Community Working Group (CWG) Meeting #5 April 14 2011 April 14, 2011
Transcript
Page 1: Community Working Group (CWG) Meeting€¦ · 14/04/2011  · Need Criterion Measure Accommodate Managed Growth Is the alternative compatible with adopted land 1use plans? % change

Community Working Group (CWG) Meeting #5April 14 2011April 14, 2011

Page 2: Community Working Group (CWG) Meeting€¦ · 14/04/2011  · Need Criterion Measure Accommodate Managed Growth Is the alternative compatible with adopted land 1use plans? % change

1. Alternative Development

a. Review alternatives

b. Discuss transportation system management and

transit alternatives

2 Alternative Evaluation Criteria2. Alternative Evaluation Criteria

3. Step 1 – Initial Screening

4 N t St4. Next Steps

Page 3: Community Working Group (CWG) Meeting€¦ · 14/04/2011  · Need Criterion Measure Accommodate Managed Growth Is the alternative compatible with adopted land 1use plans? % change

Criterion Unit of Measure

Processing

Does the alternative directly impact state or  Yes Eliminate from further evaluationfederally protected areas? (Illinois Natural Area Inventory Sites, Illinois Nature Preserves, State or Federal Parks)

No Continue for further evaluation

Does the corridor segment meet the horizontal and vertical clear zone

Yes Continue for further evaluationNo Eliminate from further evaluationhorizontal and vertical clear zone 

requirements for the Central Illinois Regional Airport? 1

No Eliminate from further evaluation

Does the alternative divide or isolate a neighborhood or community2? (Is the neighborhood or comm nit di ided into 2

Yes Eliminate from further evaluation

No Continue for further evaluationneighborhood or community divided into 2 or more sections?  Are any sections isolated from community services?)

1Clear zone requirements in accordance with expansion/operational initiatives presented in CIRA’s masterplan.2According to the IDOT Community Impact Assessment Manual, the FHWA has identified a community as “adistinctive, homogenous, stable, self‐contained unit of a larger spatial area defined by geographic boundaries,ethnic, or cultural characteristics of the inhabitants; a psychological unity among the residents; and theconcentrated use of the area’s facilities. A community is an entity with economic, social and perhaps politicalfunctions. It usually has a name identity and number of community service facilities such as business districts,religious institutions, schools, health centers, and fire and police stations. By contrast, a neighborhood is asmall social unit based on face‐to‐face contacts.” The guidelines for determining neighborhood andcommunity boundaries contained in the Manual will be consulted for this criterion.

Page 4: Community Working Group (CWG) Meeting€¦ · 14/04/2011  · Need Criterion Measure Accommodate Managed Growth Is the alternative compatible with adopted land 1use plans? % change

Need Criterion MeasureAccommodate Managed Growth

Is the alternative compatible with adopted land use plans?

% change in accessibility (as compared to baseline1)

h l i i / d A b h l i d hDoes the alternative restrict/reduce opportunities for uncontrolled, sporadic, or leapfrog development?

Area between the alternative and the planning boundary between I‐55 and I‐74 (sq miles)

Mobility Does the alternative reduce congestion in the study area?

What is the percent change in v/c from baseline?

Does the alternati e impro e N/S Tra el time sa ings from t o north so thDoes the alternative improve N/S travel efficiencies?

Travel time savings from two north‐south travel pairs (reduced vehicle hours traveled)

Does the alternative improve E/W travel efficiencies?

Travel time savings from two east‐west travel pairs (reduced vehicle hours traveled)

Access Does the alternative improve travel  Percent increase in area with travel within X efficiency to the interstate system? minutes to the interstate (vehicle shed) (sq 

miles)Does the alternative provide N/S connectivity?

Reduced miles traveled from two north‐south travel pairs (reduced vehicle miles traveled)

Does the alternative provide E/W connectivity

Reduced miles traveled from two east‐west travel pairs (reduced vehicle miles traveled)

1Baseline is considered to be the conditions defined in the No‐Build Alternative. 2 Planning boundary is considered the outer limit of the 2035 land use plan for Bloomington and Normal.

