COMPANY PROFILE
Transcript
Page 1: COMPANY PROFILE · Stress Analysis software implemented ... Uhde Shedden; Aker Kvaerner. SEAN FITZGERALD Technical Director | BEng (Chem ... Smart Piping & …

COMPANY PROFILE

Page 2: COMPANY PROFILE · Stress Analysis software implemented ... Uhde Shedden; Aker Kvaerner. SEAN FITZGERALD Technical Director | BEng (Chem ... Smart Piping & …

CONTENTS1

2

3

4

5

6

7

8

9

10

11

WHO WE ARE

PROCESS CONSULTANTS AT A GLANCE

SERVICES WE PROVIDE

OUR PEOPLE

OUR VALUES

HEALTH, SAFETY & ENVIRONMENT FOCUS

INNOVATIVE SYSTEMS & TOOLS

QUALITY

PROJECT LOCATIONS

PROJECT REFERENCE LIST

CASE STUDY PORTFOLIO

Page 3: COMPANY PROFILE · Stress Analysis software implemented ... Uhde Shedden; Aker Kvaerner. SEAN FITZGERALD Technical Director | BEng (Chem ... Smart Piping & …

oneWHO WE ARE

Process Consultants is a growing organisation with a unique set of skills, know-how and track record of excellence in projects and services delivery. We are passionate about being innovative and challenging the “status quo” to deliver the best possible outcomes for our customers.

We recognised dissatisfaction in the industry with highly bureaucratic, unresponsive and inwards focused providers.

As a new organisation, unburdened by the past, we have been able to adopt the latest enterprise class technology that improves efficiency and streamlines workflows, delivering better value to our customers.

Customers felt bound to larger organisations as they offered the full range of services required to deliver projects.

Through referrals, established relationships, a broad technical capability, and a track record of delivering on our promises, our clients have found us to be the ‘right fit’ to deliver over 50 projects across a number of facilities; most notably in Fuel Terminals, Gas Processing, Glass Manufacturing, Mercury Removal, Olefins Processing, Resins Manufacturing and Infrastructure.

WOULD WE FIT WELL WITH YOU TOO?

The following company profile aims to provide potential customers with an introduction to our services, our capability, personnel, and our previous work completed.

With our office in Melbourne, our customers are benefiting from our highly experienced, passionate and responsive multidisciplinary team focused on delivery of practical and pragmatic solutions.

Page 4: COMPANY PROFILE · Stress Analysis software implemented ... Uhde Shedden; Aker Kvaerner. SEAN FITZGERALD Technical Director | BEng (Chem ... Smart Piping & …

Company founded

by 3 Directors

Office established in World Trade

Centre, Melbourne

Process Consultants wins first customer supporting

organisational restructure of BP’s Fuel

Terminal Assets

Intergraph’s CADWorx 3D

modelling software implemented

Fifth customer awards Process

Consultants engineering

services work

Intergraph’s CAESAR II

Stress Analysis software

implemented

AspenTech software

implemented as process simulation software

50+ Projects executed

across growing customer base

Equipment procured exceeds $10M

Established

engineering capability ready for next phase

of growth

Transition fully to digital workplace completed

All projects, all engineering services 100%

paperless

WorkflowMax project enterprise

software implemented

Process Consultants wins first simulation study work

Full multi-discipline capability team

in place

30 Employees

Tenth customer awards Process

Consultants engineering

services work

15 employees, 1st graduate

engineer recruited

APPEA Associate

Membership

Process Consultants

delivers $1.8M of services in 2015/16 FY

Instrumental/Electrical &

Civil/Structural capability added

to team

Process Consultants

executes >1000 hoursof time onsiteincident free

FEB 2015

MAR 2015

JUN 2015

FEB 2016

OCT 2015

AUG 2015

DEC 2015

AUG 2016

SEP 2016

NOV 2016

MAR 2016

JUL 2016

OCT 2016

MAY 2016

JUN 2016

JAN 2016

JAN 2017

DEC 2016

Development of systems

& tools commenced

twoPROCESS CONSULTANTS AT A GLANCE

Two years in business for

Process Consultants

First fullfinancial year

for thecompany

Growth in repeat business across the company

Australia widedilapidation

review of ATOM fuel terminalscompleted

Page 5: COMPANY PROFILE · Stress Analysis software implemented ... Uhde Shedden; Aker Kvaerner. SEAN FITZGERALD Technical Director | BEng (Chem ... Smart Piping & …

threeSERVICES WE PROVIDE

Process Consultants provide customers with end-to-end delivery of projects, access to technical expertise, and operations & maintenance support.

