PRIVATE TREATY SALEOn Behalf of Silnir Cyprus, a subsidiary of Subsea Infrastructure Ltd.
Complete Mobile ModularDesalination Plant
3 St. Helen’s Place | London EC3A 6AB | UKTel +44 (0)8453 130 140 | Fax +44 (0)8453 130 150
www.hilcoind.com
In conjunction with:
www.jaj.co
Available Immediately • Cyprus
2
AVAILABLE IMMEDIATELY
For more information, please visit our website at www.hilcoind.com
On Behalf of silnir Cyprus, a subsidiary of subsea Infrastructure ltd.
PREVIEWsTrICTly By aPPOInTMEnT Only
LOCATIONCyPrUs
FURTHER INFORMATION• FOr FUrTHEr InFOrMaTIOn PlEasE COnTaCT:
CHrIs Hall aT +44 (0)8453 130 140Or EMaIl [email protected] UMEranI aT + 971 56 765 3435Or EMaIl [email protected]
COMPLETE “ONSHORE” DESALINATION PLANTPlant can be reinstalled within 4-6 months either to an alternate onshore location or onto a barge.Produced over 20 million cubic metres of drinking water in three years of production.
Over 20,000m3/day modular•containerised mobile desalination plantfor Cyprus GovernmentUtilising the latest ultra filtration and•reverse osmosis membranesEmploying the latest energy recovery •systemsBoron is < 1.0 mg/l•Product Test Equipment•Material Handling/Internal Transport•Water Plant•Fastest execution of a large scale•desalination plant to date
Mobile ModularDesalination Unit
Disclaimer: All photos in this brochure are library footage
3
TECHNICAL SPECIFICATIONS
For more information, please visit our website at www.hilcoind.com
INTAKE, PRE-FILTRATION & ULTRA FILTRATIONTriple Head Sea Intake with filter/screen (33% redundancy )•1100m x 900mmØ intake pipeline (movable)•4 x Sulzer A44-200LM - 132kW @ 1500rpm•(33% redundancy)4 x 500µm Amiad filters•6 x 100µm Amiad filters•Dow UF modules (12 containers x 66 UF elements in each)•
REVERSE OSMOSISDOW membranes – 9 containers x 31 p/v’s x 7 membranes. •Total requirement of 1953 membranes with 40% in operation.◦ DOW FILMTEC SW30HRLE400i◦ DOW FILMTEC SW30ULE400i
POST TREATMENTCurrent post treatment is re-mineralisation using calcite•Chemical consumption per month at 20,000m³/day of•potable water produced
Hydrochloric Acid (HCl) 48t/ month•Sodium Hypochlorite (NAOCl) 15t/ month•Sodium Meta bisulphate (SMBS) 3t/ month•Caustic Soda (NaOH) 16t/ month•Calcite 25t/ month•
ELECTRICAL & ENERGYCyprus supply: 6MVa from Grid with main feed at 11Kv.Plant Supply :2 x times transformers for 690v (11kV to 690v)•2 x times transformers for 400v (11kV to 400v)•Total design energy consumption - 4.37KWh/m³•Actual total consumption for last quarter was - 4.23KWh/m³•UF and RO energy consumption - 3.50KWh/m³•
NOTE :Product water is delivered into the customer’s major waterconveyor pipeline 1400m and 60m uphill from the plant andhad to design against conveyor a back pressure + head losses ofup to 25Bar. Therefore the 4 delivery pumps are higher pressureconsumers than may be normal.
HILCO INDUSTRIAL PRIVATE TREATY SALE
In conjunction with:
www.jaj.co
3 St. Helen’s Place | London EC3A 6AB | UKTel +44 (0)8453 130 140 | Fax +44 (0)8453 130 150
www.hilcoind.com
OVER 35 OFFICES THROUGHOUT NORTH, CENTRAL & SOUTH AMERICA, EUROPE, MIDDLE EAST, ASIA, AUSTRALIA