Page 5: Community Working Group (CWG) Meeting€¦ · 14/04/2011  · Need Criterion Measure Accommodate Managed Growth Is the alternative compatible with adopted land 1use plans? % change

• The region is divided into small geographic boundaries calledTAZ ‐ primary unit of analysis in a travel demand forecastingmodel.

• TAZs contain socioeconomic information such as number ofhouseholds, population, employment etc.

TAZ’ d i th d l t ti t t i b t• TAZ’s are used in the models to estimate trips betweengeographical areas.

• TAZ size varies based on population and employment density• TAZ size varies based on population and employment densityand spacing between roadways – TAZs in downtown areas aregenerally smaller than outlying areas.

Page 6: Community Working Group (CWG) Meeting€¦ · 14/04/2011  · Need Criterion Measure Accommodate Managed Growth Is the alternative compatible with adopted land 1use plans? % change
Page 7: Community Working Group (CWG) Meeting€¦ · 14/04/2011  · Need Criterion Measure Accommodate Managed Growth Is the alternative compatible with adopted land 1use plans? % change

Criterion Unit of MeasureEnvironmentalWater Quality/Water Resources Floodplain (acres affected)

Floodways (acres affected)Biologically Significant Streams (number of crossings)g y g ( g )

Class I Streams (number of crossings)Streams (number of crossings)Drinking Water Supplies ‐ Surface Water (number affected)

Wetlands Wetland Areas (number affected)Wetland Areas (acres affected)( )

Special Waste CERCLIS, UST, RCRA Sites (number affected)Forested Area Forested Area  (acres affected)T&E Species Threatened and Endangered Species (state and federal number of 

species affected)Community and EconomicResidences Homes, also includes homes on a farmstead (number displaced)Business Commercial Buildings (number displaced)Public Facilities & Services Public Facilities (number displaced)

Public Service Facilities with access change (number affected) Section 4(f) & 6(f) Impacts Parklands (number affected)

Parklands (acres affected)Utilities Utilities Crossings (number of conflicts)Utility Infrastructure Utility Infrastructure (number affected)Noise Receptors1 (number of receptors within 500 feet of corridor)1IDOT defines a sensitive receptor as a land use where frequent outdoor human activity occurs and where a low traffic noise level would be of benefit.  Sensitive receptors typically include homes, schools, hospitals, nursing homes, and parks.parks.

Page 8: Community Working Group (CWG) Meeting€¦ · 14/04/2011  · Need Criterion Measure Accommodate Managed Growth Is the alternative compatible with adopted land 1use plans? % change

Criterion Unit of MeasureAgriculturalPrime and Important Farmland Prime and Important Farmland (acres affected)Farmsteads Farm out buildings (number affected)Severances Tracts (number affected)( )Centennial/Sesquicentennial Farms Farms (number affected)Farms Otherwise Affected Farms (number affected)CulturalCultural Historic Sites (number affected)

Cemeteries (number affected)Documented archaeological sites (number affected)

DesignROW ROW Acquisition (acres)Termini Connections Engineering and operational consideration of termini connectionsTrafficSafety Analysis Statistics based on traffic operations and design elements

Page 9: Community Working Group (CWG) Meeting€¦ · 14/04/2011  · Need Criterion Measure Accommodate Managed Growth Is the alternative compatible with adopted land 1use plans? % change

Criterion Unit of MeasureEnvironmentalWater Quality/Water Resources Floodplain (acres affected)

Floodways (acres affected)Biologically Significant Streams (number of crossings)g y g ( g )

Class I Streams (number of crossings)Streams—main stem (number of crossings)Streams—tributaries (number of crossings)Drinking Water Supplies ‐ Surface Water (number affected)

Wetlands Wetland Areas (number affected)Wetland Areas (acres affected)

Special Waste CERCLIS, UST, RCRA Sites (number affected)Forested Area Forested Area  (acres affected)T&E Species Threatened and Endangered Species (state and federal number of 

species affected)Community and EconomicResidences Homes, includes homes on a farmstead (number displaced)Business Commercial Buildings (number displaced)Tax Base Change in tax revenuePublic Facilities & Services Public Facilities (number displaced)

