COMMITTEE FOR TRANSIT ACCESSIBILITY
Wednesday, October 7, 2015
1:00 PM
VTA Auditorium
3331 North First Street
San Jose, CA
AGENDA
3331 North First Street ∙ San Jose, CA 95134-1927 ∙ Administration 408.321.5555 ∙ Customer Service 408.321.2300
CALL TO ORDER
1. ROLL CALL
2. ORDERS OF THE DAY - Approve the Consent Agenda
3. INTRODUCTION OF AUDIENCE MEMBERS
4. PUBLIC PRESENTATIONS:
This portion of the agenda is reserved for persons desiring to address the Committee on
any matter not on the agenda, within the Committee’s jurisdiction. Speakers are limited
to 2 minutes. The law does not permit Committee action or extended discussion on any
item not on the agenda except under special circumstances. If Committee action is
requested, the matter can be placed on a subsequent agenda. All statements that require a
response will be referred to staff for reply in writing.
5. Receive the Board of Directors Report. (Verbal Report)
Receive a Report from the General Manager. (Verbal Report) (Fernandez)
6. Receive Update on Envision Silicon Valley. (Verbal Report) (Haywood)
CONSENT AGENDA
7. Approve the Regular Meeting Minutes of June 10, 2015.
8. INFORMATION ITEM - Receive the Chief Operating Officer's Report.
Santa Clara Valley Transportation Authority
Committee for Transit Accessibility October 7, 2015
Page 2
9. INFORMATION ITEM - Receive the Transit Operations Performance Report: Annual
Report (Fiscal Year 2015).
10. INFORMATION ITEM - Receive a report on the October 2015 Transit Service Changes.
REGULAR AGENDA
11. ACTION ITEM - Appoint a nomination subcommittee to identify Committee members
interested in serving as the chairperson or vice chairperson for 2016.
12. ACTION ITEM - Recommend that the VTA Board of Directors approve the List of
Projects received from VTA's Call for Projects and direct staff to submit the complete list
to the Metropolitan Transpiration Commission for consideration of inclusion in the
Regional Transportation Plan.
13. ACTION ITEM - Recommend that the VTA Board of Directors approve the One Bay
Area Grant (OBAG) Cycle 2 program structure.
14. INFORMATION ITEM - Receive a presentation on the Transit Ridership Improvement
Program.
15. INFORMATION ITEM - Receive a presentation on Santa Clara-Alum Rock Project BRT
Project Status. (Verbal Report)
16. INFORMATION ITEM - Receive an update on the Transportation Assistance Program
(TAP) for Low Income patrons.
17. INFORMATION ITEM - Receive information on the Dynamic Transit Service Pilot
Program Implementation.
18. INFORMATION ITEM - Receive an update on the Real Time Transit Information (RTI)
project. (Verbal Report)
19. INFORMATION ITEM - Receive the Bus Stop Improvement Program Status Report.
20. INFORMATION ITEM - Receive Workplan update.
REPORTS
21. Receive the Committee Staff Report. (Verbal Report)
22. Receive the Citizens Advisory Committee/Citizens Watchdog Committee Report.
(Verbal Report)
23. Receive the Chairperson's Report. (Verbal Report)
Santa Clara Valley Transportation Authority
Committee for Transit Accessibility October 7, 2015
Page 3
OTHER
24. ANNOUNCEMENTS
25. ADJOURN
The Consent Agenda items may be voted on in one motion at the beginning of the meeting under
Orders of the Day. If you wish to discuss any of these items, please request the item be removed
from the Consent Agenda under Orders of the Day - Agenda Item #2.
In accordance with the Americans with Disabilities Act (ADA) and Title VI of the Civil Rights
Act of 1964, VTA will make reasonable arrangements to ensure meaningful access to its meetings
for persons who have disabilities and for persons with limited English proficiency who need
translation and interpretation services. Individuals requiring ADA accommodations should notify
the Board Secretary’s Office at least 48-hours prior to the meeting. Individuals requiring language
assistance should notify the Board Secretary’s Office at least 72-hours prior to the meeting. The
Board Secretary may be contacted at (408) 321-5680 or [email protected] or
(408) 321-2330 (TTY only). VTA’s home page is www.vta.org or visit us on
www.facebook.com/scvta. (408) 321-2300: 中文 / Español / 日本語 / 한국어 / tiếng Việt /
Tagalog.
All reports for items on the open meeting agenda are available for review in the Board Secretary’s
Office, 3331 North First Street, San Jose, California, (408) 321-5680, the Monday, Tuesday, and
Wednesday prior to the meeting. This information is available on VTA’s website at
http://www.vta.org and also at the meeting.
COMMITTEE FOR TRANSIT ACCESSIBILITY
Wednesday, June 10, 2015
MINUTES
3331 North First Street ∙ San Jose, CA 95134-1927 ∙ Administration 408.321.5555 ∙ Customer Service 408.321.2300
CALL TO ORDER
The Regular Meeting of the Committee for Transit Accessibility (CTA) was called to order at
1:03 p.m. by Chairperson Morrow in the Auditorium, Building A, Santa Clara Valley
Transportation Authority (VTA), 3331 North First Street, San José, California.
1. ROLL CALL
Attendee Name Title Status
Cam Acker Member Present
Roseryn Bhudsabourg Representative/Board Member
Kalra CTA Ex-Officio
Present
Kathy Bonilla Member Present
Christine Fitzgerald Member Present
Katie Heatley Ex-Officio Member Present
Troy Hernandez Member Present
Jeffery Jokinen First Vice Chairperson Absent
Lupe Medrano Member Present
Laura Michels Member Present
Aaron Morrow Chairperson Present
Lechi Nguyen Member Present
David Robinson Member Absent
Mark Romoser Member Present
Larry Saltman Member Absent
Dilip Shah Member Present
Barbara Stahl Member Present
Chaitanya Vaidya Second Vice Chairperson Present
Lori Williamson Member Present
3BA quorum was present. 4B
2. Orders of the Day – Approve the Consent Agenda
Chairperson Morrow requested Agenda Item #9, Receive the FY 2015 Third Quarter
Transit Operations Performance Report, be removed from the Consent Agenda for
comment.
M/S/C (Medrano/Vaidya) to approve the Orders of the Day and the Consent Agenda, as
amended.
NOTE: M/S/C MEANS MOTION SECONDED AND CARRIED AND, UNLESS OTHERWISE INDICATED,
THE MOTION PASSED UNANIMOUSLY.
7
Committee for Transit Accessibility Minutes Page 2 of 5 June 10, 2015
3. INTRODUCTION OF AUDIENCE MEMBERS
Patrick Griffin, Manager, Public Affairs and Customer Information; Paul Tatsuda,
OUTREACH; Chris Augenstein, Deputy Director, Planning; John Sighamony, Senior
Transportation Planner; Steve Fisher, Senior Transportation Planner; Lalitha Konanur,
Operations Systems Supervisor; and David Ledwitz, Management Analyst.
The Agenda was taken out of order.
REGULAR AGENDA
9. Transit Operations Performance Report - FY2015 1st Quarter
Chairperson Morrow questioned the factors that go into calculating on-time performance.
He stressed the importance of the Community having a reliable transit system and
suggested VTA set a higher threshold.
On Order of Chairperson Morrow and there being no objection, the Committee
received the FY 2015 Third Quarter Transit Operations Performance Report.
Member Williamson arrived at the meeting and took her seat at 1:07 p.m.
4. PUBLIC PRESENTIONS
There were no public presentations.
5. Board of Directors Report
There was no Board of Directors Report.
CONSENT AGENDA
7. Regular Meeting Minutes of April 8, 2015
M/S/C (Medrano/Vaidya) to approve the Regular Meeting Minutes of April 8, 2015.
8. Chief Operating Officer's Report
M/S/C (Medrano/Vaidya) to receive the Chief Operating Officer’s Report.
REGULAR AGENDA (continued)
10. US Department of Transportation’s Reasonable Modification of Policies and
Practices for Persons with Disabilities Final Rule
David Ledwitz, Management Analyst, provided a brief overview of the report,
highlighting: 1) Reasonable modifications final rule; 2) Modification exceptions;
3) Reasonable accommodation processes; 4) Required reasonable accommodations;
5) Accommodations not required; and 6) Next steps/In progress by July 13, 2015.
Chairperson Morrow noted several changes need to be made to the Paratransit Rider’s
Guide and requested staff return to the Committee with the updated version.
Member Michels questioned why calling out of stops was not listed as it is an ongoing
issue. She also indicated drivers are not waiting for students to be seated before they take
off.
Committee for Transit Accessibility Minutes Page 3 of 5 June 10, 2015
Chairperson Morrow noted inconsistencies in the automated stop annunciation system
and requested Mr. Unites research and provide follow-up.
Jim Unites, Deputy Director, Operations and Staff Liaison, requested specific data from
Member Michels so her concerns can be addressed and indicated he will look into
automated system issues.
Mr. Ledwitz indicated the draft guide can be found in the packet and requested the
Committee review it and email him any comments or suggestions.
Chairperson Morrow requested staff highlight additional changes and new items added to
the guide. Mr. Ledwitz indicated he would provide a mark-up copy.
Roseryn Bhudsabourg, Representative for Ex-officio Member Kalra, arrived at meeting
and took her seat at 1:20 p.m.
On order of Chairperson Morrow and there being no objection, the Committee
received US Department of Transportation’s Reasonable Modification of Policies and
Practices for Persons with Disabilities Final Rule and VTA/OUTREACH Paratransit
Rider’s Guide update.
11. Bus Rapid Transit (BRT) and Dedicated Lane Section
Steven Fisher, Senior Transportation Planner, provided a brief overview of the Bus Rapid
Transit (BRT) project and a map of Routes 22 and 522 in dedicated lane configuration.
The Committee discussed the following: 1) draft Environmental Impact Report (EIR);
2) support and opposition to dedicated lanes; 3) boarding a bus in the center lane;
4) Accessibility and compliance with Americans with Disabilities Act (ADA) standards;
and 5) safety.
Mr. Fisher indicated the project will comply with ADA standards and noted staff would
like to work with Committee on add-ins and extras with the design.
On order of Chairperson Morrow and there being no objection, the Committee
received a report on operation of Bus Rapid Transit (BRT) and dedicated lane section.
12. Subscription/Demand Response Bus Pilot Project
Aiko Cuenco, Transportation Planner III, provided a brief overview of the staff report
and a presentation, highlighting: 1) New transit service models; 2) Problem statement:
Market share of public transit; 3) Analysis of new service delivery models; 4) Possible
service features; 5) Where will this service provide the most benefit; 6) Planning study
inputs examples; 7) Planning study outcomes; 8) Demand response/description bus pilot
story board; 9) Key considerations; and 10) Next steps.
The Committee discussed the following: 1) concern with other companies who have
shown an unwillingness to serve people with disabilities and seniors being highlighted in
the presentation; 2) specialized training for drivers of this new service; 3) the type of
vehicles that will be used; 4) the conceptual timeline noting some concern around the
tight implementation schedule; 5) the accessibility of the project including ADA
accommodation for wheelchairs and customers' ability to pay without a smartphone; and
6) suggested staff make a distinction between this new service and paratransit service to
avoid confusion amongst users.
Mr. Unites stressed this is a pilot project for a new service which will enable staff to learn
and make modifications as it moves forward.
Committee for Transit Accessibility Minutes Page 4 of 5 June 10, 2015
On order of Chairperson Morrow and there being no objection, the Committee
received information on the approach to implementing the Subscription/Demand
Response Bus Pilot Project.
Roseryn Bhudsabourg left the meeting at 2:16 p.m.
13. Veteran’s Transportation and Community Living Initiative (VTCLI) Grant
Paul Tatsuda, OUTREACH, provided a presentation on the Veterans Transportation and
Community Living Initiative (VTCLI) Project highlighting: 1) VTCLI goal; 2) How to
meet the goal; 3) One-Call/One-Click service, database, and center; 4) Phone and
technology upgrades; 5) In-vehicle equipment upgrades; 6) Coordinated transportation
solutions; 7) Populations assisted and partner organizations; and 8) veteran programs at
Outreach.
Members of the Committee expressed their appreciation for OUTREACH working with
and within the military community.
On order of Chairperson Morrow and there being no objection, the Committee
received OUTREACH’s Presentation on Veteran’s Transportation and Community
Living Initiative (VTCLI) Grant.
6. Envision Silicon Valley
John Sighamony, Senior Transportation Planner, provided a brief update on Envision
Silicon Valley (ESV), highlighting the following: 1) approval of the ESV goals at the
June 4, 2015, Board of Directors meeting; 2) discussion and development of the metrics
by the working groups and the Ad-hoc ESV Committee; and 3) call for projects.
Chairperson Morrow questioned the date of next meeting.
Mr. Sighamony indicated he would send the Committee information on the upcoming
stakeholder meetings.
On order of Chairperson Morrow and there being no objection, the Committee
received update on Envision Silicon Valley.
14. Work Plan Update
Chairperson Morrow requested the following be added to the work plan: 1) update on
Real-time Program and dynamic signage; 2) Calling of stops and automated stop
annunciation system; and 3) Wi-Fi connectivity issues on trains.
Chairperson Morrow suggested convening a workshop if there are major issues
discovered that need to be addressed before the October Committee meeting.
Member Heatley noted the challenge of charging electric power chairs. She suggested
having a way to charge them at transit stops and requested staff research the issue.
On order of Chairperson Morrow and there being no objection, the Committee
received the Work Plan update.
REPORTS
15. Committee Staff Report
There was no Committee Staff Report.
Committee for Transit Accessibility Minutes Page 5 of 5 June 10, 2015
16. Citizens Advisory Committee (CAC)/Citizens Watchdog Committee (CWC) Report
Chairperson Morrow provided a brief report on the Citizens Watchdog Committee
(CWC) public hearing held in May on the 2000 Measure A Program. He noted Macias
Gini & O’Connell, LLP (MGO) is in the last year of their contract and the CWC will be
looking for a new firm to perform the next audit. Chairperson Morrow indicated the
Committee expressed some concern that VTA may be overextending some obligations
swapping 2000 Measure A funds and borrowing against sales tax receipts.
17. Chairperson's Report
Chairperson Morrow reported he is in the process of scheduling a meet and greet with
Bicycle and Pedestrian Advisory Committee (BPAC) and CTA chairpersons to discuss
each committee’s role and how to better work together on accessibility and pedestrian
issues.
Chairperson Morrow indicated he toured OUTREACH’s new facility. He thanked
Ms. Heatley and staff for their work and commented on their ability to leverage
non-profit funds and give the disabled and senior population a voice and a seat at the
table.
OTHER
18. ANNOUNCEMENTS
Member Romoser announced the 25th Anniversary of the ADA youth forum being held
on August 14, 2015.
Chairperson Morrow thanked Operations staff for their response with helping passengers
get where they needed to go after an accident disabled power along the light rail line in
downtown San Jose
19. ADJOURNMENT
On order of Chairperson Morrow and there being no objection, the meeting was
adjourned at 2:52 p.m.
Respectfully submitted,
Menominee L. McCarter, Board Assistant
VTA Office of the Board Secretary
Date: September 25, 2015
Current Meeting: October 7, 2015
Board Meeting: N/A
BOARD MEMORANDUM
TO: Santa Clara Valley Transportation Authority
Committee for Transit Accessibility
THROUGH: General Manager, Nuria I. Fernandez
FROM: Chief Operating Officer, Inez Evans
SUBJECT: Chief Operating Officer's Report
3331 North First Street ∙ San Jose, CA 95134-1927 ∙ Administration 408.321.5555 ∙ Customer Service 408.321.2300
FOR INFORMATION ONLY
BACKGROUND:
The Chief Operating Officer provides the Committee for Transit Accessibility (CTA) with an
update on items of relevance to the CTA at each monthly meeting. In keeping with Chairperson
Aaron Morrow’s request to have agenda items in writing and in the agenda packet, we will make
every effort possible to comply with his request. Since this report is timely and reflects up-to-the
minute information a written report for the agenda packet may not always be available.
DISCUSSION:
Events that have occurred since June 2015:
Super Bowl 50 Planning
VTA continues to meet regularly with the NFL, Homeland Security, FBI, local law enforcement,
the 49ers, and other bay area transit providers in preparation for Super Bowl 50. Planning topics
include security perimeters, traffic access, light rail train access, ACE/Capitol Corridor Station &
parking concerns, etc.
On Monday, August 24th, VTA hosted a meeting of regional transit providers to ensure efficient
coordination of services for the Super Bowl. VTA schedulers are now putting together transit
plans based on our first year of stadium service experience, taking into account the additional
Super Bowl 50 specific requirements.
Stadium Events
Since our last meeting, Levi’s Stadium has held many events including four major concerts, an
international soccer game, an All Star football game as well as two NFL preseason games (one
on a Thursday evening), and its first ever Monday Night Football game, between the San
8
Page 2 of 2
Francisco 49ers and the Minnesota Vikings. The Thursday and Monday night events presented
unique challenges due to providing our regular service and finding ways to provide the level of
event specific service needed. In both cases, VTA staff rose to the occasion and provided
excellent service. Over 10,000 Monday Night Football fans, for example, attended the game
using VTA bus and light rail services and almost all of them were on their way home within an
hour of game ending time.
Hispanic Heritage Month
September 15 – October 15, 2015 has been designated as Hispanic Heritage Month. During this
month America celebrates the culture and traditions of U.S. residents whose roots trace back to
Spain, Mexico, and other Spanish-speaking nations in Central America, South America, and the
Caribbean. VTA is hosting a Lunchtime Symposium on Wednesday, September 23 from noon to
1:00 p.m. to promote diversity in our workplace and to recognize the many contributions to
VTA’s success by staff members of Hispanic descent.
Montague Light Rail Station
The Montague Light Rail Station, which had been closed due to construction for over 5
months, reopened on Monday, August 31, 2015. All light rail trains resumed service to
the station according to the published schedule. This station was closed in order to
facilitate construction of the new Milpitas BART station, located adjacent to the
Montague station. Part of the construction activities included building a pedestrian
overcrossing that links the two stations for ease of transfer. During construction, a shuttle
operated between the Great Mall Transit Center and the Montague Station to assist VTA
riders who typically use the Montague Station.
Prepared By: Steve Johnstone
Memo No. 4978
8
Date: September 28, 2015
Current Meeting: October 7, 2015
Board Meeting: N/A
BOARD MEMORANDUM
TO: Santa Clara Valley Transportation Authority
Committee for Transit Accessibility
THROUGH: General Manager, Nuria I. Fernandez
FROM: Chief Operating Officer, Inez Evans
SUBJECT: Transit Operations Performance Report - FY2015
3331 North First Street ∙ San Jose, CA 95134-1927 ∙ Administration 408.321.5555 ∙ Customer Service 408.321.2300
FOR INFORMATION ONLY
BACKGROUND:
The FY 2015 Annual Transit Operations Performance Report presents the Fiscal Year’s (July
2014-June 2015) key performance information for VTA Operations. This report is routinely
produced after each quarter and at the end of the fiscal year. A summary of the FY 2015 Annual
Transit Operations Performance Report follows.
DISCUSSION:
Ridership Bus ridership for FY2015 totaled 32.62 million, an increase of 0.5% compared to FY2014.
Average weekday ridership was 106,214, up 0.2 % compared to FY2014.
Light rail ridership recorded 11.32 million boardings in FY2015, an increase of 3.4% compared
to the prior fiscal year. Average weekday ridership was 34,935, down 0.2% from FY2014.
Average weekend ridership rose significantly due to events at Levi’s & Avaya stadiums with
Saturday up by 17.6% and Sunday up by 19.8%.
Overall, system ridership (bus and rail) was up 1.2% at 43.95 million. Average weekday
ridership increased 0.1%, from 140,981 last year to 141,149 this year. Average Saturday
ridership was 80,025 up by 5.3% and average Sunday ridership was 65,575 up by 7.7%.This was
primarily due to events at Levi’s and Avaya stadiums.
Special Event Service: This is the first year of events and service to Levi’s Stadium and the
second quarter of service to the new Avaya Stadium. A total of 31 stadium events occurred
during the fiscal year – eight at Avaya and 23 at Levi’s. Events at Levi’s Stadium included
football games, concerts, an outdoor San Jose Sharks game, and Wrestlemania, which was
considered an excellent preparation for Super Bowl 50 in 2016. Overall, Levi’s stadium
contributed to ridership increases, especially during the weekends, with a total of 404,227 riders
from the 23 events and an average of 17,575 riders. Of the 404,227 riders, 39,772 riders were on
9
Page 2 of 3
weekdays, 133,075 riders rode Saturday and 231,380 riders rode Sunday. Express bus service
ridership to Avaya Stadium averaged 1,507, with a total of 12,052 riders from the eight events.
Levi’s Stadium events
Year Month Riders Events Average per event
2014 August 56,174 3 18,725
2014 September 53,448 3 17,816
2014 October 38018 2 19,009
2014 November 59,741 3 19,914
2014 December 62,016 4 15,504
2015 February 31,948 1 31,948
2015 March 23,662 1 23,662
2015 April 12,798 2 6,399
2015 May 17,456 2 8,728
2015 June 48,966 2 24,483
Totals 404,227 23 17,575
Avaya Stadium events
Year Month Riders Events Average per event
2015 February 807 1 807
2015 March 1,861 1 1,861
2015 April 4,338 2 2,169
2015 May 2,762 2 1,381
2015 June 2,284 2 1,142
Totals 12,052 8 1,507
Key Performance Indicators Service reliability performance for the system (both bus and light rail) in FY2015 was 99.67%.
Bus on-time performance was 85.6%, down slightly from 85.9% last year. Light rail on-time
performance was 77.4%, down from last year’s 85.4%. This was primarily due to continuous
signal issues at the City of Santa Clara segment of the line.
Bus recorded 9,890 miles between major mechanical schedule losses, down from 9,964 in FY
2014, but exceeding the goal of 8,000 miles. Light rail recorded 20,292 miles between major
mechanical schedule losses, down from 37,390 in FY2014, and did not meet the goal of 40,000
miles. This was primarily due to an increase in mechanical rail calls during the period.
Absenteeism goals were met, with the exception of light rail Way, Power, and Signal
Maintenance.
Paratransit Paratransit ridership decreased by 1.0%, from 727,688 in FY 2014 to 720,617 in FY 2015. The
number of active paratransit customers decreased by 7.8%.
VTA’s paratransit program is meeting or exceeding all of its performance goals. Passengers per
revenue hour was 2.6, exceeding the goal of 2.4. Net cost per passenger trip was $24.28, 9.2%
less than the goal of $26.75. The net cost per trip increased 4.8% compared to FY 2014 in
response to planned contractual increases for service vendors, maintenance services, and for
9
Page 3 of 3
basic price increases in goods and services in FY2015. Farebox recovery was 15.7%, up 10%
from last year.
Inter-Agency Partners and Contracted Services All of VTA’s Inter-agency partners and contracted services recorded ridership increases, with the
exception of Dumbarton Express:
Dumbarton Express ridership was 305,877, down 4.3%.
Highway 17 Express ridership was 378,084, up 3.5%.
Monterey-San Jose Express ridership was 30,818, up 2.4%.
ACE ridership was 1,204,568, up 9.0%.
Caltrain ridership was 18.5 million, up 8.5%.
ACE shuttle ridership was 417,040, up 8.9%.
Capitol Corridor ridership was 1.46 million, up 3.8%.
Prepared By: Lalitha Konanur
Memo No. 4764
9
Transit Operations Performance Report
FY 2015 Annual Report (July 1, 2014 - June 30, 2015)
9.a
Transit Operations Performance Report
FY 2015 Annual Report (July 1, 2014 – June 30, 2015)
9.a
Santa Clara Valley Transportation AuthorityFY 2015 Annual Transit Operations Performance Report
TABLE OF CONTENTS page
Executive SummarySummary of Performance 1Event Highlights 3
Key Performance Indicators 9
Ridership Summary 10
Route Performance
Route details 11Boardings Per Revenue Hour 12Average Peak Load (Express) 16Route Productivity 17
Paratransit Operating Statistics 25
Glossary
Prepared by: Operations Analysis, Reporting & Systems
9.a
Executive Summary
9.a
1
SANTA CLARA VALLEY TRANSPORTATION AUTHORITY
SUMMARY OF PERFORMANCE
FY 2015 Annual Transit Operations Performance Report
Ridership (page 10 of the report)
Bus ridership for FY2015 totaled 32.62 million, an increase of 0.5% compared to FY2014.
