+ All Categories
Home > Documents > COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s...

COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s...

Date post: 08-Sep-2019
Category:
Upload: others
View: 10 times
Download: 0 times
Share this document with a friend
84
Transcript
Page 1: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY
Page 2: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

COMPANY PROFILE INDEX

SECTION 1 INTRODUCTION

█President’s Message

█Company Information

█Organization Chart

█Location Map

SECTION 2 COMPANY POLICY

█Quality Policy

SECTION 3 COMPANY ACTIVITIES AND SERVICES

█Electrical Works

█Instrumentation Works

█Mechanical Works

█Civil Works

█Maintenance Works

█General Services

█ISO Consultancy Services

SECTION 4 ON-GOING AND COMPLETED PROJECTS

SECTION 5 COMPANY RESOURCES

█Human Resources

█Equipment and Vehicles

SECTION 6 COMPANY REFERENCES

█ISO Certification

█Accredited Contractor - Vendor Registration

█Commercial Registration & C.O.C.

█Certificate of Appreciation

Page 3: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

SECTION 1

Page 4: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

President’s Message

Asyad International Company Ltd.is a 100% Saudi-owned and an ISO 9001:2008,

ISO14001:2204 and OHSAS 18001:2007 certified Company serving the needs of the

Petrochemical and Industrial Plants as well as the ever expanding infrastructure in

the Kingdom since 1994. We are an established and trusted Construction and

Maintenance Company providing exceptional services and technical knowledge

across every phase of our projects in the field of Electrical, Instrumentation,

Mechanical, Civil, Fire Alarm System and Facilities Maintenance.

Since the Company’s inception 20 years ago, we have performed extraordinary

strides from its humble beginnings and exceptionally maintain high standards for

quality, health & safety and environmental protection, and likewise, we are

committed in delivering projects on budget & on schedule, meeting clients’

requirements, expectation and total satisfaction.

As a result of our good reputation in handling our projects, we are regularly dealing

and performing jobs with Saudi Aramco all-over the Kingdom, SADARA, Power and

Water Utilities Company (MARAFIQ) in Jubail and Yanbu, SATORP, SABIC, Saudi

Electric Company (SEC), Jubail Chemical Industries Company (JANA), Saudi Arabian

Mining Company (MA’ADEN) and we have supported other reputable clients such

as; SK Engineering & Construction, Daelim, Daewoo, Hyundai Heavy Industries,

DOOSAN, Samsung Engineering, JGC, Carlo Gavazzi, Dayim-Punj Lloyd, Saudi

Shinwha, Mitsubishi, Saudi Polyolefin Company (SPC), Siemens Co., Yanbu Steel,

Saudi Kentz, CCC, Sung Chung & Al-Shaikh Company and Arabian Polypropylene

Company.

Our success in achieving our vision and mission owes much to our highly skilled and

tremendously committed workforce. We are confident that with these people,

ASYAD will make a difference in sustaining competitive advantage through a culture

of excellence. Today, our tremendous growth and clients’ loyalty of our services are

the tangible proof that indeed our Company is a first-sought, most preferred

construction and maintenance company throughout the Kingdom.

AHMED A. AL-SAYED

PRESIDENT

Page 5: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

COMPANY INFORMATION

Company Name Asyad International Company limited

Company’s Complete Address and Contact Details

HEAD OFFICE:

P.O. Box 50, Rahima, RasTanura

Kingdom of Saudi Arabia – 31941

Tel. No(s): +966-13-667-3241 / 5773 / 5774

Fax No.: +966-13-667-3105

Email:[email protected]

Website:www.asyadco.com

JUBAIL BRANCH:

First Floor, Room 15, Al Zakary Building, Royal Commission Area Jubail, Kingdom of Saudi Arabia Telefax: +966-13-345-0147 Mobile: 0503869649

Yard and Workshop Location

Rahima,RasTanura

Commercial Registration No.

2054001527

Company’s Line of Business

█ Electrical Works

█ Instrumentation Works

█ Mechanical Works

█ Civil Works

█ Fire Alarm System

█ Blasting and Painting

█ Cathodic Protection

█ Scaffolding Services

█ Maintenance Works

█ General Services

█ Tourism and Travel Services

█ Shopping Centers

█ ISO Consultancy Services

Page 6: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

COMPANY’S KEY PERSONNEL

NAME & DESIGNATION CONTACT INFORMATION

Ahmed A. Al Sayed President

Tel.: +966-13-667-3241/5773/5774 [Ext. 121] E-mail: [email protected]

Ali A. Al Sayed Executive Vice President

Tel.: +966-13-667-3241/5773/5774 [Ext. 100] E-mail: [email protected]

Jeong Jae Jeong Projects General Manager

Tel.: +966-13-667-3241/5773/5774 [Ext. 120] E-mail: [email protected]

Anique Ahmed Assistant to President

Tel.: +966-13-667-3241/5773/5774 [Ext. 120] Email: [email protected] Mobile: 0593003550

HR Manager

Mobile: +966 -58-086-2450 E-mail: [email protected]

Mohd Mozammil Engineering Manager

Mobile:+966-59-333-0195 Tel.: +966-13-667-3241/5773/5774 [Ext. 111] E-mail: [email protected]

Al Tayeb Ahmed Accounts Dept. Manager

Mobile:+966-59-325-8789 Tel.: +966-13-667-3241/5773/5774 [Ext. 115] E-mail: [email protected]

