+ All Categories
Home > Documents > Company Profile - MechaTronics Egypt€¦ · Buildings Sahel – Saharaa Center Owner : Ministry...

Company Profile - MechaTronics Egypt€¦ · Buildings Sahel – Saharaa Center Owner : Ministry...

Date post: 19-Jul-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
40
Company Profile MechaTronics Implementation of Integrated Systems is our Aim www.mechatronics-eg.com
Transcript
Page 1: Company Profile - MechaTronics Egypt€¦ · Buildings Sahel – Saharaa Center Owner : Ministry of Defense Client : Ministry of Defense Consultant: Ministry of Defense Finish date:

Company

Profile

MechaTronicsImplementation of Integrated Systems is our Aim

www.mechatronics-eg.com

43 Palm City, Intersection of Ring Road and Al-Sahid Axis, Mokattam, Cairo - Egypt

(+202)231 52 326

(+202)231 52 194

(+2)010 003 03 810

E-mail: [email protected]

www.mechatronics-eg.com

Page 2: Company Profile - MechaTronics Egypt€¦ · Buildings Sahel – Saharaa Center Owner : Ministry of Defense Client : Ministry of Defense Consultant: Ministry of Defense Finish date:
Page 3: Company Profile - MechaTronics Egypt€¦ · Buildings Sahel – Saharaa Center Owner : Ministry of Defense Client : Ministry of Defense Consultant: Ministry of Defense Finish date:

Table OfContents

Page 4: Company Profile - MechaTronics Egypt€¦ · Buildings Sahel – Saharaa Center Owner : Ministry of Defense Client : Ministry of Defense Consultant: Ministry of Defense Finish date:

1 MechaTronics

It gives me great pleasure to acquaint MechaTronics as a Local Market Leader

and World-class integrated engineering Systems of MEP Systems.

Thanks to the creative and dedicated team of workers and professionals,

MechaTronics have succeeded in demonstrating its ability to fulfill promises,

boost skills, excel in performance, and instill the quality in every aspect of its

work; achieving higher levels of customer satisfaction with every completed

project.

Our clients and consultants, thank you for trusting us to be your source for top

quality and efficency.

We extend our gratitude for your interest to try our services and our slogan will

always be “Implementation of Integrated Systems is our Aim”.

GeneralManager Message

Page 5: Company Profile - MechaTronics Egypt€¦ · Buildings Sahel – Saharaa Center Owner : Ministry of Defense Client : Ministry of Defense Consultant: Ministry of Defense Finish date:

2MechaTronics

Company Overview

MechaTronics is the optimal choice for EPC, engineering procurement and construction services; as our team of workers and professionals are among the best in the field with an experience more than 20 years through participation in major local and international projects demonstrating their professional skills to manage, build, and support a wide variety of challenging projects to meet clients’ requirements.

The exceptional growth that MechaTronics (MT) has experienced, becoming a regional market leader in providing integrated engineering and contracting services to a diverse spectrum of clients is the testament to the company’s dedication in providing the best of services and achieving higher levels of customer satisfaction.

We are proud of our past and working hard to make tomorrow even better.

Page 6: Company Profile - MechaTronics Egypt€¦ · Buildings Sahel – Saharaa Center Owner : Ministry of Defense Client : Ministry of Defense Consultant: Ministry of Defense Finish date:

3 MechaTronics

OurMission

• Pre-engineered Electro-Mechanical

solutions providing a fast response with

affordable maintenance and longer

operating life of all project conditions

and needs.

• Attaining excellence in quality and

timely completed value-added projects.

• Becoming on the top of Middle East

electromechanical contractors via our

client’s satisfaction and frequent

recommendations.

Page 7: Company Profile - MechaTronics Egypt€¦ · Buildings Sahel – Saharaa Center Owner : Ministry of Defense Client : Ministry of Defense Consultant: Ministry of Defense Finish date:

4MechaTronics

OurVision

Our goal is to gain our customer’s passion through continuous improvement, which in turn reflected in executing projects on time with expected quality at the hands of professionals who apply the best practices for faster and more cost-effective solutions.

