Company Name Fields Modern Solutions Trading & Contracting Co. LLC. (FMSCO)
Corporate BuildingAddress
Building No. 6858FMSCO Head OfficeObidan Bin Al-Jarrah Street, Al Manar DistrictDammam 32274-3142, K.S.A.
P.O. Box Address P.O. Box 6858, Dammam 32274,Kingdom of Saudi Arabia
Telephone/Mobile +966 13 802 2770/+966531997700
Website www.fmsco.com.sa
E-Mail [email protected]
81%
19%
FMSCO
FMSCO EMPLOYEES NUMBER OF EMPLOYEES PERCENTAGE
FOREIGN NATIONALS 591 81.00 %
SAUDI NATIONALS 121 19.00 %
TOTAL EMPLOYEES 712 100%
NO. EQUIPMENT DESCRIPTION QUANTITY
1 BULLDOZER 29
2 GRADER 12
3 PAYLOADER 33
4 EXCAVATOR 22
5 ROLLER COMPACTOR 15
6 JCB 4
7 BOBCAT 4
8 CRANE 8
9 CONRETE PUMP 10
NO. EQUIPMENT DESCRIPTION QUANTITY
10 DUMP TRAILER 43
11 DUMP TRUCK 29
12 WATER TRUCK 18
13 SERVICE TRUCK 4
14 GREASE TRUCK 3
15 DIESEL TANKER 7
16 BOOM TRUCK 2
17 DYNA TRUCK 3
18 BUS 18
19 CONCRETE MIXER TRUCK 27
VENDOR Registration
No. 10050254 No. 10821
No. RCJ000522
No. 507821No. 0005007728 No. 1000001780
No. 11040118No. 8628763
PROJECT NAME NAME OF CLIENT
CONTRACTOR NAME
WORKDESCRIPTION
PROJECT VALUE (SR)
PERIOD & STATUS
Subdivision and Development of
Industrial Zone – Phase 1CONTRACT# 318-C01
ROYAL COMMISION OF JUBAIL & YANBU FMSCO
CIVIL WORK, STRUCTURAL WORKS,
PIPING WORKS, ELECTRICAL
WORKS,BUILDING,TELECOMMUNICATION
WORK
307,515,00004/17/2017 TO
04/17/2020ON-GOING
RESIDUE STORAGE FACILITIES CELL 3
RFP# 18-687-BX-129
MA’ADEN ALUMINIUM
(MA)FMSCO
CIVIL WORKS , EARTH WORKS, PIPING
WORKS, TELECOMMUNICATIO
N WORK
104,500,00002/20/2019 TO
02/20/2020ON-GOING
Expand Asphalt Production Facilities @
Ras Tanura RefinerySUBCONTRACT#MSAE-
013-SC-004
SAUDI ARABIAN OIL COMPANY
(ARAMCO)
SAUDI ARABIAN KENTZ MEMBER OF THE SNC
LAVALIN GROUP/ FMSCO
CIVIL / STRUCTURAL WORKS
34,770,9529/22/2016 TO
09/21/2019ON-GOING
ARABIYA CONDENSATE HANDLING AND SOUR WATER DISPOSAL FACILITIES - WASIT
GAS PLANTSUBCONTRACT NO#
6600036840/01-SC-001
SAUDI ARABIAN OIL COMPANY
(ARAMCO)
SAUDI ARABIAN KENTZ MEMBER OF THE SNC
LAVALIN GROUP / FMSCO
CIVIL WORKS 5,428,93811/29/2018ON-GOING
TAILING DAM EXPANSION PROJECT -
AL JALAMIDCONTRACT# 19-PH-026
MA’ADEN PHOSPHATE COMPANY
FMSCOEMBANKMENT, CIVIL
WORKS 20,212,283 05/23/2019ON-GOING
PROJECT NAME NAME OF CLIENT
CONTRACTOR NAME
WORK DESCRIPTION PROJECT VALUE (SR)
PERIOD & STATUS
KGP & Pipeline Civil Works for Sulfur Railcar
Loading Facilities Project – Contract No. 2015-C-P-
0519
SAUDI ARABIAN OIL COMPANY (ARAMCO)
POSCO E&C / FMSCO CIVILWORKS/EARTHWORKS 23,500,000
8/1/2015 to12/2/2016
COMPLETED
Umm Wu’al PhosphericAcid Plant Project –
Contract No. PAP-SC-CV-002
SAUDI ARABIAN MINING COMPANY
(MAADEN)
HANWHA SAUDI CONTRACTING
COMPANY / FMSCO
Civil / Structural Works & Road Works 81,375,000
8/30/2014 to 3/27/2017
COMPLETED
MA’ADEN Wa’ad Al Shamal Phosphate
Company & Infrastructure – U&I
Multidiscipline Package
SAUDI ARABIAN MINING COMPANY
(MAADEN)
SINOPEC / FMSCOCivil / Structural Works &