Mohammad Syeddain ISO Consultant

Mobile:+966-58-086-2186 Tel.: +966-13-667-3241/5773/5774 [Ext. 112] E-mail: [email protected]

Page 7: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY
Page 8: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

HEAD OFFICE LOCATION MAP

Rahima, RasTanura

Page 9: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

SECTION 2

Page 10: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY
Page 11: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY
Page 12: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

SECTION 3

Page 13: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

ELECTRICAL WORKS

GENERAL WORKS

█ SURVEY & ESTIMATES

█ FIELD DESIGN WORK

█ EQUIPMENT INSTALLATION

█ CABLE TRAY INSTALLATION

█ VARIOUS CONDUITING WORKS

█ ALL TYPES OF CABLING WORKS

█ ALL TYPES OF CABLE TERMINATION WORKS

█ ALL TYPES OF TESTING & COMMISSIONING WORKS

█ OFFSHORE ELECTRICAL INSTALLATION

POWER WORKS

█ EQUIPMENT INSTALLATION

⦁ All Types of Transformer Field Assembly

⦁ All Types of Bus Duct Field Assembly

⦁ Power Disconnect Switches and Gears

⦁ Power Distribution Equipment Installation & Assembly

⦁ UPS, Rectifiers, Inverters & All Types of Industrial Batteries

⦁ Electrical Equipment Control Assemblies

█ CABLING, SPLICING & TERMINATION (LV, MV, HV)

⦁ Cable Trench Excavation & Preparation

⦁ Cable Laying

⦁ All Types of Cable Testing

⦁ Cable Termination & Splicing

⦁ Cable Trays & Duct Installation

⦁ Conduit Installation

⦁ Sand Bedding & Trench Preparation for Backfilling

⦁ All Types of Support Fabrication & Installation

Page 14: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

ELECTRICAL WORKS

LIGHTING & POWER RECEPTACLES WORKS

█ ALL TYPES OF LIGHTING FIXTURES INSTALLATION

⦁ Aircraft Warning Lights

⦁ Industrial Illumination Lighting

⦁ Offshore Lighting Requirement Installation

⦁ Various Building & Architectural Lighting

⦁ Special Lighting Requirement for Various Industrial Areas

⦁ All Types of Testing & Commissioning

█ ALL TYPES OF POWER RECEPTACLES INSTALLATION

⦁ All Types of Industrial Receptacles Installation

⦁ Offshore Welding Receptacles Installation

⦁ Special Receptacle Requirement for Various Industrial Areas

⦁ All Types of Testing & Commissioning

GROUNDING & LIGHTING WORKS

⦁ Grounding Well Installation

⦁ Lighting Rod and Pole Installation

⦁ Grounding Plate & Flat Bar Installation

⦁ Underground Grounding Grid Installation

⦁ All Types of Grounding Testing & Commissioning

COMMUNICATION SYSTEM

⦁ Telephone System

⦁ Paging System

⦁ Public Address System

⦁ Radio System

⦁ CCTV System

⦁ LAN System

MISCELLANEOUS WORKS

⦁ Cathodic Protection

⦁ Instrument Power Supply

⦁ Electrical Heat Tracing

⦁ Progress Heater Overhead power line supply

Page 15: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

INSTRUMENTATION WORKS

CONTROL & EQUIPMENT ROOM WORKS

⦁ Instrument Equipment Installations

⦁ Cable Trays and/or Trunks

⦁ Internal Cables Installation & Connections

⦁ Cable Termination

⦁ All Types of Testing & Commissioning

FIELD INSTRUMENT INSTALLATION WORKS

⦁ Field Instruments Installation

⦁ Local Panels/Gauge Boards

⦁ All Types of Instrument Analyzers

⦁ Various Instruments Sun Shades

⦁ Various Metering Skids Installations

⦁ Air Volume Tanks

PDHMS installation

MPFM installation

Control valve installation

PRESSURE LEAD PIPING INSTALLATION WORKS

⦁ All Types of Instrument Tubing or Piping

⦁ Steam Tracing

⦁ Installation of All Types Instrument Supports

AIRLINE SUPPLY INSTALLATION WORKS

⦁ Airline Supply Piping & Tubing Installation Works

⦁ Installation of Various Manifolds and Accessories

⦁ Hook-Up & Accessories Installation

SECONDARY CABLING WORKS

⦁ Cabling Wiring in Conduit/Trays/Angle Supports

⦁ Cable Termination at Junction Boxes

MAIN CABLE INSTALLATION WORKS

⦁ Main Cable Laying

⦁ Main Cable Trays and/or Trunking Installation

⦁ Filling Underground Cable Trenches with Sand

⦁ Junction Boxes Installation

⦁ Cable Termination at Control Rooms

Page 16: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

INSTRUMENTATION WORKS

CALIBRATION WORKS

⦁ Receiving Test & Visual Test

⦁ Safety Valves Piping Test

⦁ Loop Test

⦁ Sequence Test

⦁ Field Instrument Bench Calibration

⦁ All Types of Gauges Calibration

MECHANICAL WORKS

[SHOP & FIELD WORKS]

INDUSTRIAL PLANT PIPING WORKS

⦁ Pipe Spool Fabrication

⦁ Field Installation

⦁ All Types of Flushing

⦁ All Types of Testing & Commissioning

MACHINERY INSTALLATION WORKS

⦁ Various Mechanical Machineries Installation

⦁ Installation of Various Lifting Equipment Including Elevator

⦁ All Types of Engine & Pump Installation

⦁ Testing & Commissioning

DESALINATION PLANT WORKS

⦁ Machineries Erection (Evaporators, Pumps, Etc.)