Page 8: Company Profile - MechaTronics Egypt€¦ · Buildings Sahel – Saharaa Center Owner : Ministry of Defense Client : Ministry of Defense Consultant: Ministry of Defense Finish date:

5 MechaTronics

QualityPolicy

The Quality System has the full commitment of Management, as our quality policy has been determined with the intention of providing customizable and quality products meet the requirements of the local and international customers in terms of the better realization of their requirements, optimum solutions to meet those requirements and building systems; ensuring quality at all phases, which made us competent to obtain certified ISO 9001.

MechaTronics (MT) is committed to:

• Provide exceptional service and accurate reports that are easy to understand and work professionally to achieve design requirements.

• Promote the continued training of all employees to achieve quality and skills required to provide right products and services.

• Offer timely delivery of services to our customers.

Page 9: Company Profile - MechaTronics Egypt€¦ · Buildings Sahel – Saharaa Center Owner : Ministry of Defense Client : Ministry of Defense Consultant: Ministry of Defense Finish date:

6MechaTronics

Scopeof Work

MechaTronics (MT) conducts all the projects associated to Electrical, Mechanical and Plumbing work, incorporating project budgeting, construction, engineering, procurement, development, execution, testing and commissioning through complete construction procedures for residential, commercial, health care, hospitality, institutional, Real-estate, malls and industrial projects.

The MT services include:

Mechanical ServicesWe accomplish all varied mechanical works including Central Air Conditioning, Plumbing, Drainage, and Fire Protection with the high quality, efficiency, productivity to gratify our clients, as we provide:

• HVAC System- Central Chillers & Boiler plants.- Smoke Management & Control Systems.- Car Parking Ventilation.- Commercial Kitchen Ventilation

Systems.- Steam & Hydraulic Systems.- District Cooling Systems.- Building Management Systems.- Industrial Ventilation- Duct cleaning system- Indust yent

Page 10: Company Profile - MechaTronics Egypt€¦ · Buildings Sahel – Saharaa Center Owner : Ministry of Defense Client : Ministry of Defense Consultant: Ministry of Defense Finish date:

7 MechaTronics

Scopeof Work

• Fire Protection Systems- Water based Fire Protection Systems Including: 1 - Water Sprinkler Protection Systems. 2 - Stand Pipes and Fire Hose Cabinets Protection Systems. 3 - Foam Water Solutions Fire Protection Systems.- Gas Suppression Systems Including:- 1 - Clean agent Gas suppression Systems. 2 - CO2 Gas suppression Systems.- Kitchen Hood Fire Suppression Systems.- Fire Protection for Hangers & Warehouses.- Fire Pumps and Private Fire Networks.

Page 11: Company Profile - MechaTronics Egypt€¦ · Buildings Sahel – Saharaa Center Owner : Ministry of Defense Client : Ministry of Defense Consultant: Ministry of Defense Finish date:

8MechaTronics

Scopeof Work

• Plumbing System- Water supply system including: 1 - Domestic plants 2 - Piping external and internal networks 3 - Plumbing fixture finishing- Drainage system including: 1 - External network c/w manholes and inspection chambers 2 - Internal soil, waste and rain water network 3 - Lifting stations 4 - Swage treatment plant

Page 12: Company Profile - MechaTronics Egypt€¦ · Buildings Sahel – Saharaa Center Owner : Ministry of Defense Client : Ministry of Defense Consultant: Ministry of Defense Finish date:

9 MechaTronics

Scopeof Work

Electrical ServicesThe Electrical services are fit out to implement all types of electrical systems

from Power Distribution to Low Voltage System in accordance with the high

quality, efficiency, productivity to gratify our clients, as we provide:

• Power Systems- Medium Voltage Switch Gear and RMU

- Power Transformers

- Low Voltage Switch Gear, ATS and synchronizing panels

- Generators

- Medium Voltage Cables

- Low Voltage Cables

- Distribution Panels

- UPS units

- Cable Trays

- PVC Conduits

- EMT Conduits

- Sockets

- Lighting System

- Disconnecting Switches

- Earthing and lightening system

Page 13: Company Profile - MechaTronics Egypt€¦ · Buildings Sahel – Saharaa Center Owner : Ministry of Defense Client : Ministry of Defense Consultant: Ministry of Defense Finish date:

10MechaTronics

Scopeof Work

• Light Current Systems- Fire Alarm Systems

- Burglar (intrusion) Alarm System

- Access Control System

- Closed Circuit TV System (CCTV)

- Car Parking System

- Gate Barrier System

- Time Attendance System

- Telephone System

- Data Communication Network System

- Public address and sound systems

- Audio/video Intercom system

- SMATV system

- BMS Building Management System

- Central Clock System

- Queuing System

- IP systems

- Nurse Call System

- HIMS ( Hospital information

management system )

Page 14: Company Profile - MechaTronics Egypt€¦ · Buildings Sahel – Saharaa Center Owner : Ministry of Defense Client : Ministry of Defense Consultant: Ministry of Defense Finish date:

11 MechaTronics

OurProjects

Domestic Projects

Outboard Projects

Page 15: Company Profile - MechaTronics Egypt€¦ · Buildings Sahel – Saharaa Center Owner : Ministry of Defense Client : Ministry of Defense Consultant: Ministry of Defense Finish date:

12MechaTronics

DomesticProjects

Medical

& hospital

projects

Emergency HospitalSouth Valley University

Owner : South Valley University

Client : South Valley University

Consultant : MASS Consult

Finish date : Nov. 2018

Emergency Hospital in the South Valley University considered as one of the newest hospitals in Qena, where the hospital was built on plant area of 3000 Sq. m consists of 5 floors with built-up area of 15000 Sq. m.

The hospital capacity is 300 beds and 8 up-to-date operating rooms, in addition to intensive care, post-op, burn and toxins wards, patient wards, radiology, laboratories, central sterilization department, the kitchen, and the central laundry of the hospital.

All project’s Electro-mechanical works have been executed by MechaTronics.

The A/C works was executed with Cooling capacity of 850 T.R using a direct expansion condensing Units (DX UNIT).

All hospital spaces are protected from fire using a pumps station with capacity of 1000 GPM, in addition to internal and external Piping Networks, automatic sprinklers, and fire cabinets.

Moreover, DATA, MDB rooms, Elect and Power station annexed to the project are protected using special gas systems (AIROSOL – CO2).

The electrical works have been implemented; providing 2 transformers with capacity of 2500 KVA per transformer, in addition to the entire main and branch cables and main and sub-main distribution panels.

Advanced light current systems have been used to operate the works of the fire alarm, nurses call, telephone, data, MATV, Public address and CCTV Systems.

Page 16: Company Profile - MechaTronics Egypt€¦ · Buildings Sahel – Saharaa Center Owner : Ministry of Defense Client : Ministry of Defense Consultant: Ministry of Defense Finish date:

13 MechaTronics

DomesticProjects

Medical

& hospital

projects

Aswan HospitalAswan - Egypt

Owner : Ministry of Republic Health - Egypt

Client : Ministry of Defense

Consultant : SHAKER Consultancy Group

Finish date : Feb. 2017

Aswan General Hospital considered as one of the major hospitals in the South of the country where the hospital has been built on Plant area of 3000 Sq. m consists of 6 floors with total built-up area of 12000 Sq. m.

The hospital includes 350-bed and 4 up-to-date operating rooms, in addition to intensive care, post-op, burn, and toxins wards, and patient wards, radiology, laboratories, central sterilization department, the kitchen, and the central laundry of the hospital.

All project A/C works have been executed by MechaTronics.

The A/C works are executedwith cooling capacity of 520 T.R using chillers, chilled water distribution pumps, air handling units, galvanized ducts, black steel ducts for kitchen ventilation, and Aluminum ducts for laundry ventilation.

All patients’ rooms were provided with split units.

Page 17: Company Profile - MechaTronics Egypt€¦ · Buildings Sahel – Saharaa Center Owner : Ministry of Defense Client : Ministry of Defense Consultant: Ministry of Defense Finish date:

14MechaTronics

DomesticProjects

Admin

Buildings

UCCMA Admin Building Owner : UCCMA

Client : Ministry of Defense

Consultant : HEGAB Consult

Finish date : DEC. 2017

Due to building a new factories complex of UCCMA company, an administrative building has been built on plant area of 3500 Sq. m consists of 4 floors including a Conference Hall and restaurant for employees.

