316 D, OPF Housing Colony Raiwind Road, Lahore-53700 Phone: +92 302 5000678, +92 344 4650646E-mail: [email protected] Web http://www.berkeley.com
Company Profile
Berkeley Associates (Pvt.) Ltd.
CONTENTS INTRODUCTION
OUR DOMAIN
ORGANIZATION
TURNOVER
SPECTRUM OF SERVICES
COMPLETED PROJECTS
CLIENTS
TOPOGRAPHIC SURVEY EQUIPMENT
DRILLING EQUIPMENT
LABORATORY TESTING EQUIPMENT
KEY PERSONNEL
FIELD STAFF
REGISTRATION
QUALITY & SAFETY POLICY
Introduction f
Berkeley Associates (Pvt) Ltd
Berkeley Associates (Pvt.) Ltd. Consulting Engineers
Berkeley Associates (Pvt.) Ltd. is an engineering firm providing highly professional services in various disciplines of Civil Engineering. We provide project management, design, supervision, planning and drafting services in the fields of Construction, Geotechnical, Groundwater and Structural Engineering for various infrastructure and development Projects including Buildings, Highways, Motorways, Hydropower, Dams, Power Transmission Lines, and Airfields. Main areas of our Engineering Services include Topographic and Bathymetric Surveys, Project Management, Value Engineering, Geotechnical Investigations and Design, Foundation Engineering, Site Evaluation, Site Improvement, Pavement Design and Evaluation, Material Engineering, Construction Supervision of Earthworks and Foundations and Ground Water Studies. The project planning services are provided for all project stages including inception, feasibility, design, construction, and operation. Computer aided drafting facilities are provided for all kinds of engineering drawings.
INTRODUCTION
Our Domain
For Civil Engineering Projects we provide services in the following engineering disciplines;
1. Project/ Construction Management
2. Hydropower Engineering
3. Value Engineering
4. Geotechnical Engineering
5. Pile Foundation and Construction of Fills
6. Groundwater Engineering
7. Structural Engineering
8. Transmission Line / Grid Station & Power Plants
9. Highways & Bridges
10. Detailed Engineering & Drafting
11. Dewatering Design / Supervision
12. Topographic and Bathymetric Surveys
OUR DOMAIN
BERKELEY ASSOCIATES (PVT) LTD
ORGANIZATIONCHART
CHEIF EXECUTIVE OFFICERDr. Tahir Masood
BOARD OF DIRECTORSDr. Tahir MasoodJahangir AkhtarKhalid Ayyub
Structural EngineeringIjaz Shafi
Senior Structural Engineers
Junior Structural Engineers
CAD Operators
Geotechnical EngineeringKhalid Ayyub
Site Staff i/c Drillers & Helpers
Senior Geotechnical Engineers
Junior Engineers/ Geologists
Draftsmen
Geotechnical Engg. Laboratory Technicians
Hydropower & Dams Engineering
Jahangir Akhtar
E&M Design Engineers
Civil Design Engineers
Project Managment & Business DevelopmentSheikh Ilyas Ahmad
Schedulers
Planning Engineers
Environmental & Public Health Engineering
Sayed Azhar Maqsood
Environmental Engineers
Environmentalists
Public Health Engineers
Contract ManagementSyed Hamid Hassan
Groundwater EngineeringAhmed Nawaz
Site Staff
Geophysicists
Survey SectionRaja Naeem
Surveyors
Helpers
Office AdministrationAslam Hayat
Accounts and Record Keeping
Asif Chughtai
Organization Chart
Spectrum of Services
Berkeley Associates (Pvt.) Ltd.
For Civil Engineering Projects we provide services in the following engineering fields
The Geotechnical Engineering services include planning and execution of field investigations,
preparation of geotechnical investigation reports, evaluation of geotechnical design parameters,
analyses and design of foundations, slopes, embankments. Evaluation of existing foundations,
and earth retaining structures are also carried out.
Carrying out field investigations including drilling of boreholes, sampling, field tests,
installation of piezometers, monitoring of ground water table, etc., using our in-
house facilities.
Planning of comprehensive Geotechnical investigation program tailored to specific
needs of the Project with particular aim of obtaining safety and economy in the design
of foundations and earth structures. Planning includes establishing drilling
requirements, extent of drilling, method of drilling, method of soil sampling etc.
Prepare cost estimates and specifications for the geotechnical investigations.
Supervision and monitoring the progress of field investigations ensuring
that investigations are being carried out in accordance with the internationally
recognized standard practice.
Carrying out initial analyses of the field data and modifying (if required) the field
investigation program.
Inspection of soil samples and preparation of most efficient laboratory testing
Program.
Carryout the laboratory testing under technical supervision.
Carryout geophysical surveys.
Evaluation of physical and engineering characteristics of soils/ rocks on the basis of
field and laboratory test results.
Determination of foundation design parameters.
Design of shallow and deep foundations i.e. spread foundations, rafts, piles etc.
Preparation of geotechnical investigation reports.
Design of earthen embankments for roads and water retaining structures.
SPECTRUM OF SERVICES
Soil Investigations
Analyses & Design of Foundations & Embankments
Geotechnical Engineering
Spectrum of Services
Berkeley Associates (Pvt.) Ltd.
Slope stability analyses
Design of cut slopes and slope stabilization systems.
Design of excavation support systems.
Design of dikes and coffer dams. Design of under-ground water cut-off systems.
Seepage analyses of water retaining structures.
Liquefaction analyses.
Evaluation of dynamic design parameters for design of foundations.
Evaluation and remediation of problematic soil conditions.
Design of site improvement systems.
Design, performance and analyses of pile load tests.
Design and construction supervision of cast in-situ piles.
Design and construction of contiguous pile system. Preparation of technical specifications for earthworks.
Quality control of large earthworks.
Assessment of engineering characteristics of earthworks.
Supervision of construction of foundations, earthwork and soil improvement works.
Pile load tests and evaluation.
In order to assess the groundwater potential for various projects, we plan and execute field
investigations, computer modelling, assessment of aquifer parameters, prediction of availability
of groundwater, ground water quality analyses. Design of tube wells and influence of exiting
water facilities on pumping of new wells is also carried out. Groundwater Engineering services
include;
Design of dewatering systems.
Design and installation of piezometers.
Performance of electrical resistivity surveys for initial assessment of ground water quality.
Groundwater monitoring.
Groundwater quality assessment.
Planning and execution of pump out tests.
Interpretation of pump out test data and evaluation of aquifer parameters.
Installation and development of tube wells.
Piling and Construction of Fills
Groundwater Engineering
Spectrum of Services
Berkeley Associates (Pvt.) Ltd.
Topographic surveys are carried out for all types of projects for developing the surface
contours, area assessments, project planning and layout studies. Underwater surveys
(Bathymetric Survey) are carried out to develop underwater bed profiles required for
placement of intake and outfall structures. The services include;
Performance of Topographic Surveys of land for infrastructures projects.
Preparation of topographic maps at desired contour intervals.
Establishment of Benchmarks.
Performance of underwater (Bathymetric) survey of canals and offshore sites.
Feasibility stage structural designs are carried out for development of cost estimates.
Detailed analyses and design of structures are carried out using computer aided tools for all
type of projects. Construction drawings are prepared for material take-offs and
implementation. Design review services are also provided. Other service include;
Planning stage design of various structures.
Analyses of structural elements of all types of projects.
Detailed design of structures.
Preparation of tender drawings and construction drawings.
Preparation of bar bending schedules.
Preparation of as-built drawings.
Review of Civil works Design prepared by EPC contractors.
Optimization of design and Value Engineering.
Design for strengthening and rehabilitation of structures
Project Management services are provided for optimizing the available resource. Resident
construction supervision services are provided for ensuring quality construction and
adherence to agreed time line. The services include;
Preparation and monitoring of project implementation schedules.
Preparation and implementation of quality control/ quality assurance plans.
Providing resident supervision and monitoring progress of works.
Maintaining construction and QA/QC records.
Preparation of as built drawing.
Verify construction quantities and progress payment invoices.
Topographic and Bathymetric Surveys
Structural Engineering
Project Management & Construction Supervision
Spectrum of Services
Berkeley Associates (Pvt.) Ltd.
Contract management, issuance of variation orders.
Preparation of detailed Bill of Quantities (BOQ) for construction projects.
Completed Projects
Berkeley Associates (Pvt.) Ltd.
COMPLETED PROJECTS
Completed Projects
Berkeley Associates (Pvt.) Ltd.
150 MW Patrint Hydropower Project, AJK
22 MW Jabban Hydropower Project, KPK
90 MW Batakundi Hydropower Project, KPK
180 MW Naran Hydropower Project, KPK
300 MW Balakot Hydropower Project, KPK
100 MW Solar Power Project, Bahawalpur
Cooling Tower for AES Lal Pir Power Project, Muzaffargarh
120 MW Shushghai Zhendoli Hydropower Project, Chitral
100 MW Kotli Hydropower Project, AJK
100 MW Shogo Sin Hydropower Project, Chitral
762 MW AES Power Project, Muzaffarabad
232 MW Karkey Rental Power Project, Karachi
120 MW Rajdhani Hydropower Project, AJK
Engro Rice Plant Extensions, Bhikki
Engro Food Plant Floor Rehabilitation
New Ammonia / Urea Plants Project of Engro Dharki
Machai Hydropower Project, AJK
Fire Water Tanks in UAE
Khari Hydropower Project, AJK
Sind Engro Coal Mining Project, Thar
Foundation Piling for Mabarak Center, Lahore
Hub Water Treatment Plant, Hub, Karachi
Effluent Treatment Plant for Tanneries, Kasur
Additional Cooling Towers for AES Power Project , Mahmood Kot, Muzaffargarh
Water Supply & Sewerage System and Sewage Treatment Plant for New Mir Pur City
FEASIBILITY STUDIES DESIGN & PROJECT MANAGEMENT SERVICES
CONTRACT MANAGEMENT, CONSTRUCTION SUPERVISION & QUALITY CONTROL SERVICES
Completed Projects
Berkeley Associates (Pvt.) Ltd.
