Committee on Right of Way, Utilities and Outdoor Advertising Control 2019 Annual MeetingChattanooga, TennesseeApril 28–May 2, 2019
UTILITY COST ESTIMATING
Committee on Right of Way, Utilities, and Outdoor Advertising Control Annual Meeting, 2019
Presented by:Anthony J. Carovillano, P.E., P.S.Railroads and Utilities Engineer
West Virginia Division of Highways
Patrick Allen, P.E.State Utilities Engineer
Georgia Department of Transportation
UTILITY COST ESTIMATING
Committee on Right of Way, Utilities, and Outdoor Advertising Control Annual Meeting, 2019
Presented by:
Anthony J. Carovillano, P.E., P.S.Railroads and Utilities Engineer
West Virginia Division of Highways
UTILITY COST ESTIMATING
Committee on Right of Way, Utilities, and Outdoor Advertising Control Annual Meeting, 2019
What is a Cost Estimate?“A cost estimate is a prediction of the most probable cost to relocate certain utility facilities. The estimate will include the cost to replace the facilities and provide the same level of service which existed prior to the undertaking of the project.”
Indiana DOT Design Manual, Chapter 104
UTILITY COST ESTIMATING
Committee on Right of Way, Utilities, and Outdoor Advertising Control Annual Meeting, 2019
The 3 “W”s of Utility Cost Estimatingand 1 “H”.
UTILITY COST ESTIMATING
Committee on Right of Way, Utilities, and Outdoor Advertising Control Annual Meeting, 2019
• Why Do We Need to Prepare A Cost Estimate?
• When Do We Prepare a Cost Estimate?• Who Should Prepare the Cost Estimate?
• How Do We prepare an Estimate?
UTILITY COST ESTIMATING
Committee on Right of Way, Utilities, and Outdoor Advertising Control Annual Meeting, 2019
• Why Do We Need to Prepare A Cost Estimate? Planning
Set Aside Adequate Funds (Budgeting Purposes)Select Most Economical Alternative
Establish The Items Of Work to be Performed
UTILITY COST ESTIMATING
Committee on Right of Way, Utilities, and Outdoor Advertising Control Annual Meeting, 2019
• When Do We Prepare a Cost Estimate? Design Study Report Preliminary Engineering (As plans are being
developed) Reimbursement (Agreement)
UTILITY COST ESTIMATING
Committee on Right of Way, Utilities, and Outdoor Advertising Control Annual Meeting, 2019
• Who Should Prepare the Cost Estimate? Design Study Report – Engineer, Utility
Coordinator Preliminary Engineering – Utility Coordinator Reimbursement – Utility Company
UTILITY COST ESTIMATING
Committee on Right of Way, Utilities, and Outdoor Advertising Control Annual Meeting, 2019
• How Do We prepare an Estimate? Design Study Report
Determine Impacts• Review Plans• Site Visit• Mapping Software
Unit CostState’s Reimbursement Policy
UTILITY COST ESTIMATING
Committee on Right of Way, Utilities, and Outdoor Advertising Control Annual Meeting, 2019
• How Do We prepare an Estimate (cont.)? Preliminary Engineering
Determine Impacts• Review Plans• Site Visit• Mapping Software
Unit CostState’s Reimbursement Policy
UTILITY COST ESTIMATING
Committee on Right of Way, Utilities, and Outdoor Advertising Control Annual Meeting, 2019
• How Do We prepare an Estimate (cont.)? Reimbursement (Agreement)
Develop Relocation Plans• Review Plans• Site Visit• Mapping Software
Prepare Detailed Cost Estimate (Utility Company)• State’s Reimbursement Policy (Eligibility for
Reimbursement)• Unit Cost
UTILITY COST ESTIMATING
Committee on Right of Way, Utilities, and Outdoor Advertising Control Annual Meeting, 2019
• What is Eligible for Reimbursement? Material and Supplies Labor Overhead Transportation Equipment Traffic Control Right of Way
UTILITY COST ESTIMATING
Committee on Right of Way, Utilities, and Outdoor Advertising Control Annual Meeting, 2019
• Deduction (Credits) from a Reimbursement?Betterments
• Upgrading of a Facility that is not attributable to the project.
Salvage• Removed Components that still have Value. Estimated
by Utility Company.Accrued Depreciation
• Applies to Plants, Stations and Buildings.
UTILITY COST ESTIMATING
Committee on Right of Way, Utilities, and Outdoor Advertising Control Annual Meeting, 2019
• What is NOT Eligible for Reimbursement?AdvertisingSales PromotionInterest on BorrowingBad Debts and Uncollected Accounts ReceivableDonationsEntertainmentsFines and PenaltiesLobbying
UTILITY COST ESTIMATING
Committee on Right of Way, Utilities, and Outdoor Advertising Control Annual Meeting, 2019
• Parts of a Cost Estimate Preliminary Engineering Temporary Construction Permanent Construction Construction Engineering and Inspection Accounting Overheads Betterments Right of Way Acquisition
UTILITY COST ESTIMATING
Committee on Right of Way, Utilities, and Outdoor Advertising Control Annual Meeting, 2019
• Parts of a Cost Estimate (cont.) Preliminary Engineering
Research Existing EasementsConduct Preliminary Studies and SurveysReview As-Built PlansPrepare Work Plans and Relocation DrawingsDevelop Cost EstimatesAcquire EasementsPrepare and Evaluate Bid Documents
UTILITY COST ESTIMATING
Committee on Right of Way, Utilities, and Outdoor Advertising Control Annual Meeting, 2019
• Parts of a Cost Estimate (cont.) Permanent Construction
Mobilization and DemobilizationEngineeringRemoval or Abandonment of Existing FacilitiesInstallation of New FacilitiesE&S Control and Site RestorationTemporary Traffic Control
UTILITY COST ESTIMATING
Committee on Right of Way, Utilities, and Outdoor Advertising Control Annual Meeting, 2019
Patrick Allen, P.E.State Utilities EngineerGeorgia Department of
Transportation
• Utility Cost Estimating Tools Reimbursable Agreements PE Phase Utility Cost Estimates &Updates
UTILITY COST ESTIMATING
• Utility Agreement Estimates Prepared by Utility 23 CFR 645 Compliance Applicable Federal & State Laws Utility Accommodations Policy
UTILITY COST ESTIMATING
Case I – Prior Rights/Compensable Property Interest Case II – “Utility Aid” Case III – State Highway Revision Case IV – “Make-Ready”/Transportation Purpose
Department facilities are attached to third-party facility/pole. Applies to pole owner only
Case V – Safety/Clear Roadside (CRC) Utility relocates its facilities to improve safety along roadway
Case VI – Future Project Accommodation Advance installation of new facilities for future GDOT project
Conditions for Reimbursement
Conditions for Reimbursement
Case VII – Property Interest Affidavit Facilities requiring relocation are located off existing R/W and no
documentation can be found by Utility to establish a property interest Case VIII – Public Interest Determination (PID)
Utility included in the Roadway contract Case IX – 2nd Relocations
Utility facilities require additional relocation or adjustment due to a plan change
Case X – Undergrounding Department determines it is in public interest to relocate aerial facilities to
underground
Utility Agreement Estimate I. Company:
Address:
*Estimate Prepared By:
II. Project #: County:PI #:
III. Georgia Department of Transportation (GDOT) Project Description:
ABC Power
Patrick Allen
Atlanta, GA
SR 3/Northside Dr from MLK to SR 8 Hollowell Pkwy
123456 Fulton
Utility Agreement Estimate Method of Accounting: [Section 645.113f and Section 645.117, 23 CFR 645A]
Work Order Accounting Procedure prescribed by regulatory body.
Established accounting procedure approved by State and FHWA.
Agreed Lump Sum.
Other (Including use of GDOT Form 8465):
(Check Method that Applies)
This estimate has been prepared by the Company in accordance with Title 23 of the Code of Federal Regulations (CFR), Chapter 1, Subchapter G, Part 645, Subpart A and in accordance with the Department's Utility Accommodation Policy and Standards Manual, Current Edition (Manual), to support a Utility Relocation Agreement between the Utility Company and the Department. The work will be performed and the costs accounted for in accordance with the methods described herein. Costs will be recorded as provided in Section 645.113f or Section 645.117, 23 CFR 645A. Equipment rental rates, salvage credit, accrued depreciation credit (expired service life) and betterment credit have been given due consideration and proper explanations have been noted in the estimate where applicable and as provided by 23 CFR 645A. Claim for reimbursement costs shown in the Estimate is based on the attached Certificate of Eligibility for reimbursement which is made a part hereof.
Utility Agreement Estimate
Total Preliminary Engineering CostsAttach Support Documentation to Estimate - See Exhibit:
Total Construction Engineering CostsAttach Support Documentation to Estimate - See Exhibit:
NOTE: Payment for Construction Engineering will not be allowed for Work included in GDOT Contracts.
Total Preliminary and Construction Engineering Costs
$10,518.50
$35,300.00
$45,818.50
Utility Agreement Estimate
VI. Right of Way Acquisition [Section 645.111, 23 CFR 645A](Check Applicable Section)
Replacement R/W or Easements are not required for adjustment of utilities facilities on this Project.
Replacement R/W or Easements shown on the attached plans will be acquired by the Company.Total Cost of Right of Way Acquisition $25,000.00
Replacement R/W shown on plans will be acquired by the Department (Separate written request must be furnished).