The central air-conditioning works of the administrative building and its annexes have been implemented using Air Handling Units (AHU) and Fan Coil Units (FCU) with an air- conditioning capacity of 600 T.R.

Also, the light current systems work has been implemented by MechaTronics (fire alarm system, data system, CCTV, accesses control, MATV, Public address and the telephones, in the admin building and its annexes)

Page 18: Company Profile - MechaTronics Egypt€¦ · Buildings Sahel – Saharaa Center Owner : Ministry of Defense Client : Ministry of Defense Consultant: Ministry of Defense Finish date:

15 MechaTronics

DomesticProjects

Admin

Buildings

South Helwan

Cairo - Egypt.

Owner : Ministry of Electricity and Energy

Client : SIAC

Consultant : COSMOS

Finish date : Feb. 2017

The administrative building annexed to South of Helwan Electricity Power Station was built on

plant area of 300 Sq. m and consists of 3 floors.

The central air-conditioning works have been executed using DX units and VAV units with a

cooling capacity of 450 T.R and all ventilation works.

Page 19: Company Profile - MechaTronics Egypt€¦ · Buildings Sahel – Saharaa Center Owner : Ministry of Defense Client : Ministry of Defense Consultant: Ministry of Defense Finish date:

16MechaTronics

DomesticProjects

Admin

Buildings

ZEPTER Office Building Owner : ZEPTER

Client : ASSAS

Consultant : Zoran

Finish date : Nov. 2016

The ZEPTER administrative building located in the (5th Settlement New Cairo) built on plant

area of 1000 Sq. m consists of 5 floors with a built-up area of 5000 Sq. m

The building’s HVAC works have been executed using VRF system with cooling capacity of

124 T.R including all ducts, vents, control systems, and air outlets.

Page 20: Company Profile - MechaTronics Egypt€¦ · Buildings Sahel – Saharaa Center Owner : Ministry of Defense Client : Ministry of Defense Consultant: Ministry of Defense Finish date:

17 MechaTronics

DomesticProjects

Admin

Buildings

Abu Ghazaleh Office Building,

Smart Village - Egypt.

Owner : ZEPTER

Client : ASSAS

Consultant : Zoran

Finish date : Nov. 2016

Talal Abu-Ghazaleh building located in the smart village on plant area of 1000 Sq. m

consists of 4 floors. Three floors have been renovated and maintained with built-up area of

3000 Sq. m for all electro-mechanical works.

Full maintenance have been executed for all building’s main services equipment from air

handling units and main distribution panels to all the Fan Coil Units.

The required Cooling capacity has been recalculated according to the new architectural

design and all-electric modifications and low current systems adjustment, including fire

alarm, CCTV, data, telephones, and public address systems.

Page 21: Company Profile - MechaTronics Egypt€¦ · Buildings Sahel – Saharaa Center Owner : Ministry of Defense Client : Ministry of Defense Consultant: Ministry of Defense Finish date:

18MechaTronics

DomesticProjects

Admin

Buildings

Sahel – Saharaa Center Owner : Ministry of Defense

Client : Ministry of Defense

Consultant : Ministry of Defense

Finish date : Apr. 2014

Sahel – Saharan district Center one of Organization of African Nations Departments which built on plant area of 14300 Sq. m and consists of 4 floors.

All project’s electro-mechanical works have been executed by MechaTronics.

The A/C works has been executed using DX unit with cooling capacity of 360 T.R, in addition to all ducts and air outlets.

Moreover, an Elect. power station with a capacity of 1000 KVA, all main panels and sub-panels, back-up power generator with capacity of 350 KVA, all the cables, and lighting units, have been established.

It was provided with the latest low current systems of fire alarm systems, CCTV, access control of doors, information transfer systems, and data/telephones system.

