH -­ TECHNISCHE UNIVERSITAET HAMBURG-­HARBURG TUHH excludes:

Patents, patent applications, utility models for the production of Aerographite material

TUM -­ TECHNISCHE UNIVERSITÄT MÜNCHEN For the avoidance of doubt Technische Universität München (TUM) will only make available Background

of the Lehrstuhl für Experimentelle Halbleiter Physik (E25) (Prof. Martin Stutzmann), and only to the extent

described in Attachment 1.

The following Background shall be expressly excluded:

all Background generated by personnel, scientists or students at TUM other than those directly involved

in the Project;;

all Background generated by personnel, scientists or students at TUM that are directly involved in the

Project, which is outside the scope of the tasks to be performed by TUM according to the Consortium

Plan of the Project;;

all Background which TUM, due to existing or pending third party rights, is unable to grant access rights

to.

UAB -­ UNIVERSITAT AUTÒNOMA DE BARCELONA UAB in accordance with the Grant Agreement Annex II, Section II Access Rights, excludes from its

obligations to grant Access Rights to:

all Background that has been created or obtained outside the scope and field of Graphene Project

all Background related to the project Graphene generated by scientists and/or students and/or people

other than by the members of the research team of Prof. David Jiménez

all Background that is covered under other specific research agreements and confidentiality agreements

and therefore subject to third party rights

all Background to which UAB due to existing or pending third party rights, is unable to grant Access Rights

any know-­how in present or future patents and patents applications.

UAU -­ UNIVERSITAT AUGSBURG

Page 258: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

244 (294)

UAU excludes from its obligation to grant Access Rights any and all Background and side ground whether

already existing or henceforth being developed, that originates from any department or research group

within the UAU other than the research group led by Dr. Sergey Mikhailov. Background developed by the

research group of Dr. Sergey Mikhailov on research topics, which are not specifically subject of the project

activities of UAU (as described in Annex I of the GA) is also excluded. Furthermore UAU excludes all

Background and side ground to which Access Rights may not be granted due to third parties rights or

other contractual obligations.

UCAM -­ THE CHANCELLOR, MASTERS AND SCHOLARS OF THE UNIVERSITY OF CAMBRIDGE The University of Cambridge hereby excludes all Background of its participating institutes or organisation,

included but not limited to:

all Background developed by University of Cambridge researchers not participating in the Project.

all Background developed by University of Cambridge researchers participating in the Project which is

outside the scope of the work allocated to the University of Cambridge under the Project.

UCdL -­ UNIVERSITE CATHOLIQUE DE LOUVAIN UCdL hereby excludes from its obligation to grant Access Rights the following Background:

All Background generated by employees, agents or representatives of UCdL other than those involved in

the Project.

All Background generated by the research team directly involved in the Project, which is unrelated to the

work plan, aims and objectives of the Project.

Any unpublished work that UCdL wants to publish before disclosure to the Consortium.

All Background within UCdL, due to existing future third party rights, which UCdL is not able to grant

Access Rights to.

UCL -­ UNIVERSITY COLLEGE LONDON University College London hereby excludes from its obligation to grant Access Rights to Background

including, but not limited to, the following: a) All Background developed by researchers working at UCL

who are not participating in the GRAPHENE project and b) All Background developed by researchers

working at UCL and participating in the GRAPHENE project where this Background falls outside the scope

of the Work Tasks allocated to UCL under the project;; and c) All Background developed by researchers

working at UCL which is subject to third party rights or for which UCL needs to obtain permission to grant

Access Rights.

UCLM -­ UNIVERSIDAD DE CASTILLA -­ LA MANCHA No background excluded

UEF -­ ITA-­SUOMEN YLIOPISTO

Page 259: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

245 (294)

all Background generated by UEF other than by those persons directly involved in the Project

all Background to which UEF is unable to grant Access Rights due to existing or pending third party rights

or prior contractual obligations

all Background to which UEF is unable to grant Access Rights as such Background has been developed

in research projects financed by industrial, charitable or public financiers, the conditions of which prohibit

UEF from granting Access Rights

all Background generated by those persons directly involved in the Project which is outside the scope of

or not directly related to the Project.

UHAM -­ UNIVERSITAET HAMBURG Background excluded:

-­ Background generated by UHAM other than by those persons directly involved in the Project

-­ Background to which UHAM is unable to grant Access Rights due to existing or pending third

party rights or prior contractual obligations

-­ All Background to which UHAM is unable to grant Access Rights as such Background has been

developed in research projects financed by industrial, charitable or public financiers, the

conditions of which prohibit UHAM from granting Access Rights

-­ All Background generated by those persons directly involved in the Project which is outside the

scope of or not directly related to the Project.

ULANC -­ LANCASTER UNIVERSITY No background excluded

ULB -­ UNIVERSITÉ LIBRE DE BRUXELLES Background excluded from the project:

all background developed by personnel, scientists or students at ULB not participating in the Project

all background developed by personnel, scientists or students at ULB which is outside the scope of the

Project

any know-­how in patents and in current patent applications

any unpublished work that ULB want to publish before disclosure of the Project

all background that is covered under other specific research agreements and CDA and therefore subject

to third party rights

all background in patents or current patent applications owned by ULB or filed in the name of ULB

all background to which the ULB is not able to grant Access Rights due to third parties rights

ULM -­ UNIVERSITAET ULM The Universitaet Ulm hereby excludes from its obligation to grant Access Rights to Background all

Background which is not generated by the research group which is directly involved in carrying out the

Project.

The Universitaet also hereby excludes from its obligation to grant Access Rights to Background all

information that has been and/or will be derived outside this Project, which the Universitaet Ulm due to

Page 260: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

246 (294)

third party rights is not able to grant Access Rights to, for whom the Universitaet Ulm needs to get

permission to grant Access Rights to, or which is outside the scope of the Project.

UM – UNIVERSITÉ DE MONTPELLIER UM hereby excludes from its obligation to grant Access Rights to Background, all Background developed

by research groups, departments and/ or institutes of UM, other than the scientists and/or students directly

participating in the Project.

UMEA UNIVERSITET -­ UMEA UNIVERSITET Umeå universitet excludes the following Background from Access Rights;;

all Background and/or material deriving from research groups, departments and/or institutes of Umeå

universitet which is not relevant to and Needed for the GRAPHENE project;;

all Background that has been and/or will be created and developed by personnel and/or scientists and/or

students at Umeå universitet not directly involved in the GRAPHENE project;;

all Background to which Umeå universitet, due to existing or pending or future third party rights or

contractual obligations, is unable to grant access rights to;;

all Background related to existing patents and/or ongoing patent applications.

UMINHO -­ UNIVERSIDADE DO MINHO No background excluded

UNamur -­ UNIVERSITÉ DE NAMUR ASBL For the purpose of the GRAPHENE Project, Université de Namur ASBL hereby excludes the following

Background from Access Rights and/or Exploitation by the Consortium:

all Background generated by employees, agents or representatives of Université de Namur ASBL other

than those directly involved in the GRAPHENE Project;;

all Background generated by employees, agents or representatives of Université de Namur ASBL that

are directly involved in the GRAPHENE Project, which is unrelated to the Description of Work, aims and

objectives of the GRAPHENE Project;;

all Background which Université de Namur ASBL, due to existing or future third party rights, is unable to

grant Access Rights to.

UNIBAS -­ UNIVERSITAT BASEL Background of UNIVERSITAET BASEL excluded from Access Rights:

Background developed by scientists not participating in the Project;;

Background developed by scientists participating in the Project which is outside the scope of the Project;;

all Background in patents and current patent applications;;

Page 261: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

247 (294)

all Background that is covered under other specific research agreements and confidentiality agreements

and therefore subject to third party rights.

UNIBI -­ UNIVERSITAET BIELEFELD Bielefeld University excludes all Background, except for the Background belonging to our responsible

investigator Prof. Armin Gölzhäuser, needed for the purposes of performing the tasks within this project

UNIBO -­ ALMA MATER STUDIORUM-­UNIVERSITÀ DI BOLOGNA No background excluded

UNIPD -­ UNIVERSITÀ DEGLI STUDI DI PADOVA The following information is expressly excluded from access rights within the Project:

-­ all Background generated by personnel, scientists or students at UNIPD other than those directly

involved in the GRAPHENE Project;;

-­ all Background generated by personnel, scientists or students at UNIPD that are directly involved in the

GRAPHENE Project, which is outside the scope of the GRAPHENE Project;;

-­all Background which UNIPD is unable to grant access rights to due to existing or pending third party

rights.

UNIPI -­ UNIVERSITÀ DI PISA UNIPI excludes all background of all other researchers working at UNIPI not directly involved in the

GRAPHENE project.

UNIPI excludes all background related to access to the source and object codes of simulation programs

or parts of them developed at UNIPI, except for codes that are explicitly released as “open source”.

UniSA -­ UNIVERSITÀ DEGLI STUDI DI SALERNO UniSA hereby excludes from its obligation to grant Access Rights

background generated by its personnel, scientists and student, not participating in the Project;;

background generated by its personnel, scientists or student, participating in the Project which is outside

its role in the Project;;

all background in patents and current patent applications;;

all background that is subjected to third party rights.

UNISTRA -­ UNIVERSITE DE STRASBOURG UNISTRA excludes all Background deriving from research groups, departments and/or institutes of

UNISTRA other than UMR 7006,

UNISTRA excludes all pre-­existing know-­how that has been created and developed by personnel and/or

scientists and/or students of the UMR 7006 who are not directly involved in the Project.

UNISTRA excludes all Background, pre-­existing know-­how that had been created and developed by

personnel and/or scientists and/or students of the UMR 7006 who are directly involved in the Project but

Page 262: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

248 (294)

which UNISTRA is not able to grant access to, due to existing contractual obligations and/or third party

rights.

UNITS -­ UNIVERSITA DEGLI STUDI DI TRIESTE No background excluded

UNIVERSITAET BREMEN -­ UNIVERSITAET BREMEN Universitaet Bremen hereby informs, in accordance with the Grant Agreement article II.33.2, that the

following information is excluded:

all Background generated by personnel, scientists or students at Universitaet Bremen other than those

directly involved in the Project;;

all Background generated by personnel, scientists or students at Universitaet Bremen that are directly

involved in the GRAPHENE Project, which is outside the scope of the tasks to be performed by

Universitaet Bremen according to the Consortium Plan of the GRAPHENE Project;;

all Background which Universitaet Bremen, due to existing or pending third party rights, is unable to grant

access rights to.