Average weekday ridership was 106,214, up 0.2 % compared to FY2014.
Light rail ridership recorded 11.32 million boardings in FY2015, an increase of 3.4% compared
to the prior fiscal year. Average weekday ridership was 34,935, down 0.2% from FY2014.
Average weekend ridership rose significantly due to events at Levi’s & Avaya stadiums with
Saturday up by 17.6% and Sunday up by 19.8%.
Overall, system ridership (bus and rail) was up 1.2% at 43.95 million. Average weekday
ridership increased 0.1%, from 140,981 last year to 141,149 this year. Average Saturday
ridership was 80,025 up by 5.3% and average Sunday ridership was 65,575 up by 7.7%.This was
primarily due to events at Levi’s and Avaya stadiums.
Special Event Service: This is the first year of events and service to Levi’s Stadium and the
second quarter of service to the new Avaya Stadium. A total of 31 stadium events occurred
during the fiscal year – eight at Avaya and 23 at Levi’s. Events at Levi’s Stadium included
football games, concerts, an outdoor San Jose Sharks game, and Wrestlemania, which was
considered an excellent preparation for Super Bowl 50 in 2016. Overall, Levi’s stadium
contributed to ridership increases, especially during the weekends, with a total of 404,227 riders
from the 23 events and an average of 17,575 riders. Of the 404,227 riders, 39,772 riders were on
weekdays, 133,075 riders rode Saturday and 231,380 riders rode Sunday. Express bus service
ridership to Avaya Stadium averaged 1,507, with a total of 12,052 riders from the eight events.
Levi’s Stadium events
Year Month Riders Events Average per event
2014 August 56,174 3 18,725
2014 September 53,448 3 17,816
2014 October 38018 2 19,009
2014 November 59,741 3 19,914
2014 December 62,016 4 15,504
2015 February 31,948 1 31,948
2015 March 23,662 1 23,662
2015 April 12,798 2 6,399
2015 May 17,456 2 8,728
2015 June 48,966 2 24,483
Totals 404,227 23 17,575
9.a
2
Avaya Stadium events
Year Month Riders Events Average per event
2015 February 807 1 807
2015 March 1,861 1 1,861
2015 April 4,338 2 2,169
2015 May 2,762 2 1,381
2015 June 2,284 2 1,142
Totals 12,052 8 1,507
Key Performance Indicators (page 9 of the report)
Service reliability performance for the system (both bus and light rail) in FY2015 was 99.67%.
Bus on-time performance was 85.6%, down slightly from 85.9% last year. Light rail on-time
performance was 77.4%, down from last year’s 85.4%. This was primarily due to continuous
signal issues at the City of Santa Clara segment of the line.
Bus recorded 9,890 miles between major mechanical schedule losses, down from 9,964 in FY
2014, but exceeding the goal of 8,000 miles. Light rail recorded 20,292 miles between major
mechanical schedule losses, down from 37,390 in FY2014, and did not meet the goal of 40,000
miles. This was primarily due to an increase in mechanical rail calls during the period.
Absenteeism goals were met, with the exception of light rail Way, Power, and Signal
Maintenance.
Paratransit (page 25 of the report)
Paratransit ridership decreased by 1.0%, from 727,688 in FY 2014 to 720,617 in FY 2015. The
number of active paratransit customers decreased by 7.8%.
VTA’s paratransit program is meeting or exceeding all of its performance goals. Passengers per
revenue hour was 2.6, exceeding the goal of 2.4. Net cost per passenger trip was $24.28, 9.2%
less than the goal of $26.75. The net cost per trip increased 4.8% compared to FY 2014 in
response to planned contractual increases for service vendors, maintenance services, and for
basic price increases in goods and services in FY2015. Farebox recovery was 15.7%, up 10%
from last year.
Inter-Agency Partners and Contracted Services (page 10 of the report)
All of VTA’s Inter-agency partners and contracted services recorded ridership increases, with the
exception of Dumbarton Express:
Dumbarton Express ridership was 305,877, down 4.3%.
Highway 17 Express ridership was 378,084, up 3.5%.
Monterey-San Jose Express ridership was 30,818, up 2.4%.
ACE ridership was 1,204,568, up 9.0%.
Caltrain ridership was 18.5 million, up 8.5%.
ACE shuttle ridership was 417,040, up 8.9%.
Capitol Corridor ridership was 1.46 million, up 3.8%.
9.a
SANTA CLARA VALLEY TRANSPORTATION AUTHORITY EVENT HIGHLIGHTS FY 2015 Annual Transit Operations Performance Report (July 1, 2014 to June 30, 2015) This section shows events that can affect normal service operations and system ridership. Ridership historically follows employment trends in the Valley, for example. Weather, public events, strikes, traffic, construction, new service, area gasoline prices, and other changes to our operating environment also affect system ridership and service conditions.
July 4, 2014 – Due to the fireworks event in downtown San Jose, VTA light rail service was extended to 11:30 p.m.
July 7, 2014 – VTA quarterly service changes are implemented. One major change adds Saturday service every 15 minutes from 9:00 a.m. to 6:00 p.m. for Line 323.
July 25, 2014 – Spare the Air Day.
July 30, 2014 – PG&E Flip the Switch Day declared due to high temperatures.
July 2014 – Service changes and reroutes were in effect due to the Morgan Hill Cruise’n Show and Parade, The Rotary Centennial Fireworks Show in San Jose, Sunnyvale Music in the Market, the Thursday Night Live Summer Concert Series in Mountain View, and construction projects in Morgan Hill and San Jose.
July 2014 – Santa Clara County unemployment rate was 5.9%.
July 2014 – There was no measurable rainfall in July.
July 2014 – Unleaded fuel averaged $4.06 a gallon.
August 1, 2014 – Spare the Air Day.
August 2, 2014 – First event at Levi’s Stadium – Major League Soccer – San Jose Earthquakes vs. Seattle Sounders.
August 6, 2014 – Warren Avenue in Southern Fremont reopens to traffic.
August 13, 2014 – Cisco Systems announces layoffs of 6,000 workers, 900 in San Jose.
August 17, 2014 – First (pre-season) San Francisco ‘49ers football game at Levi’s Stadium.
August 24, 2014 – A 6.1 magnitude earthquake hits Napa. Caltrain service is delayed connecting to VTA for Levi’s Stadium football game due to track inspections. Local VTA service is not affected.
3
9.a
August 2014 – Service changes and reroutes were in effect due to the Thursday Night Live Summer Concert Series in Mountain View, Jazz Summer Fest in San Jose, and construction projects in Mountain View and San Jose.
August 2014 – Santa Clara County unemployment rate was 5.5%.
August 2014 – There was no measurable rainfall in August.
August 2014 – Unleaded fuel averaged $3.93 a gallon.
September 11-12, 2014 – Spare the Air Days.
September 14, 2014 – ‘49ers Opening Day at Levi’s Stadium. 9,400 attendees ride VTA to the game.
September 30, 2014 – Stevens Creek Boulevard/I-880 interchange opens.
September 2014 – Service changes and reroutes were in effect due to the South First Friday Street Market in San Jose; the Mountain View Art & Wine Festival; the Morgan Hill Auto Show; the Willow Glen Founders’ Day Parade; the National Drive Electric Week Parade in Cupertino; construction on the Santa Clara Alum Rock Bus Rapid Transit project on Alum Rock Avenue; and construction projects in Gilroy, San Jose, and Palo Alto.
September 2014 – Santa Clara County unemployment rate was 5.2%.
September 2014 – Rainfall was 200% of normal.
September 2014 – Unleaded fuel averaged $3.79 a gallon.
October 3, 2014 – Spare the Air Day.
October 5, 2014 – Regular game at Levi’s Stadium, ‘49ers vs. Philadelphia Eagles
October 10, 2014 – Cisco Systems layoffs affect 903 workers in San Jose.
October 17, 2014 – Advanced Micro Devices (AMD) announces layoffs of 7% of its workforce (approximately 710 workers).
October 24, 2014 – College football game at Levi’s Stadium, Cal Bears vs. Oregon Ducks.
October 2014 – Service changes and reroutes were in effect due to a memorial event for former San Jose Police Chief McNamara; the annual Rock & Roll Half Marathon in San Jose; parades in Gilroy, Santa Clara, and Cupertino; and various construction projects in San Jose.
October 2014 – Santa Clara County unemployment rate was 5.1%.
October 2014 – Rainfall was 78% of normal.
4
9.a
October 2014 – Unleaded fuel averaged $3.53 per gallon.
November 2, 2014 – Regular game at Levi’s Stadium, ‘49ers vs. St. Louis Rams.
November 7, 2014 – Work began on double-tracking light rail between Mountain View and Whisman stations.
November 23, 2014 – Regular game at Levi’s Stadium, ‘49ers vs. Washington Redskins.
November 9 and 25-27, 2014 – Winter Spare the Air Days.
November 27, 2014 – Regular game at Levi’s Stadium, ‘49ers vs. Seattle Seahawks.
November 28, 2014 – VTA’s Historic Holly Trolley Historic holiday service begins.
November 2014 – Service changes and reroutes were in effect due to the Morgan Hill Marathon; the annual Turkey Trot in San Jose; events at Levi’s Stadium; and construction projects in San Jose, Sunnyvale, and Palo Alto. A major gas leak in San Jose also caused disruption of service at the Downtown Customer Service Center and reroutes in downtown San Jose for several days.
November 2014 – Santa Clara County unemployment rate was 5.1%.
November 2014 – Rainfall was 93% of normal.
November 2014 – Unleaded fuel averaged $3.17 per gallon.
December 5, 2014 – PAC 12 Championship football game at Levi’s Stadium.
December 11, 2014 – Major storm hits Bay Area. VTA Lines 22, 55, 63, 522, 58, and light rail in the downtown San Jose area were affected due to flooding.
December 20, 2014 – Regular game at Levi’s Stadium, ‘49ers vs. San Diego Chargers.
December 28, 2014 – Regular game at Levi’s Stadium, ‘49ers vs. Arizona Cardinals.
December 28-29, 2014 – Winter Spare the Air Days.
December 29, 2014 – Qualcomm announces layoffs affecting more than 100 San Jose and Santa Clara workers.
December 30, 2014 – Foster Farms Bowl college football game at Levi’s Stadium.
December 2014 – Service changes and reroutes were in effect due to the Children’s Holiday Christmas Parade in Los Gatos; Christmas tree lighting event in Sunnyvale; Holiday Parade in Gilroy; Hussain Day Procession in San Jose; Levi’s Stadium events; and construction projects in San Jose and Sunnyvale.
5
9.a
December 2014 – Santa Clara County unemployment rate was 4.5%.
December 2014 – Rainfall was 297% of normal.
December 2014 – Unleaded fuel averaged $2.86 per gallon.
January 2-12, 15-17, and 24-25, 2015 – Winter Spare the Air Days – an unprecedented 16 days.
January 5, 2015 – VTA adds hours to weekday and Saturday service and adds all-new Sunday service to Line 323.
January 5, 2015 – Google-funded Mountain View Community Shuttle begins service.
January 26, 2015 – Nine-month closure of Sierra at Lundy in San Jose begins for BART construction.
January 28, 2015 – Citrix announces 900 job cuts or 10% of its workforce.
January 2015 – Service changes and reroutes were in effect due to Levi’s Stadium events, bus stop relocations, police activity, and construction projects in San Jose and Palo Alto.
January 2015 – Santa Clara County unemployment rate was 4.7%.
January 2015 – Rainfall was 1% of normal.
January 2015 – Unleaded fuel averaged $2.57 per gallon.
February 2, 2015 – EBay and PayPal cut 2,500 jobs (7% of workforce).
February 3, 2015 – Winter Spare the Air Day.
February 4-5, 2015 – Palo Alto Transit Center closed overnight for maintenance work.
February 5, 2015 – New Eastridge Transit Center opened.
February 28, 2015 – Avaya Stadium opening event and VTA Express service to Earthquakes’ soccer games begins.
February 2015 – Service changes and reroutes were in effect due to the San Jose 408k Run; Cupid’s Undie Run; Levi’s Stadium events; rail rehab work; street closures; police activity; and construction projects in San Jose and Mountain View.
February 2015 – Santa Clara County unemployment rate was 4.5%.
February 2015 – Rainfall was 56% of normal.
February 2015 – Unleaded fuel averaged $2.72 per gallon.
6
9.a
March 12, 2015 – Cypress Semiconductor and Spansion announce 1,600 layoffs.
March 16, 2015 – Evelyn Light Rail Station closes permanently for double-tracking project.
March 23, 2015 – Montague Light Rail Station closes for 5 months for BART construction.
March 29, 2015 – WWE Wrestlemania at Levi’s Stadium draws record light rail event ridership.
February 2015 – Service changes and reroutes were in effect due to Levi’s Stadium events; street closures; police activity; and construction projects in San Jose.
March 2015 – Santa Clara County unemployment rate was 4.2%.
March 2015 – Rainfall was 7% of normal.
March 2015 – Unleaded fuel averaged $3.31 per gallon.
April 2015 – There were a number of light rail service impacts due to the double-tracking work in Mountain View and non-VTA accidents on the trackways.
April 2015 – Bus service reroutes occurred due to construction, bus stop relocations, police activity, the Nihonmachi Run, Mountain View Downtown Spring event, The Great Race, and temporary street closures.
April 7, 2015 – An unusual spring storm with high winds dumped more than 1½ inches of rain, hail, and a dusting of snow on Bay Area peaks.
April 11, 2015 – Monster Jam event at Levi’s Stadium.
April 13, 2015 – Due to a potential suicide attempt, US 101 and I-680 freeways are closed in all directions for 4 hours by police, impacting the evening commute and all VTA bus service in the area.
April 18, 2015 – Monster Energy Super X Event at Levi’s Stadium.
April 2015 – Santa Clara County unemployment rate was 3.8%.
April 2015 – Rainfall was 75% of normal.
April 2015 – Unleaded fuel averaged $3.20 per gallon.
May 2015 – Bus service changes and reroutes were in effect due to Cinco de Mayo weekend events, Mountain View’s A La Carte and Art Festival, May Fete in Palo Alto, Magic and Wine Stroll in Sunnyvale, the Amgen Tour of California, the Color Run in San Jose, bus stop closures, construction, and bus stop relocations.
7
9.a
May 2015 – Light rail service was impacted by weekend closures of the 902 line from Lockheed Martin to Mountain View, with replacement bus service.
May 2, 2015 – Kenny Chesney Concert at Levi’s Stadium.
May 6, 2015 – Broken track and power outages cause BART system shutdown for most of the day.
May 24, 2015 – San Jose Earthquakes vs. Orlando Soccer Match at Levi’s Stadium.
May 2015 – Santa Clara County unemployment rate was 4.0%.
May 2015 – Rainfall was 98% of normal.
May 2015 – Unleaded fuel averaged $3.68 per gallon
June 2015 -- Bus service changes and reroutes were in effect due to construction, bus stop relocations, bus stop closures, the Holy Spirit Parade in San Jose, the Thursday Night Live Summer Concert Series in Mountain View, Dancin’ on the Avenue in San Jose, Sunnyvale Music in the Market, SubZero Festival in San Jose, Sunnyvale Art and Wine Festival, San Jose Giants Run, a gas leak, non-VTA accidents, and police activity.
May 2015 – Light rail service was impacted by weekend closures of the 902 line from Lockheed Martin to Mountain View, with replacement bus service, operational and mechanical issues, police activity, maintenance-related track closures, and non-VTA accidents.
June 10, 2015 – VTA announces Dynamic Transit Service Pilot scheduled for Fall 2015.
June 11, 2015 – VTA announces expanded bus service to Gilroy in October 2015.
June 19, 2015 – Intel announces layoffs affecting a few hundred people at each location.
June 19, 2015 – Large American Communications Network Conference at SAP Center.
June 20, 2015 – A severe heat warning was issued for the Bay Area.
June 27-28, 2015 – Grateful Dead Concerts at Levi’s Stadium.
June 2015 – There was no measurable rainfall.
June 2015 – Santa Clara County unemployment rate was 4.1%
June 2015 – Unleaded fuel averaged $3.45 per gallon.
8
9.a
Key Performance
Indicators
9.a
SANTA CLARA VALLEY TRANSPORTATION AUTHORITYKEY PERFORMANCE INDICATORSFY 2015 Annual Transit Operations Performance Report
FY 2012 Annual
FY 2013 Annual
FY 2014 Annual
FY 2015Annual
Met Goal? FY 2015 Goals
SYSTEM (Bus & Light Rail)Total Boarding Riders (in millions) 42.43 43.15 43.43 43.94 No 45.60>= Average Weekday Boarding Riders 137,299 140,402 140,965 141,149 No 148,400>= Boardings per Revenue Hour 31.9 31.9 29.6 30.5 No 30.9>= Percent of Scheduled Service Operated 99.72% 99.73% 99.67% 99.67% YES 99.55%>= Miles Between Major Mechanical Schedule Loss1 11,065 13,110 10,839 9,890 YES 9,000>= Miles Between Chargeable Accidents 94,649 88,300 80,812 78,449 No 111,500>= Passenger Concerns per 100,000 Boardings 12.5 13.7 16.2 18.4 No 10.6<=
BUS OPERATIONSTotal Boarding Riders (in millions) 32.05 32.40 32.48 32.62 No 34.00>= Average Weekday Boarding Riders 104,583 106,161 105,969 106,214 No 111,500>= Boardings per Revenue Hour 26.9 26.7 26.0 25.1 No 25.5>= Percent of Scheduled Service Operated 99.69% 99.70% 99.64% 99.64% YES 99.50%>= Miles Between Major Mechanical Schedule Loss1 10,202 12,080 9,964 9,890 YES 8,000>= Miles Between Chargeable Accidents 85,926 80,608 73,702 78,449 No 100,000>= On-time Performance 88.4% 87.4% 85.9% 85.6% No 92.5%>= Operator Personal Time-off 8.8% 8.5% 8.1% 7.2% YES 10.0%<= Maintenance Personal Time-off 8.2% 7.4% 8.2% 6.0% YES 8.0%<= Passenger Concerns per 100,000 Boardings 15.5 17.1 20.2 21.3 No 11.8<=
LIGHT RAIL OPERATIONSTotal Boarding Riders (in millions) 10.37 10.74 10.95 11.32 No 11.60>= Average Weekday Boarding Riders 32,716 34,241 34,996 34,935 No 36,900>= Boardings per Revenue Hour 75.4 78.3 78.8 80.4 No 81.4>= Percent of Scheduled Service Operated 99.97% 99.98% 99.97% 99.96% YES 99.90%>= Miles Between Major Mechanical Schedule Loss1 32,489 40,723 37,381 20,292 No 40,000>= Miles Between Chargeable Accidents2 441,847 366,503 367,582 558,019 No 2,214,000>= On-time Performance 89.4% 88.5% 84.5% 77.4% No 95.0%>= Operator Personal Time-off 6.6% 5.9% 7.2% 7.3% YES 10.0%<= Maintenance Personal Time-off 7.1% 7.3% 8.1% 5.2% YES 8.0%<= Way, Power, & Signal Personal Time-off 6.3% 6.3% 4.0% 8.6% No 8.0%<= Passenger Concerns per 100,000 Boardings 3.3 3.3 4.3 10.0 No 2.8<= Fare Evasion Rate 7.8% 3.9% 3.1% 3.0% YES 5.0%<=
PARATRANSIT 7.8Passengers per Revenue Hour³ 2.60 2.50 2.60 2.60 YES 2.40>= Net Cost per Passenger $22.73 $22.69 $25.25 $24.22 YES $26.75<= Ontime Performance ³ 96.5% YES 92.0%>= Complaints per 1,000 passenger Trips³ 0.47 YES 1.0<= Schedule Calls Response Time (minutes)³ 1.36 YES 2.0<= Days of Service Calls Response Time (minutes)³ 1.14 YES 2.0<= ADA Eligibility Certification within 21 Days³ 100.0% YES 100.0%>= Preventative Maintenance Inspections Ontime³ 100.0% YES 95.0%>= Major Accidents and Incidents per 85,000 Passenger Trips ³ 0 YES 1.0<= Non-Major Accidents and Incidents per 85,000 Passenger Trips³ 0.47 YES 2.0<=
Note: Ridership goals were developed using budget projections.1 Mechanical failure that prevents the vehicle from completing a scheduled service due to limited vehicle movement or safety concerns.2 Goal is no more than one chargeable accident in a year.3 New ADA Paratransit Performance Indicators for Paratransit effective FY 2014
9
9.a
Ridership Summary
9.a
SANTA CLARA VALLEY TRANSPORTATION AUTHORITYRIDERSHIP SUMMARY(Directly Operated, Inter-Agency Partners, and Contracted Services)FY 2015 Annual Transit Operations Performance Report
FY2015 FY2014 % ChangeDirectly Operated ServicesBus 32,624,767 32,475,527 0.5% Average Weekday Riders 106,214 105,969 0.2%
Light Rail 11,320,497 10,952,965 3.4% Average Weekday Riders 34,927 35,012 -0.2%
Total Directly Operated Services 43,945,264 43,428,492 1.2% Average Weekday Riders 141,141 140,981 0.1%
Inter-Agency Partners
Dumbarton Express 305,877 319,642 -4.3% Average Weekday Riders 1,204 1,258 -4.3%
Highway 17 Express 378,084 365,168 3.5% Average Weekday Riders 1,170 1,130 3.5%
Monterey-San Jose Express 30,818 30,083 2.4% Average Weekday Riders 83 81 2.5%Altamont Commuter Express (ACE) 1,204,568 1,104,963 9.0% Average Weekday Riders 4,775 4,367 9.3%
Caltrain 18,472,178 17,029,447 8.5% Average Weekday Riders 58,204 53,471 8.9%
Caltrain Shuttles (in Santa Clara County) 1,660,381 1,465,017 13.3% Average Weekday Riders 6,386 5,635 13.3%Contracted ServicesParatransit 720,617 727,688 -1.0% Average Weekday Riders 2,553 2,581 -1.1%
ACE Shuttles 417,040 383,118 8.9% Average Weekday Riders 1,655 1,514 9.3%
Total Contracted / Inter-Agency 11,446,923 10,517,148 8.8%
Combined Total Ridership (in Santa Clara County) 1 55,392,187 53,945,640 2.7%1 These figures are based on estimated ridership in the VTA service area for Caltrain, ACE, Highway 17 Express, Dumbarton Express, and Monterey-San Jose Express. Paratransit, Light Rail Shuttles, ACE Shuttles, and Caltrain Santa Clara County Shuttles are operated wholly within the service area, therefore, 100% of the ridership is included.
10
9.a
Route Performance
9.a
Route Destination Route Destination
10 Santa Clara Transit Ctr.-San Jose International Airport-Metro Airport LRT Station 68 Gilroy Transit Ctr.-San Jose Diridon Transit Ctr.
12 San Jose Civic Ctr.-Eastridge Transit Ctr. via San Jose Flea Market 70 Capitol LRT Station-Great Mall/Main Transit Ctr.
13* Almaden Expwy. & McKean-Ohlone/Chynoweth LRT Station 71 Eastridge Transit Ctr.-Great Mall/Main Transit Ctr. via White Rd. 14* Gilroy Transit Ctr. to St. Louise Hospital 72 Senter & Monterey-Downtown San Jose 16* Morgan Hill Civic Ctr. to Burnett Ave. 73 Snell/Capitol-Downtown San Jose 17* Gilroy Transit Ctr. to Murray & Tomkins 77 Eastridge Tran Ctr-Great Mall/Main Trans Ctr via King Rd
18* Gilroy Transit Ctr. to Gavilan College 81 Weekday-Vallco-San Jose State University; Sat-Vallco-Santa Clara Tran.Ctr
19* Gilroy Transit Ctr. to Wren & Mantelli 82 Westgate-Downtown San Jose22 Palo Alto Transit Ctr.-Eastridge Transit Ctr. via El Camino 88* Palo Alto Veteran's Hospital-Middlefield & Colorado23 DeAnza College-Alum Rock Transit Ctr. via Stevens Creek 89 California Ave. Caltrain Station-Palo Alto Veteran's Hospital25 DeAnza College-Alum Rock Transit Ctr. via Valley Medical Ctr. 101 Camden & Hwy 85-Palo Alto26 Sunnyvale/Lockheed Martin Transit Ctr.-Eastridge Transit Ctr. 102 South San Jose-Palo Alto27 Good Samaritan Hospital-Kaiser San Jose 103 Eastridge Transit Ctr.-Palo Alto31 Evergreen Valley College-Eastridge Transit Ctr. 104 Penitencia Creek Transit Ctr.-Palo Alto
32* San Antonio Shopping Ctr.-Santa Clara Transit Ctr. 120 Fremont BART-Lockheed Martin/Moffett Park-Shoreline 34* San Antonio Shopping Ctr.-Downtown Mountain View 121 Gilroy Transit Ctr.-Lockheed Martin/Moffett Park35 Downtown Mountain View-Stanford Shopping Ctr. 122 South San Jose-Lockheed Martin/Moffett Park
37* West Valley College-Capitol LRT Station 140 Fremont BART-Mission College & Montague Expwy. 39* The Villages-Eastridge Transit Ctr. 168 Gilroy Transit Ctr.-San Jose Diridon Transit Ctr.