Project, AJK
Water Supply & Sewerage System for Defense Housing Scheme, Islamabad New
Ammonia/ Urea Plants Project at Engro Chemicals Pakistan, Daharki Commercial
Complex at G-4, Clifton Road Karachi
Commercial Complex at F-99, Clifton Road Karachi
Dewatering Design / Supervision Projects
Berkeley Associates (Pvt.) Ltd.
DEWATERING DESIGN / SUPERVISION PROJECTS
Dewatering Design / Supervision Projects
Berkeley Associates (Pvt.) Ltd.
Estimation of drainage requirements and design of dewatering system for Lusai Underground Railway Construction Project, Qatar Estimation of drainable surplus using available data on aquifer parameters.
Doha Conventional Centre and Tower Project, Doha, Qatar Aquifer testing and data analysis, estimation of dewatering requirements, design of dewatering system and dewatering wells for construction below water table.
Site B-201 Nawabshah, Sindh, Pakistan - Conducted aquifer tests (pump out tests), analysis of test data, estimation of aquifer parameters, design and construction of dewatering systems for pumping drainable surplus to lower water table below foundation (50 ft. below NSL) of the buildings.
Site B-109, Sargodha, Punjab, Pakistan - Conducted aquifer tests (pump out tests), analysis of test data, estimation of aquifer parameters, design and construction of dewatering systems for pumping drainable surplus to lower water table below foundation (50 ft. below NSL) of the buildings.
Study causes of rise of water table and proposed remedial measures - Industrial and ResidentialAreas in Dammam, Saudi Arabia.
Chashma Hydropower Project Member of panel of experts for dewatering. Analysis of aquifer test data, estimation of dewatering requirements to lower water table about 15 m to facilitate construction of power plant.
CHASNUPP - Evaluation of pumping requirements and design of dewatering system to facilitate construction of intake structure.
Supervision of 26 numbers dewatering tubewells installation at CHASNUPP Assuring installation in accordance with the design specifications
Dewatering Design / Supervision Projects
Geotechnical Investigations
Berkeley Associates (Pvt.) Ltd.
GEOTECHNICAL INVESTIGATIONS
Geotechnical Investigations
Berkeley Associates (Pvt.) Ltd.
Army Officers Housing Scheme ASKARI-II, Gujranwala Cant.
Army Officers Housing Scheme ASKARI-III, Sargodha Cant.
Army Officers Housing Scheme ASKARI-VII, Rawalpindi.
Prime Minister Housing Scheme Peshawar.
Prime Minister Housing Scheme Faisalabad.
Prime Minister Housing Scheme Gujranwala.
Commercial Plaza at Army Welfare Housing Society Morgah Rawalpindi.
Park View Housing Society, Lahore Cant.
Punjab Housing Scheme Satiana Road Faisalabad.
Eden Canal Villas, Lahore.
High rising building at DHA Morgah-II Islamabad.
Sport Complex DHA Morgah-II Islamabad.
Sukh Chayn Gardens Housing Society Multan road Lahore.
WAPDA Finance Housing Scheme Raiwind Road Lahore.
WAPDA Finance Subsistence Farm Homes Lahore.
Mosque at Defense Housing Islamabad.
Crescent Bay Project, Karachi
Mabarak Center, A Mixed Use Project, Lahore
Crescent Bay Project, Karachi
Faletti's Hotel Development Project, Lahore
Kalu Khan Girls High School Building at Swabi
District Headquarter Complex at Swabi
Regency Plaza at Mini Market Gulberg Lahore
Aslam Arcade Mcleod Road Lahore
Pakistan Air Force Complex at Abbott Road Lahore
Police Club Complex at Race Course Road Lahore
Mosque at Rinala Kurd
Rahber Center at Jail Road Lahore
Tax Free Plaza on Lawrance Road Lahore
Extension Unit for Pakistan Air Force Complex at Abbott Road Lahore
Shopping Complex at Main Market Gulberg Lahore
Extension Units for Tax Free Plaza on Lawrance Road Lahore
Pakistan Bait-ul-Maal Complex on Dev Smaj Road Lahore
Leeds Center Main Boulevard Gulberg Lahore
Ibrahim Mosque at Ferozepur Road Lahore
Housing Schemes
High-Rise Buildings
Geotechnical Investigations
Berkeley Associates (Pvt.) Ltd.
Big City Plaza Building at Liberty Chowk Lahore
Multi storey building at Narang Mandi
Multi-storey building at Bhatta Chowk Lahore
Benevolent Fund Building at Peshawar
Residential Villas Saudi Embassy Islamabad
NHA Building at Thokar Niaz Baig, Lahore
MCB Building, Jail Road Lahore
Aitchison College, Lahore
McDonald's Allama Iqbal Town , Lahore
Jamia Mosque, Kala Shah Kaku, Lahore
Descon ES Building, Lahore
Zohra Heights, Gulberg Lahore
Garrison Academy for Girls, Lahore Cantt.
Garrison Degree College, Lahore Cantt.
McDonalds, Faisalabad
Fauji Foudation Medical College, Rawalpindi
Honda Building Ferozpur Road, Lahore
IT Building, Raiwind Road, Lahore
A.D. Palace Rahim Yar Khan
Aitchison College, Junior Wing, Lahore
Babul Islam, Sargodha
Bank Alhabib, Gulberg Lahore
PSO Retail Stations at Lahore, D.G. Khan and Sargodha
Law Chambers at Fan Road Lahore
Neighbourhood G-11/4 Islamabad
Detatched Houses at I-8 Islamabad
New Auriga Shopping Plaza, Gulberg Lahore
International Islamic Center, Johar Town Lahore
PIA Facilities at New Terminal Lahore Airport
Aligarh college, Gulberg Lahore
Aitchison College Staff Housing Lahore
River Side Hotel Jhelum
FFC Tower The Mall Rawalpindi
PC Hotel Muzzaffarabad
PIA Engineering Transportation Site
PIA Cargo Complex Site
Shaheen Airport Services SAPS Cargo Complex site
Sheikh Zayyed Complex at Ferozpur road Lahore
Expo Center Johar Town Lahore
Geotechnical Investigations
Berkeley Associates (Pvt.) Ltd.
Kohat University of Science and Technology Kohat
Schlumberger offices and workshop at Sukkur
Plaza at Liberty Market
Bahria Town Lahore
PSO Zoom Logo Sign Tower Pattoki Bypass
Plaza at Abbott Road Lahore
Plaza at 37-P, Gulberg Lahore
Plaza at Davis Road Lahore
Plaza at Mcleod Road Lahore
Commercial plaza at Bedian Road Lahore
Eden Palace Villas
Mediacom Faisalaba
Comsat Complex Islamabad
PACE complex Gujrat
Decent Plaza Gujranwala
Government College Lahore
Al-Nafah Tower Gujranwala
Commercial Plaza Faisalabad
Historical Structural at Shalimar Garden Lahore
Enplan Plaza Garden Town Lahore
IT Park Ferozepur Lahore
Suzuki Motors Showroom Sargodha
Mian Tyre Office at Jail Road Lahore
Sterling Plaza at M M Alam Road Lahore
North East Hospital Complex, Peshawar
Ammar Medical Complex at Jail Road, near bypass, Lahore
Rahmat-ul-Alameen Trust Hospital Pak Patten
Muhammad Nawaz Sharif Kidney Institute at Shaikh Zayed Hospital Lahore
Alkhidmat Hospital, Sialkot
Hospital at Ferozpur road Lahore
Federal Hospital Rawalpindi
Hospitals
Geotechnical Investigations
Berkeley Associates (Pvt.) Ltd.
Cherished Pharmaceutical Industry at Raiwind
MSB Industries on Ferozepur Road Lahore
Cholistan Sugar Mill Liaquatpur
ICI go down near Kala Shah Kaku
Rawat Switchyard
FJFC Complex Bin Qasim Karachi
Merino Textile Mill on Faisalabad Shahkot Road Shahkot
International Juice Factory Azad Jammu & Kashmir
Sapphire Textile at Bhai Pharu
Pharmagen Beximco on Ferozpur Road Lahore
CCL extension unit at Kot Lakhpat Industrial Area Lahore
ProDiesal Services on Firozpur Road Lahore
Genesis Pharmaceutical Complex on Sheikhupura Faisalabad Road
Tower Crane Foundation at Fauji Cement, Jhang Bhatar
Ammar Textiles on Defence Road near Multan Road Lahore
Gas Treatment Plant at Liberty Power Project Ghotki Sind
CCL Godowns at Industrial Area Kot Lahkpat Lahore
Maria Balal Garment Factory and its Extension Units at Raiwind Road Lahore
Zuchini Industries Raiwind Road Lahore
Expansion of Caustic Soda Plant at Sitara Chemicals Limited on Faisalabad Sheikhupura Road
Carpet Processing Unit at Defence - Raiwind Road Lahore for Abbas Corporation (Pvt) Ltd
Expansion Unit for Dynamic Sportswear (Pvt) Ltd Canal Road Lahore
New Processing Unit for Vision Technologies (Pvt) Ltd Sialkot
Burhan Flour Mill at Gujrat Bypass
Kohat Cement Factory at Kohat
Coca Cola Plant, Gugranawala
Millac Foods, Manga Raiwind Road, Lahore
Merit Pharmaceutical, 34 km Ferozpur Road Lahore
Pepsi Cola International, Hattar
Pakistan Gloves Manufacturers & Export, Building, Sialkot
Shangai Chemicals, Sheikhupura Road
Nishat Dying and Finishing, Lahore
Ramey Textile Mills, Lahore
Forest Sweaters Pvt Limited
SKB Milk Plant, Raiwind Road, Lahore
Sitara Chemicals, Faisalabad
Rizwan Textile, Lahore
Industrial Buildings
Geotechnical Investigations
Berkeley Associates (Pvt.) Ltd.
SKB Factory at Raiwind Road, Lahore
Tandlianwala Suger Mill
CSK Distilleries Palia
Kohat Cement Plant Kohat
ICI extension for polyester plant Sheikhupura
Infra-structural for DHA Phase-VI Lahore
Packages Pulp and Paper Factory Kasur
Shed for Pepsi Cola Hattar
Export Processing Zone Gujranwala
Waste water treatment plant Rawalpindi
Madina Cold Storage Sillanwali Road Faisalabad
Food Processing Plant at Export Promotion Zone Gujranwala
Pepsi cola Manga Road Lahore
Rest House Building at Packages Kasur
Hitech Feeds Rawalpindi, Sheikhupura, Sharakpur and Fatehjang
Snack Green Field Factory at Sunder Industrial Estate for Pepsi.