Our Engineering personnel provide support services including:

• Project initiation and management• Concept selection• Feasibility studies• Front end engineering design• Detailed engineering design• Procurement & expediting• Operations & maintenance• Shutdown support including construction, commissioning and handover

The engineering and design disciplines that we have in-house include:

• Process• Technical Safety• Mechanical - Static and Rotating• Piping• Electrical, Instrumentation and Control Systems• Civil and Structural• Construction

To compliment engineering delivery we have a strong team of 3D and 2D CAD designers and drafting personnel for detailed design and as-building, and can support on-going maintenance of facility critical drawings and other documentation.

The specialist capabilities we have in-house include:

• Project portfolio management• Cost estimation• Design review, HAZOP and SIL facilitation, and peer reviews• Taproot style incident investigations• Fire protection and risk assessment• Hazardous area (Class H) licenced electrical inspectors• Advanced structural analysis• Dynamic simulation and steady-state flow assurance• Safety case impact assessment updates and management• Regulatory support• Procurement strategy• Client side project delivery

Our team is established, well connected and reputable in the local process and infrastructure industry. We have a comprehensive understanding of process facility design and supporting infrastructure and a track record of delivering portfolios of projects competently, safely and efficiently.

One of our strengths is our ability to attract high calibre individuals with specialist training & competencies.

Page 6: COMPANY PROFILE · Stress Analysis software implemented ... Uhde Shedden; Aker Kvaerner. SEAN FITZGERALD Technical Director | BEng (Chem ... Smart Piping & …

MICHAEL STANSFIELD Managing Director | BEng (Chem)

Previous Experience / Strengths | Leadership of Process Engineering & Multidiscipline Project Teams; Offshore & Onshore Oil and Gas Production; LNG; Mercury Removal Facilities; Clean Fuels & Refining; Gas Sweetening & Sulfur Removal; Fuel Terminals; Project Planning and Execution; Process Improvement; Commissioning and Performance Testing.Former Established Relationships | Esso; ExxonMobil; Nexus Energy; Santos; BP; OneSteel; Shell; Wood Group; WorleyParsons; Bechtel; MW Kellogg; CB&I; Uhde Shedden; Aker Kvaerner.

SEAN FITZGERALD Technical Director | BEng (Chem), BSci

Previous Experience / Strengths | Leadership of Process Engineering & Multidiscipline Project Teams; Offshore & Onshore Oil and Gas Production; Early Phase Project Concept Selection Studies & Workshops; Packaged Equipment Design & Supply; Project Planning and Execution; ‘Fit-For-Purpose’ Engineering Delivery; Process Improvement, Commissioning and Performance Testing.Former Established Relationships | Esso; ExxonMobil; Origin Energy; Wood Group; WorleyParsons; Process Group.

GEOFFREY CONSTABLE Projects & Alliances Director | MMgt, BEng (Mech), MIEAust, CPEng

Previous Experience / Strengths | Alliance Management; Leadership of Multidisciplinary Project and Operations Teams; HSE; Onshore Gas Processing; Petrochemicals Processing; Fuel Storage Terminals; Project Planning and Execution; Maintenance & Reliability; Commissioning and Operational Experience.Former Established Relationships | Qenos; Lochard Energy; Woodside; Origin Energy; ExxonMobil; Samsung Heavy Industries; Total; WorleyParsons.

fourOUR PEOPLE

Since our inception, we have built a group of technically focussed multi-discipline personnel. This group comprises a strong leadership team and our company founders, which ensures that we maintain focus on both near-term project success and the preservation of the longer-term service provider / customer relationship.

This group is supported by our local technical experts, engineers and designers which ensures timely delivery of production or deadline critical multi-disciplinary technical and consulting services, something that is unique for a company of our size.

Page 7: COMPANY PROFILE · Stress Analysis software implemented ... Uhde Shedden; Aker Kvaerner. SEAN FITZGERALD Technical Director | BEng (Chem ... Smart Piping & …

fiveOUR VALUES

Process Consultants is driven by its 4 core values. These values guide our decision making on a day-to-day basis and ensure we remain focussed on our objectives, both short and longer term.

LIVESAFETY LIVELONG

LIVESMART LIVELOCAL

INTEGRITY

INNOVATION

ENDURINGRELATIONSHIPS

SOCIALRESPONSIBILITY

LIVESAFETY We are committed to making Process Consultants a 100% safe and injury free workplace, and aim to protect our customers and the general public by embedding safety in all phases of project delivery.