Page 22: Company Profile - MechaTronics Egypt€¦ · Buildings Sahel – Saharaa Center Owner : Ministry of Defense Client : Ministry of Defense Consultant: Ministry of Defense Finish date:

19 MechaTronics

DomesticProjects

Admin

Buildings

Coptic Culture Center Owner : Coptic Culture Center

Client : Culture Center

Consultant : MAK Consult

Finish date : Feb. 2012

The Coptic cultural center located in Egypt (Cathedral in Abbasiah, Cairo) was equipped

with private studios.

The A/C works have been executed using Air Handling Units with cooling capacity of 15

T.R, including all ducts and internal sound insulation of the studios according to the

international standards.

Page 23: Company Profile - MechaTronics Egypt€¦ · Buildings Sahel – Saharaa Center Owner : Ministry of Defense Client : Ministry of Defense Consultant: Ministry of Defense Finish date:

20MechaTronics

DomesticProjects

Industrial

Projects

Egyptian army factories

for its supplies

( El RUBIKY Industrial Zone )

Owner : Ministry of Defense

Client : Al AHRAM

Consultant : HOWEEDY Consult

Finish date : Running

The Egyptian army factories for its supplies ,Rubiky industrial Zone considered as one of the major industrial zones in Egypt, as it includes more than 12 factories for high quality industrial purposes.

Five factories have been assigned to MechaTronics to execute all electro-mechanical works, including:

- HVAC of the administrative buildings annexed to the factories.

- Specialized works have been implemented in the dyeing factory, such as steam, hot water, treated water, and the compressed air systems,

- Transformers room, all main-panel and sub-panel, cables, and lighting systems,

- Fire-fighting works using automatic sprinklers system and fire cabins.

- Fire alarm works have been executed for all factories with connecting them to the central system.

Page 24: Company Profile - MechaTronics Egypt€¦ · Buildings Sahel – Saharaa Center Owner : Ministry of Defense Client : Ministry of Defense Consultant: Ministry of Defense Finish date:

21 MechaTronics

DomesticProjects

Industrial

Projects

LEONI Factories Owner : LEONI International

Client : LEONI wiring systems

Consultant : LEONI International

Finish date : Nov. 2013 - Nov. 2018

LEONI, wiring system company, is considered as one of the most important clients for our company, as we executed various factories to LEONI throughout the lifetime of the company in several regions within Egypt.

- LEONI factory # 1 (Free Zone- Nasr City) - LEONI factory # 1 (Badr City)

- LEONI factory # 2 (Badr City) - LEONI factory Flex (Free Zone- Nasr City)

- LEONI factory (Asyut) - LEONI swift factory (Free Zone - Nasr City)

HVAC and fire-fighting works have been executed for the former factories according to owner needs using high quality of material and advanced equipment according to the international conditionality and specifications to fit the global company policy, security and safety requirements.

Page 25: Company Profile - MechaTronics Egypt€¦ · Buildings Sahel – Saharaa Center Owner : Ministry of Defense Client : Ministry of Defense Consultant: Ministry of Defense Finish date:

22MechaTronics

DomesticProjects

Sukhna Port

Ain ElShokhna - Egypt

Owner : Ministry of Defense

Client : Al AHRAM

Consultant : HOWEEDY Consult

Finish date : Running

Development projects of Sukhna port and its shipping docks, as the project was executed on plant area of 150000 Sq. m.

All networking works and project infrastructure have been executed, from electrical power transformers station with capacity of 2500 KVA and distribution voltage of 22 k/690 Volt, all public cables, to the administrative buildings, distribution sub-points, external lighting of roads and trails, data cables, and telephones.

The entire area was covered by the under-ground fire-fighting networks and groundwater outlets (Fire Hydrant)

As well as drainage systems of roads and trails like pipes, rain chamber, sewage collection, and lift stations.