Faisal Asad Textile Mill Muzaffargarh
Sitara Agriculture Research Centre Gutwala Faisalabad
Sitara Hydrogen peroxide Plant Faisalabad
Sitara Chemicals Faisalabad
Underpasses at Committee Chowk and Rawalpindi General Hospital Chowk on
Murree Road Rawalpindi
Sub-soil Investigation for Internal Roads for Rupafab at Raiwind
Sub-soil Investigation for Internal Roads for District Headquarter at Swabi
Sub-soil Investigation for Lahore Bypass (sub-contract)
Sub-soil Investigation for Rawalpindi Ring Road Project Rawalpindi
Road Side Soil Investigation & Borrow Material Exploration/Testing For ADB
Assisted Rural Access Roads Project Phase - I in District Mandi Bahauddin,
Jhelum, Khushab, Kasur and Okara.
Road Side Soil Investigation & Borrow Material Exploration & Existing Road
Condition Survey for Dualization of Sheikhupura Faisalabad Road Soil Investigation for Seven Nos. Of Bridges For Sheikhupura Faisalabad Dual Carriage
Way
Flyover bridge at Sherpao bridge Lahore
Flyover bridge at Katchary Chowk Multan
Underpass bridge at Jail Road Lahore
Roads and Bridges
Geotechnical Investigations
Berkeley Associates (Pvt.) Ltd.
Additional Carriage Way (N-5) Section: TMP-Bahawalpur.
Road Side Soil Investigation & Borrow Material Exploration/Testing & Existing Condition
Survey for Khwaza Khela Besham Road Malakand Division.
Road Side Soil Investigation & Borrow Material Exploration/Testing & Existing Condition
Survey for Three Roads in Malakand Division.
Bridge Over Sutlej River
Soil Investigation and Testing at Ferozpur Road Lahore
Quetta Chamman Road
200 km Roads in Wanna
200 km Roads in MRDP
Sibbi Much Road
Internal and Main Boulevard for Bahria Town Lahore M3
Confirmatory Investigations
Lahore Ring Road Project Package VIII, IX, XI, VII and VIII
Chukiatian Barawal Road
Feasibility study for 1.2 Mw Marchai Hydropower Project.
Feasibility Study for 1.5 MW Khari II Hydropower Project.
Feasibility Study for 120 MW Shushghai Zhendoli Hydropower Project.
EPC Bid Preparation for 100 MW Kotli Hydropower Project.
Feasibility Study for 100 MW Shogo Sin Hydropower Project.
Detail Civil Design for 22 MW Jabban Hydropower Project.
EPC Bid Preparation for 120 Mw Rajdhani Hydropower Project.
Periodic Inspection of 1450 Mw Ghazi Brotha Hydropower Project.
Feasibility Study for 300 MW Naran Hydropower Project.
Feasibility Study for 98 MW Batakundi Hydropower Project.
Feasibility Study for 180 MW Balakot Hydropower Project.
Bid Preparation for Small Hydropower Project on Canal in Punjab.
Engineering Services for Lucky Hydropower Project, Marala
Engineering Services for LBDC Hydropower Project, Chichawatni.
Engineering Services for JBC Hydropower Project.
Engineering Services for 130 MW Sehra Hydropower Project.
Hydropower Projects
Geotechnical Investigations
Berkeley Associates (Pvt.) Ltd.
1180 MW RLNG Bhikki Power Project
230 MW LNG Based Engro Power Project Port Qasim
350 MW Coal Based Power Project of Siddique Sons, Port Qasim
2 x 330 MW coal Fired Power Project in Thar, Engro Energy.
100 MW Charbon Coal Power Project.
2 x 60 MW Coal Fired Power Project, Fatima Energy.
50 MW Coal Power Project near Johar Abad, Orient Power.
11 MW Biomass Based Project in Faisalabad.
1 x 46 MW Coal Based captive power plant of Nishat Chunian Ltd., Pakistan
425 MW Combined Cycle Nandipur Power Plant
152 MW Combined Cycle Diesel Engine Power Project Pasrur Sialkot
225 MW Shahpur Power Plant, Sargodha
135 MW Bhiki Power Project
225 MW Combined Cycle Balloki Power Plant
225 MW Combined Cycle Saif Power Plant, Sahiwal
AES Power Plant; Design of Cooling Towers and Construction Supervision
Preliminary sub-soil Investigation for 481 MW Thermal Power Plant on Sheikhupura
Faisalabad Road
Preliminary sub-soil Investigation for proposed Thermal Power Plant near Kot Addu
Detail Design stage sub-soil Investigation for 481 MW Thermal Power Plant on
Sheikhupura Faisalabad Road
Confirmatory sub-soil investigation for Olympia Power Project on Sheikhupura
Faisalabad Road
1 x 46 MW Coal Based captive power plant of Nishat Chunian Ltd., Pakistan
425 MW Combined Cycle Nandipur Power Plant
152 MW Combined Cycle Diesel Engine Power Project Pasrur Sialkot
225 MW Shahpur Power Plant, Sargodha
225 MW Combined Cycle Balloki Power Plant
225 MW Combined Cycle Saif Power Plant, Sahiwal
Engro Chemicals Pakistan; Design of Pile Foundations and Supervision of Piling Works
AES Power Plant; Design of Cooling Towers and Construction Supervision
Preliminary sub-soil Investigation for 481 MW Thermal Power Plant on Sheikhupura
Faisalabad Road (Main contract with M/s Mirza Associates (pvt) Ltd
Preliminary sub-soil Investigation for proposed Thermal Power Plant near Kot Addu
Power Plant and Fertilizer Plants
Thermal Power Plants
Geotechnical Investigations
Berkeley Associates (Pvt.) Ltd.
(Main contract with M/s Habib Rafiq (pvt) Ltd)
Detail Design stage sub-soil Investigation for 481 MW Thermal Power Plant on
Sheikhupura Faisalabad Road (Main contract with M/s Progressive Consultants (pvt) Ltd
PAK and M/s Black & Veatch USA)
Confirmatory sub-soil investigation for Olympia Power Project on Sheikhupura
Faisalabad Road (Main contract with M/s Olympia Group)
135 MW Bhiki Power Project (Main contract M/s Pakistan Power Resources LLC)
Engro Chemicals Pakistan; Design of Pile Foundations and Supervision of Piling Works
Preliminary Geotechnical Investigation for New Processing Units at Attock Refinery
Morgah Rawalpindi (Main contract with M/s ARL Rawalpindi Pakistan)
Detail design Geotechnical Investigation for New Processing Units at Attock Refinery
Morgah Rawalpindi (sub-contract with M/s Mitsui Japan)
Geotechnical Investigation for New tank area sites at Attock Refinery Morgah
Rawalpindi (Main contract with M/s ARL Rawalpindi Pakistan)
Preliminary Geotechnical Investigation for Pak Arab Refinery (PARCO) Mahmood Kot
(sub-contract with M/s Habib Rafiq (pvt) Ltd).
Geotechnical Investigation for Flare Stack Structure at Attock Refinery Rawalpindi (sub-
contract with M/s Descon Engineering (pvt) Ltd)
Detail design Geotechnical Investigation for Central Processing Plant for REHMAT-1
Gas Field at Sardar Garh near Gotki (Main contract with M/s Presson International of
Canada)
Detail design Geotechnical Investigation for Central Processing Plant for MOL Gas Plant
at GURGURI (Main contract with M/s Presson International of Canada)
Soil Survey Along 6” Dia. Oil Pipeline From Turkwal to ARL Via Pindori (for K.F.
Corporation (Pvt.) Ltd
New Grey 6700 TPD Cement Plant for M/s Kohat Cement Company Ltd at Kohat
New Grey 7600 TPD Cement Plant for M/s Fauji Cement Company Ltd at Fatehjang
Oil & Gas Sector
Cement Industry
Oil Refinery & Fertilizer Plants
Geotechnical Investigations
Berkeley Associates (Pvt.) Ltd.
28 Nos. of 30 m to 60 m High GF Towers in Lahore for Nortel Networks
18 Nos. of 30 m to 60 m High GF Towers in Sialkot for Nortel Networks
18 Nos. of 30 m to 60 m High GF Towers in Gujrat for Nortel Networks
18 Nos. of 30 m to 60 m High GF Towers in Gujranwala for Nortel Networks
18 Nos. of 30 m to 60 m High GF Towers in Faisalabad for Nortel Networks
14 No. of 30 m to 60 m High GF Towers in Sheikhupura for Nortel Networks
18 Nos. of 30 m to 60 m High GF Towers in Multan for Nortel Networks
3 Nos. of 30 m to 60 m High GF Towers in Attock for Nortel Networks
8 Nos. of 30 m to 60 m High GF Towers in Islamabad and Rawalpindi
45 Nos. of 30 m to 60 m High GF Towers in Lahore for Ericsson Pakistan
8 Nos. of 30 m to 60 m High GF Towers in wazirabad for Ericsson Pakistan
7 Nos. of 30 m to 60 m High GF Towers in Gujrat for Ericsson Pakistan
9 Nos. of 30 m to 60 m High GF Towers in Gujranwala for Ericsson Pakistan
21 Nos. of 30 m to 60 m High GF Towers in Faisalabad for Ericsson Pakistan
14 No. of 30 m to 60 m High GF Towers in sialkot for Ericsson Pakistan
12 Nos. of 30 m to 60 m High GF Towers in Multan for Ericsson Pakistan
8 Nos. of 30 m to 60 m High GF Towers in sargodha for Ericsson Pakistan 5 Nos. of 30 m to 60 m High GF Towers in sheikhupura for Ericsson Pakistan
8 Nos. of 30 m to 60 m High GF Towers in phalia for Ericsson Pakistan
5 Nos. of 30 m to 60 m High GF Towers in tandianlwala for Ericsson Pakistan
3 Nos. of 30 m to 60 m High GF Towers in Okara for Ericsson Pakistan
8 Nos. of 30 m to 60 m High GF Towers in Gujrat for Alandick Pakistan
4 Nos. of 30 m to 60 m High GF Towers in Gujranwala for Alandick Pakistan
8 Nos. of 30 m to 60 m High GF Towers in Faisalabad for Alandick Pakistan
11 No. of 30 m to 60 m High GF Towers in sialkot for Alandick Pakistan
17 Nos. of 30 m to 60 m High GF Towers in Multan for Alandick Pakistan
18 Nos. of 30 m to 60 m High GF Towers in sargodha for Alandick Pakistan
15 Nos. of 30 m to 60 m High GF Towers in sheikhupura for Alandick Pakistan
5 Nos. of 30 m to 60 m High GF Towers in phalia for Alandick Pakistan
8 Nos. of 30 m to 60 m High GF Towers in tandianlwala for Alandick Pakistan
Tele Communication Towers
Geotechnical Investigations
Berkeley Associates (Pvt.) Ltd.