LIVELONG We are committed to long term client relationships through delivery of sustainable and efficient engineering services. Our approach is to ensure delivery of the optimal solution today yet place an even greater focus on achieving exceptional performance over the longer term.

LIVELOCAL We are committed to local workers and companies, and deliver benefits in the short and long term by doing things locally.

LIVESMART We focus our effort on the right approach to help our clients meet their objectives. We seek to utilise the smartest and most innovative technology and training for our people.

Our strong commitment to these values has helped us build a vibrant company with committed and customer focussed employees.

Page 8: COMPANY PROFILE · Stress Analysis software implemented ... Uhde Shedden; Aker Kvaerner. SEAN FITZGERALD Technical Director | BEng (Chem ... Smart Piping & …

sixHEALTH, SAFETY & ENVIRONMENT FOCUS

Total commitment to HSE in our business, and in the meeting of the expectations of our customers, employees and the community we work in, is underpinned by our own LIVESAFETY value and HSE Policy.

Our key personnel have a proven track record of delivering exceptional support to major hazard facilities and are HSE leaders. We share our experiences and knowledge, and provide the training and oversight required to engage less experienced personnel in our business.

We’re focused on HSE in:

• Design• Inherently safe equipment and process specifications• Adequate design challenge through Design Reviews• HAZOPs, SIL assessments etc.,• Appropriate risk reduction measures through adoption of ALARP principles

• Operations• Safe commissioning practices• Critical controls• Operating procedures and instructions• Emergency response, etc.

• Maintenance• Work permits

• JSEA,

• Contractor assessments

• Planning etc.

Process Consultants understand the importance of compliance with our customer’s HSE policies and procedures.

Page 9: COMPANY PROFILE · Stress Analysis software implemented ... Uhde Shedden; Aker Kvaerner. SEAN FITZGERALD Technical Director | BEng (Chem ... Smart Piping & …

Software packages that we currently hold licencing agreements for, includes:

Aspen Engineering Suite 45 packages in total; including HYSYS, Aspen Exchanger Design & Rating, Flare System Analyser and Aspen Capital Cost Estimator

AutoCAD 2016 & 2017 Industry leading CAD software

Intergraph CADWorx Plant Professional

3D plant modelling, isometric generation, material take-offs, smart line lists and equipment lists.

Intergraph CADWorx PID Professional

Smart Piping & Instrumentation Diagrams

Intergraph CAESAR II Pipe stressing analysis with integration to CADWorx

SPACE GASS Leading structural engineering software for 3D structural design, analysis and bill of materials generation.

TNO EFFECTS 10 Consequence modelling software suited to the assessment of fire contingencies, development of radiation contours, etc.

Fluidflow 3 Hydraulic modelling of firewater protection systems.

MS Project Project scheduling and management software

Innovative systems implemented in our business to date include:

• WorkflowMax & Xero – industry leading ‘cloud’ based job management andaccounting software. Used for project timekeeping, manpower resourcing, projectexpenditure tracking and control, invoicing, payroll and business reporting.

• Enterprise class data storage – we use a trusted Citrix ‘cloud’ based platform toensure the data we manage is protected. This underpins our use of a fully digitalplatform for development and storage of project information, including our masterand check print files. The Citrix software employs the highest levels of data securityand encryption currently available, accessible remotely from any computer with aninternet connection.

• Secure and reliable customer access – our platform not only ensures data is secure, but facilitates sharing of files with our customers up to 100GB at a time, controlledaccess to project files through distribution groups, and formal document transmittalof issued project deliverables. We can provide our customer’s personnel with anunlimited number of accounts to work with us collaboratively free of charge.

• Fully paperless digital workflows – we use iPad Pro devices, a secure and trustedfile storage system, and electronic workflow software to replace all ‘normal’ paperbased activities. We have significantly reduced time wasted in handling hard copiesof documents and in the managing of document review cycles internally, withvendors, and with our customers.

sevenINNOVATIVE SYSTEMS & TOOLS

Process Consultants maintains a suite of industry standard software packages that allows us to efficiently deliver engineering projects.

The Process Consultants value of ‘LIVESMART’ drives us to be an innovative and customer focussed company. As part of this drive, we have developed a way of working which is unique in the industry, and has set a new benchmark in how engineering services can be delivered.

Page 10: COMPANY PROFILE · Stress Analysis software implemented ... Uhde Shedden; Aker Kvaerner. SEAN FITZGERALD Technical Director | BEng (Chem ... Smart Piping & …

eightQUALITY

Our processes and approach to quality management are aligned with the 2015 edition of ISO9001 which is significantly updated from previous versions.