Attach Support Documentation to Estimate. Include Estimates for Appraisal, Negotiation, Recording, and Right-of-Way or Easement Costs - See Exhibit:
Utility Agreement Estimate VII. Construction [Section 645.115 and Section 645.117, 23 CFR 645A]
A. Description of Proposed Utility Work:
B. The Company will perform the work provided for in this Estimate by the following method: (Check Applicable Method - see page 3 for continuation)
By Company's Regular Forces
By ContractThe Company does not have adequate staff or equipment to perform the necessary work with its own forces; therefore, the Company, subject to approval of the Department and FHWA, proposes to contract the work covered by this estimate in accordance with the provisions of Section 645.115 (a), 23 CFR 645A. The items of work to be accomplished by contract are noted in this estimate. When the Company elects to solicit competitive bids from a list of qualified contractors rather than through advertising in a publication, the names and addresses of these contractors so circularized shall be noted on the estimate and furnished to the Department in advance of the Company's solicitation of bids. The Department shall approve the low bidder before work can began. Please provide Company Name, Address, and
The Company Proposes to use its regular construction or maintenance crews and personnel at its standard schedule of wages and working hours in accordance with the terms of its Agreement with such employees.
Utility Agreement Estimate
C. Detail of Construction CostsLabor Costs [Section 645.117, 23 CFR 645A]Attach Support Documentation to Estimate, Including Additives - See Exhibit:Materials Costs [Section 645.117(e), 23 CFR 645A]
Attach Support Documentation to Estimate - See Exhibit:Right-of-Way Clearing & Trimming Costs
Attach Support Documentation to Estimate - See Exhibit:Equipment Costs [Section 645.117(f), 23 CFR 645A]
Attach Support Documentation to Estimate - See Exhibit:Total Construction Costs
Total Costs of Proposed Relocation (V through VII)
$1,430,000.00
250,000.00
$1,500,818.50
1
$350,000.00
$750,000.00
$80,000.00
Utility Agreement Estimate
Total Salvage CreditTotal Accrued Depreciation and Salvage Credit
$75,000.00$140,000.00
The Department and the FHWA shall have the right to inspect recovered materials prior to disposal by sale or scrap. This requirement will be satisfied by the Company giving two weeks written notice to the Department or oral notice followed by written confirmation of the time and place the materials will be available for inspection. This notice is the responsibility of the Company and it may be held accountable for full value of materials disposed of without notice. If recovered materials are not reusable, they shall be disposed of as outlined in Section 645.117(e), 23 CFR 645A.
Utility Agreement Estimate X. Total Cost of Relocation
(Less Credits for Accrued Depreciation and Salvage Value, VIII-IX)
XI. Betterment Credit [Section 645.117(h), 23 CFR 645A (Check Applicable Statement) Betterment credit is not allowed in this estimate since there is to be no functional
increase in size in the replaced facility unless caused by proposed highway constructionBetterment credit is allowed as shown in the following comparison:Location of Betterment: (Please indicate Station, Route Name, and Number)
Betterment Credit Amount*Attach Support Documentation to Estimate - See Exhibit:
*Include Estimate for Cost to Install Proposed Facilities to Produce Current Capacity and the Cost to Install Proposed Facilities for Increased Capacity.
$1,360,818.50
$0.00
Utility Agreement Estimate XIII. Proportionate Share
(Check Applicable Statement - 1, 2, or 2 & 3)
1. The Department will bear 100 percent of the cost of the adjustments.
2. The Company will participate in a pro rata share of the cost of adjustments (No Betterments).
Percentage Split: Company Participation (If 0%, insert 100% for GDOT Participation)GDOT Participation
Total (Total Shall be 100%)Attach Support Documentation/Detailed Calculations to Estimate - See Exhibit:
30.00%100.00%
3. The Company will participate in a pro rata share of the cost of the adjustments determined as Betterments.
70.00%
Utility Agreement Estimate Items
V. Preliminary and Construction Engineering VI. Right-of-Way Acquisition CostsVII. Construction CostsVIII. Total for Proposed Relocation Work (V+VI+VII)IX. Total Accrued Depreciation and Salvage Credits ( - )X. Total Relocation WorkXI. Betterment Credit ( - )XII. Total Estimate of Reimbursable Adjustments (X-XI)XIII. Proportionate Share: Check Applicable Statement and Insert Above Estimate Amounts from X, XI, and XII
1. The Department will bear 100 percent of the cost of the adjustments (See XII).XII. Total Estimate of Reimbursable Adjustments
2. The Company will Participate in a pro rata share of the cost of adjustments (No Betterments).XII. Total Estimate of Reimbursable Adjustments
Percentage Split (Insert From Page 4) Proportionate Share:70.00% Company Participation Company Participation30.00% GDOT Participation GDOT Participation
$0.00
$952,572.95$408,245.55
$1,360,818.50
(OR)
$1,360,818.50$0.00$1,360,818.50
$140,000.00
Total$45,818.50$25,000.00$1,430,000.00$1,500,818.50
Utility Agreement Estimate Items
V. Preliminary and Construction Engineering VI. Right-of-Way Acquisition CostsVII. Construction CostsVIII. Total for Proposed Relocation Work (V+VI+VII)IX. Total Accrued Depreciation and Salvage Credits ( - )X. Total Relocation WorkXI. Betterment Credit ( - )XII. Total Estimate of Reimbursable Adjustments (X-XI)XIII. Proportionate Share: Check Applicable Statement and Insert Above Estimate Amounts from X, XI, and XII
1. The Department will bear 100 percent of the cost of the adjustments (See XII).XII. Total Estimate of Reimbursable Adjustments
2. The Company will Participate in a pro rata share of the cost of adjustments (No Betterments).XII. Total Estimate of Reimbursable Adjustments
Percentage Split (Insert From Page 4) Proportionate Share:70.00% Company Participation Company Participation30.00% GDOT Participation GDOT Participation
3. The Company will participate in a pro rata share of the cost of the adjustments determined as Betterments.
X. Total Relocation WorkXI. Betterment CreditXII. Total Estimate of Reimbursable Adjustments
Percentage Split Proportionate Share:#DIV/0! Company Participation Company Participation#DIV/0! GDOT Participation GDOT Participation
Combination of 2. and 3.X. Total Relocation WorkXI. Betterment CreditXII. Total Estimate of Reimbursable Adjustments
2. Percentage Spilt (Insert From Page 4) 0.00% Company Participation0.00% GDOT Participation
3. Plus Betterment Credit
2 Plus 3 Proportionate Share#DIV/0! Company Participation#DIV/0! GDOT Participation#DIV/0! Total
Arithmetic Extensions Checked and Found Correct.
District Utilities Engineer (Signature) (Date)
$0.00
$0.00
$0.00$0.00
Company ParticipationGDOT Participation
Company Participation$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00$0.00
(OR)
Company Participation $0.00$0.00GDOT Participation
$1,360,818.50$0.00$1,360,818.50
$140,000.00
Total$45,818.50$25,000.00$1,430,000.00$1,500,818.50
(OR)
$0.00
$952,572.95$408,245.55
$1,360,818.50
(OR)
Page 1
I.Company:ABC Power
Address:Atlanta, GA
*Estimate Prepared By:
II.Project #:123456County:Fulton
PI #:
III.Georgia Department of Transportation (GDOT) Project Description:
IV.Method of Accounting: [Section 645.113f and Section 645.117, 23 CFR 645A]
(Check Method that Applies)
Work Order Accounting Procedure prescribed by regulatory body.
Established accounting procedure approved by State and FHWA.
Agreed Lump Sum.
Other (Including use of GDOT Form 8465):
This estimate has been prepared by the Company in accordance with Title 23 of the Code of Federal Regulations (CFR), Chapter 1, Subchapter G, Part 645, Subpart A and in accordance with the Department's Utility Accommodation Policy and Standards Manual, Current Edition (Manual), to support a Utility Relocation Agreement between the Utility Company and the Department. The work will be performed and the costs accounted for in accordance with the methods described herein. Costs will be recorded as provided in Section 645.113f or Section 645.117, 23 CFR 645A. Equipment rental rates, salvage credit, accrued depreciation credit (expired service life) and betterment credit have been given due consideration and proper explanations have been noted in the estimate where applicable and as provided by 23 CFR 645A. Claim for reimbursement costs shown in the Estimate is based on the attached Certificate of Eligibility for reimbursement which is made a part hereof.
Name and Title of Authorized Company RepresentativeDate
Company Representative hereby certifies the Estimate and agrees that the Estimate shall remain valid for one year from the above authorized date. After one year from the authorized date, the Estimate may be subject to revision by the Utility Company.
*Please Provide Two (2) sets of Relocation Plans and Two (2) sets of signed estimates.
Estimate to Support Agreement for Relocation, Removal, or Adjustment of Facilities in Conflict with Proposed Transportation Construction
Estimate to Support Agreement for Relocation, Removal, or Adjustment of Facilities in Conflict with Proposed Transportation Construction
Estimate to Support Agreement for Relocation, Removal, or Adjustment of Facilities in Conflict with Proposed Transportation Construction
Estimate to Support Agreement for Relocation, Removal, or Adjustment of Facilities in Conflict with Proposed Transportation Construction
Estimate to Support Agreement for Relocation, Removal, or Adjustment of Facilities in Conflict with Proposed Transportation Construction
Estimate to Support Agreement for Relocation, Removal, or Adjustment of Facilities in Conflict with Proposed Transportation Construction
GDOT - State Utilities Office1First Use: September 24, 2009Revised January 9, 2015
GDOT - State Utilities Office1First Use: September 24, 2009Revised January 9, 2015
GDOT - State Utilities Office1First Use: September 24, 2009Revised January 9, 2015
GDOT - State Utilities Office1First Use: September 24, 2009Revised January 9, 2015
GDOT - State Utilities Office1First Use: September 24, 2009Revised January 9, 2015
GDOT - State Utilities Office1First Use: September 24, 2009Revised January 9, 2015
Page 2
V.Preliminary and Construction Engineering [Section 645.109, 23 CFR 645A, & 23 CFR 140B]
1. Preliminary Engineering authorized on this project by GDOT letter dated:
2. Plans and Estimate Prepared By:(Check Applicable Party)
Forces of this Company
Consultant: (Name and Address)
Approval of Consultant given by GDOT letter dated:Amount:
Effective date of Contract, if a Continuing Contract:Exp. Date:
The Certificate of Consultant Form is attached to the Consultant's Estimate of Engineering Services.
