+ All Categories
Home > Documents > COMeSafetyArchitecture

COMeSafetyArchitecture

Date post: 04-Oct-2015
Category:
Upload: moroianu-gabriel
View: 1 times
Download: 0 times
Share this document with a friend
Description:
Safety in Transports
Popular Tags:
17
Specific Support Action COMeSafety Specific Support Action COMeSafety COMeSafety Specific Support Action Towards a Common European Communication Architecture for Cooperative Systems Current Status, Major Issues, Next Steps Dr. Timo Kosch BMW Group Research and Technology ITU Fully Networked Car Workshop, Geneva, Switzerland 7 th of March 2007
Transcript
  • Specific Support Action COMeSafetySpecific Support Action COMeSafety

    COMeSafetySpecific Support Action

    Towards a Common European Communication Architecture

    for Cooperative Systems

    Current Status, Major Issues, Next Steps

    Dr. Timo KoschBMW Group Research and Technology

    ITU Fully Networked Car Workshop, Geneva, Switzerland 7th of March 2007

    COMeSafetySpecific Support Action

    Towards a Common European Communication Architecture

    for Cooperative Systems

    Current Status, Major Issues, Next Steps

    Dr. Timo KoschBMW Group Research and Technology

    ITU Fully Networked Car Workshop, Geneva, Switzerland 7th of March 2007

  • 7thof March 2007 ITU Workshop on the fully networked CarGeneva

    2

    Specific Support Action COMeSafetySpecific Support Action COMeSafetyContentsContentsMotivation

    ONE common communication architecture ?What for exactly ? Methodology ?

    Major issues Convergence of CALM and C2C-CC architecture

    How to define the harmonization process

    Level of detail for the common architecture

    Conclusions and next steps

    Discussion

  • 7thof March 2007 ITU Workshop on the fully networked CarGeneva

    3

    Specific Support Action COMeSafetySpecific Support Action COMeSafety

    ASV3

    VICS

    UTMS

    Support of the eSafety Forum

    Worldwide harmonization of the basic radio system

    Support and co-ordination of

    Standardization

    Recommendation for and consolidation of work of

    European projects

    Push forward a co-ordinated EU

    Frequency Allocation Prozess

  • 7thof March 2007 ITU Workshop on the fully networked CarGeneva

    4

    Specific Support Action COMeSafetySpecific Support Action COMeSafety

    A variety of EU and national projects elaborateProtocol Architectures,System Architectures, High-Level Architectures .......

    Do we really need yet another Communication - Architecture ?

    Numerous Systems and Standards are under ConstructionNumerous Systems and Standards are under Construction

    Yes, because a comprehensive framework is needed to enableindividually developed components to cooperate easily

  • 7thof March 2007 ITU Workshop on the fully networked CarGeneva

    5

    Specific Support Action COMeSafetySpecific Support Action COMeSafety

    Vehicle-to-Vehicle

    Vehicle-to-TrafficInfrastructure

    Safety Mobility

    Communication Technologies for Safety and MobilityCommunication Technologies for Safety and Mobility

    Interoperability through standardizedprotocols, interfaces, data formats etc.

    Enabled and facilitated by architectural framework.

  • 7thof March 2007 ITU Workshop on the fully networked CarGeneva

    6

    Specific Support Action COMeSafetySpecific Support Action COMeSafety

    Vehicle-to-Vehicle

    Vehicle-to-Traffic Infrastructure

    Safety Mobility

    Communication Technologies for Safety and MobilityCommunication Technologies for Safety and Mobility

  • 7thof March 2007 ITU Workshop on the fully networked CarGeneva

    7

    Specific Support Action COMeSafetySpecific Support Action COMeSafetyComplex overall systemComplex overall system

    Source: COOPERS project

  • 7thof March 2007 ITU Workshop on the fully networked CarGeneva

    8

    Specific Support Action COMeSafetySpecific Support Action COMeSafetyAnalyse overall systemAnalyse overall system

    Who are the actors ? What are the components inside the actors ?

    What kind of data do they need to exchange ? At which quality ?

    What is the maximum tolerable delay ? Tolerable fault rates ?

    Which security and privacy requirements need to be addressed ?

