Date post: | 20-Mar-2017 |
Category: |
Documents |
Upload: | paul-wagner |
View: | 16 times |
Download: | 0 times |
MINING - QUARRY - INDUSTRIAL
V.E.S.I Trained Personnel for work on Brownfields sites.
Service provider for the Tru-Flo helical rotor dewatering parts for the states of VIC, TAS &
SA.
Excellent safety policies and procedures
Experienced labour force, Project managers, Supervisors, Electricians, Fitters, Welders,
TA’s, Machine Operators, Labourers. Throughout Australia and Overseas.
Project construction Civil, Electrical, Mechanical
Switchboard design and construction
Mining underground operations, installation and maintenance
Mining process plant installation, maintenance and upgrades
Quarry plant operations, installations, maintenance and upgrades
Industry high voltage substation design and construction to 33kv
Transmission high voltage substation construction to 330kv
High voltage switchgear and transformer maintenance, oil sampling
Electrical equipment hire and sales
Machinery hire
Production and development Drill Rig modifications and maintenance
Pump station design and construction
Pump repairs and rebuilds
Primary and secondary fan servicing, repairs and rebuilds
Trailing cable supply and repairs
Single point suspension HV and LV cable installation, shafts, service holes
Tunnel bore machine (TBM) Set up and maintenance
Victorian based workshop facilities with 1000 volt testing capability
Electrical drafting and engineering
Electrical compliance auditing
Electrical statutory inspections carried out
PLC and safety system design and installation
Safety
by Choice not b
y Chance
Project Construction Civil - Electrical - Mechanical
Recent Projects
Oz Mineral Prominent Hill mining operation - South Australia. Underground pump station installation. 4 x 106 Wear tuff pumps, all civil, electrical and mechanical
works carried out by Compliance Electrical including supply of all machinery, IT Loader, Crane, Light
vehicles, Generator, Air Leg Drills, 4WD Boom lift, pumps controlled by Allan Bradley PLC and HMI
system.
Project Construction Electrical
Recent Projects
YTC Resources Hera Mine Operation – NSW. Supply CAT 924G Loader with Man Basket. Underground light vehicle and Electrical labour to install
two by Truflo 75kw Mono Pump starters, including 150 Watt metal halide flood lights.
Project Construction Electrical
Recent Projects
YTC Resources Hera Mine Operation - NSW Supply CAT 924G Loader with Man Basket. Underground light vehicle and Electrical labour to install
two by Truflo 75kw Mono Pump starters, including 150 Watt metal halide flood lights.
Project Construction Electrical
Olam Orchards Almond processing plant operation - Victoria. High Voltage supply. Electrical design, procurement and Installation. 2 x 2 MVA 22 KV / 415 Volt kiosk
substations, 1 x 1.5 MVA 22 KV / 415 Volt kiosk substation, 1 x 22 KV metering panel. Installation of
700 meters of 22 kV 240 mm2 Aluminium Cable. HV Relay setting and protection injection testing.
Earth grid installation.
Project Construction Electrical
Morning Star Gold and Rose of Denmark mining operations – Victoria.
2 years running day to day site electrical contract for supply of site electrical labour. Generator hire.
Underground and surface plant installations, maintenance and breakdown support. Installations works
included site HV Supply relocation, 415 Volt Distribution Board / MCC and Power factor correction, 750
kva Backup Generator site supply with A.T.S.
160 kw shaft winder and level safety system. Install Minecom Underground communication system
including wireless slack rope system for shaft winder cage. Locomotive rebuild. Office fit outs. Septic
system. Paste fill plant. Camera system. Supply and installation of underground 1000 Volt reticulation
system. Distribution Boards, fan starters, pump starters, jumbo starters and scrapper starters.
Project Construction Electrical - Automation
Hill View Quarry operation - Victoria.. Electrical upgrade to Crushing plant. Design, supply and installation of Primary Crushing circuit
electrical system. 415 volt 1000 amp primary crusher MCC with 22 associated motor starters, D.O.L,
Soft start, auto tranny and variable speed drive starting systems. All field wiring. Safety emergency
stop and lanyard switch system. Design, program and install PLC and HMI control system.