Scope of Work Detailing Preliminary Engineering and Construction Engineering attached to Consultant's Estimate of Engineering Services.
Total Preliminary Engineering Costs$10,518.50
Attach Support Documentation to Estimate - See Exhibit:
Total Construction Engineering Costs$35,300.00
Attach Support Documentation to Estimate - See Exhibit:
NOTE: Payment for Construction Engineering will not be allowed for Work included in GDOT Contracts.
Total Preliminary and Construction Engineering Costs$45,818.50
VI.Right of Way Acquisition [Section 645.111, 23 CFR 645A]
(Check Applicable Section)
Replacement R/W or Easements are not required for adjustment of utilities facilities on this Project.
Replacement R/W shown on plans will be acquired by the Department (Separate written request must be furnished).
Replacement R/W or Easements shown on the attached plans will be acquired by the Company.
Total Cost of Right of Way Acquisition$25,000.00
Attach Support Documentation to Estimate. Include Estimates for Appraisal, Negotiation, Recording, and Right-of-Way or Easement Costs - See Exhibit:
VII.Construction [Section 645.115 and Section 645.117, 23 CFR 645A]
A. Description of Proposed Utility Work:
B. The Company will perform the work provided for in this Estimate by the following method:
(Check Applicable Method - see page 3 for continuation)
By Company's Regular Forces
The Company Proposes to use its regular construction or maintenance crews and personnel at its standard schedule of wages and working hours in accordance with the terms of its Agreement with such employees.
By Contract
The Company does not have adequate staff or equipment to perform the necessary work with its own forces; therefore, the Company, subject to approval of the Department and FHWA, proposes to contract the work covered by this estimate in accordance with the provisions of Section 645.115 (a), 23 CFR 645A. The items of work to be accomplished by contract are noted in this estimate. When the Company elects to solicit competitive bids from a list of qualified contractors rather than through advertising in a publication, the names and addresses of these contractors so circularized shall be noted on the estimate and furnished to the Department in advance of the Company's solicitation of bids. The Department shall approve the low bidder before work can began. Please provide Company Name, Address, and Contact Person and Number below:
Estimate for Relocation, Removal, or Adjustment of Utility Facilities
Estimate for Relocation, Removal, or Adjustment of Utility Facilities
Estimate for Relocation, Removal, or Adjustment of Utility Facilities
Estimate for Relocation, Removal, or Adjustment of Utility Facilities
Estimate for Relocation, Removal, or Adjustment of Utility Facilities
Estimate for Relocation, Removal, or Adjustment of Utility Facilities
GDOT - State Utilities Office2First Use: September 24, 2009Revised January 9, 2015
GDOT - State Utilities Office2First Use: September 24, 2009Revised January 9, 2015
GDOT - State Utilities Office2First Use: September 24, 2009Revised January 9, 2015
GDOT - State Utilities Office2First Use: September 24, 2009Revised January 9, 2015
GDOT - State Utilities Office2First Use: September 24, 2009Revised January 9, 2015
GDOT - State Utilities Office2First Use: September 24, 2009Revised January 9, 2015
Page 3
By Existing Continuing Contract
Subject to the approval of the Department and the FHWA, the Company proposes to use an existing continuing contract performed under which certain work as shown by the Company's estimate is regularly performed for the Company and under which the lowest available costs are developed. The name of the contractor or contractors are listed in the company's estimate. Please indicate the Company Name, Address, and Contact Person and Number below (If needed, attach additional names to Estimate). Once the Company selects a continuing contractor, a copy of the continuing contract has to be submitted to the Department for approval before any work begans.
Effective Date of Continuing Contract:Expiration Date:
C. Detail of Construction Costs
Labor Costs [Section 645.117, 23 CFR 645A]$350,000.00
Attach Support Documentation to Estimate, Including Additives - See Exhibit:
Materials Costs [Section 645.117(e), 23 CFR 645A] $750,000.00
Attach Support Documentation to Estimate - See Exhibit:
Right-of-Way Clearing & Trimming Costs$80,000.00
Attach Support Documentation to Estimate - See Exhibit:
Equipment Costs [Section 645.117(f), 23 CFR 645A]250,000.00
Attach Support Documentation to Estimate - See Exhibit:1
Total Construction Costs$1,430,000.00
VIII.Total Costs of Proposed Relocation (V through VII)$1,500,818.50
IX.Detail of Accrued Depreciation and Salvage Credits
A. Accrued Depreciation (Expired Service Life) [Section 645.117(h), 23 CFR 645A]
(Check Applicable Statement)
Accrued Depreciation is not allowed in this estimate.
Accrued Depreciation is allowed in this estimate.
(Please Provide Detailed Description/Explanation i.e. Pumping Station, Filtration Plant, Power Plant, Substation, etc.)
Accrued Depreciation Credit$65,000.00
Attach Support Documentation to Estimate - See Exhibit:1
B. Salvage [Section 645.117(e), 23 CFR 645A]
(Check Applicable Statement)
Salvage is not allowed in this estimate because:
Salvage from temporary material is not allowed because:
Salvage is allowed in this estimate.
Salvage from temporary material is allowed.
The Department and the FHWA shall have the right to inspect recovered materials prior to disposal by sale or scrap. This requirement will be satisfied by the Company giving two weeks written notice to the Department or oral notice followed by written confirmation of the time and place the materials will be available for inspection. This notice is the responsibility of the Company and it may be held accountable for full value of materials disposed of without notice. If recovered materials are not reusable, they shall be disposed of as outlined in Section 645.117(e), 23 CFR 645A.
Total Salvage Credit$75,000.00
Total Accrued Depreciation and Salvage Credit$140,000.00
* See Contingencies & Markups
Estimate for Relocation, Removal, or Adjustment of Utility Facilities
Estimate for Relocation, Removal, or Adjustment of Utility Facilities
Estimate for Relocation, Removal, or Adjustment of Utility Facilities
Estimate for Relocation, Removal, or Adjustment of Utility Facilities
Estimate for Relocation, Removal, or Adjustment of Utility Facilities
Estimate for Relocation, Removal, or Adjustment of Utility Facilities
GDOT - State Utilities Office3First Use: September 24, 2009Revised January 9, 2015
GDOT - State Utilities Office3First Use: September 24, 2009Revised January 9, 2015
GDOT - State Utilities Office3First Use: September 24, 2009Revised January 9, 2015
GDOT - State Utilities Office3First Use: September 24, 2009Revised January 9, 2015
GDOT - State Utilities Office3First Use: September 24, 2009Revised January 9, 2015
GDOT - State Utilities Office3First Use: September 24, 2009Revised January 9, 2015
Page 4
X.Total Cost of Relocation$1,360,818.50
(Less Credits for Accrued Depreciation and Salvage Value, VIII-IX)
XI.Betterment Credit [Section 645.117(h), 23 CFR 645A](Check Applicable Statement)
Betterment credit is not allowed in this estimate since there is to be no functional
increase in size in the replaced facility unless caused by proposed highway construction
Betterment credit is allowed as shown in the following comparison:
Location of Betterment: (Please indicate Station, Route Name, and Number)
Betterment Credit Amount$0.00
*Attach Support Documentation to Estimate - See Exhibit:
*Include Estimate for Cost to Install Proposed Facilities to Produce Current Capacity and the Cost to Install Proposed Facilities for Increased Capacity.
XII.Total Estimated Cost of Reimbursable Adjustments$1,360,818.50
(Item X less Item XI)
XIII.Proportionate Share
(Check Applicable Statement - 1, 2, or 2 & 3)
1. The Department will bear 100 percent of the cost of the adjustments.
2. The Company will participate in a pro rata share of the cost of adjustments (No Betterments).
Percentage Split:70.00%Company Participation (If 0%, insert 100% for GDOT Participation)
30.00%GDOT Participation
Total100.00%(Total Shall be 100%)
Attach Support Documentation/Detailed Calculations to Estimate - See Exhibit:
3. The Company will participate in a pro rata share of the cost of the adjustments determined as Betterments.
Estimate for Relocation, Removal, or Adjustment of Utility Facilities
Estimate for Relocation, Removal, or Adjustment of Utility Facilities
Estimate for Relocation, Removal, or Adjustment of Utility Facilities
Estimate for Relocation, Removal, or Adjustment of Utility Facilities
Estimate for Relocation, Removal, or Adjustment of Utility Facilities
Estimate for Relocation, Removal, or Adjustment of Utility Facilities
GDOT - State Utilities Office4First Use: September 24, 2009Revised January 9, 2015
GDOT - State Utilities Office4First Use: September 24, 2009Revised January 9, 2015
GDOT - State Utilities Office4First Use: September 24, 2009Revised January 9, 2015
GDOT - State Utilities Office4First Use: September 24, 2009Revised January 9, 2015
GDOT - State Utilities Office4First Use: September 24, 2009Revised January 9, 2015
GDOT - State Utilities Office4First Use: September 24, 2009Revised January 9, 2015
Page 5
ItemsTotal
V.Preliminary and Construction Engineering $45,818.50
VI.Right-of-Way Acquisition Costs$25,000.00
VII.Construction Costs$1,430,000.00
VIII.Total for Proposed Relocation Work (V+VI+VII)$1,500,818.50
IX.Total Accrued Depreciation and Salvage Credits( - )$140,000.00
X.Total Relocation Work$1,360,818.50
XI.Betterment Credit( - )$0.00
XII.Total Estimate of Reimbursable Adjustments (X-XI)$1,360,818.50
XIII.Proportionate Share: Check Applicable Statement and Insert Above Estimate Amounts from X, XI, and XII
1. The Department will bear 100 percent of the cost of the adjustments (See XII).
XII. Total Estimate of Reimbursable Adjustments$0.00
(OR)
2. The Company will Participate in a pro rata share of the cost of adjustments (No Betterments).
XII. Total Estimate of Reimbursable Adjustments$1,360,818.50
Percentage Split (Insert From Page 4)Proportionate Share:
70.00%Company Participation$952,572.95Company Participation
30.00%GDOT Participation$408,245.55GDOT Participation
(OR)
3. The Company will participate in a pro rata share of the cost of the adjustments determined as Betterments.
X. Total Relocation Work$0.00
XI. Betterment Credit$0.00
XII. Total Estimate of Reimbursable Adjustments$0.00
Percentage SplitProportionate Share:
ERROR:#DIV/0!Company Participation$0.00Company Participation
ERROR:#DIV/0!GDOT Participation$0.00GDOT Participation
(OR)
Combination of 2. and 3.