40 Weekday/Sat-Foothill College-La Avenida & Shoreline Sun-San Antonio & Lyell-La Avenida & Shoreline 180 Great Mall/Main Transit Ctr/Aborn&White-Fremont BART
42* Weekday-Kaiser San Jose-Evergreen Valley College Sat-Santa Teresa LRT-Monterey & Senter 181 San Jose Diridon Transit Ctr.-Fremont BART via Great Mall/Main
Transit Ctr. late evenings & weekends 45* Alum Rock Transit Ctr.-Penitencia Creek Transit Ctr. 182 Palo Alto-IBM/Bailey Ave.46 Great Mall/Main Transit Ctr.-Milpitas High School 201 DASH SJ Diridon Stn-Downtown SJ LRT Stations47 Great Mall/Main Transit Ctr.-McCarthy Ranch 231 Avaya Stadium-Downtown San Jose (Event Service Only)
48* Los Gatos Civic Ctr.-Winchester Transit Ctr. via Winchester Blvd. 251 Fremont BART-Levi's Stadium (Event Service Only)
49* Los Gatos Civic Ctr.-Winchester Transit Ctr. via Los Gatos Blvd. 252 Vallco-Levi's Stadium (Event Service Only)
51 De Anza College-Moffett Field/Ames Ctr. 253 Gilroy/Morgan Hill-Levi's Stadium (Event Service Only)52 Foothill College-Downtown Mountain View 255 Almaden-Levi's Stadium (Event Service Only)53 West Valley College-Sunnyvale Transit Ctr. 256 Ohlone-Chynoweth-Levi's Stadium (Event Service Only)54 De Anza College-Sunnyvale/Lockheed Martin Trans Ctr. 304 South San Jose-Sunnyvale Transit Ctr. via Arques55 De Anza College-Great America 321 Great Mall/Main Transit Ctr.-Lockheed Martin/Moffett Park
55X Fremont High School-Lakewood Village (School Days Only) 323 De Anza College-Downtown San Jose57 West Valley College-Great America via Quito Rd. 328 Almaden Expy/Via Valiente-Lockheed Martin/Moffett Pk58 West Valley College-Alviso via Fruitvale 330 Almaden Expy. & Via Valiente-Tasman Drive60 Winchester Transit Ctr.-Great America 522 Palo Alto Transit Ctr.-Eastridge Transit Ctr.61 Good Samaritan Hospital-Sierra & Piedmont via Bascom LRT Line 902 - Mountain View-Winchester62 Good Samaritan Hospital-Sierra & Piedmont via Union Line 901 - Alum Rock-Santa Teresa63 Almaden Expy & Camden-San Jose State University Line 900 - Ohlone/Chynoweth-Almaden
64 Almaden LRT Station-McKee & White via Downtown San Jose
65* Kooser & Blossom Hill-13th & Hedding66 Kaiser San Jose-Milpitas/Dixon Rd. via Downtown San Jose
Route Listing
*Community Bus
11
9.a
SANTA CLARA VALLEY TRANSPORTATION AUTHORITYWeekday Boardings per revenue hourFY 2015 Annual Transit Operations Performance Report
24.3 21.1
23.8 33.8
26.9 22.7
26.2 25.1
30.5 29.2
21.8 23.0
25.1 24.9
27.2 28.4
33.8 33.1
522
323
77
73
72
71
70
68
66
64
62
61
60
55
26
25
23
22
Core Standard: 26.7 boardings
per rvenue hour
21.8 23.8
15.4 18.3
15.4 22.3
26.8 25.7
19.2 23.9 24.1 24.4
25.1 16.3
18.0 17.3
22.5
89
82
81
63
58
57
54
53
52
51
47
46
40
35
31
27
10
Local Standard: 21.2 boardings
per revene hour
32.1
10.6
13.3
15.8
11.9
15.1
16.5
14.0
22.1
14.6
11.7
20.1
18.2
18.4
7.3
12.9
14.0
12.7
0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0 50.0
201
200
88
65
49
48
45
42
39
37
34
32
19
18
17
16
14
13
Community Bus Standard: 15.6 boardings
per revenue hour
24.7 ACEShuttles
Note: ACE shuttles are not considered in the calculation of the Community Bus standard, which is VTA-based only.
12
9.a
SANTA CLARA VALLEY TRANSPORTATION AUTHORITYWeekday Boardings per revenue hourFY 2015 Annual Transit Operations Performance Report
76.0
93.7
50.8
0 20 40 60 80 100 120 140
Express Standard: is 60% Maximum Load
Factor
Light Rail Standard: 73.7 boardings
per revenue train hour
* Line 900 is the Ohlone/Chynoweth – Almaden line * Line 901 is the Alum Rock - Santa Teresa Line * Line 902 is the Mountain View - Winchester Line.
13.0
11.0
11.3
13.3
0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0 50.0
Limited Standard 15.0 Boarding Per
Revenue Hour
13
9.a
SANTA CLARA VALLEY TRANSPORTATION AUTHORITYSaturday Boardings per revenue hourFY 2015 Annual Transit Operations Performance Report
65.5
58.5
49.9
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
902*
901*
900* Light Rail Standard: 58.0
boardings per revenue
train hour
15.3
3.7
13.2
16.0
14.6
17.9
11.2
11.4
12.8
8.4
13.5
26.8
19.2
82
81
63
57
54
47
46
40
35
31
27
12
10
7.2
10.9
9.4
6.7
15.7
9.8
13.9
4.1
9.5
0 10 20 30 40 50 60200
4948423932191814
Local Standard: 15.0 boardings
per revenue hour
Community Bus Standard: 15.0 boardings
per revenue hour
* Line 900 is the Ohlone/Chynoweth – Almaden line * Line 901 is the Alum Rock - Santa Teresa Line * Line 902 is the Mountain View - Winchester Line.
18.5
37.2
20.9
20.9
20.7
16.8
21.0
22.7
24.0
18.9
17.1
14.2
18.5
14.8
20.3
22.2
26.5
27.9
522
323
77
73
72
71
70
68
66
64
62
61
60
55
26
25
23
22
Core Standard: 19.8 boardings
per revenue hour
14
9.a
SANTA CLARA VALLEY TRANSPORTATION AUTHORITYSunday Boardings per revenue hourFY 2015 Annual Transit Operations Performance Report
78.7
60.7
40.7
0 10 20 30 40 50 60 70 80 90
902*
901*
900*Light Rail
Standard 60.0 boardings per revenue train hour
17.3
11.3
18.6
24.0
24.7
21.7
21.9
26.0
28.7
19.3
16.4
13.7
21.1
19.4
18.8
26.9
29.2
30.7
522
323
77
73
72
71
70
68
66
64
62
61
60
55
26
25
23
22
Core Standard: 21.7 boardings
per revenue hour
15.2
12.3
16.1
13.1
19.7
11.6
15.1
7.1
12.4
19.5
21.7
82
63
57
54
47
40
35
31
27
12
10
Local Standard: 15.0 boardings
per revenue hour
1.9
7.0
7.8
15.1
10.0
3.0
5.8
0 5 10 15 20 25 30 35 40 45 50
200
49
48
39
19
18
14
Community Bus Standard: 15.0 boardings
per revenue hour
* Line 900 is the Ohlone/Chynoweth – Almaden line * Line 901 is the Alum Rock - Santa Teresa Line * Line 902 is the Mountain View - Winchester Line
15
9.a
Saturday / Sunday
SANTA CLARA VALLEY TRANSPORTATION AUTHORITY
Express Routes Average Peak LoadFY 2015 Annual Transit Operations Performance Report
Weekday
41.6%
55.3%
57.4%
47.6%
52.6%
51.8%
55.5%
65.0%
60.0%
36.6%
53.2%
39.2%
34.8%
44.0%
13.4%
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
101
102
103
104
120
121
122
140
168
180
181
182
DB
Hwy 17
MST 55
Express Standard: 60% Peak Load
Note: HWY 17, MST and DB are not considered in the calculation of the standard which is VTA- based only.
Saturday, 59.7%
Sunday, 68.4%
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
181
181
16
9.a
Boardings per Revenue Hour by Time PeriodFY 2015 Annual Transit Operations Performance Report
Core Routes
WEEKDAYROUTE PEAK MIDDAY OFF PEAK TOTAL
22 30.4 35.0 36.5 33.123 30.1 38.4 31.4 33.8 Weekday Service Periods25 26.1 30.9 28.4 28.4 Peak 5:00 AM to 9:00 AM &26 24.3 31.5 25.1 27.2 3:00 PM to 7:00 PM55 22.8 28.2 27.6 24.9 Midday 9:00 AM to 3:00 PM60 22.0 30.6 22.2 25.1 Off Peak 7:00 PM to 5:00 AM61 22.3 26.2 13.4 23.062 19.2 27.5 12.2 21.864 27.5 33.6 17.2 29.266 26.4 36.1 31.7 30.568 21.5 29.1 28.3 25.170 23.3 29.6 26.2 26.271 20.3 26.9 22.4 22.772 24.5 29.6 28.0 26.973 28.0 41.3 29.1 33.877 19.8 28.4 31.6 23.8
323 20.5 23.1 15.5 21.1 Legend:522 23.3 25.0 26.0 24.3 Below standard
Standard 24.0 30.6 25.2 26.7 No Service
17
9.a
Boardings per Revenue Hour by Time PeriodFY 2015 Annual Transit Operations Performance Report
Core Routes
SATURDAYROUTE AM BASE NIGHT TOTAL
22 25.9 30.1 25.0 27.923 24.0 29.1 21.0 26.5 Saturday Service Periods25 20.2 23.1 19.6 22.2 AM 5:00 AM to 9:00 AM26 20.3 20.3 20.3 20.3 Base 9:00 AM to 6:00 PM55 15.7 14.6 15.8 14.8 Night 6:00 PM to 5:00 AM60 21.3 18.4 17.0 18.561 10.7 17.2 7.0 14.262 17.6 17.8 11.5 17.164 15.8 21.2 12.7 18.966 19.2 28.5 16.3 24.068 18.7 26.5 17.2 22.770 20.7 21.5 18.4 21.071 28.6 16.1 14.6 16.872 17.7 21.9 17.6 20.773 17.9 21.5 21.0 20.977 16.7 21.7 19.1 20.9
323 37.9 38.2 26.3 37.2522 14.1 20.0 15.2 18.5
Standard 20.2 22.7 17.5 21.3
SUNDAYROUTE AM BASE NIGHT TOTAL
22 25.7 31.2 34.9 30.7 Sunday Service Periods23 27.5 30.1 27.2 29.2 AM 5:00 AM to 9:00 AM25 21.2 30.7 17.1 26.9 Base 9:00 AM to 6:00 PM26 16.3 19.0 21.7 18.8 Night 6:00 PM to 5:00 AM55 15.6 20.1 18.1 19.460 20.8 22.7 12.9 21.161 10.2 16.1 6.7 13.762 15.9 17.0 12.4 16.464 16.7 20.9 13.3 19.366 23.4 32.9 19.1 28.768 19.0 30.6 21.7 26.070 19.6 23.0 18.8 21.971 17.7 23.7 17.0 21.772 24.4 25.5 21.0 24.773 18.9 25.8 16.9 24.0 Legend:77 17.6 19.1 13.8 18.6 Below standard
323 1.2 11.5 0.0 11.3 No Service522 4.5 17.9 0.0 17.3
Standard 17.6 23.2 18.3 21.718
9.a
Boardings per Revenue Hour by Time PeriodFY 2015 Annual Transit Operations Performance ReportLocal Routes
WEEKDAYROUTE PEAK MIDDAY OFF PEAK TOTAL
10 21.2 23.8 22.9 22.527 15.0 21.0 16.0 17.3 Weekday Service Periods31 15.4 22.4 13.4 18.0 Peak 5:00 AM to 9:00 AM &35 16.0 16.8 15.0 16.3 3:00 PM to 7:00 PM40 22.3 29.1 19.2 25.1 Midday 9:00 AM to 3:00 PM46 22.6 28.4 0.0 24.4 Off Peak 7:00 PM to 5:00 AM47 20.2 29.1 22.4 24.151 23.5 24.5 0.0 23.952 18.3 22.1 9.2 19.253 21.6 31.2 0.0 25.754 28.1 25.2 28.5 26.857 18.6 27.3 17.2 22.358 16.9 10.3 18.5 15.463 16.6 21.2 15.2 18.381 15.0 16.2 12.1 15.4 Legend:82 20.9 28.1 18.3 23.889 21.2 27.5 0.0 21.8 Below standard
Standard 19.6 23.8 17.5 21.2 No Service
19
9.a
Boardings per Revenue Hour by Time PeriodFY 2015 Annual Transit Operations Performance ReportLocal Routes
SATURDAYROUTE AM BASE NIGHT TOTAL
10 14.6 23.8 14.1 19.212 0.0 26.8 0.0 26.827 14.4 13.9 8.2 13.5 Saturday Service Periods31 7.3 8.9 5.2 8.4 AM 5:00 AM to 9:00 AM35 15.2 13.3 7.9 12.8 Base 9:00 AM to 6:00 PM40 11.4 11.4 0.0 11.4 Night 6:00 PM to 5:00 AM46 0.0 11.2 0.0 11.247 21.3 17.4 19.7 17.954 12.6 14.8 14.6 14.657 16.8 15.9 16.3 16.063 12.4 13.7 7.4 13.281 0.0 3.7 0.0 3.782 14.2 16.3 8.7 15.3
Standard 15.0 15.0 15.0 15.0
SUNDAYROUTE AM BASE NIGHT TOTAL
10 12.1 26.2 19.1 21.712 0.0 19.5 0.0 19.527 0.0 12.4 0.0 12.4 Sunday Service Periods31 0.0 7.1 0.0 7.1 AM 5:00 AM to 9:00 AM35 14.8 15.5 9.0 15.1 Base 9:00 AM to 6:00 PM40 0.0 11.6 0.0 11.6 Night 6:00 PM to 5:00 AM47 30.2 19.4 20.3 19.754 8.3 13.8 1.9 13.157 11.0 18.2 4.3 16.163 0.0 12.3 0.0 12.3 Legend:82 0.0 15.2 0.0 15.2 Below standard
Standard 15.3 15.6 15.0 15.0 No Service
20
9.a
Boardings per Revenue Hour by Time PeriodFY 2015 Annual Transit Operations Performance ReportCommunity BusWEEKDAY
ROUTE PEAK MIDDAY OFF PEAK TOTAL13 12.0 13.4 0.0 12.7 Weekday Service Periods14 11.2 15.7 0.0 14.0 Peak 5:00 AM to 9:00 AM &16 14.0 8.4 0.0 12.9 3:00 PM to 7:00 PM17 6.5 7.8 0.0 7.3 Midday 9:00 AM to 3:00 PM18 16.5 20.5 0.0 18.4 Off Peak 7:00 PM to 5:00 AM19 16.2 21.1 10.1 18.232 19.7 20.8 16.9 20.134 0.0 11.7 0.0 11.737 14.5 16.5 5.4 14.639 17.9 30.7 17.7 22.142 12.0 16.7 7.8 14.045 16.9 16.1 0.0 16.548 14.5 17.0 8.1 15.149 10.8 14.4 7.0 11.965 14.2 17.6 0.0 15.888 13.0 13.7 0.0 13.3200 0.0 0.0 10.6 10.6201 34.7 29.3 29.6 32.1
Standard 15.3 17.1 15.0 15.6
21
9.a
Boardings per Revenue Hour by Time PeriodFY 2015 Annual Transit Operations Performance ReportCommunity Bus
SATURDAYROUTE AM BASE NIGHT TOTAL Saturday Service Periods
14 0.0 9.5 0.0 9.5 AM 5:00 AM to 9:00 AM18 0.0 4.1 0.0 4.1 Base 9:00 AM to 6:00 PM19 13.5 14.0 0.0 13.9 Night 6:00 PM to 5:00 AM32 3.7 10.6 0.0 9.839 15.0 16.3 3.6 15.742 3.1 6.9 0.0 6.748 9.4 9.3 10.3 9.449 24.6 10.0 6.2 10.9200 0.0 0.0 7.2 7.2
Standard 15.0 15.0 15.0 15.0
SUNDAYROUTE AM BASE NIGHT TOTAL Sunday Service Periods
14 0.0 5.8 0.0 5.8 Base 9:00 AM to 6:00 PM18 0.0 3.0 0.0 3.0 Night 6:00 PM to 5:00 AM19 7.8 10.2 0.0 10.039 0.0 15.1 0.0 15.148 0.0 7.8 0.0 7.849 0.0 7.0 0.0 7.0 Legend:
200 0.0 0.0 1.9 1.9 Below standardStandard 15.0 15.0 15.0 15.0 No Service
22
9.a
Boardings per Revenue Hour by Time PeriodFY 2015 Annual Transit Operations Performance Report
Light Rail
WEEKDAYROUTE PEAK MIDDAY OFF PEAK TOTAL Weekday Service Periods
900* 52.8 56.6 36.7 50.8 Peak 5:00 AM to 9:00 AM &901* 103.6 105.1 46.5 93.7 3:00 PM to 7:00 PM902* 81.2 78.4 51.2 76.0 Midday 9:00 AM to 3:00 PM
Standard 79.2 80.0 44.8 73.5 Off Peak 7:00 PM to 5:00 AM
SATURDAYROUTE AM BASE NIGHT TOTAL Saturday Service Periods
900* 26.3 57.3 37.2 49.9 AM 5:00 AM to 9:00 AM901* 33.5 71.0 51.9 58.5 Base 9:00 AM to 6:00 PM902* 58.6 79.5 46.4 65.5 Night 6:00 PM to 5:00 AM
Standard 39.5 69.3 45.2 58.0
SUNDAYROUTE AM BASE NIGHT TOTAL Sunday Service Periods
900* 19.4 46.9 30.4 40.7 AM 5:00 AM to 9:00 AM901* 32.8 74.6 53.9 60.7 Base 9:00 AM to 6:00 PM902* 54.3 88.6 70.7 78.7 Night 6:00 PM to 5:00 AM
Standard 35.5 70.0 51.7 60.0Legend:Below standard No Service
* Line 900 is the Ohlone/Chynoweth – Almaden line * Line 901 is the Alum Rock to Santa Teresa Line * Line 902 is the Mountain View to Winchester Line.
23
9.a
Paratransit Operating
Statistics
9.a
SANTA CLARA VALLEY TRANSPORTATION AUTHORITYPARATRANSIT OPERATING STATISTICSFY 2015 Annual Transit Operations Performance Report
FYTD 2015 FYTD 2014 Percent ChangeRIDERSHIPClients 513,840 523,195 -1.8%Attendants 112,417 116,763 -3.7%Companions 94,360 87,730 7.6%
Total Ridership 720,617 727,688 -1.0%Average Weekday Trips 2,553 2,581 -1.1%Average Weekday Client Trips 1,815 1,852 -2.0%Active Clients 7,479 8,112 -7.8%Average Trips per Client 69 64 6.5%PREMIUM SERVICESSame Day Trips 1,660 1,457 13.9%Second Vehicles 167 203 -17.7%Open Returns 258 387 -33.3%Service Area Surcharge Trips 2,912 3,322 -12.3%Subscription Trips 91,117 100,299 -9.2%
Total 96,114 105,668 -9.0%LEVEL OF SERVICERevenue Miles 5,922,864 6,196,215 -4.4%Revenue Hours 280,706 285,273 -1.6%Passenger Miles (NTD) 6,827,328 8,096,897 -15.7%ELIGIBILITYTotal Data Cards Received 6,842 6,777 1.0%New Applicants Certified 2,274 2,229 2.0%New Applicants Denied 541 568 -4.8%Clients Recertified 2,382 2,422 -1.7%Clients Denied Recertification 558 631 -11.6%
Total Eligibility Assessments 5,755 5,850 -1.6%EXPENSES AND REVENUES
EXPENSESEligibility Certification Costs $605,349 $520,084 16.4%Broker Costs $4,241,800 $3,797,824 11.7%Vendor Costs $15,906,125 $15,479,411 2.8%
Total Operating Costs $20,753,274 $19,797,319 4.8%REVENUES
Client Fare $1,951,458 $1,988,039 -1.8%Other Fare $1,290,425 $938,766 37.5%Non-VTA Broker Revenue $14,575 $13,711 6.3%
Total Revenue $3,256,459 $2,940,515 10.7%Net Expenses $17,496,815 $16,856,804 3.8%
Fare Recovery Rate 15.62% 14.78% 5.7%Capital Expenses $82,019 $65,789 24.7%Total Expenses $17,578,833 $16,922,593 3.9%
COST PER PASSENGER TRIP (excludes capital expenses)Total Reported Costs $28.80 $27.21 5.9%Fare Revenue $4.50 $4.02 11.9%Non-fare revenue $0.02 $0.02 0.0%
Net Cost $24.28 $23.16 4.8%
24
9.a
Glossary
9.a
GLOSSARY
AVERAGE FARE PER BOARDING – This measure is calculated by dividing the total fare revenue (cash, passes, tokens, and Eco Pass) by total boarding riders. It measures the rider contribution towards the farebox recovery ratio. AVERAGE WEEKDAY BOARDINGS – The average number of persons who board the transit system on a day that normal weekday revenue service is provided. BOARDINGS PER REVENUE HOUR – This is a productivity measure comparing the number of boardings to the number of revenue hours operated. It measures service utilization per unit of service operated. The Revenue hours is the time when a vehicle is available to the general public to carry passengers. This will include layover but exclude deadheads. BRT (BUS RAPID TRANSIT) ROUTES – The BRT route is a multi-component transit improvement that includes preferential treatment at traffic signals to improve bus operating speed and on-time performance. It operates in mixed traffic and relies on priority for buses at traffic signals to provide much of its time advantage over conventional buses. COMMUNITY BUS ROUTES – Community Bus service is characterized by weekday frequencies of 30 minutes or more in both the peak and midday periods. Service span is 14 hours or less, usually 12 hours for weekdays. Community Bus services operate seven days per week or less. These routes are defined as neighborhood-based circulator and feeder routes that travel within a limited area .They may be distinguished from Core and Local service by a unique and smaller vehicle. CORE ROUTES – Core network routes are defined as bus routes or shared corridors that feature weekday frequencies of 15 minutes or less during the peak and midday periods and/or service spans of 18 hours or more. Core routes operate seven days per week. They typically travel on long distance corridors, which connect major trip generators such as universities, regional shopping malls and high-density housing and employment sites. Multiple core routes will sometimes operate on the same corridor where demand warrants, providing additional service frequency and transfer opportunities. Core network corridors are typically large arterial streets and intersect with freeways and expressways. DEADHEAD: Time during movement of a transit vehicle without passengers aboard, typically from the operating division to the start of the route. EXPRESS & LIMITED SERVICE ROUTES – Express routes generally operate during peak periods and are primarily commuter oriented. Midday, evening, and weekend service may be offered on regional express lines. Express routes emphasize direct service, use freeways and expressways to reduce travel time, and make few stops. Limited Service routes are characterized by limited stops. FEEDER ROUTES – Feeder routes are short-length lines, usually less than 10 miles in length, that provide feeder or distribution service to and from major stops, transit centers, activity centers or rail stations. This classification of service includes neighborhood lines, which link residential areas to rail stations, activity centers, and/or transit centers; and shuttle lines, which serve industrial areas from nearby rail stations or transit centers.
