1 MechaTronics
It gives me great pleasure to acquaint MechaTronics as a Local Market Leader
and World-class integrated engineering Systems of MEP Systems.
Thanks to the creative and dedicated team of workers and professionals,
MechaTronics have succeeded in demonstrating its ability to fulfill promises,
boost skills, excel in performance, and instill the quality in every aspect of its
work; achieving higher levels of customer satisfaction with every completed
project.
Our clients and consultants, thank you for trusting us to be your source for top
quality and efficency.
We extend our gratitude for your interest to try our services and our slogan will
always be “Implementation of Integrated Systems is our Aim”.
GeneralManager Message
2MechaTronics
Company Overview
MechaTronics is the optimal choice for EPC, engineering procurement and construction services; as our team of workers and professionals are among the best in the field with an experience more than 20 years through participation in major local and international projects demonstrating their professional skills to manage, build, and support a wide variety of challenging projects to meet clients’ requirements.
The exceptional growth that MechaTronics (MT) has experienced, becoming a regional market leader in providing integrated engineering and contracting services to a diverse spectrum of clients is the testament to the company’s dedication in providing the best of services and achieving higher levels of customer satisfaction.
We are proud of our past and working hard to make tomorrow even better.
3 MechaTronics
OurMission
• Pre-engineered Electro-Mechanical
solutions providing a fast response with
affordable maintenance and longer
operating life of all project conditions
and needs.
• Attaining excellence in quality and
timely completed value-added projects.
• Becoming on the top of Middle East
electromechanical contractors via our
client’s satisfaction and frequent
recommendations.
4MechaTronics
OurVision
Our goal is to gain our customer’s passion through continuous improvement, which in turn reflected in executing projects on time with expected quality at the hands of professionals who apply the best practices for faster and more cost-effective solutions.
5 MechaTronics
QualityPolicy
The Quality System has the full commitment of Management, as our quality policy has been determined with the intention of providing customizable and quality products meet the requirements of the local and international customers in terms of the better realization of their requirements, optimum solutions to meet those requirements and building systems; ensuring quality at all phases, which made us competent to obtain certified ISO 9001.
MechaTronics (MT) is committed to:
• Provide exceptional service and accurate reports that are easy to understand and work professionally to achieve design requirements.
• Promote the continued training of all employees to achieve quality and skills required to provide right products and services.
• Offer timely delivery of services to our customers.
6MechaTronics
Scopeof Work
MechaTronics (MT) conducts all the projects associated to Electrical, Mechanical and Plumbing work, incorporating project budgeting, construction, engineering, procurement, development, execution, testing and commissioning through complete construction procedures for residential, commercial, health care, hospitality, institutional, Real-estate, malls and industrial projects.
The MT services include:
Mechanical ServicesWe accomplish all varied mechanical works including Central Air Conditioning, Plumbing, Drainage, and Fire Protection with the high quality, efficiency, productivity to gratify our clients, as we provide:
• HVAC System- Central Chillers & Boiler plants.- Smoke Management & Control Systems.- Car Parking Ventilation.- Commercial Kitchen Ventilation
Systems.- Steam & Hydraulic Systems.- District Cooling Systems.- Building Management Systems.- Industrial Ventilation- Duct cleaning system- Indust yent
7 MechaTronics
Scopeof Work
• Fire Protection Systems- Water based Fire Protection Systems Including: 1 - Water Sprinkler Protection Systems. 2 - Stand Pipes and Fire Hose Cabinets Protection Systems. 3 - Foam Water Solutions Fire Protection Systems.- Gas Suppression Systems Including:- 1 - Clean agent Gas suppression Systems. 2 - CO2 Gas suppression Systems.- Kitchen Hood Fire Suppression Systems.- Fire Protection for Hangers & Warehouses.- Fire Pumps and Private Fire Networks.