Tarbela Lahore 500 kv in-out arrangement for M/s ICC (Pvt) Ltd
Rewat Islamabad 220 kv transmission line towers for M/s ICC (Pvt) Ltd
Shahibagh - Peshawar 220 kv transmission line towers for M/s ICC (Pvt) Ltd
Barotha Nowshera Shahibagh 220 kv transmission line towers for M/s ICC (Pvt) Ltd
Rahim Yar Khan - Jamshoro 500 Kv Transmission Line, 3rd Circuit
Zahir Pir - Guddu 500 Kv Transmission Line
Jamshoro - Dadu 500 Kv Transmission Line (partial)
Ghazi Barotha 500 kV Transmission Line
132/11.5 kV GIS Station at Lahore Airport
500 kV Grid station at Sahiwal for Siemens
Ghatti-Muzzaffargarh 500 kv Transmission Line Project
Thal Canal Project
PSO Petrol Pump
Sewerage Treatment Plant Rahim Yar Khan
Mazar at Chalay Sharif Gujrat
Weather Radar Station Islamabad
Swimming Pool at Aitchison College Lahore
Beacon House Complex Raiwing Road Lahore
Bridge at Abdullahpur Faisalabad
Office building for DESCON Ferozepur Road Lahore
Sethi Motor Showroom Ferozpur Road Lahore
Beacon House School Walton Road Lahore
Magic park Motorway
State Bank of Pakistan
Suzuki Motors Sargodha Road Lahore
Schlumberger S.A. offices and workshop at Sukkur
Lahore Rapid Mass Transit Project, Lahore
Orange Line Metro Train Project, Lahore
Miscellaneous
Power Transmission Lines
Mass Transit Projects
Piling Projects
Berkeley Associates (Pvt.) Ltd.
PILING PROJECTS
Piling Projects
Berkeley Associates (Pvt.) Ltd.
Construction and Load Testing of 14 test piles for Orange Line Metro Train Project, Lahore
Construction of 40 pile foundations for Barotha Nowshera Industrial Shahi Bagh D/C Twin Bundle 220 kV Transmission Line (Diameter of pile 900 mm each 20 m deep, Diameter of piles 1220 mm each 30 m deep, using Percussion Method) in year 2003
Construction of 32 pile foundations for Peshawer Shahi Bagh D/C Twin Bundle 220 kV Transmission Line (Diameter of pile 900 mm each 20 m deep, Diameter of piles 1220 mm each 30 m deep, using Percussion Method) in year 2003
Construction of 28 pile foundations for Rewat Islamabad D/C Twin Bundle 220 kV Transmission Line (Diameter of pile 900 mm each 20 m deep, Diameter of piles 1220 mm each 30 m deep, using Percussion Method) in year 2003
Construction of 1500 nos of 760 mm each of 40 m deep diameter piles for New Grey Cement Plant for Kohat Cement (Pvt) Ltd at Kohat.
Construction of pile foundation for Highway Bridge near Muridkay. (Diameter of pile = 760 mm, Nos. of piles = 36, Using reverse rotary method)
Construction of pile foundation for Highway Bridge over B.S. Link Canal near Chunian. (Diameter of pile = 760 mm, Nos. of piles = 26, Using percussion method)
Construction of pile foundation for railway overhead bridge Ghari Shahu. (Diameter of pile = 840 mm, Nos. of piles = 126, Using reverse rotary method)
Construction of pile foundation for nullah at kharian Cantt. (Diameter of pile = 610 mm, Nos. of piles = 6, Using reverse rotary method)
Construction of pile foundations for 25 m high Mobilink Tower at Chung. (Diameter of pile = 760 mm, Nos. of piles = 4, Using reverse rotary method)
Construction of pile foundations for 25 m high Mobilink Tower at Muridkay.(Diameter of pile = 760 mm, Nos. of piles = 4, Using reverse rotary method)
Construction of 1220 mm dia piles for towers for 220 KV Transmission Lines (76 nos. of towers)
Construction of 1000 mm diameter piles for bridge at Bahria Town Rawalpindi
Piling Projects
Well Drilling Projects
Berkeley Associates (Pvt.) Ltd.
WELL DRILLING PROJECTS
Well Drilling Projects
Berkeley Associates (Pvt.) Ltd.
Design and Construction of Four (4) tubewells having 3.2 cusec discharge capacity at 425 MW CCPP Nandipur for M/s DEC China
Design and Construction of six (6) tubewells having 3 cusec discharge capacity at PARCO Mid-Country Refinery Project Mahmood Kot for M/s Marubeni Corporation (MC / JJC) Japan.
Construction of one (1) tubewell at Rehmat Oil and Gas Processing Plant for Presson / Petronas Canada.
Construction of one (1) tubewell for Wapda at Gujrat Construction of one (1) tubewell at Liberty Power Project Ghotki Sind. Construction of one (1) tube well having 2 cusec discharge capacity at Sunny View Housing Scheme Lahore for M/s Habib Rafiq (pvt) Ltd.
Construction of seven (7) tube wells having 3 cusec discharge capacity for construction of Lahore Islamabad Motorway on Section - I.
Construction of five (5) tube wells for water supply in Islamabad. Construction of two (2) tube wells for water supply at Bhimber and Mirpur. Construction of two (2) tube wells for L.D.A. in under construction Gujarpura Scheme as sub-contract.
Construction of seven (7) tube wells for WASA Faisalabad as sub-contract. Construction of three (3) tube wells for agriculture purpose in Kasur. Construction of one no. of tubewell at Labour Colony Gujrat for M/s Ghulam Habib Construction.
Construction of one no. of tubewell at Gujrat for WAPDA Colony. Construction of one tubewell at Rehmat Gas Treatment Plant Gothki.
Completed Projects
Berkeley Associates (Pvt.) Ltd.
Topographic Surveys
Completed Projects
Berkeley Associates (Pvt.) Ltd.
75 KTPA LIGHT ASH EXPANSION (PHASE-I) ICI Khewera
425 MW Combined Cycle Nandipur Power Plant
1180 MW CCPP at Bhikki
1223 MW CCPP at Balloki
Calci Packages Limited
100 MW Fatima Energy Cogen Power Project
New Ammonia / Urea Plants Project of Engro Dharki
PARCO Mid-Country Refinery Project Mahmood Kot
Pepsi Cola International, Multan
660 Lucky Hydropower Project
Gulf Rental Power
230 MW LNG Based Engro Power Project Port Qasim
Green Power CNEC
Rehabilitation of Building Defects of Malala Yousaf Zai Daanish School (Boys and Girls) Jand
District Attock
100 MW Solar Power Project
300 MW Coal Based Power Project of Siddique Sons, Port Qasim
1 x 46 MW Coal Based Captive Power Plant of Nishat Chunian Ltd, Pakistan
90 MW Batakundi Hydropower Project, KPK
180 MW Naran Hydropower Project, KPK
300 MW Balakot Hydropower Project, KPK
120 MW Shushghai Zhendoli Hydropower Project, Chitral
200 Bed North East Hospital Complex, Peshawar
Moro & Dadu 500Kv substations
22 MW Jabban Hydropower Project, KPK
Residential Villas Saudi Embassy Islamabad
JBC Hydropower Project, Sukheke
Project Sheets
Berkeley Associates (Pvt.) Ltd.
PROJECT SHEETS
Project Sheets
Berkeley Associates (Pvt.) Ltd.
Project: 1180 MW CCPP at Bhikki
Location: Bhikki, District Shekhupura, Pakistan
Client: Quaid-e-Azam Thermal Power (Pvt.) Ltd., Govt. of Punjab
Scope of Services:
Geotechnical Investigations for Power Plant and Access Road comprising 3,500 m drilling of investigation boreholes, down‐hole seismic survey, electrical resistivity survey, and laboratory testing
Topographic Survey and Bathymetric Survey of canal
Groundwater Studies comprising site survey, groundwater modeling, design of pumping wells
Construction of test piles, pile load testing, evaluation of pile load tests
Construction of 1300 cast in‐situ concrete piles
Start date: October 2015
End date: Dec. 2015
Project Sheets
Berkeley Associates (Pvt.) Ltd.
Project: 350 MW Coal Fired Power Plant
Location: Port Qasim
Client: Siddique Sons Energy
Scope of Services:
Geotechnical Investigations
Topographic Survey & Bathymetric Survey
Groundwater Studies
Resistivity Survey
Start date: Jan, 2015
End date: Mar, 2015
B k l A i tB k l A i tB k l A i tB k l A i t
Project Sheets
Berkeley Associates (Pvt.) Ltd.
Project: Orange Line Metro Train, Project
Location: Lahore, Pakistan
Client: Punjab Metro bus Authority
Scope of Services:
Geotechnical Investigations along the alignment of the Orange Line
Execution of 14 Test Piles and Pile Load Tests up to 12000 tons, interpretation of pile load tests, and design recommendations for working piles
Start date: July 2015
End date: September 2015
Project Sheets
Berkeley Associates (Pvt.) Ltd.
Project: 150 MW Patrind Hydropower Project
Location: Muzaffarabad, AJK
Client: Daewoo Engineering & Construction
Scope of Services:
Preparation of Construction Drawings for Power House, Weir, Excavation, Retaining System.
Detailed Design and preparation of Construction Drawings for Access Roads
Project Sheets
Berkeley Associates (Pvt.) Ltd.
