+ All Categories
Home > Documents > Communication Division First Quarter 2015. List of Projects (Only design development activities...

Communication Division First Quarter 2015. List of Projects (Only design development activities...

Date post: 11-Jan-2016
Category:
Upload: barbra-williamson
View: 213 times
Download: 0 times
Share this document with a friend
Popular Tags:
13
Communication Division First Quarter 2015
Transcript
Page 1: Communication Division First Quarter 2015. List of Projects (Only design development activities excluding courses and industry services) Tea Color Separator.

Communication DivisionFirst Quarter 2015

Page 2: Communication Division First Quarter 2015. List of Projects (Only design development activities excluding courses and industry services) Tea Color Separator.

List of Projects (Only design development activities excluding courses and industry services)Tea Color Separator SystemTrain detection technique development using AFTC for Sri

Lanka rail tracks, for rail/road crossingsHigh Tech Security System using CCTV for NWSDBAutomated model library (ACCIMT) using RF-ID technologyAutomatic low cost solar light for the Semaphore signal

poles of SLRLow cost bell and light pole for rail/road crossings of SLRReservoir level monitoring/logging for remote accessDiesel Generator Temperature monitoring system for CEB Advanced Hardware Recovery of Locomotive modules-SLRAdvanced recovery of SCADA systems (NWSDB)

Page 3: Communication Division First Quarter 2015. List of Projects (Only design development activities excluding courses and industry services) Tea Color Separator.

Tea Color Separator SystemFor low grown area tea factories (imported

system Rs. 15M)Sorting mixed colored tea samples of the final

stage of tea processing.Mechanical prototype fabrication

procurement process.

Page 4: Communication Division First Quarter 2015. List of Projects (Only design development activities excluding courses and industry services) Tea Color Separator.

Train detection technique development using AFTC for Sri Lanka rail tracks, for rail/road crossingsCurrent locally developed techniques have disadvantages of track separation at the crossings

The modern trend in the world is for AFTC This technology is currently used by imported systems from China at the cost around Rs. 10MPrototype test module under construction

Page 5: Communication Division First Quarter 2015. List of Projects (Only design development activities excluding courses and industry services) Tea Color Separator.

High Tech Security System using CCTV for NWSDBAs a reliable security measure to selected

NWSDB sitesTreatment plants Ambatale and BiyagamaAlso stores and head officeProject value Rs. 10M for NWSDB (As pilot

project for ACCIMT)Client approval granted for the installation to

commenceRemote monitoring

Page 6: Communication Division First Quarter 2015. List of Projects (Only design development activities excluding courses and industry services) Tea Color Separator.

Automated model library (ACCIMT) using RF-ID technologyUse of RF-ID tagging for the easy management of library process (books and personnel)

Gate antenna system and reader unit under purchase, rest units already designed and tested.

TagsSticker CardReadingDeskGate

Page 7: Communication Division First Quarter 2015. List of Projects (Only design development activities excluding courses and industry services) Tea Color Separator.

Automatic low cost solar light for the Semaphore signal poles of SLRCurrently they are not illuminated in a proper

automatically operated mannerLower cost is a concernColonial age poles still usedRequirement of SLR, Prototype already

submitted

Page 8: Communication Division First Quarter 2015. List of Projects (Only design development activities excluding courses and industry services) Tea Color Separator.

Low cost bell for rail/road crossings of SLRCurrently bought units are at a higher cost to

SLRDemonstration unit for SLR to get them

convinced for rail/road crossingsAvailable technology at ACCIMT

Page 9: Communication Division First Quarter 2015. List of Projects (Only design development activities excluding courses and industry services) Tea Color Separator.

Reservoir level monitoring/logging for remote accessApplication of already developed and success

technology of NWSDBBetter water management of CEB reservoirs (specially run over like in Kukuleganga)Proposal prepared

Page 10: Communication Division First Quarter 2015. List of Projects (Only design development activities excluding courses and industry services) Tea Color Separator.

Diesel Generator Temperature monitoring system for CEB On the request of Sapugaskanda Diesel Power Generation of CEB, sample unit developped

Local development of imported part replacement

Page 11: Communication Division First Quarter 2015. List of Projects (Only design development activities excluding courses and industry services) Tea Color Separator.

Advanced Hardware Recovery of Locomotive control modules-SLRContinuous engagement for the 5 years

Class M9 Locomotives, Class S9 Power CoachTraction control, Main Processor, Driver Display

console, IGBT driving, Power modules and protection equipment

IGBT driver units recovered for an engine.

Page 12: Communication Division First Quarter 2015. List of Projects (Only design development activities excluding courses and industry services) Tea Color Separator.

Advanced recovery of SCADA systems (NWSDB)Process automation (Water treatment, pumping)

plantsRecovery (Hardware, Firmware), Modifications,

ExpandingCurrently modifying the SCADA at NWSDB Galle, Hapugala Treatment Plant on adding pumps, source code familiarising.

Page 13: Communication Division First Quarter 2015. List of Projects (Only design development activities excluding courses and industry services) Tea Color Separator.

Thank you


Recommended