⦁ Piping Erection (Cladded Pipes, CS, SS Pipes)

⦁ Intake Erection (Dan Boards, Strainers, Sluice Gate, Etc.)

DRAINAGE & SEWER LINES

⦁ Construction of Various Types of Sum Pit

⦁ Fabrication & Installation of Sewer Pipe Lines such as RTR, Cemented, B.I. and CS Pipes

⦁ Testing & Commissioning

Page 17: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

MECHANICAL WORKS

[SHOP & FIELD WORKS]

MECHANICAL STRUCTURAL WORKS

⦁ Shop Fabrication

⦁ Field Erection

H.V.A.C. WORKS

⦁ Machinery Assembly & Installation Works

⦁ Various Ducting Works

⦁ Testing & Commissioning

INSULATION WORKS

⦁ All Types of Insulation & Cladding Works

PAINTING WORKS ⦁ Blasting

⦁ Painting

CIVIL WORKS

LAND SURVEY & SITE PREPARATION

EXCAVATION & BACKFILLING WORKS

INDUSTRIAL, COMMERCIAL & RESIDENTIAL BUILDING CONSTRUCTIONS

ALL TYPES OF CULVERTS, MANHOLES & TRENCHES CONSTRUCTIONS

BUILDING & STRUCTURAL FOUNDATIONS CONSTRUCTION AND ERECTION

DRAINAGE AND SEWER LINE REHABILITATION & CONSTRUCTIONS

INDUSTRIAL PLANTS SEA WATER INTAKE CANAL REHABILITATION & CONSTRUCTIONS

FENCE WORKS

DRAIN PIT CONSTRUCTION

Page 18: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

MAINTENANCE WORKS

PLANT MAINTENANCE WORKS

█ ELECTRICAL AND INSTRUMENTATION WORKS

⦁ Renovation Works

⦁ Maintenance Works

█ MECHANICAL, PLUMBING AND H.V.A.C. WORKS

⦁ Renovation Works

⦁ Maintenance Works

BUILDING MAINTENANCE WORKS

⦁ Building Maintenance, Cleaning & Renovation Works

⦁ Plumbing & H.V.A.C. Renovation & Maintenance Works

BLASTING & PAINTING WORKS

GENERAL SERVICES

SUPPLY OF MANPOWER & EQUIPMENT

SCAFFOLDING SERVICES

TRAVEL AND TOURISM SERVICES

SHOPPING CENTERS

ISO CONSULTANCY SERVICES

Page 19: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

SECTION 4

Page 20: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

LIST OF CURRENT / ONGOING PROJECTS Sl. #

Title of the Job Contract # Location Start/Completion

Date Client Name &

References

1 Saudi Aramco Sulfur Railcar Loading Facilities project

2015CP0548 2015CP0549

Wasit & Berri, Saudi Arabia

18th September 2015-30th June 2018

Mr. Youngchan Im

2

UTMN-44, 554 and 409

TSTL replacement at

UTMN-GOSP-2 6510766843

Uthmaniyah, Saudi Arabia

29th February 2016 – 30th June 2018

Mr. ShantiKumar Ariyaratnam

+966 13 572 8251

3

UTMN-117, 118, 119,

120, 257 and 356 FL

replacements 6510778779

Uthmaniyah, Saudi Arabia

26th May 2016 – 30th June 2018

Mr. Fahad Khaldi +966 13 576 7503

4

Electrical & Instrument

Services at Yanbu area

6600040744

Yanbu, Saudi Arabia

11th May 2018 to 2nd April 2023

5

New Shaded

Containment System at

Shedgum 6510817664 Shedgum

02-Jul-17 - 02-Jul-18

Hussain Sari 13 8729485

6

Replacement of 69kV

overhead feeders to

Dhahran SUB#35 from

SUB#6

6510777179 Dhahran, Saudi Arabia 1st June 2016- 30th July

2018 Mr. Fadhel Jaber

+966 13 872 8601

7

Khursaniyah Upstream

Gas Pipelines - OHPL

01901- DENYS-

SCW-001/17

Jubail

17th September 2017- 30th July 2018

8

To Replace Annunciator

Panel at Berth No. 61, 62,

63 & 64

6510842015

Yanbu

15th Oct 2017- 30th Aug 2018

9

Replace Three BN-3300

Vibration Monitoring

System

6510842320

Yanbu

1st May 2018- 30th Sep 2018

Page 21: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

LIST OF CURRENT / ONGOING PROJECTS Sl. #

Title of the Job Contract # Location Start/Completion

Date Client Name &

References

12

DR-2 SIB Fire Alarm

System

6510846673

Khurais

21st Feb 2018- 30th Jun 2018

13

Electrical & Instrument

Services at Yanbu area

6600040744

Yanbu

1st May 2018-30th Apr 2023

14

F07 D-103 Scraper

Launcher AAPD

6510848055

Juaymah

22nd oct 2017

15

Exchanger's Plugs to

Header Box Threads Repair

6510859818

Hawiyah

15th March 2018- 30th July 2018

16

SFC 036 Remedial Work for

Fire Alarm System @ LIP

Riyadh Ref

6510850611

Riyadh

1st June 2018- 15th July

17

Jubail Chemical Industries

Co. (JANA) Support

Services

Contract to JANA

Jubail

April 1999 (Long term contract)