Project: Feasibility Study of 12 MW Biomass Based IPP Project
Location: Faisalabad, Punjab
Client: Masood Textile Mills
Scope of Services:
Sitting Studies
Topographic survey
Geotechnical investigations
Initial Environmental Examination
Grid interconnection studies
Completion Time: 9 Months
Completion Date: March 2013
Project Sheets
Berkeley Associates (Pvt.) Ltd.
Project: Feasibility Study for 180 MW Naran Hydropower Project
Location: Naran, Khyber Pakhtunkhwa
Client: Sarhad Hydel Development Organization (SHYDO)
Scope of Services: Preparation of Geotechnical investigations program and tender documents
Top supervision of Geotechnical investigations
Preparation of laboratory testing program
Geotechnical analysis and design for feasibility study
Preparation of geotechnical investigations report
Feasibility level design of all hydraulic structures
Preparation of drawings for feasibility level design
Financial and economic analyses of the project
Seismological studies and geological mapping
Environmental studies
Completion Time: 18 Months
Completion Date: December, 2013
Project Sheets
Berkeley Associates (Pvt.) Ltd.
Project: Feasibility Study for 300 MW Balakot Hydropower Project
Location: Balakot, Khyber Pakhtunkhwa
Client: Sarhad Hydel Development Organization (SHYDO)
Scope of Services: Preparation of Geotechnical investigations program and tender documents
Top supervision of Geotechnical investigations
Preparation of laboratory testing program
Geotechnical analysis and design for feasibility study
Preparation of geotechnical investigations report
Feasibility level design of all hydraulic structures
Preparation of drawings for feasibility level design
Financial and economic analyses of the project
Seismological studies and geological mapping
Environmental studies
Completion Time: 18 Months
Completion Date: December, 2013
Project Sheets
Berkeley Associates (Pvt.) Ltd.
Project: Feasibility Study for 98 MW Batakundi Hydropower Project
Location: Batakundi, Khyber Pakhtunkhwa
Client: Sarhad Hydel Development Organization (SHYDO)
Scope of Services: Preparation of Geotechnical investigations program and tender documents
Top supervision of Geotechnical investigations
Preparation of laboratory testing program
Geotechnical analysis and design for feasibility study
Preparation of geotechnical investigations report
Feasibility level design of all hydraulic structures
Preparation of drawings for feasibility level design
Financial and economic analyses of the project
Seismological studies and geological mapping
Environmental studies
Completion Time: 18 Months
Completion Date: December, 2013
Project Sheets
Berkeley Associates (Pvt.) Ltd.
Project: Shogo – Sin Hydropower Project
Location: Chitral
Client: Private Power Infrastructure Board (PPIB)
Scope of Services: Preparation of Geotechnical investigations program
Preparation of Tender documents for Geotechnical investigations
Top supervision of Geotechnical investigations
Preparation of Laboratory testing program
Geotechnical analysis and design for feasibility study
Preparation of geotechnical investigations report
Feasibility level design of all structures
Preparation of drawings for feasibility level design
Completion Time: 15 Months
Completion Date: April, 2010
Project Sheets
Berkeley Associates (Pvt.) Ltd.
Project: Shushghai - Zhendoli Hydropower Project
Location: Chitral
Client: Private Power Infrastructure Board (PPIB)
Scope of Services: Preparation of Geotechnical investigations program
Preparation of Tender documents for Geotechnical investigations
Top supervision of Geotechnical investigations
Preparation of Laboratory testing program
Geotechnical analysis and design for feasibility study
Preparation of geotechnical investigations report
Feasibility level design of all structures
Preparation of drawings for feasibility level design
Completion Time: 15 Months
Completion Date: April, 2010
Project Sheets
Berkeley Associates (Pvt.) Ltd.
Project: 548 MW Kaigah Hydropower Project
Location: Kandian River
Client: Kaigah Power Pvt Ltd
Scope of Services: Preparation of Geotechnical investigations program
Preparation of Tender documents for Geotechnical investigations
Top supervision of Geotechnical investigations
Preparation of Laboratory testing program
Geotechnical analysis and design for feasibility study
Preparation of geotechnical investigations report
Feasibility level design of all structures
Preparation of drawings for feasibility level design
Completion Time: 15 Months
Completion Date: February, 2011
Project Sheets
Berkeley Associates (Pvt.) Ltd.
Project: 22 MW Jabban Hydroelectric Power Station Rehabilitation Project
Location: Jabban – District Malakand
Client: WAPDA
EPC Contractor: HRL – CCPG JV
Scope of Services: Preparation of Geotechnical investigations program
Carrying out geotechnical investigation at site
Preparation of geotechnical investigations report
Geotechnical analysis and design for various components of
Project (i.e. power house, substation, and penstock)
Structural design of powerhouse, penstocks and 132 kV substation
Rehabilitation design for Forebay structure
Preparation of civil work construction drawings
Project Sheets
Berkeley Associates (Pvt.) Ltd.
Project: JBC Hydropower Project, Sukheke
Location: Sukheke, (50km from Lahore)
Client: JBC Powr Ltd.
Consultants: Pakistan Consulting Services
Scope of Services: Drilling of 4 boreholes ranging in depth from 30m to 50m along with SPT and undisturbed soil sampling
Total exploratory drilling – 130m
Laboratory testing including PSD, consolidation, direct shear, unconfined compression, triaxial compression tests
Factual and Interpretative Reports
Completion Time: Eight (04) weeks
No. of Drill Rigs: One straight rotary drilling rigs along with necessary crew and accessories
Completion Date: August 30th 2008
Project Sheets
Berkeley Associates (Pvt.) Ltd.
Project: LBDC Hydropower Project, Chichawatni
Location: Chichawatni, (180km from Lahore)
Client: LBOD Power Ltd.
Consultants: Pakistan Consulting Services
Scope of Services: Drilling of 4 boreholes ranging in depth from 30m to 50m along with SPT and undisturbed soil sampling
Total exploratory drilling – 130m
Field permeability tests in boreholes
Laboratory testing including PSD, consolidation, direct shear, unconfined compression, triaxial compression tests
Factual and Interpretative Reports
Completion Time: Eight (04) weeks
No. of Drill Rigs: One straight rotary drilling rigs along with necessary crew and accessories
Completion Date: September 10th 2008
Project Sheets
Berkeley Associates (Pvt.) Ltd.
Project: Lucky Hydropower Project
Location: Sialkot
Client: Olympus Energy (Pvt.) Ltd.
Consultants: Barqab
Scope of Services: Drilling of 5 boreholes ranging in depth from 20m to 30m along with SPT and undisturbed soil sampling
Total exploratory drilling – 155m
Field permeability tests in boreholes
Laboratory testing including PSD, consolidation, direct shear, unconfined compression, triaxial compression tests
Factual and Interpretative Reports
Completion Time: Eight (04) weeks
No. of Drill Rigs: One straight rotary drilling rigs along with necessary crew and accessories
Completion Date: August 30th 2008
Project Sheets
Berkeley Associates (Pvt.) Ltd.
Project: 100 MW Fatima Energy Cogen Power Project
Location: Sanawan - Pakistan
Client: Fatima Energy Limited (FEL)
Scope of Services:
Sitting Studies
Topographic survey
Groundwater studies
Material studies
Coal Transportation studies
Geotechnical investigations
Initial Environmental Examination
Preliminary design of civil structures
Completion Time: 10 Months
Completion Date: May 2011
Project Sheets
Berkeley Associates (Pvt.) Ltd.
COOLING TOWERS FOR AES THERMAL POWER PLANT
Scope of Work:
o Preparation of detailed design of all civil and mechanical works, and preparation of technical specifications, drawings, and Bill of Quantities
o Preparation of tender documents o Prequalification of Contractors and Invitation of Bids o Evaluation of Bids o Award of construction contract o Construction Supervision for all site works o Quality Control and Quality Assurance audits o Verification of contractors running bills o Preparation of completion reports o Preparation of progress reports o Preparation of as-built drawings
Project Sheets
Berkeley Associates (Pvt.) Ltd.
Project: Fatima Energy Cogen Power Project
Location: Sanawan, Pakistan
Client: Fatima Energy Limited
Scope of Services:
Geotechnical Investigation (Drilling of 5 boreholes ranging from 15m to 30 m depth along with SPT and undisturbed soil sampling, 4 testpits, laboratory testing including PSD, consolidation, direct shear, unconfined compression and Factual and Interpretative Reports)
Electrical Resistivity Survey Geologic al Hazard Assessment
Completion Date: May 2011 (4 Weeks)
Project Sheets
Berkeley Associates (Pvt.) Ltd.
Project: 234 MW Combined Cycle Power Plant
Location: Muridke, Lahore
Client: Albario Engineering (Pvt) Ltd.
Project Consultants: Skoda Export
Scope of Services: Geotechnical Investigation (Drilling of 3 boreholes each down to 15m
depth along with SPT and undisturbed soil sampling, laboratory testing including PSD, consolidation, direct shear, unconfined compression and Factual and Interpretative Reports)
Pile Integrity Test (Total Tested Piles = 23 Piles)
Completion Time: April 2008 (02 Weeks)
Project Sheets
Berkeley Associates (Pvt.) Ltd.
Project: Feasibility Studies for 11 MW Biomass Based Power Plant
Location: Jhang, Punjab
Client: Lumen Energia (Private) Limited
Scope of Services:
Sitting Studies
Topographic survey
Geotechnical investigations
Initial Environmental Examination
Grid interconnection studies
Completion Time: 9 Months
Completion Date: July 2011
Project Sheets
Berkeley Associates (Pvt.) Ltd.
Project: Feasibility Study of 100 MW Charbon Coal Power Project
Location: Chakwal, Punjab
Client: Habib Rafiq (Pvt.) Limited
Scope of Services:
Sitting Studies
Topographic survey
Groundwater studies
Material studies
Coal Transportation studies
Geotechnical investigations
Initial Environmental Examination
Preliminary design of civil structures
Completion Time: 12 Months
Completion Date: June 2013
Project Sheets
Berkeley Associates (Pvt.) Ltd.
