Council Transportation Committee - May 19 2021
Part 2 on Chapter 5 of the Comprehensive Streets Program
1 Introduction
2 Public Engagement
3 Street Operations
4 Street Improvements
5 Street Preservation
6 Street Programming
7 Funding Options
8 Prioritization and Recommendations
Engage PT
Chapters
Jan Mtg
Feb Mtg
March Mtg
April and May Mtgs
1 Introduction
2 Public Engagement
3 Street Operations
4 Street Improvements
5 Street Preservation
6 Street Programming
7 Funding Options
8 Prioritization and Recommendations
Engage PT
ChaptersTodayrsquos Focus
Review Preservation Program
Review of Part 1 Present types of pavement treatments and costs
Part 2 Present what a hypothetical $10 Million Dollar over 10-year investment option looks like
What is Pavement Preservation
For the purpose of the Comprehensive Streets Program pavement preservation is the investment the City makes in managing existing pavement
Pavement preservation are not considered improvement projects (refer to Chapter 4) Improvements projects are typically the addition of sidewalks bike lanes public space etc Pavement preservation is investment in managing our existing roads as they are Side note 1 some improvement projects like Discovery Road impact
pavement preservation program in a positive way by eliminating the need for city investment over the next 20 years
Side note 2 pavement preservation makes nominal investments in safety by fixing shoulders
Lawrence near Monroe St
San Juan near the Cemetery
Estimated 2020 Revenues 2020Motor Vehicle Fuel Tax $217000
Utility Tax $695000
P A V E M E N TO P T I O N S
1 Chip Seal
2 Pulverize and Chip Seal
3 Asphalt Overlay
4 Pulverize and Asphalt Paving
5 Reconstruction
$
$$
$$
$$$
$$$$$
Cost Treatment______
C H I P S E A L
bull $7065 per Block (250rsquox24rsquo)
bull $1104 SY
bull Seals Cracks
bull Provides a Wear Course
bull 10 ndash 15 Year Longevity
P U L V E R I Z E C H I P S E A L
bull $21680 per Block (250rsquox24rsquo)
bull $3252 SY
bull Generally Requires Some Stormwater Infrastructure
bull 10 ndash 15 Year Longevity
A S P H A L TO V E R L A Y
bull $22596 per Block (250rsquox32rsquo)
bull $2542 SY
bull Generally Requires Some Stormwater Infrastructure
bull Requires ADA Ramp Upgrades If Adjacent
bull 15 ndash 25 Year Longevity
P U L V E R I Z E A S P H A L T
bull $34222 per Block (250rsquox24rsquo)
bull $5133 SY
bull Generally Requires Some Stormwater Infrastructure
bull Requires ADA Ramp Upgrades If Adjacent
bull 15 ndash 25 Year LongevityWashington Street amp Harrison Street
R E C O N S T R U C T I O N
bull $99004 per Block (250rsquox32rsquo)
bull $11138 SY
bull Generally Requires Stormwater Infrastructure
bull Requires ADA Ramp Upgrades If Adjacent
bull 20 ndash 25 Year LongevityWater Street amp Fillmore Street
A D D I T I O N A L C O S T S
bull Drainage Swales amp Stormwater Infrastructure
bull Digoutsbull ADA Curb Rampsbull EngineeringAdministrationbull Digouts and pre-level
Stormwater at Pacific Avenue amp Milo Street
ADA needs at Lawrence Street amp Adams Street
Insert I worq street rating
1 How many street segments were rated
1 Insert map of 10 year program
1 Insert table Too small to read is ok Wersquoll include it as a handout in 11x17
Rem
aini
ng
Serv
ice Li
feRoad Name From To
Length (ft)
Width (ft)
Area (SY)
Total Construction
Price(SY)
Re
cons
truc
tion
Pul
veriz
e amp
Pa
ve
Ash
palt
Ove
rlay
Pav
e Gr
avel
Ro
ad
Pul
veriz
e amp
Ch
ip S
eal
Chi
p Se
al
Tot
al B
ase
Pavi
ng C
osts
Dig
outs
(SY)
Pre
-Lev
elin
g(S
Y)
Con
stru
ct
Shou
lder
s Bot
h Si
des (
LF)
Pre
para
tion
Tota
l
Sto
rmw
ater
Pipe
s (LF
)
Sto
rmw
ater
Catc
hbas
ins
Sto
rmw
ater
Swal
es (L
F)
Sto
rmw
ater
To
tal
Cur
b Ra
mps
Cur
b Ra
mps
To
tal
Sur
veyi
ng
Eng
inee
ring
amp
Adm
inist
ratio
n
Eng
inee
ring
amp
Adm
inist
ratio
n To
tal
$102 $45 $22 $35 $29 $9 $35 $15 $20 $50 $1500 $25 $150002 Polk St - Street Lawrence St 1056 200 56 1244 210679$ 169$ 127518$ 127518$ -$ 150 1 1 9025$ 2 30000$ 10000$ 25 44136$ 6 47th Street Pettygrove McNeil 500 18 1548 258717$ 167$ 158624$ 158624$ -$ 687 8 46350$ -$ 10000$ 25 53743$
6 to 10 Lawrence St Calhoun St Harrison St 1200 36 4800 786070$ 164$ 491856$ 491856$ 600 15000$ 8$ 120000$ 10000$ 25 159214$ 8 Lawrence St Cass St Calhoun St 250 36 1000 146213$ 146$ 102470$ 102470$ 0 0 -$ 75 350 12500$ -$ 10000$ 25 31243$ 8 Lawrence St Walker St Cass St 250 36 1000 144650$ 145$ 102470$ 102470$ -$ 100 250 11250$ -$ 10000$ 25 30930$
4 to 8 San Juan Ave Lopez Ave Admiralty 2300 34 8689 1222938$ 141$ 890350$ 890350$ -$ 800 5 1500 85000$ -$ 15000$ 25 247588$ 6 to 8 Lawrence St Harrison St Monroe St 2380 47 12429 1331314$ 107$ 274803$ 274803$ 15 5 74573$ 1900 10 110000$ 50 750000$ 10000$ 10 121938$ 2 to 4 Center St San Juan Ave Redwood St 1660 16 2951 295222$ 100$ 86910$ 86910$ -$ 1600 9 3000 168500$ -$ 10000$ 15 39812$ 0 to 6 Pacific St Cedar St Tremont St 400 16 711 66581$ 94$ 31744$ 31744$ -$ 100 2 700 25500$ -$ 5000$ 15 9337$ 0 to 6 Benton St Lawrence Lincoln Blg 580 36 2320 203265$ 88$ 20880$ 20880$ 20 10 19720$ 250 2 15500$ 8 120000$ 5000$ 15 27165$
2 Grant St 14th St 16th St 525 16 933 73635$ 79$ 27487$ 27487$ -$ 400 2 500 35500$ -$ 8000$ 15 10648$ 2 to 6 Olympic St Cedar St Tremont St 536 12 715 52716$ 74$ 21047$ 21047$ -$ 950 23750$ -$ 8000$ 15 7920$
2 Milo St Olympic Ave Pacific Ave 466 12 621 44793$ 72$ 18298$ 18298$ -$ 800 20000$ -$ 5000$ 15 6495$ 0 11th St Hendricks St Sheridan St 550 16 978 65077$ 67$ 28796$ 28796$ -$ 100 2 750 26750$ -$ 8000$ 15 9532$ 0 58th St Hill St Kuhn St 525 16 933 60329$ 65$ 32667$ 32667$ -$ 750 18750$ -$ 8000$ 15 8913$ 2 10th St Hendricks St Grant St 283 18 566 34294$ 61$ 16669$ 16669$ -$ 500 12500$ -$ 5000$ 15 5125$
4 to 10 31st St Hancock St Sheridan St 1050 22 2567 150027$ 58$ 23100$ 23100$ 10 10 12833$ 1200 10 1000 100000$ -$ 5000$ 10 14093$ 6 25th St Sheridan St Holcomb St 1200 18 2400 125895$ 52$ 70680$ 70680$ -$ 125 1 1200 37750$ -$ 8000$ 15 17465$ 6 Holcomb St 7th St 10th St 850 12 1133 58703$ 52$ 10200$ 10200$ 10 10 5667$ 1500 37500$ -$ -$ 10 5337$ 2 Hendricks St 9th St 12th St 800 16 1422 70930$ 50$ 41884$ 41884$ -$ 750 18750$ -$ 8000$ 15 10295$
2 to 6 Hill St 19th 21st St 807 16 1435 67443$ 47$ 21125$ 6456$ 27581$ 10 5021$ 1000 25000$ -$ 8000$ 15 9840$ 2 to 8 57th St Jackman St Kuhn St 800 18 1600 66550$ 42$ 14400$ 14400$ 20 10 13600$ 1300 32500$ 10 6050$ 6 to 8 Sheridan St Hastings Ave SilverUmatilla 1750 22 4278 154115$ 36$ 38500$ 38500$ 20 10 36361$ 300 4 1500 58500$ -$ 5000$ 15 20754$ 6 to 10 Tyler St Jefferson St Lawrence St 900 32 3200 115280$ 36$ 28800$ 28800$ 5 5 8000$ 100 2 8000$ 4 60000$ 10 10480$ 6 to 14 14th St McPherson St Sheridan St 2375 21 5542 182027$ 33$ 49875$ 49875$ 20 10 47104$ 750 4 1000 68500$ -$ 10 16548$
8 49th St Kuhn St Admiralty Ave 400 24 1067 34613$ 32$ 9600$ 9600$ 5 1867$ 800 20000$ -$ 10 3147$ 6 to 10 Fir St F St UCherry 4360 22 10658 341621$ 32$ 95920$ 95920$ 5 5 4000 106644$ 100 2 4000 108000$ -$ 10 31056$ 6 to 8 Cedar St San Juan Ave Redwood St 1460 16 2596 81747$ 31$ 23360$ 23360$ 20 20 25956$ 1000 25000$ -$ 10 7432$
8 Clallam St McKinley St Roosevelt St 975 14 1517 46796$ 31$ 13650$ 13650$ 20 10 12892$ 200 4 16000$ -$ 10 4254$ 6 San Juan Ave 19th St 20th St 300 31 1033 31827$ 31$ 9300$ 9300$ 50 10 19633$ -$ -$ 10 2893$
6 to 20 Cherry St F St W St 4200 32 14933 457307$ 31$ 134400$ 134400$ 5 5 4200 121333$ 200 6000 160000$ -$ 10 41573$ 6 to 8 Jackman St 45th St 49th St 1100 22 2689 81940$ 30$ 24200$ 24200$ 15 10 18150$ 225 3 500 28250$ -$ 5000$ 15 11340$ 6 to 12 Jackson St LawrenceMonroe Roosevelt St 1600 18 3200 93530$ 29$ 28800$ 28800$ 10 10 16000$ 1000 25000$ 1 15000$ 2500$ 10 8730$
2 7th St Wilson St Holcomb St 450 16 800 23320$ 29$ 7200$ 7200$ 10 10 4000$ 400 10000$ -$ 10 2120$ 8 to 14 25th St Sherman St Sheridan St 800 20 1778 50061$ 28$ 16000$ 16000$ 10 5 7556$ 1 800 21500$ -$ 5000$ 10 5006$ 2 to 6 Hancock St SR 20 9th St 1100 20 2444 67833$ 28$ 22000$ 22000$ 15 5 14667$ 1000 25000$ -$ 10 6167$
Benton St Washington St Lawrence St 1160 22 2836 74468$ 26$ 25520$ 25520$ 10 10 14178$ 140 4 600 28000$ 10 6770$ W St San JuanAdmiralty Walnut St 2560 22 6258 163807$ 26$ 56320$ 56320$ 10 5 26596$ 200 4 2000 66000$ -$ 10 14892$
6 to 8 Walnut W Street Jackson 2300 22 5622 145194$ 26$ 50600$ 50600$ 10 5 23894$ 2300 57500$ -$ 10 13199$ 6 to 8 24th St Discovery Rd San Juan Ave 1250 18 2500 63938$ 26$ 22500$ 22500$ 10 5 10625$ 1000 25000$ -$ 10 5813$ 6 to 10 Tyler St Lawrence St Blaine St 900 32 3200 78980$ 25$ 28800$ 28800$ 5 5 8000$ 200 5000$ 2 30000$ 10 7180$ 4 to 12 McPherson St SR 20 Discovery Rd 2925 32 10400 244860$ 24$ 93600$ 93600$ 5 5 2925 84500$ 230 2 1200 44500$ -$ -$ 10 22260$
10 Landes St 12th St 19th St 1820 32 6471 151821$ 23$ 58240$ 58240$ 5 1400 39324$ 400 10000$ 2 30000$ 5000$ 10 14256$ 6 to 8 Discovery Rd 19th Hastings Ave 2900 22 7089 136565$ 19$ 63800$ 63800$ 15 10 47850$ 500 12500$ -$ 10 12415$ 8 to 12 Hastings Ave Discovery Rd County Line 8450 32 30044 542349$ 18$ 270400$ 270400$ 5 10 5000 197644$ 1000 25000$ -$ 10 49304$ 6 to 12 Washington St Van Buren St SR20 2025 30 6750 118388$ 18$ 60750$ 60750$ 5 5 16875$ 0 0 0 -$ 2 30000$ -$ 10 10763$
14 Blaine St San Juan Ave Walker St 1275 48 6800 113910$ 17$ 61200$ 61200$ 5 11900$ -$ 2 30000$ 5000$ 10 10810$ 6 Washington St Harrison St Taylor St 1175 33 4308 59240$ 14$ 38775$ 38775$ 10 15079$ -$ -$ 10 5385$
8 to 10 Sheridan St SR 20 19th St 4000 46 20444 272922$ 13$ 184000$ 184000$ 5 5 51111$ 200 2 13000$ -$ 10 24811$ 8 to 10 19th St San Juan Ave Sheridan St 3200 48 17067 197120$ 12$ 153600$ 153600$ 3 3 25600$ 0 0 0 -$ -$ 10 17920$
10 to 20 San Juan Ave F St Lopez Ave 2800 32 9956 110059$ 11$ 89600$ 89600$ 3 10453$ -$ -$ 10 10005$ 10 to 20 F St Hastings Ave Tyler St 5300 31 18256 180730$ 10$ 164300$ 164300$ -$ -$ -$ 10 16430$
9952406$ 1873288$ 31744$ 274803$ 32667$ 332896$ 1998646$ 4544044$ 1155207$ 1747625$ 1215000$ 1290529$
9 Stormwater Base Paving Costs Preperation EngineeringADA
Chip Seal
Pulverize amp Chip Seal
Pulverize amp Asphalt
Asphalt Overlay
Reconstruction
1 Insert summary table of average costs of ada sw eng digouts etc
Additional Paving Costs Average Cost per SY Percent of Paving CostDigouts amp Pre-Leveling $4 25Stormwater $7 38ADA $5 27Engineering amp Administration $5 28
Chip Seal
Pulverize amp Chip Seal
Pulverize amp Asphalt
Asphalt Overlay
Reconstruction
1 Insert total costs for the entire city based on pavement rating
RSL Length (FT) Area (SY) Condition Treatment Cost Total20 61834 138524 131 Good $0 $014 23656 49915 47 $147055212 43586 106382 100 $313413410 74803 193570 182 $57027908 96662 228046 215 $67184926 95452 261794 247 $174899304 6420 14536 14 $9711212 29238 60616 57 Poor Rehab $107 $64928500 3851 7532 07 Very Poor Rebuild $155 $1169719
$43149589
Satisfactory Chip Seal $29
Fair Overlay $67
Chip Seal
Pulverize amp Chip Seal
Pulverize amp Asphalt
Asphalt Overlay
Reconstruction
Fir Street Asphalt Overlay in early 1990s Inadequate Stormwater System Water Intrusion Inadequate Base Material
San Juan Avenue Reconstructed 1997
New ADA Sidewalks
Complete Stormwater System
Lawrence Street Chip Sealed in 2000
Inadequate Base
Water Intrusion
F Street Reconstructed 2001 2002
New ADA Sidewalks
Complete Stormwater System
Best Streets First
Stop the Continued Decay of our Streets
Slowly Rebuild Street System Investment
1 Introduction
2 Public Engagement
3 Street Operations
4 Street Improvements
5 Street Preservation
6 Street Programming
7 Funding Options
8 Recommendations
January
February
April
March
May
June
Encouraging the public to be involved through Engage PTwwwcityofptusengagept
Street Pavement Improvement Plan Projects | 9 | 110 | |||||||||||||||||||||||||||||||||||||||||||||
Road Name | From | To | Iworq ID | Length (ft) | Width (ft) | Area (yd^2) | Actual Area(SY) | Unit Cost per yd2 | Construction Cost | Prep Work | Survey Testing | ADA Curb Ramps | Storm Water | Mill amp Fill$50SY | Pre-Level$4SY | Total Construction | Project Cost + 10 | Unit Cost w Additional Costs no 10 | Engineering Costs | Notes | |||||||||||||||||||||||||||
Priority | Reconstruct | 2021 | 2022 | 2023 | 2024 | ||||||||||||||||||||||||||||||||||||||||||
1 | Reconstruct | Lawrence St | Cass St | Calhoun St | 1304 | 250 | 36 | 1000 | $ 80 | $ 80000 | $ 5000 | $ 20000 | $ 105000 | $ 115500 | $ 105 | Stormwater South Side Parking Raingarden on Cass | |||||||||||||||||||||||||||||||