Our processes:

• Are fully paperless, and allow for efficient electronic checking and sign-off

• Have an emphasis on competence of personnel, and give authorised personnelroom to use their skills to achieve the best outcomes

• Were developed by the experts in doing that specific process

• Scale requirements depending on the criticality of the work

• Identify individual needs of clients and tailor delivery accordingly

• Cover ten business functions: six external and four internal, as outlined below

CODE Tier 1 - Manuals Tier 2 Tier 3

EXTERNAL PRM Project Management

Operating ProceduresPoliciesGuidesForms

Templates

Project, Contract or Customer specific:

ProceduresPoliciesGuidesFormsPlans

END Engineering and Design

PRC Procurement

CTR Contracts

CON Construction and Commissioning Management

CRP Customer Relationships and Proposals

INTERNAL FIN Finance

HRX People and Resources

HSE Health, Safety, Environment and Security

QAC Quality Assurance and Quality Control

Quality Manual

In the last decade, there has been a revolution in the way that enterprises create, organise and disseminate information, and legacy procedures relying on hard copy prints are no longer industry best practice.

• Have a feedback loop on the quality of outcomes to adapt and fine-tune processes We are progressing to have our Quality Management System independently certified to ISO 9001, with a target completion date of mid 2018.

Page 11: COMPANY PROFILE · Stress Analysis software implemented ... Uhde Shedden; Aker Kvaerner. SEAN FITZGERALD Technical Director | BEng (Chem ... Smart Piping & …

HOBART

CAIRNS

ESPERANCE

PORT CAMPBELL

ADELAIDE

KALGOORLIE MELBOURNE

NEWCASTLE

BRISBANE

GLADSTONEMACKAY

TOWNSVILLE

THAILAND

50+ PROJECTSDELIVERED

PROJECT LOCATION

PERTHGERALDTON

PORT HEDLANDBROOME

BURNIE

ninePROJECT LOCATIONS

Page 12: COMPANY PROFILE · Stress Analysis software implemented ... Uhde Shedden; Aker Kvaerner. SEAN FITZGERALD Technical Director | BEng (Chem ... Smart Piping & …

Client / Operator Facility Development / Project

2017

ExxonMobil Snapper “A” Platform A21A Well Development HAZOP

BP Australia / ATOM Geraldton Terminal Fire Water System Upgrade – Define Phase

Qenos Altona Chemical Complex Olefins Unit Consulting

Schneider Electric Chacheongsao Thailand Process Response Times for SIL Assessment

BP Australia / ATOM Port Hedland Terminal Fire Water System Upgrade – Define Phase

2016

Lochard Energy Iona Gas Plant Train 1 Compressors Vents & Drains Replacement

Lochard Energy Iona Gas Plant Methanol Tank Conversion

Iona Gas Plant Slug Catcher Flow Metering

Port Hedland Terminal Fire Water System Upgrade – Select Phase

Lochard Energy Iona Gas Plant MEG Overhead Condenser Replacement

Hexion Brimbank Chemical Complex Confidential Project

BP Australia / ATOM Geraldton Terminal Fire Water System Upgrade – Appraise Phase

Lochard Energy Iona Gas Plant Fire Water Pump Replacement

Lochard Energy Iona Gas Plant Train 1 Gas Quality Analyser

Viridian Dandenong Plant Confidential Project

Lochard Energy Iona Gas Plant Low Inlet Pressure Study

BP Australia / ATOM Port Hedland Terminal Berth 1 Wharf Line Repair

2015

BP Australia / ATOM Kewdale Terminal Additional Fire Water Tank

BP Australia / ATOM Hobart Terminal Additional Fire Water Tank

BP Australia / ATOM Port Hedland Terminal Berth 3 Wharf Line Repair

BP Australia / ATOM Newcastle Terminal Vapour Recovery Unit

BP Australia / ATOM Largs North Terminal Bunding Upgrade

BP Australia / ATOM Geraldton Terminal Ultimate Diesel Additive Skid

BP Australia / ATOM Newcastle Terminal M98 Storage And Despatch

BP Australia / ATOM Broome Terminal Fire Water System Upgrade

Toxfree Wheatstone LNG Commissioning Services

Origin Energy Otway Gas Plant Halladale, Black Watch & Speculant Development

tenPROJECT REFERENCE LIST

Lochard Energy Iona Gas Plant Fire Water Pumps Replacement Project

Lochard Energy Iona Gas Plant Gas Quality Analyser Replacement Project

BP Australia / ATOM

Lochard Energy

ExxonMobil Bass Strait Platforms Plant Surveillance & Optimisation Support

Page 13: COMPANY PROFILE · Stress Analysis software implemented ... Uhde Shedden; Aker Kvaerner. SEAN FITZGERALD Technical Director | BEng (Chem ... Smart Piping & …

Process Consultants have delivered a wide range of multidiscipline services across numerous industry sectors from preliminary conceptual design through execution.