Road Works41,791,089
4/6/2015 to 12/30/2016COMPLETED
Fadhili Industrial Support Facilities
Project
SAUDI ARABIAN OIL COMPANY (ARAMCO)
AL MUHAIDIB / FMSCO Earth/ Concrete & Civil Works 5,800,225
4/3/2017 to12/20/2017COMPLETED
Various ProjectREDSEA HOUSING
SERVICES FMSCOCivil Works / Road Works 25,190,199 12/8/2013 to
7/29/2017COMPLETED
PROJECT NAME NAME OF CLIENT CONTRACTOR NAME
WORK DESCRIPTION
PROJECT VALUE(SR) PERIOD & STATUS
Civil Work BGP Loading Area for
Sulfur Railcar Loading Facilities Project –
Contract No. 2015-C-S-0136
SAUDI ARABIAN OIL COMPANY (ARAMCO)
POSCO E&C / FMSCO SITE PREPARATIONS14,200,000
6/3/2015 to4/30/2016
COMPLETED
ALUMINA REFINERY PROJECT – ContractNo. SMAD-C-SC-053
SAUDI ARABIAN MINING COMPANY
(MA’ADEN)
HYUNDAI ENGINEERING AND
CONSTRUCTION COMPANY / FMSCO
Road Works & Paving Works
5,500,500 12/3/2013 to 2/28/2015
COMPLETED
Replace Power Supply at Abu Ali Plant –
Contract No. 6600032204
SAUDI ARABIAN OIL COMPANY (ARAMCO)
LARSEN & TOUBRO / FMSCO
Civil Works & Roads Works
5,409,088 9/1/2014 to 4/29/2015
COMPLETED
Asphalt Paving Works for Access Road &
Parking Area
SALINE WATER CONVERSION
COMPANY(SWCC)
DOOSAN HEAVY INDUSTRIES &
CONSTRUCTION CO., LTD.
Asphalt Paving and Road Works
2,806,450 6/1/2015 to 8/30/2015
COMPLETED
SSD2 Fence Supply & Installation Works
SALINE WATER CONVERSION
COMPANY(SWCC)
DOOSAN HEAVY INDUSTRIES &
CONSTRUCTION CO., LTD.
SSD2 Fence Supply & Installation Works 1,100,000
5/1/2016 to 5/31/2016
COMPLETED
PROJECT NAME NAME OF CLIENT CONTRACTOR NAME
WORK DESCRIPTION
PROJECT VALUE(SR) PERIOD & STATUS
Sulfur Railcar Loading Facilities –Package 1 – Wasit
Gas Plant – Contract No. 2018-C-S-0379
SAUDI ARABIAN OIL COMPANY (ARAMCO)
POSCO E&C / FMSCO CIVIL WORKS 97,000,000 01/31/2016 TO6/26/2018
COMPLETED
New Mixed C4 Export Line From
SHARQ Olefins Plant to Petrokemya
SABIC SINOPEC / FMSCO ROAD WORKS 1,051,23012/1/2017 TO
8/30/2018COMPLETED
Umm Wu’al Tailings Storage Facility
Contract No#RFP-15-KB-040
SAUDI ARABIAN MINING COMPANY
(MA’ADEN)FMSCO
Tailing Storage Facilities Involving
Mainly of 5.0 Million cu.mt Earthworks and 6km 10 inch
HDPE Piping Slime Delivery System
191,000,00011/26/2015 to
05/20/2017COMPLETED
TS-8 Highway ProjectROYAL COMMISION OF JUBAIL & YANBU CRCC / FMSCO EARTHWORK & ROAD
WORKS44,400,000
7/28/2018 TO 3/28/2019
COMPLETED
Ras Tanura Refinery Clean Fuels Project –
Subcontract No. 1010025110
SAUDI ARABIAN OIL COMPANY (ARAMCO)
TECHNICAS REUNIDAS / FMSCO
CIVIL WORKS/ROAD WORKS / PIPING
WORKS
74,215,781 09/20/2017 TO 4/11/2019
COMPLETED
PROJECT NAME NAME OF CLIENT CONTRACTOR NAME
WORK DESCRIPTION
PROJECT VALUE(SR) PERIOD & STATUS
CAR PARKING PROJECT
JOHNS HOPKINS ARAMCO
HEALTHCAREFMSCO DISMANTLING, CAR
PARKING WORKS359,042
2/22/2019 TO 04/18/2019COMPLETED
Contract No. 6690000939
Psychiatry Parking Project Bldg# 9165
JOHNS HOPKINS ARAMCO HEALTHCARE
COMPANYFMSCO CIVIL WORKS 668,540.89 SEPT. 9, 2019