8MechaTronics
Scopeof Work
• Plumbing System- Water supply system including: 1 - Domestic plants 2 - Piping external and internal networks 3 - Plumbing fixture finishing- Drainage system including: 1 - External network c/w manholes and inspection chambers 2 - Internal soil, waste and rain water network 3 - Lifting stations 4 - Swage treatment plant
9 MechaTronics
Scopeof Work
Electrical ServicesThe Electrical services are fit out to implement all types of electrical systems
from Power Distribution to Low Voltage System in accordance with the high
quality, efficiency, productivity to gratify our clients, as we provide:
• Power Systems- Medium Voltage Switch Gear and RMU
- Power Transformers
- Low Voltage Switch Gear, ATS and synchronizing panels
- Generators
- Medium Voltage Cables
- Low Voltage Cables
- Distribution Panels
- UPS units
- Cable Trays
- PVC Conduits
- EMT Conduits
- Sockets
- Lighting System
- Disconnecting Switches
- Earthing and lightening system
10MechaTronics
Scopeof Work
• Light Current Systems- Fire Alarm Systems
- Burglar (intrusion) Alarm System
- Access Control System
- Closed Circuit TV System (CCTV)
- Car Parking System
- Gate Barrier System
- Time Attendance System
- Telephone System
- Data Communication Network System
- Public address and sound systems
- Audio/video Intercom system
- SMATV system
- BMS Building Management System
- Central Clock System
- Queuing System
- IP systems
- Nurse Call System
- HIMS ( Hospital information
management system )
11 MechaTronics
OurProjects
Domestic Projects
Outboard Projects
12MechaTronics
DomesticProjects
Medical
& hospital
projects
Emergency HospitalSouth Valley University
Owner : South Valley University
Client : South Valley University
Consultant : MASS Consult
Finish date : Nov. 2018
Emergency Hospital in the South Valley University considered as one of the newest hospitals in Qena, where the hospital was built on plant area of 3000 Sq. m consists of 5 floors with built-up area of 15000 Sq. m.
The hospital capacity is 300 beds and 8 up-to-date operating rooms, in addition to intensive care, post-op, burn and toxins wards, patient wards, radiology, laboratories, central sterilization department, the kitchen, and the central laundry of the hospital.
All project’s Electro-mechanical works have been executed by MechaTronics.
The A/C works was executed with Cooling capacity of 850 T.R using a direct expansion condensing Units (DX UNIT).
All hospital spaces are protected from fire using a pumps station with capacity of 1000 GPM, in addition to internal and external Piping Networks, automatic sprinklers, and fire cabinets.
Moreover, DATA, MDB rooms, Elect and Power station annexed to the project are protected using special gas systems (AIROSOL – CO2).
The electrical works have been implemented; providing 2 transformers with capacity of 2500 KVA per transformer, in addition to the entire main and branch cables and main and sub-main distribution panels.
Advanced light current systems have been used to operate the works of the fire alarm, nurses call, telephone, data, MATV, Public address and CCTV Systems.
13 MechaTronics
DomesticProjects
Medical
& hospital
projects
Aswan HospitalAswan - Egypt
Owner : Ministry of Republic Health - Egypt
Client : Ministry of Defense
Consultant : SHAKER Consultancy Group
Finish date : Feb. 2017
Aswan General Hospital considered as one of the major hospitals in the South of the country where the hospital has been built on Plant area of 3000 Sq. m consists of 6 floors with total built-up area of 12000 Sq. m.
The hospital includes 350-bed and 4 up-to-date operating rooms, in addition to intensive care, post-op, burn, and toxins wards, and patient wards, radiology, laboratories, central sterilization department, the kitchen, and the central laundry of the hospital.
All project A/C works have been executed by MechaTronics.
The A/C works are executedwith cooling capacity of 520 T.R using chillers, chilled water distribution pumps, air handling units, galvanized ducts, black steel ducts for kitchen ventilation, and Aluminum ducts for laundry ventilation.
All patients’ rooms were provided with split units.