2 | Reconstruct | Lawrence St | Walker St | Cass St | 250 | 36 | 1000 | $ 80 | $ 80000 | $ 5000 | $ 20000 | $ 5000 | $ 110000 | $ 121000 | $ 110 | Stormwater South Side Parking | |||||||||||||||||||||||||||||||
3 | Reconstruct Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | San Juan Ave | Lopez Ave | Admiralty | 2300 | 32 | 8178 | $ 50 | $ 408889 | $ 10000 | $ 100000 | $ 518889 | $ 570778 | $ 63 | Stormwater Problem 45th | ||||||||||||||||||||||||||||||||
4 | Reconstruct Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Polk St - Street Improvements | Lawrence St | 1056 Sarah Tiffany Sarah TiffanyGarfield | 1073 | 200 | 56 | 1244 | $ 50 | $ 62222 | X | X | X | $ 62222 | $ 68444 | $ 50 | Parking Theater 4 AC Watermain Infiltration or Rain Garden Parking on Condo Side | ||||||||||||||||||||||||||||||
Reconstruct | 47th Street | Pettygrove | McNeil | 500 | 18 | 1000 | 1548 | $ 50 | $ 50000 | $ 5000 | $ 40000 | $ 95000 | $ 104500 | $ 95 | $210000 Engineers Estimate With Engineering Cost Turnaround Spaghetti Waterline | ||||||||||||||||||||||||||||||||
Chip Seal - $50000 to $70000 per Mile | $6 No DigoutsPre-leveling | $10 with Additional Prep Work | |||||||||||||||||||||||||||||||||||||||||||||||
Chip Seal | Washington St | Van Buren St | SR20 | 2025 | 30 | 6750 | $ 10 | $ 67500 | $ 67500 | $ 74250 | Digouts Flagging | ||||||||||||||||||||||||||||||||||||
Chip Seal | Hastings Ave - Pre-level and widen shoulders | Discovery Rd | County Line | 8450 | 24 | 22533 | $ 6 | $ 135200 | $ 135200 | $ 148720 | Ditches amp Culverts Total Width change from 21 to 24 How wide will shoulders be | ||||||||||||||||||||||||||||||||||||
Tyler St | Jefferson St | Lawrence St | 900 | 32 | 3200 | $ 6 | $ 19200 | $ 19200 | $ 21120 | ||||||||||||||||||||||||||||||||||||||
Chip Seal | McPherson - Chip Seal | 4th St | Discovery Rd | 3100 | 32 | 11022 | $ 6 | $ 66133 | $ 66133 | $ 72747 | Ditches amp Culverts Shoulder Wideneing | ||||||||||||||||||||||||||||||||||||
Chip Seal | 19th St - Chip Seal | San Juan Ave | Sheridan St | 3200 | 48 | 17067 | $ 6 | $ 102400 | $ 102400 | $ 112640 | Bike Lanes amp Shoulder Prelevel | ||||||||||||||||||||||||||||||||||||
Chip Seal | Walnut | W Street | Jackson | 2300 | 22 | 5622 | $ 6 | $ 33733 | $ 33733 | $ 37107 | Dig-Outs Pre-Leveling Striping Shoulders | ||||||||||||||||||||||||||||||||||||
Chip Seal | Fir St - Chip Seal | F St | UCherry | 4360 | 22 | 10658 | $ 10 | $ 106578 | X | X | $ 106578 | $ 117236 | Dig-Outs Pre-Leveling Striping | ||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | |||||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | P St - Chip Seal | Redwood St | Cedar St | 0486 | 300 | 16 | 533 | $ 20 | $ 10667 | $ 10667 | $ 11733 | Watermain Looping Shouldnt this be part of Center | |||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 25th St - Chip Seal | Sheridan St | Holcomb St | 1200 | 18 | 2400 | $ 20 | $ 48000 | $ 48000 | $ 52800 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 14th St - Chip Seal | $ - | $ - | ||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Cedar St - Chip Seal | Redwood St | San Juan Ave | 1460 | 16 | 2596 | $ 20 | $ 51911 | $ 51911 | $ 57102 | Ex ChipSeal 22 Wide | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Center St - Chip Seal | Redwood St | San Juan Ave | 484 | 1660 | 16 | 2951 | $ 20 | $ 59022 | $ 59022 | $ 64924 | Ex ChipSeal 22 Wide Stormwater | |||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Grant St Chip Seal | 14th St | 16th St | 525 | 16 | 933 | $ 20 | $ 18667 | $ 18667 | $ 20533 | Ex Street 10 Wide | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 11th St Chip Seal | Hendricks St | Sheridan St | 550 | 16 | 978 | $ 20 | $ 19556 | $ 19556 | $ 21511 | Hospital Parking | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Hendricks St Chip Seal | 9th St | 12th St | 800 | 16 | 1422 | $ 20 | $ 28444 | $ 28444 | $ 31289 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 10th St Chip Seal | Hendricks St | Grant St | 1655 | 283 | 18 | 566 | $ 20 | $ 11320 | $ 11320 | $ 12452 | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Grant St Chip Seal | 14th St | 16th St | 525 | 18 | 1050 | $ 20 | $ 21000 | $ 21000 | $ 23100 | Ex Street 10 Wide Stormwater | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Hill St | 21st St | 19th St | 807 | 16 | 1435 | $ 20 | $ 28693 | $ 28693 | $ 31563 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Milo St -Chip seal | Olympic Ave | Pacific Ave | 0003 | 466 | 12 | 621 | $ 20 | $ 12427 | $ 12427 | $ 13669 | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Olympic St | Cedar St | Tremont St | 536 | 12 | 715 | $ 20 | $ 14293 | $ 14293 | $ 15723 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Benton St - street improvement | Blaine St | Lincoln Blg | 580 | 36 Sarah Tiffany Sarah TiffanyEstimated at 25-36 used higher number | Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Sarah Tiffany Sarah TiffanyGarfield | 2320 | $ 20 | $ 46400 | $ 46400 | $ 51040 | ||||||||||||||||||||||||||||||||||
Pave Gravel Road | |||||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Pacific St | Cedar St | Tremont St | 400 | 16 | 711 | $ 50 | $ 35556 | $ 6000 | $ 15000 | $ 56556 | $ 62211 | $ 80 | ||||||||||||||||||||||||||||||||||
58th St | Hill St | Kuhn St | 525 | 16 | 933 | $ 50 | $ 46667 | $ 6000 | $ 20000 | $ 72667 | $ 79933 | $ 78 | 4 AC Waterline Driveways Site Distance (Re-grade Slope) | ||||||||||||||||||||||||||||||||||
Sidewalks | |||||||||||||||||||||||||||||||||||||||||||||||
Harrison St | Franklin St | Clay St | 340 | 6 | 227 | $ 165 | $ 56100 | $ 5000 | $ 61100 | $ 67210 | $ 180 | ||||||||||||||||||||||||||||||||||||
9th St | Hancock St | McPherson St | 1300 | 6 | 867 | $ 165 | $ 214500 | $ 10000 | $ 15000 | $ 239500 | $ 263450 | $ 184 | |||||||||||||||||||||||||||||||||||
Asphalt Path | |||||||||||||||||||||||||||||||||||||||||||||||
Spruce St Easement | Cedar St | Center St | 150 | 8 | 133 | $ 50 | $ 6667 | $ 2000 | $ 8667 | $ 9533 | $ 65 | ||||||||||||||||||||||||||||||||||||
Cherry St | A St | E St | 990 | 10 | 1100 | $ 50 | $ 55000 | $ 10000 | $ 10000 | $ 15000 | $ 90000 | $ 99000 | $ 82 | ||||||||||||||||||||||||||||||||||
Gravel Path | |||||||||||||||||||||||||||||||||||||||||||||||
16th St | Thomas St | Grant St | 1700 | 6 | 1133 | $ 15 | $ 17000 | $ 1500 | $ 18500 | $ 20350 | |||||||||||||||||||||||||||||||||||||
Cleveland St | 21st St | 23rd St | 500 | 6 | 333 | $ 15 | $ 5000 | $ 5000 | $ 5500 | Need Easement | |||||||||||||||||||||||||||||||||||||
6 | - | $ 15 | $ - | $ - | $ - | Need Easement | |||||||||||||||||||||||||||||||||||||||||
6 | - | $ 15 | $ - | $ - | $ - | Need Easement | |||||||||||||||||||||||||||||||||||||||||
Total | $ 1582256 | $ 1792256 | $ 1971481 | ||||||||||||||||||||||||||||||||||||||||||||
Project Descriptioin | Length | Width | Construction Costs | ConstructionUnit Costs | Units | Engineering Costs | Total CostsUnit Cost | Total Costs | Total CostsUnit Cost | Notes | |||||||||||
Sidewalk | |||||||||||||||||||||
9th Street Sidewalk Grant Street to Hancock Street | 826 | 6 | $ 141506 | $ 17131 | LF | Construction Unit Cost per Foot | |||||||||||||||
Jefferson Street Sidewalk Washington Street to Taylor Street | 724 | 6 | $ 390502 | $ 53937 | LF | Construction Unit Cost per Foot | |||||||||||||||
Landis Street Sidewalk 10th Street to 19th Street | 1795 | 6 | $ 364550 | $ 20309 | LF | Construction Unit Cost per Foot | |||||||||||||||
ADA Corner Ramps | |||||||||||||||||||||
Washington Street amp Harrison Street | $ 42000 | $ 42000 | Each | ||||||||||||||||||
Washington Street amp Adams Street | $ 38150 | $ 19075 | Each | Two Corners Were Retrofitted | |||||||||||||||||
Chip Seal Pavement | |||||||||||||||||||||
Walker Street Washington Street to Lawrence Street | 1144 | 24 | $ 20000 | $ 656 | SY | Does not include flagging nor prep work | |||||||||||||||
Pulverize amp Asphalt Paving | |||||||||||||||||||||
Washington Street VanBuren Street to Harrison Street | 300 | 22 | $ 35000 | $ 4773 | SY | ||||||||||||||||
Asphalt Overlay | |||||||||||||||||||||
Sidewalks | ||||||||||||||||||||||||||||||||||||||
Harrison St | Franklin St | Clay St | 340 | 6 | 227 | |||||||||||||||||||||||||||||||||
9th St | Hancock St | McPherson St | 1300 | 6 | 867 | |||||||||||||||||||||||||||||||||
Asphalt Path | ||||||||||||||||||||||||||||||||||||||
Spruce St Easement | Cedar St | Center St | 150 | 8 | 133 | $ 2000 | $ 2000 | $ 2000 | ||||||||||||||||||||||||||||||
Cherry St | A St | E St | 990 | 10 | 1100 | $ 10000 | $ 10000 | $ 10000 | ||||||||||||||||||||||||||||||
Gravel Path | ||||||||||||||||||||||||||||||||||||||
16th St | Thomas St | Grant St | 1700 | 6 | 1133 | $ 1500 | $ 1500 | $ 1500 | ||||||||||||||||||||||||||||||
Cleveland St | 21st St | 23rd St | 500 | 6 | 333 | Need Easement | ||||||||||||||||||||||||||||||||
6 | - | Need Easement | ||||||||||||||||||||||||||||||||||||
6 | - | Need Easement | ||||||||||||||||||||||||||||||||||||
Total |
Type | Improvement | Cost Range SY | Cost Range LF | ||||||||
1 | Complete Road Rebuild | $80 | $100 | ||||||||
2 | Asphalt Overlay | $50 | $60 | ||||||||
3 | Pulverize amp Chip Seal | $20 | $30 | ||||||||
4 | Chip Seal | $6 | $10 | $12 | $25 | ||||||
5 | Seal Coat | ||||||||||
6 | |||||||||||
7 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 3-Inch | 413 | TONS | $ 15000 | $ 6187500 | 1000 x 22 x 025 httpwwwamerasphaltcomasphalthtm | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 1630 | CY | $ 4800 | $ 7824000 | Water Street Project = $48 CY (1000 x 22 x 2)27 = 1630 CY | ||||||
Gravel Borrow | 2282 | TONS | $ 3000 | $ 6846000 | (1000 x 22 x 2)27 = 1630 1630 CY x 14 = 2282 Tons | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 128 | Hours | $ 5728 | $ 733133 | (2) People for 64 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 25043033 | |||||||||||
$ 10247 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 2-Inch | 275 | TONS | $ 15000 | $ 4125000 | 1000 x 22 x 017 httpwwwamerasphaltcomasphalthtm | | ||||||
Digouts amp Pre-leveling | 122 | SY | $ 4900 | $ 597800 | |||||||
Flagging | 64 | Hours | $ 5728 | $ 366566 | (2) People for 32 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 180000 | $ 180000 | |||||||
$ 5403066 | |||||||||||
$ 2211 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 3-Inch | 413 | TONS | $ 15000 | $ 6187500 | 1000 x 22 x 025 httpwwwamerasphaltcomasphalthtm | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 150 | CY | $ 4800 | $ 720000 | Water Street Project = $48 CY | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 96 | Hours | $ 5728 | $ 549850 | (2) People for 48 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 10909750 | |||||||||||
$ 4464 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Chip Seal | 2444 | SY | $ 1050 | $ 2566200 | 1000 X 22 | Unit Cost $525 SY from Walker Street County Invoice Doubled to $1050 for Chip Seal Over Gravel | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 150 | CY | $ 4800 | $ 720000 | Water Street Project = $48 CY | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 80 | Hours | $ 5728 | $ 458208 | (2) People for 40 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | Hours | $ 12500 | $ - 0 | High Average Loaded Rate No Testing | ||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 7196808 | |||||||||||
$ 2945 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 1500000 | $614 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 500 | LF | $ 5000 | $ 2500000 | |||||||
Catch Basins | 4 | EACH | $ 150000 | $ 600000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Chip Seal | 2444 | SY | $ 525 | $ 1283100 | 1000 X 22 | Unit Cost from Walker Street County Invoice | ||||||
Digouts amp Pre-leveling | 122 | SY | $ 4900 | $ 598780 | Cost from 2018 Lakeside Mill amp Fill | Estimate Quanity Based on 5 | ||||||
Flagging | 32 | Hours | $ 5728 | $ 183283 | (2) People for 16 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | Hours | $ 12500 | $ - 0 | High Average Loaded Rate No Surveying or Testing | ||||||
Surveying | 1 | LS | $ - 0 | $ - 0 | |||||||
$ 2198863 | |||||||||||
$ 900 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 1500000 | $614 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY |
Project Descriptioin | Length | Width | Construction Costs | Engineering Costs | Engineering Total | Digouts Pre-Leveling Costs | Digouts Pre-Leveling Total | ADACosts | ADATotal | StormwaterCosts | StormwaterTotal | Total Costsby SY | Cost Per 250 Block | Length | Width | Notes | |||||||||||||||||