Project MCC Upgrade
CGT – Castlemaine Gold, MCC upgrade at the Process plant – Victoria
Design, supply and installation of MCC enclosures for control and power. The MCC needed an upgrade
to comply with AS3000 standards. Compliance Electrical removed all switchgear and re-installed in
new rated fault enclosures. The Mill Manager was pleased with the company efforts and sent this email
through.
I just wanted to say thanks for the excellent work Compliance Electrical did on our MCC upgrade. I can
tell you I was quite nervous about the potential impact all that work might have on our production –
not being able to start back up without major headaches. As it turned out I had no reason to worry,
because you guys did a fantastic job. Everything went back the right way and we saw ZERO production
impact. This was a major achievement in a brown-field operation like ours and I want you to pass on my
thanks to your Team. Not only did the technical side of the job go without a hitch, but the attitude of
the guys around safety, respect for our systems and procedures and flexibility to work in around us was
really appreciated.
You’ve got a good bunch of blokes there.
Thanks again...
Terminal Switchyard Construction
Powercor. Elaine Terminal Station. Victoria 2013 $650,000.00 Project.
Construction of 132KV 220KV Terminal Switchyard Fed from Mount Mercer 131 Megawatts High Voltage Wind Farm.
Earth grid in outdoor yard and control room.
Control room - ITC wiring - DC panels and battery installation - Cable tray/ladder - Protection relays -Cabling installation and termination
Switchyard - Marshaling box (VT/CT/CVT) installation and termination - Remote Operated Isolators build and terminations - 132KV 220KV busbar installation - 132KV 220KV Insulator installation - Transformer Installation and termination
Site power and Amenities wiring and Installation.
High Voltage Cable Installation and Commissioning
Macarthur Wind Farm Project. Victoria
Complete 33’000 Volt inline aluminium Cable terminations.
Complete High Voltage VLF High Pot cable, joint and end termination testing and Commissioning.
Complete Shear off connector 10 Amp Micro Ohm testing.
Switchboard Design - Construction
415 Volt and 1000 Volt Distribution boards
1000 Volt Jumbo and Jumbo / Pump starters
415 Volt and 1000 Volt Mono and Submersible Pump Starters
1000 Volt / 240 Volt lighting / Fresh Air Base and Crib room supply panels
415 Volt and 1000 Volt Primary and Secondary ventilation fan starters. Twin 45Kw through to Single 220
KW Solcon soft start units with IFM vibration and bearing temp monitors.
415 Volt and 1000 Volt Scrapper Starters
Remote stop / start boards for fan starters
MCC motor control cubicles
Visual motor isolation cubicles
(LCS) Local motor Isolator start stop stations
PLC and Communications switchboards
Drill Rig control panels
Utility CT Metering / Distribution panels
Zinc plated mild steel powder coated and stainless steel powder coated enclosure options
Switchboard refurbishing
Low & High Voltage Substation Design & Construction
Recent Substation Builds
750 KVA 415 / 1000 Volt skid mounted substation. Star- star (step up or step down)
1.5 MVA 11,000 / 1000 Volt skid mounted substation. Delta- star (step down) High Voltage
500 KVA 415 / 1000 Volt skid mounted substation. Star- star (step up or step down)
250 KVA 415 / 1000 Volt skid mounted substation Star- star (step up or step down)
Equipment - Machinery Hire & Sales
For Hire and Sale
U/G Compliant Generators. Sizing calculations and advice offered
U/G Compliant Transformer. Sizing calculations and advice offered
For Hire
U/G Compliant CAT Loader 924G with, bucket, forks, cable roller, basket and Jib crane attachments.
New Holland 1445 Telehandler with, bucket, forks, cable roller, basket and jib crane attachments.
New Holland Skid Steer
Genie scissor lift
JCB Excavator
U/G Compliant 4WD boom lift. Genie Z34 / 22 boom lift
Container kitted workshops
Mitsubishi 24 tonne tilt truck.