14MechaTronics
DomesticProjects
Admin
Buildings
UCCMA Admin Building Owner : UCCMA
Client : Ministry of Defense
Consultant : HEGAB Consult
Finish date : DEC. 2017
Due to building a new factories complex of UCCMA company, an administrative building has been built on plant area of 3500 Sq. m consists of 4 floors including a Conference Hall and restaurant for employees.
The central air-conditioning works of the administrative building and its annexes have been implemented using Air Handling Units (AHU) and Fan Coil Units (FCU) with an air- conditioning capacity of 600 T.R.
Also, the light current systems work has been implemented by MechaTronics (fire alarm system, data system, CCTV, accesses control, MATV, Public address and the telephones, in the admin building and its annexes)
15 MechaTronics
DomesticProjects
Admin
Buildings
South Helwan
Cairo - Egypt.
Owner : Ministry of Electricity and Energy
Client : SIAC
Consultant : COSMOS
Finish date : Feb. 2017
The administrative building annexed to South of Helwan Electricity Power Station was built on
plant area of 300 Sq. m and consists of 3 floors.
The central air-conditioning works have been executed using DX units and VAV units with a
cooling capacity of 450 T.R and all ventilation works.
16MechaTronics
DomesticProjects
Admin
Buildings
ZEPTER Office Building Owner : ZEPTER
Client : ASSAS
Consultant : Zoran
Finish date : Nov. 2016
The ZEPTER administrative building located in the (5th Settlement New Cairo) built on plant
area of 1000 Sq. m consists of 5 floors with a built-up area of 5000 Sq. m
The building’s HVAC works have been executed using VRF system with cooling capacity of
124 T.R including all ducts, vents, control systems, and air outlets.
17 MechaTronics
DomesticProjects
Admin
Buildings
Abu Ghazaleh Office Building,
Smart Village - Egypt.
Owner : ZEPTER
Client : ASSAS
Consultant : Zoran
Finish date : Nov. 2016
Talal Abu-Ghazaleh building located in the smart village on plant area of 1000 Sq. m
consists of 4 floors. Three floors have been renovated and maintained with built-up area of
3000 Sq. m for all electro-mechanical works.
Full maintenance have been executed for all building’s main services equipment from air
handling units and main distribution panels to all the Fan Coil Units.
The required Cooling capacity has been recalculated according to the new architectural
design and all-electric modifications and low current systems adjustment, including fire
alarm, CCTV, data, telephones, and public address systems.
18MechaTronics
DomesticProjects
Admin
Buildings
Sahel – Saharaa Center Owner : Ministry of Defense
Client : Ministry of Defense
Consultant : Ministry of Defense
Finish date : Apr. 2014
Sahel – Saharan district Center one of Organization of African Nations Departments which built on plant area of 14300 Sq. m and consists of 4 floors.
All project’s electro-mechanical works have been executed by MechaTronics.
The A/C works has been executed using DX unit with cooling capacity of 360 T.R, in addition to all ducts and air outlets.
Moreover, an Elect. power station with a capacity of 1000 KVA, all main panels and sub-panels, back-up power generator with capacity of 350 KVA, all the cables, and lighting units, have been established.
It was provided with the latest low current systems of fire alarm systems, CCTV, access control of doors, information transfer systems, and data/telephones system.
19 MechaTronics
DomesticProjects
Admin
Buildings
Coptic Culture Center Owner : Coptic Culture Center
Client : Culture Center
Consultant : MAK Consult
Finish date : Feb. 2012
The Coptic cultural center located in Egypt (Cathedral in Abbasiah, Cairo) was equipped
with private studios.
The A/C works have been executed using Air Handling Units with cooling capacity of 15
T.R, including all ducts and internal sound insulation of the studios according to the
international standards.
20MechaTronics
DomesticProjects
Industrial
Projects
Egyptian army factories
for its supplies
( El RUBIKY Industrial Zone )
Owner : Ministry of Defense
Client : Al AHRAM
Consultant : HOWEEDY Consult
Finish date : Running
The Egyptian army factories for its supplies ,Rubiky industrial Zone considered as one of the major industrial zones in Egypt, as it includes more than 12 factories for high quality industrial purposes.