UNIGE -­ UNIVERSITE DE GENEVE The University de Geneva (UNIGE) hereby excludes the following Background:

all Background generated by employees, agents or representatives of UNIGE, other than the research

team of Prof. Alberto Morpurgo and Dr. Alexey Kuzmenko of the Physics Department, who are directly

involved in the Project.

all Background generated by employees, agents or representatives of UNIGE that are directly involved in

the Project, which is unrelated to the work plan, aims and objectives of the Project.

all Background which UNIGE, due to third Party rights, is unable to grant Access Rights to.

all Background in patents and current patent applications owned by UNIGE.

all UNIGE proprietary materials and software whether covered by patents or not.

UNIVERSITY OF MANCHESTER -­ THE UNIVERSITY OF MANCHESTER UNIVERSITY OF MANCHESTER hereby informs, in accordance with the Grant Agreement Annex II,

article II.33.2, that the following information is excluded:

all Background generated by current or former employees of, or students at, UNIVERSITY OF

MANCHESTER and all individuals who have either assigned Intellectual Property Rights to UNIVERSITY

OF MANCHESTER or are subject to its Intellectual Property Policy (“Relevant Individuals”), other than

those directly involved in the GRAPHENE Project;;

all Background generated by Relevant Individuals that are directly involved in the GRAPHENE Project,

which is outside the scope of the tasks to be performed by UNIVERSITY OF MANCHESTER according

Page 263: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

249 (294)

to the Consortium Plan of the GRAPHENE Project;;

all Background which UNIVERSITY OF MANCHESTER, due to existing or pending third party rights, is

unable to grant Access Rights to;; and

all registered and registrable Intellectual Property Rights in relation to which applications were filed by or

on behalf of UNIVERSITY OF MANCHESTER on or before the date of execution of this Consortium

Agreement, whether or not arising from research carried out by Relevant Individuals that are directly

involved in the GRAPHENE Project.

UNIWARSAW -­ UNIWERSYTET WARSZAWSKI University of Warsaw (UW) hereby excludes any Background other than the Background generated by the

core research team led by Prof. Pawel J. Kulesza, Faculty of Chemistry, directly involved in carrying out

activities under this very Project, and in particular any Background involving patents or current patent

applications, any Background developed under other RTD agreements, license agreements and/or

confidentially agreements including those subject to third party rights. UW excludes as well access to any

sideground developed in parallel to this Project.

UNIZAR -­ UNIVERSIDAD DE ZARAGOZA UNIZAR hereby excludes from its obligation to grant Access Rights to Background:

all Background generated by personnel, scientists or students other than the members of the research

team of Dr. R. Arenal.

all Background that has been created or obtained outside the scope and field of this project, and

all Background to which the University of Zaragoza is not able to grant access rights due to third party

rights.

UNOTT -­ THE UNIVERSITY OF NOTTINGHAM UNOTT excludes the following information:

Background generated by individuals other than those directly involved in the Graphene Flagship Project;;

Background generated by individuals who are directly involved in the Graphene Flagship Project, which

is outside the scope of the tasks to be performed by UNOTT according to the plan of the Graphene

Flagship Project.

Background to which UNOTT, due to existing or pending third party rights is unable to grant Access

Rights.

UoC -­ PANEPISTIMIO KRITIS (University of Crete) No background excluded

UOI -­ PANEPISTIMIO IOANNINON The University of Ioannina (UOI) excludes from its obligations to grant Access Rights to Background, all

Background owned and developed by UOI except that developed by Professor Elefterios Lidorikis and

his research group in the Department of Materials Science and Engineering -­ UOI which relates directly

Page 264: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

250 (294)

to the GRAPHENE project.

UoS -­ UNIVERSITY OF SUNDERLAND University of Sunderland (UoS) hereby excludes from its obligation to grant Access Rights the following:

Background:

developed by researchers/staff/students not participating in the project

developed by researchers/staff/students participating in the project which is outside the scope of the

project

covered by IPR for which applications were made before UoS became a Party to the Consortium

Agreement and/or not related to the Project.

subject to third party rights.

UOXF -­ THE CHANCELLOR, MASTERS AND SCHOLARS OF THE UNIVERSITY OF OXFORD The University of Oxford hereby excludes from its obligation to grant Access Rights to Background all

Background generated by the University other than that generated by the members of the research group

of Dr Feliciano Giustino in the Department of Materials are directly involved in carrying out the Project.

The University of Oxford also hereby excludes specifically from its obligation to grant Access Rights to

Background to the following Background:

all data, materials including biological samples, methodologies and know-­how not generated through the

direct participation in the Project or which the University of Oxford is not free to provide

databases and software not generated through the direct participation in the Project or which the

University of Oxford is not free to provide

all Background resulting from research carried out by Dr Giustino and his team which was funded in full

or in part by industrial, charitable, military or government sponsors.

The University of Oxford also hereby excludes from its obligation to grant Access Rights to Background

all Background that has been and/or will be derived outside the Project and to which the University of

Oxford due to third party rights is not able to grant Access rights or for which the University of Oxford

needs to obtain permission to grant Access Rights.

UPMC -­ UNIVERSITÉ PIERRE AND MARIE CURIE -­ PARIS 6 UPMC excludes all background that has been and/or will be created by UPMC other than those members

of the research group of the Principal Investigator directly involved in carrying out the project. UPMC

further excludes all background that has been or will be derived outside the project by members of the

research group of the Principal Investigator.

UREG -­ UNIVERSITAET REGENSBURG The Universitaet Regensburg (UREG) hereby excludes from its obligation to grant Access Rights to

Page 265: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

251 (294)

Background all Background owned and developed by UREG that has been or will be developed outside

the Project and Background which UREG due to third party rights is not able to grant access rights to.

USFD -­ THE UNIVERSITY OF SHEFFIELD University of Sheffield hereby informs that the following information is excluded:

all Background generated by personnel, scientists or students (past and present) of The University of

Sheffield other than those directly involved in or affiliated with the research group working on the

Graphene Flagship project;;

all Background generated by personnel, scientists or students at University of Sheffield that are directly

involved in the Graphene Project, which is outside the scope of the tasks to be performed by University

of Sheffield according to the Collaboration Agreement governing University of Sheffield’s participation in

the Graphene Flagship project;;

all Background which University of Sheffield, due to existing or pending third party rights, is unable to

grant access rights to.

USTL -­ UNIVERSITE DES SCIENCES ET TECHNOLOGIES DE LILLE -­ LILLE I USTL excludes all Background generated by USTL not participating in the Project.

Background developed by personnel, scientist or students at USTL participating in the Project, which is

outside the scope of the Project

Background developed on graphene synthesis.

This includes;;

-­ SiC graphitization in UHV chamber

-­ Epitaxial growth of graphene on SiC substrate

This represents the status at the time of signature of this Consortium Agreement.

UTARTU -­ TARTU ÜLIKOOL University of Tartu excludes from its obligation to grant Access Rights to:

all Background generated by researchers and/or students other than those directly involved in the Project;;

all Background generated or obtained outside the scope and field of the Project;;

all Background related to existing patents and/or ongoing patent applications;;

all Background which University of Tartu, due to existing or pending or future third parties’ rights or

contractual obligations, is unable to grant Access Rights to.

UZH -­ UNIVERSITAET ZUERICH Background of UNIVERSITAET ZUERICH excluded from Access Rights:

Background developed by scientists not participating in the Project;;

Background developed by scientists participating in the Project which is outside the scope of the Project;;

All Background in patents and current patent applications;;

Page 266: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

252 (294)

All Background that is covered under other specific research agreements and confidentiality agreements

and therefore subject to third party rights.

VIS -­ N VISION SYSTEMS AND TECHNOLOGIES SL. all background generated by employees nvision Systems & Technologies S.L. other than those directly

involved in the Project;;

all background generated by employees of nvision Systems & Technologies S.L. that are directly involved

in the Project, which is unrelated to the work plan, aims and objectives of the Project;;

all background which nvision Systems & Technologies S.L. due to existing or future third party rights, is

unable to grant access rights to;;

any patent or application filed before the Effective Date and owned by nvision Systems & Technologies

S.L.;;

any utility model or application therefore filed before the effective date and owned by nvision Systems &

Technologies S.L.;;

any software created prior to the Effective Date and identified as owned by nvision Systems &

Technologies S.L. or created by an employee of nvision Systems & Technologies S.L.;;

all other background developed by scientists not participating in the project and all other Background

developed by scientists not belonging to nvision systems & technologies S.L.

VMI -­ VARTA MICRO INNOVATION GMBH No background excluded

VTT -­ TEKNOLOGIAN TUTKIMUSKESKUS VTT Oy No background excluded

This represents the status at the time of signature of this Consortium Agreement.

Page 267: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

253 (294)

[Attachment 3: Accession document] ACCESSION of a new Party to

[Acronym of the Project] Consortium Agreement, version […, YYYY-­MM-­DD]

[OFFICIAL NAME OF THE NEW PARTY AS IDENTIFIED IN THE EU-­FPA]

hereby consents to become a Party to the Consortium Agreement identified above and accepts all the rights

and obligations of a Party starting [date].

[OFFICIAL NAME OF THE COORDINATOR AS IDENTIFIED IN THE EU-­FPA]

hereby certifies that the Consortium has accepted in the meeting held on [date] the accession of [the name

of the new Party] to the Consortium starting [date].

This Accession document has been done in 2 originals to be duly signed by the undersigned authorised

representatives.

[Date and Place]

[INSERT NAME OF THE NEW PARTY]

Signature(s)

Name(s)

Title(s)

[Date and Place]

[INSERT NAME OF THE COORDINATOR]

Signature(s)

Name(s)

Title(s)

Page 268: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

254 (294)

[Attachment 4: List of Affiliated Entities and Third Parties to which transfer of Results is possible without prior notice List of Affiliated Entities and Third Parties to which transfer of Results is possible without prior notice to the

other Parties and for which the other Parties have waived their right to object:

ABB – ABB AB All Affiliated Entities of ABB AB which fulfil the definition of “Affiliated Entities” under this Consortium

Agreement and or the GA shall for the purpose of this Attachment be deemed to be Affiliated Entities of

ABB AB, including in particular, ABB Schweiz AG (Switzerland), ABB Technology Ltd (Switzerland) and

ABB Ltd (Switzerland).