Industrial

Projects

Page 26: Company Profile - MechaTronics Egypt€¦ · Buildings Sahel – Saharaa Center Owner : Ministry of Defense Client : Ministry of Defense Consultant: Ministry of Defense Finish date:

23 MechaTronics

DomesticProjects

Industrial

Projects

AL Oula Industrial Park

LG Factory

Owner : AL Oula Industrial Park

Client : RME

Consultant : COSMOS

Finish date : OCT. 2015

Owner : LG Electronics Egypt

Client : LG Electronics Egypt

Consultant : LG Electronics Egypt

Finish date : SEP. 2015

Due to needs of the first zone factories complex in 6th October for water recharge, we have built major water reservoirs, and lifting station, a pumping station has been executed with a set of pumps with capacity of 148 m3/h per pump and all lifting station works of the pipes and control valves.

LG factory is located in 10th of Ramadan City and it is considered as one of the largest factories in Egypt.

The conditioning works of it have been executed using VRF system with total conditioning capacity of 750 T.R. This factory is one of the largest world’s projects using this system.

Page 27: Company Profile - MechaTronics Egypt€¦ · Buildings Sahel – Saharaa Center Owner : Ministry of Defense Client : Ministry of Defense Consultant: Ministry of Defense Finish date:

24MechaTronics

DomesticProjects

Polaris Logisticawarehouse6Th October City - Egypt.

Owner : Logistica warehouse

Client : RME

Consultant : HOWEEDY Consult

Finish date : Aug. 2014

Logistica warehouses located in the industrial zone in 6th of October and it is one of the largest executed warehouses in the Republic, as the project built on Plant area of 50000 Sq. m.

The project was implemented on three successive phases over three years; due to the magnitude of the project and the particular requirements of the owner, as the storage height reached 15 m.

All fire-fighting works have been executed using a pumping station with capacity of 2500 GPMGPMM, all external and internal networks, and sprinklers, according to special needs of the project and the storage method, also all external and internal health works networks, room inspection, and the project’s main lift station.

Industrial

Projects

Page 28: Company Profile - MechaTronics Egypt€¦ · Buildings Sahel – Saharaa Center Owner : Ministry of Defense Client : Ministry of Defense Consultant: Ministry of Defense Finish date:

25 MechaTronics

DomesticProjects

Food

Industrial

Projects

Ragab SonsDistribution Center,Ismailia Desert Road – Egypt.

Nestle Factory6th Of October - Egypt.

Owner : Ragab Sons Trading Co.

Client : Ragab Sons Trading Co.

Consultant : HOWEEDY Consult

Finish date : Feb. 2017

Owner : Nestle EgyptClient : Nestle EgyptConsultant : HOWEEDY ConsultFinish date : Mar. 2014

Ragab Sons chain is considered as one of the major trade and distribution companies in the Republic, consequently, the stores and the main distribution area of the chain have been built on Egypt Ismailia Desert Road on plant area of 35000 Sq. m and a storing height up to 15 m.

We used the latest systems to protect these stores from fire using fire pumping station with capacity of 2500 GPM including all external and internal networks, and also using special sprinkler for the proportionality with stores height and high storage capacity, as well as fireboxes and Early alarming systems in case of fire, according to the requirement of high codes of such installations.

Nestle is one of the leading companies in the field of food processing in Egypt, where plant area of 3400 Sq. m were added in October 6th factory for ice cream production, and administrative building consists of 2 floors on Built –up area of 1200 Sq. m,

The electrical works have been executed using stainless steel materials for all used systems from pipes and cables holders according to the standard specifications used in such projects.

All conditioning works were implemented with 50 T.R of cooling capacity for the annex administrative building, and the ventilation works of the storage areas using fans and specific filters for protection against contamination.

Page 29: Company Profile - MechaTronics Egypt€¦ · Buildings Sahel – Saharaa Center Owner : Ministry of Defense Client : Ministry of Defense Consultant: Ministry of Defense Finish date:

26MechaTronics

DomesticProjects

Food

Industrial

Projects

Hyper One, Al SolimaniaAlexandria desert roadEgypt.

Owner : Hyper One

Client : RME

Consultant : El Gohary Consult

Finish date : Feb. 2017

Hyper One Located in Egypt Alexandria Desert Road in Solimania region on plant area of 50000 Sq. m and consists of storage places, kitchens, conservation rooms, and refrigerators that have been executed on Built-up area of 12000 Sq. m besides, the public area, the administrative building annexed to it, and the restaurants area.