Chip Seal Pavement | |||||||||||||||||||||||||||||||||
Walker Street Washington Street to Lawrence Street | 1144 | 24 | $ 25000 | 15 | $ 3750 | 10 | $ 2500 | $ 1024 | $ 682911 | 250 | 24 | ||||||||||||||||||||||
Pulverize amp Chip Seal | |||||||||||||||||||||||||||||||||
Engineers Estimate | 250 | 24 | $ 22000 | 15 | $ 3300 | 0 | $ - | 20 | $ 4400 | $ 4455 | $ 2970000 | 250 | 24 | ||||||||||||||||||||
Pulverize amp Asphalt Paving | |||||||||||||||||||||||||||||||||
Washington Street VanBuren Street to Harrison Street | 300 | 22 | $ 35000 | 20 | $ 7000 | 0 | $ - | 10 | $ 3500 | 20 | $ 7000 | $ 7159 | $ 4772727 | 250 | 24 | ||||||||||||||||||
Asphalt Overlay (2) | |||||||||||||||||||||||||||||||||
Engineers Estimate | 250 | 24 | $ 21334 | 20 | $ 426680 | 10 | $ 2133 | 20 | $ 426680 | 20 | $ 426680 | $ 5440 | $ 4835707 | 250 | 32 | ||||||||||||||||||
Reconstruction | |||||||||||||||||||||||||||||||||
Walker Street Lawrence Street to Blaine Street | 650 | 36 | $ 184310 | 25 | $ 46078 | 0 | $ - | 20 | $ 36862 | 30 | $ 55293 | $ 12405 | $ 11027094 | 250 | 32 | ||||||||||||||||||
RSL | Length (FT) | Area (SY) | Condition | Treatment | Cost | Total | |||||||||
20 | 61834 | 138524 | 131 | Good | $0 | $0 | |||||||||
14 | 23656 | 49915 | 47 | Satisfactory | Chip Seal | $29 | $1470552 | ||||||||
12 | 43586 | 106382 | 100 | $3134134 | |||||||||||
10 | 74803 | 193570 | 182 | $5702790 | |||||||||||
8 | 96662 | 228046 | 215 | $6718492 | |||||||||||
6 | 95452 | 261794 | 247 | Fair | Overlay | $67 | $17489930 | ||||||||
4 | 6420 | 14536 | 14 | $971121 | |||||||||||
2 | 29238 | 60616 | 57 | Poor | Rehab | $107 | $6492850 | ||||||||
0 | 3851 | 7532 | 07 | Very Poor | Rebuild | $155 | $1169719 | ||||||||
$43149589 | |||||||||||||||
Additional Paving Costs | Average Cost per SY | Percent of Paving Cost | |||
Digouts amp Pre-Leveling | $4 | 25 | |||
Stormwater | $7 | 38 | |||
ADA | $5 | 27 | |||
Engineering amp Administration | $5 | 28 |
9 | Base Paving Costs | Preperation | Stormwater | ADA | Engineering | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Remaining Service Life | Road Name | From | To | Length (ft) | Width (ft) | Area (SY) | Total Construction | Price(SY) | Reconstruction | Pulverize amp Pave | Ashpalt Overlay | Pave Gravel Road | Pulverize amp Chip Seal | Chip Seal | Total Base Paving Costs | Digouts(SY) | Pre-Leveling(SY) | Construct Shoulders Both Sides (LF) | Preparation Total | StormwaterPipes (LF) | StormwaterCatchbasins | StormwaterSwales (LF) | Stormwater Total | Curb Ramps | Curb Ramps Total | Surveying | Engineering amp Administration | Engineering amp Administration Total | Other Work | ||||||||||||||||||||||||||||||
$102 | $45 | $22 | $35 | $29 | $9 | $35 | $15 | $20 | $50 | $1500 | $25 | $15000 | |||||||||||||||||||||||||||||||||||||||||||||||
2 | Polk St - Street | Lawrence St | 1056 | 200 | 56 | 1244 | $ 210679 | $ 169 | $ 127518 | $ 127518 | $ - | 150 | 1 | 1 | $ 9025 | 2 | $ 30000 | $ 10000 | 25 | $ 44136 | |||||||||||||||||||||||||||||||||||||||
6 | 47th Street | Pettygrove | McNeil | 500 | 18 | 1548 | $ 258717 | $ 167 | $ 158624 | $ 158624 | $ - | 687 | 8 | $ 46350 | $ - | $ 10000 | 25 | $ 53743 | |||||||||||||||||||||||||||||||||||||||||
6 to 10 | Lawrence St | Calhoun St | Harrison St | 1200 | 36 | 4800 | $ 786070 | $ 164 | $ 491856 | $ 491856 | 600 | $ 15000 | $ 8 | $ 120000 | $ 10000 | 25 | $ 159214 | ||||||||||||||||||||||||||||||||||||||||||
8 | Lawrence St | Cass St | Calhoun St | 250 | 36 | 1000 | $ 146213 | $ 146 | $ 102470 | $ 102470 | 0 | 0 | $ - | 75 | 350 | $ 12500 | $ - | $ 10000 | 25 | $ 31243 | |||||||||||||||||||||||||||||||||||||||
8 | Lawrence St | Walker St | Cass St | 250 | 36 | 1000 | $ 144650 | $ 145 | $ 102470 | $ 102470 | $ - | 100 | 250 | $ 11250 | $ - | $ 10000 | 25 | $ 30930 | |||||||||||||||||||||||||||||||||||||||||
4 to 8 | San Juan Ave | Lopez Ave | Admiralty | 2300 | 34 | 8689 | $ 1222938 | $ 141 | $ 890350 | $ 890350 | $ - | 800 | 5 | 1500 | $ 85000 | $ - | $ 15000 | 25 | $ 247588 | ||||||||||||||||||||||||||||||||||||||||
6 to 8 | Lawrence St | Harrison St | Monroe St | 2380 | 47 | 12429 | $ 1331314 | $ 107 | $ 274803 | $ 274803 | 15 | 5 | $ 74573 | 1900 | 10 | $ 110000 | 50 | $ 750000 | $ 10000 | 10 | $ 121938 | ||||||||||||||||||||||||||||||||||||||
2 to 4 | Center St | San Juan Ave | Redwood St | 1660 | 16 | 2951 | $ 295222 | $ 100 | $ 86910 | $ 86910 | $ - | 1600 | 9 | 3000 | $ 168500 | $ - | $ 10000 | 15 | $ 39812 | ||||||||||||||||||||||||||||||||||||||||
0 to 6 | Pacific St | Cedar St | Tremont St | 400 | 16 | 711 | $ 66581 | $ 94 | $ 31744 | $ 31744 | $ - | 100 | 2 | 700 | $ 25500 | $ - | $ 5000 | 15 | $ 9337 | ||||||||||||||||||||||||||||||||||||||||
0 to 6 | Benton St | Lawrence | Lincoln Blg | 580 | 36 | 2320 | $ 203265 | $ 88 | $ 20880 | $ 20880 | 20 | 10 | $ 19720 | 250 | 2 | $ 15500 | 8 | $ 120000 | $ 5000 | 15 | $ 27165 | ||||||||||||||||||||||||||||||||||||||
2 | Grant St | 14th St | 16th St | 525 | 16 | 933 | $ 73635 | $ 79 | $ 27487 | $ 27487 | $ - | 400 | 2 | 500 | $ 35500 | $ - | $ 8000 | 15 | $ 10648 | ||||||||||||||||||||||||||||||||||||||||
2 to 6 | Olympic St | Cedar St | Tremont St | 536 | 12 | 715 | $ 52716 | $ 74 | $ 21047 | $ 21047 | $ - | 950 | $ 23750 | $ - | $ 8000 | 15 | $ 7920 | ||||||||||||||||||||||||||||||||||||||||||
2 | Milo St | Olympic Ave | Pacific Ave | 466 | 12 | 621 | $ 44793 | $ 72 | $ 18298 | $ 18298 | $ - | 800 | $ 20000 | $ - | $ 5000 | 15 | $ 6495 | ||||||||||||||||||||||||||||||||||||||||||
0 | 11th St | Hendricks St | Sheridan St | 550 | 16 | 978 | $ 65077 | $ 67 | $ 28796 | $ 28796 | $ - | 100 | 2 | 750 | $ 26750 | $ - | $ 8000 | 15 | $ 9532 | ||||||||||||||||||||||||||||||||||||||||
0 | 58th St | Hill St | Kuhn St | 525 | 16 | 933 | $ 60329 | $ 65 | $ 32667 | $ 32667 | $ - | 750 | $ 18750 | $ - | $ 8000 | 15 | $ 8913 | ||||||||||||||||||||||||||||||||||||||||||
2 | 10th St | Hendricks St | Grant St | 283 | 18 | 566 | $ 34294 | $ 61 | $ 16669 | $ 16669 | $ - | 500 | $ 12500 | $ - | $ 5000 | 15 | $ 5125 | ||||||||||||||||||||||||||||||||||||||||||
4 to 10 | 31st St | Hancock St | Sheridan St | 1050 | 22 | 2567 | $ 150027 | $ 58 | $ 23100 | $ 23100 | 10 | 10 | $ 12833 | 1200 | 10 | 1000 | $ 100000 | $ - | $ 5000 | 10 | $ 14093 | ||||||||||||||||||||||||||||||||||||||
6 | 25th St | Sheridan St | Holcomb St | 1200 | 18 | 2400 | $ 125895 | $ 52 | $ 70680 | $ 70680 | $ - | 125 | 1 | 1200 | $ 37750 | $ - | $ 8000 | 15 | $ 17465 | ||||||||||||||||||||||||||||||||||||||||
6 | Holcomb St | 7th St | 10th St | 850 | 12 | 1133 | $ 58703 | $ 52 | $ 10200 | $ 10200 | 10 | 10 | $ 5667 | 1500 | $ 37500 | $ - | $ - | 10 | $ 5337 | ||||||||||||||||||||||||||||||||||||||||
2 | Hendricks St | 9th St | 12th St | 800 | 16 | 1422 | $ 70930 | $ 50 | $ 41884 | $ 41884 | $ - | 750 | $ 18750 | $ - | $ 8000 | 15 | $ 10295 | ||||||||||||||||||||||||||||||||||||||||||
2 to 6 | Hill St | 19th | 21st St | 807 | 16 | 1435 | $ 67443 | $ 47 | $ 21125 | $ 6456 | $ 27581 | 10 | $ 5021 | 1000 | $ 25000 | $ - | $ 8000 | 15 | $ 9840 | ||||||||||||||||||||||||||||||||||||||||
2 to 8 | 57th St | Jackman St | Kuhn St | 800 | 18 | 1600 | $ 66550 | $ 42 | $ 14400 | $ 14400 | 20 | 10 | $ 13600 | 1300 | $ 32500 | 10 | $ 6050 | ||||||||||||||||||||||||||||||||||||||||||
6 to 8 | Sheridan St | Hastings Ave | SilverUmatilla | 1750 | 22 | 4278 | $ 154115 | $ 36 | $ 38500 | $ 38500 | 20 | 10 | $ 36361 | 300 | 4 | 1500 | $ 58500 | $ - | $ 5000 | 15 | $ 20754 | ||||||||||||||||||||||||||||||||||||||
6 to 10 | Tyler St | Jefferson St | Lawrence St | 900 | 32 | 3200 | $ 115280 | $ 36 | $ 28800 | $ 28800 | 5 | 5 | $ 8000 | 100 | 2 | $ 8000 | 4 | $ 60000 | 10 | $ 10480 | |||||||||||||||||||||||||||||||||||||||
6 to 14 | 14th St | McPherson St | Sheridan St | 2375 | 21 | 5542 | $ 182027 | $ 33 | $ 49875 | $ 49875 | 20 | 10 | $ 47104 | 750 | 4 | 1000 | $ 68500 | $ - | 10 | $ 16548 | |||||||||||||||||||||||||||||||||||||||
8 | 49th St | Kuhn St | Admiralty Ave | 400 | 24 | 1067 | $ 34613 | $ 32 | $ 9600 | $ 9600 | 5 | $ 1867 | 800 | $ 20000 | $ - | 10 | $ 3147 | ||||||||||||||||||||||||||||||||||||||||||
6 to 10 | Fir St | F St | UCherry | 4360 | 22 | 10658 | $ 341621 | $ 32 | $ 95920 | $ 95920 | 5 | 5 | 4000 | $ 106644 | 100 | 2 | 4000 | $ 108000 | $ - | 10 | $ 31056 | ||||||||||||||||||||||||||||||||||||||
6 to 8 | Cedar St | San Juan Ave | Redwood St | 1460 | 16 | 2596 | $ 81747 | $ 31 | $ 23360 | $ 23360 | 20 | 20 | $ 25956 | 1000 | $ 25000 | $ - | 10 | $ 7432 | |||||||||||||||||||||||||||||||||||||||||
8 | Clallam St | McKinley St | Roosevelt St | 975 | 14 | 1517 | $ 46796 | $ 31 | $ 13650 | $ 13650 | 20 | 10 | $ 12892 | 200 | 4 | $ 16000 | $ - | 10 | $ 4254 | ||||||||||||||||||||||||||||||||||||||||
6 | San Juan Ave | 19th St | 20th St | 300 | 31 | 1033 | $ 31827 | $ 31 | $ 9300 | $ 9300 | 50 | 10 | $ 19633 | $ - | $ - | 10 | $ 2893 | ||||||||||||||||||||||||||||||||||||||||||
6 to 20 | Cherry St | F St | W St | 4200 | 32 | 14933 | $ 457307 | $ 31 | $ 134400 | $ 134400 | 5 | 5 | 4200 | $ 121333 | 200 | 6000 | $ 160000 | $ - | 10 | $ 41573 | |||||||||||||||||||||||||||||||||||||||
6 to 8 | Jackman St | 45th St | 49th St | 1100 | 22 | 2689 | $ 81940 | $ 30 | $ 24200 | $ 24200 | 15 | 10 | $ 18150 | 225 | 3 | 500 | $ 28250 | $ - | $ 5000 | 15 | $ 11340 | ||||||||||||||||||||||||||||||||||||||
6 to 12 | Jackson St | LawrenceMonroe | Roosevelt St | 1600 | 18 | 3200 | $ 93530 | $ 29 | $ 28800 | $ 28800 | 10 | 10 | $ 16000 | 1000 | $ 25000 | 1 | $ 15000 | $ 2500 | 10 | $ 8730 | |||||||||||||||||||||||||||||||||||||||
2 | 7th St | Wilson St | Holcomb St | 450 | 16 | 800 | $ 23320 | $ 29 | $ 7200 | $ 7200 | 10 | 10 | $ 4000 | 400 | $ 10000 | $ - | 10 | $ 2120 | |||||||||||||||||||||||||||||||||||||||||
8 to 14 | 25th St | Sherman St | Sheridan St | 800 | 20 | 1778 | $ 50061 | $ 28 | $ 16000 | $ 16000 | 10 | 5 | $ 7556 | 1 | 800 | $ 21500 | $ - | $ 5000 | 10 | $ 5006 | |||||||||||||||||||||||||||||||||||||||
2 to 6 | Hancock St | SR 20 | 9th St | 1100 | 20 | 2444 | $ 67833 | $ 28 | $ 22000 | $ 22000 | 15 | 5 | $ 14667 | 1000 | $ 25000 | $ - | 10 | $ 6167 | |||||||||||||||||||||||||||||||||||||||||
Benton St | Washington St | Lawrence St | 1160 | 22 | 2836 | $ 74468 | $ 26 | $ 25520 | $ 25520 | 10 | 10 | $ 14178 | 140 | 4 | 600 | $ 28000 | 10 | $ 6770 | |||||||||||||||||||||||||||||||||||||||||
W St | San JuanAdmiralty | Walnut St | 2560 | 22 | 6258 | $ 163807 | $ 26 | $ 56320 | $ 56320 | 10 | 5 | $ 26596 | 200 | 4 | 2000 | $ 66000 | $ - | 10 | $ 14892 | ||||||||||||||||||||||||||||||||||||||||
6 to 8 | Walnut | W Street | Jackson | 2300 | 22 | 5622 | $ 145194 | $ 26 | $ 50600 | $ 50600 | 10 | 5 | $ 23894 | 2300 | $ 57500 | $ - | 10 | $ 13199 | |||||||||||||||||||||||||||||||||||||||||
6 to 8 | 24th St | Discovery Rd | San Juan Ave | 1250 | 18 | 2500 | $ 63938 | $ 26 | $ 22500 | $ 22500 | 10 | 5 | $ 10625 | 1000 | $ 25000 | $ - | 10 | $ 5813 | |||||||||||||||||||||||||||||||||||||||||
6 to 10 | Tyler St | Lawrence St | Blaine St | 900 | 32 | 3200 | $ 78980 | $ 25 | $ 28800 | $ 28800 | 5 | 5 | $ 8000 | 200 | $ 5000 | 2 | $ 30000 | 10 | $ 7180 | ||||||||||||||||||||||||||||||||||||||||
4 to 12 | McPherson St | SR 20 | Discovery Rd | 2925 | 32 | 10400 | $ 244860 | $ 24 | $ 93600 | $ 93600 | 5 | 5 | 2925 | $ 84500 | 230 | 2 | 1200 | $ 44500 | $ - | $ - | 10 | $ 22260 | |||||||||||||||||||||||||||||||||||||
10 | Landes St | 12th St | 19th St | 1820 | 32 | 6471 | $ 151821 | $ 23 | $ 58240 | $ 58240 | 5 | 1400 | $ 39324 | 400 | $ 10000 | 2 | $ 30000 | $ 5000 | 10 | $ 14256 | |||||||||||||||||||||||||||||||||||||||
6 to 8 | Discovery Rd | 19th | Hastings Ave | 2900 | 22 | 7089 | $ 136565 | $ 19 | $ 63800 | $ 63800 | 15 | 10 | $ 47850 | 500 | $ 12500 | $ - | 10 | $ 12415 | |||||||||||||||||||||||||||||||||||||||||
8 to 12 | Hastings Ave | Discovery Rd | County Line | 8450 | 32 | 30044 | $ 542349 | $ 18 | $ 270400 | $ 270400 | 5 | 10 | 5000 | $ 197644 | 1000 | $ 25000 | $ - | 10 | $ 49304 | ||||||||||||||||||||||||||||||||||||||||
6 to 12 | Washington St | Van Buren St | SR20 | 2025 | 30 | 6750 | $ 118388 | $ 18 | $ 60750 | $ 60750 | 5 | 5 | $ 16875 | 0 | 0 | 0 | $ - | 2 | $ 30000 | $ - | 10 | $ 10763 | |||||||||||||||||||||||||||||||||||||
14 | Blaine St | San Juan Ave | Walker St | 1275 | 48 | 6800 | $ 113910 | $ 17 | $ 61200 | $ 61200 | 5 | $ 11900 | $ - | 2 | $ 30000 | $ 5000 | 10 | $ 10810 | |||||||||||||||||||||||||||||||||||||||||