ALCATEL-­LUCENT DEUTSCHLAND AG -­ ALCATEL-­LUCENT DEUTSCHLAND AG

§ Alcatel Lucent, 148-­152 route de la Reine, 92100 Boulogne-­Billancourt, France

§ Nokia Solutions and Networks Oy, Karaportti 3, FIN-­02610 Espoo

ALUI -­ ALCATEL-­LUCENT ITALIA S.P.A. – § Alcatel Lucent, 148-­152 route de la Reine, 92100 Boulogne-­Billancourt, France

§ Nokia Solutions and Networks Oy, Karaportti 3, FIN-­02610 Espoo GRUPO ANTOLIN-­INGENIERA SA Grupo Antolin Irausa, S.A. is the mother company of Grupo Antolin Ingenería, S.A. and could be transferred

with Results if necessary.

GSK – GLAXOSMITHKLINE RESEARCH AND DEVELOPMENT LTD. All GlaxoSmithKline subsidiary companies. IDIBAPS -­ CONSORCI INSTITUT D'INVESTIGACIONS BIOMÈDIQUES AUGUST PI I SUNYER Hospital Clínic i Provincial de Barcelona (HCPB)

Institució Catalana de Recerca I Estudis Avançats (ICREA)

Imperial -­ Imperial College of Science, Technology and Medicine Imperial Innovations Limited;; Registered N° 2060639;; 52 Princes Gate, Exhibition Road, London SW7 2PG,

United Kingdom;;

http://www.imperialinnovations.co.uk/

Nokia R&D (UK) ltd Upon signing of this Agreement, Nokia Oyj and Nokia R&D (UK) LIMITED confirm that they shall assign all

Intellectual Property Rights to Results created by Nokia Oyj or Nokia R&D (UK) LIMITED under this

Agreement to Nokia Technologies Oy.

Page 269: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

255 (294)

UCAM -­ THE CHANCELLOR, MASTERS AND SCHOLARS OF THE UNIVERSITY OF CAMBRIDGE Cambridge Enterprise Limited (CEL) is a wholly owned subsidiary of the University of Cambridge. CEL is

responsible for exploiting University of Cambridge intellectual property including the licensing of its

Background and Results. Any request for access to University of Cambridge intellectual property in

connection with the Project must be directed to:

Cambridge Enterprise Limited

University of Cambridge

Hauser Forum

3 Charles Babbage Road

Cambridge CB3 0GT

Phone: +44 (0)1223 760339

Fax: +44 (0)1223 763753

Email: [email protected]

UNIZAR -­ Universidad de Zaragoza Fundación Agencia Aragonesa para la Investigación y el Desarrollo (ARAID) is under the case of a third

party "in kind contribution against payment" (article 11). ARAID researchers carry out their work at

universities and research centers located in Aragon for promoting the research, development and

innovation as key factor for regional development. In this case, the beneficiary makes a payment and

therefore incurs a cost. The beneficiaries may declare their costs for paying the in-­kind contribution, but

only up to the costs actually incurred by the third party. The ARAID researcher concerned in this project is

Raul Arenal and carries out his work at the University of Zaragoza.

UOXF -­ THE CHANCELLOR, MASTERS AND SCHOLARS OF THE UNIVERSITY OF OXFORD The University of Oxford’s wholly-­owned technology transfer company:

Isis Innovation Ltd

Ewert House, Ewert Place

Summertown

Oxford

OX2 7SG

United Kingdom

Tel: +44 1865 280830

Fax: +44 1865 280831

Email: [email protected]

url: http://www.isis-­innovation.com

Company number: 2199542

Registered office: University Offices, Wellington Square, Oxford OX1 2JD

VTT -­ TEKNOLOGIAN TUTKIMUSKESKUS VTT Oy

Page 270: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

256 (294)

VTT Ventures Ltd, Business ID 2297523-­9,

VTT International Ltd, Business ID 2183316-­7

VTT Expert Services Ltd, Business ID 2297513-­2

IMEC

§ IMEC International

§ Stichting IMEC NL

§ IMEC Taiwan Co.

§ IMEC India Pvt Ltd.

§ IMEC Microelectronics (Shanghai) Co. Ltd.

§ Imec Inc.

§ Any other company or legal entity pertaining to IMEC group (i.e. having IMEC International as parent company)”

TECHNION -­ Technion -­ Israel Institute of Technology

Technion Research & Development Foundation Ltd., the commercial arm of Technion – Israel Institute of

Technology

USTL -­ UNIVERSITE DES SCIENCES ET TECHNOLOGIES DE LILLE -­ LILLE I

SATT Nord, USTL’s technology transfer operator

Société d’Accélaration du Transfert de Technologie du NORD ( SATT NORD) 2, rue du Priez

59800 Lille France

Tel : +33 3 28 36 04 68 [email protected]

UCdL -­ UNIVERSITE CATHOLIQUE DE LOUVAIN SOPARTEC, technology transfer company of UCdL with its registered office located Place de l’Université 1, B-­1348 Louvain-­la-­Neuve, Belgium.

FNM – FINMECCANICA SOCIETÀ PER AZIONI University of Firenze

University of Pisa

Politecnico di Milano

Page 271: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

257 (294)

[Attachment 5: List of Third parties linked to a Party:]

CENTRE NATIONAL DE LA RECHERCHE SCIENTIFIQUE (”CNRS”): The following third parties are linked to CENTRE NATIONAL DE LA RECHERCHE SCIENTIFIQUE

(”CNRS”) under Special clause n 19 in the EU-­FPA:

• ONERA

• UCBL – Claude Bernard Lyon 1

• ECOLE NORMALE SUPERIEURE (ENS)

• UNIVERSITE TOULOUSE III PAUL SABATIER (UPS)

• INSTITUT NATIONAL POLYTECHNIQUE DE TOULOUSE (INPT)

• UNIVERSITE PARIS-­SUD (Paris Sud)

CHALMERS INDUSTRITEKNIK -­ STIFTELSEN CHALMERS INDUSTRITEKNIK The following third parties are linked to Chalmers Industriteknik (CIT):

-­ CIP Professional Services AB (CIP-­PS),

IDIBAPS -­ CONSORCI INSTITUT D'INVESTIGACIONS BIOMÈDIQUES AUGUST PI I SUNYER Hospital Clínic i Provincial de Barcelona (HCPB)

Institució Catalana de Recerca I Estudis Avançats (ICREA)

UPMC -­ Université Pierre and Marie Curie -­ Paris 6 The following third parties are linked to Université Pierre et Marie Curie -­ Paris 6 ("UPMC") under Special clause n 19 in the EU-­FPA : -­ Institut National de la Santé et de la Recherche Médicale (INSERM)

Page 272: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

258 (294)

[Attachment 6: Initial list of GA members and other contact persons] CHALMERS -­ CHALMERS TEKNISKA HÖGSKOLA AB Member of the General Assembly:

Prof. Jari Kinaret

Position: Head of Division

Tel: + 46 31 7723668

Fax: + 46 31 7722639

E-­mail: [email protected]

Address: Department of Applied Physics

412 96 Göteborg, Sweden

AALTO -­ AALTO-­KORKEAKOULUSAATIO Member of the General Assembly:

Prof. Harri Lipsanen

Position: Vice head of department

Tel: + 358 50 433 9740

Fax:

E-­mail: [email protected]

Address: Dept. of Micro-­ and Nanosciences

Tietotie 3, 00076 Aalto, Finland

ABB – ABB AB Member of the General Assembly: Dr Henrik Hillborg

Position: Senior Principal Scientist

Tel: +46 21 323102

Fax: +46 21 323264

E-­mail: [email protected]

Address: ABB Corporate Research, Dept. P, Forskargränd 7, 721 78 Västerås, Sweden

AERNNOVA -­ INTERNACIONAL DE COMPOSITES SA. Member of the General Assembly: MARÍA DE MIRANDA

Position: Head Of Manufacturing Engineering Department

Tel: +34 925269504

E-­mail: [email protected]

Address INTERNACIONAL DE COMPOSITES

Río Záncara, s/nº

Polígono Industrial

45007 Toledo

Spain

Page 273: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

259 (294)

AIRBUS OPERATIONS SL -­ AIRBUS OPERATIONS SL Member of the General Assembly:

Ms. Tamara Blanco Varela

Position: Composite Research and Technology

Tel: + 34 91 6242573

Fax:

E-­mail: [email protected]

Address: Material and Processes, Airbus Operations S.L.

Avenida John Lennon, 28906 Getafe, Spain

AIXTRON LIMITED -­ AIXTRON LIMITED Member of the General Assembly:

Dr. Ken Teo

Position: Director Nanoinstuments

Tel: + 44 1954 208 409

Fax:

E-­mail: [email protected]

Address: Kaiserstrasse 98, 52134 Herzogenrath, Germany

ALCATEL-­LUCENT DEUTSCHLAND AG -­ Member of the General Assembly:

Dr. Wolfgang Templ

Position: Senior Research Engineer

Tel: + 49 711 821 44792

Fax:

E-­mail: wolfgang.templ@alcatel-­lucent.com

Address: Bell Labs, Germany

Lorenzstrasse 10, 70435 Stuttgart, Germany

ALU-­FR -­ ALBERT-­LUDWIGS-­UNIVERSITAET FREIBURG Member of the General Assembly:

Prof. Rolf Muelhaupt

Position: Head of Freiburg Materials Research Center

Tel: + 49 761 2036270

Fax:

E-­mail: [email protected]

Address: Freiburg Materials Research Center

Stefan-­Meier-­Strasse 21, 79104 Freiburg, Germany

Page 274: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

260 (294)

ALUI -­ ALCATEL-­LUCENT ITALIA S.P.A. Member of the General Assembly:

Paola Galli

Position: Member of Technical Staff

Tel: +39 039 686 5929

Fax:

E-­mail: paola.galli@alcatel-­lucent.com

Address: BELL-­LABS

Via Energy Park, 14. 20871 Vimercate (MB). Italy.