Five factories have been assigned to MechaTronics to execute all electro-mechanical works, including:
- HVAC of the administrative buildings annexed to the factories.
- Specialized works have been implemented in the dyeing factory, such as steam, hot water, treated water, and the compressed air systems,
- Transformers room, all main-panel and sub-panel, cables, and lighting systems,
- Fire-fighting works using automatic sprinklers system and fire cabins.
- Fire alarm works have been executed for all factories with connecting them to the central system.
21 MechaTronics
DomesticProjects
Industrial
Projects
LEONI Factories Owner : LEONI International
Client : LEONI wiring systems
Consultant : LEONI International
Finish date : Nov. 2013 - Nov. 2018
LEONI, wiring system company, is considered as one of the most important clients for our company, as we executed various factories to LEONI throughout the lifetime of the company in several regions within Egypt.
- LEONI factory # 1 (Free Zone- Nasr City) - LEONI factory # 1 (Badr City)
- LEONI factory # 2 (Badr City) - LEONI factory Flex (Free Zone- Nasr City)
- LEONI factory (Asyut) - LEONI swift factory (Free Zone - Nasr City)
HVAC and fire-fighting works have been executed for the former factories according to owner needs using high quality of material and advanced equipment according to the international conditionality and specifications to fit the global company policy, security and safety requirements.
22MechaTronics
DomesticProjects
Sukhna Port
Ain ElShokhna - Egypt
Owner : Ministry of Defense
Client : Al AHRAM
Consultant : HOWEEDY Consult
Finish date : Running
Development projects of Sukhna port and its shipping docks, as the project was executed on plant area of 150000 Sq. m.
All networking works and project infrastructure have been executed, from electrical power transformers station with capacity of 2500 KVA and distribution voltage of 22 k/690 Volt, all public cables, to the administrative buildings, distribution sub-points, external lighting of roads and trails, data cables, and telephones.
The entire area was covered by the under-ground fire-fighting networks and groundwater outlets (Fire Hydrant)
As well as drainage systems of roads and trails like pipes, rain chamber, sewage collection, and lift stations.
Industrial
Projects
23 MechaTronics
DomesticProjects
Industrial
Projects
AL Oula Industrial Park
LG Factory
Owner : AL Oula Industrial Park
Client : RME
Consultant : COSMOS
Finish date : OCT. 2015
Owner : LG Electronics Egypt
Client : LG Electronics Egypt
Consultant : LG Electronics Egypt
Finish date : SEP. 2015
Due to needs of the first zone factories complex in 6th October for water recharge, we have built major water reservoirs, and lifting station, a pumping station has been executed with a set of pumps with capacity of 148 m3/h per pump and all lifting station works of the pipes and control valves.
LG factory is located in 10th of Ramadan City and it is considered as one of the largest factories in Egypt.
The conditioning works of it have been executed using VRF system with total conditioning capacity of 750 T.R. This factory is one of the largest world’s projects using this system.
24MechaTronics
DomesticProjects
Polaris Logisticawarehouse6Th October City - Egypt.
Owner : Logistica warehouse
Client : RME
Consultant : HOWEEDY Consult
Finish date : Aug. 2014
Logistica warehouses located in the industrial zone in 6th of October and it is one of the largest executed warehouses in the Republic, as the project built on Plant area of 50000 Sq. m.
The project was implemented on three successive phases over three years; due to the magnitude of the project and the particular requirements of the owner, as the storage height reached 15 m.
All fire-fighting works have been executed using a pumping station with capacity of 2500 GPMGPMM, all external and internal networks, and sprinklers, according to special needs of the project and the storage method, also all external and internal health works networks, room inspection, and the project’s main lift station.