6 | Washington St | Harrison St | Taylor St | 1175 | 33 | 4308 | $ 59240 | $ 14 | $ 38775 | $ 38775 | 10 | $ 15079 | $ - | $ - | 10 | $ 5385 | |||||||||||||||||||||||||||||||||||||||||||
8 to 10 | Sheridan St | SR 20 | 19th St | 4000 | 46 | 20444 | $ 272922 | $ 13 | $ 184000 | $ 184000 | 5 | 5 | $ 51111 | 200 | 2 | $ 13000 | $ - | 10 | $ 24811 | ||||||||||||||||||||||||||||||||||||||||
8 to 10 | 19th St | San Juan Ave | Sheridan St | 3200 | 48 | 17067 | $ 197120 | $ 12 | $ 153600 | $ 153600 | 3 | 3 | $ 25600 | 0 | 0 | 0 | $ - | $ - | 10 | $ 17920 | |||||||||||||||||||||||||||||||||||||||
10 to 20 | San Juan Ave | F St | Lopez Ave | 2800 | 32 | 9956 | $ 110059 | $ 11 | $ 89600 | $ 89600 | 3 | $ 10453 | $ - | $ - | 10 | $ 10005 | |||||||||||||||||||||||||||||||||||||||||||
10 to 20 | F St | Hastings Ave | Tyler St | 5300 | 31 | 18256 | $ 180730 | $ 10 | $ 164300 | $ 164300 | $ - | $ - | $ - | 10 | $ 16430 | ||||||||||||||||||||||||||||||||||||||||||||
$ 9952406 | $ 1873288 | $ 31744 | $ 274803 | $ 32667 | $ 332896 | $ 1998646 | $ 4544044 | $ 1155207 | $ 1747625 | $ 1215000 | $ 1290529 | $ - 0 | |||||||||||||||||||||||||||||||||||||||||||||||
Street Pavement Improvement Plan Projects | 9 | 110 | |||||||||||||||||||||||||||||||||||||||||||||
Road Name | From | To | Iworq ID | Length (ft) | Width (ft) | Area (yd^2) | Actual Area(SY) | Unit Cost per yd2 | Construction Cost | Prep Work | Survey Testing | ADA Curb Ramps | Storm Water | Mill amp Fill$50SY | Pre-Level$4SY | Total Construction | Project Cost + 10 | Unit Cost w Additional Costs no 10 | Engineering Costs | Notes | |||||||||||||||||||||||||||
Priority | Reconstruct | 2021 | 2022 | 2023 | 2024 | ||||||||||||||||||||||||||||||||||||||||||
1 | Reconstruct | Lawrence St | Cass St | Calhoun St | 1304 | 250 | 36 | 1000 | $ 80 | $ 80000 | $ 5000 | $ 20000 | $ 105000 | $ 115500 | $ 105 | Stormwater South Side Parking Raingarden on Cass | |||||||||||||||||||||||||||||||
2 | Reconstruct | Lawrence St | Walker St | Cass St | 250 | 36 | 1000 | $ 80 | $ 80000 | $ 5000 | $ 20000 | $ 5000 | $ 110000 | $ 121000 | $ 110 | Stormwater South Side Parking | |||||||||||||||||||||||||||||||
3 | Reconstruct Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | San Juan Ave | Lopez Ave | Admiralty | 2300 | 32 | 8178 | $ 50 | $ 408889 | $ 10000 | $ 100000 | $ 518889 | $ 570778 | $ 63 | Stormwater Problem 45th | ||||||||||||||||||||||||||||||||
4 | Reconstruct Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Polk St - Street Improvements | Lawrence St | 1056 Sarah Tiffany Sarah TiffanyGarfield | 1073 | 200 | 56 | 1244 | $ 50 | $ 62222 | X | X | X | $ 62222 | $ 68444 | $ 50 | Parking Theater 4 AC Watermain Infiltration or Rain Garden Parking on Condo Side | ||||||||||||||||||||||||||||||
Reconstruct | 47th Street | Pettygrove | McNeil | 500 | 18 | 1000 | 1548 | $ 50 | $ 50000 | $ 5000 | $ 40000 | $ 95000 | $ 104500 | $ 95 | $210000 Engineers Estimate With Engineering Cost Turnaround Spaghetti Waterline | ||||||||||||||||||||||||||||||||
Chip Seal - $50000 to $70000 per Mile | $6 No DigoutsPre-leveling | $10 with Additional Prep Work | |||||||||||||||||||||||||||||||||||||||||||||||
Chip Seal | Washington St | Van Buren St | SR20 | 2025 | 30 | 6750 | $ 10 | $ 67500 | $ 67500 | $ 74250 | Digouts Flagging | ||||||||||||||||||||||||||||||||||||
Chip Seal | Hastings Ave - Pre-level and widen shoulders | Discovery Rd | County Line | 8450 | 24 | 22533 | $ 6 | $ 135200 | $ 135200 | $ 148720 | Ditches amp Culverts Total Width change from 21 to 24 How wide will shoulders be | ||||||||||||||||||||||||||||||||||||
Tyler St | Jefferson St | Lawrence St | 900 | 32 | 3200 | $ 6 | $ 19200 | $ 19200 | $ 21120 | ||||||||||||||||||||||||||||||||||||||
Chip Seal | McPherson - Chip Seal | 4th St | Discovery Rd | 3100 | 32 | 11022 | $ 6 | $ 66133 | $ 66133 | $ 72747 | Ditches amp Culverts Shoulder Wideneing | ||||||||||||||||||||||||||||||||||||
Chip Seal | 19th St - Chip Seal | San Juan Ave | Sheridan St | 3200 | 48 | 17067 | $ 6 | $ 102400 | $ 102400 | $ 112640 | Bike Lanes amp Shoulder Prelevel | ||||||||||||||||||||||||||||||||||||
Chip Seal | Walnut | W Street | Jackson | 2300 | 22 | 5622 | $ 6 | $ 33733 | $ 33733 | $ 37107 | Dig-Outs Pre-Leveling Striping Shoulders | ||||||||||||||||||||||||||||||||||||
Chip Seal | Fir St - Chip Seal | F St | UCherry | 4360 | 22 | 10658 | $ 10 | $ 106578 | X | X | $ 106578 | $ 117236 | Dig-Outs Pre-Leveling Striping | ||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | |||||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | P St - Chip Seal | Redwood St | Cedar St | 0486 | 300 | 16 | 533 | $ 20 | $ 10667 | $ 10667 | $ 11733 | Watermain Looping Shouldnt this be part of Center | |||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 25th St - Chip Seal | Sheridan St | Holcomb St | 1200 | 18 | 2400 | $ 20 | $ 48000 | $ 48000 | $ 52800 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 14th St - Chip Seal | $ - | $ - | ||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Cedar St - Chip Seal | Redwood St | San Juan Ave | 1460 | 16 | 2596 | $ 20 | $ 51911 | $ 51911 | $ 57102 | Ex ChipSeal 22 Wide | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Center St - Chip Seal | Redwood St | San Juan Ave | 484 | 1660 | 16 | 2951 | $ 20 | $ 59022 | $ 59022 | $ 64924 | Ex ChipSeal 22 Wide Stormwater | |||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Grant St Chip Seal | 14th St | 16th St | 525 | 16 | 933 | $ 20 | $ 18667 | $ 18667 | $ 20533 | Ex Street 10 Wide | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 11th St Chip Seal | Hendricks St | Sheridan St | 550 | 16 | 978 | $ 20 | $ 19556 | $ 19556 | $ 21511 | Hospital Parking | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Hendricks St Chip Seal | 9th St | 12th St | 800 | 16 | 1422 | $ 20 | $ 28444 | $ 28444 | $ 31289 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 10th St Chip Seal | Hendricks St | Grant St | 1655 | 283 | 18 | 566 | $ 20 | $ 11320 | $ 11320 | $ 12452 | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Grant St Chip Seal | 14th St | 16th St | 525 | 18 | 1050 | $ 20 | $ 21000 | $ 21000 | $ 23100 | Ex Street 10 Wide Stormwater | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Hill St | 21st St | 19th St | 807 | 16 | 1435 | $ 20 | $ 28693 | $ 28693 | $ 31563 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Milo St -Chip seal | Olympic Ave | Pacific Ave | 0003 | 466 | 12 | 621 | $ 20 | $ 12427 | $ 12427 | $ 13669 | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Olympic St | Cedar St | Tremont St | 536 | 12 | 715 | $ 20 | $ 14293 | $ 14293 | $ 15723 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Benton St - street improvement | Blaine St | Lincoln Blg | 580 | 36 Sarah Tiffany Sarah TiffanyEstimated at 25-36 used higher number | Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Sarah Tiffany Sarah TiffanyGarfield | 2320 | $ 20 | $ 46400 | $ 46400 | $ 51040 | ||||||||||||||||||||||||||||||||||
Pave Gravel Road | |||||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Pacific St | Cedar St | Tremont St | 400 | 16 | 711 | $ 50 | $ 35556 | $ 6000 | $ 15000 | $ 56556 | $ 62211 | $ 80 | ||||||||||||||||||||||||||||||||||
58th St | Hill St | Kuhn St | 525 | 16 | 933 | $ 50 | $ 46667 | $ 6000 | $ 20000 | $ 72667 | $ 79933 | $ 78 | 4 AC Waterline Driveways Site Distance (Re-grade Slope) | ||||||||||||||||||||||||||||||||||
Sidewalks | |||||||||||||||||||||||||||||||||||||||||||||||
Harrison St | Franklin St | Clay St | 340 | 6 | 227 | $ 165 | $ 56100 | $ 5000 | $ 61100 | $ 67210 | $ 180 | ||||||||||||||||||||||||||||||||||||
9th St | Hancock St | McPherson St | 1300 | 6 | 867 | $ 165 | $ 214500 | $ 10000 | $ 15000 | $ 239500 | $ 263450 | $ 184 | |||||||||||||||||||||||||||||||||||
Asphalt Path | |||||||||||||||||||||||||||||||||||||||||||||||
Spruce St Easement | Cedar St | Center St | 150 | 8 | 133 | $ 50 | $ 6667 | $ 2000 | $ 8667 | $ 9533 | $ 65 | ||||||||||||||||||||||||||||||||||||
Cherry St | A St | E St | 990 | 10 | 1100 | $ 50 | $ 55000 | $ 10000 | $ 10000 | $ 15000 | $ 90000 | $ 99000 | $ 82 | ||||||||||||||||||||||||||||||||||
Gravel Path | |||||||||||||||||||||||||||||||||||||||||||||||
16th St | Thomas St | Grant St | 1700 | 6 | 1133 | $ 15 | $ 17000 | $ 1500 | $ 18500 | $ 20350 | |||||||||||||||||||||||||||||||||||||
Cleveland St | 21st St | 23rd St | 500 | 6 | 333 | $ 15 | $ 5000 | $ 5000 | $ 5500 | Need Easement | |||||||||||||||||||||||||||||||||||||
6 | - | $ 15 | $ - | $ - | $ - | Need Easement | |||||||||||||||||||||||||||||||||||||||||
6 | - | $ 15 | $ - | $ - | $ - | Need Easement | |||||||||||||||||||||||||||||||||||||||||
Total | $ 1582256 | $ 1792256 | $ 1971481 | ||||||||||||||||||||||||||||||||||||||||||||
Project Descriptioin | Length | Width | Construction Costs | ConstructionUnit Costs | Units | Engineering Costs | Total CostsUnit Cost | Total Costs | Total CostsUnit Cost | Notes | |||||||||||
Sidewalk | |||||||||||||||||||||
9th Street Sidewalk Grant Street to Hancock Street | 826 | 6 | $ 141506 | $ 17131 | LF | Construction Unit Cost per Foot | |||||||||||||||
Jefferson Street Sidewalk Washington Street to Taylor Street | 724 | 6 | $ 390502 | $ 53937 | LF | Construction Unit Cost per Foot | |||||||||||||||
Landis Street Sidewalk 10th Street to 19th Street | 1795 | 6 | $ 364550 | $ 20309 | LF | Construction Unit Cost per Foot | |||||||||||||||
ADA Corner Ramps | |||||||||||||||||||||
Washington Street amp Harrison Street | $ 42000 | $ 42000 | Each | ||||||||||||||||||
Washington Street amp Adams Street | $ 38150 | $ 19075 | Each | Two Corners Were Retrofitted | |||||||||||||||||
Chip Seal Pavement | |||||||||||||||||||||
Walker Street Washington Street to Lawrence Street | 1144 | 24 | $ 20000 | $ 656 | SY | Does not include flagging nor prep work | |||||||||||||||
Pulverize amp Asphalt Paving | |||||||||||||||||||||
Washington Street VanBuren Street to Harrison Street | 300 | 22 | $ 35000 | $ 4773 | SY | ||||||||||||||||
Asphalt Overlay | |||||||||||||||||||||
Sidewalks | ||||||||||||||||||||||||||||||||||||||
Harrison St | Franklin St | Clay St | 340 | 6 | 227 | |||||||||||||||||||||||||||||||||
9th St | Hancock St | McPherson St | 1300 | 6 | 867 | |||||||||||||||||||||||||||||||||
Asphalt Path | ||||||||||||||||||||||||||||||||||||||
Spruce St Easement | Cedar St | Center St | 150 | 8 | 133 | $ 2000 | $ 2000 | $ 2000 | ||||||||||||||||||||||||||||||
Cherry St | A St | E St | 990 | 10 | 1100 | $ 10000 | $ 10000 | $ 10000 | ||||||||||||||||||||||||||||||
Gravel Path | ||||||||||||||||||||||||||||||||||||||
16th St | Thomas St | Grant St | 1700 | 6 | 1133 | $ 1500 | $ 1500 | $ 1500 | ||||||||||||||||||||||||||||||
Cleveland St | 21st St | 23rd St | 500 | 6 | 333 | Need Easement | ||||||||||||||||||||||||||||||||
6 | - | Need Easement | ||||||||||||||||||||||||||||||||||||
6 | - | Need Easement | ||||||||||||||||||||||||||||||||||||
Total |
Type | Improvement | Cost Range SY | Cost Range LF | ||||||||
1 | Complete Road Rebuild | $80 | $100 | ||||||||
2 | Asphalt Overlay | $50 | $60 | ||||||||
3 | Pulverize amp Chip Seal | $20 | $30 | ||||||||
4 | Chip Seal | $6 | $10 | $12 | $25 | ||||||
5 | Seal Coat | ||||||||||
6 | |||||||||||
7 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 3-Inch | 413 | TONS | $ 15000 | $ 6187500 | 1000 x 22 x 025 httpwwwamerasphaltcomasphalthtm | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 1630 | CY | $ 4800 | $ 7824000 | Water Street Project = $48 CY (1000 x 22 x 2)27 = 1630 CY | ||||||
Gravel Borrow | 2282 | TONS | $ 3000 | $ 6846000 | (1000 x 22 x 2)27 = 1630 1630 CY x 14 = 2282 Tons | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 128 | Hours | $ 5728 | $ 733133 | (2) People for 64 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 25043033 | |||||||||||
$ 10247 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 2-Inch | 275 | TONS | $ 15000 | $ 4125000 | 1000 x 22 x 017 httpwwwamerasphaltcomasphalthtm | | ||||||
Digouts amp Pre-leveling | 122 | SY | $ 4900 | $ 597800 | |||||||
Flagging | 64 | Hours | $ 5728 | $ 366566 | (2) People for 32 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 180000 | $ 180000 | |||||||
$ 5403066 | |||||||||||
$ 2211 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 3-Inch | 413 | TONS | $ 15000 | $ 6187500 | 1000 x 22 x 025 httpwwwamerasphaltcomasphalthtm | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 150 | CY | $ 4800 | $ 720000 | Water Street Project = $48 CY | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 96 | Hours | $ 5728 | $ 549850 | (2) People for 48 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 10909750 | |||||||||||