Amalyst -­ Amalyst Ltd Member of the General Assembly:

Dr. David Hodgson

Position: Principal Investigator

Tel: +44 121 250 3828

Fax:

E-­mail: [email protected]

Address: Faraday Wharf, Innovation Birmingham Campus, Holt Street, Birmingham Science Park Aston,

B7 4BB Birmingham, UK

AMO GMBH -­ GESELLSCHAFT FUR ANGEWANDTE MIKRO-­ UND OPTOELEKTRONIK MIT BESCHRAENKTERHAFTUNG AMO GmbH

Member of the General Assembly:

Dr. Daniel Neumaier

Position: Head of Research Group

Tel: + 49 2418867219

Fax:

E-­mail: [email protected]

Address: AMICA

Otto-­Blumenthal-­Strasse 25, 52074 Aachen, Germany

AVANZARE -­ AVANZARE INNOVACION TECNOLOGICA SL Member of the General Assembly:

Dr. Julio Gomez Cordon

Position: Manager

Tel: + 34 9 41587027

Fax:

E-­mail: [email protected]

Address: C/ Antonio de Nebrija 8, 26006 Logrono, Spain

Page 275: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

261 (294)

BASF SE -­ BASF SE Member of the General Assembly:

Dr. Kitty Cha

Position: Principal Investigator

Tel: +49 621 6022 729

Fax:

E-­mail: [email protected]

Address: Carl Bosch Strasse 38, 67056 Ludwigshafen Am Rhein, Germany

Breton -­ Breton S.p.A. Member of the General Assembly:

Dr. Stefano Zeggio

Position: Principal Investigator

Tel: +39 0423 76 9248

Fax:

E-­mail: [email protected]

Address: Via Garibaldi 27, 31030 Castello di Godego Veneto, Italy

CAU -­ CHRISTIAN-­ALBRECHTS-­UNIVERSITÄT ZU KIEL Member of the General Assembly:

Prof: Rainer Adelung

Position: Professor

Tel: + 49 431 880 6116

Fax:

E-­mail: [email protected]­kiel.de

Address: Faculty of Engineering, Institute for Material Science, Kaiserstrasse 2, 24143 Kiel, Germany

CEA -­ COMMISSARIAT A L´ENERGIE ATOMIQUE ET AUX ENERGIES ALTERNATIVES Member of the General Assembly:

Dr. Engin Molva

Position: Director of Nano Science Programme

Tel: +33 4 38 78 34 98

Fax: + 33 1 69 08 40 04

E-­mail: [email protected]

Address: CEA Nanoscience Programme

CEA Saclay, DSM/DIR/DPNS, 91191 Gif sur Yvette Cedex, France

CHALMERS INDUSTRITEKNIK -­ STIFTELSEN CHALMERS INDUSTRITEKNIK Member of the General Assembly:

Dr. Helena Theander

Page 276: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

262 (294)

Position: Project Manager

Tel: + 46 709 284074

Fax:

E-­mail: [email protected]

Address: Commercial R&D

Sven Hultins Gata 9, 412 88 Göteborg, Sweden

STIFTELSEN CHALMERS INDUSTRITEKNIK (CIT)

CIBER -­ CENTRO DE INVESTIGACION BIOMEDICA EN RED BIOINGENIERIA, BIOMATERIALES Y NANOMEDICINA Member of the General Assembly:

Dr. Rosa Villa Sanz

Position: Principal Investigator

Tel: +34 93 594 7700

Fax:

E-­mail: rosa.villa@imb-­cnm.csic.es;; [email protected]

Address: Calle Monforte de Lemos 5, 28029 Madrid, Spain

CIC BIOMAGUNE – ASOCIACION CENTRO DE INVESTIGACION COOPERATIVA EN BIOMATERIALES Member of the General Assembly: Maurizio Prato

Position: Principal Investigator

Tel: +34 943 00 53 07

Fax: +34 943 00 53 01

E-­mail: [email protected]

Address: Parque Tecnológico de San Sebastián, Edificio Empresarial “C”, Paseo Miramón 182, Donostia

– San Sebastián, 20009 (SPAIN)

Information on the authorised representatives to sign the Consortium Agreement

Name of legally authorised representative: José M. Mato

Title of legally authorised representative: General Director

CIC energiGUNE -­ CENTRO DE INVESTIGACION COOPERATIVA EN ENERGIAS ALTERNATIVAS FUNDACION Member of the General Assembly:

Prof. Teófilo Rojo

Position: Scientific Director EES

Tel: + 34 945 297 108

Fax:

E-­mail: [email protected]

Page 277: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

263 (294)

Address: Parque Tecnológico de Alava, Calle Albert Einstein 48, 01510 Vitoria-­Gasteiz, Alava, Basque

Country, Spain

CIC nanoGUNE -­ Asociacion -­ Centro de Investigacion Cooperativa en Nanociencias – CIC NANOGUNE Member of the General Assembly:

Dr. Rainer Hillenbrand

Position: Group Leader

Tel: + 34 943 574007

Fax: + 34 943 574001

E-­mail: [email protected]

Address: CIC nanoGUNE

Tolosa Hiribidea 76, 20018 San Sebastian, Spain

CNIT -­ Consorzio Nazionale Interuniversitario per le Telecomunicazioni Member of the General Assembly:

Prof. Marco Romagnoli

Position: Area Leader Advanced Technologies

Tel: + 39 050 459 2266

Fax:

E-­mail: [email protected]

Address: Via Moruzzi 1, 56124 Pisa, Italy

CNM -­ CNM Technologies GmbH Member of the General Assembly:

Dr. Albert Schnieders

Position: Managing Director, CTO

Tel: +49-­521-­5560282-­20

Fax: +49-­521-­5560282-­99

E-­mail: albert.schnieders@cnm-­technologies.com

Address: Herforder Strasse 155a, 33609 Bielefeld, Germany

CNR -­ CONSIGLIO NAZIONALE DELLE RICERCHE Member of the General Assembly:

Dr. Vincenzo Palermo

Position: Head of MAFO Research Unit -­ ISOF

Tel: + 39 051 6399824

Fax: + 39 051 6399844

E-­mail: [email protected]

Address: Institute for Organic Synthesis and Photoreactivity

Page 278: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

264 (294)

Via Piero Gobetti 101, 40129 Bologna, Italy

CNRS -­ CENTRE NATIONAL DE LA RECHERCHE SCIENTIFIQUE Member of the General Assembly:

Dr. Annick Loiseau

Position: Director of Research Unit GDR 3217 and GDR-­I GNT

Tel: + 33 1 46734453

Fax: +33 1 46734155

E-­mail: [email protected]

Address: UMR 104, CNRS – Onera

Avenue de la Division Leclerc 29, 92320 Chatillon, France

CRF -­ Centre Ricerche Fiat S.C.p.A Member of the General Assembly:

Dr. Brunetto Martorana

Position: Senior Researcher

Tel: +39 011 9080 376

Fax:

E-­mail: [email protected]

Address: Strada Torino 50, 10043 Orbassano, Italy

CSIC -­ AGENCIA ESTATAL CONSEJO SUPERIOR DE INVESTIGACIONES CIENTIFICAS Member of the General Assembly:

Prof. Maria del Mar García Hernandez

Position: Profesor de Investigacion

Tel: + 34 620314825

Fax: + 34 913720623

E-­mail: [email protected]

Address: Instituto de Ciencia de Materiales de Madrid

Sor Juana Ines de la Cruz 3, 28049 Madrid, Spain

DSM -­ DSM Ahead BV Member of the General Assembly:

Rolf Van Benthem

Position:

Tel: +

Fax:

E-­mail: [email protected]

Address: Poststraat 1, 6135 KR Sittard, Netherlands

Page 279: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

265 (294)

DTECH -­ Delta-­Tech S.p.A Member of the General Assembly:

Dr. Antonio Nieri

Position: General Director

Tel: +39 0583 269 080

Fax:

E-­mail: a.nieri@delta-­preg.it

Address: Localita Rifoglieto 60/A Int 1, 55011 Altopaschio (Lucca), Italy

DTU -­ DANMARKS TEKNISKE UNIVERSITET Member of the General Assembly: Dr. Peter Bøggild

Position: Professor, Group Leader

Tel: + 45 45255723

Mobile: +45 21362798

Fax: +45 45 88 77 62

E-­mail: [email protected]

Address: DTU Nanotech, Anker Engelundsvej 1, Building 101A, 2800 Kongens Lyngby, Denmark

Dyesol Italia -­ Dyesol Italia S.r.l. Member of the General Assembly:

Luca Sorbello

Position:

Tel: +

Fax:

E-­mail: [email protected]

Address: Viale Castro Pretorio 122, 00185 Roma, Italy

EMPA -­ EIDGENOESSISCHE MATERIALPRUEFUNGS-­ UND FORSCHUNGSANSTALT Member of the General Assembly:

Dr. Peter Wick

Position: Head of Lab Materials-­Biology Interactions

Tel: +41 58 765 7684

Fax: +41 58 765 7694

E-­mail: [email protected]

Address: Lerchenfeldstrasse 5, CH-­9014 St. Gallen, Switzerland

EPCOS -­ EPCOS AG Member of the General Assembly:

Dr. Edgar Schmidhammer

Position: Vice President

Page 280: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

266 (294)

Tel: +49 89 54020 2450

Fax:

E-­mail: [email protected]

Address: Anzinger Strasse 13, 81671 Munich, Germany

EPFL -­ École Polytechnique Fédérale de Lausanne Member of the General Assembly:

Prof. Andras Kis

Position: Head of Laboratory of Nanoscale Electronics and Structures LANES

Tel: +41 21 693 4628

Fax: +41 21 693 69 20

E-­mail: [email protected]

Address:

EPFL STI IEL LANES, BM 2141, Station 17, 1015 Lausanne, Switzerland

Ericsson -­ Ericsson AB Member of the General Assembly:

Dr. Peter Olanders

Tel: +46 10 717 0518

Fax:

E-­mail: [email protected]

Address: Torshamnsgatan 23, 164 80 Stockholm, Sweden

ESF -­ FONDATION EUROPEENNE DE LA SCIENCE Member of the General Assembly:

Dr. Ana Helman

Position: Science Officer

Tel: + 33 388762158

Fax: +33 3 88 37 05 32

E-­mail: [email protected]