Page 22: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

LIST OF MAJOR PROJECTS COMPLETED

Sl. #

Title of the Job Project Description Contract # Location Client Name &

References

1. SADARA MFC Jubail Project

SADARA MIXED Feed Cracker (MFC) Project, Jubail,-II

600027129 (IK) Jubail DAELIM - Site

Manager SADARA Young- Sub HAN

2. SK – Yanbu Project Yanbu Export Refinery Project – EPC 2

101119D-P501-001

Yanbu SK – YERP Mr. Er Lee

3. SATORP - JERP Package 3

Manpower Support Services CGA/27761/1031/12

Carlo Gavazzi

4. SATORP - JERP Package 5A

Manpower Support Services Contract to CG Carlo Gavazzi

5. Jeddah Refinery Project

Replace Utilities Control System at Jeddah Refinery

6600027104 Jeddah Saudi Aramco

Mr. MatouqShalabi Tel.# 02 427 1189

6. HHI – Riyadh PP11-IPP Project

Complete Electrical & Instrumentation Works for Riyadh PP11-IPP Project

RIYADH PP11-SUBCON-E&I-004

Riyadh Hyundai Heavy Ind. Mr. Mun Suk Hwang Tel.# 0515175029

7. Doosan Rabigh Project

Complete Cabling Works for Rabigh Power Plant

DSR-SC-C-0031 Rabigh Doosan

Mr. Kimun Choi Tel.# 0569830867

8. DPL – JERP Package 9 Project

Electrical & Instrumentation Works for Package 9 (Tank Farm) of Jubail Export Refinery Project

DPL-235453-SC-23 Jubail DayimPunj Lloyd Mr. Tom Martin +966 1 4624500

9. SK – JERP Project

Complete Electrical & Instrumentation Works for Package 5B (Plant Utilities) of Jubail Export Refinery Project

Contract to SKEC Jubail

SKEC Mr. Yong Gi Kim

Tel.# 0500528694

10.

Construction of Two Off Loading Skids at Qassim Bulk Plant

Construction of Two Kerosene & Diesel Off-Loading Skids at Qassim Bulk Plant

6510413425 Qassim

Saudi Aramco Mr. WaleedKanhal Tel.# 01 285 6689

11.

Saudi Kayan Polycarbonate Project

Complete E & I Works for PC #3 & #4

Contract to Daelim

Jubail Daelim

Mr. Yun Sup Kim Tel.# 03 359 0689

12.

MARAFIQ Independent Water & Power Project, Jubail

All electrical & instrumentation works for power block # 1, 2, 4 & GIS in respect of Marafiq Independent Water & Power Project. Installation, Inspection, testing, Preservation, Pre-commissioning and Commissioning Assistance

MARAFIQ – E&I-002

Jubail

Hyundai Heavy Ind.

Mr. Young-Kil Lim Tel.# 882 8603

13 Daewoo – Khafji Project

HOUT-DEC-005-S01 AL Khafji, Saudi Arabia

7th march 2013- 2nd January 2017

Mr. Tae Woo Lee

Page 23: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

LIST OF MAJOR PROJECTS

COMPLETED

Sl. #

Title of the Job Project Description Contract # Location Client Name &

References

14. Maintenance Manpower Supply Project

Advanced Polypropylene Company (APPC) Plant Maintenance Support Services

Contract to APPC Jubail

APPC Mr. Ahmed Obeidalla

Tel.# 03 358 5075

15. Shaybah Power Generation Plant, Shaybah

Installation, inspection, testing, preservation, pre-commissioning, commissioning assistance & control instrument & installation work for Shaybah Plant in accordance with the requirements for RFQ code, standard & regulation

6600015962(OOK)

6600015963 (IK)

Shaybah Plant

Hyundai Heavy Ind.

Mr. K.S. Lee Tel.# 03 578 7240

16. APPC PDH/Polypropylene Project

Installation of electrical & instrumentation equipment, pre-commissioning & commissioning for APPC

APPC SC-017 Jubail

Samsung Saudi Arabia

Mr. H.S. Choi Tel.# 03 358 5055

17. Upgrade Berth 71 & 72 Loading Arms – Yanbu Gas Terminal

Installation of hydraulic pack & accessories, fire alarm & AC system, electrical & instrumentation works

6600016328 Yanbu NGL

Saudi Aramco Mr. Atiyeh Al-

Zahrani Tel.# 04 397 4039

18. Saudi aramco Third Party Co-generation Program

Installation, inspection, testing, preservation, pre-commissioning, commissioning assistance for electrical & control instrument installation work for RasTanura Refinery Plant in accordance with the requirements of RFQ standard & regulation

Subcontract RT Refinery Hyundai Heavy Ind. Mr. Young-Kil Lim

Tel.# 882 8603

19. Saudi Aramco Third Party Co-generation Program

Installation, inspection, testing, preservation, pre-commissioning, commissioning assistance for electrical & control instrument installation work for Shedgum Plant in accordance with the requirements of RFQ standard & regulation

Subcontract Shedgum Hyundai Heavy Ind. Mr, young-Kil Lim

Tel.# 882 8603

20. J 24 Elevator Replacement at RT Refinery

The job involves construction of foundations & structural fabrication. Also, it involves demolition of existing elevator approximately 89 meters high & installation of new elevator with associated electrical works, testing & commissioning of the system turnkey project

6600011685 RT Refinery Saudi Aramco

Mr. Ali Mahmood Tel.# 862 1525

21.