$ 4464 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Chip Seal | 2444 | SY | $ 1050 | $ 2566200 | 1000 X 22 | Unit Cost $525 SY from Walker Street County Invoice Doubled to $1050 for Chip Seal Over Gravel | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 150 | CY | $ 4800 | $ 720000 | Water Street Project = $48 CY | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 80 | Hours | $ 5728 | $ 458208 | (2) People for 40 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | Hours | $ 12500 | $ - 0 | High Average Loaded Rate No Testing | ||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 7196808 | |||||||||||
$ 2945 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 1500000 | $614 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 500 | LF | $ 5000 | $ 2500000 | |||||||
Catch Basins | 4 | EACH | $ 150000 | $ 600000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Chip Seal | 2444 | SY | $ 525 | $ 1283100 | 1000 X 22 | Unit Cost from Walker Street County Invoice | ||||||
Digouts amp Pre-leveling | 122 | SY | $ 4900 | $ 598780 | Cost from 2018 Lakeside Mill amp Fill | Estimate Quanity Based on 5 | ||||||
Flagging | 32 | Hours | $ 5728 | $ 183283 | (2) People for 16 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | Hours | $ 12500 | $ - 0 | High Average Loaded Rate No Surveying or Testing | ||||||
Surveying | 1 | LS | $ - 0 | $ - 0 | |||||||
$ 2198863 | |||||||||||
$ 900 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 1500000 | $614 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY |
Project Descriptioin | Length | Width | Construction Costs | Engineering Costs | Engineering Total | Digouts Pre-Leveling Costs | Digouts Pre-Leveling Total | ADACosts | ADATotal | StormwaterCosts | StormwaterTotal | Total Costsby SY | Cost Per 250 Block | Length | Width | Notes | |||||||||||||||||
Chip Seal Pavement | |||||||||||||||||||||||||||||||||
Walker Street Washington Street to Lawrence Street | 1144 | 24 | $ 25000 | 15 | $ 3750 | 10 | $ 2500 | $ 1024 | $ 682911 | 250 | 24 | ||||||||||||||||||||||
Pulverize amp Chip Seal | |||||||||||||||||||||||||||||||||
Engineers Estimate | 250 | 24 | $ 22000 | 15 | $ 3300 | 0 | $ - | 20 | $ 4400 | $ 4455 | $ 2970000 | 250 | 24 | ||||||||||||||||||||
Pulverize amp Asphalt Paving | |||||||||||||||||||||||||||||||||
Washington Street VanBuren Street to Harrison Street | 300 | 22 | $ 35000 | 20 | $ 7000 | 0 | $ - | 10 | $ 3500 | 20 | $ 7000 | $ 7159 | $ 4772727 | 250 | 24 | ||||||||||||||||||
Asphalt Overlay (2) | |||||||||||||||||||||||||||||||||
Engineers Estimate | 250 | 24 | $ 21334 | 20 | $ 426680 | 10 | $ 2133 | 20 | $ 426680 | 20 | $ 426680 | $ 5440 | $ 4835707 | 250 | 32 | ||||||||||||||||||
Reconstruction | |||||||||||||||||||||||||||||||||
Walker Street Lawrence Street to Blaine Street | 650 | 36 | $ 184310 | 25 | $ 46078 | 0 | $ - | 20 | $ 36862 | 30 | $ 55293 | $ 12405 | $ 11027094 | 250 | 32 | ||||||||||||||||||
RSL | Length (FT) | Area (SY) | Condition | Treatment | Cost | Total | |||||||||
20 | 61834 | 138524 | 131 | Good | $0 | $0 | |||||||||
14 | 23656 | 49915 | 47 | Satisfactory | Chip Seal | $29 | $1470552 | ||||||||
12 | 43586 | 106382 | 100 | $3134134 | |||||||||||
10 | 74803 | 193570 | 182 | $5702790 | |||||||||||
8 | 96662 | 228046 | 215 | $6718492 | |||||||||||
6 | 95452 | 261794 | 247 | Fair | Overlay | $67 | $17489930 | ||||||||
4 | 6420 | 14536 | 14 | $971121 | |||||||||||
2 | 29238 | 60616 | 57 | Poor | Rehab | $107 | $6492850 | ||||||||
0 | 3851 | 7532 | 07 | Very Poor | Rebuild | $155 | $1169719 | ||||||||
$43149589 | |||||||||||||||
Additional Paving Costs | Average Cost per SY | Percent of Paving Cost | |||
Digouts amp Pre-Leveling | $4 | 25 | |||
Stormwater | $7 | 38 | |||
ADA | $5 | 27 | |||
Engineering amp Administration | $5 | 28 |
9 | Base Paving Costs | Preperation | Stormwater | ADA | Engineering | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Remaining Service Life | Road Name | From | To | Length (ft) | Width (ft) | Area (SY) | Total Construction | Price(SY) | Reconstruction | Pulverize amp Pave | Ashpalt Overlay | Pave Gravel Road | Pulverize amp Chip Seal | Chip Seal | Total Base Paving Costs | Digouts(SY) | Pre-Leveling(SY) | Construct Shoulders Both Sides (LF) | Preparation Total | StormwaterPipes (LF) | StormwaterCatchbasins | StormwaterSwales (LF) | Stormwater Total | Curb Ramps | Curb Ramps Total | Surveying | Engineering amp Administration | Engineering amp Administration Total | Other Work | ||||||||||||||||||||||||||||||
$102 | $45 | $22 | $35 | $29 | $9 | $35 | $15 | $20 | $50 | $1500 | $25 | $15000 | |||||||||||||||||||||||||||||||||||||||||||||||
2 | Polk St - Street | Lawrence St | 1056 | 200 | 56 | 1244 | $ 210679 | $ 169 | $ 127518 | $ 127518 | $ - | 150 | 1 | 1 | $ 9025 | 2 | $ 30000 | $ 10000 | 25 | $ 44136 | |||||||||||||||||||||||||||||||||||||||
6 | 47th Street | Pettygrove | McNeil | 500 | 18 | 1548 | $ 258717 | $ 167 | $ 158624 | $ 158624 | $ - | 687 | 8 | $ 46350 | $ - | $ 10000 | 25 | $ 53743 | |||||||||||||||||||||||||||||||||||||||||
6 to 10 | Lawrence St | Calhoun St | Harrison St | 1200 | 36 | 4800 | $ 786070 | $ 164 | $ 491856 | $ 491856 | 600 | $ 15000 | $ 8 | $ 120000 | $ 10000 | 25 | $ 159214 | ||||||||||||||||||||||||||||||||||||||||||
8 | Lawrence St | Cass St | Calhoun St | 250 | 36 | 1000 | $ 146213 | $ 146 | $ 102470 | $ 102470 | 0 | 0 | $ - | 75 | 350 | $ 12500 | $ - | $ 10000 | 25 | $ 31243 | |||||||||||||||||||||||||||||||||||||||
8 | Lawrence St | Walker St | Cass St | 250 | 36 | 1000 | $ 144650 | $ 145 | $ 102470 | $ 102470 | $ - | 100 | 250 | $ 11250 | $ - | $ 10000 | 25 | $ 30930 | |||||||||||||||||||||||||||||||||||||||||
4 to 8 | San Juan Ave | Lopez Ave | Admiralty | 2300 | 34 | 8689 | $ 1222938 | $ 141 | $ 890350 | $ 890350 | $ - | 800 | 5 | 1500 | $ 85000 | $ - | $ 15000 | 25 | $ 247588 | ||||||||||||||||||||||||||||||||||||||||
6 to 8 | Lawrence St | Harrison St | Monroe St | 2380 | 47 | 12429 | $ 1331314 | $ 107 | $ 274803 | $ 274803 | 15 | 5 | $ 74573 | 1900 | 10 | $ 110000 | 50 | $ 750000 | $ 10000 | 10 | $ 121938 | ||||||||||||||||||||||||||||||||||||||
2 to 4 | Center St | San Juan Ave | Redwood St | 1660 | 16 | 2951 | $ 295222 | $ 100 | $ 86910 | $ 86910 | $ - | 1600 | 9 | 3000 | $ 168500 | $ - | $ 10000 | 15 | $ 39812 | ||||||||||||||||||||||||||||||||||||||||
0 to 6 | Pacific St | Cedar St | Tremont St | 400 | 16 | 711 | $ 66581 | $ 94 | $ 31744 | $ 31744 | $ - | 100 | 2 | 700 | $ 25500 | $ - | $ 5000 | 15 | $ 9337 | ||||||||||||||||||||||||||||||||||||||||
0 to 6 | Benton St | Lawrence | Lincoln Blg | 580 | 36 | 2320 | $ 203265 | $ 88 | $ 20880 | $ 20880 | 20 | 10 | $ 19720 | 250 | 2 | $ 15500 | 8 | $ 120000 | $ 5000 | 15 | $ 27165 | ||||||||||||||||||||||||||||||||||||||
2 | Grant St | 14th St | 16th St | 525 | 16 | 933 | $ 73635 | $ 79 | $ 27487 | $ 27487 | $ - | 400 | 2 | 500 | $ 35500 | $ - | $ 8000 | 15 | $ 10648 | ||||||||||||||||||||||||||||||||||||||||
2 to 6 | Olympic St | Cedar St | Tremont St | 536 | 12 | 715 | $ 52716 | $ 74 | $ 21047 | $ 21047 | $ - | 950 | $ 23750 | $ - | $ 8000 | 15 | $ 7920 | ||||||||||||||||||||||||||||||||||||||||||
2 | Milo St | Olympic Ave | Pacific Ave | 466 | 12 | 621 | $ 44793 | $ 72 | $ 18298 | $ 18298 | $ - | 800 | $ 20000 | $ - | $ 5000 | 15 | $ 6495 | ||||||||||||||||||||||||||||||||||||||||||
0 | 11th St | Hendricks St | Sheridan St | 550 | 16 | 978 | $ 65077 | $ 67 | $ 28796 | $ 28796 | $ - | 100 | 2 | 750 | $ 26750 | $ - | $ 8000 | 15 | $ 9532 | ||||||||||||||||||||||||||||||||||||||||
0 | 58th St | Hill St | Kuhn St | 525 | 16 | 933 | $ 60329 | $ 65 | $ 32667 | $ 32667 | $ - | 750 | $ 18750 | $ - | $ 8000 | 15 | $ 8913 | ||||||||||||||||||||||||||||||||||||||||||
2 | 10th St | Hendricks St | Grant St | 283 | 18 | 566 | $ 34294 | $ 61 | $ 16669 | $ 16669 | $ - | 500 | $ 12500 | $ - | $ 5000 | 15 | $ 5125 | ||||||||||||||||||||||||||||||||||||||||||
4 to 10 | 31st St | Hancock St | Sheridan St | 1050 | 22 | 2567 | $ 150027 | $ 58 | $ 23100 | $ 23100 | 10 | 10 | $ 12833 | 1200 | 10 | 1000 | $ 100000 | $ - | $ 5000 | 10 | $ 14093 | ||||||||||||||||||||||||||||||||||||||
6 | 25th St | Sheridan St | Holcomb St | 1200 | 18 | 2400 | $ 125895 | $ 52 | $ 70680 | $ 70680 | $ - | 125 | 1 | 1200 | $ 37750 | $ - | $ 8000 | 15 | $ 17465 | ||||||||||||||||||||||||||||||||||||||||
6 | Holcomb St | 7th St | 10th St | 850 | 12 | 1133 | $ 58703 | $ 52 | $ 10200 | $ 10200 | 10 | 10 | $ 5667 | 1500 | $ 37500 | $ - | $ - | 10 | $ 5337 | ||||||||||||||||||||||||||||||||||||||||
2 | Hendricks St | 9th St | 12th St | 800 | 16 | 1422 | $ 70930 | $ 50 | $ 41884 | $ 41884 | $ - | 750 | $ 18750 | $ - | $ 8000 | 15 | $ 10295 | ||||||||||||||||||||||||||||||||||||||||||
2 to 6 | Hill St | 19th | 21st St | 807 | 16 | 1435 | $ 67443 | $ 47 | $ 21125 | $ 6456 | $ 27581 | 10 | $ 5021 | 1000 | $ 25000 | $ - | $ 8000 | 15 | $ 9840 | ||||||||||||||||||||||||||||||||||||||||
2 to 8 | 57th St | Jackman St | Kuhn St | 800 | 18 | 1600 | $ 66550 | $ 42 | $ 14400 | $ 14400 | 20 | 10 | $ 13600 | 1300 | $ 32500 | 10 | $ 6050 | ||||||||||||||||||||||||||||||||||||||||||
6 to 8 | Sheridan St | Hastings Ave | SilverUmatilla | 1750 | 22 | 4278 | $ 154115 | $ 36 | $ 38500 | $ 38500 | 20 | 10 | $ 36361 | 300 | 4 | 1500 | $ 58500 | $ - | $ 5000 | 15 | $ 20754 | ||||||||||||||||||||||||||||||||||||||
6 to 10 | Tyler St | Jefferson St | Lawrence St | 900 | 32 | 3200 | $ 115280 | $ 36 | $ 28800 | $ 28800 | 5 | 5 | $ 8000 | 100 | 2 | $ 8000 | 4 | $ 60000 | 10 | $ 10480 | |||||||||||||||||||||||||||||||||||||||
6 to 14 | 14th St | McPherson St | Sheridan St | 2375 | 21 | 5542 | $ 182027 | $ 33 | $ 49875 | $ 49875 | 20 | 10 | $ 47104 | 750 | 4 | 1000 | $ 68500 | $ - | 10 | $ 16548 | |||||||||||||||||||||||||||||||||||||||
8 | 49th St | Kuhn St | Admiralty Ave | 400 | 24 | 1067 | $ 34613 | $ 32 | $ 9600 | $ 9600 | 5 | $ 1867 | 800 | $ 20000 | $ - | 10 | $ 3147 | ||||||||||||||||||||||||||||||||||||||||||
6 to 10 | Fir St | F St | UCherry | 4360 | 22 | 10658 | $ 341621 | $ 32 | $ 95920 | $ 95920 | 5 | 5 | 4000 | $ 106644 | 100 | 2 | 4000 | $ 108000 | $ - | 10 | $ 31056 | ||||||||||||||||||||||||||||||||||||||
6 to 8 | Cedar St | San Juan Ave | Redwood St | 1460 | 16 | 2596 | $ 81747 | $ 31 | $ 23360 | $ 23360 | 20 | 20 | $ 25956 | 1000 | $ 25000 | $ - | 10 | $ 7432 | |||||||||||||||||||||||||||||||||||||||||
8 | Clallam St | McKinley St | Roosevelt St | 975 | 14 | 1517 | $ 46796 | $ 31 | $ 13650 | $ 13650 | 20 | 10 | $ 12892 | 200 | 4 | $ 16000 | $ - | 10 | $ 4254 | ||||||||||||||||||||||||||||||||||||||||
6 | San Juan Ave | 19th St | 20th St | 300 | 31 | 1033 | $ 31827 | $ 31 | $ 9300 | $ 9300 | 50 | 10 | $ 19633 | $ - | $ - | 10 | $ 2893 | ||||||||||||||||||||||||||||||||||||||||||
6 to 20 | Cherry St | F St | W St | 4200 | 32 | 14933 | $ 457307 | $ 31 | $ 134400 | $ 134400 | 5 | 5 | 4200 | $ 121333 | 200 | 6000 | $ 160000 | $ - | 10 | $ 41573 | |||||||||||||||||||||||||||||||||||||||
6 to 8 | Jackman St | 45th St | 49th St | 1100 | 22 | 2689 | $ 81940 | $ 30 | $ 24200 | $ 24200 | 15 | 10 | $ 18150 | 225 | 3 | 500 | $ 28250 | $ - | $ 5000 | 15 | $ 11340 | ||||||||||||||||||||||||||||||||||||||
6 to 12 | Jackson St | LawrenceMonroe | Roosevelt St | 1600 | 18 | 3200 | $ 93530 | $ 29 | $ 28800 | $ 28800 | 10 | 10 | $ 16000 | 1000 | $ 25000 | 1 | $ 15000 | $ 2500 | 10 | $ 8730 | |||||||||||||||||||||||||||||||||||||||
2 | 7th St | Wilson St | Holcomb St | 450 | 16 | 800 | $ 23320 | $ 29 | $ 7200 | $ 7200 | 10 | 10 | $ 4000 | 400 | $ 10000 | $ - | 10 | $ 2120 | |||||||||||||||||||||||||||||||||||||||||
8 to 14 | 25th St | Sherman St | Sheridan St | 800 | 20 | 1778 | $ 50061 | $ 28 | $ 16000 | $ 16000 | 10 | 5 | $ 7556 | 1 | 800 | $ 21500 | $ - | $ 5000 | 10 | $ 5006 | |||||||||||||||||||||||||||||||||||||||
2 to 6 | Hancock St | SR 20 | 9th St | 1100 | 20 | 2444 | $ 67833 | $ 28 | $ 22000 | $ 22000 | 15 | 5 | $ 14667 | 1000 | $ 25000 | $ - | 10 | $ 6167 | |||||||||||||||||||||||||||||||||||||||||
Benton St | Washington St | Lawrence St | 1160 | 22 | 2836 | $ 74468 | $ 26 | $ 25520 | $ 25520 | 10 | 10 | $ 14178 | 140 | 4 | 600 | $ 28000 | 10 | $ 6770 | |||||||||||||||||||||||||||||||||||||||||
W St | San JuanAdmiralty | Walnut St | 2560 | 22 | 6258 | $ 163807 | $ 26 | $ 56320 | $ 56320 | 10 | 5 | $ 26596 | 200 | 4 | 2000 | $ 66000 | $ - | 10 | $ 14892 | ||||||||||||||||||||||||||||||||||||||||
