Comments on WG2_N1421_5th_SP_of_CD2_19763-5. OKABE, Masao Expert Contribution 2010.11.17. Relation between Part5 Process model and Part7 Service model How can the process models created with a specific modeling language be registered in MFI Part5 ? - PowerPoint PPT Presentation
33
2010/11/17 OKABE, Masao 1 Comments on WG2_N1421_5th_SP_of_CD2_19763-5 OKABE, Masao Expert Contribution 2010.11.17
Transcript
Page 1: Comments on WG2_N1421_5th_SP_of_CD2_19763-5

2010/11/17 OKABE, Masao 1

Comments on WG2_N1421_5th_SP_of_CD2_19763-5

OKABE, MasaoExpert Contribution

2010.11.17

Page 2: Comments on WG2_N1421_5th_SP_of_CD2_19763-5

2010/11/17 OKABE, Masao 2

1. Relation between Part5 Process model and Part7 Service model

2. How can the process models created with a specific modeling language be registered in MFI Part5 ?

3. What should be the common semantics ( or essential subset) of process models ?

Note Unfortunately, all the comments are

on WG2_N1421_5th_SP_of_CD2_19763-5, and not on WG2_N1467_ 6th_SP_of_CD2_19763-5.

But I guess most of the comments, and I believe at least some, can be also applicable to WG2_N1467_ 6th_SP_of_CD2_19763-5.

Page 3: Comments on WG2_N1421_5th_SP_of_CD2_19763-5

2010/11/17 OKABE, Masao 3

Issues that need be discussed on MFI-Part5

1. Relation between Part5 Process model and Part7 Service model

Page 4: Comments on WG2_N1421_5th_SP_of_CD2_19763-5

2010/11/17 OKABE, Masao 4

Relation between Part5 Process model and Part7 Service model

Process 4.1.1 Process at WG2_N1421_5th_SP_of_CD2_19763-5

a set of activities and resources, organized by a dependency construct, which all participate in fulfilling a given purpose.

SE VOCAB definition 7--- our preferred definition at Wuhan project meeting in August

system of activities, which use resources to transform inputs into outputs (ISO/IEC 25000:2005 Guide to SQuaRE, 4.41)

Service4.2.1 Service at WG2-N1201-WD_19763-7

a kind of Web based application, which encapsulates certain computing module and can be accessed by certain interface.

A question is whether a service is a kind of process or not?

Page 5: Comments on WG2_N1421_5th_SP_of_CD2_19763-5

2010/11/17 OKABE, Masao 5

Original understanding of a process and a serviceMy original understanding of a process and a service is that

a process intends to represent capability (see WG2N1441a-MFI 5 Proposed Standard Terms) or common semantics of a service, independent of its implementation,

based on;This part of ISO/IEC 19763 specifies the metamodel that provides

a facility to register administrative structural information and meaningful semantics of process models, including workflows, business processes, Web services, etc.

at 1 Scope of 32N1819-text_for_ballot-CD_19763-5.pdfThe relationship between MFI PMR and MFI Service means that a process can be realized by zero to many instances of Service and a service can achieve only one Process.

at 5.2 Relationship between MFI PMR and some parts in MFI of 20100131 3rd_SP_19763-5.doc

Page 6: Comments on WG2_N1421_5th_SP_of_CD2_19763-5

2010/11/17 OKABE, Masao 6

Original understanding of a process and a service

All of the services B, C, D, E have the same capability.Since a service has only one capability(totally), ideally,

the multiplicities between Process and Service are as follows;

Unfortunately, this is almost impossible because in MFI Part5 registry it is almost impossible to ensure that one fact (capability) is one place is almost impossible.

Process

Service

0..*

0..1

Process A

Service B Service C Service EService D ・・・

realized by

achieves

in SOP in REST in JAVA in Rails

Page 7: Comments on WG2_N1421_5th_SP_of_CD2_19763-5

2010/11/17 OKABE, Masao 7

Changes from CD1In WG2_N1421_5th_SP_of_CD2_19763-5.doc

“only one” was relaxed to “zero to many” at “The relationship between MFI PMR and MFI Service means that a process can be realized by zero to many instances of Service and a service can also achieve zero to many Process.”

at 5.2 Relationship between MFI PMR and other parts in MFI of 20100131 3rd_SP_19763-5.doc

References hasPrecondition: Precondition[0..*]” and hasPostcondition: Postcondition[0..*]“ of Process, which exist in 20100131 3rd_SP_19763-5.doc, are removed.

although, at Introduction, there still exists a sentence “On the other hand, a process expresses the semantics

of a service to support semantic discovery of a service.”

