1/21
Comparison of Different Coal-basedPower Generation Technologies
A Subcomponent of the WHRC Project on
Climate Policy for Development in Emerging Economies
Sponsored by Hewlett Foundation
Conducted by Energy Technology Innovation Policy and
Institute of Engineering and Themophysics of China
Prepared by Lifeng Zhao (ETIP)
Oct. 12, 2007
7/29/2019 comparison of coal based power plants
2/21
2
Brief Introduction Data Collection
Thermodynamic Performance Environmental Performance
Economic Assessment
Next Steps
Contents
7/29/2019 comparison of coal based power plants
3/21
3
Cost and performance differences among differenttechnology options Sub-critical PC, 600MW Sub-critical PC, 600MW+Flue gas desulfurization (FGD) Sub-critical PC, 600MW+FGD+ Flue gas denitrification Super Critical PC 600MW
Super Critical PC 600MW+FGD Super Critical PC 600MW+FGD+ Flue gas denitrification USC PC, 600MW USC PC, 600MW+FGD USC PC, 600MW+FGD+ Flue gas denitrification CFB 300MW IGCC 200MW
What should we do
Brief Introduction
7/29/2019 comparison of coal based power plants
4/21
4
Data needed for calculation of performance
typical coal types steam parameters, steam consumption, and heat recovery
system parameters of typical sub-critical, SC, and USC PCplants
technical parameters of gas turbine combined cycle powergeneration system
Data needed for calculation of economics equipment cost construction work cost installation work cost primary material cost fuel and power cost
Data Collection
7/29/2019 comparison of coal based power plants
5/21
5
Pathways to data collection
plant visits
attendance at conferences
technology vendor and manufacturercontacts
interviews with experts
Data Collection
7/29/2019 comparison of coal based power plants
6/21
6
No. Title Contents
1 Shan Xi Fertilizer plantFixed bed gasifier (equipment, construction engineering,
and installation engineering)
2Jilin Changshan Fertilizer(Group) Co., LTD.
Fluidized bed gasifier (equipment, constructionengineering, and installation engineering)
4East China University ofScience and Technology
Entrained-bed gasifier, including GE, Shell, and new coal-water slurry with opposed multi-nozzles gasifier
6
Air Products and
Chemicals (China)
Air Separation Unit (equipment, construction engineering,
and installation engineering)
7Air Liquide (Hangzhou)LTD., CO.
Air Separation Unit (equipment, construction engineering,and installation engineering)China Huadian Corporation
3 Yankuang Group
Entrained-bed gasifier (new coal-water slurry with
opposed multi-nozzles gasifier), sysgas cleanup unit(equipment, construction engineering, and installationengineering)
5Sichuan BluestarMachinery Co., Ltd
ShanxGaisifier manufacturei Luan Group
8
Test and demoNanjing
Turbine & ElectricMachinery (Group) Co.,LTD.
6B and 9E gas turbines, HRSG , steam turbine, auxiliary
system, Control system, electric system, water treatmentsystem, water supply system, fuel supply system,thermodynamic system
7/29/2019 comparison of coal based power plants
7/21
7
9Harbin BoilerCompany Limited
subcritical, supercritical, ultra supercritical boilers and CFBboilers
10 Shanghai Electric subcritical, supercritical, ultra supercritical boilers andsteam turbines, electric motors
12
North China Power
Engineering Co., LTD.
Financial discount rate, loan rate, loan ratio, depreciationperiod, depreciation residual rate, amortization of intangible
assets, amortization of deferred assets, Urban constructioncharge rate, Extra charges rate of education funs, Operatingearning tax rate, Income tax rate
14 Shenhua Group Coal price
15Clean EnvironmentalProtectionEngineering Co., LTD.
FGD, flue gas denitrification
11Zhengjiang Electric
Power Design Institute
Financial discount rate, loan rate, loan ratio, depreciationperiod, depreciation residual rate, amortization of intangibleassets, amortization of deferred assets, Urban construction
charge rate, Extra charges rate of education funs, Operatingearning tax rate, Income tax rate
13 China Huaneng Group
subcritical, supercritical, ultra supercritical PC power plants(capital, operations and maintenance costs), Construction
period, Operation period, Load of first year in the operationperiod, Load of second year in the operation period, Annualoperation hours
7/29/2019 comparison of coal based power plants
8/21
8
Site
Design Air Pressure 1atm
Design Temperature 298KRelative Humidity 55%
Transportation Rail access