Case Study / Discipline

Design & Procurement Services (I) Vapour Recovery l l l l l l

Design & Procurement Services (II) M98 Fuel Storage l l l l l l

Project Scoping Services l l l l l l l l

Capital Cost Estimation l l l l l l l

Design & Procurement Services (III) Gas Dewpoint Analyser l l l

Consulting Services Dilapidation l l l l

Civil & Structural Engineering Services l l

Strategic Advice Mercury Impacts Assessment l

Commissioning Services Fire System l l

Fire Safety Design Services l

Proc

ess

Fire

Eng

inee

ring

Mec

hani

cal /

Pip

ing

Esti

mat

ing

Civ

il / S

truc

tura

l

Pro

cure

men

t

Inst

rum

ent

/ Ele

ctri

cal

O&

M

elevenCASE STUDY PORTFOLIO

Page 14: COMPANY PROFILE · Stress Analysis software implemented ... Uhde Shedden; Aker Kvaerner. SEAN FITZGERALD Technical Director | BEng (Chem ... Smart Piping & …

THE SCOPE OF WORK

Process Consultants developed the commissioning strategy, procedures, and checklists for new Fire Water Pumps, Foam Concentrate Pumps, Foam Proportioning, Fire Water Ring Main, and Storage Tank Cooling Water Spray systems.Process Consultants also developed the commissioning schedule and resource requirements, and provided site personnel to execute the commissioning activities.

BP BROOME TERMINAL | FIRE WATER SYSTEM UPGRADE

WHY PROCESS CONSULTANTS?Process Consultants retains experienced Fire Safety engineers, as well as other engineering personnel with significant commissioning and operational experience to execute and co-ordinate such site works.The multi-disciplined teams at Process Consultants offices remain on hand to support troubleshooting and resolution of commissioning issues as they occur.

THE RESULTSProcess Consultants safely executed the commissioning to meet the requirements of AS1940, AS2941 and NFPA11. Operational impacts and risks were successfully identified and mitigated.Minimising the outage of fire protection services during commissioning was a key requirement for the project. Cutover to the new facilities was achieved in a three day window per agreed schedule.The new facilities were seamlessly handed over to operations.

COMMISSIONING SERVICES

Page 15: COMPANY PROFILE · Stress Analysis software implemented ... Uhde Shedden; Aker Kvaerner. SEAN FITZGERALD Technical Director | BEng (Chem ... Smart Piping & …

THE SCOPE OF WORK

Process Consultants performed a Fire Study to support the upgrade of the fire water system at a bulk storage terminal.The assessment included the maximum firewater demand calculations to meet AS1940 requirements, and the sizing of associated equipment including new fire water pumps, fire water tanks, foam concentrate pumps, and foam tank.Process Consultants also performed the design and sizing of the replacement fire water ring main, and detailed design of new bulk storage tank cooling water spray systems.

BP PORT HEDLAND TERMINAL | FIRE WATER SYSTEM UPGRADE

WHY PROCESS CONSULTANTS?Process Consultants retains skilled Fire Safety Engineers, with significant experience in performing maximum fire water demand calculations, hydraulic design of fire water piping networks, and design of tank cooling water spray systems. Process Consultants utilize a suite of industry standard software packages, such as FluidFlow for hydraulic models, and TNO Effects for radiant heat consequence modelling.

THE RESULTSThe close proximity of eight bulk storage tanks in a compound presented multiple, complex “Tank on Fire” / “Tank at Risk” scenarios.Process Consultants successfully completed the analysis, and were able to offer tank cooling water spray arrangements that reduced maximum firewater demand by 15%, with an associated reduction in fire water pump and tank sizing. Following analysis of the fire water ring main network and proposed location of deluge supply lines, the ring main was able to be reduced by one line size compared to the original conceptual arrangement, and all equipment located outside critical radiant heat contours.

FIRE SAFETY DESIGN SERVICES

Page 16: COMPANY PROFILE · Stress Analysis software implemented ... Uhde Shedden; Aker Kvaerner. SEAN FITZGERALD Technical Director | BEng (Chem ... Smart Piping & …

DESIGN & PROCUREMENT SERVICES

THE SCOPE OF WORK

Process Consultants performed the mechanical, civil, structural, and fire safety design for a new unit to recover vapours from tanker filling operations, and return the captured hydrocarbon to bulk storage. Process Consultants also performed the technical bid evaluation for the vendor supply equipment package.