Address: PESC

1 Quai Lezay Marnesia, 67080 Strasbourg Cedex, France

ETH Zurich -­ EIDGENOESSISCHE TECHNISCHE HOCHSCHULE ZURICH Member of the General Assembly:

Prof. Klaus Ensslin

Position: Professor

Tel: + 41 44 6332209

Fax: + 41 44 6331146

E-­mail: [email protected]

Page 281: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

267 (294)

Address: Laboratory for Solid State Physics

Schafmattstrasse 16, 8093 Zurich, Switzerland

FAU -­ FRIEDRICH-­ALEXANDER-­UNIVERSITAT ERLANGEN NURNBERG Member of the General Assembly:

Prof. Andreas Hirsch

Position: Professor

Tel: + 49 9131 8522537

Fax: +49 9131 8526864

E-­mail: [email protected]­erlangen.de

Address: Institute for Organic Chemistry

Henkestraße 42, 91054 Erlangen, Germany

FBK -­ FONDAZIONE BRUNO KESSLER Member of the General Assembly: Dr. Luigi Crema

Position: Head of Applied Research on Energy Systems research unit

Tel: +39-­0461-­314922

Fax: +39-­0461-­314591

E-­mail: [email protected]

Address: Via Sommarive 18 – 38123 Povo-­Trento – Italy

FNM – FINMECCANICA SOCIETÀ PER AZIONI Member of the General Assembly: Marco MOLINA

Position: Chief Technical Officer, Line of Business Space Airborne and Space System Division

Tel: +39.0331.175.3673

Fax: +39 06 502 646 732

E-­mail: [email protected]

Address: viale Europa 20014 NERVIANO MI ITALY

FE – FLEXENABLE LIMITED Member of the General Assembly: Mike Banach

Position: Technical Director

Tel: 01223 706049

Fax: N/A

E-­mail: [email protected]

Address: 34 Cambridge Science Park

Milton Road

Cambridge

England

CB4 0FX

Page 282: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

268 (294)

FIDAMC – FUNDACION PARA LA INVESTIGACION, DESARROLLO Y APLICACION DE MATERIALES COMPUESTOS Jacinto Tortosa Lozano

Position: General Director

Tel: +34916244616

Fax: +34916244639

E-­mail: [email protected]

Address: Avda Rita Levi Montalcini , 29

28906 Getafe (Madrid)

FORTH -­ FOUNDATION FOR RESERACH AND TECHNOLOGY HELLAS Member of the General Assembly:

Prof. Costas Galiotis

Position: Director

Tel: + 30 2610 965300

Fax: +30 2610 990987

E-­mail: [email protected]

Address: Institute of Chemical Engineering Sciences

Stadiou, 26504 Platani Patras, Greece

Fraunhofer -­ Fraunhofer-­Gesellschaft zur Foerderung der angewandten Forschung e.V. Member of the General Assembly:

Dr. Thomas Reiss

Position: Head of Competence Center Emerging Technologies

Tel: + 49 721 6809 160

Fax:

E-­mail: [email protected]

Address: Fraunhofer Institute for Systems and Innovation Research ISI

Breslauer Strasse 48

76139 Karlsruhe

Germany

FSU – FRIEDRICH-­SCHILLER-­UNIVERSITAT JENA Member of the General Assembly: Prof. Dr. Andrey Turchanin

Position: Full Professor

Tel: + 49 3641 948 370

Fax: +49 3641 -­ 948 302

E-­mail: andrey.turchanin@uni-­jena.de

Page 283: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

269 (294)

Address: Lessingstraße 10, 07743 Jena / Germany

g.tec -­ Guger Technologies OG Member of the General Assembly:

Dr. Christoph Guger

Position: Principal Investigator

Tel: +43 316 675 10 60

Fax:

E-­mail:[email protected]

Address: Herbersteinstrasse 60, 8020 Graz, Austria

G24 -­ G24 Power Ltd Member of the General Assembly:

Dr. Mark Spratt

Position: Dr.

Tel: +44 1633 654 217

Fax:

E-­mail: [email protected]

Address: South Lake Drive, Imperial Park, NP10 8AS Newport, UK

Graphenea -­ Graphenea S.A. Member of the General Assembly:

Dr. Amaia Zurutuza

Position: Scientific Director

Tel: + 34 626 164 161

Fax:

E-­mail: [email protected]

Address: GRAPHENEA

Avenida Tolosa 76, 20018 Donostia-­San Sebastian, Spain

GRINP -­ Grinp S.r.l. Member of the General Assembly:

Francesco Parisi

Position:

Tel: +

Fax:

E-­mail: [email protected]

Address: Via Nazionale 89, 10060 Porte, Italy

GRUPO ANTOLIN-­INGENIERIA SA -­ GRUPO ANTOLIN-­INGENIERIA SA

Page 284: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

270 (294)

Member of the General Assembly:

Dr. César Merino

Position: Nanotechnology Responsable

Tel: + 34 947 478 380

Fax:

E-­mail: [email protected]

Address: Innovation

Carretera Madrid Irun KM 244,8, 09007 Burgos, Spain

GSK – GLAXOSMITHKLINE RESEARCH AND DEVELOPMENT LTD. Member of the General Assembly: Dr Daniel Chew

Position: Director – Neural Interface Group, Bioelectronics.

Tel: +44(0) 7552283377

E-­mail: [email protected]

Address: Bioelectronics R&D

GlaxoSmithKline

Room 3S120

Medicines Research Centre,

Gunnels Wood Road,

Stevenage, Hertfordshire, UK

SG1 2NY

HORIBAJY -­ HORIBA JOBIN YVON S.A.S. Member of the General Assembly:

Dr. Bertrand Dutertre

Position: Principal Investigator

Tel: +33 1 69 74 72 69

Fax:

E-­mail: [email protected]

Address: 16-­18, rue du Canale, 91165 Longjumeau, France

ICFO -­ FUNDACIO INSTITUT DE CIENCIES FOTONIQUES Member of the General Assembly:

Prof. Frank Koppens

Position: Group Leader

Tel: + 34 935 542 207

Fax:

E-­mail: [email protected]

Address: Avinguda Carl Friedrich Gauss 3, 08860 Castelldefels, Spain

Page 285: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

271 (294)

ICN2 -­ FUNDACIO INSTITUT CATALÀ DE NANOCIÈNCIA I NANOTECNOLOGIA Member of the General Assembly:

Prof. Stephan Roche

Position: Group Leader

Tel: + 34 937373601

Fax:

E-­mail: [email protected]

Address: Campus UAB. CIN2 Building Office 1004, 08193 Bellaterra, Spain

IDIBAPS -­ Consorci Institut d'Investigacions Biomèdiques August Pi i Sunyer Member of the General Assembly: Maria Victoria Sanchez-­Vives

Position: Prof

Tel: +34932275400-­4301

Fax:

E-­mail: [email protected]

Address: Calle Rossello 149 Puerta BJS, 08036 Barcelona, Spain

IFX – INFINEON TECHNOLOGIES AG Member of the General Assembly: Dr. Guenther Ruhl

Position: Lead Principal New Materials

Tel: +49 941 2021081

Fax: +49 941 202941081

E-­mail: [email protected]

Address: Wernerwerkstrasse 2, 93049 Regensburg, Germany

Project administration: Madeleine Meier

Position: R&D Funding Project management

Tel: +49 89 234 21516

Fax: +49 89 234 1521516

E-­mail: [email protected]

Address: Am Campeon 1-­12, 85579 Neubiberg, Germany

IIT -­ FONDAZIONE ISTITUTO ITALIANO DI TECNOLOGIA Member of the General Assembly:

Vittorio Pellegrini

Position: Senior Scientist

Tel: + 390 1071 781 796

Fax:

E-­mail: [email protected]

Address: Nanostructures Department

Page 286: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

272 (294)

Via Morego 30, 16163 Genova, Italy

IMDEA – FUNDACION IMDEA NANOCIENCIA Member of the General Assembly:

Francisco Guinea

Position: Senior researcher

Tel: +34 91 22 988 04

Fax: +34 912 998 725

E-­mail: [email protected]

Address: Ciudad Universitaria de Cantoblanco – Calle Faraday 9. 28049 Madrid, Spain.

IMEC -­ Interuniversitair Micro-­Electronica Centrum vzw Member of the General Assembly:

Dr. Cedric Huyghebaert

Position: Team Leader

Tel: +32 162 88 155

Fax:

E-­mail: [email protected]

Address: Kapeldreef 75, 3001 Leuven, Belgien

IMech-­BAS OLEM -­ Bulgarian Academy of Sciences Member of the General Assembly:

Prof. Rumiana Kotsilkova

Position: Professor

Tel: +359 2 979 6462

Fax:

E-­mail: [email protected]

Address: Acad. G. Bonchev Block 4, 1113 Sofia, Bulgaria

Imperial -­ Imperial College of Science, Technology and Medicine Member of the General Assembly:

Prof. Milo Shaffer

Position: Principal Investigator

Tel: +44 20 7594 5825

Fax:

E-­mail: [email protected]

Address: Department of Chemistry, South Kensington, SW7 2AZ London, UK

INFN -­ Istituto Nazionale di Fisica Nucleare Member of the General Assembly:

Page 287: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

273 (294)

Prof. Stefano Bellucci

Position: Professor

Tel: +39 0969 403 2883

Fax:

E-­mail: [email protected]

Address: Via Enrico Fermi 40, 00044 Frascati, Italy

INP BSU -­ Belarusian State University, Institute for Nuclear Problems Member of the General Assembly:

Dr. Polina Kuzhir

Position: Head of Laboratory

Tel: +37 517 200 7410

Fax:

E-­mail: [email protected]

Address: Bobruiskaya 11, 220030 Minsk, Belarus

INTER -­ Instituto de Tecnologias Emergentes de la Rioja Member of the General Assembly:

Dr. Marta Perez Fernandez

Position: Principal Investigator

Tel: +34 914 126 5276

Fax:

E-­mail: [email protected]

Address: Calle San Fransisco 11, 26370 Navarrete, Spain

ITC -­ ITALCEMENTI Fabbriche Riunite Cemento S.p.A. Bergamo Member of the General Assembly:

Mr Marco Goisis

Position: Mr

Tel: +39 035 396 991

Fax:

E-­mail: [email protected]

Address: Via G. Camozzi 124, 24121 Bergamo, Italy

ITME -­ INSTYTUT TECHNOLOGII MATERIALOW ELEKTRONICZNYCH Member of the General Assembly:

Dr. Wlodzimierz Strupinski

Position: Manager of Department of Semiconductor Compounds Epitaxy

Tel: + 48 502325661

Fax: +48 228349003.