Saudi Aramco Mechanical, Electrical, Instrumentation, Construction & Maintenance Services

All Electrical, instrumentation, mechanical, construction & maintenance works – Saudi Aramco

Various Contracts Saudi Aramco

Page 24: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

LIST OF MAJOR PROJECTS COMPLETED

Sl. #

Title of the Job Project Description Contract # Location Client Name &

References

22 Replacement of two chilled water pumps at AC Plant No. 5, DH

Supply & installation of 2 Chilled water pumps,

VFD and DDC connections

6510674613 Dhahran, Saudi

Arabia

Mr. Abdullah Ghamdi

+966 13 876 1076

23 Replacement of two chilled water pumps at AC Plant No. 4, DH

Supply & installation of 2 Chilled water pumps,

VFD and DDC connections

6510650557 Dhahran, Saudi

Arabia

Mr. Abdullah Ghamdi

+966 13 876 1076

24 RT Police Checkpoint Enhancement project

Construction of Ras Tanura Police

Checkpoint which is mainly comprised of

Building, Shade, Hammam, "U" Turn

Road, Armor Cabin, etc

6510751698 Ras Tanura, Saudi

Arabia

Mr. Abdullah Maghaslah

+966 13 673 3411

25 Replacement of 13.8kV switchgear

Installation for replacement 13.8kv and 4.16kv switchgears, along with all cabling termination works, testing and commissioning.

6510741899 Ras Tanura, Saudi

Arabia

Mr. Amjad Bin Ghanim

+966 13 673 1585

26 Rearrange and upgrade the underground cables at PH-1 and 2

Re-arrangement and upgrading of underground grounding cables at RT Terminal

6510753968 Ras Tanura, Saudi

Arabia Mr. Majed Ameeri +966 13 678 1585

27 Rabigh 2 CP2 Project

Electrical & Instrumentation works for Rabigh CP II project under Daelim Saudi Arabia scope.

CP2-IK-EI-001 Rabigh, Saudi

Arabia Mr. Kim Man Ho

28 Renovation of Al Hassa Medical Houses

Civil, HVAC, plumbing. lighting and electrical works for renovation of swimming pool, tennis court and social hall

6510670348

AL Hassa, Saudi Arabia

Mr. Abdurrahman Barrak

+966 13 872 5682

29 Renovation of Al Hassa Camp Facilities

Civil, HVAC, plumbing and electrical works for renovation of bachelor houses and family villas

6510670351 AL Hassa, Saudi

Arabia

Mr. Abdurrahman Barrak

+966 13 872 5682

30 Building 1 & 2 Replace utility system at AL Hassa Health center – Package 0

Electrical, Civil and mechanical works, including supply and installation of electrical equipment,installation of medical gas system, fire protection system and construction of new substation

6510622108

AL Hassa, Saudi Arabia

Mr. Abdurrahman Barrak

+966 13 872 5682

Page 25: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

31 Replace 4 elevators at Al Hassa Health center

Supply & installation of 4 Elevators

6510601261

AL Hassa, Saudi Arabia

Mr. Abdurrahman Barrak

+966 13 872 5682

32 Replacement of AC units at building No. 1061, Abqaiq

Replacement of A/C units, HVAC works.

6510740395 Abqaiq, Saudi Arabia

Mr. Noura Mirdad +966 13 875 9867

33 Replace The Defective 24" Piping on Sphere Line at the Inlet Area

Mechanical works 6510816036 Hawiyah, Saudi

Arabia Mr. Fahad Khaldi

+966 13 576 7503

34 Installation of Temporary Power Supply to the new Office Support Building at Hawiyah

Provide temporary Electrical supply to OSB

6510819898 Hawiyah, Saudi

Arabia Mr. Fahad Khaldi

+966 13 576 7503

35 HWYH-565 and 566 EV Wells and MPFM at UTMN-GOSP-13-TSTL-2 and 8

Mechanical piping works, instrumentation connections to field instruments, installation of Fence

6510765185 Hawiyah, Saudi

Arabia

Mr. ShantiKumar Ariyaratnam

+966 13 572 8251

36 HWYH-49 EV Well surface Equipment

Installation of surface panel for Permanent Downhole Monitoring System (PDHMS) and associated accessories with provision for SCADA, installation of new RTU, installation of switchrack.

6510786617 Hawiyah, Saudi

Arabia Mr. Fahad Khaldi

+966 13 576 7503

37 SFC Replace 24 Main Ball Valve of G-070 DE

6510778509 Hawiyah, Saudi

Arabia Meshaal Nuaim

13 5766569

Jabal Sayid Paste Plant Project - CP5111_E&I Construction Package

MBCC-JS-113-17 Jabal Sayid Sidd Mukherjee

12 230-1307

Page 26: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY
Page 27: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

SK EC – YASREF CRUDE PACKAGE – EPC 2 PROJECT

COMPLETE E & I WORKS

2012 - 2013

Page 28: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

RIYADH PP11 – IPP PROJECT

COMPLETE E & I WORKS

2011 - 2012

Page 29: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

SATORP – JERP PACKAGE 5B

COMPLETE E & I WORKS

2011 - 2012

Page 30: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

SAUDI KAYAN POLYCARBONATE PROJECT

COMPLETE E & I WORKS

2010

Page 31: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

MARAFIQ POWER AND DESSALINATION PLANT

[POWER BLOCK 1, 2 & 4 – E & I WORKS]