9.a
LAYOVER: Break the driver or the vehicle is given at the end of a trip before it starts operating its reverse route, or if the route is circular, before beginning its next trip LIMITED STOP ROUTES – Limited-stop service generally operates during peak periods and is primarily commuter oriented. Midday, evening, and weekend service may be offered on limited-stop lines. Limited-stop routes use major arterials, freeways, and/or expressways; and make fewer stops than grid routes, but more stops than express routes. LOCAL ROUTES – Local network routes are defined as bus routes or corridors that feature weekday frequencies of thirty minutes or more during the peak and midday periods and/or service spans less than 18 hours. Local Network routes operate seven days per week or less. They typically travel on medium distance corridors, serving minor trip generators such as schools, hospitals and medium-density housing and employment. They also provide feeder service to the core network or to rail stations and transit centers. MILES BETWEEN CHARGEABLE ACCIDENTS – Safety measure that captures the number of total scheduled miles traveled between each occurrence of a preventable accident. A preventable accident is defined as accidents in which the transit driver is normally deemed responsible or partly responsible for the occurrence of the accident. MILES BETWEEN MECHANICAL SERVICE LOSS – Service quality measure capturing the number of total scheduled miles traveled between each mechanical breakdown that result in a loss of service to the public. SPECIAL SERVICE ROUTES – Special services routes only operate on certain days of the week or on a seasonal basis to address a specific service need. NATIONAL TRANSIT DATABASE (NTD) – The Federal Transit Administration's (FTA's) primary national database for statistics on the transit industry. Recipients of FTA’s Urbanized Area Formula Program (Section 5307) grants are required by statute to submit data to the NTD. Each year, NTD performance data are used to apportion over $4 billion of FTA funds to transit agencies in urbanized areas (UZAs). Annual NTD reports are submitted to Congress summarizing transit service and safety data. The NTD is the system through which FTA collects uniform data needed by the Secretary of Transportation to administer department programs. The data consist of selected financial and operating data that describe public transportation characteristics. The legislative requirement for the NTD is found in Title 49 U.S.C. 5335(a). ON-TIME PERFORMANCE – A reliability measure capturing the percentage of transit vehicles departing or arriving at a location on time. On-time performance is measured only for specific locations called timepoints for which a schedule is published. A bus transit vehicle is considered “on time” if it departs a location within three minutes before and five minutes after its published scheduled time. A light rail transit vehicle is considered “on time” if it departs a location within one minute before and three minutes after its published scheduled time. At the last timepoint location of a trip, early arrival is considered on-time. PASSENGER CONCERNS PER 100,000 BOARDINGS – A customer service measure that captures the number of passenger complaints/concerns per 100,000 boardings. This measure reports the amount of customer complaints received on the service that is attributed to an operating division.
9.a
PEAK LOAD (Express) - The Express bus standard is 60 percent of the seated vehicle loading capacity. This singular standard is needed due to the special characteristics of Express Bus lines where seat turnover is low. PERCENT SCHEDULED SERVICE OPERATED – This service reliability measure indicates the percent of service hours completed based on published schedule. A service is considered not completed when scheduled service hours are lost due to equipment failure, missed or late pull-outs caused by operator absenteeism, pullouts, accidents/incidents, or natural causes. PERSONAL TIME OFF (PTO) – This is defined as time off for non-scheduled absences such as: sick, industrial injury, FMLA (Family Medical Leave Act.), excused/unexcused leave, union business, and suspensions. REVENUE HOURS: Time when a vehicle is available to the general public to carry passengers. This will include layover but exclude deadhead. STANDARD (Boardings per revenue Hour): This is the average boardings per Revenue Hour and applies to Community Bus, Local, BRT, and Light Rail. The minimum standard is 15 boardings per revenue hour. TOTAL BOARDINGS – The total number of boarding riders using VTA directly operated bus service and light rail service. Riders are counted each time they board a bus or light rail vehicle.
9.a
Date: September 24, 2015
Current Meeting: October 7, 2015
Board Meeting: October 1, 2015
BOARD MEMORANDUM
TO: Santa Clara Valley Transportation Authority
Committee for Transit Accessibility
THROUGH: General Manager, Nuria I. Fernandez
FROM: Chief Operating Officer, Inez Evans
SUBJECT: Transit Service Changes - October 2015
3331 North First Street ∙ San Jose, CA 95134-1927 ∙ Administration 408.321.5555 ∙ Customer Service 408.321.2300
FOR INFORMATION ONLY
BACKGROUND:
VTA implements transit service changes on a quarterly basis in January, April, July and October.
Major changes are typically planned for January and July, while minor changes are implemented
in April and October. Proposed “major” service changes must be submitted to the VTA Board of
Directors for review and approval. For Title VI compliance purposes, all “major” service
changes also require that VTA staff perform a Service Equity Analysis.
The following modifications are considered “major” service changes as adopted by the VTA
Board of Directors.
Establishment of a new transit line or service.
Elimination of a transit line or service.
Route change that impacts 25 percent or more of a line’s route miles.
Span of service or frequency changes affecting 25 percent or more of a line’s revenue
vehicle hours.
Series of changes on a single route which are included in the two-year Transit Service
Plan and cumulatively meet any of the above criteria.
Proposed changes that are anticipated to be controversial with a particular community or
interested parties based on public feedback.
System-wide change concurrently affecting five percent or more of the total system
revenue hours.
Service change proposals that do not meet the criteria for ”major” service changes are handled at
the staff level and are still subject to an appropriate level of public and community review and
comment.
10
Page 2 of 3
DISCUSSION:
The following transit service changes will take effect on Monday, October 12, 2015, and were
approved by the VTA Board of Directors in May 2015 as part of the two year FY16-FY17
Transit Service Plan. The Transit Service Plan also included the required Title VI Service Equity
Analysis. The service changes for October are all considered minor in nature and are mainly to
revise schedules, connections and running times.
Community Bus Line 37 (West Valley College-Capitol LRT Station): Minor schedule
changes will be made.
Community Bus Line 45 (Alum Rock Transit Center-Penitencia Creek Transit Center):
Minor schedule changes will be made.
Community Bus Line 48 (Los Gatos-Winchester Transit Center): On weekdays, afternoon
schedule changes will be made due to a change in school hours at Los Gatos High School.
Community Bus Line 49 (Los Gatos-Winchester Transit Center): On weekdays, afternoon
schedule changes will be made due to a change in school hours at Los Gatos High School.
Line 51 (De Anza College-Moffett Field/Ames Center): Minor schedule changes will be made
in the northbound direction.
Line 53 (West Valley College-Sunnyvale Transit Center): Minor schedule changes will be
made.
Express Line 101 (Camden & Highway 85-Palo Alto): Minor schedule changes will be made.
Express Line 102 (South San Jose-Palo Alto): Due to passenger requests, the first southbound
afternoon trip will be moved 10 minutes earlier to start at Hansen & Page Mill at 3:15 p.m.
Minor schedule changes will be made to the other afternoon trips.
Express Line 104 (Penitencia Creek Transit Center-Palo Alto): Minor schedule changes will
be made. The 6:39 a.m. westbound trip will start at 6:33 a.m. due to increasing traffic
congestion.
Express Line 120 (Fremont BART-Lockheed Martin/Moffett Park-Shoreline): Minor
schedule changes will be made.
Express Line 121 (Gilroy-Lockheed Martin/Moffett Park): Minor schedule changes will be
made. Most morning northbound trips will start earlier due to increasing traffic congestion.
10
Page 3 of 3
Limited Stop Line 304 (South San Jose-Sunnyvale Transit Center): Minor schedule changes
will be made.
STANDING COMMITTEE DISCUSSION/RECOMMENDATION:
The Transit Planning and Operations (TP&O) committee reviewed this item at its September 16,
2015 meeting. The Committee acting as a Committee of the Whole endorsed the item and
recommended placing it on the Board of Directors’ Consent Agenda for October 1, 2015.
Prepared By: Jim Unites
Memo No. 4785
10
Date: September 25, 2015
Current Meeting: October 7, 2015
Board Meeting: N/A
BOARD MEMORANDUM
TO: Santa Clara Valley Transportation Authority
Committee for Transit Accessibility
THROUGH: General Manager, Nuria I. Fernandez
FROM: Board Secretary, Elaine Baltao
SUBJECT: Election Process for 2016 Advisory Committee Leadership: Appoint
Nomination Subcommittee
3331 North First Street ∙ San Jose, CA 95134-1927 ∙ Administration 408.321.5555 ∙ Customer Service 408.321.2300
Policy-Related Action: No Government Code Section 84308 Applies: No
ACTION ITEM
RECOMMENDATION:
Appoint a nomination subcommittee to identify Committee members interested in serving as the
chairperson or vice chairperson for 2016.
BACKGROUND:
VTA has five advisory committees providing input to the Board of Directors: Bicycle &
Pedestrian Advisory Committee (BPAC); Citizens Advisory Committee (CAC); Committee for
Transit Accessibility (CTA); Policy Advisory Committee (PAC); and Technical Advisory
Committee (TAC).
The bylaws for these committees specify that each committee must elect from its membership a
chairperson and vice chairperson annually. The duties of the chairperson are to preside at all
meetings of the committee and represent the committee before the Board of Directors. In
addition, it is the responsibility of the CAC and PAC chairpersons to provide to the Board at
each of its regular meetings a verbal report on the previous meeting of their respective
committees and any of the committee’s concerns. The duty of the vice chairperson is to perform
the duties of the chairperson when the chairperson is absent. The chairperson and vice
chairperson positions both serve a one-year term coinciding with the calendar year and are
eligible for election to multiple and consecutive terms. For the PAC and TAC, only members,
not alternates, are eligible to serve in these positions.
11
Page 2 of 3
The bylaws for all advisory committees except PAC specify that the elections for these positions
are held the last meeting of the calendar year (usually December), whenever possible. The PAC
bylaws specify that the elections for that committee are conducted the first meeting of the
calendar year (usually January).
DISCUSSION:
The election process for the chairperson and vice chairperson positions is comprised of three
distinct steps. The first step is the appointing of the nomination subcommittee. The second is
presentation of the nomination subcommittee’s report. The final step is conducting elections to
select the chairperson and vice chairperson. Each of these components is conducted during the
committee meeting.
Appointing the Nomination Subcommittee
The chairperson requests a small number of volunteers to serve on the nomination subcommittee,
typically two or three members. For PAC and TAC, only members, not alternates, are eligible to
serve on the nomination subcommittee. If there are no volunteers or an insufficient number, it is
the chairperson’s prerogative to appoint committee members to serve on it. The bylaws require
that each committee vote to approve the appointment of members to the nomination
subcommittee. This step normally takes place two meetings prior to conducting the elections.
The mission of the nomination subcommittee is to determine members interested in serving as
the chairperson or vice chairperson. This is done by soliciting nominations from members, either
for themselves or other members, and is done at a time other than during the committee meeting.
Additionally, it is the nomination subcommittee’s responsibility to determine that members that
have been nominated are willing to serve.
Report from the Nomination Subcommittee
At the meeting immediately preceding the elections, whenever feasible, the nomination
subcommittee provides a verbal report to the advisory committee identifying committee
members who have confirmed their willingness to serve. In instances where a report cannot be
provided at the targeted committee meeting, the nomination subcommittee’s report is emailed to
the committee prior to the elections. This action establishes the initial list of candidates for the
elections to be held at the next meeting. The nomination subcommittee is automatically
discharged when its report is formally presented to the committee. No action is required of the
committee other than to receive the report.
Election of Chairperson and Vice Chairperson
These elections, which are held at the bylaw-specified meeting whenever possible, are conducted
for the chairperson and vice chairperson positions individually and in sequence. Immediately
preceding the vote, the chairperson will ask whether there are any nominations from the floor,
then close the nomination process to establish the final list of candidates for each position.
11
Page 3 of 3
For all advisory committees except CTA and PAC, the affirmative vote of a majority of the total
authorized membership is required to elect the chairperson and vice chairperson. CTA requires
the affirmative vote of nine members or a majority of the members present, whichever is greater,
and PAC requires the affirmative vote of the majority of the quorum present.
For PAC, the term for the newly elected chairperson and vice chairperson commences
immediately following completion of the voting for each office. For the other four committees,
the term of office begins January 1 of the calendar year following the scheduled vote.
ALTERNATIVES:
There are no alternatives since the Committee’s bylaws specify that to complete the required
election process, the Committee must first appoint a nomination subcommittee to identify
members interested in serving as the chairperson or vice chairperson.
FISCAL IMPACT:
There is no fiscal impact associated with this action.
Prepared by: Stephen Flynn, Advisory Committee Coordinator
Memo No. 5073
11
Date: September 24, 2015
Current Meeting: October 7, 2015
Board Meeting: October 1, 2015
BOARD MEMORANDUM
TO: Santa Clara Valley Transportation Authority
Committee for Transit Accessibility
THROUGH: General Manager, Nuria I. Fernandez
FROM: Director of Planning and Program Development, John Ristow
SUBJECT: Envision Silicon Valley Preliminary Project List
3331 North First Street ∙ San Jose, CA 95134-1927 ∙ Administration 408.321.5555 ∙ Customer Service 408.321.2300
Policy-Related Action: No Government Code Section 84308 Applies: No
ACTION ITEM
RECOMMENDATION:
Approve the List of Projects received from VTA's Call for Projects and direct staff to submit the
complete list to the Metropolitan Transpiration Commission for consideration of inclusion in the
Regional Transportation Plan.
BACKGROUND:
As the Congestion Management Agency (CMA) for Santa Clara County, VTA is in the process
of developing the countywide, long-range transportation plan: Envision Silicon Valley. This will
be an update to the Valley Transportation Plan (VTP) 2040 adopted by the VTA Board of
Directors in October 2014. Envision Silicon Valley provides a framework for transportation
investment decisions and a process to develop our vision for transportation in Santa Clara
County - including identifying potential federal, state and regional funding for projects as well as
a potential sales tax in November 2016. The projects contained within Envision Silicon Valley
will also serve as VTA’s input to the Regional Transportation Plan (RTP). The next RTP is
scheduled for adoption by the Metropolitan Transportation Commission (MTC) in summer 2017.
DISCUSSION:
In May 2015, VTA issued a Call-for-Projects to identify new transportation projects and provide
updated information for projects currently in VTP 2040. The Call-for-Projects was set to
coincide with MTC's schedule for the RTP and was issued to city, town and county governments
in Santa Clara County, as well as other relevant agencies such as Caltrans. Members of the
public were also encouraged to submit applications as part of the call-for-projects.
12
Page 2 of 4
This memorandum presents the complete list of projects and programs that were submitted to
VTA (Attachment A). Per MTC's requirements, VTA is required to submit this initial list of
projects by October 2015. The preliminary list of projects will also be presented to VTA
Committees in September and four public meetings will be held throughout Santa Clara County.
Over the next several months, VTA will be working through the Envision Silicon Valley process
to evaluate the projects using Board-adopted Goals and Criteria. Through this process we will
determine which of these projects and programs would be best suited for a potential sales tax
measure and which projects would be strong candidates for state, local and regional funding
sources. Throughout this process, staff will be working with our stakeholders, advisory
committees and the public.
Below is a timeline of events for the development of Envision Silicon Valley (subject to change).
August 31, 2015 Call for Projects Due
September 2015 VTA holds Open Houses for Preliminary Project List
October 2015 VTA Board adopts Preliminary Project List
Fall 2015 VTA Evaluates Preliminary Envision Project List
Early 2016 VTA Refines Envision Project List
Summer 2016 VTA Prepares Ballot Measure
ALTERNATIVES:
The Board may choose an alternative list of projects for submittal to MTC.
FISCAL IMPACT:
There is no direct financial impact to the approval and submittal of the list of projects to MTC.
However, projects must be included in the RTP in order to receive federal, state, regional and
local discretionary fund programming.
ADVISORY COMMITTEE DISCUSSION/RECOMMENDATION:
Citizens Advisory Committee (CAC)
The CAC received the item and approved it to move forward to the Board.
Bicycle Pedestrian Advisory Committee (BPAC)
Committee members were concerned that the list of projects has duplicate projects on it, overall
and within the categories. Committee members expressed concern that projects which appear to
be bicycle and pedestrian related are in different categories. Multiple members were uneasy with
forwarding the list to the Board as it was presented to BPAC because of missing items and
duplicate items.
12
Page 3 of 4
Dawn Cameron, from County Roads and Airports, mentioned that two County projects are not
on the list but should be added to it.
Member Simons is worried that the projects are not supported by the public and voters.
A member of the public inquired if the preliminary project list will be available on the Envision
Silicon Valley website because he was unable to find it when he looked.
Technical Advisory Committee (TAC)
Member Batra stated that the deadline for project submittal was before their council meeting.
They received comments from public and their council to add more projects. The additional
proposed project is pedestrian overcrossing connecting Santana Row to Valley Fair Mall. John
Ristow replied that staff will add the project to our list, but we have time till the September 25th
Board of Directors workshop to clean the list.
Member Chiu requested to add Los Atos Hills missing projects; the ones that are already in VTP
list. Ex-Officio Nick Saleh, from Caltrans, mentioned the list is a good size of project list.
Caltrans has some more projects that they would like to add.
Member Batra asked if for pavement projects cities should submit it or should Caltrans. He was
referring to re-pavement of El Camino Real. John Ristow replied that BRT is in the list and has
all components of ECR improvements including re-pavement. But state highway maintenance is
not added to VTP and Caltrans addresses those improvements in the SHOPP fund.
Member Lightbody mentioned the process was unclear and inconsistent about road maintenance.
John Ristow replied that staff added the estimated pavement & non pavement need to the project
list/ the entire amount as a program, which totals approximately $7 billion.
Policy Advisory Committee (PAC)
Committee member discussed the process for Envision and stated there was some confusion to
the process. Staff responded that the ballot measure will be part of the countywide long range
transportation planning effort. The project list is a submittal to the MTC and is preliminary in
nature.
Member Miller asked how the project list be narrowed down from an estimated $50 Billion.
Staff responded the criteria adopted by the Board will be used as well as input from our
stakeholder groups and advisory committees.
Member Wasserman requested that project descriptions be included to give a better sense of the
scale and scope of the projects on the list. He also noted that the proportion of transit
improvements on the list is more than half of the requested projects.
Member Chang questioned the projects related to Express Lanes stating his opposition to those
projects, especially on SR 85. Member Jensen opined that there is a Los Gatos Interchange
project on SR 17 that the City Council did not want to pursue and questioned why that is on the
list. Staff responded that projects came from all sponsors, including Caltrans.
12
Page 4 of 4
The list moved forward to the Board with two no votes that stated that the project list is accepted
as complete based on revisions from staff, that no one member of the committee endorses a
particular project at this stage, and the committee reserves the right to make additional edits as
the process moves forward.
STANDING COMMITTEE DISCUSSION/RECOMMENDATION:
The Congestion Management Program & Planning Committee heard this item at their September
17, 2015 meeting.
Members noted that VTA staff needs to be clear in their communications on Envision and voiced
concern that there may be some confusion between the preliminary project list, the regional
transportation plan and a potential sales tax measure. Members also noted that it is important that
VTA keeps promises with the public from previous measures.
Members also directed staff to ensure that they are working with elected officials on Envision as
they hear regularly from their constituents about transportation issues. It was also recommended
that staff look into “conjoint analysis” and other innovative processes to help with trade-off
discussions.
Members unanimously recommended that the Board approve the list of projects and to submit
the complete list to the Metropolitan Transportation Commission for consideration of inclusion
in the Regional Transportation Plan. The committee also directed staff to; (a) distinguish the
process for the regional transportation plan update and the potential sales tax measure; (b) be
innovate in analyzing priorities and consider implementing processes such as “conjoint analysis”
for future trade-off discussions; (c) engage public officials in the determination of priorities; and
(d) bring future Envision Silicon Valley updates to the committee for discussion.
Prepared by: John Sighamony
Memo No. 5156
ATTACHMENTS:
Attachment A for Committees (PDF)
12
ENVISION SILICON VALLEY PRELIMINARY PROJECT LISTS
PROGRAM AREAS (IN $ MILLIONS)
HIGHWAY $11,085.0 M
TRANSIT $21,593.6 M
EXPRESSWAYS* $1,362.2 M
LOCAL STREETS AND ROADS $10,908.6 M
LOCAL OPERATION SYSTEMS $608.1 M
PEDESTRIAN AND BICYCLE $2,208.6 M
TOTAL $47,766.1 M
*Some Expressway Projects are captured in the Highway Project List.