All fire-fighting systems have been executed using main pumping station with capacity of 2500 GPMGPM, as well as all internal and external networks, automatic sprinklers to fit the height of the store, storage capacity, and display spaces.

All sanitary works were executed from water recharge stations, internal and external water, and sewage networks, sewage collection, and room inspection, to the sewage treatment plant.

Page 30: Company Profile - MechaTronics Egypt€¦ · Buildings Sahel – Saharaa Center Owner : Ministry of Defense Client : Ministry of Defense Consultant: Ministry of Defense Finish date:

27 MechaTronics

DomesticProjects

Malls and

Real-Estate

Cloves Resort(5th Settlement new Cairo)

MAVIDA Resort

Owner : Ministry of DefenseClient : Ministry of DefenseConsultant : GID ConsultantFinish date : Mar. 2018

Owner : MAVIDAClient : SIACConsultant : EGEC ConsualtFinish date : Nov. 2015

Cloves residential complex is located in the (5th Settlement new Cairo) has been equipped with squash complex, health services building, where built on plan area of 3700 Sq. m

The Resort was equipped with HVAC systems with total conditioning capacity of 170 T,R including all air ducts works.

Mavida is considered one of the most important and largest sui generis residential in the Republic. All conditioning works for several villas in the project have been executed according to the highest specification using the split units including all air ducts works.

Page 31: Company Profile - MechaTronics Egypt€¦ · Buildings Sahel – Saharaa Center Owner : Ministry of Defense Client : Ministry of Defense Consultant: Ministry of Defense Finish date:

28MechaTronics

DomesticProjects

Malls and

Real-Estate

Maxim Mall Owner : MaximClient : RMEConsultant : BAKRY ConsultantFinish date : Nov. 2017

Maxim Mall is located in (5th Settlement New Cairo) on plant area of 8000 Sq. m and 4 floors, other than garages area in the basement with total Built-up area of 40000 Sq. m.

All fire-fighting and sanitary works of the project were executed using a fire-fighting pumping station with capacity of 2000 GPMGPM, all external and internal networks, water automatic sprinklers, fire cabinets, in addition to the sanitary works of water pumping station and its internal and external networks, sewage collection, room inspection, and the lift stations in the basement using submersible pumps.

Page 32: Company Profile - MechaTronics Egypt€¦ · Buildings Sahel – Saharaa Center Owner : Ministry of Defense Client : Ministry of Defense Consultant: Ministry of Defense Finish date:

29 MechaTronics

DomesticProjects

Duct

Cleaning

Project

Dar El Fouad Hospital

LEONI Factories

Owner : Dar El Fouad HospitalClient : Dar El Fouad HospitalConsultant : DAR AL- HANDASAHFinish date : DEC. 2017

Owner : LEONI InternationalClient : LEONI wiring systemsConsultant : LEONI InternationalFinish date : Nov. 2016

All central air-conditioning systems that ducting system represent a comfortable environment for bacteria ,fungus and distasteful odors that is caused if not cleaned and decontamination regularly.

And due to our long experience in the field of air conditioning works and to provide integrated solutions to our customers in this field, the company has added a new sector of services using the latest methods and equipment for duct cleaning and decontamination the air ducts of the central air conditioning systems.

At the behest of Dar Al Fouad hospital (Nasr City) to maintain the distinct service and submitted by them, the cleaning of air ducts has been assigned to Mechatronics company due to their experience in this field.

The works included – Operating rooms - the laboratories - radiology -dental clinics - the kitchen, the restaurant, patients’ rooms, public places, and the garages.

Leoni company one of the international companies that apply the stringent standards in their factories to maintain the quality of its products

Since air ducts contamination has a negative effect on high-tech products.

The duct cleaning has been assigned to Mechatronics company due to their experience in this field.

Page 33: Company Profile - MechaTronics Egypt€¦ · Buildings Sahel – Saharaa Center Owner : Ministry of Defense Client : Ministry of Defense Consultant: Ministry of Defense Finish date:

DomesticProjects

Food

Industrial

Projects

30MechaTronics

Page 34: Company Profile - MechaTronics Egypt€¦ · Buildings Sahel – Saharaa Center Owner : Ministry of Defense Client : Ministry of Defense Consultant: Ministry of Defense Finish date:

31 MechaTronics

OutboardProjects

Najaf hospital was built in Najaf Iraq on Plant area of 8880 Sq. m, and it consists of 4 floors on total Built-up area of 56000 Sq. m.