BP NEWCASTLE TERMINAL | VAPOUR RECOVERY UNIT

WHY PROCESS CONSULTANTS?Process Consultants have in-house capability across all engineering disciplines, and utilise a suite of industry standard software packages to streamline delivery.Process Consultants personnel have significant experience in specifying and evaluating equipment, and integrating vendor supplied items into complex and challenging brownfields environments.

THE RESULTSProcess Consultants successfully supported the integration of this complex $2.2M package into the facility, within project schedule requirements.Engineering services were tailored to meet the specific project requirements, with non-essential deliverables eliminated from scope.A key project objective was to limit the impact of on-site construction activities on the facility. This was accomplished by meticulous review of the brownfields tie-in locations, and maximisation of off-site works.

Page 17: COMPANY PROFILE · Stress Analysis software implemented ... Uhde Shedden; Aker Kvaerner. SEAN FITZGERALD Technical Director | BEng (Chem ... Smart Piping & …

DESIGN & PROCUREMENT SERVICES

THE SCOPE OF WORK

Process Consultants performed the process, civil, structural, mechanical, pipe stressing and fire safety design for a new system to expand the storage capacity of M98 fuel blend, including the installation of new ethanol storage tanks, and modifications to API 650 bulk storage tanks and piping.Process Consultants took the conceptual design through detailed design, including code checks to confirm the suitability of double walled tanks for ethanol storage.

BP NEWCASTLE TERMINAL | M98 FUEL STORAGE & SUPPLY

WHY PROCESS CONSULTANTS?Process Consultants have in-house capability to ensure regulatory compliance, while delivering fit for purpose design that meets industry standards and practices.Process Consultants personnel provide innovative solutions that reuse existing equipment, and integrate new facilities into complex and challenging brownfields environments.

THE RESULTSProcess Consultants successfully supported the integration of the new $1.9M storage unit into the existing facility, meeting project schedule requirements.Engineering services were tailored to meet the specific project requirements, with non-essential deliverables eliminated from scope.Process Consultants scoped and specified modifications to the double walled ethanol storage tanks, allowing them to fully utilise available working volume, whilst meeting AS1940 requirements.

Page 18: COMPANY PROFILE · Stress Analysis software implemented ... Uhde Shedden; Aker Kvaerner. SEAN FITZGERALD Technical Director | BEng (Chem ... Smart Piping & …

CONSULTING SERVICES

THE SCOPE OF WORK

Process Consultants were engaged to execute an Australia-wide site ‘dilapidation’ inspection of BP’s fuel terminals as part of their transition to a new management model. The purpose of the inspections was to provide a baseline for the state of the assets of each site for both contractual and operational purposes.

BP AUSTRALIA | TERMINAL DILAPIDATION INSPECTIONS

WHY PROCESS CONSULTANTS?Process Consultants have a highly capable multi-discipline engineering team. Our personnel have many years of experience working at industrial sites including oil & gas facilities in roles including operations, maintenance and project delivery. This experience meant Process Consultants was ideally placed to be able to develop the plan, estimate the overall cost and timeline, and manage and report outcomes of the site visits to the end customers.

THE RESULTSThe Process Consultants team developed the terms of reference, condition assessment criteria, project budget and timetable for the 4-month site visit and reporting program prior to submitting these to the customer for approval. Following approval, the three-man multidiscipline Process Consultants team commenced the 15-off site visits to South Australia, West Australia, Queensland, New South Wales and Tasmania.The site visits and subsequent reports were completed safely, on time and under budget, and with minimal impact of the day-to-day operations and personnel activities at each of the sites. The reports rated the condition of all assets in a hierarchy from unsafe, poor, fair to good and provided recommendations on rectification works required, along with a timeline for this rectification work and supporting documentation including checklists and photography. The outcome of these reports was also used as an input to the subsequent budget cycle for site improvements and project development.

Page 19: COMPANY PROFILE · Stress Analysis software implemented ... Uhde Shedden; Aker Kvaerner. SEAN FITZGERALD Technical Director | BEng (Chem ... Smart Piping & …

CIVIL & STRUCTURAL ENGINEERING SERVICES

THE SCOPE OF WORK

Process Consultants was engaged to perform an independent constructability and compliance review of the bund upgrade design for the existing BP Largs North terminal. The bunds walls and floor were to be upgraded while the tanks and pipes remained operational. The purpose of the review was to identify elements of the design and/or site conditions that may have contributed to the higher than expected construction cost estimates and to look at cost saving options.