X. Total Relocation Work$0.00
XI. Betterment Credit$0.00
XII. Total Estimate of Reimbursable Adjustments$0.00
2. Percentage Spilt (Insert From Page 4)
0.00%Company Participation$0.00Company Participation
0.00%GDOT Participation$0.00GDOT Participation
3. Plus Betterment Credit
$0.00Company Participation
2 Plus 3 Proportionate Share
ERROR:#DIV/0!Company Participation$0.00Company Participation
ERROR:#DIV/0!GDOT Participation$0.00GDOT Participation
ERROR:#DIV/0!$0.00Total
Arithmetic Extensions Checked and Found Correct.
District Utilities Engineer (Signature)(Date)
&"Arial,Bold"&12Estimate for Relocation, Removal, or Adjustment of Utility FacilitiesSummary of Costs
&"Arial,Bold"&12Estimate for Relocation, Removal, or Adjustment of Utility FacilitiesSummary of Costs
&"Arial,Bold"&12Estimate for Relocation, Removal, or Adjustment of Utility FacilitiesSummary of Costs
&"Arial,Bold"&12Estimate for Relocation, Removal, or Adjustment of Utility FacilitiesSummary of Costs
&"Arial,Bold"&12Estimate for Relocation, Removal, or Adjustment of Utility FacilitiesSummary of Costs
&"Arial,Bold"&12Estimate for Relocation, Removal, or Adjustment of Utility FacilitiesSummary of Costs
GDOT - State Utilities Office5First Use: September 24, 2009Revised January 9, 2015
GDOT - State Utilities Office5First Use: September 24, 2009Revised January 9, 2015
GDOT - State Utilities Office5First Use: September 24, 2009Revised January 9, 2015
GDOT - State Utilities Office5First Use: September 24, 2009Revised January 9, 2015
GDOT - State Utilities Office5First Use: September 24, 2009Revised January 9, 2015
GDOT - State Utilities Office5First Use: September 24, 2009Revised January 9, 2015
Page 6
Company Name:
GDOT Project No:
GDOT PI No:123456
County:
The Company shall attach a completed Facility Detail Summary to substantiate and prove its facilities are eligible for reimbursement. As a minimum, the Company shall provide the following information:
Location of Facility (Referencing Project Station Number and intersecting street, road, or highway)
Date Existing Facility was installed by Utility Owner
Indicate location of utilities: Private property by deed or easement or on a public facility by permit. Indicate dates of all applicable deeds, easements, or permits.
Case Number of Reimbursement eligibility (See Chapter 4 of the Utility Accommodation Policy and Standards Manual - classification to be made by the Utility Company and Verified by GDOT District Utilities Office)
Any other information that may assist the Department in certifying eligibility.
This is to certify that the utility facilities as presently existing and as to be adjusted or relocated and as shown on the plans and estimate of cost supporting the Utility Relocation Agreement for which reimbursement is to be claimed, are owned, operated and maintained the company listed above. The facts concerning location of utility facilities, dates of installations and records of the Company showing its property interests will be made available for inspections by representatives of the Department at the office of the Company. It is further certified that the facilities shown as located on private property are correctly shown; that the facilities as located on streets and roads or other permits and franchise rights are correctly shown. Further, the above information as to title records, permits and franchise rights are correctly shown.
John DoeApril 28, 2019
Name and Title of Authorized Company RepresentativeDate
The facilities noted on the attached summary, as required by this estimate, have been reviewed in the field with a representative of the Utility Owner. This is to certify that the facilities noted on the attached summary and shown to be on streets, roads, highways, or other public facilities are correct, and the facilities shown to be on private property are correct; further, that the cost of adjustment as covered by the attached estimate is eligible for reimbursement by the Department under the noted case(s) as described in Chapter 4 of the Utility Accommodation Policy and Standards Manual.
Jane WiiliiamsMay 3, 2019
GDOT District EngineerDate
Certificate of Eligibility for Utility Reimbursement
Certificate of Eligibility for Utility Reimbursement
Certificate of Eligibility for Utility Reimbursement
Certificate of Eligibility for Utility Reimbursement
Certificate of Eligibility for Utility Reimbursement
Certificate of Eligibility for Utility Reimbursement
GDOT - State Utilities Office6First Use: September 24, 2009Revised January 9, 2015
GDOT - State Utilities Office6First Use: September 24, 2009Revised January 9, 2015
GDOT - State Utilities Office6First Use: September 24, 2009Revised January 9, 2015
GDOT - State Utilities Office6First Use: September 24, 2009Revised January 9, 2015
GDOT - State Utilities Office6First Use: September 24, 2009Revised January 9, 2015
GDOT - State Utilities Office6First Use: September 24, 2009Revised January 9, 2015
Certificate of Eligilibility
Company Name:
Georgia Project No:
Georgia PI No:123456
County:
Facility Right or Permission
Facility Location (Provide Station Number and Intersecting Streets, Roads, or Highways)Date Existing Facility InstalledPrivate Property by Deed or EasementPublic Facility by Permit or FranchiseInsert Reimbursement Case Number 1-10 as outlined in 4.2.A.2 ManualSupplemental Information
DB 23 Pg 275-279I
Certificate of Eligibility for Utility ReimbursementFacility Detail Summary
Certificate of Eligibility for Utility ReimbursementFacility Detail Summary
Certificate of Eligibility for Utility ReimbursementFacility Detail Summary
Certificate of Eligibility for Utility ReimbursementFacility Detail Summary
Certificate of Eligibility for Utility ReimbursementFacility Detail Summary
Certificate of Eligibility for Utility ReimbursementFacility Detail Summary
GDOT - State Utilities OfficeFirst Use: September 24, 2009Revised January 9, 2015
GDOT - State Utilities OfficeFirst Use: September 24, 2009Revised January 9, 2015
GDOT - State Utilities OfficeFirst Use: September 24, 2009Revised January 9, 2015
GDOT - State Utilities OfficeFirst Use: September 24, 2009Revised January 9, 2015
GDOT - State Utilities OfficeFirst Use: September 24, 2009Revised January 9, 2015
GDOT - State Utilities OfficeFirst Use: September 24, 2009Revised January 9, 2015
Engineering Billing Breakdown
REQUIRED FORMAT FOR PRESENTING ENGINEERING FEES - BILLING
PRELIMINARY ENGINEERINGHOURSAMOUNT
CLASSIFICATIONBare Labor (per hr.)Overhead (per hr.)Total RateThis BillTOTAL TO DATEThis BillTOTAL TO DATEApproved Estimate
Design Engineer$ 20.00$ 20.0084$ 1,680.00$ 20.00
CADD Operator$ 18.00$ 18.00160$ 2,880.00$ 18.00
Survey Chief$ 16.00$ 16.00160$ 2,560.00$ 16.00
Laborer$ 12.00$ 12.00210$ 2,520.00$ 12.00
Other (Specify)$ - 0$ - 0$ - 0
COST OF LABOR$ 9,640.00$ 66.00
INCIDENTALS
Transportation700miles @0.055per mile=$ 38.50
Subsistance30days @28per day=$ 840.00
Other(specify)
COST OF INCIDENTALS$ 878.50$ 878.50
*FIXED FEE(PROFIT)
TOTAL PRELIMINARY ENGINEERING$ 10,518.50$ 944.50$ - 0
CONSTRUCTION ENGINEERING
HOURSAMOUNT
CLASSIFICATIONBare Labor (per hr.)Overhead (per hr.)Total RateThis BillTOTAL TO DATEThis BillTOTAL TO DATEApproved Estimate
Engineer
Inspector$ 25.00$ 25.00728$ 18,200.00$ 25.00
Survey Chief$ 18.00$ 18.00650$ 11,700.00$ 18.00
Laborer$ 12.00$ 12.00450$ 5,400.00$ 12.00
Other (Specify)$ - 0$ - 0$ - 0
COST OF LABOR$ 35,300.00$ 55.00
INCIDENTALS
Transportation729miles @0.55per mile=$ 400.95
Subsistance60days @28per day=$ 1,680.00
Other(specify)
COST OF INCIDENTALS$ - 0$ 2,080.95
*FIXED FEE(PROFIT)
TOTAL CONSTRUCTION ENGINEERING$ 35,300.00$ 2,135.95$ - 0
Estimated
TOTAL PRELIMINARY AND CONSTRUCTION ENGINEERING$ 45,818.50$ 3,080.45$ - 0
* If the scope of work changes, a revised estimate will be required and the FIXED FEE may be renegotiated.
Certificate of Consultant
Certificate of Consultant
I hereby certify that I am the _________________ representative of the firm of ______________________________________________________________________________________, and that except as expressly stated and described herein, neither I nor the firm of ___________________________________________has, in connection with its contract with ________________________, entered into pursuant to provisions of an agreement between the (Name of Utility)aforementioned utility and the State of _____________, as a part of Federal-aid project___________________________.
