+ All Categories
Home > Documents > Complete Crewing Projects 2016

Complete Crewing Projects 2016

Date post: 16-Apr-2017
Category:
Upload: john-doyle
View: 195 times
Download: 0 times
Share this document with a friend
6
RECENT PROJECTS
Transcript
Page 1: Complete Crewing Projects 2016

RECENTPROJECTS

Page 2: Complete Crewing Projects 2016

WE KICKED OFF 2016 PROVIDING CREWS FOR A

PHARMECEUTICALLAUNCH AT THECHICAGO HILTONFEATURING THE

CONSTRUCTION OF A GROUND SUPPORTED 90’ X 22’ CURVED

LED VIDEOWALLIN THE

GRAND BALLROOM

Page 3: Complete Crewing Projects 2016

RECENTPROJECTS

22’ X 90’ GROUND SUPPORTED LED VIDEOWALL – CHICAGO HILTON

Page 4: Complete Crewing Projects 2016

RECENTPROJECTS

22’ X 90’ GROUND SUPPORTED LED VIDEOWALL – CHICAGO HILTON

Page 5: Complete Crewing Projects 2016

RECENTPROJECTS

22’ X 90’ GROUND SUPPORTED LED VIDEOWALL – CHICAGO HILTON

Page 6: Complete Crewing Projects 2016

INTERNATIONAL BALLROOM – CHICAGO HILTON

The same project had a General Session setconsisting of two widescreen blends, four

outboard scenic projections and three LED videowall tile stage backdops.


Recommended