    Vehicle

    C2C-CC NET protocolsIEEE802.11p

    Vehicle / RSU

    Translator ?Vehicle

    CALMBroadcast

    TrafficManagement

    obstacle slowdown

    roadblocked

    changeroute

    Sensing Communicating Acting

  • 7thof March 2007 ITU Workshop on the fully networked CarGeneva

    9

    Specific Support Action COMeSafetySpecific Support Action COMeSafety

    Vehicle

    Vehicle

    KeysCertificates

    KeyManagement

    V2X IPv6Backbone

    TelcoSPP

    Telco IPv6Backbone, incl. heterog.

    access network

    Road-SideUnitKeys

    Certificates

    TrustworthyMessage Exchange

    TrustworthyMessage Exchange V2X

    OSS

    KeysCertificatesSIM

    Identity Federation

    OtherServiceInfrast.

    V2XServiceInfrast.

    MobileDevice

    Map to existing infrastructure and technologies Map to existing infrastructure and technologies > standardisation required ? research required?> standardisation required ? research required?

  • 7thof March 2007 ITU Workshop on the fully networked CarGeneva

    10

    Specific Support Action COMeSafetySpecific Support Action COMeSafety

    High-level architectures look similar, many same components, butComponents that look the same arent necessarily the sameTerminology seems to be not coherent

    It is often not obvious whether you can just simply combine or map certain components

    Assumptions sometimes not statedInterfaces and behaviour unclearMore detail on functionality and supported applications needed

    Projects necessarily focus on different requirements or different aspects of requirements

    Need for a Common Understanding of Architecture

    Need for a common view on types of communication

    Need to standardize common components/interfaces

    Need to provide guidance with respect to proper use of technologies

  • 7thof March 2007 ITU Workshop on the fully networked CarGeneva

    11

    Specific Support Action COMeSafetySpecific Support Action COMeSafetyConclusions of joint C2CConclusions of joint C2C--CC ARCH and COMeSafety MeetingCC ARCH and COMeSafety MeetingDefinition of a Baseline Architectural Framework providing

    a consolidated and agreed set of terms and definitions

    consolidated communication requirements

    descriptions of functional blocks

    a set of different views

    BUT: Not a specification ready to be used on implementation level

    Methodical aspects for Baseline Architecture work Mixture of top down (scenario driven) and bottom up approach

    Appropriate use of proven ITS FRAME methodology

    Use of UML 2.0 for specific architectural descriptions

    Including both CALM and C2C-CC architectures

    Related research projects (e.g. SAFESPOT, COOPERS, CVIS) are expected to provide architectural concepts and functional blocks

  • 7thof March 2007 ITU Workshop on the fully networked CarGeneva

    12

    Specific Support Action COMeSafetySpecific Support Action COMeSafety

    Transparent access to heterogeneous networks

    Convergence of CALM and C2CConvergence of CALM and C2C--CCCC

    Focusing on short range technology

    One layer with full convergence?

    Response times / QoS - Can all QoS reqs be fulfilled ?

    What will IPv6 be used for ?CALM grants direct access for WAVE short message service

    C2C-CC may propose geo-based communication solutions to IETF

  • 7thof March 2007 ITU Workshop on the fully networked CarGeneva

    13

    Specific Support Action COMeSafetySpecific Support Action COMeSafetyIntegration of Safety and NonIntegration of Safety and Non--Safety Applications ? Safety Applications ?

    Source: C2C-CC (A. Festag)

  • 7thof March 2007 ITU Workshop on the fully networked CarGeneva

    14

    Specific Support Action COMeSafetySpecific Support Action COMeSafetyExperiences from the past:Experiences from the past:WILLWARN and GST: Architectural IntegrationWILLWARN and GST: Architectural Integration

  • 7thof March 2007 ITU Workshop on the fully networked CarGeneva

    15

    Specific Support Action COMeSafetySpecific Support Action COMeSafety

    eSafety Scope

    A lot of existing work

    Harmonization ProcessHarmonization ProcessTop-down approach:

    Application classes for cooperative systemsRequirements consolidationEntities, interfacesData flow

    Bottom-up approach:Interoperability for testingPreparation of FOT

  • 7thof March 2007 ITU Workshop on the fully networked CarGeneva

    16

    Specific Support Action COMeSafetySpecific Support Action COMeSafetyFrequency Allocation Frequency Allocation

  • 7thof March 2007 ITU Workshop on the fully networked CarGeneva

    17

    Specific Support Action COMeSafetySpecific Support Action COMeSafetyThankThank youyou forfor youryour attentionattention !!

    Safety enhancing

    networkswill be

    everywhere.