Page 288: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

274 (294)

E-­mail: [email protected]

Address: ITME -­ Department of Semiconductor Compounds Epitaxy

Wolczynska Street 133, 01919 Warszawa, Poland

JHIPC -­ J. Heyrovsky Institute of Physical Chemistry Member of the General Assembly:

Prof. Ladislav Kavan

Position: Professor

Tel: +420 2 6605 3975

Fax:

E-­mail: kavan@jh-­inst.cas.cz

Address: Dolejskova 2155/3, 18223 Prague, Czech Republic

KI -­ KAROLINSKA INSTITUTET Member of the General Assembly:

Prof. Bengt Fadeel

Position: Head of Division, Vice Chairman

Tel: + 46 8 52487737

Fax:

E-­mail: [email protected]

Address: Institute of Environmental Medicine

Nobels väg 13, 171 77 Stockholm, Sweden

KIT -­ Karlsruher Institut fuer Technologie Member of the General Assembly:

Dr. Norbert Fabricius

Position: Principal Investigator

Tel: +49 721 608 285 85

Fax:

E-­mail: [email protected]

Address: Hermann-­von-­Helmholtz-­Platz 1, 76344 Eggenstein-­Leopoldshafen, Germany

LIB -­ Libre S.r.l. Member of the General Assembly: Matteo Piccini

Position: CEO

Tel: +39 (0)571 172 0151

Fax: +39 (0)571 188 2165

E-­mail: [email protected]

Address: Via Fidippide 20, 50053 Empoli (FI) -­ Italy

Page 289: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

275 (294)

LIU -­ LINKOPINGS UNIVERSITET Member of the General Assembly:

Prof. Rositsa Yakimova

Position: Professor

Tel: + 46 13 282528

Fax: 46 13 137568

E-­mail: [email protected]

Address: Department of Physics, Chemistry and Biology

Campus Valla, 581 83 Linköping, Sweden

LNE -­ Laboratoire national de métrologie et d'essais Member of the General Assembly:

Dr. Félicien Schopfer

Position: Principal Investigator

Tel: + 33 130 692 169

Fax:

E-­mail: [email protected]

Address: 1, rue Gaston Boissier, 75724 Paris, France

M-­SOLV – M-­SOLV LTD Member of the General Assembly:

Helios Chan

Position:

Strategic Technologist

Tel: +44 1865 844070

E-­mail: helios.chan@m-­solv.com

Address: M-­Solv Ltd,

Unit 8 Oxonian Park,

Langford Locks,

Kidlington,

Oxfordshire.

OX5 1FP

MFA EK MTA -­ Centre for Energy Research, Hungarian Academy of Sciences Member of the General Assembly:

Dr. Géza I. Mark

Position: Senior Scientist

Tel: +36 139 22 222/1316

Fax: +36 139 22 226

E-­mail: [email protected]

Page 290: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

276 (294)

Address: Konkoly-­Thege Miklós 29-­33, 1121 Budapest, Hungary

MPG -­ MAX PLANCK GESELLSCHAFT ZUR FOERDERUNG DER WISSENSCHAFTEN E.V. Member of the General Assembly:

Prof. Feng Xinliang

Position: Group Leader

Tel: + 49 6131 379488

Fax: +49 6131 379361

E-­mail: feng@mpip-­mainz.mpg.de

Address: Max Planck Institute for Polymer Research

Ackermannweg 10, 55128 Mainz, Germany

Nano Tech Lab -­ Nano Tech Lab Ltd Member of the General Assembly: Dr. Evgeni Ivanov

Position: Principal Investigator

Tel: +359 2 979 64 81

Fax:

E-­mail: [email protected]

Address: Acad. G. Bonchev Str. Block No4, 1113 Sofia, Bulgaria

NanOsc AB – NANOSC AB Member of the General Assembly: Johan Åkerman

Position: CEO

Tel: +46-­70 710 4360

Fax: N/A

E-­mail: [email protected]

Address: Electrum 205, 16440 Kista, Sweden

NNsa -­ Nanesa S.r.l. Member of the General Assembly:

Mr Francesco Bertocchi

Tel: +39 334 804 6165

Fax:

E-­mail: [email protected]

Address: Via Setteponti 143-­1, Arezzo, Italy

Nokia R&D (UK) Ltd -­ Nokia R&D (UK) LIMITED Member of the General Assembly:

Dr: Stefano Borini

Position: Research Leader

Page 291: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

277 (294)

Tel: + 44 758 415 7710

E-­mail: [email protected]

Address: Broers Building, Hauser Forum 21 JJ Thomson Avenue, Madingley Road, Cambridge CB30FA,

United Kingdom

NOKIA OYJ – NOKIA OYJ Member of the General Assembly:

Dr Tapani Ryhänen

Position: Head of Business Line

Tel: + 358 504836327

Fax:

E-­mail: [email protected]

Address: NOKIA OYJ

Karaportti 4, 02610 Espoo, Finland

NOVALIA – NOVALIA LIMITED Member of the General Assembly: Mr Chris Jones

Position: Head of Business Development

Tel: 0044 7799 846 899

Fax: N/A

E-­mail: [email protected]

Address: 133 Station Road, Cambridge CB24 9NP United Kingdom

NPL MANAGEMENT LIMITED -­ NPL MANAGEMENT LIMITED Member of the General Assembly:

Prof. Alexander Tzalenchuk

Position: Principal Research Scientist

Tel: + 44 20 8943 6953

Fax: + 44 20 8614 0577

E-­mail: [email protected]

Address: Quantum Detection Group

Hampton Road, TW11 0LW Teddington, United Kingdom

NUID UCD -­ UNIVERSITY COLLEGE DUBLIN, NATIONAL UNIVERSITY OF IRELAND, DUBLIN Member of the General Assembly:

Prof. Kenneth Dawson

Position: Director for Centre for BioNano Interactions

Tel: + 35 317 162 459

Fax:

E-­mail: [email protected]

Page 292: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

278 (294)

Address: Centre for BioNano Interactions

School of Chemistry and Chemical Biology, Centre for BioNano Interactions, Belfield, 4 Dublin, Ireland

OINT -­ OXFORD INSTRUMENTS NANOTECHNOLOGY TOOLS LIMITED Member of the General Assembly:

Dr. Ziad Melhem

Position: Alliances Manager

Tel: + 44 1865 393222

Fax: +44 1865 393333

E-­mail: [email protected]

Address: Oxford Instruments NanoScience

Tubney Woods, OX135QX Abingdon, United Kingdom

Pixium -­ Pixium Vision Member of the General Assembly:

Dr. Guillaume Buc

Position: Principal Investigator

Tel: +33 176 214 738

Fax:

E-­mail: gbuc@pixium-­vision.com

Address: 13 rue Moreau, 75012 Paris, France

PMI -­ POLITECNICO DI MILANO Member of the General Assembly:

Dr Roman Sordan

Position: Assistant Professor

Tel: + 39 031 332 7622

Fax: +39 031 332 7617

E-­mail: [email protected]

Address: Department of Physics

Via Anzani Number 42, 22100 Como, Italy

POLITO -­ POLITECNICO DI TORINO Member of the General Assembly:

Prof: Guido Saracco

Position: Head of Department of Applied Science and Technology

Tel: + 39 011 049 046 18

Fax:

E-­mail: [email protected]

Address: Corso Duca Degli Abruzzi 24, 10129 Torino, Italy

Page 293: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

279 (294)

Polymem -­ Polymem S.A Member of the General Assembly:

Dr. Olivier Lorain

Position: Principal Investigator

Tel: +33 561 317 868

Fax:

E-­mail: [email protected]

Address: 3, rue de l´Industrie, 31320 Castanet Tolosan, France

PROGNOMICS – PROGNOMICS LTD Member of the General Assembly: Dr Daniele Doneddu

Position: Director

Tel: 00447910491417

E-­mail: [email protected]

Address:

Prognomics Ltd.

Institute of Life Science Singleton Park Swansea SA2 8PP QMUL -­ Queen Mary University of London Member of the General Assembly:

Prof. Yang Hao

Position: Professor of Antennas and Electromagnetics

Tel: +44 20 7882 5341

Fax:

E-­mail: [email protected]

Address: 327 Mile End Road, E1 4NS, London, UK

REPSOL -­ REPSOL SA Member of the General Assembly:

Dr. Antonio Paez Duenas

Position: Senior Consultant

Tel: + 34 917536436

Fax: +34 913488613

E-­mail: [email protected]

Address: Technology Center

Carretera de Extremadura KM 18, 28935 Mostoles, Spain

RIJKSUNIVERSITEIT GRONINGEN -­ RIJKSUNIVERSITEIT GRONINGEN

Page 294: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

280 (294)

Member of the General Assembly:

Prof. Bart Jan Van Wees

Position: Professor

Tel: +31 50 363 4933

Fax:

E-­mail: [email protected]

Address: Physics of Nanodevices

Nijenborgh 4, 9747 AG Groningen, Netherlands

RUN -­ STICHTING KATHOLIEKE UNIVERSITEIT Member of the General Assembly:

Prof. Mischa Katsnelson

Position: Professor

Tel: + 31 243652981

Fax:

E-­mail: [email protected]

Address: Faculty of Science Institute of Molecules and Materials (IMM)

Heyendaalseweg 135, 6525 AJ Nijmegen, Netherlands

RWTH AACHEN -­ RHEINISCH-­WESTFAELISCHE TECHNISCHE HOCHSCHULE AACHEN Member of the General Assembly:

Prof. Christoph Stampfer

Position: Junior Professor

Tel: + 49 241 8027094

Fax: + 49 241 8022306

E-­mail: [email protected]­aachen.de

Address: II. Institute of Physics

Otto-­Blumenthal-­Strasse 28C301, 52074 Aachen, Germany

Sabanci University -­ SABANCI UNIVERSITY Member of the General Assembly:

Dr. Selmiye Alkan Gürsel

Position: Faculty Member

Tel: + 90 2164839573

Fax: +90 2164839550

E-­mail: [email protected]

