Date post: | 21-May-2015 |
Category: |
Business |
Upload: | altair-engineering |
View: | 690 times |
Download: | 0 times |
09-11-2011,EHTC,Bonn
1
Component optimization driven by
flexible body vehicle dynamics
09-11-2011,EHTC,Bonn
2
• Technical infra structur
• digital equipment according to technical state-of-the-art
• direct data connection to different customers
• Methodical project management • modern ERP system for project
acquisition
• Quality Management System • ISO 9001:2000 • VCA**
• Personal Capacity • more than 500 employees at 7 subsidiaries • multidisciplinary • flexible applicable
• Business network • Associates for production, assembly and installation • relation to external specialists
• Adequate space • for project teams • for assembly
Company Profile
09-11-2011,EHTC,Bonn
3
Hengelo • Arnhem • Echt • Helmond • Schiedam • Kerpen • Osnabrück
VIRO engineering – OFFICE LOCATIONS
VIRO engineering GmbH zuid bv
Hüttenstr. 205 Newtonweg 3
50170 Kerpen 6101 WX Echt
T : 02273 59 26 20 +31 475 850 903
F : 02273 59 26 23 +31 475 850 904
M: 0160 963 159 13 +31 6 533 907 05
www.viro-engineering.com
Formation 2008
Formation 2006
Formation 1991 Formation 1995
Headquarter Formation 1964
Kerpen
●
09-11-2011,EHTC,Bonn
4
Projects
• Projects at our office
• Projects on client’s site
• Turn-Key
• Total solutions
09-11-2011,EHTC,Bonn
5
• Aerospace
• Amusement parks
• Automotive
• Mechanical engineering
• Offshore
• Shipbuilding
• Semicon
Market areas
09-11-2011,EHTC,Bonn
6
Designing for Trucks
09-11-2011,EHTC,Bonn
7
Designing for Trucks
09-11-2011,EHTC,Bonn
8
Designing for Trucks
09-11-2011,EHTC,Bonn
9
Designing for Trucks
Up to 800kg
200kg
150kg
09-11-2011,EHTC,Bonn
10
Designing for Trucks
60 Modes<30 Hz
09-11-2011,EHTC,Bonn
11
Determining dynamic loads
09-11-2011,EHTC,Bonn
12
Combining the input
09-11-2011,EHTC,Bonn
13
Combining the input
09-11-2011,EHTC,Bonn
14
Combining the input
09-11-2011,EHTC,Bonn
15
Vertical Sooth filter Euro 5
• Layout study
• Design with full CAE support
• Delivery of prototype
09-11-2011,EHTC,Bonn
16
Layout/ Packaging
09-11-2011,EHTC,Bonn
17
CAE Proof of concept
Using flexible connections reduces the design loads
09-11-2011,EHTC,Bonn
18
CAE optimising design loads
09-11-2011,EHTC,Bonn
19
Determining design space and constraints
09-11-2011,EHTC,Bonn
20
Optimization
09-11-2011,EHTC,Bonn
21
Delivery of prototype
09-11-2011,EHTC,Bonn
22
Stand 13
For more information