ENVISION SILICON VALLEY PROJECT LIST
ATTACHMENT A
1
#NEW VTP
ID Route Project Title
Cost ($M) in
2017 1 E017-01 SR 17 SR 17 Express Lanes: I-280 to SR 85 32$
2 E085-01 SR 85 SR 85 Express Lanes: US 101 (South San Jose) to Mountain View 181$ 3 E087-01 SR 87 SR 87 Express Lanes: SR 85 to US 101 38$ 4 E101-01 US 101 US 101 Express Lanes: Whipple Ave. in San Mateo County to Cochrane Rd. in Morgan Hill. 465$ 5 E101-02 US 101 US 101 Express Lanes: Cochrane Rd. to Masten Ave. 116$ 6 E101-03 US 101 US 101 Express Lanes: Masten Ave. to 10th St. 73$ 7 E101-04 US 101 US 101 Express Lanes: 10th St. to SR 25 54$ 8 E237-01 SR 237 SR 237 Express Lanes: North First St. to Mathilda Ave. 26$ 9 E237-02 SR 237 SR 237 Express Lanes: Mathilda Ave. to SR 85 87$ 10 E280-01 I-280 I-280 Express Lanes: US 101 to Leland Ave. 27$ 11 E280-02 I-280 I-280 Express Lanes: Leland Ave. to Magdalena Ave. 63$ 12 E280-03 I-280 I-280 Express Lanes: Magdalena Ave. to San Mateo County Line 95$ 13 E680-01 I-680 I-680 Northbound Express Lane: Calaveras Blvd. to Alameda County Line 39$ 14 E680-02 I-680 I-680 Express Lanes: Calaveras Blvd. to US 101 40$ 15 E880-01 I-880 I-880 Express Lanes: Alameda County line to US 101 25$ 16 E880-02 I-880 I-880 Express Lanes: US 101 to I-280 201$ 17 H000-01 All Noise Abatement Program (Countywide) 50$
18 H000-02 All Hwy. Transportation Operations System/Freeway Performance Initiative Phase 1 & 2 54$ 19 H017-01 SR17 SR 17/SR 9 Interchange Improvements 15$ 20 H017-02 SR 17 SR 17 Widening (Lark Ave. to South of SR 9) 35$ 21 H017-03 SR 17 SR 17 Southbound/Hamilton Ave. Off-Ramp Widening 2$ 22 H017-04 SR 17 SR 17/San Tomas Expressway Interim Improvements (Tier 1 Exp Plan 2040) 2$
23 H085-01 SR 85 SR 85 Northbound to Eastbound SR 237 Connector Ramp and Northbound SR 85 Auxiliary Lane 35$
24 H085-02 SR 85 SR 85/El Camino Real Interchange Improvements 25$
25 H085-03 SR 85 SR 85 Noise Abatement Pilot Projects 8$
26 H085-04 SR 85 SR 85 Noise Abatement Project (from SR 87 to I-280) 17$
27 H085-05 SR 85 SR 85/Saratoga Ave. On/Off-ramps Landscaping 1$
28 H085-06 SR 85 SR 85/I-280 Interchange HOV Connectors (from south SR 85 to/from north I-280) 30$
29 H085-07 SR 85 SR 85/I-280/Homestead Rd. Interchange Improvements 30$
30 H085-08 SR 85 SR 85/Winchester Blvd. Interchange Study 1$ 31 H087-01 SR 87 SR 87/Capitol Expressway/Narvaez Ave. Interchange Improvements 13$ 32 H087-02 SR 87 SR 87 Technology-based Corridor Improvements 40$ 33 H101-01 US 101 US 101/Oregon Expressway/Embarcadero Rd. Improvements 59$
34 H101-02 US 101 US 101 Interchanges Improvements: San Antonio Rd. to Charleston Rd./Rengstorff Ave. 35$
35 H101-03 US 101 US 101/Shoreline Blvd. Interchange Improvements 15$
36 H101-04 US 101 US 101/Moffett Blvd. Interchange Improvements 75$ 37 H101-05 US 101 US 101 Southbound Auxiliary Lane Improvement Between Ellis St. and SR 237 4$
38 H101-06 US 101 US 101 Southbound Auxiliary Lane: Great America Pkwy. to Lawrence Expressway 3$ 39 H101-07 US 101 US 101/Montague Expwy. Interchange Improvements 28$
40 H101-08 US 101 US 101 Southbound/Trimble Rd./De La Cruz Blvd./Central Expwy. Interchange Improvements 50$
41 H101-09 US 101 Double Lane Southbound US 101 off-ramp to Southbound SR 87 2$ 42 H101-10 US 101 US 101/Zanker Rd./Skyport Dr./Fourth St. Interchange Improvements 138$
43 H101-11 US 101 US 101/I-880 Interchange Improvements 1,000$ 44 H101-12 US 101 US 101/Old Oakland Rd. Interchange Improvements 25$ 45 H101-13 US 101 US 101/Mabury Rd./Taylor St. Interchange Construction 70$ 46 H101-14 US 101 US 101/Hellyer Ave. Interchange Improvements 17$ 47 H101-15 US 101 US 101/Blossom Hill Rd. Interchange Improvements 25$ 48 H101-16 US 101 US 101/Buena Vista Ave. Interchange Improvements 35$ 49 H101-17 US 101 US 101/SR 152/10th St. Ramp and Intersection Improvements 11$
50 H101-18 US101 South County US 101 Ramp Metering 72$ 51 H101-19 US101 US 101 NB/SB Auxiliary Lanes - 10th St. to Leavesley Rd. 45$ 52 H101-20 US 101 US 101/N. Fair Oaks Ave. Interchange Reconstruction 32$
53 H101-21 US 101 US 101/Great America Pkwy SB off-ramp Improvements 10$
54 H152-01 SR 152 New SR 152 Re-Alignment (US 101 to I-5) 1,120$
55 H237-01 SR 237 SR 237/El Camino Real/Grant Rd. Intersection Improvements 5$
56 H237-02 SR 237 SR 237 Westbound to Southbound SR 85 Connector Ramp Improvements (Including SR 85 Auxiliary Lanes between El Camino Real and SR 237) 43$
57 H237-03 SR 237 SR 237 Westbound On-Ramp at Middlefield Rd. 14$
58 H237-04 SR 237 SR 237/Mathilda Ave. and US 101/Mathilda Ave. Interchange Improvement 40$ 59 H237-05 SR 237 SR 237 Eastbound Auxiliary Lanes: Mathilda Ave. to Fair Oaks Ave. 8$ 60 H237-06 SR 237 SR 237/Great America Pkwy. WB off-ramp Improvements 13$ 61 H237-07 SR 237 SR 237/North First St. Interchange Improvements 3$
62 H237-08 SR 237 SR 237 Westbound/Eastbound Auxiliary Lanes (N. First St to Coyote Creek, and Zanker Rd. to N. First St.) 17$
63 H280-01 I-280 I-280 Northbound: Second Exit Lane to Foothill Expressway 3$
HIGHWAY PROJECT LIST
ATTACHMENT A
2
#NEW VTP
ID Route Project Title
Cost ($M) in
2017
64 H280-02 I-280 I-280 Northbound Braided Ramps between Foothill Expressway and SR 85 47$
65 H280-03 I-280 I-280/Stevens Creek Blvd./Lawrence Expwy.Interchange Improvements (Tier 2 Exp Plan 2040) 120$
66 H280-04 I-280 I-280/De Anza Blvd. Interchange Improvements 60$
67 H280-05 I-280 I-280/Wolfe Rd. Interchange Improvements 85$
68 H280-06 I-280 I-280/Saratoga Ave. Interchange Improvements 50$ 69 H280-07 I-280 I-280/Winchester Blvd. Interchange Improvements 90$ 70 H280-08 I-280 I-280/Leigh Ave./Leland Ave. Interchange Improvements 95$ 71 H280-09 I-280 I-280 Soundwalls - from Robelda Rd. in Los Altos to South 11th St. in San Jose 25$ 72 H280-10 I-280 I-280 Downtown Access Improvements between 3rd St. and 7th St. 31$ 73 H280-11 I-280 I-280/Senter Rd. Interchange 54$
74 H280-12 I-280 I-280/San Tomas Expressway New Interchange 50$ 75 H280-13 I-280 Northbound I-280 Connector from Stevens Creek Blvd. 50$ 76 H280-14 I-280 I-280/Foothill Expressway Interchange Modifications (Tier 1 Exp Plan 2040) 5$
77 H280-15 I-280 I-280/Oregon-Page Mill Road Interchange Improvements (Tier 1 Exp Plan 2040) 21$
78 H280-16 I-280 I-280/Bird Interchange Improvements 8$
79 H680-01 I-680 I-680/Jacklin Rd. Interchange Improvements 3$
80 H680-02 I-680 I-680/Calaveras Blvd. Interchange Improvements 30$
81 H680-03 I-680 I-680/Montague Expwy. Interchange Improvement (Tier 2 Exp Plan 2040) 30$
82 H680-04 I-680 I-680/Capitol Ave. Interchange Improvements 8$
83 H680-05 I-680 I-680/Hostetter Rd. Interchange Improvements 10$
84 H680-06 I-680 I-680/Berryessa Rd. Interchange Improvements 40$
85 H680-07 I-680 I-680 Auxiliary Lanes (Berryessa Rd. to McKee Rd.) 20$
86 H680-08 I-680 I-680/Alum Rock Ave./McKee Rd. Interchange Improvements 40$
87 H680-09 I-680 I-680 Auxiliary Lanes (Capitol Expwy. to Berryessa Rd.) 20$
88 H680-10 I-680 I-680 Soundwalls - Jackson Ave. in San Jose to Hostetter Rd. in Milpitas 10$
89 H680-11 I-680 I-680/Capitol Expwy./Jackson Ave. Interchange Improvements 50$
90 H680-12 I-680 I-680 Soundwalls - Capitol Expwy. to Mueller Ave. in San Jose 6$
91 H680-13 I-680 I-680/King Rd. Interchange Improvements 40$
92 H880-01 I-880 I-880/Montague Expwy. Interchange Improvement 18$
93 H-NEW N/A Santa Cruz Toll Corridor Tunneled Highway with Light Rail 5,031$
11,085$
HIGHWAY PROJECT LIST
ATTACHMENT A
3
Agency # Project Title COST ($M) in 2017
Campbell 1 Implementation of Future Mass Transit Needs for Santa Clara County 25.0$
2 Comprehensive Systems Study for Future Mass Transit in Santa Clara County1.0$
3 Future Mass Transit Needs for Santa Clara County810.0$
4 Transit Stop Enhancements 9.0$ 5 Tri-School Area Shuttle Service 1.1$
6 Cupertino Bus/Shuttle Service Expansion 2.2$
7 South County Commuter Rail service enhancements 19.0$
8 CaHSR Station at Downtown Gilroy Transit Center201.0$
Los Altos 9 Future Mass Transit Needs for Santa Clara County Study 2.5$ Morgan Hill 10 Expand Loading Platform at Caltrain Station 0.4$
11 Study of Mass Transit Needs for Santa Clara County 25.0$
12 Implementation Funding for Future Mass Transit Investments in Santa Clara County750.0$
13 Reversible Transit Lane on Shoreline Boulevard13.5$
14 Downtown Transit Center Improvements 126.2$ 15 Future Mass Transit Needs for Santa Clara County Study 25.0$ 16 Palo Alto Shuttle Project 22.0$ 17 Caltrain Quiet Zones 5.0$
18 Caltrain Grade Crossings - Safety Improvements (Fencing) 1.3$ 19 Caltrain Grade Crossings - Safety Improvements (Camera Intrusion Detection System) 0.7$ 20 Palo Alto Inter-model Transportation Center (PAITC) 50.0$ 21 Implement North San Jose Transit Improvements 39.0$ 22 West San Carlos Light Rail Station 12.1$
23 Implement Mineta San Jose International Airport APM connector 70.2$
Saratoga 25 City of Saratoga Senior Transportation Program0.5$
26 Downtown San Jose Double Track 57.2$
27 VTA Transportation Demand Management Development Grant Program150.0$
28 SVRT Phase II (San Jose to Santa Clara) 4,700.0$
29 Upgraded Santa Clara Great America Intermodal Station200.0$
30 Caltrain Railroad Maintenance (Santa Clara County Share) 419.0$
31 Caltrain Santa Clara County Station Area Enhancements 42.0$
32 Caltrain System Performance and Reliability (Santa Clara County Share) 58.0$
33 Caltrain Modernization (CalMod 2.0)214.0$
34 ACE Operations (Santa Clara County Share) 127.7$
35 ACE Alviso Wetlands Doubletrack 156.0$ 36 New Grade Separations 150.3$ 37 Express Bus Countywide Expansion 500.2$ 38 Tasman West Reconstruction 150.3$ 39 North Bayshore Light Rail 430.3$ 40 Light Rail Vehicle replacement 500.2$ 41 LRV additional vehicle purchase 87.5$ 42 Guadalupe Rail Yard Improvements 148.0$ 43 De Anza to East San Jose Light Rail 949.1$ 44 Alviso to Blossom Hill DMU service 530.0$
San Jose
Palo Alto
VTA
Gilroy
Mountain View
Cupertino
TRANSIT PROJECT LIST
ATTACHMENT A
4
Agency # Project Title COST ($M) in 2017
45 Winchester Line Double Tracking and Platform 90.2$
46 North First Street light rail speed Improvements10.5$
47 New bus yard (250 buses) 240.0$ 48 Park & Ride Improvements 144.0$ 49 Affordable fares 60.0$ 50 Bus Stop Improvements 60.0$ 51 Fast and Reliable Bus Network 250.0$ 52 Enhance Frequent Core Bus Network 2,143.0$ 53 Frequent Core Bus Network 502.0$ 54 Reconstruct Mountain View Transit Center 503.6$ 55 Bus Facility Upgrades at Cerone and Chaboya 234.5$
56 De Anza College Transit Center 52.8$ 57 Downtown San Jose Subway 996.9$
58 Extend ligh-rail transit from Winchester Station to Route 85 (Vasona Junction) 176.0$
59 Extend Capitol Expressway light rail to Eastridge Transit Center - Phase II 293.0$
60 Implement El Camino Rapid Transit Project 275.5$
61 Implement Stevens Creek Rapid Transit Project 196.0$
62 Extend BART to Berryessa (includes environmental, preliminary engineering, property acquisition and construction phases) 3,226.5$
63 Santa Cruz Metro Bus Purchase (VTA Share) 6.6$
64 Express Bus Highway Stations 305.0$
Outreach 65 Senior Transportation Mobility Management (STAR) Program 46.0$ 21,593.6$
VTA
TRANSIT PROJECT LIST
ATTACHMENT A
5
Agency # Project Title COST ($M) in 2017
Campbell 1 Widen San Tomas Expressway to 8 Lanes from Stevens Creek Blvd to Campbell Ave 40.0$ 2 Montague Expressway / Trimble Road Flyover 49.0$
3 Widen Montague Expressway to 8-lanes for HOV lanes between Lick Mill and Trade Zone boulevards and on Guadalupe River Bridge and Penitencia Creek Road 17.0$
4 Widen Montague Expressway between Trade Zone and I-680 16.0$ 5 Montague Expressway & McCarthy/O'Toole Interchange Improvements 48.0$ 6 San Tomas Expwy: Widen from Moorpark to Homestead 51.1$
7 Foothill Expressway at Magdelena/Springer Intersection Improvements (Tier 2 Exp Plan 2040) 2.0$
8 Montague Expressway widening between Trade Zone and Main/Oakland (Tier 1 Exp Plan 2040) 2.1$
9 Montague Expressway Widening Between Great Mall to Trade Zone (Tier 1 Exp Plan 2040) 6.2$
10 Foothill Expressway widening between El Monte and San Antonio (Tier 1 Exp Plan 2040) 2.3$
11 Montague Expressway at Mission College Boulevard Intersection (Tier 2 Exp Plan 2040) 18.0$
12 San Tomas Expressway at Scott Boulevard Intersection Improvements (Tier 2 Exp Plan 2040) 2.0$
13 Grade Separation at Central Expressway & Moffett/Castro & Caltrain Tracks (Tier 1 Exp Plan 2040) 150.0$
14 Central Expressway at Bowers Ave Intersection Interim Improvement (Tier 2 Exp Plan 2040) 2.0$
15 Central Expressway Auxiliary Lanes between Lawrence and Mary (Tier 2 Exp Plan 2040) 20.3$ 16 Capitol Expressway Widening from I-680 to Capitol Avenue (Tier 1 Exp Plan 2040) 12.1$ 17 Widen Lawrence Expressway between Moorpark and I-280 (Tier 2 Exp Plan 2040) 7.8$
18 Lawrence Expressway at Moorpark/Bollinger Intersection Improvements (Tier 2 Exp Plan 2040) 1.8$
19 Almaden Expressway at SR-85 - Interim Improvements (Tier 1 Exp Plan 2040) 0.5$
20 Lawrence Expressway at Saratoga Avenue Intersection Improvements (Tier 2 Exp Plan 2040) 2.0$
21 Almaden Expressway at Branham Lane Intersection Improvement (Tier 1 Exp Plan 2040) 0.7$ 22 Almaden Expressway Widening (Tier 2 Exp Plan 2040) 10.7$
23 Almaden Expressway at Camden Ave intersection improvements (Tier 1 Exp Plan 2040) 2.7$ 24 Central Expressway at Thompson (Tier 1 Exp Plan 2040) 0.5$
25 Lawrence Expressway at Homestead Road Interim Improvements (Tier 1 Exp Plan 2040) 2.7$ 26 Lawrence Expressway right-in/out closures (Tier 2 Exp Plan 2040) 1.5$
27 Lawrence Expressway at Homestead Road Grade Separation (Tier 1 Exp Plan 2040) 100.0$
28 Lawrence Expressway from Reed/Monroe to Arques Grade Separation (Tier 1 Exp Plan 2040) 440.0$
29 Montague Expressway widening between Main/Oakland and McCarthy/O'Toole (Tier 1 Exp Plan 2040) 35.2$
30 San Tomas Expressway Widening between Homestead and Stevens Creek (Tier 1 Exp Plan 2040) 42.0$
31 Santa Teresa-Hale Corridor widening (Tier 1 Exp Plan 2040) 8.4$
33 Oregon-Page Mill widening between I-280 and Foothill Expressway (Tier 1 Exp Plan 2040) 23.5$
34 Oregon-Page Mill intersection improvements (Tier 1 Exp Plan 2040) 2.7$
35 Oregon-Page Mill/El Camino Real (Tier 1 Exp Plan 2040) 2.4$ 37 Santa Teresa-Hale Corridor Extension (Tier 1 Exp Plan 2040) 13.8$
38 Santa Teresa/Hale Corridor various intersection improvements (Tier 2 Exp Plan 2040) 2.5$
39 Santa Teresa direct connection between Sunnyside and DeWitt (Tier 2 Exp Plan 2040) 8.1$ 41 LRT grade separation at Montague Expressway/First Street (Tier 2 Exp Plan 2040) 95.0$
42 Grade separate Caltrain tracks from Rengstorff Ave at Central Expressway (Tier 1 Exp Plan 2040) 120.0$
1,362.6$
San Jose
Santa Clara County
EXPRESSWAY PROJECT LIST
ATTACHMENT A
6
Agency # Project Title COST ($M) in 2017
1 Dell Avenue Area Improvements 4.0$ 2 Campisi Way Improvements 2.0$ 3 Citywide Sidewalk Gap Closure 7.0$
4 McClellan Road Bridge Replacement 6.0$ 5 Citywide ADA curb ramp improvements 4.0$
6 Stevens Creek Blvd Bridge Replacement over Stevens Creek 8.0$
7 Extend Buena Vista Avenue from Santa Teresa Boulevard to Monterey Road 10.0$
8 IOOF Ave US101 Overcrossing16.9$
9 Tenth Street Bridge over Uvas Creek16.3$
10 Las Animas Ave US 101 Overcrossing10.8$
12 Old Gilroy Street "Community Access" US101 Overcrossing12.2$
13 Maple Ave. Overcrossing 30.0$
14 El Monte Avenue Street Resurfacing Project 2.1$
15 Fremont Avenue Street Resurfacing 1.3$
16 Blossom Hill Road South Side (Union Avenue to Regent Drive) 2.0$
17 HWY 9 @ North Santa Cruz Avenue2.0$
18 Lark Avenue Improvements from HWY 17 to Los Gatos Blvd 4.0$
19 Blossom Hill Road Widening @ HWY 1710.0$
20 Lark Avenue Widening from Winchester Blvd. to HWY 17 3.0$ 21 Los Gatos-Almaden Road Improvement from Los Gatos Boulevard to National Avenue 4.0$
22 Los Gatos Boulevard Improvement from Lark to Samaritan Drive 4.0$
23 Los Gatos Boulevard and Lark Avenue Intersection improvements 1.2$
24 Los Gatos Blvd and Samaritan Drive Intersection Improvements1.0$
25 Pollard Road Improvements from York to Knowles Drive 2.0$
26 Union Avenue Improvements from Blossom Hill Road to Los Gatos-Almaden Road 3.0$
27 Wedgewood Avenue improvements from Granada to Wimbledon 3.0$
28 Winchester Blvd. Improvements from Daves Ave to Lark4.0$
29 Blossom Hill Road (BH Park to Union) Improvement Project 3.0$
30 Dixon Landing Road/Milpitas Blvd. Intersection Improvements 4.0$
31 Widen Calaveras Boulevard overpass from 4-lanes to 6-lanes 85.0$
32 Monterey Road Corridor Safety Improvements 2.4$
33 Depot Street Realignment 1.3$ 34 Butterfield Blvd. North Extension 1.1$
36 Castro Street/Moffett Boulevard/Central Expressway Intersection Improvements2.0$
37 San Antonio Road Interchange / Charleston Road Connection 101.0$ 38 San Antonio Ramp to Southbound Central Expressway (Tier 2 Expressway Study) 31.8$ 39 Castro Street/Moffett Boulevard Closure/Grade Separation 150.0$
40 Mountain View Rengstorff Avenue Railroad Grade Separation 150.1$
41 Shoreline Boulevard Transportation Corridor Improvements Full Build Out 10.2$ 42 Caltrain Grade Separation - Charleston and Meadow 527.0$ 43 Caltrain Grade Separation - Churchill 196.0$ 44 Charleston Road / Arastradero Road Corridor Improvements 10.0$
Palo Alto
Milpitas
Campbell
Cupertino
Los Altos
Los Gatos
Morgan Hill
Mountain View
Gilroy
LOCAL STREETS AND ROADS PROJECT LIST
ATTACHMENT A
7
Agency # Project Title COST ($M) in 2017
45 Chynoweth/Thornwood Extension from Almaden Expwy to Winfield 21.0$ 46 Widen Zanker Road from 4-lanes to 6-lanes 67.0$ 47 Alum Rock Falls over Penitencia Creek Bridge Replacement 32.0$
48 Implement improvements to the North First Street Core Area grid 93.0$ 49 Senter Road Widening from Umbarger to Lewis 8.0$
50 Widen Oakland Road from 4-lanes to 6-lanes between U.S. 101 and Montague Expressway 15.0$ 51 Implement miscellaneous intersection improvements in North San Jose 44.0$ 52 Widen Brokaw Bridge over Coyote Creek 29.0$ 53 Santa Clara Street at Coyote Creek Bridge Replacement 33.0$
54 Extend Charcot Avenue over I-880 35.0$ 55 Highwood Drive over North Babb Creek Bridge Replacement 11.0$ 56 City of San Jose General Plan Local Streets Improvements 13.0$ 57 Downtown Couplet Conversions 27.6$
58 South Bascom Complete Streets from Parkmoor to Southwest $ 33.0
59 East Santa Clara Complete Streets from 7th St to 17th St $ 7.0
60 Winchester Blvd. Road Diet and Pedestrian and Bicycle Facilities Improvements from 1-280 to City Limit $ 3.5
61 Stevens Creek Blvd. Complete Street Improvements from I-880 $ 15.0
62 West San Carlos Streetscape and Pedestrian Improvements $ 16.2
63 San Jose Vision Zero Priority Safety Corridor Improvements $ 38.0
64 Noble Avenue Bridge over Penitencia Creek 28.0$ 65 O'Connor Drive Bridge over Forest Avenue 34.0$
66 King Road Bridge Replacement and Widening at Penitencia Creek 20.0$ 67 Chynoweth/Monterey Rd/UPRR Grade Separation Project 43.0$ 68 Widen Coleman Avenue from 4-lanes to 6-lanes between I-880 and Taylor Street 17.0$
69 Extend Autumn Parkway from Julian Street to San Carlos Street and implement improvements from St. John Street to Park Avenue 45.0$
70 Almaden Road Improvement from Malone Road to Curtner Avenue 8.0$ 71 San Carlos Street Bridge Replacement and Widening 37.1$ 72 Branham/Snell/Chynoweth Area Roadway Improvements 21.0$ 73 Construct Caltrain grade separation at Skyway 43.0$
74 Construct Caltrain grade separation at Branham Lane 40.0$ 75 Umbarger Rd./Barberry Ln. Overcrossing at US 101 38.0$ 76 Holly Hill Dr./Havana Dr. Overcrossing at US 101 38.0$ 77 Thomas Rd./Kenneth St./Alfred St. Overcrossing at US 101 40.0$ 78 I-680/Mather Dr. and Muller Ave. Overcrossing 30.0$ 79 I-680/Madden Ave. Overcrossing 30.0$ 80 I-680/Mabury Rd. Overcrossing 20.0$ 81 Landscape Improvements at Santa Clara Gateways 15.0$ 82 Widen intersection at El Camino Real/Lafayette Street 1.0$
83 Implement capacity increasing improvements at the intersection of Great America Parkway/Mission College Boulevard 8.3$
84 Intersections and improve sidewalks throughout the city of Sunnyvale 18.0$ 85 Sunnyvale Downtown Specific Plan Transportation Improvements 17.0$
86 Extend Mary Avenue north across Route 237 78.0$
87 Realign Wildwood Avenue to connect with Lawrence Expressway (includes new traffic signal at Lawrence Expressway/Wildwood Avenue intersection) 7.0$
88 Mary Avenue Rail Road Grade Separation 80.0$
89 Sunnyvale Avenue Rail Road Grade Crossing 100.0$
90 Watsonville Rd. Center Turn Lane 8.1$
91 Center Ave & Marcella Ave Two-lane connection & new bridge 3.4$ 92 Marcella Ave. Two-Lane Realignment 7.0$ 93 Railroad Crossing Improvements at Church Ave. and Monterey Hwy. 0.8$ 94 DeWitt Ave/Sunnyside Ave realignment at Edmundsen Ave 7.7$ 95 Fitzgerald Ave/Masten Ave realignment at Monterey Hwy 0.7$ 96 Hill Rd. Extension from East Main Ave. to Peet Rd. 9.5$ 97 Rural Road Safety Program 25.0$ 98 Santa Clara Countywide Pavement Management Program 7,000.0$ 99 Lawrence Expressway Multimodal Grade Separated Toll Corridor 1,000.0$
10,908.6$
VTA
Santa Clara
Sunnyvale
Santa Clara County