Project: 100 MW Solar Power Project
Location: Quaid-e-Azam Solar Park, Bahawalpur, Pakistan
Client: TBEA, China
Scope of Services:
Review of Geotechnical Data
Review Design of foundations for the Solar Panels and Buildings
Evaluation of the load test results of the screw piles used for panels
Start date: June 2014
End date: Nov. 2014
Project Sheets
Berkeley Associates (Pvt.) Ltd.
Project: 50 MW Coal Fired Khushab Power Plant
Location: Khushab - Pakistan
Client: Shahpur Energy (Pvt.) Limited
Scope of Services:
Sitting Studies
Topographic survey
Groundwater studies
Material studies
Coal Transportation studies
Geotechnical investigations
Initial Environmental Examination
Preliminary design of civil structures
Completion Time: 12 Months
Completion Date: April 2011
Project Sheets
Berkeley Associates (Pvt.) Ltd.
Project: Lahore Rapid Mass Transit System Project
Location: Lahore
Client: Metro Associates, Lahore
Consultants: Systra Group, France
Scope of Services: Drilling of 78 boreholes ranging in depth from 28m to 50m along with SPT and undisturbed soil sampling along the 27km long alignment
Total exploratory drilling – 2,622m
Field permeability tests in boreholes
Installation of fourteen piezometer
Thirty shallow test pits along with field density tests
Five Plate Load tests
Laboratory testing including PSD, consolidation, direct shear, unconfined compression, triaxial compression tests
Factual and Interpretative Reports
Completion Time: Eight (08) weeks
No. of Drill Rigs: Six straight rotary drilling rigs along with necessary crew and accessories; and seven crews of hand auger cum light percussion
Project Sheets
Berkeley Associates (Pvt.) Ltd.
Project: 425 MW CCPP Nandipur, Pakistan
Location: Nandipur (160 km from Lahore)
Client: Dongfang Electric Corporation Limited (DEC), China
EPC Contractor: DEC, China
Scope of Survey: Topographic Survey on Land and under water for Canal Preparation of Survey Maps and Report
Scope of Services: Drilling of 137 boreholes ranging in depth from 15m to 50m along with SPT and undisturbed soil sampling
Total exploratory drilling = 4,200 m
Down hole shear wave velocity tests in six boreholes 50 m deep
Cone Penetration Tests (CPT) at 23 locations
Field permeability test
Six Plate load tests
Electrical resistivity tests at 83 locations
Laboratory testing including PSD, consolidation, direct shear, unconfined compression
Factual and Interpretative Reports on the basis of Chinese Code
- Construction of a 120 m deep well, and five piezometers Performance of pump out test, analyses of data and design of pumping wells.
- Tubewell
- Ground water studies
- Surface water studies
Project Sheets
Berkeley Associates (Pvt.) Ltd.
Project: 225 MW CCPP Saif Power Project Sahiwal
Location: Sahiwal (150 km from Lahore)
Client: Saif Power Limited, Islamabad
EPC Contractor: CMEC, China
Scope of Services: Drilling of 112 boreholes ranging in depth from 30m to 40m along with SPT and undisturbed soil sampling
Total exploratory drilling – 2,800m
Down hole shear wave velocity tests in three boreholes 80m deep
Six Plate load tests
Electrical resistivity tests at 20 locations
Laboratory testing including PSD, consolidation, direct shear, unconfined compression
Factual and Interpretative Reports
Completion Time: Ten (10) weeks
No. of Drill Rigs: Nine straight rotary drilling rigs along with necessary crew and accessories
Project Sheets
Berkeley Associates (Pvt.) Ltd.
Project: 152 Combined Cycle Diesel Engine Power Plant, Pasrur
Location: Eastern Power Company (EPCO), Islamabad
Client: Eastern Power Company (EPCO), Islamabad
EPC Contractor: Gama Power, Turkey
Scope of Services: Drilling of 20 boreholes ranging in depth from 30m to 50m along with SPT and undisturbed soil sampling
Total exploratory drilling – 920m
Five shallow test pits along with field density test
Installation of piezimeters
Aquifer Pump out test
Electrical resistivity tests at 12 locations
Laboratory testing including PSD, consolidation, direct shear, unconfined compression
Factual and Interpretative Reports
Completion Time: Eight (08) weeks
No. of Drill Rigs: Three straight rotary drilling rigs along with necessary crew and accessories
Project Sheets
Berkeley Associates (Pvt.) Ltd.
Project: New Urea / Amonia Plants Project, Engro Dharki
Location: Dharki, Dist. Ghotki, Sindh
Client: Engro Chemicals Pakistan Ltd
EPC Contractor: Snamprogatti, Italy
Descon, Pakistan
Scope of Services:
- Geotechnical Investigation and foundation design - Design coordination with EPC contractor - Supervision of piling constructions - Design of dewatering system - Design of parameters for PMS buildings - Design review of ammonia storage tanks - Quality control and quality assurance of all civil works through
resident team of engineers - Trouble shooting and assistance in design and construction
bottle necks
Completion Time: Three (03) Years
Project Sheets
Berkeley Associates (Pvt.) Ltd.
Project: Design of Cofferdam for Construction of Intake Structure
Location: Guddu, Sindh
Client: Habib Rafiq (Pvt.) Ltd.
Scope of Services:
- Development of design of cofferdam including stability analysis, seepage analysis
- Preparation of construction drawings - Preparation of detailed method statement - Analysis to find out impact of construction of cofferdam on the
following canal and development of remedial measures
Project Sheets
Berkeley Associates (Pvt.) Ltd.
Project: PARCO Refinery
Location: Mahmood Kot, Near Multan
Client: Marubeni Corporation of Japan
Consultants: NA
Scope of Services: Design, Construction, and Commissioning of 6 deep wells of 2 cusec (ft3/sec) capacity each. The scope included drilling of wells, procurement of all materials and machinery required for the works.
Completion Time: Eight (08) weeks
No. of Drill Rigs: Two (reverse rotary type)
Project Sheets
Berkeley Associates (Pvt.) Ltd.
Project: Flattie’s Hotel Development Project
Location: Lahore
Client: Gulf Commercial Bank, Abu Dhabi
Consultants: Meinhardt, Singapore
Scope of Services: Drilling of 25 boreholes ranging in depth from 65m to 80m along with SPT and undisturbed soil sampling
Total exploratory drilling – 1925m
12 CPT probes to 30m depth each
Field permeability tests in boreholes
Installation of piezometers
Laboratory testing including PSD, consolidation, direct shear, unconfined compression, triaxial compression tests
Factual and Interpretative Reports
Completion Time: Eight (08) weeks
No. of Drill Rigs: Nine straight rotary drilling rigs along with necessary crew and accessories
Project Sheets
Berkeley Associates (Pvt.) Ltd.
Project: Mobilink Office Building at Quaid-e-Azam Industrial Estate
Location: Lahore, Punjab
Client: Progressive Consultants (Pvt.) Ltd.
Scope of Services:
Comparison of different layout of shoring systems
Finalizing the layout of shoring system
Evaluation of lateral loading at different support levels
Design of different structural components of shoring system
Design of in-situ tangent concrete piles
Preparation of detailed construction drawings
Preparation of Tender Documents for the construction of shoring system
Project Sheets
Berkeley Associates (Pvt.) Ltd.
Project: Safety Assessment of Existing Shoring System and Design of Rehabilitation/ Strengthening Measures at Mubarak Center, Ferozepur Road, Lahore
Location: Lahore, Punjab
Client: M/s Taavun (Pvt.) Ltd.
Scope of Services:
Stage – I Assessment of existing retaining system and establish the need for remedial/ strengthening measures, which included;
a) Condition survey/ physical inspection of entire shoring system
b) In-situ Testing; Anchor lift-off tests; Integrity of concrete piles and bracing beams using Schmidt hammer and PUNDIT
c) Evaluation of existing shoring system by incorporating results of in-situ testing
Stage – II Suggesting the most appropriate and economical strengthening measures to ensure safety of the shoring system and adjacent buildings
Project Sheets
Berkeley Associates (Pvt.) Ltd.
Project: Pindi Bhattian Faisalabad Motorway (M-3) Location: Pindi Bhattian -Faisalabad
Client: National Highway Authorities (NHA)
Scope of Work:
Drilling of 40 boreholes ranging in depth from 05m to 10m along with SPT and undisturbed soil sampling along the 60km long alignment Forty (40) test pits along with field density tests Laboratory testing including PSD, consolidation, direct shear, unconfined compression, triaxial compression tests Factual and Interpretative Reports
Preparation of comprehensive evaluation rep
Project Sheets
Berkeley Associates (Pvt.) Ltd.
Project: Bridge on Sutlej River, Bahawalpur. Location: Bahawalpur
Client: SKB Pvt. Ltd.
Scope of Work: Drilling of 2 boreholes to maximum depth of 50.0m along with
SPT and undisturbed soil sampling Laboratory testing including PSD, consolidation, direct shear, unconfined compression, triaxial compression tests
Preparation of geotechnical
investigation report Design of bridge
foundations
Start Date: July 01, 2003
End Date: July 20, 2003
Project Sheets
Berkeley Associates (Pvt.) Ltd.
Project: Naran Jalkhan Road Location: Naran to Jakkhad
Consultants: Republic Engineering Corporation (REC), Lahore
Scope of Work: Eighty (80) test pits along with field density tests along the
60km long alignment
Laboratory testing including PSD, Liquid Limit, Plastic Limit, consolidation, direct shear, CBR tests
Preparation of geotechnical investigation reports for the road and all the structures along the road including bridges, culverts, and cross drainage structures
Design of pavement
Design of foundations for all the structures along the road
Date of Work Started: July 5, 2000
Project Sheets
Berkeley Associates (Pvt.) Ltd.
Project: Lai Nullah Road Project, Rawalpindi Package-1) Location: Rawalpindi Client: National Engineering Services Pakistan (Pvt.) Limited
Scope of Work: Drilling of 20 boreholes ranging in depth from 20m to 40m along
with SPT and undisturbed soil sampling.
Thirty Two shallow test pits along with field density tests
Laboratory testing including PSD, consolidation, direct shear, unconfined compression, triaxial compression tests
Preparation of factual reports for geotechnical investigations
Start Date: March 21, 2007
End Date: April 21, 2007
Completion Time: Eight (04) weeks
Project Sheets
Berkeley Associates (Pvt.) Ltd.