BP AUSTRALIA | LARGS NORTH BUND UPGRADE CONSTRUCTABILITY REVIEW

WHY PROCESS CONSULTANTS?Process Consultants’ Civil and Structural Engineers have extensive design and site experience across many industries including oil & gas, mining and manufacturing. They have successfully provided civil and structural design solutions for small to large complex projects and are focussed in developing designs that are both practical and cost effective.

THE RESULTSProcess Consultants reviewed the extent of works in the design and looked at the constructability of the proposed works. The assessment identified design elements such as the excavations, the use of Geofabric Clay Layer (GCL) and the thickness of the concrete, to be both conservative and difficult to construct, particularly for a brownfield site.It was found that the critical design elements such as the excavations, concrete slab and walls could be significantly reduced in size and still be compliant to Australian Standards.Process Consultants also proposed alternatives that were more suitable for a brownfield site such as a concrete slab in lieu of buried GCL and the use of fibre reinforced concrete under pipe runs instead of reinforced concrete.The quantities and cost of the proposed recommendations were calculated and found to be approximately 20% more cost effective than the designed works.

Page 20: COMPANY PROFILE · Stress Analysis software implemented ... Uhde Shedden; Aker Kvaerner. SEAN FITZGERALD Technical Director | BEng (Chem ... Smart Piping & …

STRATEGIC ADVICE

THE SCOPE OF WORK

Process Consultants performed an independent technical assessment of a mercury removal concept to support our client in their commercial negotiations with JV partners.The assessment scope covered a broad range of considerations, from the adequacy of mercury sampling undertaken, to the suitability of the proposed mercury treatment concept to mitigate risks to product quality, facility integrity, operations personnel and the environment.

CONFIDENTIAL CLIENT | MERCURY IMPACTS ASSESSMENT

WHY PROCESS CONSULTANTS?Process Consultants retain skilled Process Engineers with highly sought after expertise in Mercury Removal from hydrocarbons. We are experienced in the facilitation of options identification and selection workshops which are highly effective in aligning stakeholders on technical, environmental, OH&S, regulatory and commercial risks associated with delivery of these types of projects. Our established relationships with leading mercury adsorbent vendors, chemists and sampling experts, along with an end-to-end multidiscipline engineering and design capability, underpin our unique and impartial service offering.

THE RESULTSProcess Consultants quickly responded with a mercury mitigation concept that provided our client with a strong strategic position to protect their commercial interests in the facility, but also provided sufficient background and basis for further negotiation with JV partners. We demonstrated an in-depth understanding of the customer’s facility and our ability to assess the broader risks associated with the various treatment options. Bottom line savings for our client and the other JV partners were in the millions of dollars.

Page 21: COMPANY PROFILE · Stress Analysis software implemented ... Uhde Shedden; Aker Kvaerner. SEAN FITZGERALD Technical Director | BEng (Chem ... Smart Piping & …

DESIGN & PROCUREMENT SERVICES

THE SCOPE OF WORK

Process Consultants delivered the engineering and procurement of a new gas dewpoint analyser. The analyser was required to automatically sample the process stream and display and alarm both hydrocarbon and water dew points on the site DCS.

LOCHARD ENERGY – IONA GAS PLANT | GAS DEWPOINT ANALYSER

THE RESULTSThe project was delivered on-time and on-budget, and the required functionality was achieved.The energy and time required from client personnel was minimised. This was achieved by: • An accurate understanding of the project requirements from the outset• Taking technical responsibility for the project and raising technical queries

only when necessary• Communicating efficiently, and minimising the meetings and correspondence• Using Citrix ShareFile for document transmittals, and combining documents

for client review into single pdf compilation packs.The planned total cost of the project was correctly estimated prior to commencement, due to the experienced team’s ability to foresee the complete package.Process Consultants delivered a design that was clear, practical, simple and constructible. To reduce the cost of engineering work, drawings that were not required for as-building were redlined using iPad mark-ups, instead of CAD.

WHY PROCESS CONSULTANTS?Process Consultants engineering personnel have many years of hands-on experience in construction, commissioning and operations roles, as well as design roles. This practical approach to engineering was used to filter the design activities that add value in the real world. We listen and work together with client personnel to deliver the right solution in the most useful way. We look at the bigger picture in project delivery, and design with consideration to materials costs, construction efficiency and impact to existing operations.