Process

Service

0..*

0..*

Page 8: Comments on WG2_N1421_5th_SP_of_CD2_19763-5

2010/11/17 OKABE, Masao 8

About Changes from CD1 Now, I am confused on these changes;

1. In what senseis the multiplicity constraint is relaxed andWhat many-to-many relations between processes and services mean?

For example, in the case that a process can be realized by three instances of Service, this

means each instance can realize the process or all the three instances as a whole can realize the process?

in the case that a service can also achieve three instances of Process, it means that this service achieves the three different Processes, or this service achieves one of the three processes and the other two Processes must be equivalent to the one?

2. How MFI Part5 represent semantics of a process without pre- and post- conditins?

What is the common semantics of processes which are necessary from the point of RGPS?

Do we really need a process (model) which dose not have a precondition nor postcondition?

Page 9: Comments on WG2_N1421_5th_SP_of_CD2_19763-5

2010/11/17 OKABE, Masao 9

2. How can the process models created with a specific modeling language be registered in MFI Part5 ?

Page 10: Comments on WG2_N1421_5th_SP_of_CD2_19763-5

2010/11/17 OKABE, Masao 10

MFI Part5 Process Model ExampleLet us think about this very simple process model on the left,

MFI Part 5 models this as follows;

A

CB

yes

no

conditional process B&C

conditional process A

event: yes

event: no

process

process A

process B & C

process B process C

dependency construct

process

Page 11: Comments on WG2_N1421_5th_SP_of_CD2_19763-5

2010/11/17 OKABE, Masao 11

MFI Part5 Process Model ExampleIt is unnecessarily complex and confusing.A simpler and easy-to-understand model is desired.

Page 12: Comments on WG2_N1421_5th_SP_of_CD2_19763-5

2010/11/17 OKABE, Masao 12

Table C.2 – Mapping table of Process_ Modeling_ Languages

If we look at Table C.2 – Mapping table of Process_ Modeling_Languages at Annex C of WG2_N1421_ 5th_SP_of_CD2_19763-5, there are many problems to register process models created with the languages.

Page 13: Comments on WG2_N1421_5th_SP_of_CD2_19763-5

2010/11/17 OKABE, Masao 13

Treatment of Initial and Final All of BPMN, UML activity diagram and UML state machine

have a initial and a final event (or node or state).All of them have almost the same semantics.

But, MFI Part5 treats them differently.In BPMN, they are mapped to Events, if we look at Table

C.2.In UML activity diagram, they are ignored if we look at

Figure A.2.1.In UML state machine, they are mapped to the attribute of

resource , if we look at Table C.2.

They should be treated uniformly in MFI Part5.

Page 14: Comments on WG2_N1421_5th_SP_of_CD2_19763-5

2010/11/17 OKABE, Masao 14

About BPMN at Table C.2In some cases, an Event of BPMN has to be mapped to a

Process of MFI Part5, instead of a Process of MFI Part5.

See an example below.

Page 15: Comments on WG2_N1421_5th_SP_of_CD2_19763-5

2010/11/17 OKABE, Masao 15

Example from Business Process Model and Notation (BPMN) Version 1.2 formal/2009-01-03Let us focus on gateway “Conference Call in Discussion

Week?” and event “wait until Thursday,9 am”.

Page 16: Comments on WG2_N1421_5th_SP_of_CD2_19763-5

2010/11/17 OKABE, Masao 16

Example from Business Process Model and Notation (BPMN) Version 1.2 formal/2009-01-03

If we see Figure A.2.3 of an example of UML activity diagram at WG2_N1421_ 5th_SP_of_CD2_19763-5,

Gateway “Conference Call in Discussion Week?” should be mapped to a XOR_Split_Process and a XOR_Split_Construct, which creates a conditional process as a node set, which has event “Yes” as a guard condition and has a process as a resultProcess.

But, in this case, this result process is not a a process but an event, because event “wait until Thursday,9 am” is not a process but an event.

Page 17: Comments on WG2_N1421_5th_SP_of_CD2_19763-5

2010/11/17 OKABE, Masao 17

About IDEF0 at Table C.2 (1 of 2)In IDEF0, a arrow has roles of Input, Output, Control,

Mechanism and Call.Except a Call arrow, it does not necessarily a

Depebdency_Construct, which designates the order in which processes (Boxes) are executed.