2008 - 2010

Page 32: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

SHAYBAH COGENERATION PLANT

2007 - 2008

Page 33: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

SAMSUNG APPC PDH / PP PROJECT

2006 - 2007

Page 34: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

SAUDI ARAMCO COGENERATION PLANT

[RAS TANURA REFINERY]

2005 - 2006

Page 35: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY
Page 36: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

SAUDI ARAMCO ABQAIQ PROJECT

Page 37: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

SAUDI ARAMCO RAS TANURA REFINERY

UPGRADE PROJECT

NHT: 55,000BBL/D, CCR-45,000BBL/D

Page 38: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

AL JUBAIL HRSG COGENERATION PROJECT

E & I WORKS

Page 39: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

SECTION 5

Page 40: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

OUR STRENGTH : Human Resources

Srl. No. Category Quantity

1 A/C TECHNICIAN 2

2 ACCOUNTANT 7

3 ADMIN-SUPERVISOR 2

4 AUTO ELECTRICIAN 2

5 AUTOCAD OPERATOR 5

6 BRANCH IN-CHARGE 3

7 CABLE PULLING FOREMAN 12

8 CABLE PULLING LABOR 24

9 CABLE PULLING SUPERVISOR 2

10 CAMP BOSS 4

11 CAMP CLEANER 4

12 CAMP SECURITY GUARD 1

13 CARPENTER 9

14 CASHIER 2

15 CONSTRUCTION MANAGER 5

16 CONTROL PANEL ELECTRICIAN 1

17 COOK (FILIPINO) 13

18 COOK (INDIAN) 10

19 COOK (NEPALI) 7

20 COOK HELPER 2

21 COST ESTIMATION ENGR-CIVIL/STRUCTURAL 2

22 COST ESTIMATION ENGR-ELECTRICAL 1

23 COUNTER STAFF 7

24 DIESEL MECHANIC 3

25 DISTRIBUTION CABLE ELECTRICIAN 2

26 DOCUMENT CONTROLLER 2

27 DRIVER-HEAVY 31

28 DRIVER-LIGHT 6

Page 41: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

OUR STRENGTH : Human Resources

Srl. No. Category Quantity

29 ELECTL SPLICER - MV/HV 2

30 ELECTRICAL ENGINEER 17

31 ELECTRICAL TECHNICIAN 1

32 ELECTRICAL TERMINATOR 46

33 ELECTRICIAN 185

34 ELECTRICIAN/ CONDUIT FITTER 7

35 ELEVATOR INSTALLER 2

36 ENGINEER CIVIL/ STRUCTURAL 3

37 ENGINEER INSTRUMENTATION 5

38 ENGINEERING MANAGER 1

39 EXECUTIVE VICE PRESIDENT SECRETARY 1

40 FABRICATOR 21

41 FOREMAN CIVIL & STRUCTURAL 3

42 FOREMAN ELECTRICAL 43

43 FOREMAN FABRICATOR 2

44 FOREMAN INSTRUMENTATION 22

45 FOREMAN SCAFFOLDING 4

46 GOVERNMENT RELATIONS OFFICER 1

47 GROUND CABLE ELECTRICIAN 4

48 HELPER/LABORER-CIVIL 49

49 HELPER/LABORER-CONTROL/INSTR. 6

50 HELPER/LABORER-ELECTRICAL 193

51 HELPER/LABORER-MECHANICAL 3

52 HR EXECUTIVE 2

53 I.T. TECHNICIAN 3

54 ID COORDINATOR 11

55 INDUSTRIAL ELECTRICIAN 111

56 INSPECTOR-ELECTRICAL 11

Page 42: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

OUR STRENGTH : Human Resources

Srl. No. Category Quantity

57 INSPECTOR-INSTRUMENTATION 9

58 INSPECTOR-WELDING 3

59 INSTRUMENT FITTER 127

60 INSTRUMENT TECHNICIAN 90

61 INSTRUMENT TERMINATOR- LV/ FOC 9

62 ISO ADMIN ASSISTANT 1

63 ISO CONSULTANT 1

64 IT MANAGER 1

65 LEADMAN - CIVIL / STURCTURAL 1

66 LEADMAN ELECTRICAL 2

67 LEADMAN INSTRUMENTATION 1

68 MASON 3

69 MECHANIC 9

70 MECHANICAL TECHNICIAN 1

71 OFFICE ADMINISTRATOR 1

72 OFFICE BOY 4

73 OPERATOR-BACKHOE 1

74 OPERATOR-CRANE 7

75 OPERATOR-FORKLIFT 2

76 OPERATOR-HEAVY EQPT. 5

77 OPERATOR-LOADER 2

78 OPERATOR-MANLIFT 1

79 PAINTER & SANDBLASTER 4

80 PERMIT RECEIVER 1

81 PIPE FITTER 2

82 PLANNER/SCHEDULER 1

83 PLUMBER 3

84 PRESIDENT SECRETARY 2

Page 43: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

OUR STRENGTH : Human Resources

Srl. No. Category Quantity

85 PROCUREMENT MANAGER 1

86 PROCUREMENT SUPERVISOR 2

87 PROJECT ADMINISTRATOR 4

88 PROJECT DOC.CONTROLLER 3

89 PROJECT GENERAL MANAGER 1

90 PROJECT GENERAL MANAGER SECRETARY 2

91 PROJECT LOGISTICS COORDINATOR 1

92 PROJECT MALE NURSE 8

93 PROJECT MATERIAL CONTROLLER 2

94 PROJECT PURCHASER 4

95 PROJECT SAFETY MANAGER 2

96 PROJECT SAFETY OFFICER 25

97 PROJECT SAFETY SUPERVISOR 4

98 PROJECT SCHEDULER/PLANNER 1

99 PROJECT SITE ENGINEER 1

100 PROJECT SITE MANAGER 5

101 PROJECT STORE KEEPER 3

102 PROJECT TIMEKEEPER 1

103 PURCHASER 3

104 QUALITY MANAGER 2

105 QUANTITY SURVEYOR 2

106 RIGGER I 1

107 RIGGER III 8

108 SALESMAN 14

109 SCAFFOLDER 76

110 SCAFFOLDING INSPECTOR 2

111 SCAFFOLDING LEADMAN 1

112 SECURITY GUARD 12

Page 44: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

OUR STRENGTH : Human Resources

Srl. No. Category Quantity

113 STEEL FIXER 30

114 SUPERINTENDENT-ELECTRICAL 3

115 SUPERINTENDENT-INSTR. 1

116 SUPERINTENDENT-MECHANICAL 1

117 SUPERVISOR ELECTRICAL 17

118 SUPERVISOR FABRICATOR 1

119 SUPERVISOR INSTRUMENTATION 10

120 SUPERVISOR SCAFFOLDING 3

121 SUPPORT SERVICES MANAGER 1