Public Service Facilities with access change (number affected) Section 4(f) & 6(f) Impacts Parklands (number affected)

Parklands (acres affected)Utilities Utilities Crossings (number of conflicts)Utility Infrastructure Utility Infrastructure (number affected)Noise Receptors (number of receptors within 500 feet of corridor)

Page 10: Community Working Group (CWG) Meeting€¦ · 14/04/2011  · Need Criterion Measure Accommodate Managed Growth Is the alternative compatible with adopted land 1use plans? % change

Criterion Unit of MeasureAgriculturalPrime and Important Farmland Prime and Important Farmland (acres affected)

Farmsteads Farm out buildings (number affected)Severances Tracts (number affected)( )

Tracts with access change (number affected)

Centennial/Sesquicentennial Farms Farms (number affected)

Farms Otherwise Affected Farms (number affected)

Cultural

Cultural Historic Sites (number affected)Cultural Historic Sites (number affected)

Cemeteries (number affected)

Documented Archeological Sites (number affected)

Design

ROW ROW Acquisition (acres)

Termini Connections Engineering and operational consideration of termini connectionsTermini Connections Engineering and operational consideration of termini connections

Area of Pavement Area of Pavement (square miles)

Topology Cut & Fill (cubic yards)

Drainage Structure Drainages Structure (number/type required)

Estimated Cost Estimated Cost ($)

Page 11: Community Working Group (CWG) Meeting€¦ · 14/04/2011  · Need Criterion Measure Accommodate Managed Growth Is the alternative compatible with adopted land 1use plans? % change

Criterion Unit of MeasureSustainabilityAlignment Area of new pavement required (+/‐ square miles)

ROW Area of new ROW required (+/‐ square miles)Farmland Preservation Area of farmland consumed vs. area of urban/developed landFarmland Preservation Area of farmland consumed vs. area of urban/developed land  

consumed (+/‐ acres) based upon 2035 Land Use Plan.  Number of farms located between the developed area and the proposed alignment.

Watershed Percentage affected of four main watersheds

Amount of riparian area affected ( acres)Amount of riparian area affected ( acres)

Highly Erodible Soils Area affected

Bike/Pedestrian Access Is alternative adjacent to proposed or existing bike/ped network?

Traffic

Traffic Analysis v/c, vehicle miles traveled, vehicle hours traveled 

S f t A l i St ti ti b d t ffi ti d d i l tSafety Analysis Statistics based on traffic operations and design elements

Page 12: Community Working Group (CWG) Meeting€¦ · 14/04/2011  · Need Criterion Measure Accommodate Managed Growth Is the alternative compatible with adopted land 1use plans? % change

Criterion Unit of MeasureEnvironmentalWater Quality/Water Resources Floodplain (acres affected)

Floodways (acres affected)Biologically Significant Streams (number of crossings)Biologically Significant Streams (number of crossings)

Class I Streams (number of crossings)Streams—main stem (number of crossings)Streams—tributaries (number of crossings)Drinking Water Supplies ‐ Surface Water and Private Wells(number affected)( )Streams water quality

INHS Wetlands Wetland Areas (number affected)Wetland Areas (acres affected)High Quality Wetland Areas (number affected)High Quality Wetland Areas (acres affected)

Special Waste Recognized Environmental Conditions (RECs) ( number of RECs identified)

INAI Sites INAI Sites (acres affected)High Quality Woodlands High Quality Woodlands (acres affected)T&E Species Threatened and Endangered Species (state and federal number of 

species affected)Ecologically sensitive sites Ecologically sensitive sites (number affected)

Cover Type Cover Type (acres affected of each vegetation type, including forested areas

Page 13: Community Working Group (CWG) Meeting€¦ · 14/04/2011  · Need Criterion Measure Accommodate Managed Growth Is the alternative compatible with adopted land 1use plans? % change

