Consultation Leaflet – We’d like to find out what you think Crystal Rig 400kV Substation Extension Consultation Considerable environmental planning has been undertaken to minimise the environmental impact of the proposals and, as part of our consultation process, we want to give you the opportunity to comment prior to the new planning applications being made to East Lothian and Scottish Borders Councils for consent to construct the Crystal Rig Substation Extension. You can see these proposals by visiting our Exhibition at: Spott Village Hall (Spott, EH42 1RJ): 24th & 25th April 2017 between the hours of 12 noon to 8pm. SPT staff and environmental consultants will be available at the Exhibition to discuss the proposals on Tuesday 25th April 2017. A copy of the Environmental Report providing further details of the proposed development and specialist environmental assessments is available to view on the Internet at: https://www.spenergynetworks.co.uk/pages/community_consultation.aspx Direct access can be made to the website by scanning the QR code with your smartphone. Comments If you wish to make any comments on this proposal, you can do so by contacting us at either the following email or postal address no later than Friday 16th June 2017. [email protected] or by writing to: Crystal Rig Project Manager Scottish Power EnergyNetworks Ochil House 10 Technology Avenue Hamilton International Technology Park Blantyre G72 0HT Please note that any comments made during this Consultation are not representations to the Local Planning Authority, who will determine the subsequent planning applications for consent. Following the submission of the planning applications, interested parties will have the opportunity to make representations to East Lothian and Scottish Borders Councils on these proposals. © ScottishPower 2017 The Environmental Report will accompany the two new planning applications for the proposed development being submitted to East Lothian and Scottish Borders Councils. A Pre-Application Consultation Report, and Design and Access Statement will also accompany the applications. Environmental Report (continued) Crystal Rig Substation Extension Environmental Report_Technical Appendices Crystal Rig Substation Extension Pre-Application Consultation Report Crystal Rig Substation Extension Design and Access Statement
Transcript
Page 1: Comments - Welcome to SP Energy Networks - SP … Leaflet – We’d like to find out what you think Crystal Rig 400kV Substation Extension Consultation Considerable environmental

Consultation Leaflet – We’d like to find out what you think

Crystal Rig 400kV Substation Extension

ConsultationConsiderable environmental planning has been undertaken to minimise the environmental impact of the proposals and, as part of our consultation process, we want to give you the opportunity to comment prior to the new planning applications being made to East Lothian and Scottish Borders Councils for consent to construct the Crystal Rig Substation Extension.

You can see these proposals by visiting our Exhibition at:

Spott Village Hall (Spott, EH42 1RJ): 24th & 25th April 2017 between the hours of 12 noon to 8pm.

SPT staff and environmental consultants will be available at the Exhibition to discuss the proposals on Tuesday 25th April 2017.A copy of the Environmental Report providing further details of the proposed development and specialist environmental assessments is available to view on the Internet at:

https://www.spenergynetworks.co.uk/pages/community_consultation.aspxDirect access can be made to the website by scanning the QR code with your smartphone.

CommentsIf you wish to make any comments on this proposal, you can do so by contacting us at either the following email or postal address no later than Friday 16th June 2017.

[email protected] by writing to:

Crystal Rig Project Manager Scottish Power EnergyNetworks Ochil House 10 Technology Avenue Hamilton International Technology Park Blantyre G72 0HT

Please note that any comments made during this Consultation are not representations to the Local Planning Authority, who will determine the subsequent planning applications for consent. Following the submission of the planning applications, interested parties will have the opportunity to make representations to East Lothian and Scottish Borders Councils on these proposals.

© S

cotti

shPo

wer

201

7

The Environmental Report will accompany the two new planning applications for the proposed development being submitted to East Lothian and Scottish Borders Councils. A Pre-Application Consultation Report, and Design and Access Statement will also accompany the applications.

Environmental Report (continued)

Crystal Rig Substation Extension

Environmental Report_Technical Appendices

Crystal Rig Substation Extension

Pre-Application Consultation Report

Crystal Rig Substation Extension

Design and Access Statement

Page 2: Comments - Welcome to SP Energy Networks - SP … Leaflet – We’d like to find out what you think Crystal Rig 400kV Substation Extension Consultation Considerable environmental

+318m

5

Crystal Rig Wind FarmCrystal Rig Wind Farm

Proposed ConstructionAccess

Aikengall Wind Farm

Wester Aikengall

Proposed ConstructionAccess

Aikengall Wind Farm

Wester Aikengall

ProposedCrystal RigSubstationExtension

ProposedCrystal RigSubstationExtension

A1

Innerwick

DunbarDunbarA1A1

Crystal Rig Wind Farm & SubstationOperational Access

Crystal Rig Wind Farm & SubstationOperational Access

Proposed Operational Access

Proposed Operational Access

SpottSpott

HallsHallsThurston MainsThurston Mains

Thurston Manor

Thurston Manor

n0 3km1km 2km

+ Friardykes Dod 334m

yradnuoB licnuoC naihtoL tsaE

Wind Turbine

Wind Turbine No 6

Wind Turbine No 7

Wind Turbine No 20

Wind TurbineWind Turbine No 21

Approved Neart na GaoitheWind Farm Substation (12/00922/PM)

Approved Crystal Rig Substation Aikengall IIExtension (12/00347)under construction

Existing 400kV Overhead Line

Existing Crystal Rig Substation

Proposed ConstructionAccess using the Existing Aikengall II Extension ConstructionAccess