San Jose
LOCAL STREETS AND ROADS PROJECT LIST
ATTACHMENT A
8
Agency # Project Title COST ($M) in 2017
1 Reactivation of Traffic Count Stations 0.1$ 2 Winchester Blvd. Intelligent Transportation System Phase 2 0.2$ 3 ATMS Enhancements 0.0$ 4 Downtown Flashing Beacon Systems 0.3$ 5 Adaptive Pedestrian Detection Systems 0.2$ 6 Winchester/Latimer Signal Modification 0.1$ 7 Hamilton/Central Signal Modification 0.2$ 8 Hamilton/April Signal Modification 0.2$ 9 Traffic Operations Center Upgrade 0.5$ 10 Citywide Advanced Traffic Management System Implementation 0.5$
11 Citywide traffic monitoring camera expansion 0.2$
12 Citywide traffic signal retiming and coordination 0.3$
13 De Anza Blvd Advanced Traffic Management System 0.6$
14 Citywide ADA Pedestrian Signal Upgrades 1.0$
15 Miscellaneous Citywide Traffic Signal Upgrades 10.0$
16 Flood Watch Camera System (iNet Phase 3) 0.7$
17 Adaptive traffic signal control system (iNet Ph 1) 1.2$
18 Gilroy Downtown Parking Guidance/Event Management System1.2$
19 Traffic Signal System Upgrade (iNet Ph 2)5.0$
20 ITS Enhancements on Santa Teresa Blvd 2.6$
21 SR 152 (First Street) Signal System Upgrade for complete streets and "Caltrans Main Street" candidate street conversion. 3.0$
22 Downtown and 10th Street Corridor Signal Upgrades2.0$
23 Downtown Parking Management System0.5$
24 Gilroy Signal Upgrades 1.3$
25 Community Bus Signal Pre-emption 0.6$
Los Altos 26 Advanced Traffic Management System
5.0$
27 Los Gatos Traffic Signal and Information System4.0$
28 Traffic Corridor Study Project1.0$
29 South Milpitas Blvd. SMART Corridor 0.6$ 30 Citywide Adaptive Bicycle and Pedestrian Timing 0.6$ 31 Citywide video detection/monitor 0.8$
Monte Sereno 32 SR-9 Traffic Signal Upgrades and Interconnect 1.0$ 33 Install adaptive signal technology at all locations 2.5$ 34 Arterial Intersection Efficiency Improvements 1.0$
35 Mountain View Citywide Traffic Signal Upgrade and IP Traffic Signal Access 5.0$
36 Rengstorff Avenue Adaptive Signal System 1.6$ 37 Palo Alto Downtown Parking Improvements 2.5$ 38 Citywide Traffic Signal CCTV/EV Preemption Project 1.4$ 39 Citywide traffic signal retiming and coordination 1.0$ 40 Palo Alto Downtown and Calif. Ave. Parking Supply and Management Program 10.0$ 41 San Jose Proactive Signal Retiming Program $ 60.0 42 San Jose Transportation Communications Network Enhancements $ 27.1 43 San Jose Traffic Signal System Upgrades $ 27.1 44 Silicon Valley ITS Program Upgrades $ 35.2 45 City of San Jose Red Light Running Enforcement Program $ 3.2 46 San Jose Emergency Vehicle Preemption System $ 10.8 47 Eastridge/Evergreen Area Advanced Traffic Management System $ 5.4 48 Saratoga/Moorpark Advanced Traffic Management System $ 5.4 49 San Jose Traffic Surveillance Video System Expansion $ 3.2 50 San Jose Multimodal Operations and Efficiency $ 21.6 51 San Jose Adaptive Traffic Management System $ 10.8 52 San Jose Accessible Pedestrian Signal System Upgrade $ 2.2 53 San Jose Traffic Signal Installation and Modification $ 17.9 54 Transportation Innovation Zone Infrastructure Enhancements $ 5.4 55 San Jose General Plan Technology Upgrades $ 12.6 56 First/Last Mile Trip Completion Alternatives $ 1.5 57 Streetlight Conversion to LED $ 37.9 58 Balanced Transportation Education Program $ 5.4 59 San Jose TMC System Integration $ 16.2 60 San Jose Coleman-Airport-Avaya Stadium Area Advanced Traffic Management System $ 5.4 61 San Jose Citywide Roadways Performance Monitoring System $ 10.8 62 San Jose Wayfinding Program $ 3.0
Palo Alto
San Jose
Mountain View
Campbell
Cupertino
Gilroy
Los Gatos
Milpitas
Morgan Hill
LOCAL OPERATION SYSTEMS PROJECT LIST
ATTACHMENT A
9
Agency # Project Title COST ($M) in 2017
63 Monroe Street @ Bellomy Street Signal Upgrade 1.0$ 64 Homestead Road @ Lincoln Street Signal Upgrade 1.0$ 65 Santa Clara Communications Network Upgrade 6.6$ 66 Santa Clara Traffic Signals Upgrade 5.5$ 67 Citywide Traffic Monitoring Cameras 3.0$ 68 Citywide Bicycle Detection 4.8$ 69 Citywide Pedestrian Signal Upgrades 4.2$ 70 Santa Clara Adaptive Traffic Signal System 7.2$ 71 Lafayette Street Reversible Lane Control Upgrade 3.6$ 72 North Santa Clara Event Management System 9.2$ 73 Video Detection System Upgrade 2.5$ 74 Travel Time Monitoring System 3.0$
75 Pedestrian Crosswalk Warning System 5.0$ 76 Traffic Signal Coordination Update 3.5$ 77 Traffic Signal Traffic Responsive Plan 5.0$ 78 Citywide Emergency Vehicle Preemption for Traffic Signals 3.0$
79 Herriman Ave/Saratoga Ave Traffic Signal Project0.4$
80 Verde Vista Ln. Traffic Signal0.4$
81 Citywide Accessible Pedestrian Signals0.4$
82 Advanced Adopted Traffic Management System (AATMS) and ITS Architecture Deployment3.0$
83 Install pedestrian countdown signals in Sunnyvale 0.2$ 84 Traffic Adaptive Signal Controller Update 4.0$ 85 Citywide CCTV Camera Deployment 1.3$ 86 Citywide Traffic Signal Controller Update 0.7$ 87 Citywide Count and Speed Monitoring Stations 1.2$ 88 ITS Communications Infrastructure $ 2.0 89 Traffic Management Center Integration 0.4$ 90 Emergency Preemption Receiver Installation 1.2$ 91 Traffic Signal Reconstruction to Downtown Streetscape Standards 2.3$ 92 Expressway ITS/Signal System (Tier 2 Exp Plan 2040) 68.0$
93 Expressway ITS/Signal System (Tier 1 Exp Plan 2040) 17.5$
94Countywide Freeway Traffic Operation System and Ramp Metering Improvements $ 30.1
95 Regional Transportation Operations Personnel Service $ 6.0
96 Regional ITS Maintenance Service $ 2.4 608.1$
VTA
Santa Clara
Saratoga
Sunnyvale
Santa Clara County
LOCAL OPERATION SYSTEMS PROJECT LIST
ATTACHMENT A
10
Agency # Project Title COST ($M) in 2017
1 Hamilton Avenue/Highway 17 Bicycle Overcrossing $ 4.0
2 Latimer Avenue Pedestrian Overcrossing $ 5.1
3 Ped/Bike Bridge over SR 17 from Railway/Sunnyside to Campbell Technology Pkwy $ 5.0
4 Bike Share Program $ 0.1
5 Los Gatos Creek Trail expansion on west side (Hamilton to Campbell) $ 2.5
6 San Tomas Aquino Creek Trail $ 1.8
7 San Tomas Expressway Bike/Ped Path $ 0.5
8 Bascom Avenue Great Streets Project $ 1.0
9 Citywide School Sidewalks $ 1.0
10 Downtown Pedestrian and Bicycle Enhancements $ 1.7
11 Harriet Avenue Sidewalks $ 0.8
12 Widen Los Gatos Creek Trail on east side(Camden to Campbell) $ 0.3
13 Hamilton Ave. Medians, Bicycle, and PedestrianEnhancements $ 1.8
14 Citywide Sidewalk Gap Closure $ 7.0
15 Stevens Creek Trail grade separation at Stevens Creek Blvd $ 3.0
16 Foothill Blvd Bike Lane and Sidewalk Improvements $ 0.5 17 Stevens Canyon Road Widening, Bike and Ped Improvements $ 10.0 18 Stevens Creek Trail Completion $ 16.0 19 Saratoga Creek Trail Extension: Lawrence Expressway to Mitty Way $ 8.1 20 Union Pacific Rail Trail $ 20.3
21 Bike/Ped Bridge Over UPRR Tracks Snyder-Hammond House $ 5.0
22 Citywide ADA Pedestrian Signal Upgrades $ 1.0
23 Bicycle Transportation Plan Implementation $ 10.0 24 Mary Avenue Complete Street Converstion $ 0.5 25 Citywide Class 1 Bikeway Network Implementation $ 10.0 26 Stelling Road Complete Street Project $ 0.5 27 Lions Creek Bike Trail (West of Kern to Day) $ 2.3
28 Lions Creek Trail (W of Santa Teresa – Christopher HS) $ 0.8 29 Northern Uvas Creek Trail (Gilroy Gardens Trail Extension) $ 2.3 30 West Branch Llagas Creek Trail $ 0.5 31 Southern Uvas Creek (Sports Park Bile Trail) $ 5.9 32 Lions Creek Trail (Kern Bridge Gap Closure) $ 1.4
33 Safe Routes to School/Complete Streets $ 2.4
34 Santa Teresa Expressway Bike Detection $ 2.7
35 Miramonte Avenue Bikeway Improvements $ 1.6 36 Stevens Creek Trail Link $ 3.5 37 Completing Bikeway Network-Other than Miramonte $ 1.6 38 Implementation of Los Altos Pedestrian Plan $ 13.1
39 Fremont Road Pathway Phase 2: Concepcion Road to Arastradero Road $ 0.9
40 Hale Creek Path Connecting to El Monte Road $ 0.5
41 El Monte Road: Stonebrook to Voorhees (Segment 4) $ 0.6
42 Blossom Hill Road Widening North Side (Union Ave. to Westhill Drive) $ 2.0
43 HWY 9 – Los Gatos Creek Connector $ 3.0
44 Highway 9 (HWY 17 to Los Gatos Blvd) Complete Streets $ 10.0 45 Knowles from Pollard to Winchester Complete Streets $ 2.0 46 Los Gatos Blvd. bike lane project from Camino Del Sol to Blossom Hill Road $ 3.0
Campbell
Cupertino
Gilroy
Los Altos
Los Gatos
Los Altos Hills
BICYCLE AND PEDESTRIAN PROJECT LIST
ATTACHMENT A
11
Agency # Project Title COST ($M) in 2017
47 Berryessa Creek Trail (Reach 4 - 6): Hillview Drive to San Jose City limits 6.9$
48 So. Milpitas Boulevard from Calaveras Boulevard to Montague Expwy Bicycle Path & Sidewalk on east side (1.5 miles) 29.0$
49 Berryessa Creek Trail (Reach 4 - 6): Hillview Drive to San Jose City limits $ 6.9
Milpitas/ VTA 50 Montague Expwy Bike/Ped Overcrossing at Milpitas BART Station 7.8$
51 Monterey Road Corridor Safety Improvements $ 2.4
52 Butterfield Linear Park Expansion $ 1.2
53 Coyote Creek Trail Connection $ 0.3
54 Pedestrian Rail Crossing Enhancements $ 2.0
55 Main Avenue Bike Lanes $ 0.2
56 SobratoHigh School Bike Access Improvements $ 0.5
57 West Little Llagas Creek Trail, Main Avenue to SpringAvenue $ 1.5
58 Stevens Creek Trail Reach 4 Segment 2: Dale/Heatherstone to Mountain View High School $ 17.2
59 Stevens Creek Trail: New Trailhead at Landels School $ 1.6
60 Permanente Creek Trail Extension Feasibility Study (Part II) $ 0.2
61 Shoreline Boulevard Pathway over Central Expressway and Railroad $ 2.4
62 Shoreline Boulevard Cycle Track -- Stierlin Road to Terra Bella $ 9.6
63 Shoreline Boulevard/US Route 101 Pedestrian/Bicycle Overcrossing $ 22.1
64 Permanente Creek Trail: Modification to Under-crossing at Amphitheatre Parkway $ 0.8
65 Mayfield Tunnel Ped/Bike under Central Expressway connecting to San Antonio Caltrain station $ 9.0
66 Old Middlefield Way Bike Lanes $ 0.7
67 Moffett Boulevard Bike Lanes $ 0.9
68 California Street Ped/Bike complete street implementation (including potential road diet) (Showers to Bryant_ $ 30.3
69 Shoreline Blvd. Ped/Bike Complete Street Implementation (including potential road diet) (El Camino Real to Montecito) $ 20.3
70 Escuela Ave. Ped/Bike complete street implementation (Latham to Crisanto) $ 11.2
71 Bernardo Bike/Ped Tunnel $ 10.2 72 Bay Area Bike Share 20 Stations in Mountain View $ 3.1
73 Permanente Creek Trail: Grade Separation at Charleston Road $ 4.6
74 Mountain View Stevens Creek Trail: Middlefield Road North Side Access $ 1.0
75 Palo Alto-Sunnyvale Bicycle Regional Connections $ 1.2
76 El Camino Real Bike Lanes $ 0.5
77 South Palo Alto Caltrain Pedestrian/Bicycle Grade Separation $ 13.0
78 California Avenue Caltrain Undercrossing $ 13.0
79 Palo Alto Transit Center/University Ave. Undercrossing $ 10.0
80 US 101 / Adobe Creek Pedestrian and Bicycle Over Crossing $ 13.0
81 Bicycle Boulevards Network Project $ 20.0
82 Enhanced Bikeways Project $ 20.0
83 Downtown Palo Alto Pedestrian Facility Upgrades $ 3.0
84 Matadero Creek Trail and Undercrossing at US 101 $ 7.0
85 Bike Share Expansion $ 11.0
86 Adobe Creek Reach Trail: West Bayshore Road to Louis Road $ 0.1
Milpitas
Morgan Hill
Mountain View
Palo Alto
BICYCLE AND PEDESTRIAN PROJECT LIST
ATTACHMENT A
12
Agency # Project Title COST ($M) in 2017
87 Airport Blvd from Guadalupe River Trail to Coleman Ave. Bike & Pedestrian Connection 4.1$
88 Auzerais Ave from Sunol St to Race St Bicycle and Pedestriar 2.4$
89 Montgomery St/Bird Ave from Santa Clara St to West Virginia St Bicycle and Pedestrian Corridor 3.8$
90 Blossom Hill Road/Silver Creek Valley Road from Monterey Rd. to Coyote Ck Trail Multiuse Path 6.6$
91 Calero Ave from Allen Ave to Palmia Dr Bikeway Project 0.4$
92 Branham Lane Bikeway: Camden Avenue to Coyote Creek Trail 13.4$
93 Capitol Avenue/Capitol Expressway Bikeway from Penitencia Creek Road/Trail to Quimby Road/Thompson Creek 0.3$
94 Cottle Road Multi-Use Path from Hospital Parkway to Poughkeepsie Road $ 2.9
95 Havana Dr/ Holly Hill Drive Bike/Ped Bridge at US 101 $ 9.2
96 Hedding St. Bikeway: Winchester Blvd. to Ruff Dr (Hwy 87) $ 0.3
97 Highway 87 Trail Connection Multi-Use Path: Unified Way through Curtner Light Rail Station Park and Ride to Carol Drive at Hwy 87 $ 2.1
98 Hwy 237 Bikeway from Great America Parkway to Zanker 0.5$
99 Los Gatos Creek Trail Reach 5d: Park Avenue to Santa Clara Avenue (Diridon Station Segment) $ 9.2
100 Los Gatos Creek Trail Reach 5b and 5c: Auzerais Avenue south of W. San Carlos Avenue to Park Avenue/Montgomery Avenue (Trail and Undercrossing) $ 6.3
101 Monroe Bikeway: Newhall Street to Tisch Way $ 0.3
102 Newhall Street Bike/Ped Overcrossing over Caltrain Tracks $ 8.8
103 North San Jose Bike/Ped Improvements: Connections to Guadalupe River Trail/Coyote Creek Trail/Alviso Neighborhood $ 37.9
104 Park Avenue/San Fernando Street/San Antonio Bikeway $ 0.3
105 Three Creeks Trail: West from Los Gatos Creek Trail/Lonus Street to Coyote Creek Trail $ 2.2
106 Citywide Implementation- Several Projects from Bike Plan 2020 $ 6.0
107 Coyote Creek Trail (Montague Expwy to Old Oakland Road) $ 9.4
108 Coyote Creek Trail (Old Oakland Road to Watson Park) $ 9.4
109 Coyote Creek Trail (Watson Park to Williams Street Park) $ 6.3
110 Coyote Creek Trail ( William St Park to Kelley Park $ 3.6
111 Upper Penitencia Creek Trail Connector Phase 2: Berryessa BART to Coyote Creek $ 2.5
112 Capitol Expwy Bike and Pedestrian Improvements from 1-680 $ 5.4
113 Almaden Expwy Bike and Pedestrian Improvements from Foxworthy Ave to Trinidad Dr $ 5.4
114 Phelan Avenue Pedestrian & Bike Bridge over Coyote Creek $ 7.4
115 Capitol Expressway at 1-680 Bike and Pedestrian lmprovements $ 1.8
116 Three Creeks Trail East from Guadalupe River to Coyote Creek Trail $ 48.7
117 Coyote Creek Trail from Story Rd to Phelan through Kelley Park $ 2.7
118 Bay Trail 9/9B: Lower Guadalupe River Trail connection 15.2$
119 Bay Trail: Alviso Frontage $ 32.5
120 Coyote Creek Trail from Phelan Avenue to Tully Road $ 3.2
121 Lower Guadalupe River Access Ramps $ 10.8
122 Five Wounds Trail from William Street to Mabury Road/Berryessa $ 21.6
123 Thompson Creek Trail from Quimby Road to County border $ 21.6
124 Lower Silver Creek Trail from Coyote Creek Trail/Berryessa B Capitol Light Rail) $ 32.5
125 San Jose Citywide ADA Curb Ramp Improvements $ 64.9
126 San Jose Citywide Sidewalk Gap Closure- Phase I $ 50.0
127 Guadalupe River Trail -Virginia to Blossom Hill Rd 20.5$
San Jose
BICYCLE AND PEDESTRIAN PROJECT LIST
ATTACHMENT A
13
Agency # Project Title COST ($M) in 2017
128 Winchester Bicycle & Pedestrian Overcrossing $ 10.0
129 Kiely Bicycle & Pedestrian Overcrossing $ 10.0
130 Tasman Pedestrian Overcrossing $ 10.0
131 Citywide Sidewalk Connections $ 55.0
132 Benton St. Bike Lanes: Lawrence Expwy. to San Tomas Expwy $ 0.6
133 Bowers Ave./Kiely Blvd. Bike Lanes: Cabrillo Ave. to Stevens Creek Blvd $ 1.0
134 Calabazas Creek Trail: From SR 237 to Lochinar Ave. $ 23.5
135 Lafayette St. Bike Lanes: Agnew Rd. to Reed St $ 1.2
136 Lick Mill Blvd. Bike Lanes from Tasman Dr. to Hope Dr $ 0.3
137 Mission College Blvd. Bike Lanes from Mission College Blvd. to Wildwood Ave. (City Limits) $ 0.3
138 Pruneridge Ave. Bike Lanes: Pomeroy Ave. to Winchester Blvd. $ 0.9
139 San Tomas Aquino Creek Spur Trail Phase 2: El Camino Real to Homestead Rd. $ 4.6
140 Saratoga Ave. Bike Lanes: Los Padres Blvd. to San Tomas Expwy $ 0.3
141 Saratoga Creek Trail: Cabrillo Ave. to Forbes Ave. and Undercrossing at Kiely Blvd. and Homestead Rd. $ 3.5
142 Benton St. Bike Lanes: Monroe St. to Railroad Ave. $ 0.2
143 De La Cruz Blvd. Bike Lanes: Central Expwy to Brokaw Rd $ 0.7
144 Hetch-Hetchy Trail: Calabazas Creek to Lick Mill Blvd $ 6.6
145 Lafayette St. Bike Lanes: Calle de Luna to Yerba Buena Way $ 0.3
146 San Tomas Aquino Creek Trail Underpass at 49er Stadium $ 4.2
147 Calabazas Boulevard Bike Lanes from Monroe Street to Cabrillo $ 0.3
148 Monroe Street Bike Lanes from Lawrence Expressway to San Tomas-Aquino Creek $ 0.9
149 San Tomas Aquino Creek Trail/Agnew Road At-grade Improvements $ 0.4
150 San Tomas Aquino Creek Trail Pavement Rehabilitation Project $ 0.4
151 San Tomas Aquino Creek Spur Trail Phase III along San Tomas Expressway from Homestead Rd to Stevens Creek Boulevard $ 8.5
152 Class I Bicycle Parking (lockers) $ 0.5
153 Class II Bicycle Parking (Racks) $ 0.2
154Pedestrian Connection Between Valley Fair Mall and Santana Row 10.0$
155 Santa Teresa Blvd. Bicycle Delineation and Shoulder Widening (BEP Submittal) $ 0.6
156 Watsonville Rd. Shoulders from Santa Teresa Blvd. to SR-152 (BEP Submittal) $ 7.9
157 Oregon-Page Mill/I-280 interchange interim bike improvements (BEP Submittal) $ 0.2
158 Fitzgerald Ave. Bicycle Shoulder widening from Santa Teresa Blvd. to Monterey Hwy. (BEP Submittal) $ 2.4
159 Coyote Creek Trail: Hellyer Park to Malaguerra Ave (BEP Submittal) $ 3.2
160 Trails in Expressway Rights-of-Way (BEP Submittal) $ 30.0
161 Trails in County Roads Rights-of-Way (BEP Submittal) $ 55.0
162 Popular Bicycle Rural Roads Improvements (BEP Submittal) $ 5.0
163 McKean Rd. Shoulder Improvements: Harry Rd. to Bailey Ave. (BEP Submittal) $ 7.4
164 Los Gatos Creek Trail: Lark Ave. to Blossom Hill Dr. (BEP Submittal) $ 1.8
165 Doyle Rd bicycle and pedestrian trail connection to Saratoga Creek Trail (BEP Submittal) $ 0.5
166 Safe Routes to School Direct Education Programming $ 55.0
Santa Clara
Santa Clara County
BICYCLE AND PEDESTRIAN PROJECT LIST
ATTACHMENT A
14
Agency # Project Title COST ($M) in 2017
Santa Clara County 167 Countywide Safe Routes To School (SRTS) Coordination $ 48.5
168 Blue Hills School RR Crossing Safety Project $ 0.7
169 Saratoga Ave Sidewalk Pedestrian Improvements $ 0.4
170 Highway 9 Pedestrian Safety Improvement Project (Phase 5) $ 2.3
171 Joe’s Trail: Saratoga-Sunnyvale Rd to Prospect Rd $ 0.9
172 Saratoga-to-the-Sea Trail: From Saratoga Village to Quarry Park $ 3.0
173 Saratoga-to-the-Sea Trail: From Quarry Park to Sanborn Park $ 2.5
174 Citywide Dedicated Bicycle Lanes $ 1.3
175 Dedicated Bicycle Lanes on Prospect Road: From Stelling Rd to Fremont Older $ 2.7
176 Lighted Crosswalk with Rapid Flash Beacons at Quito Rd and McCoy Ave $ 0.1
177 Lighted Crosswalk with Rapid Flash Beacons at Cox Ave and Miller Ave $ 0.1
178 Quito Rd sidewalk gap closure and Bike Lane Improvements: From SR 85 to Allendale Ave $ 0.3
179 Buildout of City's Bike Plan $ 5.0
180 Build-out of City's Pedestrian and Safe Route to School Plans $ 5.0
181 Fair Oaks / Tasman East Channel Trail from Greenbelt to Tasman Drive $ 0.7
182 Fair Oaks Junction Trail from Arques Ave to Wolfe Road along East Channel Trail $ 0.2
183 Olive Avenue Bike Lanes: Mathilda to Fair Oaks $ 0.02
184 Belleville Way Bike Lanes and Bike Detection: Fremont to Homestead $ 0.1
185 Bernardo Avenue Bike Lanes and Bike Detection: El Camino Real to Evelyn $ 0.2
186 Bernardo Ave Bike Lanes and Bike Detection: Remington to Homestead $ 0.2
187 Bernardo Avenue Caltrain Undercrossing: Evelyn Avenue to Central Expressway $ 9.8
188 California Ave Bike Lanes and Bike Detection: Mary to Fair Oaks $ 0.2
189 El Camino Real Bike Lanes: West City Limits to East City Limits (plus bike detection at 13 intersections) $ 0.4
190 Fair Oaks Ave Bike Lanes, Medians, and Detection: Old San Francisco Road to Ahwanee Avenue $ 1.2
191 Hollenbeck Avenue Bike Lanes and Bike Detection: Danforth Drive to Alberta Avenue $ 0.2
192 Java Drive Bike Lanes and Bike Detection: Via Road Diet from Mathilda to Crossman Avenue $ 0.1
193 Lakewood/Sandia Drive Bike Lanes $0.02
194 Mary Avenue Bike Lanes: Fremont to Maude $ 1.8
195 Mathilda Avenue Bike Lanes: US 101 to El Camino Real $ 4.1
196 Maude Avenue Bike Lanes: Mathilda to Wolfe $ 0.8
197 Moffett Park Area East Channel Trail and West Channel Trail $ 4.8
198 Sunnyvale Stevens Creek Trail and Structures: Dale/Heatherstone to Homestead Road (2.5 mi bike path, 4 structures and 1.2 mi bike lane) $ 20.0
199 Tasman Drive Bike Lanes and Bike Detection: Via Road Diet from Fair Oaks Avenue to Reamwood Drive $ 0.3
200 Upper Penitencia Creek Trail Connector Phase 1: Berryessa BART Station (OBAG) 2.12$
201 Capitol Caltrain Station Undercrossing 9.29$
202 Countywide Complete Streets Program $ 100.0
203 Vision Zero Santa Clara County $ 100.0
204 Countywide Bicycle Superhighway Program-Santa Clara County $ 325.0
205 Implementation of Countywide Bicycle Plan $ 175.0
206 First Mile-Last Mile Transit Connections: Bike Access $ 20.0
207 First-Last Mile Transit Connections: Pedestrian Access to Transit Plan Implementation $ 35.0
Saratoga
Sunnyvale
VTA
BICYCLE AND PEDESTRIAN PROJECT LIST
ATTACHMENT A
15
Agency # Project Title COST ($M) in 2017
VTA/SJ 208 Capitol Expressway Pedestrian/Bicycle Crossing at Eastridge Transit Center $ 1.5
VTA/SJ/SC 209 Santa Clara Caltrain Station Undercrossing Extension $ 13.7
2,208.6$
BICYCLE AND PEDESTRIAN PROJECT LIST
ATTACHMENT A
16
Notes
TRANSIT
Extend ligh-rail transit from Winchester Station to Route 85 (Vasona Junction)
176.0$ Under VTA Transit Heading
Implementation of Future Mass Transit Needs for Santa Clara County
25.0$ Added to project list.