Project: Lukpass Tunnel Quetta Location: Quetta, Baluchistan
Client: Associated Consulting Engineers (ACE) Pvt. Ltd.
Scope of Work: Drilling of 2 boreholes to maximum depth of 120m along with SPT and undisturbed soil sampling
Laboratory testing including PSD, consolidation, direct shear, unconfined compression, triaxial compression tests
Preparation of geotechnical
investigation reports Initial design of
tunnels support system
Design of slope stabilization near portals
Start Date: February 15, 2006
End Date: March 30, 2006
Project Sheets
Berkeley Associates (Pvt.) Ltd.
Project: Improvement/Renovation of Existing Multan Road from Thokar Niaz Baig to Chauburji, Lahore Location: Lahore
Client: National Engineering Services Pakistan (Pvt.) Limited
Scope of Work: Drilling of 4 boreholes to maximum depth of 06m along with
SPT and undisturbed soil sampling
Laboratory testing including PSD, consolidation, direct shear, unconfined compression, triaxial compression tests
Fourteen (14) test pits along with field density tests
Start Date: October 01, 2009
End Date: November 01, 2009
Project Sheets
Berkeley Associates (Pvt.) Ltd.
EFFLUENT TREATMENT PLANT FOR TANNERIES, KASUR
Scope of Work:
Detailed design of Treatment Ponds, Screen House, Equalization Tanks, Settling tanks, Pump House, Embankments, Sludge Disposal Lagoons
Construction supervision for all site works
Quality Control and Quality Assurance audits
Project Sheets
Berkeley Associates (Pvt.) Ltd.
HUBB WATER TREATMENT PLANT
Scope of Work:
Detailed design of civil works of entire treatment plant including building, roads, and tanks
Construction Supervision for all site works
Quality Control and Quality Assurance audits
Preparation of progress report
Project Sheets
Berkeley Associates (Pvt.) Ltd.
Project: Design, Construction and commissioning of six (6) tubewells having 1.0 cusec discharge capacity
Location: PARCO Mid-Country Refinery Project Mahmood Kot, Pakistan
Client: M/s Marubeni Corporation (MC) JGC Japan
Scope of Work:
Design of wells, procurement of well material and pump / motor units, construction of wells, development and testing of wells
Completion Time: Two Months
Completion Date: November 1997
Clients
Berkeley Associates (Pvt.) Ltd.
CLIENTS
Clients
Berkeley Associates (Pvt.) Ltd.
Harbin Electric International, China Dong Fong Electric Corporation, China CMEC, China CHINT, China TBEA, China Deawoo Corporation, Koria Karkey International, Turkey Sinogy, China Vestas, Australia M/s Mitsui Engineering & Shipbuilding Co Ltd Japan M/s Marubeni Corporation (JGC) Japan M/s Petrosin Pakistan Ltd M/s Presson Pakistan Ltd M/s Habib Rafiq (Pvt) Ltd M/s General Construction Company (Pvt) Ltd M/s Al-Wasay Construction Company (Pvt) Ltd M/s Walee Builders (Pvt) Ltd M/s Nowshera Engineering Services NENSER (Pvt) Ltd M/s Hisar Corporation (Pvt) Ltd M/s Ghulam Habib Construction (Pvt) Ltd M/s Nazir & Company (Pvt) Ltd
Engro Pakistan Pepsicola, Pakistan Siddique Sons Energy, (Pvt.) Ltd. Tetra Pack, Pakistan Packages Pakistan Nishat Group Shareef Group M/s Align Technologies (pvt) Ltd USA M/s Fauji Fertilizer Rawalpindi M/s Pakistan Services Limited PSL Karachi M/s Regency Developer Group (Pvt) Ltd M/s Rupali Group (Pvt) Ltd M/s Crescent Services (Pvt) Ltd M/s Attock Refinery Ltd M/s Four Brothers (Pvt) Ltd M/s Global Marketing (Pvt) Ltd M/s Zafar Sons (Pvt) Ltd M/s Rahmat-ul-Alameen Trust M/s Cherished Pharmaceuticals (Pvt) Ltd M/s MSB Industries (Pvt) Ltd M/s Cholistan Sugar Mills (Pvt) Ltd M/s ICI Group Ltd M/s Merino Textile (Pvt) Ltd M/s International Juices (Pvt) Ltd M/s Sapphire Textile Group (Pvt) Ltd M/s Pharmagen Beximco (Pvt) Ltd M/s ProDiesal Services (Pvt) Ltd M/s Genesis Pharmaceuticals (Pvt) Ltd M/s Olympia Power Ltd M/s Hoechst Ravi Chemical Ltd M/s Sitara Chemicals Limited M/s Zuchini Industries Limited M/s Kohat Cement Limited
Private Agencies
Contractors
Clients
Berkeley Associates (Pvt.) Ltd.
National Highway Authority Building Division Swabi Pakistan Air Force Police Club Pakistan Bait-ul-Maal Rawalpindi Metropolitan Corporation Pakistan Television Corporation (Headquarter) Islamabad Assistant Director Housing Gujranwala Cantt General Headquarter AG's Branch Rawalpindi National Engineering Services Pakistan (NESPAK) Lahore Development Authority Engineering Consultancy Services Punjab (ECSP) Public Health Engineering Department, Punjab
Government Agencies
Topographic Survey Equipment
Berkeley Associates (Pvt.) Ltd.
TOPOGRAPHIC
SURVEY EQUIPMENT
Completed Projects
Berkeley Associates (Pvt.) Ltd.
RTK DGPS (Dual Frequency)
2 NO, SET Trimble R10 GNSS System,440 Channel Dual Frequency GPS and
WAAS/EGNOS receiver system with L2C capability and integrated UHF
radio modem
4 NO, SET Trimble R8 GNSS System, 440 Channel Dual Frequency GPS and
WAAS/EGNOS receiver system with L2C capability and integrated UHF
radio modem
2 NO, SET Trimble 5700 DGPS Receiver Advanced Dual Frequency GPS and
WAAS/EGNOS receiver system with L2C capability and integrated UHF
radio modem.
2 N0'S Sokkia Stratus L1 12 channel single frequency Receivers.
3 NO’S Magellan Triton series 400
3 NO’S Garmin Hand Held GPS E Series.
TOTAL STATION
5 No’s (I) Sokkia CX‐105 (10,000 point) Built in Memory with Reflector less)
2 No’s (II) Sokkia 530 RK, (10,000 point) Built in Memory with Reflector less
1 No’s (III) Nikon NPl‐632, 2” accuracy (Built in Memory with SD card)
2 No’s (IV) Nikon Nivo 5‐M (Built in Memory)
ECHO SOUNDERS
2 No’s GPSMAP 527xs ‐ Garmin
LEVELS
10 No’s (I) Digital Level, Sokkia, NIKON, PENTAX (Level accuracy 0.10 mm)
(ii) Wild B2
* Above all items are available with their accessories.
Drilling Equipment
Berkeley Associates (Pvt.) Ltd.
DRILLING EQUIPMENT
Drilling Equipment
Berkeley Associates (Pvt.) Ltd.
DESCRIPTION QTY MAKE Rotary Boring Rig for Soil Investigations 12 No. Pakistan
Wash Boring Rig for Soil Investigation 2 No. Pakistan
CPT Rig (Manual) 1 No. Pakistan
Percussion Rig for Soil Investigation 4 No. Pakistan
Percussion Rig for Piling 15 No. Pakistan
Reverse Rotary for Tube well & Piling 6 No. Pakistan
Auger Bucket Dry Drilling Rigs for Piling 3 No. Pakistan
Auger boring for Soil Investigation 8 No. Pakistan
Tremie, Funnel, Bucket and Pipes 5 No. Pakistan
Core Extraction Machine 1 No. Pakistan
Hydraulic Jack 2 No. Pakistan
Casing 100mm Diameter Sufficient Pakistan
Shelby Tubes Sufficient Pakistan
Speedy Moisture Tester 2 No. USA
Pitcher Sampler 5 No. Pakistan
Denison Sampler 5 No. Pakistan
SPT Rods (AW) 800 m USA
SPT Apparatus 3 No. USA
Sand Cone Apparatus 3 No. Pakistan
Drive Cylinder 10 No. Pakistan
Laboratory Testing Equipment
Berkeley Associates (Pvt.) Ltd.
LABORATORY TESTING EQUIPMENT
Laboratory Testing Equipment
Berkeley Associates (Pvt.) Ltd.
DESCRIPTION QTY MAKE Electric Oven 2 Nos. Germany
Triple Beam Balance 2 Nos. USA
Digital Balance 4 Nos. USA
Analytical Balance 1 Nos. China
Field Balance 2 Nos. China
US Standard Sieve 4 Sets Imported Mesh
US Standard Sieve (Coarse) 2 Sets Pakistan
Liquid Limit Device 3 Sets China
Unconfined Compression Machine 2 Nos. Imported Ring
Direct Shear Machine 1 Nos. Imported Ring
Consolidation Machine 4 Nos. Pakistan
Standard Proctor Apparatus 2 Nos. Pakistan
Modified Proctor Apparatus 2 Nos. Pakistan
CBR Molds 12 Nos. Pakistan
CBR Machine 1 Nos. Pakistan
Sample Extruder 1 Nos. Pakistan
AASHTO Compaction Test 2 Sets Pakistan
Cylinder 1000 ml 12 Nos. China
Cylinder 500 ml 2 Nos. China
Beaker 250 ml 12 Nos. China
Pycnometers 50 ml 6 Nos. China
Moisture Can Sufficient
Allied Accessories Sufficient
Key Personnel
Berkeley Associates (Pvt.) Ltd.