Criterion Unit of MeasureCommunity and EconomicResidences Homes (number displaced)Environmental Justice Minority and Low Income population (percent impacted)Business Businesses  (number displaced)

Parking (number of spaces lost)Tax Base Change in tax revenuePublic Facilities & Services Public Facilities (number displaced)

Public Service Facilities with access change (number affected) Section 4(f) & 6(f) Impacts Parklands (number affected)

Parklands (acres affected)Utilities Utilities Crossings (number of conflicts)Visual Resources Visual Resources ( Impact by viewscape)Utility Infrastructure Utility Infrastructure (number affected)Air Quality Air Quality compliance with ambient air quality standards by 

pollutantNoise Number of impacted receptors  and anticipated noise levels 

(mitigation required)AgriculturalPrime and Important Farmland Prime and Important Farmland (acres affected)L dl k d P l L dl k d P l ( d b )Landlocked Parcels Landlocked Parcels ( acres and number)Uneconomical Remnants Uneconomical Remnants ( acres and number)Farmsteads Residences, businesses, and Farm out buildings (number affected)Severances Tracts (number affected)

Tracts with access change (number affected)Adverse Travel  Adverse Travel ( miles)Number of Farms, owners, operators

Farms, owners, operators ( number)

Centennial/Sesquicentennial Farms Farms (number affected)

Page 14: Community Working Group (CWG) Meeting€¦ · 14/04/2011  · Need Criterion Measure Accommodate Managed Growth Is the alternative compatible with adopted land 1use plans? % change

Criterion Unit of MeasureCulturalCultural Historic Sites (number affected)

Cemeteries (number affected)High Probability Archeological Significance (number affected)

DesignROW ROW Acquisition (acres)Termini Connections Engineering and operational consideration of termini connectionsArea of Pavement Area of Pavement (square miles)Topology Cut & Fill (cubic yards)Drainage Structure Drainages Structure (number/type required)Drainage Structure Drainages Structure (number/type required)Estimated Cost Estimated Cost ($)SustainabilityAlignment Area of new pavement required (+/‐ square miles)ROW Area of new ROW required (+/‐ square miles)Farmland Preservation Area of farmland consumed vs. area of  urban/developed land 

consumed (+/ acres) based upon 2035 Land Use Plan Number ofconsumed (+/‐ acres) based upon 2035 Land Use Plan.  Number of farms located between the developed area and the proposed alignment.

Watershed Percentage affectedAmount of riparian area affected ( acres)

Highly Erodible Soils Area affectedHighly Erodible Soils Area affectedBicycle/Pedestrian Access Is alternative adjacent to existing or proposed bicycle/ped network?

Page 15: Community Working Group (CWG) Meeting€¦ · 14/04/2011  · Need Criterion Measure Accommodate Managed Growth Is the alternative compatible with adopted land 1use plans? % change

• Continue evaluation and refinement of alternatives

Page 16: Community Working Group (CWG) Meeting€¦ · 14/04/2011  · Need Criterion Measure Accommodate Managed Growth Is the alternative compatible with adopted land 1use plans? % change

PURPOSE    AND NEED

ALTERNATIVE DEVELOPMENT & ANALYSIS

PREFERRED ALTERNATIVE

FINDING OF NO SIGNIFICANT IMPACT(FONSI)

2010 2011 2012 2013 2014

AND NEED & ANALYSIS ALTERNATIVE (FONSI)

PUBLIC MEETING

PUBLIC HEARING

STUDY MILESTONE

Page 17: Community Working Group (CWG) Meeting€¦ · 14/04/2011  · Need Criterion Measure Accommodate Managed Growth Is the alternative compatible with adopted land 1use plans? % change

Jun 9 Jun 23 Aug/Sep Dec 1CWG

CWG #6Jun 23CWG #7

Aug/SepUpdate

Purpose & Need 

Evaluation 

Macro Analysis Evaluation 

Alignment Analysis Evaluation 

Continue Alignment Analysis Evaluation

Apr May Jun Jul Aug Sep Oct Nov Dec

‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Traffic Analysis and Environmental and Socioeconomic Data Collection  ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐‐

2011