Nissan 1.4 Tone LPG Gas Fork Lift
U/G Compliant Light Vehicles
Bramco 1000 Volt. 60 and 150 amp outlet earth leakage and pilot tester
High Voltage Electrical testing equipment to 10kv
CAT 924G IT Loader for hire. Underground Compliant with following attachments. Basket, cable roller, jib
crane, bucket and forks
Genie Z34 / 22 4WD diesel Boom Lift for hire. Underground Compliant
Genie Elevated Work Platform – GS-2023
JCB Excavator-
New Holland Skid Steer
Polaris with trailer set up for remote area access and to limit vegitation damage. Used for Poly welding
assignments.
Mitsubishi FUSO 24 Tonne Tilt Truck. 9 metre x 2.5 metre tray with 20,000 pound winch.
New Holland 1445 Telehandler Loader for hire. Underground Compliant with following attachments. Basket,
cable roller, jib crane, bucket and forks. 4.5 tonne lifting capacity. 16 metre reach with jib attachment.
Production & Development Drill Rig Modifications &
Maintenance
Recent projects UME long hole drill rig conversion, conversion from Atlas long hole drill to Raise bore carrier and power
pack - Bendigo Victoria
Deepcore Diamond drill rig electrical rebuild. Compliance Electrical workshop - Ballarat Victoria
Workshop 1000 Volt Testing Facility
1000 volt workshop power supply package Generator 250 kva and step up Transformer. Drill Rig Commissioning and 1000 Volt Equipment testing.
Also available for hire as a package including 150 Amp extension leads. All plug and play with pilot and
earth leakage protected outlets.
Experienced Labour Force - Project Managers
Supervisors – Electricians – Concreters – Engineering
Personnel.
Compliance Contracting team for contracts or labour hire working throughout Australia and Overseas.
Combined 200 years plus in Industrial work
Combined 100 years plus experience in mining (Underground & Surface)
(TBM) Tunnel Bore Machine electrical experience
High Voltage switching operators
High Voltage cable termination trained
PLC trained - Rockwell, Allan Bradley - Mitsubishi - B&R - Modicon - IFM - ABB - Omron
Austel / ACA licensed
Forklift, Dog man, EWP, Crane, Vehicle mounted Crane ticketed
Heavy Rigid Truck licensed
Plant Operators ticketed ( Loader- excavator –skid steer)
First aid level 2 accreditation
Cad drafting
HIGH VOLTAGE - MINING - QUARRY - INDUSTRIAL
Clients
Contacts
Paul Stamp – Manager Director – 0417017947
Paul Wagner – Project Manager – 0414604395
Gareth Anderson – Electrical Supervisor - 0417011485
Website – compliancecontracting.com.au
Delivery address – 30/32 Butt street
Canadian, Ballarat, Victoria 3350
Postal address – PO Box 175, Mt Clear,
Ballarat, Victoria 3350
ABN - 28160539024
Safety
by Choice not b
y Chance
Mandalay Resources – Vic
K92mining – Papua New
Guinea
Philsaga Mine – Philippines
Fosterville Gold Mine –Vic
Stawell Gold Mine – Vic
Morning Star Gold – Vic
Glenn Wills Gold Mine – Vic
Hillview Quarries – Vic
Gekko Systems – Vic
Mancala Mining – Vic
Deepcore Drilling – Vic
Octagonal Resources –Vic
UME – Vic & Qld
CGT – Castlemaine Gold – Vic
Independence Group - Vic
Quarry Mining & Engineering –
Vic
Coates Hire – Qld
Straits Tritton Mine - NSW
Zera Mining – Vic
Trimas Corporation – Vic
Pybar Mining – Vic, NSW & SA
Macarthur Wind Farm – Vic
Olam Orchards – Vic
Millers Contracting – Vic
Amp Control – NSW
Challenge Pumps – SA
Terramin Angus Zinc Mine – SA
Newcrest Mining Cracow Gold -
QLD
Macmahon, Ranger Deeps – QLD
Mine Tuff Pumps – WA
Powercor – Elaine Terminal
Station Vic
Macmahon - Vic
Byrnecut – SA
YTC Hera Mine - NSW