Industrial
Projects
25 MechaTronics
DomesticProjects
Food
Industrial
Projects
Ragab SonsDistribution Center,Ismailia Desert Road – Egypt.
Nestle Factory6th Of October - Egypt.
Owner : Ragab Sons Trading Co.
Client : Ragab Sons Trading Co.
Consultant : HOWEEDY Consult
Finish date : Feb. 2017
Owner : Nestle EgyptClient : Nestle EgyptConsultant : HOWEEDY ConsultFinish date : Mar. 2014
Ragab Sons chain is considered as one of the major trade and distribution companies in the Republic, consequently, the stores and the main distribution area of the chain have been built on Egypt Ismailia Desert Road on plant area of 35000 Sq. m and a storing height up to 15 m.
We used the latest systems to protect these stores from fire using fire pumping station with capacity of 2500 GPM including all external and internal networks, and also using special sprinkler for the proportionality with stores height and high storage capacity, as well as fireboxes and Early alarming systems in case of fire, according to the requirement of high codes of such installations.
Nestle is one of the leading companies in the field of food processing in Egypt, where plant area of 3400 Sq. m were added in October 6th factory for ice cream production, and administrative building consists of 2 floors on Built –up area of 1200 Sq. m,
The electrical works have been executed using stainless steel materials for all used systems from pipes and cables holders according to the standard specifications used in such projects.
All conditioning works were implemented with 50 T.R of cooling capacity for the annex administrative building, and the ventilation works of the storage areas using fans and specific filters for protection against contamination.
26MechaTronics
DomesticProjects
Food
Industrial
Projects
Hyper One, Al SolimaniaAlexandria desert roadEgypt.
Owner : Hyper One
Client : RME
Consultant : El Gohary Consult
Finish date : Feb. 2017
Hyper One Located in Egypt Alexandria Desert Road in Solimania region on plant area of 50000 Sq. m and consists of storage places, kitchens, conservation rooms, and refrigerators that have been executed on Built-up area of 12000 Sq. m besides, the public area, the administrative building annexed to it, and the restaurants area.
All fire-fighting systems have been executed using main pumping station with capacity of 2500 GPMGPM, as well as all internal and external networks, automatic sprinklers to fit the height of the store, storage capacity, and display spaces.
All sanitary works were executed from water recharge stations, internal and external water, and sewage networks, sewage collection, and room inspection, to the sewage treatment plant.
27 MechaTronics
DomesticProjects
Malls and
Real-Estate
Cloves Resort(5th Settlement new Cairo)
MAVIDA Resort
Owner : Ministry of DefenseClient : Ministry of DefenseConsultant : GID ConsultantFinish date : Mar. 2018
Owner : MAVIDAClient : SIACConsultant : EGEC ConsualtFinish date : Nov. 2015
Cloves residential complex is located in the (5th Settlement new Cairo) has been equipped with squash complex, health services building, where built on plan area of 3700 Sq. m
The Resort was equipped with HVAC systems with total conditioning capacity of 170 T,R including all air ducts works.
Mavida is considered one of the most important and largest sui generis residential in the Republic. All conditioning works for several villas in the project have been executed according to the highest specification using the split units including all air ducts works.
28MechaTronics
DomesticProjects
Malls and
Real-Estate
Maxim Mall Owner : MaximClient : RMEConsultant : BAKRY ConsultantFinish date : Nov. 2017
Maxim Mall is located in (5th Settlement New Cairo) on plant area of 8000 Sq. m and 4 floors, other than garages area in the basement with total Built-up area of 40000 Sq. m.
All fire-fighting and sanitary works of the project were executed using a fire-fighting pumping station with capacity of 2000 GPMGPM, all external and internal networks, water automatic sprinklers, fire cabinets, in addition to the sanitary works of water pumping station and its internal and external networks, sewage collection, room inspection, and the lift stations in the basement using submersible pumps.