Planning ApplicationBoundary

+322m

+322m

+302m

+318m

+320m

+316m

+308m

+302m

+298m

Mast

yradnuoB licnuoC sredroB hsittocS

Existing Crystal Rig Wind Farm &Substation Operational Access

Proposed Temporary Compound

Proposed Temporary Compound

Proposed Temporary Compound

Proposed Crystal RigSubstationExtension

Proposed Earth Bund

Proposed Swale

Public Right of Way

Public Right of Way

+ Friardykes Dod 334m+ Friardykes Dod 334m

hh

emporary emporary

n

0 250m50 100 150 200

East Lothian CouncilEast Lothian Council

Scottish Borders CouncilScottish Borders Council

Proposed Crystal RigSubstation Extension

Proposed Crystal RigSubstation Extension

Proposed NNG SubstationProposed NNG Substation

Existing Crystal Rig SubstationExisting Crystal Rig Substation

Proposed Aikengall II SubstationProposed Aikengall II Substation

Existing 400kV Overhead LineExisting 400kV Overhead Line

Existing 400kV Overhead Line

Existing 400kV Overhead Line

Substation ExtensionSubstation ExtensionSubstation ExtensionSubstation Extension

Aikengall II SubstationAikengall II SubstationAikengall II SubstationAikengall II Substation

Zone of Theoretical Visibility with proposed Earthworks

Existing

Proposed

Existing Crystal Rig Substation

Existing Crystal Rig Substation

Proposed Crystal Rig Substation Extension

Approved NNG Wind Farm Substation

Project NeedSP Energy Networks (SPEN), through its transmission licence holder Scottish Power Transmission plc (SPT), proposes to construct an extension to the existing 400kV Crystal Rig Substation located approximately 10km south of Dunbar. The extension is required to allow the proposed Neart na Gaoithe (NNG) offshore wind farm to connect to the electricity network. SPT has a statutory duty “to develop and maintain an efficient, co-ordinated and economical system of electricity transmission” under section 9 of the Electricity Act 1989 (as amended by the Utilities Act 2000). It is also subject to licence conditions requiring it to enter into an agreement with the system operator to carry out works and obtain consents necessary to facilitate connections for generators.

B. ase map reproduced from OS 1:50,000 with the permission of HMSO. Crown copyright and database right (01-04-09). All rights reserved. SP OS Licence No 100019036.

Proposed Crystal Rig Substation Extension, Access and Temporary Construction Compounds

The Environmental Reportis available to view on the internet (see Consultation Section for details).

Environmental ReportEnvironmental specialists have undertaken an assessment of the proposed amendments to the Crystal Rig Substation Extension. The findings are detailed in an Environmental Report covering the following topics: Landscape and Visual; Heritage; Ecology; and Hydrology.

Proposed DevelopmentThe proposed Crystal Rig Substation Extension is located within East Lothian and Scottish Borders, the site straddling the administrative boundary between the two Council areas. Planning permission was obtained from both Councils to construct the Crystal Rig Substation Extension in 2013. Since obtaining the planning permissions, new electrical engineering safety clearance standards have been introduced which require the Substation Extension electrical compound area to be increased in size from 95m x 137m to 100m x 144m (an increase overall of 5m in width x 7m in length). In addition, the proposed development construction method has identified the requirement for an enlarged temporary compound area primarily for the storage of material and management of surface water in accordance with best practice guidelines. A construction programme of approximately 21 months is currently considered necessary for the proposed Crystal Rig Substation Extension.The earthworks to accommodate the amended electrical compound area have been rechecked by SPT engineers and will retain the approved ridgeline

alignment and top of slope heights as approved under the planning permissions in 2013. The earth bund will retain the majority of the cut-and-fill excavated materials on site, with only unsuitable material removed off site.To the south of the existing Crystal Rig Substation, an extension to allow the connection of Aikengall II wind farm is currently under construction. A new temporary construction access road has been established to facilitate the development. It is now considered that this road would provide a more appropriate route for traffic engaged in the construction of the Crystal Rig Substation Extension.A dedicated route for construction traffic will minimise any potential conflicts associated with traffic engaged in carrying out the onshore works associated with the NNG offshore. It will also ensure that any potential traffic conflicts with operational traffic using the existing access road to the Crystal Rig Substation are minimised. The access road to the Substation Extension originally proposed for use by all traffic shall therefore be used for operational purposes only.

To comply with its statutory and licence obligations, SPT must provide the proposed NNG wind farm with a connection to the existing transmission system.The proposed NNG wind farm is located in the Outer Forth Estuary. Development consents for the NNG wind farm were granted in September and October 2014. Subsequently RSPB sought a judicial review of two of the consents granted by Scottish Ministers. The two decisions were found to be unlawful and quashed in July 2016. Scottish Ministers have reclaimed (appealed) against the decision to reduce the consents and a judgement is expected later in 2017.

Location and Proposed Operational and Temporary ConstructionAccess Routes

Zone of Theoretical Visibility with proposed Earthworks

On review, the environmental effects are either Minor or represent No Change to those as reported in the Environmental Report, which accompanied the two approved planning applications in 2013. No Significant environmental effects are therefore predicted by the amended proposals. As agreed with the Council, potential Traffic and Transport effects shall be handled as for the previous planning permissions by imposing conditions on any consent, such as the requirement for a Traffic Management Plan.

Viewpoint 1_Watch Law Access TrackExample photomontage of the proposed Substation Extension.

Crystal Rig Substation Extension

Environmental Report


Recommended