(A) employed or retained for a commission, percentage, brokerage, contingent fee, or other consideration , any firm, company, or person, other than a bona fide employee working solely for me or the aforementioned firm, to solicit or secure the contract, or(B) agreed, as an express or implied condition for obtaining the award of the contract, to employ or retain the services of any firm, company, or person in connection with the carrying out of the contract, or(C) paid, or agreed to pay, to any firm, company organization, or person, other than a bona fide employee working solely for me or the aforementioned firm, any fee, contribution, donation, or consideration of any kind for, or in connection with, procuring or carrying out the contract.
(Statement and Explanation of exception, if any): I acknowledge that this certificate is to be furnished to the Department of Transportation in connection with the aforementioned project involving participation of Federal-aid Highway funds, and is subject to applicable State and federal laws, both criminal and civil. _______________________________________Date Signature
Guidelines
&"Tahoma,Regular"&12Guidelines for Completing the Estimate for Relocation, Removal, or Adjustment of Utility Facilities
&"Tahoma,Regular"&12Guidelines for Completing the Estimate for Relocation, Removal, or Adjustment of Utility Facilities
&"Tahoma,Regular"&12Guidelines for Completing the Estimate for Relocation, Removal, or Adjustment of Utility Facilities
&"Tahoma,Regular"&12Guidelines for Completing the Estimate for Relocation, Removal, or Adjustment of Utility Facilities
&"Tahoma,Regular"&12Guidelines for Completing the Estimate for Relocation, Removal, or Adjustment of Utility Facilities
&"Tahoma,Regular"&12Guidelines for Completing the Estimate for Relocation, Removal, or Adjustment of Utility Facilities
GDOT - State Utilities OfficeFirst Use: September 24, 2009Revised January 9, 2015
GDOT - State Utilities OfficeFirst Use: September 24, 2009Revised January 9, 2015
GDOT - State Utilities OfficeFirst Use: September 24, 2009Revised January 9, 2015
GDOT - State Utilities OfficeFirst Use: September 24, 2009Revised January 9, 2015
GDOT - State Utilities OfficeFirst Use: September 24, 2009Revised January 9, 2015
GDOT - State Utilities OfficeFirst Use: September 24, 2009Revised January 9, 2015
The Utility Agreement Cost Estimate (Estimate), formerly known as the 10 Page Estimate, has been revised to accommodate current practices of Utility Companies use of attachments and exhibits to support the estimate categories and overall totals. The Estimate has been streamlined by requiring the Company to insert the final estimate amounts for the major categories of the work such as Engineering, Right-of-Way, Construction, Salvage and Depreciation, Betterment, and Proportionate Share. The Company will need to provide documentation (“Exhibits”) to support the estimate categories. The Estimate no longer has separate tables under the major categories for the Company to complete. The Company’s exhibits (or attachments) will take the place of the tables in the previous Estimate versions. The Company should insert data into all of the applicable orange shaded fields. The Company should note all exhibits/attachments in the Estimate with the appropriate designation (Example – Exhibit A, Exhibit B, etc.).
Page 3: The Company will need to provide a copy of the Continuing Contract for the contractor selected to complete the relocation work.
Page 4: For Item XIII, the Company shall check the appropriate statement: Either the Department will participate at 100%, or… The Company and the Department will share in the costs with no betterments, or… The Company and the Department will share in the costs with the Company funding betterments, or…, The Company and the Department will share in the costs with the Company funding betterments and non-betterments. Page 5: Items V through XII will calculate or populate automatically. However, as stated above, the Company will need to check the appropriate statements as applicable to the specific estimate and project. In addition, the Company will need to complete the section by inserting the numbers calculated/populated at the top of the page into the applicable section and shaded fields. Depending on which statement is selected, the Company will also need to insert the participation percentages from Page 4. Remember, if the section or field is shaded, input, if applicable to the section or item, is required from the Company.
Contingencies and Markups
To promote accuracy and consistency, the Office of Utilities at the Georgia Department of Transportation (GDOT) is providing clarification for Contingencies and Markups when preparing the estimates for utilities relocation work. Please note that GDOT’s Estimate for Relocation, Removal, or Adjustment of Facilities conveniently refers to the corresponding Federal Regulations listed below. CONTIGENCIES: Contingencies cost are generally unallowable except in some cases as outlined in the Federal Acquisition Regulation (FAR) 31.205-7(c) (2). See link below and attachment for excerpt. https://acquisition.gov/far/current/html/Subpart%2031_2.html#wp1095552 MARKUPS: The 23 CFR, Part 645, Subpart A, Section 645.117 “Cost development and reimbursement” explains in detail what costs are allowable. See link below and attachment for excerpt. http://www.fhwa.dot.gov/legsregs/directives/fapg/cfr0645a.htm23 CFR, Part 645, Subpart A, Section 645.117 allows for the utility to bill direct labor and additives such as labor surcharge (cost of benefits) and overhead. Theses additives can be billed as a percentage of cost. The regulation also requires the utility to provide documentation of the rate(s) charged, the components of the rate(s), and the basis of the allocation (the cost to rate(s) were applied to) of the each additive. Any additional additives to the direct labor other than the above, is not allowed. For Material and supply costs, the “Handling Cost” can be shown as an actual cost or as a percentage in lieu of the actual or average cost (refer to Sec. 645.117 (e) (4)).
Utility Agreement Estimate
• Project Cost Updates
Concept Development
Project Milestones
• Historical Data
Items included in the roadway contract
Agreement Estimates provided by Utilities
Directly from Utility Owners
Utility Estimates
FILE
Project No: Office:County Date:P.I.#
Description:
FROM
TO
SUBJECT
Reimbursable Non-Reimbursable
$715,000.00 $677,500.00$1,250,000.00 $500,000.00
$0.00 $0.00$0.00 $74,000.00
** $0.00 $215,750.00** $0.00 $120,000.00** $41,000.00 $60,000.00
$36,000.00 $120,000.00$0.00 $124,000.00$0.00 $36,000.00
100.00% $2,042,000.00 $1,927,250.00100.00% $2,042,000.00
0.00% $0.00
** Indicates Potential Utility Aid Request from Local Gov't
City of AtlantaClayton CountyCity of AtlantaColonial PipelineTelephone 1
Department ResponsibilityLocal Sponsor Responsibility
Site Visit / Available Drawings
Zayo
Site Visit / Available Drawings
Georgia Transmission CorpGeorgai Power
Estimate Based onUtility Owner
PFA Dated N/A with N/A
Power Co 3Comcast
Total
Site Visit / Available DrawingsSite Visit / Available Drawings
Site Visit / Available Drawings
Site Visit / Available DrawingsSite Visit / Available DrawingsSite Visit / Available DrawingsSite Visit / Available Drawings
DEPARTMENT OF TRANSPORTATIONSTATE OF GEORGIA
A review of utilities located on the above referenced project has been conducted without a design concept. Listed below is a breakdown of the anticipated reimbursable and non-reimbursable cost.
Site Visit / Available Drawings
___________
ATLANTAMay 2, 2019
INTERDEPARTMENT CORRESPONDENCE
AASHTO CRUO Chattanooga
n/aForsyth1234567
PRELIMINARY UTILITY COST ESTIMATE
xxxx xxxxx, Project Manager
Robby Oliver, District Utilities Manager
Utility Owner Reimbursable Non-Reimbursable Estimate Based on
Georgia Power $715,000.00 $677,500.00 Site Visit / Available DrawingsGeorgia Transmission Corp $1,250,000.00 $500,000.00 Site Visit / Available DrawingsPower Co 3 $0.00 $0.00 Site Visit / Available DrawingsComcast $0.00 $74,000.00 Site Visit / Available DrawingsCity of Atlanta ** $0.00 $215,750.00 Site Visit / Available DrawingsClayton County ** $0.00 $120,000.00 Site Visit / Available DrawingsCity of Atlanta ** $41,000.00 $60,000.00 Site Visit / Available DrawingsColonial Pipeline $36,000.00 $120,000.00 Site Visit / Available DrawingsAT&T $0.00 $124,000.00 Site Visit / Available DrawingsZayo $0.00 $36,000.00 Site Visit / Available Drawings
Total 100.00% $2,042,000.00 $1,927,250.00Department Responsibility 100.00% $2,042,000.00
Local Sponsor Responsibility 0.00% $0.00 PFA Dated N/A with N/A
** Indicates Potential Utility Aid Request from Local Gov't
Utility EstimatesP.I.# 1234567
Power Company Name
Reimbursable Costs 5/3/2019 5/3/2019 5/3/2019
Units Quantity Unit Cost Subtotal Units Quantity Unit Cost Subtotal Units Quantity Unit Cost SubtotalPrel Eng. -$ -$ -$ Constr Eng. -$ -$ -$ Easements -$ -$ -$ Facilities, Poles - type 1 EA 2 35,000.00$ 70,000.00$ EA -$ EA -$ Facilities, Poles - type 2 EA -$ EA 5 250,000.00$ 1,250,000.00$ EA -$ Facilities, Poles - type 3 EA 15 43,000.00$ 645,000.00$ EA -$ EA 0 22,000.00$ -$ Facilities, Other -$ -$ -$
Total 715,000.00$ 1,250,000.00$ -$
Non Reimbursable Costs
Units Quantity Unit Cost Subtotal Units Quantity Unit Cost Subtotal Units Quantity Unit Cost SubtotalPrel Eng. -$ -$ -$ Constr Eng. -$ -$ -$ Easements -$ -$ -$ Facilities, Poles - type 1 EA 10 35,000.00$ 350,000.00$ EA -$ EA -$ Facilities, Poles - type 2 EA -$ EA 2 250,000.00$ 500,000.00$ EA -$ Facilities, Poles - type 3 EA 5 43,000.00$ 215,000.00$ EA -$ EA 0 22,000.00$ -$ UG electric LF 750 150.00$ 112,500.00$ -$ -$
Total 677,500.00$ 500,000.00$ -$
Georgia Power Georgai Transmission Corp Power Company 3
Power Company Relocation Costs
Utility Estimates
FILE
Project No: Office:County Date:P.I.#
Description:
FROM
TO
SUBJECT
Formats are set. I would prefer that you do not change any fonts, sizes etc, with the exception of the "Additional comments" go here box. You can make that box taller if needed to show entire comment added.