Water Municipal
The design and calculation basisSite characteristicsCoal characteristics
Site Characteristics
7/29/2019 comparison of coal based power plants
9/21
9
Coal
Proximate Analysis%wt Ultimate Analysis%wtdrybasis
Moisture 10.56 Carbon 76.99
Fixed Carbon 52.52 Hydrogen 4.58
Volatile Matter 30.64 Oxygen 10.07
Ash 6.28 Nitrogen 0.94
Sulfur 0.4
ASH 7.02
As-Received LHVkJ/kg 26110
Base Coal Analysis Shendong Coal
7/29/2019 comparison of coal based power plants
10/21
10
Emissions Standards
Particulate matter: 100mg/Nm3
SO2: 450mg/Nm3
NOx: Vdaf20% 450 mg/Nm3
10%Vdaf20% 650 mg/Nm3
Vdaf10% 1100 mg/Nm3
7/29/2019 comparison of coal based power plants
11/21
11
Thermodynamic Performance
35
36
37
38
39
40
41
42
43
Sub-c
riticalP
C
Sub-c
ritica
lPC+F
GD
Sub
-critic
alPC
+FGD+S
NCR
SCPC
SCPC+
FGD
SCPC+F
GD+SNC
R
USCPC
USCPC+
FGD
USCPC
+FGD+S
NCR
C
FB
IGC
C(M
ulti-N
ozzlegas
ifier)
IGCC
(dry
coalpulveri
zed)
power
supply
efficien
cy(%)
7/29/2019 comparison of coal based power plants
12/21
12
Thermodynamic Performance
270
280
290
300
310
320
330
Sub-c
ritica
lPC
Sub-c
ritica
lPC+FG
D
Sub-c
ritica
lPC+
FGD+
SNCR
SCPC
SCPC+F
GD
SCPC+F
GD+SNC
R
USCPC
USCPC
+FGD
USCPC
+FGD
+SNC
RCFB
IGCC
(Multi-N
ozzle
gasifier
)
IGCC
(dry
coalpulve
rized)
Standardcoalc
onsumptionrate(g/kWh)
7/29/2019 comparison of coal based power plants
13/21
13
Environmental Performance
0.000
0.500
1.000
1.500
2.000
2.500
Sub-c
ritica
lPC
Sub-c
riticalP
C+FG
D
Sub-c
ritica
lPC+FG
D+SN
CRSC
PC
SCPC+F
GD
SCPC+F
GD+SNC
R
USCPC
USCPC
+FGD
USCPC
+FGD
+SNC
RCFB
IGCC
(Multi-N
ozzle
gasifier
)
IGCC
(dry
coalpulve
rized)
SO2E
missions(g/kWh)
7/29/2019 comparison of coal based power plants
14/21
14
Environmental Performance
0
100
200
300
400
500
600
700
800
Sub-c
riticalPC
Sub-c
ritica
lPC+FGD
Sub-c
ritica
lPC+
FGD+
SNCR
SCPC
SCPC+F
GD
SCPC+F
GD+SNCR
USCPC
USCPC
+FGD
USCPC
+FGD
+SNCR CFB
IGCC
(Multi-N
ozzle
gasifier)
IGCC
(dry
coalpulve
rized)
SO2Emissions(mg/Nm3)
Standard
7/29/2019 comparison of coal based power plants
15/21
15
Environmental Performance
0.000
0.200
0.400
0.600
0.800
1.000
1.200
1.400
1.600
Sub-c
riticalPC
Sub-c
ritica
lPC+FGD
Sub-c
ritica
lPC+FG
D+SNCR SCPC
SCPC+FGD
SCPC+F
GD+SNCR
USCPC
USCPC
+FGD
USCPC
+FGD
+SNCR CFB
IGCC
(Multi-N
ozzle
gasifier
)
IGCC
(dry
coalpulve
rized)
NOxEmissions(g/kWh)
7/29/2019 comparison of coal based power plants
16/21
16
Environmental Performance
0
50
100
150
200
250
300
350
400
450
500
Sub-c
riticalP
C
Sub-c
ritica
lPC+FG
D
Sub-c
ritica
lPC+FG
D+SNC
RSCP
C
SCPC+FG
D
SCPC+F
GD+SNC
R
USCP
C
USCPC
+FGD
USCPC
+FGD
+SNCR
CFB
IGCC
(Multi-N
ozzle
gasifie
r)
IGCC
(dry
coalpulve
rized)
NOxE
missions(mg/Nm3)
Standard
7/29/2019 comparison of coal based power plants
17/21
17
0.000
0.020
0.040
0.060
0.080
0.100
0.120
0.140
0.160
0.180
0.200
Sub-c
riticalPC
Sub-c
ritica
lPC+FGD
Sub-c
ritica
lPC+FG
D+SNCR
SCPC
SCPC+F
GD
SCPC+F
GD+SN
CR
USCPC
USCPC+F
GD
USCPC
+FGD
+SNCR
C
FB
IGCC
(Multi-N
ozzle
gasifie
r)
IGCC
(dry
coalpulveri
zed)
Particulate
MatterEmissions(g/kWh)
Environmental Performance
Environmental Performance
7/29/2019 comparison of coal based power plants
18/21
18
Environmental Performance
0
100
200
300
400
500
600
700
800
900
1000
Sub-c
riticalPC
Sub-c
ritica
lPC+FGD
Sub-c
ritica
lPC+FG
D+SNCR SCPC
SCPC+FGD
SCPC+F
GD+SNCR
USCPC
USCPC
+FGD
USCPC
+FGD
+SNCR CFB
IGCC
(Multi-N
ozzle
gasifier
)
IGCC
(dry
coalpulve
rized)
CO2
Emissions(kg/kWh)
7/29/2019 comparison of coal based power plants
19/21
19
Formation and Analysis System for InvestmentProject Feasibility Study is used to calculate totalplant investment and COE
The system was developed based on theguidelines on investment project feasibility study
issued by NDRC in 2002
Economic Assessment
7/29/2019 comparison of coal based power plants
20/21
20
Economic Assessment (cont.)
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Sub-c
ritica
lPC
Sub-c
ritica
lPC+FG
D
Sub-c
ritica
lPC+FG
D+SN
CRSC
PC
SCPC+F
GD
SCPC+F
GD+SNC
R
USCPC
USCPC
+FGD
USCPC
+FGD
+SNC
RCFB
IGC
C(M
ulti-N
ozzle
gasifier
)
IGCC
(dry
coalpulve
rized)
capital
cost(RMBYuan/kW)
7/29/2019 comparison of coal based power plants
21/21
21
Plan for Next Steps
Scenario design
Chinas own prediction for mid-term powerdemand
Efficiency improvement goals
Emission reduction goals
Costs and benefits (efficiency improvement
and emission reductions) of different scenarios
Policies for realizing a certain scenario