Comprehensive Systems Study for Future Mass Transit in Santa Clara County
1.0$ Added to project list.
Caltrain Capacity Expansion - Santa Clara Portion
50.0$ Captured under separate Caltrain Listing
Future Mass Transit Needs for Santa Clara County
810.0$ Added to project list.
Los Altos Future Mass Transit Needs for Santa Clara County Study
2.5$ Added to project list.
Los Gatos Vasona Light Rail Project
10.0$ Under VTA Transit Heading
Caltrain Request for Station Improvements
165.0$ Captured under separate Caltrain Listing
Caltrain Request for Electrified, Modernized Trains/Station Modifications
430.0$ Captured under separate Caltrain Listing
Caltrain Request for System Performance and Reliability
162.0$ Captured under separate Caltrain Listing
Implementation Funding for Future Mass Transit Investments in Santa Clara County
750.0$ Added to project list.
Study of Mass Transit Needs for Santa Clara County
25.0$ Added to project list.
Caltrain Station Improvements
44.0$ Captured under separate Caltrain Listing
Caltrain System Performance and Reliability
60.0$ Captured under separate Caltrain Listing
Electrified, Modernized Trains / Station Modifications (CalMod 2.0)
223.0$ Captured under separate Caltrain Listing
Future Mass Transit Needs for Santa Clara County Study
25.0$ Added to project list.
San Jose Double Vasona Light Rail Corridor from Diridon to Fruitvale and Bascom to Campbell
65.1$ Duplicate on VTA Transit List
VTA Caltrain Santa Clara County Safety/Grade Separation Program
1,592.0$ Captured under individual City listings.
XPWY Campbell San Tomas/SR 17 Interchange Interim Improvements 2.0$ On Highway List
San Jose Construct interchange at I-880 and Montague Expressway (includes improvements to Montague Expressway) 16.0$ On Highway List
Grade Separation - Lawrence Expressway and Homestead Road100.0$ On County Tier 1 List
Grade Separation Lawrence Expressway from Reed/Monroe to Arques 440.0$ On County Tier 1 ListMontague Expressway and I-680 interchange modification and widening (Tier 2 Exp Plan 2040) 30.1$ On Highway List
Lawrence/Stevens Creek/I‐280 Interchange (Tier 2 Exp Plan 2040) 120.2$ On Highway List
`San Tomas Expressway at SR-17 Interim improvements (Tier 1 Exp Plan 2040) 1.6$ On Highway List
SC County
Campbell
Sunnyvale
Cupertino
Mountain View
Palo Alto
ENVISION DUPLICATE PROJECTS
ATTACHMENT A
17
LSRSanta Clara Citywide Street Pavement Maintenance/Rehabilitation Project
65.0$ Captured under LSR Pavement Program
Gilroy 30-year unfunded Pavement Maintenance gap
125.0$ Captured under LSR Pavement Program
Morgan Hill Santa Teresa/Hale Avenue Extension Project13.8$ Captured under Expwy List
Silicon Valley TiMC ‐ San Jose Police Department Integration $ 16.2 Removed per SJSOM Brokaw‐Airport Area Advanced Traffic Management System $ 5.4 Removed per SJ
SJ Citywide Count and Speed Monitoring System $ 10.8 Removed per SJSan Jose
ENVISION DUPLICATE PROJECTS
ATTACHMENT A
18
Date: September 25, 2015
Current Meeting: October 7, 2015
Board Meeting: November 5, 2015
BOARD MEMORANDUM
TO: Santa Clara Valley Transportation Authority
Committee for Transit Accessibility
THROUGH: General Manager, Nuria I. Fernandez
FROM: Director of Planning and Program Development, John Ristow
SUBJECT: One Bay Area Grant Cycle 2 - Program Structure
3331 North First Street ∙ San Jose, CA 95134-1927 ∙ Administration 408.321.5555 ∙ Customer Service 408.321.2300
Policy-Related Action: No Government Code Section 84308 Applies: No
ACTION ITEM
RECOMMENDATION:
Recommend that the VTA Board of Directors approve the One Bay Area Grant (OBAG) Cycle 2
program structure.
BACKGROUND:
The Metropolitan Transportation Commission (MTC) is scheduled to adopt its "One Bay Area
Grant” Program 2 (OBAG) programming framework and criteria for Federal flexible grant funds
for fiscal years 2018 through 2020 in November 2015. The current OBAG Cycle 2 estimate for
Santa Clara County is approximately $100 million.
Due to the complexity of the program, VTA staff is developing the local OBAG programming
framework with VTA's Advisory Committees and community partners in a three part process:
(1) Program Structure, (2) Guarantee Formulas and (3) Project Selection Criteria. This
memorandum contains VTA staff's proposal for Program Structure. If the Board adopts the
OBAG Cycle 2 program structure proposed in this memorandum, VTA staff will return in
December 2015 with proposals for the guarantee formula and the project selection criteria.
DISCUSSION:
MTC places the following requirements on VTA in developing its local OBAG program
structure.
Eligibility: Project Eligibility: Local road reconstruction and rehabilitation, bicycle,
13
Page 2 of 4
pedestrian, streetscape, and Safe-Routes-to-School projects that are
eligible for Federal Surface Transportation Program (STP) and Congestion
Mitigation Air Quality (CMAQ).
Project Sponsor Eligibility: Cities and counties with General Plan
circulation elements adopted prior to 2010 must adopt resolutions ensuring
compliance with the Complete Streets Act of 2008 by January 1, 2016.
Transportation agency sponsored projects, other than vehicles, are only
eligible if located in jurisdictions that meet this requirement.
Geographic Limits: At least 70% of the funds must be programmed in Priority Development
Areas (PDAs). PDA-serving projects, as justified by the Congestion
Management Agency (CMA), count towards this requirement, as does
70% of funding used for CMA planning purposes.
Program Structure: MTC expects the CMA project selection process and criteria to be open,
reward jurisdictions which provide housing, and support the growth and
development of PDAs.
Santa Clara County’s OBAG funding is expected to be composed of STP and CMAQ funds. The
proportions thereof are unknown at this time. This funding split creates its own limitations as the
eligibility for each funding program varies.
With that in mind, VTA staff is proposing a program structure similar to what the Board adopted
in 2012 for OBAG Cycle 1. This structure provides guaranteed minimum funding to each
Member Agency, maximum flexibility within that guarantee, and a significant competitive pool
to fund larger projects based on the Board’s adopted criteria. It is also robust enough to handle
changes in funding levels and fund composition. The proposed structure is shown graphically in
Page 1 of Attachment A. For comparison, Page 2 of Attachment A shows the OBAG Cycle 1
program structure from 2012.
PDA Exempt Programs:
County Federal Aid Secondary Programming (FAS): State law requires that each of California's counties be programmed at least the amount of STP
funding that it would have received under the Federal Aid Secondary program prior to the
enactment of the Intermodal Surface Transportation Efficiency Act (ISTEA) of 1991. That
translates to approximately $1.7 million in this OBAG cycle. Those funds are for eligible
projects proposed by County of Santa Clara Roads Department, and are exempt from the
PDA/Non-PDA split.
Vehicle Emissions Reductions Based at Schools (VERBS): VTA staff recommends setting aside the MTC designated amount of $6.9 million in CMAQ to
continue VTA's Safe Routes to School Program. A separate program allows the Board to adopt
specific school-safety-oriented selection criteria for these projects. VTA is allowed to exempt
$6.9 million from the PDA/Non-PDA split for this purpose. VERBS-eligible safe routes to
school projects would still be eligible for additional programming in the Complete Streets
programs described later in this memorandum, but they would be subject to the PDA/Non PDA
splits and compete on Complete Streets criteria.
13
Page 3 of 4
PDA Focused Programs (70%):
CMA Planning Funds: VTA staff recommends programming $10.0 million for CMA planning and programming over
the four year period of the program. CMA activities are funded through Member Agency (which
are the 15 cities in the County of Santa Clara) fees, Planning Programming & Monitoring funds
from the State Transportation Improvement Program (STIP) and STP Planning funds. VTA
currently receives approximately $1.1 million per year in STP planning funds for this purpose.
Due to statewide STIP shortfalls, VTA has been unable to program PPM funds in the STIP for
2020 and 2021. These years fall within the OBAG 2 period and VTA staff is proposing to
increase STP programming in lieu of raising Member Agency fees to cover the shortfall.
PDA Planning Program: This program funds Member Agency planning activities that support the growth and
development of existing PDAs. Separately from VTA, MTC will be soliciting PDA planning
projects at the regional level. All VTA Member Agencies are eligible for MTC's program;
however VTA staff recommends supplementing the regional program with a local Santa Clara
County Agency-only program. VTA staff recommends a total of $2.0 million for this purpose.
Countywide Competitive Complete Streets Program: This is a competitive program which provides grants to projects in or serving designated PDAs.
It is open to the cities, towns, Santa Clara County and VTA to compete for grants that will fund
pedestrian, bicycle, and signal systems projects designed to support dense development and use
of alternate modes. Criteria for this program will be developed in consultation with VTA's
Member Agencies and community partners, and brought to the VTA Board for discussion and
adoption in subsequent meetings.
Either/Or (Applicant Discretion - 30%)
City Guarantee Program:
Road Rehabilitation Guarantee: VTA staff recommends making the balance of the STP
funds available under the Non-PDA 30% share to the cities and the County for pavement
rehabilitation. While VTA supports and encourages the cities to use these funds within,
or serving the PDAs, it would not be required. Consistent with previous Board-adopted
programs, the first expected use of these funds will be for rehabilitation and
reconstruction of Federal Aid-eligible local roads with a pavement condition index (PCI)
of 70 or less. If a city has no eligible road rehabilitation projects, it may use its funds for
Complete Streets projects and off-road bicycle and pedestrian facilities.
Complete Streets Guarantee: If STP funds aren't sufficient to fund the entire 30%
guarantee, VTA staff recommends funding the balance with CMAQ funds under the
guarantee formula to the cities and County for Complete Streets projects such as bicycle
and pedestrian facilities and Safe Routes to School projects.
Guarantee Distribution Formula
The draft formula will be developed in consultation with VTA's Member Agencies and
community partners and be brought to VTA's committees and Board in a future meeting.
13
Page 4 of 4
FISCAL IMPACT:
This action will provide $10 million in STP funding for VTA Congestion Management Agency
activities. These funds will be included in VTA's respective Congestion Management Program
budgets for the future fiscal years 2018 through 2022.
Prepared by: Celeste Fiore
Memo No. 5140
ATTACHMENTS:
OBAG_II_Bble_8-25-15 (PDF)
13
Santa Clara County OBAG II Structure Proposal – 8/24/15
STP -XX%$TBD
CMA Planning$10.0M
Complete Streets
Competitive$TBD
CMAQ - XX%$TBD
30% - Non-PDA$26.9M
County FAS$1.7M
SCL OBAG TOTAL$98.4 M
Road Rehab.“Guarantee”
$TBD
CompleteStreets
“Guarantee”$TBD
70% PDA$62.9M
VERBS$6.9 M
PDA Planning$2.0M
13.a
Santa Clara County OBAG I Structure
STP -44%$38.99M
CMA Planning$6.0M Complete
Streets Competitive
$45.69M
CMAQ /TA– 56%$49.14M
30% - Non-PDA$26.44M
San Tomas Expressway
$10M
SCL OBAG TOTAL$88.13M
CityRoad Rehab.“Guarantee”
$22.99M
City
Complete Streets“Guarantee”
$3.45M
70% PDA$61.69M
13.a
Date: September 29, 2015
Current Meeting: October 7, 2015
Board Meeting: N/A
BOARD MEMORANDUM
TO: Santa Clara Valley Transportation Authority
Committee for Transit Accessibility
THROUGH: General Manager, Nuria I. Fernandez
FROM: Director of Planning and Program Development, John Ristow
SUBJECT: Transit Ridership Improvement Program
3331 North First Street ∙ San Jose, CA 95134-1927 ∙ Administration 408.321.5555 ∙ Customer Service 408.321.2300
FOR INFORMATION ONLY
BACKGROUND:
In the past few years, Santa Clara County’s economy has rebounded strongly and travel demand
has increased. In contrast, transit ridership has remained relatively flat. Over the same time,
corporate shuttles and on-demand services like Uber, Lyft and Sidecar have become more
prevalent. As travel demand has grown and congestion increased, travel speeds for all vehicles
have decreased. This makes transit slower, less attractive as a travel choice and more expensive
for VTA to operate. VTA’s farebox recovery rate (the percentage of the transit operating cost
that is paid by fares) is currently around 14 percent, which is low compared to peer agencies.
Due to the evolving travel market, declining cost-effectiveness and low farebox recovery rate, it
is crucial that VTA reevaluate its transit service and related policies to ensure that a more
appealing, cost-effective and competitive product is being provided. To this end, VTA is
launching the Transit Ridership Improvement Program (TRIP). The TRIP will touch all
elements of VTA’s transit program and may result in changes to transit service, fare policy, the
transit capital program and new planning efforts. Making such changes will require VTA’s
Board of Directors to develop policies and priorities for the design of the next two-year transit
service plan.
DISCUSSION:
Designing transit service requires making tough choices between good intentions. To emphasize
ridership, agencies may reduce geographical coverage. To increase frequency, buses may be
reallocated from other routes. To increase travel speeds, buses may make fewer stops. To
increase farebox recovery rates, fares may need to be adjusted. To improve on-time reliability,
separating transit from automobile traffic may be necessary. Each objective is interconnected
with others and knowing the right balance for achieving the goals of the agency is difficult. To
help with that process, VTA has hired Jarrett Walker and Associates, a well-regarded network
14
Page 2 of 2
design and transit planning firm, to assist with the TRIP on a two-year contract.
Jarrett Walker and Associates have worked throughout the world advising transportation
agencies about how they can balance transit network design tradeoffs to meet their goals. They
recently assisted with the redesign of the Houston Metro transit network, converting it from a
coverage-oriented network that featured many routes, but few that were frequent, to a ridership-
oriented network built around a fast, frequent core network. The new network doubled the
number of homes and jobs that are connected by transit and Houston is now projecting a 20
percent increase in ridership. They accomplished that redesign without changing the transit
operating cost. Jarrett Walker has extensive experience in California and is a former resident of
Santa Clara County.
Jarrett Walker and Associates has been asked to assist with multiple tasks:
Evaluate VTA’s current projects, plans and studies and assess areas where VTA can
improve or identify any gaps that can be addressed through new efforts.
Analyze VTA’s transit service and identify any changes that will increase ridership
and/or farebox recovery and assist with the development of the next two-year service
plan.
Lead VTA’s Board of Directors through a discussion of policy goals that will inform the
development of the next two-year transit service plan and hold multiple workshops with
municipal partners to better integrate cities in the transit planning process and better
integrate planning for transit into city processes.
Develop a final report and implementation plan documenting improved agency processes
and improved collaboration with municipal partners for increasing transit ridership and
farebox recovery.
Jarrett Walker and Associates are currently working on the first two tasks and plan to begin the
policy conversation with VTA’s Board in late 2015.
Prepared By: Adam Burger
Memo No. 5195
14
Date: September 25, 2015
Current Meeting: October 7, 2015
Board Meeting: N/A
BOARD MEMORANDUM
TO: Santa Clara Valley Transportation Authority
Committee for Transit Accessibility
THROUGH: General Manager, Nuria I. Fernandez
FROM: Director of Engr. & Trans. Infrastructure Dev., Carolyn M. Gonot
SUBJECT: Santa Clara-Alum Rock BRT Project Status
3331 North First Street ∙ San Jose, CA 95134-1927 ∙ Administration 408.321.5555 ∙ Customer Service 408.321.2300
FOR INFORMATION ONLY
Prepared By: Mohammed Basma
Memo No. 5216
15
Date: September 11, 2015
Current Meeting: October 7, 2015
Board Meeting: N/A
BOARD MEMORANDUM
TO: Santa Clara Valley Transportation Authority
Committee for Transit Accessibility
THROUGH: General Manager, Nuria I. Fernandez
FROM: Director of Government Affairs, Jim Lawson
SUBJECT: Transportation Assistance Program (TAP) Update
3331 North First Street ∙ San Jose, CA 95134-1927 ∙ Administration 408.321.5555 ∙ Customer Service 408.321.2300
FOR INFORMATION ONLY
BACKGROUND:
At the request of People Acting in Community Together (PACT), the Santa Clara Valley
Transportation Authority (VTA) Board of Directors approved the Transit Assistance Program
(TAP) at the August 1, 2013 Board Meeting. At this point the program has been operating for 22
months. The purpose of this memo is to provide an update on the program.
With funding support from the Metropolitan Transportation Commission (MTC), TAP was
established in August 2013 by agreement between VTA and the County of Santa Clara. TAP
provides discounted VTA monthly transit passes to eligible low-income county residents at or
below 200% of the Federal Poverty Level. This equates to a household income of $47,000 for a
family of four. Under the direction of County Social Services passes are distributed through a
network of six local non-profit organizations comprising the Emergency Assistance Network
(EAN). County staff provides coordination between the EAN agencies and between the EAN
agencies and VTA.
Monthly transit passes are sold to qualified individuals for $25.00. This represents a discount of
$45.00 from the regular monthly price of $70.00. The initial program agreement provided for a
total of 24,000 monthly passes to be distributed over a period of 24 months, with an option to
extend the term up to six months. Also, the agreement provided for a total of $400,000 to be
distributed amongst the EAN agencies for program management expenses ($50,000 per calendar
quarter for two years).
EAN agencies participating in TAP include Sacred Heart Community Services, Sunnyvale
Community Services, Salvation Army, St. Joseph’s Family Center, Community Service Agency
of Mountain View, Los Altos, and Los Altos Hills and West Valley Community Services.
Innvision was initially a member but due to their unique needs left the program.
16
Page 2 of 2
The original plan for the program was for all passes to be distributed using Clipper™ cards. Due
to technical challenges the participants of the program were negatively impacted. Additionally
these technical issues caused an unforeseen need for recurring staff time by VTA, the EANs and
Cubic (the company managing the Clipper™ system), the program transitioned to paper passes
in early 2015. This has reduced the technical challenges that were an impediment to using the
system.
DISCUSSION:
TAP has been well received by the EAN agencies and the individuals they serve. Since the rollout of the program, over 12,000 monthly passes have been distributed to eligible individuals. Pass distribution has increased from 30 in September 2013 to 859 in May 2015. Attachment A quotes some of the users from Sacred Heart Community Services describing the impact this program has on their lives. As stated in a letter (Attachment B) dated May 1, 2015 by Ms. Marie Bernard, Executive Director, Sunnyvale Community Services:
The program has changed lives and proven that low-income residents need and use affordable public transportation.
Since the original term of the TAP program agreement was due to expire, VTA and County
Social Services have recently agreed to extend the agreement through December 2015. VTA
executed this amendment on June 9, 2015. It is expected that a follow-up amendment to further
extend the program will be executed before the end of the year. Sufficient funding remains from
the original program grant to support TAP pass discounts through at least the end of FY 2016.
VTA’s recently approved FY 2016 and FY 2017 Biennial Budget includes appropriation
authority to continue funding EAN agency program management costs at the level of $200,000
per year, and VTA has also recently applied for additional grant funding to support the discount
element of the program into FY 2017 and beyond.
Prepared By: Manolo Gonzalez-Estay
Memo No. 5089
16
1381 South First Street
San José, CA 95110
June 18, 2015
Transportation Assistance Program (TAP)
Recipient Feedback
1. Name: Lucy
Duration of TAP recipient: 6 months
How has TAP helped you? To go to work and look for more work, to go to my doctor appointments
and to drop off my grandson to school
2. Name: Juana
Duration of TAP recipient: 5 months
How has TAP helped you? Greatly, it is economical and it has helped me move all over the city with
my sons without going broke.
3. Name: Alejandra
Duration of TAP recipient: almost 3 years
How has TAP helped you? : It has helped me tremendously with my critical needs. I go to the doctor,
go to work and take my daughter to school. My husband uses it to go work—thank you, it has been very
helpful.
4. Name: Candida
Duration of TAP recipient: 2 years
How has TAP helped you? To go to work, to the store, to my doctor appointments and sometimes to
take my son to school
5. Name: Yolinda
Duration of TAP recipient: 4 months
How has TAP helped you? A lot, I use it to go to my appointments and shop for my necessities
6. Name: Pascual
Duration of TAP recipient: 3 months
How has TAP helped you? I use it to go to work and for my personal needs.
16.a
16.b
16.b
16.b
16.b
Date: September 24, 2015
Current Meeting: October 7, 2015
Board Meeting: October 1, 2015
BOARD MEMORANDUM
TO: Santa Clara Valley Transportation Authority
Committee for Transit Accessibility
THROUGH: General Manager, Nuria I. Fernandez
FROM: Director of Planning and Program Development, John Ristow
SUBJECT: Dynamic Transit Service Pilot Program Implementation
3331 North First Street ∙ San Jose, CA 95134-1927 ∙ Administration 408.321.5555 ∙ Customer Service 408.321.2300
FOR INFORMATION ONLY
BACKGROUND:
VTA is launching a new, innovative, Dynamic Transit Service Pilot program in fall 2015. The
first proposed pilot will provide dynamic and flexible transit service within a predetermined zone
to fill in gaps in the existing transit network and provide first/last mile connectivity. This
innovative pilot will serve as a demonstration project to test the functionality of a dynamic
dispatch and routing software, and to provide proof-of-concept for new dynamic transit service
models.
VTA staff first introduced the Dynamic Transit Pilot Program to the Advisory Committees in
June 2015. In August 2015, staff provided a status update on the development of the pilot
program to the committees and Board of Directors. This month, staff will present final details of
the implementation plan and service design in a PowerPoint presentation to the committees and
Board of Directors.
DISCUSSION:
VTA has identified key implementation steps necessary to launch, operate and evaluate the
Dynamic Transit Pilot Program. The details of the service plan are summarized below:
Proposed Service Area
VTA's travel and market pattern analysis identified “Tasman Zone,” an area roughly bounded by
SR 237, Montague Expressway, Coyote Creek and Guadalupe River as a promising market for
Pilot 1 implementation (see Attachment 1). The proposed service area is approximately 3.3
square miles with significant potential demand due to rail connections, a variety of trip patterns,
and mix of trip generators, which includes high-density housing and major employment centers
such as Cisco, Cadence, Nortech business park and the new Samsung headquarters.