Reimbursable Non-Reimbursable
$70,000.00 $350,000.00 These boxes are drop down choices. Verify that choice shown is what you want to show.$1,250,000.00 $500,000.00
$0.00 $0.00 These box contain formulas, but you may need to change them as they are location specific.$0.00 $74,000.00 I can help with this.
** $0.00 $215,750.00** $0.00 $120,000.00 These boxes are where data needs to be filled in and/or changed.** $41,000.00 $60,000.00 May just be part of the box (e.g. add an appropriate date or name to PFA box).
$36,000.00 $120,000.00$0.00 $124,000.00 These boxes contain formulas that I would prefer not be changed. However, they can be$0.00 $36,000.00 changed if necessary - just be sure to let me know.
100.00% $1,397,000.00 $1,599,750.00100.00% $1,397,000.00
0.00% $0.00
For ease of your estimates, you can just put the information in as if it is the Initial estimate.Estimate is based on the best available information at the current stage, unforeseen prior rights information may be provided by the Utility Company at a later date that could cause some non-reimbursable costs to shift to the reimbursable cost column.
Additional comments go here if needed. Delete this line if not needed.
If additional information is needed, please contact Robby Oliver at 770-531-5772.
cc: Patrick Allen, State Utilities AdministratorYulonda Pride-Foster, State Utilities Preconstruction Manager???, DesignerBrandon Kirby, District Preconstruction EngineerScott Frederick, Area ManagerFile
** Indicates Potential Utility Aid Request from Local Gov't
City of AtlantaClayton CountyCity of AtlantaColonial PipelineTelephone 1
Department ResponsibilityLocal Sponsor Responsibility
Site Visit / Available Drawings
Zayo
Site Visit / Available Drawings
Georgia Transmission CorpGeorgai Power
Estimate Based onUtility Owner
PFA Dated N/A with N/A
Power Co 3Comcast
Total
Site Visit / Available DrawingsSite Visit / Available Drawings
Site Visit / Available Drawings
Site Visit / Available DrawingsSite Visit / Available DrawingsSite Visit / Available DrawingsSite Visit / Available Drawings
DEPARTMENT OF TRANSPORTATIONSTATE OF GEORGIA
A review of utilities located on the above referenced project has been conducted without a design concept. Listed below is a breakdown of the anticipated reimbursable and non-reimbursable cost.
Site Visit / Available Drawings
___________
ATLANTAMay 3, 2019
INTERDEPARTMENT CORRESPONDENCE
AASHTO CRUO Chattanooga
n/aForsyth1234567
PRELIMINARY UTILITY COST ESTIMATE
xxxx xxxxx, Project Manager
Robby Oliver, District Utilities Manager
Unit Cost
660-1215 SEWER FORCE MAIN, 4 IN, - 5,880.00 4 LF 41.76 38.65
660-1220 SEWER FORCE MAIN, 6 IN, - 14,841.00 5 LF 32.89 15.71
660-1225 SEWER FORCE MAIN, 8 IN, - 8,016.00 6 LF 135.61 61.60
660-1230 SEWER FORCE MAIN, 10 IN, - 1,185.00 2 LF 34.35 34.56
Georgia Department Of TransportationItem Mean Summary for May-06-2005 to Mar-26-2019
2013 Spec
ITEM CODE ITEM DESCRIPTION QUANTITY USE UM MEAN WTD AVG
Unit Cost
670-1120 WATER MAIN, 12 IN 179,264.00 45 LF 110.46 84.74
670-1140 WATER MAIN, 14 IN 2,265.00 3 LF 164.92 71.72
670-1160 WATER MAIN, 16 IN 34,641.00 15 LF 169.57 88.96
670-1180 WATER MAIN, 18 IN 200.00 1 LF 109.62 109.62
Georgia Department Of TransportationProcessed Date: Mar-26-2019
Item Mean Summary for May-06-2005 to Mar-26-20192013 Spec
ITEM CODE ITEM DESCRIPTION QUANTITY USE UM MEAN WTD AVG
References
Federal Acquisition Regulations (FAR) – CFR 48 – Part 31https://www.ecfr.gov/cgi-bin/text-idx?tpl=/ecfrbrowse/Title48/48cfr31_main_02.tpl
23 CFR 645.109https://www.gpo.gov/fdsys/pkg/CFR-2017-title23-vol1/pdf/CFR-2017-title23-vol1-sec645-
109.pdf
23 CFR 172https://www.gpo.gov/fdsys/pkg/CFR-2017-title23-vol1/xml/CFR-2017-title23-vol1-part172.xml
https://www.ecfr.gov/cgi-bin/text-idx?tpl=/ecfrbrowse/Title48/48cfr31_main_02.tplhttps://www.gpo.gov/fdsys/pkg/CFR-2017-title23-vol1/pdf/CFR-2017-title23-vol1-sec645-109.pdfhttp://www.fhwa.dot.gov/legsregs/directives/fapg/cfr0645a.htm
Code of Federal Regulations, Title 23, Part 645 Part A & B Utilities
http://www.fhwa.dot.gov/legsregs/directives/fapg/cfr0645a.htm
http://www.fhwa.dot.gov/legsregs/directives/fapg/cfr0645b.htm
GDOT Reimbursable Utilities Estimate www.dot.ga.gov/PartnerSmart/utilities/Pages/Details.aspx?categoryID=8
Program Guide, Utility Relocation and Accommodation https://www.fhwa.dot.gov/reports/utilguid/if03014.pdf
References
http://www.fhwa.dot.gov/legsregs/directives/fapg/cfr0645a.htmhttp://www.fhwa.dot.gov/legsregs/directives/fapg/cfr0645b.htmhttp://www.dot.ga.gov/PartnerSmart/utilities/Pages/Details.aspx?categoryID=8https://www.fhwa.dot.gov/reports/utilguid/if03014.pdf
Questions?
FILE
Project No: Office:County Date:P.I.#
Description:
FROM
TO
SUBJECT
Reimbursable Non-Reimbursable$715,000.00 $677,500.00
$1,250,000.00 $500,000.00$0.00 $0.00$0.00 $74,000.00
** $0.00 $215,750.00** $0.00 $120,000.00** $41,000.00 $60,000.00
$36,000.00 $120,000.00$0.00 $124,000.00$0.00 $36,000.00
100.00% $2,042,000.00 $1,927,250.00100.00% $2,042,000.00
0.00% $0.00
DEPARTMENT OF TRANSPORTATIONSTATE OF GEORGIA
A review of utilities located on the above referenced project has been conducted without a design concept. Listed below is a breakdown of the anticipated reimbursable and non-reimbursable cost.
Site Visit / Available Drawings
___________
ATLANTAMay 2, 2019
INTERDEPARTMENT CORRESPONDENCE
AASHTO CRUO Chattanooga
n/aForsyth1234567
PRELIMINARY UTILITY COST ESTIMATE
xxxx xxxxx, Project Manager
Robby Oliver, District Utilities Manager
Georgia Transmission CorpGeorgai Power
Estimate Based onUtility Owner
PFA Dated N/A with N/A
Power Co 3Comcast
Total
Site Visit / Available DrawingsSite Visit / Available Drawings
Site Visit / Available Drawings
Site Visit / Available DrawingsSite Visit / Available DrawingsSite Visit / Available DrawingsSite Visit / Available Drawings
** Indicates Potential Utility Aid Request from Local Gov't
City of AtlantaClayton CountyCity of AtlantaColonial PipelineTelephone 1
Department ResponsibilityLocal Sponsor Responsibility
Site Visit / Available Drawings
Zayo
Site Visit / Available Drawings
Estimate is based on the best available information at the current stage, unforeseen prior rights information may be provided by the Utility Company at a later date that could cause some non-reimbursable costs to shift to the reimbursable cost column.
Additional comments go here if needed. Delete this line if not needed.
If additional information is needed, please contact Robby Oliver at 770-531-5772.