Page 22: COMPANY PROFILE · Stress Analysis software implemented ... Uhde Shedden; Aker Kvaerner. SEAN FITZGERALD Technical Director | BEng (Chem ... Smart Piping & …

CAPITAL COST ESTIMATION

THE SCOPE OF WORK

Process Consultants were engaged by Hexion to prepare a +/-50% cost estimate for a new facility, comprising more than 40 process equipment items, 100 instruments, civil / structural, electrical and piping works. Hexion’s basis of estimate required a bottom up approach with full supporting definition including all assumptions, exclusions, contingencies, allowances, factors, indices, quotes and tools we used, together with full traceability back to the source documents. Detailed man hour costs were also required, broken down into design (FEED and detail by discipline) and management, procurement, construction (supervision, non-supervision by discipline) and pre-commissioning / handover.

HEXION – DEER PARK | CONFIDENTIAL PROJECT

WHY PROCESS CONSULTANTS?Process Consultants can mobilise a full multidiscipline engineering and design team, supported by an experienced estimator, to deliver detailed cost estimates for new facilities in short time frames. We have Aspen Capital Cost Estimator, in-house estimating sheets and an excellent rapport with local manufacturers and equipment suppliers who support us with quick turnarounds on budget pricing. Our people have the experience to develop conceptual designs and construction strategies sufficiently to bring the required confidence to the overall execution costs.

THE RESULTSOne of Process Consultants key achievements was mobilising a multidiscipline team to deliver the estimate to Hexion in the required time frame of 3 weeks.Our engineers engaged with 18 individual vendors, developed the conceptual design and prepared documentation including drawings, sketches, lists, material take-offs and engineering man-hour estimates. Our construction expert outlined the EPCM schedule and the basis for local site productivity factors, construction rates and indirect costs. Process Consultants undertook an engineering review to ensure the estimate details were accurately quantified in accordance with the scope documents, and then a peer review to verify all parameters of the estimate, including: • Basis of estimate in terms of engineering deliverables, level of definition;• Estimate details, pricing, man-hours and quantity review;• EPCM determination review;• Subcontractor indirect costs overview;• Estimating allowances; and• Contingency determination.

The estimate was well received by the Hexion and will be used to support the final investment decision on the facility.

Page 23: COMPANY PROFILE · Stress Analysis software implemented ... Uhde Shedden; Aker Kvaerner. SEAN FITZGERALD Technical Director | BEng (Chem ... Smart Piping & …

PROJECT SCOPING SERVICES

THE SCOPE OF WORK

Process Consultants were engaged to complete early to mid-phase scoping of a portfolio of projects that had been identified by the customer for future execution. The projects ranged from hot oil system improvements, gas quality measurement, plant isolation improvements through to multiple equipment access upgrades (platforms & ladders). The projects were in a preliminary stage which, due to the customer’s existing operational workload, had not been scoped. With the yearly project budgeting cycle being imminent it was necessary for the scoping to be completed quickly.

LOCHARD ENERGY – IONA GAS PLANT | PROJECT PORTFOLIO SCOPING

THE RESULTSProcess Consultants quickly mobilised to site with a multidiscipline team with engineering, design and construction know-how to scope each of the projects. Due to our high familiarity with the site, and the operational team, Process Consultants self-managed access to the relevant plant and equipment with minimal support from the customer who were engaged in day-to-day plant operations.Each of the projects was scoped with input from the relevant engineering disciplines and the next steps for each project was agreed and documented with the site personnel. For each project an early phase total installed cost (TIC) estimate was then developed and a report written for each project including confirming the next steps, relevant photographs and sketches, and TIC estimate. This report was submitted to the customer for inclusion in their project budget cycle. All work was completed successfully and to the satisfaction of the customer ahead of their project budget submission timeline.

WHY PROCESS CONSULTANTS?The Process Consultants multi-discipline engineering team has a depth of experience in scoping projects at any stage of their development. Our team can conceive and explain to the customer what design options should be considered along with the relative merits of each option. With this level of expertise Process Consultants quickly gains the confidence of both operational and management personnel to agree on a project direction and progress the project accordingly.

Page 24: COMPANY PROFILE · Stress Analysis software implemented ... Uhde Shedden; Aker Kvaerner. SEAN FITZGERALD Technical Director | BEng (Chem ... Smart Piping & …

Process Consultants Pty Ltd ACN 603 925 097

www.processconsultants.com.au

Level 7, 276 Flinders Street, Melbourne VIC 3000 | +61 3 9013 5400

February 2018


Recommended