17
Page 2 of 4
Implementation
The following details of the service design are in still in the process of being finalized and may
be revised prior to implementation:
User experience: VTA has contracted with a software vendor to provide the front and back end
of the service. The service’s entire trip making process will be designed with the customer in
mind, leveraging technology to automate and consolidate trip requests, booking, confirmation,
and payment processes. Riders will use their computer or smartphone for the process, with
telephone operator as backup. The service model will allow for both advance reservation and on-
demand trip requests in order to “batch” riders and provide an optimal window for pick-up times.
Service span: The proposed service span is Monday through Friday from 5:30 AM to 8:30 PM,
providing short distance trips throughout the Tasman zone.
Fare structure: VTA will test a range of $2-$5 to determine the appropriate fare structure to
implement with flexibility to test various price points throughout the pilot based on changes in
service design or market demand.
Fare payment: The new pilot service will use a cashless, account-based payment system which
will require customers to add a credit or debit card to a user account prior to first-time use.
Payments will be automatically deducted from the account upon each trip ensuring payment is
collected for "no shows." Additionally, VTA is working with the Metropolitan Transportation
Commission (MTC) to configure Clipper as a fare payment option in the future.
As staff continues to finalize the details of the service plan, the following implementation
priorities will be key in designing a successful dynamic transit service:
Ease of use is key for passengers. Dynamic service is attractive because it is flexible
and responsive. Staff will ensure that the dynamic nature of this new service will be easy
for passengers to use.
Distinctive branding. Staff will develop a distinct brand that will communicate the
unique nature of this service.
Track real-time performance metrics. To be iterative, staff will track metrics to be able
to make adjustments and improvements to the service. Staff will be using Key
Performance Indicators (KPIs) and data collected by the software to ensure the service is
optimized to meet ridership goals.
Flexibility and iteration. Every aspect of the service will be monitored and considered
for continual adjustment throughout the pilot including the size and location of the
implementation zone, service model, number and type of vehicles, marketing strategy,
and fare structure.
Partnership Building
VTA will explore strategies to subsidize operating costs and future expansion of the pilot by
pursuing available funding grants and public-private partnership opportunities. Currently, VTA
and the City of Sunnyvale are exploring opportunities to implement “Peery Parks Ride,” a future
17
Page 3 of 4
phase of the dynamic transit service pilot program. The concept is to apply new service models
in Sunnyvale’s Peery Park, an office development with aggressive trip reduction targets and a
prime candidate for an innovative alternative commute solution.
Evaluation and Expansion of the Pilot Program
Many of the ridership strategies will be tested through the Dynamic Transit Pilot Program, with
an initial period of 6-12 months. Evaluation of the pilot(s) will use key performance metrics such
as effectiveness in increasing ridership, accessing new markets or improving existing markets,
and cost effectiveness measured by fare revenue and cost per hour/mile.
The following is a list of considerations to determine where and how to expand the program:
Expand existing pilot service area to include additional Caltrain and light rail stations,
new BART stations, business parks and/or underserved transit areas in order of most
employment/residential density
Expand to new geographic locations in the County with service gaps
Expand to gain a larger share of the long-distance commute market especially along the
most congested corridors
Next Steps
Service and implementation planning for future pilots may begin after the first pilot has been
implemented, as part of a larger program effort to implement several new dynamic transit service
solutions throughout Santa Clara County.
September 2015: Vehicles ready, software and system testing, operators training, field testing
September-October 2015: VTA Committees and Board of Directors meeting
October 2015: Launch pilot service
ADVISORY COMMITTEE DISCUSSION /RECOMMENDATION:
The Citizens Advisory Committee (CAC) received this information item at the September 9,
2015 meeting. Members of the Committee inquired about the length of the pilot period and the
ability to request trips in advance. Staff responded that the first pilot will operate for 6-12
months and the advanced reservation feature is an option that will hopefully be available in time
for launch.
The Technical Advisory Committee (TAC) received this information item at the September 10,
2015 meeting. Members of the Committee made the following comments: 1) inquired about
additional fare for transfers to/from LRT; 2) duration of the pilot; 3) potential pilot along north-
south corridor in Santa Clara region; 4) peak period pricing and hours; and 5) service area
beyond east of Cisco. Staff confirmed that customers will have to pay an additional fare to
transfer to/from LRT to VTA Flex; the pilot will be tested for a minimum of 6-12 months; north-
south connectivity was studied as part of the North Central County Bus Improvement Plan but
may be looked at again through this pilot effort; peak period pricing and hours may be adjusted
during the pilot; and the service area was defined based on the number of vehicles available and
may be expanded later based on demand.
The Policy Advisory Committee (PAC) received this information item at the September 10, 2015
17
Page 4 of 4
meeting. A Committee Member asked about the frequency of the vehicles coming back to the
same stop and staff responded that vehicles are routed dynamically based on trip requests.
The Transit Planning & Operations Committee (TP&O) received this information item at the
September 16, 2015 meeting. Members of the Committee expressed enthusiasm for the pilot
project and made the following comments: 1) asked how the Flex Stops were located and how
the number of Flex Stops will impact pickup times; 2) asked if first/last mile is the target market,
but also should consider serving the point-to-point travel market, which could be a significant
opportunity; 3) appreciated the comparison information to other Transportation Network
Companies but asked if staff can provide comparison information to other shuttle services such
as MVgo; 4) emphasized the importance of partnering with area employers and developments; 5)
asked if we have expected performance numbers and how we’ll monitor performance and usage;
6) suggested having the vehicle livery incorporate more than just the name “Flex” in order to
inform people what it is and how to use it; 7) asked if the app can use GPS location of the rider’s
device to pre-populate the starting location; 8) asked if the app can also offer suggestions on the
regular VTA service (for requests outside of the Flex service span, for example); 9) expressed
concern over not being able to meet rider requests and rejecting trips; 10) asked if we can
monitor whether how the service impacts ridership on the rest of our network; and 11) asked
when the committee will get a report on the service’s performance following implementation.
Staff provided the following responses: 1) Flex Stops have been placed at major destinations in
the area, and they were placed carefully so that there weren’t too many stops to slow down
service but also enough so that most users will have a 5-minute walk or less to a Flex Stop; 2)
first/last mile connection to the VTA network is the primary market but the Tasman zone offers a
variety of trip types and we will be monitoring usage to learn what types of trips riders are using
the service to make; 3) staff will do a comparison to shuttle services; 4) indeed, partnering with
local employers and developments is very important to the project and we have begun an
extensive marketing effort to engage partners; 5) VTA staff will have access to real-time
performance statistics and will be monitoring against project measures of success; 6) the final
vehicle livery will indeed include more information such as the app to download and the service
website; 7) the Flex app can suggest a nearby Flex Stop based on the user’s current location; 8)
staff is investigating the potential future integration of the app with the rest of the VTA network
but will look into ways the app can refer riders to the VTA network if Flex isn’t able to meet
their needs; 9) while the service may not be able to meet all rider needs due to resource
limitations, staff is already considering ways to increase resources (such as additional vehicles) if
necessary in order to serve the greatest number of rider requests possible; 10) VTA staff will
monitor the service’s impact on VTA’s fixed route ridership; and 11) VTA staff will report back
to the committee after a month and will provide reports thereafter upon the committee’s request.
STANDING COMMITTEE DISCUSSION /RECOMMENDATION:
The Congestion Management Program & Planning Committee decided to defer this item to the
October 15, 2015 meeting.
Prepared By: Aiko Cuenco
Memo No. 5160
17
17.a
Date: September 28, 2015
Current Meeting: October 7, 2015
Board Meeting: N/A
BOARD MEMORANDUM
TO: Santa Clara Valley Transportation Authority
Committee for Transit Accessibility
THROUGH: General Manager, Nuria I. Fernandez
FROM: Chief Information Officer, Gary Miskell
SUBJECT: Real Time Information Update
3331 North First Street ∙ San Jose, CA 95134-1927 ∙ Administration 408.321.5555 ∙ Customer Service 408.321.2300
FOR INFORMATION ONLY
BACKGROUND:
VTA deployed a real time information (RTI) system in 2013 and bus shelter real time
information signs at key bus stops in 2014. Knowing that real time information and Wi-Fi
service is a critical component of our Focus on the Customer strategy, staff is in process of
deploying Wi-Fi on all VTA transit buses, and upgrading our real time web sites and mobile
application.
DISCUSSION:
Staff will be reporting on the progress and current status of the following RTI items:
RTI shelter signs
Bus RTI web site
Bus RTI Mobile Application
Light Rail RTI web site
Light Rail RTI Mobile Application
Pilot on Pedestrian Collision Avoidance systems designed for transit buses
Prepared By: Gary Miskell
Memo No. 5205
18
1
Technology InnovationCommittee for Transit Accessibility
Agenda• Real time Data • Pedestrian and Collision Avoidance Safety
October 2015
2
Real Time Data
RTI Shelter signs DeployedBus Web site for RTI DeployedBus Mobile application Doesn’t existLight Rail Web site DeployedLight Rail Mobile app. Deployed
We still have a lot of work left to be done!
3
Real Time Data
RTI Shelter signs Deployed – Operations 9 month Bus Web site for RTI Deployed – No control of the appBus Mobile application Doesn’t existLight Rail Web site Deployed – No control of the appLight Rail Mobile app. Deployed – No control of the app
What are our next steps: 1 of 41. We’re adding multi-radio, ruggedized in-vehicle hi–speed
cellular communications devices to each VTA bus supportingEthernet, Wi-Fi and GPS (60% complete)a. Hi-Speed data connection on the bus b. Wi-Fi to all VTA vehiclesc. Improved GPS data connection
Currently updates every 90 sec.Moovbox update 3 times per second
d. Improved Arrival predictions
4
Real Time Data
RTI Shelter signs DeployedBus Web site for RTI Deployed Bus Mobile application Doesn’t existLight Rail Web site Deployed Light Rail Mobile app. Deployed
What are our next steps: 2 of 42. Light Rail Mobile application
a. We’re working on a VTA branded version of the application
b. Improved ADA capability (Especially ios) a. standard UIKit controls
c. Adding Bus and Rail RTI data into the same app
5
Real Time Data
RTI Shelter signs DeployedBus Web site for RTI Deployed – No control of the appBus Mobile application Doesn’t existLight Rail Web site Deployed – No control of the appLight Rail Mobile app. Deployed – No control of the app
What are our next steps: 3 of 43. Building a new Multi modal Trip planner with RTI data
a. Web site with the Bay Area regional datab. Marketing usability study for a Mobile applicationc. In 2016 a mobile application completed
PLANNED TRIP
ACTUAL BUS POSITIONS
6
Real Time Data
RTI Shelter signs DeployedBus Web site for RTI DeployedBus Mobile application Doesn’t existLight Rail Web site DeployedLight Rail Mobile app. Deployed
What are our next steps: 4 of 44. Light Rail platform signs
a. Real time Arrivalb. VTA messagingc. Advertisingd. Looking an interoperability
with a customer application
7
Vehicle Safety Innovation
Artificial Vision Technology http://www.mobileye.com/technology/
Leader in full ADAS focused on next generation vehicle control14 OEM customers from GM, Ford, Honda, Chrysler, BMW… (No Transit)
Collision Mitigation by braking Collision WarningUrban forward Collision Warning Pedestrian Detection and warningHeadway monitoring and warning Vision only adaptive Cruise controlRadar vision Fusion General object detectionTraffic sign detection Headlamp control
8
Pedestrian Collision Avoidance system
• A driver assistance system which is intended to alert drivers of certain potential dangerous situations. The unit is designed to reduce but not eliminate certain risks of loss. It does not replace any functions drivers would ordinary perform in operating a 40 foot motor coach.
VQ4560 is
9
Pedestrian & Bike Collision Avoidance Pilot
We talked to London Transit on their pilot testing and assessment of the industry• Very positive result
• Over a 3 month period changed driver behavior• Made driver more aware of pedestrians around the
vehicle• Resolved a number of blind spots along the right side
of the bus • At the end of the test the driver / bus no longer clipper
the curb on right turns.• Driver acceptance went from septic to advocate
• Found no other creditable alternative already designed for a Transit vehicle
10
Pedestrian & Bike Collision Avoidance Pilot
Pedestrian and Bike collision avoidance system includes the following lifesaving features:• Pedestrian & Cyclist Collision Warning (Mobileye PCW)• Forward Collision Warning (Mobileye FCW)• Headway Monitoring Warning (Mobileye HMW)• Lane Departure Warning (Mobileye LDW)• Speed Limit Indicator (SLI)
Next Steps • We’re talking to a installer/provider of the Mobileye system • Planning on a three bus pilot program• One of the pilot buses to have comprehensive analytics validating
each driver notification.
Any Question on this topic
Date: September 24, 2015
Current Meeting: October 7, 2015
Board Meeting: N/A
BOARD MEMORANDUM
TO: Santa Clara Valley Transportation Authority
Committee for Transit Accessibility
THROUGH: General Manager, Nuria I. Fernandez
FROM: Director of Engr. & Trans. Infrastructure Dev., Carolyn M. Gonot
SUBJECT: Bus Stop Improvement Program
3331 North First Street ∙ San Jose, CA 95134-1927 ∙ Administration 408.321.5555 ∙ Customer Service 408.321.2300
FOR INFORMATION ONLY
BACKGROUND:
Since 1992, the Santa Clara Valley Transportation Authority (VTA) has maintained a continuous
capital program to make physical improvements at bus stops to ensure Americans with
Disabilities Act (ADA) compliance and improve the overall passenger environment since. The
improvements typically include increasing passenger waiting pads, enhancing sidewalk access,
providing additional lighting at bus stops, and repairing bus pavement at heavily-used bus stops.
Accessibility improvements are made to enable wheelchair use at the bus stops and to provide
appropriate access clearances.
At the October 2014 Committee for Transit Accessibility (CTA) meeting, staff provided an
overview of the VTA Bus Stop Improvement Program. The overview included general program
information, the process for selecting bus stop locations to improve, and the implementation plan
for FY 2015. This memorandum is intended to outline the components of the Bus Stop
Improvement Program and the implementation strategy for FY 2016 and FY 2017.
DISCUSSION:
General Program Information
There are over 3,600 VTA bus stops throughout Santa Clara County. The Bus Stop
Improvement Program has completed numerous accessibility projects and has improved more
than 660 of those bus stops, an investment approaching $7 million. During FY 2015, VTA
completed bus stop or access improvements at 18 locations in multiple cities. VTA is also
currently in the process of advertising for construction six additional locations proposed for
improvements with the FY 2015 budget. This work is being funded by Federal Transit
Enhancement grants (80%) and a local VTA contribution (20%). The sites selected for
improvements were based on a comprehensive list that was prioritized with previous CTA input.
19
Page 2 of 2
VTA staff also reviews private development submittals within Santa Clara County for transit
impacts and improvements. Staff requests that bus stop improvements be conditioned as part of
development when bus stops exist or are planned at these locations. It is estimated that 20-30
bus stops are improved annually as part of private development condition of approvals.
Overall, this work results in a very successful program of providing bus stop accessibility
improvements. Of the more than 3,600 bus stops, more than 90 percent are ADA accessible.
FY 2016 and FY 2017 Implementation
As noted in the attached (Exhibit A) list of bus stops, 24 locations were completed or are in
process of completion using the FY 2015 budget. From the FY 2015 budget, $593,128 of the
total previously approved budget is available for engineering and construction with the balance
of $451,372 anticipated to be approved by the Federal Transit Administration (FTA) in the near
future. For FY 2016 and 2017, the VTA Board of Directors approved an additional capital
project budget for the Bus Stop Improvement Program of $962,096. This budget includes an
FTA grant which can be used once FTA provides approval.
For FY 2016 and 2017, the current bus stop improvement priority list will be used to select the
next series of improvement program locations. The work will consist of widening and extending
sidewalks, installing passenger waiting pads, constructing new concrete bus pads and installing
Braille bus stop identifiers at bus stop poles. The cost of each accessibility improvement will
vary depending on the work required at each location. It is estimated that improvements will be
made at 20 bus stops in FY 2017.
The cost of each bus stop improvement varies depending on the work needed at each location.
A typical ADA accessibility improvement at a single bus stop has a construction cost of about
$5,000. A concrete pavement bus pad for one stop has a construction cost of about $30,000.
Additional project costs include design, engineering, environmental and right-of-way clearances,
permitting, and construction administration and inspection.
Project List and Public Input on Locations Needing Improvements
Staff uses a list of identified sites to record and prioritize bus stop improvement needs. The
current list includes approximately 20 sites that have been prioritized based on feedback and
ridership. The stops with the highest priority are those identified from the community and VTA
passengers. The next priority is for stops identified from reports that show high lift or ramp use
by buses. The final group of stops is based on ridership and locations that do not meet ADA
width requirements at the bus stop. The plan is to advance construction of the identified needs
according to the priority included on the bus stop list.
To establish a complete and accurate list, it is important to obtain community input and CTA
feedback. Construction complexity may influence the priority of certain stops. However, staff
encourages CTA members and our passengers to provide information about bus stops that need
accessibility and other improvements.
Prepared By: Ken Ronsse, Deputy Director
Memo No. 4758
19
Exhibit A
Bus Stop Locations
Completed in FY 15:
1. East Bound Middlefield Road Near Side Farley Street (Mountain View)
2. East Bound Middlefield Road Far Side Easy Street (Mountain View)
3. West Bound Benton Street Far Side Jefferson Street (Santa Clara)
4. East Bound Benton Street Near Side Jefferson Street (Santa Clara)
5. South Bound De La Cruz Boulevard Near Side Martin Avenue (Santa Clara)
6. South Bound Leigh Avenus at Coit Drive (San Jose)
7. West Bound The Alameda Near Side West Taylor Street (San Jose)
8. South Bound South First Near Side Keyes Street (San Jose)
9. North Bound First Street Near Side Keyes Street (San Jose)
10. West Bound McKee Road Far Side 34th Street (San Jose)
11. South Bound Silvercreek Road Near Side Ravens Place Way (San Jose)
12. South Bound San Felipe Road Near Side Metropolitan Way (San Jose)
13. South Bound San Felipe Road at Paseo De Arboles (San Jose)
14. South Bound San Felipe Road Near Side George Blauer Place (San Jose)
15. East Bound Sixth Street Far Side Wren Avenue (Gilroy)
16. North Bound Wren Avenue Far Side Perrelli Street (Gilroy)
17. South Bound Wren Avenue Far Side Byers Street (Gilroy)
18. West Bound Sixth Street Near Side Wren Avenue (Gilroy)
Construction in fall 2015:
1. North Bound El Camino Real Far Side California Street (Palo Alto)
2. South Bound Lawrence Expressway Far Side Tasman Drive Sunnyvale)
3. North Bound El Camino Real Far Side Scott Boulevard (Santa Clara)
4. South Bound San Tomas Expressway Far Side Hamilton Avenue (Campbell)
5. North Bound Coleman Avenue Far Side Earthquakes Way (San Jose)
6. West Bound Blossom Hill Far Side Judith Street (San Jose)
Next Priority Locations to be considered for FY16 and FY17 budget:
1. North Bound El Camino Real Far Side Mathilda Avenue
2. South Bound El Camino Real Far Side Mathilda Avenue
3. South Bound Fair Oaks Avenue Opposite Kiefer
4. West Bound El Camino Real Far Side Scott Boulevard
5. West Bound El Camino Real Far Side California Avenue
6. West Bound Samaritan Drive at Good Samaritan Hospital
7. South Bound Jackson Avenue Near Side McKee
8. West Bound El Camino Far Side Pomeroy
9. West Bound San Carlos Aveune Far Side Empire Street
19.a
10. East Bound San Antonio Near Side 18th Street
11. North Bound Senter Road Far Side Alma Street
12. West Bound Aborn Road Far Side Altamara
13. West Bound Aborn Road Far Side Mosher
14. East Bound Charleston Far Side Sutherland
15. South Bound 7th Street Far Side Washington Street
16. West Bound Pollard Road Far Side Abbott
17. South Bound Charleston Near Side Carlson
18. West Bound Empire Street Far Side 11th Street
19. South Bound Endicott Far Side Cottle Road
20. West Bound Camden Avenue Far Side New Jersey
19.a
Date: September 25, 2015
Current Meeting: October 7, 2015
Board Meeting: N/A
BOARD MEMORANDUM
TO: Santa Clara Valley Transportation Authority
Committee for Transit Accessibility
THROUGH: General Manager, Nuria I. Fernandez
FROM: Chief Operating Officer, Inez Evans
SUBJECT: Workplan Update
3331 North First Street ∙ San Jose, CA 95134-1927 ∙ Administration 408.321.5555 ∙ Customer Service 408.321.2300
FOR INFORMATION ONLY
BACKGROUND:
Attached is the Committee for Transit Accessibility Workplan Update
Prepared By: David Ledwitz
Memo No. 4981
20
September 24, 2015
Effective: September 24, 2015
2015 Committee for Transit Accessibility Work Plan
January 14, 2015
1. Great Streets 4826
2. RTC Clipper Card Customer Service (Griffin) 4830
3. BART Transit Integration Plan update (L. Scott) 4742
4. Levi’s Stadium Transit Service (J. Unites) 4836
5. Section 5310 Scoring Recommendation Report (D. Ledwitz) 4822
6. 2015 CTA Leadership Election Process: Conduct Elections. (S. Flynn) 4832 7. First Quarter Transit Operations Performance Report 4746
8. Update Regarding the Federal Transit Administration’s Draft ADA Circular
Chapters (D. Ledwitz) 4840
9. North Central County Bus Improvement Plan (Burger) 4810
10. Light Rail Enhancement Project (Kim) 4820
April 8, 2015
1. General Manager’s Report
2. Envision Silicon Valley (Haywood)
3. Eastridge Transit Center Update (Ronsse)
4. April Transit Service Changes (Unites) – 4783
5. FY16-FY17 Transit Service Plan (Barna)
6. Second Quarter Transit Operations Performance Report – 4762
7. Priority Seating Information (Griffin) – 4910
8. ADA Survey (Williams)
April 22, 2015 (4:00 pm)
1. Joint Advisory Committee El Camino BRT Workshop
May 12, 2015 (4:00 pm)
1. Joint Advisory Committee Budget Workshop
June 10, 2015
1. Third Quarter Transit Operations Performance Report 4763
2. Veterans Transportation and Community Living Initiative Project (OUTREACH)
- 5027
3. Paratransit Rider’s Guide Update/USDOT Reasonable Modification Final Rule –
5028
4. Demand Response Bus Pilot Project
5. Operation of Routes 522 and 22 in dedicated transit lanes with median stations.
(Fisher)
20.a
September 24, 2015
Effective: September 24, 2015
October 7, 2015
1. General Manager’s Report #3768
2. October Transit Service Changes (Unites) #4785
3. FY 2015 Annual Transit Operations Performance Report (Konanur) #4764
4. Santa Clara-Alum Rock BRT project status (Basma)
5. RTI Update (Miskell) #5205
6. Dynamic Transit Project Information (Cuenco) #5160
7. Transit Ridership Improvement Program Information (Burger) #5195
8. Envision Silicon Valley Update (Haywood) #5156
9. Bus Stop Improvement Program (Ronsse) - #4758
10. TAP Program Update (Gonzalez-Estay) #5089
11. Chief Operating Officer’s Report - #4978
12. OBAG II – Program Structure (Rensi) #5140
13. 2016 AC Leadership Election Process– Nomination Subcommittee (Flynn) #5073
14. Workplan Update (Ledwitz) #4981
January 13, 2016
1. 2016 CTA Leadership Election Process: Conduct Elections. (S. Flynn)
2. First Quarter Transit Operations Performance Report
3. January Transit Service Changes (Unites)
4. ADA Survey Status Update (Williams)
Future Items
1. Joint CTA/BART Access Committee Meeting
2. Coach Operator Training on Accessibility
3. VTP 2045 (Y. Smith)
4. Stevens Creek BRT and DeAnza Transit Center project update (Y. Smith)
5. BART Transit Integration Plan
6. Light Rail Efficiency Plan
7. CTA visit to OUTREACH’s new Headquarters
8. Warm Springs BART Station tour
Regular Reports
1. Chief Operating Officer Report
2. Committee Work Plan
3. Board of Directors Report
4. Staff Report
5. Chairperson's Report
6. CAC Report
7. Envision Update
20.a