6 to 8 | Walnut | W Street | Jackson | 2300 | 22 | 5622 | $ 145194 | $ 26 | $ 50600 | $ 50600 | 10 | 5 | $ 23894 | 2300 | $ 57500 | $ - | 10 | $ 13199 | |||||||||||||||||||||||||||||||||||||||||
6 to 8 | 24th St | Discovery Rd | San Juan Ave | 1250 | 18 | 2500 | $ 63938 | $ 26 | $ 22500 | $ 22500 | 10 | 5 | $ 10625 | 1000 | $ 25000 | $ - | 10 | $ 5813 | |||||||||||||||||||||||||||||||||||||||||
6 to 10 | Tyler St | Lawrence St | Blaine St | 900 | 32 | 3200 | $ 78980 | $ 25 | $ 28800 | $ 28800 | 5 | 5 | $ 8000 | 200 | $ 5000 | 2 | $ 30000 | 10 | $ 7180 | ||||||||||||||||||||||||||||||||||||||||
4 to 12 | McPherson St | SR 20 | Discovery Rd | 2925 | 32 | 10400 | $ 244860 | $ 24 | $ 93600 | $ 93600 | 5 | 5 | 2925 | $ 84500 | 230 | 2 | 1200 | $ 44500 | $ - | $ - | 10 | $ 22260 | |||||||||||||||||||||||||||||||||||||
10 | Landes St | 12th St | 19th St | 1820 | 32 | 6471 | $ 151821 | $ 23 | $ 58240 | $ 58240 | 5 | 1400 | $ 39324 | 400 | $ 10000 | 2 | $ 30000 | $ 5000 | 10 | $ 14256 | |||||||||||||||||||||||||||||||||||||||
6 to 8 | Discovery Rd | 19th | Hastings Ave | 2900 | 22 | 7089 | $ 136565 | $ 19 | $ 63800 | $ 63800 | 15 | 10 | $ 47850 | 500 | $ 12500 | $ - | 10 | $ 12415 | |||||||||||||||||||||||||||||||||||||||||
8 to 12 | Hastings Ave | Discovery Rd | County Line | 8450 | 32 | 30044 | $ 542349 | $ 18 | $ 270400 | $ 270400 | 5 | 10 | 5000 | $ 197644 | 1000 | $ 25000 | $ - | 10 | $ 49304 | ||||||||||||||||||||||||||||||||||||||||
6 to 12 | Washington St | Van Buren St | SR20 | 2025 | 30 | 6750 | $ 118388 | $ 18 | $ 60750 | $ 60750 | 5 | 5 | $ 16875 | 0 | 0 | 0 | $ - | 2 | $ 30000 | $ - | 10 | $ 10763 | |||||||||||||||||||||||||||||||||||||
14 | Blaine St | San Juan Ave | Walker St | 1275 | 48 | 6800 | $ 113910 | $ 17 | $ 61200 | $ 61200 | 5 | $ 11900 | $ - | 2 | $ 30000 | $ 5000 | 10 | $ 10810 | |||||||||||||||||||||||||||||||||||||||||
6 | Washington St | Harrison St | Taylor St | 1175 | 33 | 4308 | $ 59240 | $ 14 | $ 38775 | $ 38775 | 10 | $ 15079 | $ - | $ - | 10 | $ 5385 | |||||||||||||||||||||||||||||||||||||||||||
8 to 10 | Sheridan St | SR 20 | 19th St | 4000 | 46 | 20444 | $ 272922 | $ 13 | $ 184000 | $ 184000 | 5 | 5 | $ 51111 | 200 | 2 | $ 13000 | $ - | 10 | $ 24811 | ||||||||||||||||||||||||||||||||||||||||
8 to 10 | 19th St | San Juan Ave | Sheridan St | 3200 | 48 | 17067 | $ 197120 | $ 12 | $ 153600 | $ 153600 | 3 | 3 | $ 25600 | 0 | 0 | 0 | $ - | $ - | 10 | $ 17920 | |||||||||||||||||||||||||||||||||||||||
10 to 20 | San Juan Ave | F St | Lopez Ave | 2800 | 32 | 9956 | $ 110059 | $ 11 | $ 89600 | $ 89600 | 3 | $ 10453 | $ - | $ - | 10 | $ 10005 | |||||||||||||||||||||||||||||||||||||||||||
10 to 20 | F St | Hastings Ave | Tyler St | 5300 | 31 | 18256 | $ 180730 | $ 10 | $ 164300 | $ 164300 | $ - | $ - | $ - | 10 | $ 16430 | ||||||||||||||||||||||||||||||||||||||||||||
$ 9952406 | $ 1873288 | $ 31744 | $ 274803 | $ 32667 | $ 332896 | $ 1998646 | $ 4544044 | $ 1155207 | $ 1747625 | $ 1215000 | $ 1290529 | $ - 0 | |||||||||||||||||||||||||||||||||||||||||||||||
Street Pavement Improvement Plan Projects | 9 | 110 | |||||||||||||||||||||||||||||||||||||||||||||
Road Name | From | To | Iworq ID | Length (ft) | Width (ft) | Area (yd^2) | Actual Area(SY) | Unit Cost per yd2 | Construction Cost | Prep Work | Survey Testing | ADA Curb Ramps | Storm Water | Mill amp Fill$50SY | Pre-Level$4SY | Total Construction | Project Cost + 10 | Unit Cost w Additional Costs no 10 | Engineering Costs | Notes | |||||||||||||||||||||||||||
Priority | Reconstruct | 2021 | 2022 | 2023 | 2024 | ||||||||||||||||||||||||||||||||||||||||||
1 | Reconstruct | Lawrence St | Cass St | Calhoun St | 1304 | 250 | 36 | 1000 | $ 80 | $ 80000 | $ 5000 | $ 20000 | $ 105000 | $ 115500 | $ 105 | Stormwater South Side Parking Raingarden on Cass | |||||||||||||||||||||||||||||||
2 | Reconstruct | Lawrence St | Walker St | Cass St | 250 | 36 | 1000 | $ 80 | $ 80000 | $ 5000 | $ 20000 | $ 5000 | $ 110000 | $ 121000 | $ 110 | Stormwater South Side Parking | |||||||||||||||||||||||||||||||
3 | Reconstruct Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | San Juan Ave | Lopez Ave | Admiralty | 2300 | 32 | 8178 | $ 50 | $ 408889 | $ 10000 | $ 100000 | $ 518889 | $ 570778 | $ 63 | Stormwater Problem 45th | ||||||||||||||||||||||||||||||||
4 | Reconstruct Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Polk St - Street Improvements | Lawrence St | 1056 Sarah Tiffany Sarah TiffanyGarfield | 1073 | 200 | 56 | 1244 | $ 50 | $ 62222 | X | X | X | $ 62222 | $ 68444 | $ 50 | Parking Theater 4 AC Watermain Infiltration or Rain Garden Parking on Condo Side | ||||||||||||||||||||||||||||||
Reconstruct | 47th Street | Pettygrove | McNeil | 500 | 18 | 1000 | 1548 | $ 50 | $ 50000 | $ 5000 | $ 40000 | $ 95000 | $ 104500 | $ 95 | $210000 Engineers Estimate With Engineering Cost Turnaround Spaghetti Waterline | ||||||||||||||||||||||||||||||||
Chip Seal - $50000 to $70000 per Mile | $6 No DigoutsPre-leveling | $10 with Additional Prep Work | |||||||||||||||||||||||||||||||||||||||||||||||
Chip Seal | Washington St | Van Buren St | SR20 | 2025 | 30 | 6750 | $ 10 | $ 67500 | $ 67500 | $ 74250 | Digouts Flagging | ||||||||||||||||||||||||||||||||||||
Chip Seal | Hastings Ave - Pre-level and widen shoulders | Discovery Rd | County Line | 8450 | 24 | 22533 | $ 6 | $ 135200 | $ 135200 | $ 148720 | Ditches amp Culverts Total Width change from 21 to 24 How wide will shoulders be | ||||||||||||||||||||||||||||||||||||
Tyler St | Jefferson St | Lawrence St | 900 | 32 | 3200 | $ 6 | $ 19200 | $ 19200 | $ 21120 | ||||||||||||||||||||||||||||||||||||||
Chip Seal | McPherson - Chip Seal | 4th St | Discovery Rd | 3100 | 32 | 11022 | $ 6 | $ 66133 | $ 66133 | $ 72747 | Ditches amp Culverts Shoulder Wideneing | ||||||||||||||||||||||||||||||||||||
Chip Seal | 19th St - Chip Seal | San Juan Ave | Sheridan St | 3200 | 48 | 17067 | $ 6 | $ 102400 | $ 102400 | $ 112640 | Bike Lanes amp Shoulder Prelevel | ||||||||||||||||||||||||||||||||||||
Chip Seal | Walnut | W Street | Jackson | 2300 | 22 | 5622 | $ 6 | $ 33733 | $ 33733 | $ 37107 | Dig-Outs Pre-Leveling Striping Shoulders | ||||||||||||||||||||||||||||||||||||
Chip Seal | Fir St - Chip Seal | F St | UCherry | 4360 | 22 | 10658 | $ 10 | $ 106578 | X | X | $ 106578 | $ 117236 | Dig-Outs Pre-Leveling Striping | ||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | |||||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | P St - Chip Seal | Redwood St | Cedar St | 0486 | 300 | 16 | 533 | $ 20 | $ 10667 | $ 10667 | $ 11733 | Watermain Looping Shouldnt this be part of Center | |||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 25th St - Chip Seal | Sheridan St | Holcomb St | 1200 | 18 | 2400 | $ 20 | $ 48000 | $ 48000 | $ 52800 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 14th St - Chip Seal | $ - | $ - | ||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Cedar St - Chip Seal | Redwood St | San Juan Ave | 1460 | 16 | 2596 | $ 20 | $ 51911 | $ 51911 | $ 57102 | Ex ChipSeal 22 Wide | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Center St - Chip Seal | Redwood St | San Juan Ave | 484 | 1660 | 16 | 2951 | $ 20 | $ 59022 | $ 59022 | $ 64924 | Ex ChipSeal 22 Wide Stormwater | |||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Grant St Chip Seal | 14th St | 16th St | 525 | 16 | 933 | $ 20 | $ 18667 | $ 18667 | $ 20533 | Ex Street 10 Wide | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 11th St Chip Seal | Hendricks St | Sheridan St | 550 | 16 | 978 | $ 20 | $ 19556 | $ 19556 | $ 21511 | Hospital Parking | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Hendricks St Chip Seal | 9th St | 12th St | 800 | 16 | 1422 | $ 20 | $ 28444 | $ 28444 | $ 31289 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 10th St Chip Seal | Hendricks St | Grant St | 1655 | 283 | 18 | 566 | $ 20 | $ 11320 | $ 11320 | $ 12452 | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Grant St Chip Seal | 14th St | 16th St | 525 | 18 | 1050 | $ 20 | $ 21000 | $ 21000 | $ 23100 | Ex Street 10 Wide Stormwater | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Hill St | 21st St | 19th St | 807 | 16 | 1435 | $ 20 | $ 28693 | $ 28693 | $ 31563 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Milo St -Chip seal | Olympic Ave | Pacific Ave | 0003 | 466 | 12 | 621 | $ 20 | $ 12427 | $ 12427 | $ 13669 | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Olympic St | Cedar St | Tremont St | 536 | 12 | 715 | $ 20 | $ 14293 | $ 14293 | $ 15723 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Benton St - street improvement | Blaine St | Lincoln Blg | 580 | 36 Sarah Tiffany Sarah TiffanyEstimated at 25-36 used higher number | Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Sarah Tiffany Sarah TiffanyGarfield | 2320 | $ 20 | $ 46400 | $ 46400 | $ 51040 | ||||||||||||||||||||||||||||||||||
Pave Gravel Road | |||||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Pacific St | Cedar St | Tremont St | 400 | 16 | 711 | $ 50 | $ 35556 | $ 6000 | $ 15000 | $ 56556 | $ 62211 | $ 80 | ||||||||||||||||||||||||||||||||||
58th St | Hill St | Kuhn St | 525 | 16 | 933 | $ 50 | $ 46667 | $ 6000 | $ 20000 | $ 72667 | $ 79933 | $ 78 | 4 AC Waterline Driveways Site Distance (Re-grade Slope) | ||||||||||||||||||||||||||||||||||
Sidewalks | |||||||||||||||||||||||||||||||||||||||||||||||
Harrison St | Franklin St | Clay St | 340 | 6 | 227 | $ 165 | $ 56100 | $ 5000 | $ 61100 | $ 67210 | $ 180 | ||||||||||||||||||||||||||||||||||||
9th St | Hancock St | McPherson St | 1300 | 6 | 867 | $ 165 | $ 214500 | $ 10000 | $ 15000 | $ 239500 | $ 263450 | $ 184 | |||||||||||||||||||||||||||||||||||
Asphalt Path | |||||||||||||||||||||||||||||||||||||||||||||||
Spruce St Easement | Cedar St | Center St | 150 | 8 | 133 | $ 50 | $ 6667 | $ 2000 | $ 8667 | $ 9533 | $ 65 | ||||||||||||||||||||||||||||||||||||
Cherry St | A St | E St | 990 | 10 | 1100 | $ 50 | $ 55000 | $ 10000 | $ 10000 | $ 15000 | $ 90000 | $ 99000 | $ 82 | ||||||||||||||||||||||||||||||||||
Gravel Path | |||||||||||||||||||||||||||||||||||||||||||||||
16th St | Thomas St | Grant St | 1700 | 6 | 1133 | $ 15 | $ 17000 | $ 1500 | $ 18500 | $ 20350 | |||||||||||||||||||||||||||||||||||||
Cleveland St | 21st St | 23rd St | 500 | 6 | 333 | $ 15 | $ 5000 | $ 5000 | $ 5500 | Need Easement | |||||||||||||||||||||||||||||||||||||
6 | - | $ 15 | $ - | $ - | $ - | Need Easement | |||||||||||||||||||||||||||||||||||||||||
6 | - | $ 15 | $ - | $ - | $ - | Need Easement | |||||||||||||||||||||||||||||||||||||||||
Total | $ 1582256 | $ 1792256 | $ 1971481 | ||||||||||||||||||||||||||||||||||||||||||||
Project Descriptioin | Length | Width | Construction Costs | ConstructionUnit Costs | Units | Engineering Costs | Total CostsUnit Cost | Total Costs | Total CostsUnit Cost | Notes | |||||||||||
Sidewalk | |||||||||||||||||||||
9th Street Sidewalk Grant Street to Hancock Street | 826 | 6 | $ 141506 | $ 17131 | LF | Construction Unit Cost per Foot | |||||||||||||||
Jefferson Street Sidewalk Washington Street to Taylor Street | 724 | 6 | $ 390502 | $ 53937 | LF | Construction Unit Cost per Foot | |||||||||||||||
Landis Street Sidewalk 10th Street to 19th Street | 1795 | 6 | $ 364550 | $ 20309 | LF | Construction Unit Cost per Foot | |||||||||||||||
ADA Corner Ramps | |||||||||||||||||||||
Washington Street amp Harrison Street | $ 42000 | $ 42000 | Each | ||||||||||||||||||
Washington Street amp Adams Street | $ 38150 | $ 19075 | Each | Two Corners Were Retrofitted | |||||||||||||||||
Chip Seal Pavement | |||||||||||||||||||||
Walker Street Washington Street to Lawrence Street | 1144 | 24 | $ 20000 | $ 656 | SY | Does not include flagging nor prep work | |||||||||||||||
Pulverize amp Asphalt Paving | |||||||||||||||||||||
Washington Street VanBuren Street to Harrison Street | 300 | 22 | $ 35000 | $ 4773 | SY | ||||||||||||||||
Asphalt Overlay | |||||||||||||||||||||
Sidewalks | ||||||||||||||||||||||||||||||||||||||
Harrison St | Franklin St | Clay St | 340 | 6 | 227 | |||||||||||||||||||||||||||||||||
9th St | Hancock St | McPherson St | 1300 | 6 | 867 | |||||||||||||||||||||||||||||||||
Asphalt Path | ||||||||||||||||||||||||||||||||||||||
Spruce St Easement | Cedar St | Center St | 150 | 8 | 133 | $ 2000 | $ 2000 | $ 2000 | ||||||||||||||||||||||||||||||
Cherry St | A St | E St | 990 | 10 | 1100 | $ 10000 | $ 10000 | $ 10000 | ||||||||||||||||||||||||||||||
