www.HaywardBaker.com Compensation Grouting Underground Grouting and Ground Improvement September 12, 2018 Golden, Colorado Phillip Gallet, P.E.
Transcript
Page 1: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

www.HaywardBaker.com

Compensation GroutingUnderground Grouting and Ground Improvement

September 12, 2018Golden, Colorado

Phillip Gallet, P.E.

Page 2: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

2

Presentation Outline

• What is Compensation Grouting

• Installation Methods/Monitoring

• Modeling of compensation grouting

• Finite element calculations for compensation grouting at Antwerp Central Station

• Case Histories

• Summary and conclusions

2

Page 3: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

3

Presentation Outline

• What is Compensation Grouting

• Installation Methods/Monitoring

• Modeling of compensation grouting

• Finite element calculations for compensation grouting at Antwerp Central Station

• Case Histories

• Summary and conclusions

3

Page 4: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

4

Grouting Processes

Page 5: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

5

Compensation Grouting -or- Soilfrac® Grouting

• Originally developed in the oil industry for fracturing formations to aide in the production of the well.

• Keller/Hayward Baker developed the process to accommodate small scale installation process for the geotechnical construction industry

• Allows precise control of lifting structures and when coupled with computer monitoring, control within millimeters

Page 6: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

6

Soilfrac® Process

Page 7: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

7

Uses for Soilfrac® Grouting

Page 8: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

8

Typical Grouting Ranges

Page 9: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

9

The injection pipes are made of multiple ported

tubes that allow design placement of grout

Grout after fracture initiated

Sleeve Port Pipe

Grouted Sheeth

Injection Port

Injection Pipe

Grout

Packer

Known as Tube-A-Manchette Pipes

Page 10: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

10

Exposed Soilfrac lenses following a single

grout injection

Page 11: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

11

Grouting Efficiency

• Ratio of ground volume change to grout volume injected

• Varies from site to site due to ground conditions

Page 12: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

12

Presentation Outline

• What is Compensation Grouting

• Installation Methods/Monitoring

• Modeling of compensation grouting

• Finite element calculations for compensation grouting at Antwerp Central Station

• Case Histories

• Summary and conclusions

12

Page 13: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

13

Several methods of installing the grout pipes are

available based upon site restrictions

13

Page 14: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

14

Compensation grouting from a shaft

14

Page 15: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

15

Compensation grouting from nearby basement

15

Page 16: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

16

Control of grouting parameters possible in real

time

16

All grouting parameters under real time control

Use of computer controlled pumping

units allow grout quantities to be

individually controlled controlled

pumping unit

Page 17: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

17

Typical instrumentation types and locations

considered for compensation grouting

17

Page 18: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

18

Sophisticated and non sophisticated methods

allow for movement monitoring

18

Systems allow monitoring within 0.005 in

Page 19: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

19

Presentation Outline

• What is Compensation Grouting

• Installation Methods/Monitoring

• Modeling of compensation grouting

• Finite element calculations for compensation grouting at Antwerp Central Station

• Case Histories

• Summary and conclusions

19

Page 20: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

20

Grout Consumption Corresponds to the

Settlement

20

Page 21: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

21

Problem Statement for modeling analyis

Page 22: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

22

Comparison of grouting techniques and how they

are modeled

a

Volume V 0

initial situation- grouted area

V

compactiongrouting

VolumeV + V 0

VolumeV + V0

Vi

V V= i

fracturegrouting

BASIC MODELLING OF THE GROUTING PROCESS ANDDEFINITION OF GROUTED AREA

Page 23: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

23

Deformation modes of the grouted zones used in

the modeling

z

heavedue to grouting

grouted zone

surface

O

h

a

x

a

a0

> 0 vertical shortening

< 0 horizontal shortening

> 0 contraction

< 0 expansion Initial

Deformed

= a / a0 = a´ / a

Page 24: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

24

Analytical solution proposed by Sageseta (1987)

( )

+−

++

=−

2

2

2

1*2

'1

'1*1*

'1

1****2

x

x

xh

aasz

Vertical:

( )

+−

++

−=−

2

2

2

1*2

'1

'1*1

'1

'****2

x

x

x

x

h

aasx

Horizontal:

DISPLACEMENTS AT GROUND SURFACE

sz … vertical displacementsx … horizontal displacementh … depth of injection/excavationa … radius of grouted zone/excavationx´ … normalized horizontal distance (x/h) … uniform radial deformation … ovalization… relative ovalization (/) … exponent for drained cases

Page 25: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

25

Presentation Outline

• What is Compensation Grouting

• Installation Methods/Monitoring

• Modeling of compensation grouting

• Finite element calculations for compensation grouting at Antwerp Central Station