With a capacity of 600 beds and 16 modern operating rooms, other than the intensive care wards, laboratory, radiology, outpatients’ clinics, and department of central sterilization.

All project’s electro-mechanical works have been executed using the latest equipment and the best materials.

The building was adapted using chilled water plant (CHILLERS) and its extensions from pumps with conditioning capacity of 4300 T.R including all air ducts, insulation, and special exits of operating rooms from stainless steel materials.

The project has also been supported by an electricity distribution station with capacity of 16000 KVA including all transformers, main-panel and sub-panel, cables and its extensions.

Backup generators were also provided to the hospital with a panel for the synchronization incapacity of 10000 KVA.

A pumping station was also used for fire-fighting with capacity of 2500 GPMGPM, all its networks, automatic water sprinklers, and fire cabins are according to international standards.

The latest low current systems have been provided including fire alarm, on-call nurses, pagers and central watches, data systems, and telephones.

Due to the special specifications and requirements of this project, all medical information of the patients was linked to HIMS system, which is considered one of the latest used systems in this field.

Also, all the electro-mechanical systems of the hospital were linked to BMS system to control and monitor all project equipment.

Al Najaf TeachingHospitalAl Najaf Al Ashraf - Iraq.

Owner : Ministry of Health - Iraq Republic

Client : Ministry of Health - Iraq Republic

Consultant : ITEC

Finish date : Dec. 2014

Page 35: Company Profile - MechaTronics Egypt€¦ · Buildings Sahel – Saharaa Center Owner : Ministry of Defense Client : Ministry of Defense Consultant: Ministry of Defense Finish date:

32MechaTronics

OutboardProjects

Kazimia General HospitalBaghdad - Iraq

Owner : Ministry of Health - Iraq RepublicClient : Ministry of Health - Iraq RepublicConsultant : Ministry of Health - Iraq RepublicFinish date : Apr. 2015

Due to the development needs of the hospital in the Kazimia district of Baghdad City, 4 modern operations rooms have been added, as well as a post-op and intensive care wards.

All electro-mechanical works of operating rooms have been executed using central conditioning of DX units with total capacity of 180 T.R for the electrical works, and low current systems.

Al Najaf Teaching Hospital Al Najaf Al Ashraf - Iraq.

Page 36: Company Profile - MechaTronics Egypt€¦ · Buildings Sahel – Saharaa Center Owner : Ministry of Defense Client : Ministry of Defense Consultant: Ministry of Defense Finish date:

33 MechaTronics

GalleryProjects

Page 37: Company Profile - MechaTronics Egypt€¦ · Buildings Sahel – Saharaa Center Owner : Ministry of Defense Client : Ministry of Defense Consultant: Ministry of Defense Finish date:

34MechaTronics

GalleryProjects

Page 38: Company Profile - MechaTronics Egypt€¦ · Buildings Sahel – Saharaa Center Owner : Ministry of Defense Client : Ministry of Defense Consultant: Ministry of Defense Finish date:
Page 39: Company Profile - MechaTronics Egypt€¦ · Buildings Sahel – Saharaa Center Owner : Ministry of Defense Client : Ministry of Defense Consultant: Ministry of Defense Finish date:
Page 40: Company Profile - MechaTronics Egypt€¦ · Buildings Sahel – Saharaa Center Owner : Ministry of Defense Client : Ministry of Defense Consultant: Ministry of Defense Finish date:

Company

Profile

MechaTronicsImplementation of Integrated Systems is our Aim

www.mechatronics-eg.com

43 Palm City, Intersection of Ring Road and Al-Sahid Axis, Mokattam, Cairo - Egypt

(+202)231 52 326

(+202)231 52 194

(+2)010 003 03 810

E-mail: [email protected]

www.mechatronics-eg.com


Recommended