Address: Faculty of Engineering and Natural Sciences

Orhanli Tuzla, 34956 Istanbul, Turkey

SISSA -­ SCUOLA INTERNAZIONALE SUPERIORE DI STUDI AVANZATI DI TRIESTE

Page 295: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

281 (294)

Member of the General Assembly: Prof. Laura Ballerini

Position: Full Professor

Tel: +39 0403787779

Fax: +39 0403787702

E-­mail: [email protected]

Address: Via Bonomea 265, 34136 Trieste, Italy

ST-­I -­ STMICROELECTRONICS SRL Member of the General Assembly:

Dr. Sebastiano Ravesi

Position: R&D Manager

Tel: + 39 0957407635

Fax: +39 0957407589

E-­mail: [email protected]

Address: IMS R&D

Stradale Primosole 50, 95121 Catania, Italy

TECNALIA -­ Fundacion Tecnalia Research & Innovation Member of the General Assembly: Mr. Pablo.Benguria

Position: Project Leader

Tel: +34 946 430 850

Fax:

E-­mail: [email protected]

Address: Materials for Energy and Environment c/Geldo, Edificio 700, 48160 Derio Basque Country, Spain

TECHNION -­ Technion -­ Israel Institute of Technology Member of the General Assembly:

Prof. Boaz Pokroy

Position: Professor

Tel: +972 4 829 4584

Fax:

E-­mail: [email protected]

Address: Technion City, Haifa 3200003, Israel

TEI of CRETE -­ TECHNOLOGICAL EDUCATIONAL INSTITUTE OF CRETE Member of the General Assembly:

Prof. Emmanuel Kymakis

Position: Associate Professor

Tel: + 30 281 037 9895

Fax:

Page 296: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

282 (294)

E-­mail: [email protected]

Address: Center of Materials Technology & Photonics

Electrical Engineering Department STEF, 71004 Heraklion, Greece

THALES -­ THALES SA Member of the General Assembly:

Dr. Pierre LEGAGNEUX

Position: Research Engineer

Tel: + 33 1 69 41 58 84

Fax:

E-­mail: [email protected]

Address: Thales Research & Technology – France

Campus Polytechnique, avenue Augustin Fresnel Number 1, 91767 Palaiseau cedex, France

Tor Vergata -­ Università degli Studi di Roma Tor Vergata Member of the General Assembly:

Prof. Aldo Di Carlo

Position: Professor

Tel: +39 0672 59 7456

Fax:

E-­mail: [email protected]

Address: Viao Orazio Raimondo 18, 00173 Rome Lazio, Italy

TRINITY COLLEGE DUBLIN -­ THE PROVOST, FELLOWS, FOUNDATION SCHOLARS & THE OTHER MEMBERS OF BOARD OF THE COLLEGE OF THE HOLY & UNDIVIDED TRINITY OF QUEEN ELIZABETH NEAR DUBLIN Member of the General Assembly:

Prof. Jonathan Coleman

Position: Principal Investigator

Tel: + 353 1 8963859

Fax:

E-­mail: [email protected]

Address: CRANN -­ Centre for Research on Adaptive Nanostructures and Nanodevices

College Green 3, 2 Dublin, Ireland

TU Delft -­ TECHNISCHE UNIVERSITEIT DELFT Member of the General Assembly:

Prof. Herre Van der Zant

Position: Professor

Tel: + 31 15 2787733

Page 297: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

283 (294)

Fax: 31 15 2784301

E-­mail: [email protected]

Address: Faculty of Applied Sciences, Kavli Institute of Nanoscience, Department of Quantum Nanoscience

Lorentzweg 1, 2628CJ Delft, Netherlands

TU WIEN -­ TECHNISCHE UNIVERSITAET WIEN Member of the General Assembly:

Dr. Thomas Mueller

Position: Univ. Ass.

Tel: + 43 1 58801 38739

Fax:

E-­mail: [email protected]

Address: Institute of Photonics

Gusshausstrasse 27-­29, 1040 Vienna, Austria

TU/e -­ TECHNISCHE UNIVERSITEIT EINDHOVEN Member of the General Assembly:

Dr. Heiner Friedrich

Position: Assistant Professor

Tel: +31 40 247 3041

Fax:

E-­mail: [email protected]

Address: Den Dolech 2, 5612 AZ Eindhoven, Netherlands

TUC -­ TECHNISCHE UNIVERSITAET CHEMNITZ Member of the General Assembly:

Thomas Seyller

Fax:

E-­mail: [email protected]

Address: Department of Natural Science

Reichenhainer Straße 70, 09126 Chemnitz, Germany

TUD -­ TECHNISCHE UNIVERSITAET DRESDEN Member of the General Assembly:

Gotthard Seifert

E-­mail: [email protected]

Address: Faculty of Science, Department of Physical Chemistry

Helholtzstrasse 10, 01069 Dresden, Germany

TUHH -­ TECHNISCHE UNIVERSITAET HAMBURG-­HARBURG

Page 298: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

284 (294)

Member of the General Assembly:

Prof. Dr.-­Ing. habil. Bodo Fiedler

Position: Head of Institute

Tel: + +49 40 42878 3238 or 3038

Fax: +49 40 42878 2002

E-­mail: [email protected]

Address: Institute of Polymers and Composites

Denickestrasse 15, 21073 Hamburg, Germany

TUM -­ Technische Universität München Member of the General Assembly:

Dr. Martin Stutzmann

Position: Full Professor

Tel: +49 892 891 2760

Fax: +49 89 289 12 737

E-­mail: [email protected]

Address: Technische Universität München Walter Schottky Institut, Am Coulombwall 4, 85748 Garching,

Germany

UAB -­ UNIVERSITAT AUTÒNOMA DE BARCELONA Member of the General Assembly:

Prof. David Jiménez

Position: Associate Professor

Tel: + 34 935813218

Fax: 34 935812600

E-­mail: [email protected]

Address: Electronics Engineering Department / School of Engineering

Campus UAB s/n – Escola d'Enginyeria, 08193 Cerdanyola del Vallès, Spain

UAU -­ Universitat Augsburg Member of the General Assembly:

Dr. Sergey Mikhailov

Position: Privatdozent

Tel: +49 821 598 32 55

Fax:

E-­mail: [email protected]­augsburg.de

Address: Universitatsstrasse 1, 86135 Augsburg, Germany

UCAM -­ THE CHANCELLOR, MASTERS AND SCHOLARS OF THE UNIVERSITY OF CAMBRIDGE Member of the General Assembly:

Page 299: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

285 (294)

Prof. Andrea Ferrari

Position: Professor of Nanotechnology

Tel: + 441223748351

Fax:

E-­mail: [email protected]

Address: Engineering Department

JJ Thomson Avenue 9, CB3 OFA Cambridge, United Kingdom

UCdL -­ UNIVERSITE CATHOLIQUE DE LOUVAIN Member of the General Assembly:

Prof. Jean-­Christophe Charlier

Position: Full Professor

Tel: + 32 10473564

Fax:

E-­mail: jean-­[email protected]

Address: Department of IMCN/NAPS

Chemin des Étoiles (SC17 – Parc Météo -­ Bt L7.03.01) 8, 1348 Louvain-­la-­Neuve, Belgium

UCL -­ University College London Member of the General Assembly:

Prof. Paul McMillan

Position: Project Leader

Tel: +44 207 679 4610

Fax:

E-­mail: [email protected]

Address: Gower Street, WC1E 6BT London, UK

UCLM -­ UNIVERSIDAD DE CASTILLA -­ LA MANCHA Member of the General Assembly:

Prof. Ester Vázquez

Position: Professor of Organic Chemistry

Tel: + 34 606225151

Fax: + 34 926295318

E-­mail: [email protected]

Address: Departamento de Química Inorgánica Orgánica y Bioquímica

Avda. Camilo José Cela, 13071 Ciudad Real, Spain

UEF -­ Ita-­Suomen Yliopisto Member of the General Assembly:

Prof. Yuri Svirko

Page 300: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

286 (294)

Position: Professor

Tel: +358 2944 53 284

Fax:

E-­mail: [email protected]

Address: Yliopistokatu 17, 17 Josensuu, Finland

UHAM -­ UNIVERSITAET HAMBURG Member of the General Assembly:

Prof. Alexander Lichtenstein

Position: Professor

Tel: + 49 40428382393

Fax:

E-­mail: [email protected]­hamburg.de

Address: Institute of Theoretical physics I

Jungiusstrasse 9, 20355 Hamburg, Germany

Administrative contact person:

Mina Nasseh

Position: Financial officer

Tel: +49 40428388799

Email: [email protected]­hamburg.de

Adress: Mittelweg 177, 20148 Hamburg, Germany

ULANC -­ LANCASTER UNIVERSITY Member of the General Assembly:

Dr. Jonathan Prance

Position: Lecturer

Tel: + 44 1524594972

Fax:

E-­mail: [email protected]

Address: Physics Department -­ Faculty of Science and Technology

Physics Building, Bailrigg, LA1 4YB Lancaster, United Kingdom

ULB -­ Université libre de Bruxelles Member of the General Assembly:

Dr Carlo Saverio Iorio

Position: Researcher at Microgravity Research Center

Tel: +32 498 317 175

Fax:

E-­mail: [email protected]

Page 301: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

287 (294)

Address: Avenue F. Roosevelt 50, 1050 Bruxelles, Belgium

ULM -­ Universitaet Ulm Member of the General Assembly:

Prof. Ute Kaiser

Position: Principal Investigator

Tel: +49 731 5022 950

Fax:

E-­mail: ute.kaiser@uni-­ulm.de

Address: Helmholtzstraße 16, 89081 Ulm, Germany

UM -­ UNIVERSITÉ DE MONTPELLIER Member of the General Assembly:

Dr. Matthieu Paillet

Position: Project Leader

Tel: + 33 46 71 43 539

Fax:

E-­mail: [email protected]

Address: 163 rue Auguste Broussonnet, 34090 Montpellier

UMEA UNIVERSITET -­ UMEA UNIVERSITET Member of the General Assembly:

Dr. Alexandr Talyzin

Position: Associate Professor

Tel: + 46 907866320

Fax:

E-­mail: [email protected]

Address: Department of Physics

Linnaeus Väg 24, 907 36 Umea, Sweden

UMINHO -­ UNIVERSIDADE DO MINHO Member of the General Assembly:

Prof. Nuno Peres

Position: Full Professor

Tel: + 351 253604334

Fax: + 351 253604061

E-­mail: [email protected]

Address: School of Sciences, Physics Department

Campus of Gualtar, School of Sciences, Physics Department, 4710-­057 Braga, Portugal

Page 302: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

288 (294)

UNamur -­ Université de Namur ASBL Member of the General Assembly:

Prof. Luc Henrard

Position: Principal Investigator

Tel: + 32 8172 5485

Fax:

E-­mail: [email protected]

Address: Rue de Bruxelles 61, 5000 Namur, Belgium

UNIBAS -­ UNIVERSITAET BASEL Member of the General Assembly:

Prof. Christian Schoenenberger

Position: Professor Experimental Physics

Tel: + 41 61 2673690

Fax:

E-­mail: [email protected]

Address: Department of Physics

Klingelbergstrasse 82, 4056 Basel, Switzerland

UNIBI -­ Universitaet Bielefeld Member of the General Assembly:

Prof. Dr. Armin Gölzhäuser

Position: Chairman of the Bielefeld Institute for Biophysics and Nanoscience

Tel: +49 521 106 5362

Fax:

E-­mail: [email protected]­bielefeld.de

Address: Universitätsstrasse 25, 33615 Bielefeld NRW, Germany

UNIBO -­ Alma Mater Studiorum-­Università di Bologna (UNIBO) Member of the General Assembly:

Prof. Francesco Zerbetto

Position: Full Professor

Tel: +39 051 2099 473

Fax:

E-­mail: [email protected]

Address: Via F. Selmi 2, 40126 Bologna, Italy

UNIPD -­ Università degli Studi di Padova Member of the General Assembly:

Prof. Vito Di Noto

Page 303: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

289 (294)

Position:

Full Professor

Tel: +39 049 827 5229

Fax: +39 049 827 5229

E-­mail: [email protected]

Address: Via Marzolo 1, 35131 Padova (PD), Italy

UNIPI -­ Universita di Pisa Member of the General Assembly:

Dr. Gianluca Fiori

Position: Assistant Professor

Tel: +39 050 221 7596

Fax:

E-­mail: [email protected]

Address: Via Caruso 16, 56126 Pisa, Italy

UniSA -­ Università degli Studi di Salerno Member of the General Assembly:

Dr. Patrizia Lamberti

Position: Assistant Professor

Tel: +39 089 964 161

Fax:

E-­mail: [email protected]

Address: Via Giovanni Paolo II 132, 84084 Fisciano SA, Italy

UNISTRA -­ UNIVERSITE DE STRASBOURG Member of the General Assembly:

Prof. Paolo Samorì

Position: Professor and Director of ISIS

Tel: + 33 368855160

Fax: +33 368855161

E-­mail: [email protected]

Address: ISIS/Nanochemistry Laboratory

Allee Gaspard Monge 8, 67000 Strasbourg, France

UNITS -­ UNIVERSITA DEGLI STUDI DI TRIESTE Member of the General Assembly:

Prof. Maurizio Prato

Position: Professor Ordinary

Tel: + 39 040 5587883

Page 304: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

290 (294)

Fax: +39 040 52572

E-­mail: [email protected]

Address: Chemical and Pharmaceutical Sciences Department

Piazzale Europa 1, 34127 Trieste, Italy

UNIVERSITAET BREMEN -­ UNIVERSITAET BREMEN Member of the General Assembly:

Prof. Tim Oliver Wehling

Position: Professor

Tel: + 49 421 218 62039

Fax: + 49 421 218 9862039

E-­mail: [email protected]­bremen.de

Address: Fac. 1/ Physics and Electrical Engineering

Otto-­Hahn Allee 1, 28359 Bremen, Germany

UNIGE-­ UNIVERSITE DE GENEVE Member of the General Assembly:

Prof. Alberto Morpurgo

Position: Full Professor

Tel: + 41 223793574

Fax:

E-­mail: [email protected]

Address: DQMP, Faculty of Sciences

Quai Ernest-­Ansermet 24, CH 1211 Geneva, Switzerland

UNIVERSITY OF MANCHESTER -­ THE UNIVERSITY OF MANCHESTER Member of the General Assembly:

Prof. Vladimir Falko

Position: Research Director of the National Graphene Institute, Professor of Theoretical Physics

Tel: + 44 (0) 161 3061459

E-­mail: [email protected]

Address: National Graphene Institute, Booth Street East, The University of Manchester, M13 9PL,

Manchester, United Kingdom

UNIWARSAW -­ UNIWERSYTET WARSZAWSKI Member of the General Assembly:

Prof. Pawel J. Kulesza

Position: Professor

Tel: +48 228 220 211

Fax:

Page 305: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

291 (294)

E-­mail: [email protected]

Address: Pasteura 1, 02-­093 Warsaw, Poland

UNIZAR -­ Universidad de Zaragoza Member of the General Assembly:

Dr. Raul Arenal

Position: Principal Investigator

Tel: + 34 976 76 2985

Fax:

E-­mail: [email protected]

Address: Mariano Esquillor, 50018 Zaragoza, Spain

UNOTT -­ The University of Nottingham Member of the General Assembly:

Prof. Amalia Patane

Position: Professor

Tel: +44 115 951 5185

Fax:

E-­mail: [email protected]

Address: University Park, NG7 2RD, Nottingham, UK

UoC -­ PANEPISTIMIO KRITIS (University of Crete) Member of the General Assembly:

Prof. Maria Kafesaki

Position: Associate Professor

Tel: +30 2810 391 547

Fax:

E-­mail: [email protected]

Address: Vassilika Vouton, 70013 Heraklion, Greece

UOI -­ PANEPISTIMIO IOANNINON Member of the General Assembly:

Dr. Elefterios Lidorikis

Position: Assoc Professor at Materials Science and Engineering

Tel: + 30 2651007146

Fax: + 30 2651007030

E-­mail: [email protected]

Address: Department of Materials Science and Engineering

Panepistemioypole, Panepistemio Ioanninon, 45110 Ioannina, Greece

Page 306: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

292 (294)

UoS -­ University of Sunderland Member of the General Assembly:

Prof. Ahmed Elmarakbi

Position: Professor of Automotive Engineering

Tel: + 44 1915 153 877

Fax:

E-­mail: [email protected]

Address: Edinburgh Building, Chester Road, SR1 3SD, Sunderland, UK

UOXF -­ THE CHANCELLOR, MASTERS AND SCHOLARS OF THE UNIVERSITY OF OXFORD Member of the General Assembly:

Dr. Feliciano Giustino

Position: Lecturer in Materials Modeling

Tel: + 44 1865 612790

Fax: +44 1865 273789

E-­mail: [email protected]

Address: Department of Materials

Parks Road 16, OX1 3PH Oxford, United Kingdom

Contact for administrative/ financial matters:

Gill Wells

Position: Head of European Team

Tel: +44 (0)1865 289800

Fax: +44 (0)1865 289801

E-­mail: [email protected]

Address: Research Services, University of Oxford, University Offices,

Wellington Square, Oxford, OX1 2JD, United Kingdom

UPMC -­ Université Pierre and Marie Curie -­ Paris 6 Member of the General Assembly:

Dr. Serge Picaud

Position: Principal Investigator

Tel: +

Fax:

E-­mail: [email protected]

Address: Place Jussieu 4, 75252 Paris, France

UREG -­ UNIVERSITAET REGENSBURG Member of the General Assembly:

Prof. Fabian Jaroslav

Page 307: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

293 (294)

Position: Professor

Tel: + 49 941 9432031

Fax:

E-­mail: [email protected]

Address: Department of Physics

Universitaetsstrasse 31, 93053 Regensburg, Germany

USFD -­ The University of Sheffield Member of the General Assembly:

Prof. Alexander Tartakovskii

Position: Professor

Tel: +44 (0) 114 222 4545

Fax: +44 (0) 114 22 23555

E-­mail: [email protected]

Address: Department of Physics and Astronomy, the University of Sheffield, Hicks Building, Hounsfield

Road, Sheffield S3 7RH, UK

USTL -­ UNIVERSITE DES SCIENCES ET TECHNOLOGIES DE LILLE -­ LILLE I Member of the General Assembly:

Prof. Henri Happy

Position: Professor

Tel: + 33 03 20 19 78 41

Fax: +33 03 20 43 48 40

E-­mail: [email protected]­lille1.fr

Address: IEMN

Avenue Poincaré -­ BP60069, 59652 Villeneuve D'Ascq, France

UTARTU -­ Tartu Ülikool Member of the General Assembly:

Dr. Harry Alles

Position: Principale Investigator

Tel: +37 253 659 267

Fax:

E-­mail: [email protected]

Address: Ulikooli 18, 50090 Tartu, Estonia

UZH -­ UNIVERSITAET ZUERICH Member of the General Assembly:

Prof. Thomas Greber

Position: Group Leader

Page 308: Combination of CP and CSA WP14 Management Deliverable 14.8 ... D14.8 with annex… · Update of H2020 Implementation Model ... that has been addressed is the collaboration modalities

GRAPHENE Consortium Agreement version 1 February 2016

294 (294)

Tel: + 41 44 6355744

Fax:

E-­mail: [email protected]

Address: Institute of Physical Chemistry, Surface Physics Group

Winterthurerstrasse 190, 8057 Zurich, Switzerland

VIS -­ nVision Systems & Technologies S.L. Member of the General Assembly:

Mr, Richard Croyle

Position: Principale Investigator

Tel: +34 670 820 205

Fax:

E-­mail: [email protected]

Address: Avenida Paisos Catalans 17, Bajos, 08700 Igualada, Spain

VMI -­ VARTA MICRO INNOVATION GMBH Member of the General Assembly:

Dr. Harald Kren

Position: Project Manager

Tel: + 43 3168 7332 381

Fax:

E-­mail: [email protected]

Address: Stremayrgrasse 9, 8010 Graz, Austria

VTT -­ TEKNOLOGIAN TUTKIMUSKESKUS VTT Oy Member of the General Assembly:

Dr. Sanna Arpiainen

Position: Senior Scientist

Tel: + 358 40 5378924

Fax:

E-­mail: [email protected]

Address: Tietotie 3, 02044 VTT Espoo, Finland