• Case Histories

• Summary and conclusions

25

Page 26: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

26

ANTWERP CENTRAL STATION

Historical Landmark

High Loads considered

Minimal movement

Page 27: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

27

▪ 84 TAMs▪ 3500 m borings▪ 45 m max. length

wells

picture: Eurostation, Brussels

shaft

shaft

TAMs

ANTWERP CENTRAL STATION

Page 28: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

28

Graphic: Eurostation, Brussels

pipe roof

tunnel wall

picture: Eurostation, Brussels

ANTWERP CENTRAL STATION

Page 29: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

29

0.0 m

+8.0 m

Boomse Clay

-13.0 m

A B C D E F G H pipe roof

tunnel

ANTWERP CENTRAL STATION

Page 30: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

30

Compensation Grouting efficiency at Antwerp

Station

Page 31: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

FE-CALCULATIONS ANTWERP PROJECT

conditioned zone

foundations

pipes A-B-C-D

tunnel

Antwerp Sand

Boomse Clay

P 470P 455

FINITE ELEMENT MODEL

Page 32: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

COMPARISON MEASUREMENT – FE-MODELVERTICAL DISPLACEMENTS AT WATER LEVEL POINT P455

Schlauchwaagenmessung P 455

begin

ning

conta

ct gro

ut.

pipe B

comp.

B*

pipe D

comp.

D*

pipe A

comp.

A

pipe C

*

comp.

C

tunne

l exc

av.

disp

lace

men

t [m

m]

0,0

0,5

1,0

1,5

2,0

2,5

3,0

measurement P455 calculation P455

Page 33: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

COMPARISON MEASUREMENT FE-MODEL

Schlauchwaagenmessung P 470

begin

ning

conta

ct gro

ut.

pipe B

comp.

B*

pipe D

comp.

D*

pipe A

comp.

A

pipe C

*

comp.

C

tunne

l exc

av.

disp

lace

men

t [m

m]

0,0

0,5

1,0

1,5

2,0

2,5

3,0

3,5

measurement P470calculation P470

VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470

Page 34: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

34

Presentation Outline

• What is Compensation Grouting

• Installation Methods/Monitoring

• Modeling of compensation grouting

• Finite element calculations for compensation grouting at Antwerp Central Station

• Case Histories

• Summary and conclusions

34

Page 35: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

Soilfrac® - City-Tunnel LeipzigCentral Station

„Bayrischer Bahnhof“

Wilh. Leuschner Platz

Station MarktCentral Station

Page 36: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

Soilfrac® - City-Tunnel LeipzigDrilling

Page 37: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

Soilfrac® - City-Tunnel LeipzigControl of drilling deviation

Page 38: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

Soilfrac® - City-Tunnel LeipzigMonitoring

Page 39: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

Soilfrac® - City-Tunnel LeipzigGrout control

Grout volume

Vertical displacement

TAM

Page 40: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

ww

w.Ke

llerG

rund

bau.

com

Project “San Ruffillo”, Bologna, Italy

Tunnel excavation

Start shaft

N

Pk 0+966

twin tunnels with 15m distance

length 6,112m diameter 9.4m excavated

area 69.81m² cover 15 –

21m EPB-shield

Compensationgrouting

To Florence

Page 41: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

Problem statement

www.KellerGrundbau.com

expected volume loss of the TBM-excavation: 1% maximum advancement of the TBM: 10m/day

pier i pier j

displacement idisplacement j

span l

Compensation of differential settlements of piersAllowable differential settlement: Δ uij <= l/3000

Page 42: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

ww

w.Ke

llerG

rund

bau.

com

Compensation grouting “San Ruffillo”TYPICAL CROSS SECTION

Original design with SHAFT

fillsand

gravel, sandy,silty

grouting pipes2 layers

tunnel9.1m diameter

railway bridge

shaft

Page 43: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

43

Compensation grouting “San Ruffillo”

ww

TYPICAL CROSS SECTION

railway bridge

grouting pipes2 layersmaximum length 68mHDD-drilling

tunnel9.1m diameter

fillsand

gravel, sandy,silty

Page 44: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

ww

w.Ke

llerG

rund

bau.

com

Compensation grouting “Via Emilia”

MilanoFlorence

existing railway

bridge

length 112m

1 central arch (l=16.0m)

8 lateral arches (l=8.1m)

Via Emilia Levante

Page 45: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

ww

w.Ke

llerG

rund

bau.

com

Compensation grouting “Via Rimesse”

Milano Florence

Metro line („Suburbana“)

existing railway

bridge

length 41m

1 central arch (l=14.4m)

2 lateral arches (l=7.2m)