Gravel Path | ||||||||||||||||||||||||||||||||||||||
16th St | Thomas St | Grant St | 1700 | 6 | 1133 | $ 1500 | $ 1500 | $ 1500 | ||||||||||||||||||||||||||||||
Cleveland St | 21st St | 23rd St | 500 | 6 | 333 | Need Easement | ||||||||||||||||||||||||||||||||
6 | - | Need Easement | ||||||||||||||||||||||||||||||||||||
6 | - | Need Easement | ||||||||||||||||||||||||||||||||||||
Total |
Type | Improvement | Cost Range SY | Cost Range LF | ||||||||
1 | Complete Road Rebuild | $80 | $100 | ||||||||
2 | Asphalt Overlay | $50 | $60 | ||||||||
3 | Pulverize amp Chip Seal | $20 | $30 | ||||||||
4 | Chip Seal | $6 | $10 | $12 | $25 | ||||||
5 | Seal Coat | ||||||||||
6 | |||||||||||
7 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 3-Inch | 413 | TONS | $ 15000 | $ 6187500 | 1000 x 22 x 025 httpwwwamerasphaltcomasphalthtm | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 1630 | CY | $ 4800 | $ 7824000 | Water Street Project = $48 CY (1000 x 22 x 2)27 = 1630 CY | ||||||
Gravel Borrow | 2282 | TONS | $ 3000 | $ 6846000 | (1000 x 22 x 2)27 = 1630 1630 CY x 14 = 2282 Tons | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 128 | Hours | $ 5728 | $ 733133 | (2) People for 64 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 25043033 | |||||||||||
$ 10247 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 2-Inch | 275 | TONS | $ 15000 | $ 4125000 | 1000 x 22 x 017 httpwwwamerasphaltcomasphalthtm | | ||||||
Digouts amp Pre-leveling | 122 | SY | $ 4900 | $ 597800 | |||||||
Flagging | 64 | Hours | $ 5728 | $ 366566 | (2) People for 32 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 180000 | $ 180000 | |||||||
$ 5403066 | |||||||||||
$ 2211 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 3-Inch | 413 | TONS | $ 15000 | $ 6187500 | 1000 x 22 x 025 httpwwwamerasphaltcomasphalthtm | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 150 | CY | $ 4800 | $ 720000 | Water Street Project = $48 CY | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 96 | Hours | $ 5728 | $ 549850 | (2) People for 48 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 10909750 | |||||||||||
$ 4464 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Chip Seal | 2444 | SY | $ 1050 | $ 2566200 | 1000 X 22 | Unit Cost $525 SY from Walker Street County Invoice Doubled to $1050 for Chip Seal Over Gravel | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 150 | CY | $ 4800 | $ 720000 | Water Street Project = $48 CY | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 80 | Hours | $ 5728 | $ 458208 | (2) People for 40 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | Hours | $ 12500 | $ - 0 | High Average Loaded Rate No Testing | ||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 7196808 | |||||||||||
$ 2945 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 1500000 | $614 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 500 | LF | $ 5000 | $ 2500000 | |||||||
Catch Basins | 4 | EACH | $ 150000 | $ 600000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Chip Seal | 2444 | SY | $ 525 | $ 1283100 | 1000 X 22 | Unit Cost from Walker Street County Invoice | ||||||
Digouts amp Pre-leveling | 122 | SY | $ 4900 | $ 598780 | Cost from 2018 Lakeside Mill amp Fill | Estimate Quanity Based on 5 | ||||||
Flagging | 32 | Hours | $ 5728 | $ 183283 | (2) People for 16 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | Hours | $ 12500 | $ - 0 | High Average Loaded Rate No Surveying or Testing | ||||||
Surveying | 1 | LS | $ - 0 | $ - 0 | |||||||
$ 2198863 | |||||||||||
$ 900 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 1500000 | $614 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY |
Project Descriptioin | Length | Width | Construction Costs | Engineering Costs | Engineering Total | Digouts Pre-Leveling Costs | Digouts Pre-Leveling Total | ADACosts | ADATotal | StormwaterCosts | StormwaterTotal | Total Costsby SY | Cost Per 250 Block | Length | Width | Notes | |||||||||||||||||
Chip Seal Pavement | |||||||||||||||||||||||||||||||||
Walker Street Washington Street to Lawrence Street | 1144 | 24 | $ 25000 | 15 | $ 3750 | 10 | $ 2500 | $ 1024 | $ 682911 | 250 | 24 | ||||||||||||||||||||||
Pulverize amp Chip Seal | |||||||||||||||||||||||||||||||||
Engineers Estimate | 250 | 24 | $ 22000 | 15 | $ 3300 | 0 | $ - | 20 | $ 4400 | $ 4455 | $ 2970000 | 250 | 24 | ||||||||||||||||||||
Pulverize amp Asphalt Paving | |||||||||||||||||||||||||||||||||
Washington Street VanBuren Street to Harrison Street | 300 | 22 | $ 35000 | 20 | $ 7000 | 0 | $ - | 10 | $ 3500 | 20 | $ 7000 | $ 7159 | $ 4772727 | 250 | 24 | ||||||||||||||||||
Asphalt Overlay (2) | |||||||||||||||||||||||||||||||||
Engineers Estimate | 250 | 24 | $ 21334 | 20 | $ 426680 | 10 | $ 2133 | 20 | $ 426680 | 20 | $ 426680 | $ 5440 | $ 4835707 | 250 | 32 | ||||||||||||||||||
Reconstruction | |||||||||||||||||||||||||||||||||
Walker Street Lawrence Street to Blaine Street | 650 | 36 | $ 184310 | 25 | $ 46078 | 0 | $ - | 20 | $ 36862 | 30 | $ 55293 | $ 12405 | $ 11027094 | 250 | 32 | ||||||||||||||||||
RSL | Length (FT) | Area (SY) | Condition | Treatment | Cost | Total | |||||||||
20 | 61834 | 138524 | 131 | Good | $0 | $0 | |||||||||
14 | 23656 | 49915 | 47 | Satisfactory | Chip Seal | $29 | $1470552 | ||||||||
12 | 43586 | 106382 | 100 | $3134134 | |||||||||||
10 | 74803 | 193570 | 182 | $5702790 | |||||||||||
8 | 96662 | 228046 | 215 | $6718492 | |||||||||||
6 | 95452 | 261794 | 247 | Fair | Overlay | $67 | $17489930 | ||||||||
4 | 6420 | 14536 | 14 | $971121 | |||||||||||
2 | 29238 | 60616 | 57 | Poor | Rehab | $107 | $6492850 | ||||||||
0 | 3851 | 7532 | 07 | Very Poor | Rebuild | $155 | $1169719 | ||||||||
$43149589 | |||||||||||||||
Additional Paving Costs | Average Cost per SY | Percent of Paving Cost | |||
Digouts amp Pre-Leveling | $4 | 25 | |||
Stormwater | $7 | 38 | |||
ADA | $5 | 27 | |||
Engineering amp Administration | $5 | 28 |
9 | Base Paving Costs | Preperation | Stormwater | ADA | Engineering | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Remaining Service Life | Road Name | From | To | Length (ft) | Width (ft) | Area (SY) | Total Construction | Price(SY) | Reconstruction | Pulverize amp Pave | Ashpalt Overlay | Pave Gravel Road | Pulverize amp Chip Seal | Chip Seal | Total Base Paving Costs | Digouts(SY) | Pre-Leveling(SY) | Construct Shoulders Both Sides (LF) | Preparation Total | StormwaterPipes (LF) | StormwaterCatchbasins | StormwaterSwales (LF) | Stormwater Total | Curb Ramps | Curb Ramps Total | Surveying | Engineering amp Administration | Engineering amp Administration Total | Other Work | ||||||||||||||||||||||||||||||
$102 | $45 | $22 | $35 | $29 | $9 | $35 | $15 | $20 | $50 | $1500 | $25 | $15000 | |||||||||||||||||||||||||||||||||||||||||||||||
2 | Polk St - Street | Lawrence St | 1056 | 200 | 56 | 1244 | $ 210679 | $ 169 | $ 127518 | $ 127518 | $ - | 150 | 1 | 1 | $ 9025 | 2 | $ 30000 | $ 10000 | 25 | $ 44136 | |||||||||||||||||||||||||||||||||||||||
6 | 47th Street | Pettygrove | McNeil | 500 | 18 | 1548 | $ 258717 | $ 167 | $ 158624 | $ 158624 | $ - | 687 | 8 | $ 46350 | $ - | $ 10000 | 25 | $ 53743 | |||||||||||||||||||||||||||||||||||||||||
6 to 10 | Lawrence St | Calhoun St | Harrison St | 1200 | 36 | 4800 | $ 786070 | $ 164 | $ 491856 | $ 491856 | 600 | $ 15000 | $ 8 | $ 120000 | $ 10000 | 25 | $ 159214 | ||||||||||||||||||||||||||||||||||||||||||
8 | Lawrence St | Cass St | Calhoun St | 250 | 36 | 1000 | $ 146213 | $ 146 | $ 102470 | $ 102470 | 0 | 0 | $ - | 75 | 350 | $ 12500 | $ - | $ 10000 | 25 | $ 31243 | |||||||||||||||||||||||||||||||||||||||
8 | Lawrence St | Walker St | Cass St | 250 | 36 | 1000 | $ 144650 | $ 145 | $ 102470 | $ 102470 | $ - | 100 | 250 | $ 11250 | $ - | $ 10000 | 25 | $ 30930 | |||||||||||||||||||||||||||||||||||||||||
4 to 8 | San Juan Ave | Lopez Ave | Admiralty | 2300 | 34 | 8689 | $ 1222938 | $ 141 | $ 890350 | $ 890350 | $ - | 800 | 5 | 1500 | $ 85000 | $ - | $ 15000 | 25 | $ 247588 | ||||||||||||||||||||||||||||||||||||||||
6 to 8 | Lawrence St | Harrison St | Monroe St | 2380 | 47 | 12429 | $ 1331314 | $ 107 | $ 274803 | $ 274803 | 15 | 5 | $ 74573 | 1900 | 10 | $ 110000 | 50 | $ 750000 | $ 10000 | 10 | $ 121938 | ||||||||||||||||||||||||||||||||||||||
2 to 4 | Center St | San Juan Ave | Redwood St | 1660 | 16 | 2951 | $ 295222 | $ 100 | $ 86910 | $ 86910 | $ - | 1600 | 9 | 3000 | $ 168500 | $ - | $ 10000 | 15 | $ 39812 | ||||||||||||||||||||||||||||||||||||||||
0 to 6 | Pacific St | Cedar St | Tremont St | 400 | 16 | 711 | $ 66581 | $ 94 | $ 31744 | $ 31744 | $ - | 100 | 2 | 700 | $ 25500 | $ - | $ 5000 | 15 | $ 9337 | ||||||||||||||||||||||||||||||||||||||||
0 to 6 | Benton St | Lawrence | Lincoln Blg | 580 | 36 | 2320 | $ 203265 | $ 88 | $ 20880 | $ 20880 | 20 | 10 | $ 19720 | 250 | 2 | $ 15500 | 8 | $ 120000 | $ 5000 | 15 | $ 27165 | ||||||||||||||||||||||||||||||||||||||
2 | Grant St | 14th St | 16th St | 525 | 16 | 933 | $ 73635 | $ 79 | $ 27487 | $ 27487 | $ - | 400 | 2 | 500 | $ 35500 | $ - | $ 8000 | 15 | $ 10648 | ||||||||||||||||||||||||||||||||||||||||
2 to 6 | Olympic St | Cedar St | Tremont St | 536 | 12 | 715 | $ 52716 | $ 74 | $ 21047 | $ 21047 | $ - | 950 | $ 23750 | $ - | $ 8000 | 15 | $ 7920 | ||||||||||||||||||||||||||||||||||||||||||
2 | Milo St | Olympic Ave | Pacific Ave | 466 | 12 | 621 | $ 44793 | $ 72 | $ 18298 | $ 18298 | $ - | 800 | $ 20000 | $ - | $ 5000 | 15 | $ 6495 | ||||||||||||||||||||||||||||||||||||||||||
0 | 11th St | Hendricks St | Sheridan St | 550 | 16 | 978 | $ 65077 | $ 67 | $ 28796 | $ 28796 | $ - | 100 | 2 | 750 | $ 26750 | $ - | $ 8000 | 15 | $ 9532 | ||||||||||||||||||||||||||||||||||||||||
0 | 58th St | Hill St | Kuhn St | 525 | 16 | 933 | $ 60329 | $ 65 | $ 32667 | $ 32667 | $ - | 750 | $ 18750 | $ - | $ 8000 | 15 | $ 8913 | ||||||||||||||||||||||||||||||||||||||||||
2 | 10th St | Hendricks St | Grant St | 283 | 18 | 566 | $ 34294 | $ 61 | $ 16669 | $ 16669 | $ - | 500 | $ 12500 | $ - | $ 5000 | 15 | $ 5125 | ||||||||||||||||||||||||||||||||||||||||||
4 to 10 | 31st St | Hancock St | Sheridan St | 1050 | 22 | 2567 | $ 150027 | $ 58 | $ 23100 | $ 23100 | 10 | 10 | $ 12833 | 1200 | 10 | 1000 | $ 100000 | $ - | $ 5000 | 10 | $ 14093 | ||||||||||||||||||||||||||||||||||||||
6 | 25th St | Sheridan St | Holcomb St | 1200 | 18 | 2400 | $ 125895 | $ 52 | $ 70680 | $ 70680 | $ - | 125 | 1 | 1200 | $ 37750 | $ - | $ 8000 | 15 | $ 17465 | ||||||||||||||||||||||||||||||||||||||||
6 | Holcomb St | 7th St | 10th St | 850 | 12 | 1133 | $ 58703 | $ 52 | $ 10200 | $ 10200 | 10 | 10 | $ 5667 | 1500 | $ 37500 | $ - | $ - | 10 | $ 5337 | ||||||||||||||||||||||||||||||||||||||||
2 | Hendricks St | 9th St | 12th St | 800 | 16 | 1422 | $ 70930 | $ 50 | $ 41884 | $ 41884 | $ - | 750 | $ 18750 | $ - | $ 8000 | 15 | $ 10295 | ||||||||||||||||||||||||||||||||||||||||||
2 to 6 | Hill St | 19th | 21st St | 807 | 16 | 1435 | $ 67443 | $ 47 | $ 21125 | $ 6456 | $ 27581 | 10 | $ 5021 | 1000 | $ 25000 | $ - | $ 8000 | 15 | $ 9840 | ||||||||||||||||||||||||||||||||||||||||
2 to 8 | 57th St | Jackman St | Kuhn St | 800 | 18 | 1600 | $ 66550 | $ 42 | $ 14400 | $ 14400 | 20 | 10 | $ 13600 | 1300 | $ 32500 | 10 | $ 6050 | ||||||||||||||||||||||||||||||||||||||||||
6 to 8 | Sheridan St | Hastings Ave | SilverUmatilla | 1750 | 22 | 4278 | $ 154115 | $ 36 | $ 38500 | $ 38500 | 20 | 10 | $ 36361 | 300 | 4 | 1500 | $ 58500 | $ - | $ 5000 | 15 | $ 20754 | ||||||||||||||||||||||||||||||||||||||
6 to 10 | Tyler St | Jefferson St | Lawrence St | 900 | 32 | 3200 | $ 115280 | $ 36 | $ 28800 | $ 28800 | 5 | 5 | $ 8000 | 100 | 2 | $ 8000 | 4 | $ 60000 | 10 | $ 10480 | |||||||||||||||||||||||||||||||||||||||
6 to 14 | 14th St | McPherson St | Sheridan St | 2375 | 21 | 5542 | $ 182027 | $ 33 | $ 49875 | $ 49875 | 20 | 10 | $ 47104 | 750 | 4 | 1000 | $ 68500 | $ - | 10 | $ 16548 | |||||||||||||||||||||||||||||||||||||||
8 | 49th St | Kuhn St | Admiralty Ave | 400 | 24 | 1067 | $ 34613 | $ 32 | $ 9600 | $ 9600 | 5 | $ 1867 | 800 | $ 20000 | $ - | 10 | $ 3147 | ||||||||||||||||||||||||||||||||||||||||||
6 to 10 | Fir St | F St | UCherry | 4360 | 22 | 10658 | $ 341621 | $ 32 | $ 95920 | $ 95920 | 5 | 5 | 4000 | $ 106644 | 100 | 2 | 4000 | $ 108000 | $ - | 10 | $ 31056 | ||||||||||||||||||||||||||||||||||||||
6 to 8 | Cedar St | San Juan Ave | Redwood St | 1460 | 16 | 2596 | $ 81747 | $ 31 | $ 23360 | $ 23360 | 20 | 20 | $ 25956 | 1000 | $ 25000 | $ - | 10 | $ 7432 | |||||||||||||||||||||||||||||||||||||||||