For example,

A Forking Arrow (from Output to Input) only represents that Output of a Box becomes Inputs of different Boxes.

Page 18: Comments on WG2_N1421_5th_SP_of_CD2_19763-5

2010/11/17 OKABE, Masao 18

About IDEF0 at Table C.2 (2 of 2)Input and Output are roles of an arrow and are not

resources or objects themselves.For example, in the case, Box A outputs some chemical,

which is an input of Box B, there are two roles, one is chemical as an output and the other is chemical as input.

But, there is only one resource as chemical.Input and Output of IDEF0 should be mapped to attribute:

consumes and creates of Process in MFI Part5,respectively

Control, Mechanism and Call may be mapped to attribute: refersTo of Process in MFI Part5.

An important elements of IDEF0 cannot be mapped to MFI Part5.

Page 19: Comments on WG2_N1421_5th_SP_of_CD2_19763-5

2010/11/17 OKABE, Masao 19

About IDEF3 at Table C.2In IDEF3, an object can have many states which translate

from one to others.

But, a Recourse in MFI Part5 can have at most one status.

An important element of IDEF3 cannot be mapped to MFI Part5.

Page 20: Comments on WG2_N1421_5th_SP_of_CD2_19763-5

2010/11/17 OKABE, Masao 20

About UML Activity Diagram at Table C.2From UML 1.x to UML 2.x, Activity Diagram was changed

fundamentally in some sense.That is, an activity in UML 1.x is an activity state and a kind of state, but

an activity in UML 2.x is not a kind of state.But, practically, they are similar.

If we look at Table C.2, an activity (of UML 2.x) is mapped to a Process.But an activity in UML 1.x is mapped to an Attribute of Resource:state

since it is a state.This is not good.

So, MFI Part5 should map a state in UML state machine to a Process, like UML 1.x.

And, MFI Part5 need to introduce a mechanism to handle an object (or a resource) uniformly.

Page 21: Comments on WG2_N1421_5th_SP_of_CD2_19763-5

2010/11/17 OKABE, Masao 21

About UML State Diagram at Table C.2It should be UML State Machine.

There is no state diagram in UML. It is a state machine diagram.

State machine at least in UML 2.3 (current version) does not have any of Action. Object, Event, Condition.

Where do they come from?Bibliography refers to Martin Fowler, UML Distilled: A Brief Guide to the

Standard Object Modeling Language, Third Edition, 0-321-19368-7 This is just a famous text book. MFI Part5 is based on the official UML

documents.Table refers to ISO/IEC 19501 Information technology – Open Distributed

Processing – Unified Modeling Language (UML) Version 1.4.2.

Should MFI Part5 should uniformly refers to ISO/IEC DPAS 19505-2 Information technology -- OMG Unified Modeling Language (OMG UML) Version 2.1.2 -- Part 2: Superstructure ?

Page 22: Comments on WG2_N1421_5th_SP_of_CD2_19763-5

2010/11/17 OKABE, Masao 22

About PSL at Table C.2 (1 of 3)In PSL, type (or class) and occurrence (or instance,

individual) are strictly distinguished.

For example, an Activity is (an instance of ) a type, and an Activity occurrence is (an instance of ) an occurrence.

MFI Part5 does handles no occurrence (or instance, individual) .

So, Activity occurrence in PSL should not be mapped to Process in MFI Part5 and should be ignored in MFI Part5.

Page 23: Comments on WG2_N1421_5th_SP_of_CD2_19763-5

2010/11/17 OKABE, Masao 23

About PSL at Table C.2 (2 of 3)An object in PSL is almost anything in UoD, except an

activity or an activity occurrence.This is not necessarily a resource in MFI Part5.In MFI Part5, a resource is only a resource participating in a

process.What is a meaning of “participating in a process”?

Page 24: Comments on WG2_N1421_5th_SP_of_CD2_19763-5

2010/11/17 OKABE, Masao 24

About PSL at Table C.2 (3 of 3)PSL Part13 has Subactivity occurrence ordering core

Theory.This should be mapped to Dependency_Construct.They need to be mapped properly to

Dependency_Constructs in MFI Part5.Strictly speaking, they are not about Activities but Activity

occurrences, while Dependency_Constructs are about Activities.But, when mapped to MFI Part5, this difference may be ignored.

Page 25: Comments on WG2_N1421_5th_SP_of_CD2_19763-5

2010/11/17 OKABE, Masao 25

About UML Interaction (Sequence Diagram)Could you add UML Interaction to Table C.2 and provide an

example?