122 TERMINATOR 16

123 TIMEKEEPER 2

124 WELDERS (STRUCTURAL/ SMAW/ GMAW/ GTAW) 131

125 WORKSHOP ADMINISTRATOR 1

126 WORKSHOP SUPERVISOR 1

Page 45: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

OUR STRENGTH : Equipment & Vehicles

Srl. No. Description Quantity

1 Air Compressor 3

2 Air Compressor Big 4.5 Bar 4

3 Air Compressor Small 1.5 Bar 6

4 Air Compressor (Electric) 3

5 Air Compressor (S/R # 085117) 3

6 Air Drying Producer 5

7 Air Hose Red 4

8 Ambulance 4

9 Angle Grinder 4 1/2” 2

10 Angle Grinder 7” 2

11 ApparateballHanbuhren 2

12 Asphalt Cutter 6

13 Automatic Oil Test 2

14 Battery Charger 5

15 Bicycle 2

16 Bobcat 2

17 Boom Truck Big 2

18 Boom Truck Small 2

19 Cable Pulley 3

20 Cable Pulley Carrier 3

21 Cadilac Car 1

22 Camry Car 4

23 Caprice Car 2

24 Car Lifter Hydraulic Jack 1

25 Caterpillar Generator 6

26 Caterpillar Loader 1

27 Cement Vibrator 2

28 Concrete Mixer 5

29 Concrete Vibrator 3

Page 46: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

OUR STRENGTH : Equipment & Vehicles

Srl. No. Description Quantity

30 Container Van 12

31 Corolla Car 1

32 Cummin Generator 2

33 D’Max Double Cab 7

34 Diesel Tanker 3

35 Drill Machine 6

36 Drill Machine Bosch 4

37 Dump Truck Big 2

38 Dyna Truck 5

39 Electric Portable Generator 20

40 Electric Welding Machine 21

41 Electric Air Compressor 10

42 Electric Air Blower 4

43 Electric Motor Pipe Bender/Jack 3

44 Electric Portable Welding Machine 13

45 Elevator Electrical Hoist 1

46 Engine Asphalt Cutter 2

47 Flat Truck Isuzu FVR 1

48 Food Van 10

49 Forklift 4

50 Generator Old Junk 1

51 Generator Olympian 1

52 GMC Bus Service 13

53 Grease Pump with Barrel 2

54 Grove Crane 30 Ton 2

55 Heat Gun 4

56 Heater 3

57 High Bed Trailer 3

58 Hole Puncher With Dye 2

Page 47: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

OUR STRENGTH : Equipment & Vehicles

Srl. No. Description Quantity

88. Mack Truck 3

89. Man basket 5

90. Man Lift Genie S-85 5

91. Mercedes Benz 4

92. Miller Engine Drive Welding Machine 99

93. Mitsubishi L200 Pick-up 4

94. Mitsubishi Mini Dump 5

95. Nissan Urvan 2400 3

96. Oil Pressure 2

97. Oil Pump for Purifier & Degassing 2

98. Oil Purifier & Degassing M/C Set 2

99. Olympian Generator 13

100. Paint Pump 2

101. Painting Pump 3

102. Painting Pump with Hose / Gun 2

103. Pencil Grinder Makita 3

104. Peter Belt 3

105. Peugeot 206 Car 3

106. Pipe Bender 3

107. Pirani Gauge 2

108. Plate Compactor 8

109. Porche Plate No. 6854 EBS 2

110. Portable Generator 6

111. Portable Electric Welding Machine 8

112. Portable Generator 5

113. Portable Generator Use Diesel Tanker 2

114. Portable Generator Yanmar 2

115. Portable Vacuum Device 3

116. Press Drill 4

Page 48: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

OUR STRENGTH : Equipment & Vehicles

Srl. No. Description Quantity

117. Regulator Gauge 1

118. Rigid Trading Machine 3

119. Roller Compactor 3

120. Sand Blasting 4

121. Service Bus GMC 20

122. Service Car 9

123. Set Aluminum Welding Machine 8

124. SFG Gas Liquid Function System 2

125. SH 70 Punch 3

126. SL Stretcher Man Lift 3

127. Spanner Drill 5

128. Speed Car Washing Pump 5

129. Speed Cutter Machine 31

130. Speed Washer Motor for Vehicles 3

131. Spool Control 8

132. Stand Fan 9

133. Steel Container 40 Footer 7

134. Stretcher man Lift 6

135. Subaru Car 7

136. Tadano Crane 3

137. Terex Crane 2

138. Threading Machine 3

139. Tire Remover 3

140. Toyota Echo 5

141. Toyota Hiace Van 3

142. Toyota Hilux Double Cab 6

143. Toyota Hilux 2400 4

144. Toyota Land Cruiser 3

145. Treading Machine 16

Page 49: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

OUR STRENGTH : Equipment & Vehicles

Srl. No. Description Quantity

146. Trailer Carrier High Bed 5

147. Trailer Head 10

148. Trailer Water Carrier 3

149. Transformer Oil Storage Tank 5

150. Vacuum Cleaner 6

151. Vacuum Evacuation Device 3

152. Vacuum Pump 3

153. Vacuum Pump Unit 3

154. Vacuum Tanker 4

155. Vapor S-21 Tank 2

156. Vibrator Machine 3

157. Waste Basket Materials 8

158. Water Cooler 6

159. Water Pump 2

160. Water Pump Honda 3

161. Water Pump Motor Use Hammam tank 3

162. Water Tanker 5

163. Welding Machine 27

164. Welding Oven 13

165. Wheel Alignment 2

166. Woosung Vacuum SF6-Gas 2

167. Doosan Excavator DLC 225 2017 1

168. Bolt Torquing Machine 1

169. Doosan Wheel loader 2017 1

Page 50: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

SECTION 6

Page 51: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

Asyad International Co. Ltd. is an ISO 9001:2008