Page 46: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

46

Compensation grouting “Via Rimesse”

ww

Lower circuit > monitoring of vertical displacements (and rotations)

Upper circuit > vertical displacements

transition point

Page 47: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

www.KellerGrundbau.com

Compensation grouting “Via Rimesse”

Displacements resulting after TBM 2

> Maximum differential settlement 1.9mm

Page 48: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

www.KellerGrundbau.com

Compensation grouting “Via Rimesse”

3D graph of total grout volume

Page 49: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

San Francisco 3rd Street Light Rail - Central Subway Drilling and Grouting Programs

➢ Chinatown Station (CTS)➢ Issue: Adjacent Building Settlement along

Station Excavation➢ Solution: Compensation Grouting

➢ Union Market Square Station (UMS)➢ Issue: Adjacent Building Settlement along

Station Excavation➢ Solution: Compensation Grouting

9/24/2018 49

Page 50: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

3rd Street Light Rail - Central Subway Project Alignment

9/24/2018 50

Chinatown Station (CTS)

Union Market Square Station(UMS)

MosconeStation (YBM)

Page 51: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

CTS Compensation Grouting

9/24/2018 51

Total Installed Grout Holes = 94 Drilling Rigs = 2 on 2 Shifts TAM Installed = 13,320 LFT TAM Installation Rate = 73 LFT / Rig Shift Grout Injected = 86,000 Gal Grout Injection Rate = 1385 Gal / Shift Treatment = 10 Buildings – 41,150 Sq. Ft.

Pre-conditioning Statistics

Page 52: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

CTS Compensation Grouting

9/24/2018 52

TAM Pipe Array

Page 53: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

9/24/2018 53

CTS Compensation Grouting

Drilling and TAM Installation

Page 54: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

9/24/2018 54

CTS Compensation Grouting

Pre-conditioning Grouting

Page 55: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

Union Market Compensation Grouting

9/24/2018 55

Total Grout Holes = 209 Drilling Rigs = 1 on 2 Shifts TAM Installed = 19,605 LFT TAM Installation Rate = 94 LFT / Rig Shift Whips = 4 Grout Injected = 204,000 Gal Grout Injection Rate = 1416 Gal / Shift Treatment = 15 Buildings – 126,815 Sq. Ft. Completed 2017

Pre-conditioning Statistics

Page 56: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

9/24/2018 56

UMS Compensation GroutingTAM Pipe Array

Page 57: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

9/24/2018 57

UMS Compensation Grouting

Drilling and TAM Installation

Page 58: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

9/24/2018 58

UMS Compensation Grouting

Pre-conditioning Grouting

Page 59: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

Case History Annunciation Church

Page 60: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

Layout of Soilfrac® Pipes and Jet Grout Columns

Page 61: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

Amount of Movement Required

Page 62: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

Sleeve Pipe Installation

Page 63: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

Frac Grouting

Page 64: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

Results of Survey

Page 65: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

Grouting Recap

Installed 93 full and half triple system jet grout columns to depths exceeding 25 feet.

Installed 86 Soilfrac® pipes and pumped 4,178 cft of grout

Achieved plumbness within 0.12° of perfectly plumb from 0.44° and 0.34°, 65 to 75% correction.

Page 66: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

A New Foundation for Years to Come

Page 67: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

67

Compensation Grouting Program at Jack II• Access Shaft

• 34 Secant Piles• Monitoring Instrumentation

• Getec UK• Hydrostatic Leveling Cells (HLC)• Tiltmeters• Extensometers

• Preconditioning of TAM pipes• 3500+ ports• 5200 CFT grout

• Compensation Grouting• 9000 CFT grout

Page 68: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

68

Isometric View Looking Southwest

Compensation Grouting

Page 69: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

69

Compensation Grouting• Grouting Efficiency Factor

• 12 Quadrants • GEF = (Grout Tributary Area*Avg. Heave)/Grout Volume

Page 70: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

70

Compensation Grouting

Soil Frac

Pipes

Page 71: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

71

SUMMARY and CONCLUSIONS

• Finite element model proposed to simulate the effects of compensation grouting

• Numerical model compares well with analytical solution for elastic, undrained behaviour

• Compensation grouting allows for quicker tunnelling applications

• Precise levelling of sensitive structures is more efficient with compensation grouting

• HDD installation procedures extend the treatment possible on project sites

Page 72: Compensation Grouting - Tunneling Short Course · measurement P470 calculation P470 VERTICAL DISPLACEMENTS AT WATER LEVEL POINT P470. 34 Presentation Outline ... •Finite element

72

This is the Last SlideThank You!! Questions?

Dennis W. Boehm

[email protected]

281-668-1870