KEY PERSONNEL
Key Personnel
Berkeley Associates (Pvt) Ltd
NAME AND DESIGNATION QUALIFICATION EXPERIENCE Dr. Tahir Masood Ph.D. in Geotechnical 34 years experience Chief Executive Officer Engineering in design of various
Geotechnical Projects and Construction Management
Jahangir Akhtar B.Sc. Civil 48 years experience in Executive Director Engineering Geotechnical and
Geoenvironmental Engineering, design of dams and overall engineering
management of large projects
Khalid Ayyub M.Sc. in 24 years in Director/ Geotechnical Geotechnical Head Geotechnical Engineering Engineering, field work, Engineering Laboratory work, Analyses and design. Ahmad Nawaz M.Sc. Geology 46 years experience in Groundwater Expert ground water Hydrology Sheikh Ilyas Ahmed B.Sc. Civil 48 years experience of Chief Structural Engineer Engineering Structural Design of Head Project Manager Building, hydropower Project. Ijaz Shafi B.Sc. Civil 40 years experience Head Structural Engineering Saqib Mir B.Sc. Civil Engineering 15 years experience Principal Structural Engineer Umar Maqsood B.E Civil Engineering 2.5 years experience Senior Structural Engineer Hafiz Muhammad Hassan B.Sc. Civil Engineering 1 year experience Ajmal Junior Structural Engineer
Key Personnel
Berkeley Associates (Pvt) Ltd
NAME AND DESIGNATION QUALIFICATION EXPERIENCE Farooq Naveed M. Sc. Civil 8 years in Geotechnical Senior Geotechnical Engineering Engineering Engineer Imran Farooq M.Sc. Civil 5 years in Geotechnical Senior Geotechnical Engineering Engineering Engineer Abdullah Masood B.Sc. Civil 1 years experience Junior Engineer Engineering Mannan Ali B.Sc. Geological 2 years experience Geological Engineer Engineering Hafiz Abdur Razzaque M.Sc. Geology 5 years experience Senior Geologist Asad Ali BS Applied Geology 2.5 years experience Geologist Maheen Malik M.Sc. Environmental 2.5 years experience Public Health and Engineering Environmental Engineer Raja Naeem Diploma in Civil 35 Year Experience in Chief Surveyor Technology Surveying, BOQs, Bar Bending Schedule and rate analyses
Field Staff
Berkeley Associates (Pvt.) Ltd.
FIELD STAFF
Field Staff
Berkeley Associates (Pvt.) Ltd.
NAME AND DESIGNATION QUALIFICATION EXPERIENCE Abdur Razzaque M. Sc. Applied 5 years experience Site Geologist Geology
Asif Ali M. Phil Applied 2 years experience Site Supervisor Geology
Muhammad Ali Chughtai B. Sc. Geology 30 years experience Site Supervisor
Usman Majeed B. Sc. Geology 1 year experience Site Supervisor Engineering
Muhammad Ishaq F. Sc. 5 years in field and Site Supervisor Laboratory Testing
Muhammad Tariq Matric 15 years in piling and Site Supervisor well drilling works
Muhammad Naeem Matric 15 years in piling and Site Supervisor well drilling works
Muhammad Saeed F.A 30 years in laboratory Laboratory Technician testing at UET Lahore Ajmal Hahat B. A 25 years experience in Laboratory Technician material testing lab. Sikandar Hayat F.A 5 years experience in Laboratory Assistant laboratory testing Abdul Hameed Middle 15 years experience in Driller drilling
Abdur Razzaque Middle 13 year experience in Driller drilling
Muhammad Imtiaz Middle 13 year experience in Driller drilling
Curriculum Vitae of Key Personnel
Berkeley Associates (Pvt.) Ltd.
JAHANGIR AKHTAR : Partner/ Project Management Specialist
Nationality : Pakistani Date & Place of Birth : November 05, 1947 Lahore Pakistan
Profession : Civil Engineer
Position in Firm : Executive Director
Registration Number with : CIV-00873 Pakistan Engineering Council Affiliation with : Member Pakistan Engineering Council Professional Insti tutions Member Institution of Engineers Pakistan
Member Pakistan Geotechnical Engineering Society Member International Society for Soil Mechanics & Geotechnical Engineering
Key Qualifications
Practicing Professional Engineer since 1968.
Presently working as Executive Director in Berkeley Associates (Pvt.) Ltd., Responsible for
technical coordination, business development, budget monitoring, overseeing the coordination
of mega projects. Responsible for technical management, corporate technical monitoring and
control, and value addition to the technical outputs of existing projects and review of proposals,
bids and TORs for new mega projects.
Worked as Chief Operating Officer and Senior General Manager/Head Geotechnical and
Geoenvironmental Division in Engineering Consultancy Services Punjab (Pvt.) Limited,
Lahore (ECSP) from February, 2012 to April, 2016.
Worked as Chief Executive in Jahangir Akhtar and Associates (J&A) from 2009 to January
2012. In this capacity, handled geotechnical problems of Al-Ilam Bridge along Ring Road and
two bridge projects along Batinah Coastal Road Sultanate of Oman for M/s Turkpak
International. Besides worked as project manager for hydropower, management consultancy
and off shore engineering works in Pakistan.
Worked with NESPAK from 1973 to 2009 as Geotechnical Engineer in various positions
starting from Senior Engineer to Vice President (Technical Coordination) and Vice President
/ Head of Geotechnical and Geoenvironmental Engineering Division Worked on a wide
range of Projects as designer, head of design teams, review expert and coordinator including
large dams and water supply projects, hydropower projects, small and medium dams,
Highways, Motorways, Airports and bridge projects, Industrial and Energy Projects and
Buildings.
During the career with NESPAK, worked on the following major engineering projects, as a
Geotechnical Engineer in different capacities ranging from team leader to a team member.
Dams, Water Supply and Drainage Projects Ghazi-Barotha Hydropower Project, Raising of Mangla Dam, Basha Diamer Dam, Mirani
Dam, 12 small dams in FATA, 3 small dams in NWFP, Khanpur Dam Project, Simly Dam
Curriculum Vitae of Key Personnel
Berkeley Associates (Pvt.) Ltd.
Islamabad; Anchor Sihala Dam; 706 Army Base Workshop Water Supply Project; Gadani
Water Supply Project Lasbela; Goronyo Dam, Nigeria; Euphrates East Drain Project Iraq;
Eastern Province Water Transmission Project,K.S.A; Remodelling of Kinjhar-Gujjo Canal;
Quetta Water Supply
Project; Qusayba Drainage Project, K.S.A; Fordwah-Sadqia Surface Drainage Project; South
Jazira Tunnel Project, Iraq; Hofuf Water Transmission System, K.S.A; Buraidah Feeder Line
Project, K.S.A; Sabya Water Network Project (Phase-I), K.S.A.
Participated in inspection of Chashma Barrage, Simly Dam and Khanpur Dam as a
member of Panel of Experts.
Energy and Power Projects
Chashma Nuclear Power Plant; 500 KV Transmission Network Towers Pakistan; Kot Addu Gas Turbine Power Station Pakistan; Efficiency Improvement of WAPDA Thermal Power Plants; 450 MW Combined Cycle Thermal Power Plant Guddu; Tarbela and Mangla Hydropower Extension projects Pakistan; KCP Workshop Jauharabad.
Bridges and Highway Projects
Third IBRD financed highway projects in Pakistan; Pategi-Eggan Road Project Nigeria; Bridges in Northern Areas; Sohar Roads-Sultanate of Oman; Khasab Coastal Road, Oman; Additional Carriageway Mianchannu-Sahiwal Highway; various portions of Indus Highway Pakistan; Djouju-Porga Road Benin; Overhead Bridge at Quetta; Chitral Booni Road; upgrading of Old Bridges on Kohat Thal Road; Farm to Market Roads in NWFP and Punjab; Rahim Yar Khan - Tarinda M. Pannah Highway; Strengthening and extension of N-70 Highway; Balochistan Development Authority (BDA) Roads, Islamabad-Muzaffarabad Dual Carriageway, N-70 Road Project.
Motorway Projects
Pakistan Motorway Lahore-lslamabad Section (M-2 Section) and Pakistan Motorway Sheikhupura - Multan -D.G. Khan Section (Old M-3 Section), Pakistan Motorway Pindi Bhattian- Faisalabad Section (current M-3 Section).
Buildings
UBL Multistoreyed Buildings at Karachi, Lahore and Islamabad; Armed Forces Medical City Rawalpindi; Overseas Pakistanis Foundation Head Office Islamabad, Aiwan-e-lqbal Complex Lahore; Air and Naval Headquarters Islamabad; Pakistan Engineering Council Head Office Islamabad; Gomal University D.I. Khan; EFU Head Office Lahore; SLIC Head Office Islamabad; State Bank Building Sialkot; Army Welfare trust Plaza Rawalpindi; PISIC House Lahore; MCB Head Office Building Karachi; OGDC Energy House Islamabad; Prime Minister's House and Secretariat Islamabad; Airport Terminal Buildings at Karachi; Lahore and Islamabad, Pakistan Housing Project spread all over Pakistan; Kidney Centers in Pakistan.
Industrial Facilities
Pak-Saudi Fertilizer Complex; Iron Ore and Coal Berths Port Qasim; Sea Water Intake and Disposal System Karachi Steel Mills; Galadari Cement Works Karachi; Mustehkam Cement Factory Hattar; Maple Leaf Cement Factory Iskandarabad; Storage Facilities for 40,000 tons of rice in Punjab Pakistan, Bhit Gas Field Development Project.
Curriculum Vitae of Key Personnel
Berkeley Associates (Pvt.) Ltd.
Education
Name of Institution Year Degree/Diploma
University of Engineering & Technology, Lahore-Pakistan
1968 B.Sc. Civil Engineering
Other Courses University of Engineering &
1977
Certificate in Computer
Technology, Lahore-Pakistan Programming
L' Alliance Francaise Lahore 1990
Three Units Course in French Language
EXPERIENCE
I Name of Employing Agency Berkeley Associates (Pvt.) Ltd. Title of Position Executive Director
Location of Assignment Lahore-Pakistan
Period of Assignment May, 2016 to date
Activities
Working as Director in Berkeley Associates (Pvt.) Ltd., Responsible for technical coordination,
business development, budget monitoring, overseeing the coordination of mega projects.
Responsible for technical management, corporate technical monitoring and control, and value
addition to the technical outputs of existing projects and review of proposals, bids and TORs for
new mega projects.
II Name of Employing Agency Engineering Consultancy Services Punjab (Pvt.) Title of Position Chief Operating Officer
Location of Assignment Lahore-Pakistan
Period of Assignment February, 2012 to April, 2016.
Activities
Wo