cc: Patrick Allen, State Utilities AdministratorYulonda Pride-Foster, State Utilities Preconstruction Manager???, DesignerBrandon Kirby, District Preconstruction EngineerScott Frederick, Area ManagerFile
ITEM CODE
150-0008
150-0009
150-1000
150-5010
150-6000
150-7010
150-9011
151-1000
153-1300
153-1400
154-1000
156-0100
158-1000
163-0232
163-0240
163-0300
163-0501
163-0502
163-0503
163-0520
163-0527
163-0528
163-0529
163-0531
163-0535
163-0539
163-0540
163-0541
163-0542
163-0543
163-0550
163-1930
165-0010
165-0030
165-0041
165-0050
13
ITEM CODE
165-0060
165-0071
165-0085
165-0086
165-0087
165-0095
165-0096
165-0101
165-0105
165-0107
165-0110
165-0111
165-0112
165-1500
166-0400
166-0500
166-0651
167-1000
167-1500
169-0015
170-1000
170-2000
171-0010
171-0030
201-1500
204-0001
205-0001
205-0100
205-0210
206-0002
207-0203
207-2003
208-0100
208-0200
208-0500
210-0100
210-0200
210-0250
211-0200
ITEM CODE
211-0300
212-1000
215-4000
217-1000
217-1500
222-0900
222-1002
222-2001
222-2225
225-4340
225-9001
231-1250
232-0001
232-4000
301-2170
301-4161
301-4171
301-5000
301-6000
310-1101
310-1201
310-5030
310-5040
310-5060
310-5080
310-5100
310-5120
310-5140
318-1000
318-3000
400-3101
400-3205
400-3206
400-3600
400-3624
402-1801
402-1802
402-1803
402-1812
402-1818
ITEM CODE
402-3100
402-3101
402-3102
402-3103
402-3111
402-3113
402-3121
402-3129
402-3130
402-3133
402-3141
402-3143
402-3190
402-3192
402-3600
402-3605
402-3606
402-3815
402-3818
402-3910
402-4012
402-4310
402-4506
402-4510
402-4512
402-4514
402-4605
402-4610
407-0010
407-0020
410-0300
413-0750
413-1000
413-1200
413-1250
415-5000
418-1000
418-1100
418-1200
418-1300
ITEM CODE
419-1000
420-0030
424-5007
424-5090
424-5107
424-6089
424-6196
424-6201
424-7205
429-1000
430-0160
430-0180
430-0185
430-0190
430-0200
430-0220
430-0600
431-1000
432-0204
432-0205
432-0206
432-0208
432-0212
432-0214
432-0300
432-0305
432-0350
432-4000
432-5010
433-1000
433-1100
433-1200
433-1300
436-1000
437-1200
437-1300
437-1571
437-2571
437-2600
439-0018
ITEM CODE
439-0020
439-0021
439-0022
439-0024
439-0026
439-0044
439-0048
439-0050
439-0052
439-0056
439-0084
439-0086
439-0280
439-0300
441-0004
441-0006
441-0014
441-0016
441-0018
441-0050
441-0100
441-0104
441-0105
441-0106
441-0108
441-0204
441-0206
441-0216
441-0300
441-0301
441-0302
441-0303
441-0304
441-0600
441-0740
441-0746
441-0748
441-0754
441-0756
441-0764
ITEM CODE
441-3999
441-4020
441-4030
441-4040
441-4050
441-4130
441-5001
441-5002
441-5003
441-5004
441-5007
441-5008
441-5010
441-5025
441-5052
441-5053
441-5057
441-6002
441-6012
441-6022
441-6216
441-6221
441-6222
441-6223
441-6718
441-6720
441-6725
441-6730
441-6740
441-7011
441-7012
441-7013
441-7014
441-9500
442-0100
443-1000
444-1000
446-1100
446-1200
446-2118
ITEM CODE
447-1010
447-1050
449-1000
449-1350
449-1620
449-1700
449-1705
449-1800
449-3800
449-3805
451-1100
451-1105
452-1000
453-1000
454-0100
455-1000
456-2012
456-2015
456-2020
456-2022
456-2025
457-1005
457-1010
461-1000
461-2000
461-4000
500-0100
500-1005
500-1006
500-1008
500-1009
500-1011
500-2100
500-2110
500-3002
500-3101
500-3104
500-3107
500-3110
ITEM CODE
500-3115
500-3120
500-3191
500-3200
500-3201
500-3600
500-3650
500-3700
500-3800
500-3900
500-5000
500-9999
501-2000
501-2001
501-2100
501-3000
501-3001
502-1300
502-1400
504-0600
505-1100
507-0017
507-0027
507-1021
507-1024
507-5035
507-5045
507-5050
507-8900
507-9001
507-9002
507-9003
507-9030
507-9031
507-9032
507-9033
507-9034
507-9035
ITEM CODE
507-9240
509-0001
509-0005
511-1000
511-3000
514-0500
514-1000
515-1001
515-1002
515-2015
515-2020
516-1100
518-1000
519-0225
519-0400
519-0515
519-0520
519-0530
519-0700
520-0242
520-0353
520-0573
520-0589
520-0595
520-0597
520-1104
520-1125
520-1147
520-1151
520-1173
520-1179
520-1314
520-1316
520-1318
520-1320
520-1324
520-1330
520-2214
520-2216
ITEM CODE
520-2218
520-2220
520-2224
520-2230
520-2414
520-2416
520-2500
520-3214
520-3216
520-3218
520-3220
520-3224
520-3230
520-3414
520-3416
520-3500
520-4104
520-4125
520-4147
520-4151
520-4173
520-4179
520-4214
520-4216
520-4218
520-4220
520-4224
520-4230
520-4314
520-4316
520-4318
520-4320
520-4324
520-4330
520-5000
520-9000
521-1000
521-3000
522-1000
523-1100
524-0010
ITEM CODE
524-0300
524-0350
524-0500
524-0550
525-1000
527-0015
527-0020
527-0040
527-0050
527-0057
527-0070
527-0500
528-0500
528-0501
528-0750
529-1000
530-0105
531-1000
533-0010
534-1000
535-1005
535-1105
535-1500
540-1101
540-1102
540-1201
540-1202
541-0001
544-1000
547-2010
547-2012
547-2014
547-2018
550-1120
550-1150
550-1180
550-1181
550-1182
550-1183
550-1184
ITEM CODE
550-1185
550-1186
550-1187
550-1240
550-1241
550-1242
550-1243
550-1245
550-1247
550-1300
550-1301
550-1302
550-1303
550-1304
550-1306
550-1360
550-1361
550-1362
550-1363
550-1364
550-1420
550-1421
550-1422
550-1424
550-1480
550-1481
550-1482
550-1483
550-1484
550-1486
550-1487
550-1540
550-1541
550-1542
550-1543
550-1544
550-1600
550-1601
550-1603
ITEM CODE
550-1604
550-1605
550-1660
550-1720
550-1721
550-1722
550-1726
550-1728
550-1780
550-1840
550-1842
550-2108
550-2120
550-2150
550-2180
550-2182
550-2240
550-2241
550-2242
550-2300
550-2301
550-2360
550-2420
550-2480
550-3000
550-3100
550-3315
550-3318
550-3324
550-3330
550-3336
550-3342
550-3348
550-3415
550-3418
550-3424
550-3430
550-3436
550-3442
550-3448
550-3515
ITEM CODE
550-3518
550-3524
550-3530
550-3536
550-3615
550-3618
550-3624
550-3630
550-3636
550-3648
550-4112
550-4118
550-4124
550-4130
550-4136
550-4142
550-4212
550-4215
550-4218
550-4224
550-4230
550-4236
550-4242
550-4248
550-4415
550-4418
550-4436
550-4442
561-1024
570-1000
572-1000
573-1004
573-1006
573-1010
573-2004
573-2006
573-2008
576-1006
576-1008
576-1010
ITEM CODE
576-1012
576-1015
576-1018
576-1024
576-1030
576-1036
577-1100
581-1000
590-1000
600-0001
603-0006
603-1012
603-1018
603-1024
603-1050
603-1056
603-1059
603-1224
603-1300
603-2012
603-2018
603-2024
603-2030
603-2036
603-2048
603-2180
603-2181
603-2182
603-2184
603-2186
603-6006
603-6008
603-6012
603-7000
607-1000
607-3000
607-4000
608-1050
608-4000
609-1000
ITEM CODE
610-0016
610-0100
610-0110
610-0200
610-0209
610-0215
610-0300
610-0301
610-0306
610-0355
610-0400
610-0714
610-0716
610-0719
610-0725
610-0810
610-0815
610-0959
610-1005
610-1055
610-1065
610-1066
610-1074
610-1075
610-1076
610-1575
610-1700
610-1725
610-1730
610-1735
610-1745
610-1755
610-1770
610-1840
610-2355
610-2360
610-2365
610-2370
610-2375
610-2380
610-2383
ITEM CODE
610-2385
610-2395
610-2396
610-2398
610-2401
610-2586
610-2705
610-2815
610-5705
610-5715
610-5788
610-5791
610-5815
610-5825
610-6015
610-6510
610-6512
610-6515
610-6520
610-6545
610-6555
610-6560
610-6575
610-6605
610-6611
610-6625
610-6850
610-6872
610-6873
610-6874
610-6945
610-7010
610-7015
610-9000
610-9001
610-9006
610-9008
610-9097
610-9099
610-9230
610-9310
ITEM CODE
610-9401
610-9402
610-9403
610-9407
611-3000
611-3001
611-3002
611-3010
611-3012
611-3020
611-3021
611-3030
611-3031
611-3032
611-3035
611-3036
611-3100
611-4001
611-4003
611-4890
611-4990
611-4996
611-4997
611-5001
611-5002
611-5004
611-5029
611-5280
611-5300
611-5301
611-5320
611-5360
611-5380
611-5400
611-5420
611-5460
611-5480
611-5485
611-5500
611-5550
611-5551
611-5572
ITEM CODE
611-5588
611-5589
611-5590
611-5591
611-5592
611-5660
611-8000
611-8010
611-8020
611-8040
611-8050
611-8055
611-8120
611-8140
611-9000
611-9995
615-1000
615-1100
615-2540
615-2550
617-0510
617-1050
620-0100
620-0200
621-3020
621-3021
621-3022
621-3120
621-3121
621-3125
621-3126
621-3150
621-4020
621-4021
621-4022
621-4023
621-4060
621-4061
621-4062
621-4063
ITEM CODE
621-4070
621-4080
621-4082
621-4085
621-4086
621-5503
621-6001
621-6002
621-6003