29 MechaTronics
DomesticProjects
Duct
Cleaning
Project
Dar El Fouad Hospital
LEONI Factories
Owner : Dar El Fouad HospitalClient : Dar El Fouad HospitalConsultant : DAR AL- HANDASAHFinish date : DEC. 2017
Owner : LEONI InternationalClient : LEONI wiring systemsConsultant : LEONI InternationalFinish date : Nov. 2016
All central air-conditioning systems that ducting system represent a comfortable environment for bacteria ,fungus and distasteful odors that is caused if not cleaned and decontamination regularly.
And due to our long experience in the field of air conditioning works and to provide integrated solutions to our customers in this field, the company has added a new sector of services using the latest methods and equipment for duct cleaning and decontamination the air ducts of the central air conditioning systems.
At the behest of Dar Al Fouad hospital (Nasr City) to maintain the distinct service and submitted by them, the cleaning of air ducts has been assigned to Mechatronics company due to their experience in this field.
The works included – Operating rooms - the laboratories - radiology -dental clinics - the kitchen, the restaurant, patients’ rooms, public places, and the garages.
Leoni company one of the international companies that apply the stringent standards in their factories to maintain the quality of its products
Since air ducts contamination has a negative effect on high-tech products.
The duct cleaning has been assigned to Mechatronics company due to their experience in this field.
DomesticProjects
Food
Industrial
Projects
30MechaTronics
31 MechaTronics
OutboardProjects
Najaf hospital was built in Najaf Iraq on Plant area of 8880 Sq. m, and it consists of 4 floors on total Built-up area of 56000 Sq. m.
With a capacity of 600 beds and 16 modern operating rooms, other than the intensive care wards, laboratory, radiology, outpatients’ clinics, and department of central sterilization.
All project’s electro-mechanical works have been executed using the latest equipment and the best materials.
The building was adapted using chilled water plant (CHILLERS) and its extensions from pumps with conditioning capacity of 4300 T.R including all air ducts, insulation, and special exits of operating rooms from stainless steel materials.
The project has also been supported by an electricity distribution station with capacity of 16000 KVA including all transformers, main-panel and sub-panel, cables and its extensions.
Backup generators were also provided to the hospital with a panel for the synchronization incapacity of 10000 KVA.
A pumping station was also used for fire-fighting with capacity of 2500 GPMGPM, all its networks, automatic water sprinklers, and fire cabins are according to international standards.
The latest low current systems have been provided including fire alarm, on-call nurses, pagers and central watches, data systems, and telephones.
Due to the special specifications and requirements of this project, all medical information of the patients was linked to HIMS system, which is considered one of the latest used systems in this field.
Also, all the electro-mechanical systems of the hospital were linked to BMS system to control and monitor all project equipment.
Al Najaf TeachingHospitalAl Najaf Al Ashraf - Iraq.
Owner : Ministry of Health - Iraq Republic
Client : Ministry of Health - Iraq Republic
Consultant : ITEC
Finish date : Dec. 2014
32MechaTronics
OutboardProjects
Kazimia General HospitalBaghdad - Iraq
Owner : Ministry of Health - Iraq RepublicClient : Ministry of Health - Iraq RepublicConsultant : Ministry of Health - Iraq RepublicFinish date : Apr. 2015
Due to the development needs of the hospital in the Kazimia district of Baghdad City, 4 modern operations rooms have been added, as well as a post-op and intensive care wards.
All electro-mechanical works of operating rooms have been executed using central conditioning of DX units with total capacity of 180 T.R for the electrical works, and low current systems.
Al Najaf Teaching Hospital Al Najaf Al Ashraf - Iraq.
33 MechaTronics
GalleryProjects
34MechaTronics
GalleryProjects
Company
Profile
MechaTronicsImplementation of Integrated Systems is our Aim
www.mechatronics-eg.com
43 Palm City, Intersection of Ring Road and Al-Sahid Axis, Mokattam, Cairo - Egypt
(+202)231 52 326
(+202)231 52 194
(+2)010 003 03 810
E-mail: [email protected]
www.mechatronics-eg.com