Certified Company

Page 52: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

Asyad International Co. Ltd. is an ISO

14001:2004 Certified Company

Page 53: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

Asyad International Co. Ltd. is an OHSAS

18001:2007 Certified Company

Page 54: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

ACCREDITED CONTRACTOR – VENDOR REGISTRATION

SAUDI ARAMCO VENDOR NO.: 10006237

SABIC GROUP VENDOR NO.: 0000501256

MARAFIQ VENDOR NO.: 1903

JANA / SODA VENDOR NO.: 100161

SEC VENDOR NO.: 5005235

MA’ADEN VENDOR NO.: 8673

STC VENDOR NO.: 14339

YASREF VENDOR NO: 101273

Page 55: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY
Page 56: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY
Page 57: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY
Page 58: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY
Page 59: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY
Page 60: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY
Page 61: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY
Page 62: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

Certificate of Completion of Project

SADARA MFC Projects

Page 63: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

Recognition to Contribution Towards Safety

Yanbu Aramco Sinopec Refinery Project

Crude Package EPC - 2

Page 64: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

Certificate of Appreciation

SATORP - Jubail Export Refinery Project (JERP)

Package 5B Plant Utilities

Page 65: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

Certificate of Appreciation

Jubail Export Refinery Project (JERP)

Package 5B Plant Utilities

Page 66: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

Certificate of Appreciation

Jubail Export Refinery Project (JERP)

Package 5B Plant Utilities

Page 67: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

Certificate of Performance

MARAFIQ IWPP Project – Electrical &

Instrumentation Works

Page 68: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

Certificate of Performance

Various SAUDI ARAMCO Projects

Page 69: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

Certificate of Appreciation

Various Higher Voltage GIS Electrical Works

Page 70: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

Certificate of Recognition

APPC PDH/PP Plant Project

[3,000,000 Man-hours Without Lost Time

Incident/Accident]

Page 71: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

Certificate of Appreciation

SHEDGUM Gas Plant - SAUDI ARAMCO Third Party

Cogeneration Program

Page 72: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

Safety Achievement Award

RasTanura Refinery - SAUDI ARAMCO Third Party

Cogeneration Program

Page 73: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

Certificate of Appreciation

RasTanura Refinery – SAUDI ARAMCO Third Party

Cogeneration Program

Page 74: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

Safety Achievement Award

SHEDGUM Gas Plant - SAUDI ARAMCO Third Party

Cogeneration Program

Page 75: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

Certificate of Appreciation

Saudi Petrochemical Company (SADAF) – Al Jubail

HRSG Cogeneration Project

Page 76: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

Safety Achievement Award

NIGC – Air Separation Plant Project

Page 77: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

Certificate of Appreciation

SPC PDH/PP Project – 300,000 Man-hours

Page 78: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

Certificate of Performance

Various SAUDI ARAMCO Projects

Page 79: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

Safety Achievement Award

SAUDI ARAMCO – BI 3150 Ethane Recovery at

Berri Gas Plant

Page 80: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

Certificate of Appreciation

SAUDI ARAMCO – Upgrading of Fire & Gas Detection

System at Yanbu Refinery Marine Terminal

Page 81: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

Certificate of Appreciation

RasTanura Refinery – Plant 37-2 API Cells Repair

Page 82: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

Certificate of Appreciation

SAUDI ARAMCO RasTanura Refinery Utilities Plants

Various Projects

Page 83: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

Certificate of Appreciation

Construction Works for RasTanura Refinery

Upgrade Projects

Page 84: COMPANY PROFILE INDEX - asyadco · COMPANY PROFILE INDEX SECTION 1 INTRODUCTION President’s Message Company Information Organization Chart Location Map SECTION 2 COMPANY POLICY

Recommended