621-6004
621-6005
621-6008
621-6012
621-6013
621-6050
621-6200
621-6201
621-6202
621-6203
621-6204
621-6210
621-6211
621-6212
621-6213
624-0400
624-0410
624-0415
625-0100
626-0602
627-1000
627-1010
627-1020
627-1030
627-1100
627-1120
627-1140
627-1160
627-1180
628-0100
ITEM CODE
630-0010
630-0600
631-2343
631-2463
631-8000
631-8500
632-0003
633-3010
633-3020
633-5000
633-9000
634-1200
634-1700
634-1800
635-1000
635-2000
636-1020
636-1025
636-1029
636-1033
636-1036
636-1041
636-1045
636-1072
636-1077
636-2010
636-2020
636-2070
636-2080
636-2090
636-3000
636-3010
636-4101
636-4104
636-5010
636-5011
636-5020
636-5021
636-5030
636-5031
ITEM CODE
636-5100
636-6025
636-9094
638-1001
638-1003
638-1004
638-1007
638-1011
638-1013
638-1017
639-1240
639-1245
639-1535
639-1600
639-2001
639-2002
639-3001
639-3002
639-3003
639-3004
639-3014
639-4002
639-4003
639-4004
639-4014
639-5000
641-1100
641-1105
641-1200
641-1205
641-2100
641-2200
641-5000
641-5001
641-5005
641-5006
641-5012
641-5015
641-5020
641-5025
ITEM CODE
641-6000
641-7500
641-7520
641-9912
642-0100
642-0300
642-0400
643-0010
643-0050
643-0103
643-0104
643-0105
643-0155
643-0204
643-1132
643-1137
643-1138
643-1152
643-1153
643-1171
643-1452
643-2147
643-2152
643-2156
643-2162
643-2163
643-4000
643-5000
643-8000
643-8001
643-8010
643-8030
643-8040
643-8050
643-8103
643-8104
643-8106
643-8200
643-8210
ITEM CODE
643-8300
643-8405
647-0200
647-0220
647-1000
647-1300
647-1310
647-1330
647-2120
647-2130
647-2140
647-2141
647-2150
647-2151
647-2160
647-2170
647-3000
647-3100
647-5230
647-6057
647-6058
647-6085
647-6086
647-6200
647-6250
647-6300
648-1350
648-1550
649-0018
649-0027
652-0091
652-0094
652-0095
652-0100
652-0105
652-0110
652-0120
652-0130
652-0210
652-2501
ITEM CODE
652-2502
652-3501
652-3502
652-5301
652-5303
652-5451
652-5452
652-5701
652-5801
652-6301
652-6402
652-6501
652-6502
652-9001
652-9002
653-0095
653-0100
653-0105
653-0110
653-0112
653-0120
653-0122
653-0130
653-0132
653-0133
653-0140
653-0150
653-0152
653-0153
653-0160
653-0170
653-0180
653-0205
653-0210
653-0220
653-0230
653-0235
653-0240
653-0250
ITEM CODE
653-0291
653-0292
653-0293
653-0294
653-0296
653-0297
653-0298
653-0300
653-0320
653-0330
653-0400
653-0410
653-0415
653-0420
653-1501
653-1502
653-1504
653-1604
653-1606
653-1704
653-1706
653-1804
653-1810
653-1906
653-2501
653-2502
653-2804
653-2810
653-3501
653-3502
653-3804
653-3810
653-4501
653-4502
653-4505
653-4804
653-4810
653-4830
653-6004
ITEM CODE
653-6006
653-8025
653-8030
653-8050
653-8070
653-8075
653-8085
653-8090
653-8095
654-1001
654-1002
654-1003
654-1005
654-1007
654-1010
655-5000
655-7000
656-0004
656-0005
656-0050
656-0080
656-0100
656-0240
656-1004
656-1005
656-1050
656-2050
656-3050
656-3600
656-4001
656-5000
656-5500
656-5505
656-5510
656-5520
656-5521
656-5525
656-5535
656-5540
ITEM CODE
656-5550
657-1054
657-1084
657-1085
657-1104
657-1105
657-1110
657-1130
657-1243
657-1244
657-2054
657-2085
657-2086
657-3054
657-3085
657-3086
657-3104
657-4054
657-4085
657-4998
657-4999
657-5000
657-5001
657-5002
657-5003
657-5004
657-5005
657-5014
657-5016
657-5017
657-5018
657-5019
657-5020
657-5515
657-5525
657-5575
657-6054
657-6085
657-6086
657-7054
ITEM CODE
657-7085
657-8045
657-8049
657-8050
657-8054
657-8095
657-8150
657-9110
657-9111
657-9122
657-9150
657-9180
657-9210
657-9211
657-9215
657-9230
657-9235
657-9310
657-9313
657-9315
657-9410
657-9413
657-9415
657-9430
657-9435
657-9437
657-9510
657-9512
657-9530
657-9535
657-9540
657-9545
657-9550
657-9565
657-9570
657-9610
657-9620
657-9625
657-9630
ITEM CODE
658-1200
658-1201
658-1210
658-1300
658-1301
658-1310
658-1350
658-1365
658-1380
659-5000
659-5011
659-5013
659-7005
659-7010
659-7015
660-0004
660-0006
660-0008
660-0010
660-0012
660-0015
660-0018
660-0024
660-0036
660-0352
660-0804
660-0806
660-0808
660-0810
660-0812
660-0816
660-0818
660-0824
660-0836
660-1110
660-1115
660-1120
660-1150
660-1205
660-1215
ITEM CODE
660-1220
660-1225
660-1230
660-1235
660-1245
660-1425
660-1430
660-1500
660-1510
660-1625
660-1640
660-1810
660-1915
660-1920
660-1925
660-2000
660-2020
660-2040
660-2042
660-2043
660-2050
660-2070
660-2235
660-2245
660-2320
660-2325
660-2330
660-2405
660-2420
660-2435
660-2600
660-3225
660-3275
660-3300
660-3500
660-3550
660-4035
660-4040
660-4055
660-4065
660-4100
663-0105
663-0205
ITEM CODE
664-0100
664-0155
664-0300
664-0310
664-0400
664-0455
664-0600
664-0610
665-0005
665-0010
665-0015
665-0030
665-0040
665-0050
665-0060
665-0070
665-0100
665-0105
665-0110
665-0250
666-0010
666-0020
668-1100
668-1105
668-1110
668-1115
668-1200
668-1210
668-2100
668-2105
668-2110
668-2115
668-2200
668-2205
668-2210
668-2231
668-2233
668-3300
668-3311
ITEM CODE
668-3312
668-3313
668-3314
668-3400
668-3411
668-3412
668-3413
668-4300
668-4311
668-4312
668-4313
668-4400
668-4411
668-4412
668-4413
668-4414
668-5000
668-5005
668-5020
668-6000
668-6106
668-7000
668-7008
668-7012
668-7015
668-7018
668-7024
668-8011
668-8012
668-8013
668-8014
668-8015
668-9800
670-0500
670-0505
670-0515
670-0535
670-0800
670-0801
670-0803
670-0805
ITEM CODE
670-0810
670-0815
670-0910
670-0935
670-0940
670-1010
670-1020
670-1040
670-1060
670-1080
670-1085
670-1100
670-1120
670-1140
670-1160
670-1180
670-1200
670-1240
670-1360
670-1490
670-1500
670-1505
670-1508
670-1510
670-1513
670-1518
670-1523
670-1528
670-1590
670-1600
670-1650
670-1900
670-2002
670-2003
670-2005
670-2006
670-2008
670-2020
670-2040
670-2060
670-2080
ITEM CODE
670-2100
670-2120
670-2160
670-2180
670-2200
670-2360
670-2500
670-2700
670-2800
670-3000
670-3015
670-3065
670-3066
670-3086
670-3087
670-3108
670-3122
670-3126
670-3127
670-3129
670-3166
670-3167
670-3169
670-3171
670-3175
670-3190
670-4000
670-4450
670-4490
670-4500
670-4510
670-4515
670-4520
670-4530
670-4540
670-4555
670-5000
670-5010
670-5015
670-5020
670-5022
ITEM CODE
670-5025
670-5030
670-5040
670-5610
670-5620
670-5622
670-5750
670-5800
670-5850
670-6050
670-6309
670-7000
670-7215
670-7220
670-7225
670-7230
670-7240
670-7315
670-7320
670-7325
670-7330
670-7340
670-8050
670-9220
670-9225
670-9245
670-9250
670-9255
670-9260
670-9265
670-9270
670-9275
670-9280
670-9285
670-9290
670-9325
670-9340
670-9400
670-9450
670-9710
670-9712
670-9720
ITEM CODE
670-9725
670-9730
670-9731
670-9736
670-9737
670-9738
670-9740
670-9741
670-9742
670-9743
670-9810
670-9890
670-9895
670-9900
670-9905
670-9910
670-9920
670-9930
676-1000
676-3000
681-0525
681-1150
681-1160
681-2200
681-2250
681-2504
681-2505
681-3600
681-3750
681-4120
681-4121
681-4150
681-4155
681-4210
681-4211
681-4215
681-4220
681-4230
681-4253
681-4255
681-4257
681-4258
681-4270
ITEM CODE
681-4278
681-4280
681-4282
681-4289
681-4299
681-4300
681-4301
681-4302
681-4303
681-4304
681-4307
681-4347
681-4348
681-4350
681-4358
681-4359
681-4360
681-4361
681-4362
681-4363
681-4400
681-4415
681-4500
681-4501
681-4503
681-4505
681-4555
681-5112
681-5113
681-5115
681-5255
681-5257
681-5260
681-6200
681-6205
681-6220
681-6246
681-6264
681-6290
681-6295
681-6303
681-6304
681-6307
ITEM CODE
681-6309
681-6310
681-6311
681-6312
681-6315
681-6317
681-6318
681-6319
681-6320
681-6336
681-6346
681-6364
681-6366
681-6390
681-6392
681-6393
681-6400
681-6403
681-6405
681-6410
681-6411
681-6413
681-6416
681-6417
681-6418
681-6419
681-6420
681-6421
681-6446
681-6466
681-6470
681-6520
681-6546
681-6600
681-6608
681-6610
681-6614
681-6620
681-6624
681-6646
681-6850
681-6852
681-6900
ITEM CODE
681-7000
682-1303
682-1304
682-1305
682-1306
682-1307
682-1403
682-1404
682-1405
682-1406
682-1407
682-1408
682-1409
682-1413
682-1415
682-1503
682-1504
682-1505
682-1506
682-1507
682-1509
682-1510
682-1511
682-1514
682-3146
682-3324
682-3424
682-3430