Because to represent interactions (concurrency) of processes is an important issue and a Sequence Diagram can provide a simple and godd example.

Page 26: Comments on WG2_N1421_5th_SP_of_CD2_19763-5

2010/11/17 OKABE, Masao 26

3. What should be the common semantics ( or essential subset) of process models ?

Page 27: Comments on WG2_N1421_5th_SP_of_CD2_19763-5

2010/11/17 OKABE, Masao 27

Clear Scope and Objectives are necessaryTo resolve these problems and chose a common semantics

of process modeles, we need an agreement of the position of MFI Part5 in RGPS and also in MFI family.

WG2_N1436_Scope_of_19763-5 saysNow we are thinking……

MFI‐5 is for RGPS Process is one kind of service‐related model

MFI‐5 should provide semantics of services,rather than a general metamodel for variousprocess models

Support semantic discover of a service Help orchestration of Web services

Page 28: Comments on WG2_N1421_5th_SP_of_CD2_19763-5

2010/11/17 OKABE, Masao 28

Clear Scope and Objectives are necessaryThe statement above “rather than a general metamodel for

various process models” is inconsistent with MFI basic policy (or structure).We do not need to develop new RM-ODP or IE.

In spite of the statement above “MFI‐5 should provide semantics of services”, MFI Part5 seems drifting from “representing semantics of services” to “representing flow of processes”,since Pre- and Post-conditions are removed.

What is it (Now we are now thinking……) now?

Page 29: Comments on WG2_N1421_5th_SP_of_CD2_19763-5

2010/11/17 OKABE, Masao 29

Basic Structure of MFI

OWL ontology repository

ontology A

Common Logicontology repository

ontology B

・・・

RM-ODP process model

repository

processmodel C

PSL process model

repository

process model D

Part8 Role &Goal registry

entries ofprocessmodel E

entries ofprocessmodel D・・・

Part5 Process model registry

entries ofprocessmodel C

entries ofprocessmodel D ・・・

entries ofontology A

entries ofontology B ・・・

Part3 Ontology registration registry

Role &Goal E

Role &Goal F

KAOS role & goal repository

i* role & goal repository

・・・ ・・・

<MFI>

<Outside MFI>

Only common semantics (essential subsets) are registered in MFI registry with some additional information.

Part10 Core model (and basic mapping)

MFI presupposes the existence of complete repositories of models outside MFI.

All the parts (except Part1 and 6) inherit Part10.Part10 is not necessarily abstract (meta)classes.

・・・

Page 30: Comments on WG2_N1421_5th_SP_of_CD2_19763-5

2010/11/17 OKABE, Masao 30

Other comments 1If we look at slide 21 nad 22 of WG2_N1433_RMODP-

RGPS_Registration_Example at Kunming, most of MFI Part5 processes are human processes except “Validate loan:Loan validation”.

But, if I remember correctly, at Kunming meeting, we tentatively agreed that MFI Part5 only targets on “computerized” processes.

So, what should they now?

Page 31: Comments on WG2_N1421_5th_SP_of_CD2_19763-5

2010/11/17 OKABE, Masao 31

Other comments 2From the point of RGPS, a more scenario-based approach

is necessary.

For example, who creates (or are responsible for creating) links between Processes in Part5 and Services in Part7?

If this is out of the scope of MFI Part5 and Part 7 (that is, some one can do that somehow), it is better that Part5 has pre- and post- conditions in accordance with the principle that one (unfortunately in this case, almost imposiible) fact (capability) is one place.

If to support this (creating links between Processes and Services) is within the scope of MFI Part5 and Part7, both Part5 and Part7 need to have pre- and post- conditions.

Page 32: Comments on WG2_N1421_5th_SP_of_CD2_19763-5

2010/11/17 OKABE, Masao 32

Other comments 3I guess that the devision of MFI Part5 and Part7 are based

on OWL-S, which I do not know whether is appropriate or not.

It would be a good idea to model “BravoAir reservation service example” using both MFI Part5 and Part7.“BravoAir reservation service” is an OWL-S example.MFI Part5 already provides it but MFI Part7 does not yet(?).

Page 33: Comments on WG2_N1421_5th_SP_of_CD2_19763-5

2010/11/17 OKABE, Masao 33

Other comments 4I do not have any objection to forwarded WG2_N1467_

6th_SP_of_CD2_19763-5 to CD2 ballot.

In that case, most of (at least, some of) the comments here will be Japanese comments and be discussed at BRM of CD2.


Recommended