8 | Clallam St | McKinley St | Roosevelt St | 975 | 14 | 1517 | $ 46796 | $ 31 | $ 13650 | $ 13650 | 20 | 10 | $ 12892 | 200 | 4 | $ 16000 | $ - | 10 | $ 4254 | ||||||||||||||||||||||||||||||||||||||||
6 | San Juan Ave | 19th St | 20th St | 300 | 31 | 1033 | $ 31827 | $ 31 | $ 9300 | $ 9300 | 50 | 10 | $ 19633 | $ - | $ - | 10 | $ 2893 | ||||||||||||||||||||||||||||||||||||||||||
6 to 20 | Cherry St | F St | W St | 4200 | 32 | 14933 | $ 457307 | $ 31 | $ 134400 | $ 134400 | 5 | 5 | 4200 | $ 121333 | 200 | 6000 | $ 160000 | $ - | 10 | $ 41573 | |||||||||||||||||||||||||||||||||||||||
6 to 8 | Jackman St | 45th St | 49th St | 1100 | 22 | 2689 | $ 81940 | $ 30 | $ 24200 | $ 24200 | 15 | 10 | $ 18150 | 225 | 3 | 500 | $ 28250 | $ - | $ 5000 | 15 | $ 11340 | ||||||||||||||||||||||||||||||||||||||
6 to 12 | Jackson St | LawrenceMonroe | Roosevelt St | 1600 | 18 | 3200 | $ 93530 | $ 29 | $ 28800 | $ 28800 | 10 | 10 | $ 16000 | 1000 | $ 25000 | 1 | $ 15000 | $ 2500 | 10 | $ 8730 | |||||||||||||||||||||||||||||||||||||||
2 | 7th St | Wilson St | Holcomb St | 450 | 16 | 800 | $ 23320 | $ 29 | $ 7200 | $ 7200 | 10 | 10 | $ 4000 | 400 | $ 10000 | $ - | 10 | $ 2120 | |||||||||||||||||||||||||||||||||||||||||
8 to 14 | 25th St | Sherman St | Sheridan St | 800 | 20 | 1778 | $ 50061 | $ 28 | $ 16000 | $ 16000 | 10 | 5 | $ 7556 | 1 | 800 | $ 21500 | $ - | $ 5000 | 10 | $ 5006 | |||||||||||||||||||||||||||||||||||||||
2 to 6 | Hancock St | SR 20 | 9th St | 1100 | 20 | 2444 | $ 67833 | $ 28 | $ 22000 | $ 22000 | 15 | 5 | $ 14667 | 1000 | $ 25000 | $ - | 10 | $ 6167 | |||||||||||||||||||||||||||||||||||||||||
Benton St | Washington St | Lawrence St | 1160 | 22 | 2836 | $ 74468 | $ 26 | $ 25520 | $ 25520 | 10 | 10 | $ 14178 | 140 | 4 | 600 | $ 28000 | 10 | $ 6770 | |||||||||||||||||||||||||||||||||||||||||
W St | San JuanAdmiralty | Walnut St | 2560 | 22 | 6258 | $ 163807 | $ 26 | $ 56320 | $ 56320 | 10 | 5 | $ 26596 | 200 | 4 | 2000 | $ 66000 | $ - | 10 | $ 14892 | ||||||||||||||||||||||||||||||||||||||||
6 to 8 | Walnut | W Street | Jackson | 2300 | 22 | 5622 | $ 145194 | $ 26 | $ 50600 | $ 50600 | 10 | 5 | $ 23894 | 2300 | $ 57500 | $ - | 10 | $ 13199 | |||||||||||||||||||||||||||||||||||||||||
6 to 8 | 24th St | Discovery Rd | San Juan Ave | 1250 | 18 | 2500 | $ 63938 | $ 26 | $ 22500 | $ 22500 | 10 | 5 | $ 10625 | 1000 | $ 25000 | $ - | 10 | $ 5813 | |||||||||||||||||||||||||||||||||||||||||
6 to 10 | Tyler St | Lawrence St | Blaine St | 900 | 32 | 3200 | $ 78980 | $ 25 | $ 28800 | $ 28800 | 5 | 5 | $ 8000 | 200 | $ 5000 | 2 | $ 30000 | 10 | $ 7180 | ||||||||||||||||||||||||||||||||||||||||
4 to 12 | McPherson St | SR 20 | Discovery Rd | 2925 | 32 | 10400 | $ 244860 | $ 24 | $ 93600 | $ 93600 | 5 | 5 | 2925 | $ 84500 | 230 | 2 | 1200 | $ 44500 | $ - | $ - | 10 | $ 22260 | |||||||||||||||||||||||||||||||||||||
10 | Landes St | 12th St | 19th St | 1820 | 32 | 6471 | $ 151821 | $ 23 | $ 58240 | $ 58240 | 5 | 1400 | $ 39324 | 400 | $ 10000 | 2 | $ 30000 | $ 5000 | 10 | $ 14256 | |||||||||||||||||||||||||||||||||||||||
6 to 8 | Discovery Rd | 19th | Hastings Ave | 2900 | 22 | 7089 | $ 136565 | $ 19 | $ 63800 | $ 63800 | 15 | 10 | $ 47850 | 500 | $ 12500 | $ - | 10 | $ 12415 | |||||||||||||||||||||||||||||||||||||||||
8 to 12 | Hastings Ave | Discovery Rd | County Line | 8450 | 32 | 30044 | $ 542349 | $ 18 | $ 270400 | $ 270400 | 5 | 10 | 5000 | $ 197644 | 1000 | $ 25000 | $ - | 10 | $ 49304 | ||||||||||||||||||||||||||||||||||||||||
6 to 12 | Washington St | Van Buren St | SR20 | 2025 | 30 | 6750 | $ 118388 | $ 18 | $ 60750 | $ 60750 | 5 | 5 | $ 16875 | 0 | 0 | 0 | $ - | 2 | $ 30000 | $ - | 10 | $ 10763 | |||||||||||||||||||||||||||||||||||||
14 | Blaine St | San Juan Ave | Walker St | 1275 | 48 | 6800 | $ 113910 | $ 17 | $ 61200 | $ 61200 | 5 | $ 11900 | $ - | 2 | $ 30000 | $ 5000 | 10 | $ 10810 | |||||||||||||||||||||||||||||||||||||||||
6 | Washington St | Harrison St | Taylor St | 1175 | 33 | 4308 | $ 59240 | $ 14 | $ 38775 | $ 38775 | 10 | $ 15079 | $ - | $ - | 10 | $ 5385 | |||||||||||||||||||||||||||||||||||||||||||
8 to 10 | Sheridan St | SR 20 | 19th St | 4000 | 46 | 20444 | $ 272922 | $ 13 | $ 184000 | $ 184000 | 5 | 5 | $ 51111 | 200 | 2 | $ 13000 | $ - | 10 | $ 24811 | ||||||||||||||||||||||||||||||||||||||||
8 to 10 | 19th St | San Juan Ave | Sheridan St | 3200 | 48 | 17067 | $ 197120 | $ 12 | $ 153600 | $ 153600 | 3 | 3 | $ 25600 | 0 | 0 | 0 | $ - | $ - | 10 | $ 17920 | |||||||||||||||||||||||||||||||||||||||
10 to 20 | San Juan Ave | F St | Lopez Ave | 2800 | 32 | 9956 | $ 110059 | $ 11 | $ 89600 | $ 89600 | 3 | $ 10453 | $ - | $ - | 10 | $ 10005 | |||||||||||||||||||||||||||||||||||||||||||
10 to 20 | F St | Hastings Ave | Tyler St | 5300 | 31 | 18256 | $ 180730 | $ 10 | $ 164300 | $ 164300 | $ - | $ - | $ - | 10 | $ 16430 | ||||||||||||||||||||||||||||||||||||||||||||
$ 9952406 | $ 1873288 | $ 31744 | $ 274803 | $ 32667 | $ 332896 | $ 1998646 | $ 4544044 | $ 1155207 | $ 1747625 | $ 1215000 | $ 1290529 | $ - 0 | |||||||||||||||||||||||||||||||||||||||||||||||
1 Introduction
2 Public Engagement
3 Street Operations
4 Street Improvements
5 Street Preservation
6 Street Programming
7 Funding Options
8 Prioritization and Recommendations
Engage PT
Chapters
Jan Mtg
Feb Mtg
March Mtg
April and May Mtgs
1 Introduction
2 Public Engagement
3 Street Operations
4 Street Improvements
5 Street Preservation
6 Street Programming
7 Funding Options
8 Prioritization and Recommendations
Engage PT
ChaptersTodayrsquos Focus
Review Preservation Program
Review of Part 1 Present types of pavement treatments and costs
Part 2 Present what a hypothetical $10 Million Dollar over 10-year investment option looks like
What is Pavement Preservation
For the purpose of the Comprehensive Streets Program pavement preservation is the investment the City makes in managing existing pavement
Pavement preservation are not considered improvement projects (refer to Chapter 4) Improvements projects are typically the addition of sidewalks bike lanes public space etc Pavement preservation is investment in managing our existing roads as they are Side note 1 some improvement projects like Discovery Road impact
pavement preservation program in a positive way by eliminating the need for city investment over the next 20 years
Side note 2 pavement preservation makes nominal investments in safety by fixing shoulders
Lawrence near Monroe St
San Juan near the Cemetery
Estimated 2020 Revenues 2020Motor Vehicle Fuel Tax $217000
Utility Tax $695000
P A V E M E N TO P T I O N S
1 Chip Seal
2 Pulverize and Chip Seal
3 Asphalt Overlay
4 Pulverize and Asphalt Paving
5 Reconstruction
$
$$
$$
$$$
$$$$$
Cost Treatment______
C H I P S E A L
bull $7065 per Block (250rsquox24rsquo)
bull $1104 SY
bull Seals Cracks
bull Provides a Wear Course
bull 10 ndash 15 Year Longevity
P U L V E R I Z E C H I P S E A L
bull $21680 per Block (250rsquox24rsquo)
bull $3252 SY
bull Generally Requires Some Stormwater Infrastructure
bull 10 ndash 15 Year Longevity
A S P H A L TO V E R L A Y
bull $22596 per Block (250rsquox32rsquo)
bull $2542 SY
bull Generally Requires Some Stormwater Infrastructure
bull Requires ADA Ramp Upgrades If Adjacent
bull 15 ndash 25 Year Longevity
P U L V E R I Z E A S P H A L T
bull $34222 per Block (250rsquox24rsquo)
bull $5133 SY
bull Generally Requires Some Stormwater Infrastructure
bull Requires ADA Ramp Upgrades If Adjacent
bull 15 ndash 25 Year LongevityWashington Street amp Harrison Street
R E C O N S T R U C T I O N
bull $99004 per Block (250rsquox32rsquo)
bull $11138 SY
bull Generally Requires Stormwater Infrastructure
bull Requires ADA Ramp Upgrades If Adjacent
bull 20 ndash 25 Year LongevityWater Street amp Fillmore Street
A D D I T I O N A L C O S T S
bull Drainage Swales amp Stormwater Infrastructure
bull Digoutsbull ADA Curb Rampsbull EngineeringAdministrationbull Digouts and pre-level
Stormwater at Pacific Avenue amp Milo Street
ADA needs at Lawrence Street amp Adams Street
Insert I worq street rating
1 How many street segments were rated
1 Insert map of 10 year program
1 Insert table Too small to read is ok Wersquoll include it as a handout in 11x17
Rem
aini
ng
Serv
ice Li
feRoad Name From To
Length (ft)
Width (ft)
Area (SY)
Total Construction
Price(SY)
Re
cons
truc
tion
Pul
veriz
e amp
Pa
ve
Ash
palt
Ove
rlay
Pav
e Gr
avel
Ro
ad
Pul
veriz
e amp
Ch
ip S
eal
Chi
p Se
al
Tot
al B
ase
Pavi
ng C
osts
Dig
outs
(SY)
Pre
-Lev
elin
g(S
Y)
Con
stru
ct
Shou
lder
s Bot
h Si
des (
LF)
Pre
para
tion
Tota
l
Sto
rmw
ater
Pipe
s (LF
)
Sto
rmw
ater
Catc
hbas
ins
Sto
rmw
ater
Swal
es (L
F)
Sto
rmw
ater
To
tal
Cur
b Ra
mps
Cur
b Ra
mps
To
tal
Sur
veyi
ng
Eng
inee
ring
amp
Adm
inist
ratio
n
Eng
inee
ring
amp
Adm
inist
ratio
n To
tal
$102 $45 $22 $35 $29 $9 $35 $15 $20 $50 $1500 $25 $150002 Polk St - Street Lawrence St 1056 200 56 1244 210679$ 169$ 127518$ 127518$ -$ 150 1 1 9025$ 2 30000$ 10000$ 25 44136$ 6 47th Street Pettygrove McNeil 500 18 1548 258717$ 167$ 158624$ 158624$ -$ 687 8 46350$ -$ 10000$ 25 53743$
6 to 10 Lawrence St Calhoun St Harrison St 1200 36 4800 786070$ 164$ 491856$ 491856$ 600 15000$ 8$ 120000$ 10000$ 25 159214$ 8 Lawrence St Cass St Calhoun St 250 36 1000 146213$ 146$ 102470$ 102470$ 0 0 -$ 75 350 12500$ -$ 10000$ 25 31243$ 8 Lawrence St Walker St Cass St 250 36 1000 144650$ 145$ 102470$ 102470$ -$ 100 250 11250$ -$ 10000$ 25 30930$
4 to 8 San Juan Ave Lopez Ave Admiralty 2300 34 8689 1222938$ 141$ 890350$ 890350$ -$ 800 5 1500 85000$ -$ 15000$ 25 247588$ 6 to 8 Lawrence St Harrison St Monroe St 2380 47 12429 1331314$ 107$ 274803$ 274803$ 15 5 74573$ 1900 10 110000$ 50 750000$ 10000$ 10 121938$ 2 to 4 Center St San Juan Ave Redwood St 1660 16 2951 295222$ 100$ 86910$ 86910$ -$ 1600 9 3000 168500$ -$ 10000$ 15 39812$ 0 to 6 Pacific St Cedar St Tremont St 400 16 711 66581$ 94$ 31744$ 31744$ -$ 100 2 700 25500$ -$ 5000$ 15 9337$ 0 to 6 Benton St Lawrence Lincoln Blg 580 36 2320 203265$ 88$ 20880$ 20880$ 20 10 19720$ 250 2 15500$ 8 120000$ 5000$ 15 27165$
2 Grant St 14th St 16th St 525 16 933 73635$ 79$ 27487$ 27487$ -$ 400 2 500 35500$ -$ 8000$ 15 10648$ 2 to 6 Olympic St Cedar St Tremont St 536 12 715 52716$ 74$ 21047$ 21047$ -$ 950 23750$ -$ 8000$ 15 7920$
2 Milo St Olympic Ave Pacific Ave 466 12 621 44793$ 72$ 18298$ 18298$ -$ 800 20000$ -$ 5000$ 15 6495$ 0 11th St Hendricks St Sheridan St 550 16 978 65077$ 67$ 28796$ 28796$ -$ 100 2 750 26750$ -$ 8000$ 15 9532$ 0 58th St Hill St Kuhn St 525 16 933 60329$ 65$ 32667$ 32667$ -$ 750 18750$ -$ 8000$ 15 8913$ 2 10th St Hendricks St Grant St 283 18 566 34294$ 61$ 16669$ 16669$ -$ 500 12500$ -$ 5000$ 15 5125$
4 to 10 31st St Hancock St Sheridan St 1050 22 2567 150027$ 58$ 23100$ 23100$ 10 10 12833$ 1200 10 1000 100000$ -$ 5000$ 10 14093$ 6 25th St Sheridan St Holcomb St 1200 18 2400 125895$ 52$ 70680$ 70680$ -$ 125 1 1200 37750$ -$ 8000$ 15 17465$ 6 Holcomb St 7th St 10th St 850 12 1133 58703$ 52$ 10200$ 10200$ 10 10 5667$ 1500 37500$ -$ -$ 10 5337$ 2 Hendricks St 9th St 12th St 800 16 1422 70930$ 50$ 41884$ 41884$ -$ 750 18750$ -$ 8000$ 15 10295$
2 to 6 Hill St 19th 21st St 807 16 1435 67443$ 47$ 21125$ 6456$ 27581$ 10 5021$ 1000 25000$ -$ 8000$ 15 9840$ 2 to 8 57th St Jackman St Kuhn St 800 18 1600 66550$ 42$ 14400$ 14400$ 20 10 13600$ 1300 32500$ 10 6050$ 6 to 8 Sheridan St Hastings Ave SilverUmatilla 1750 22 4278 154115$ 36$ 38500$ 38500$ 20 10 36361$ 300 4 1500 58500$ -$ 5000$ 15 20754$ 6 to 10 Tyler St Jefferson St Lawrence St 900 32 3200 115280$ 36$ 28800$ 28800$ 5 5 8000$ 100 2 8000$ 4 60000$ 10 10480$ 6 to 14 14th St McPherson St Sheridan St 2375 21 5542 182027$ 33$ 49875$ 49875$ 20 10 47104$ 750 4 1000 68500$ -$ 10 16548$
8 49th St Kuhn St Admiralty Ave 400 24 1067 34613$ 32$ 9600$ 9600$ 5 1867$ 800 20000$ -$ 10 3147$ 6 to 10 Fir St F St UCherry 4360 22 10658 341621$ 32$ 95920$ 95920$ 5 5 4000 106644$ 100 2 4000 108000$ -$ 10 31056$ 6 to 8 Cedar St San Juan Ave Redwood St 1460 16 2596 81747$ 31$ 23360$ 23360$ 20 20 25956$ 1000 25000$ -$ 10 7432$
8 Clallam St McKinley St Roosevelt St 975 14 1517 46796$ 31$ 13650$ 13650$ 20 10 12892$ 200 4 16000$ -$ 10 4254$ 6 San Juan Ave 19th St 20th St 300 31 1033 31827$ 31$ 9300$ 9300$ 50 10 19633$ -$ -$ 10 2893$
6 to 20 Cherry St F St W St 4200 32 14933 457307$ 31$ 134400$ 134400$ 5 5 4200 121333$ 200 6000 160000$ -$ 10 41573$ 6 to 8 Jackman St 45th St 49th St 1100 22 2689 81940$ 30$ 24200$ 24200$ 15 10 18150$ 225 3 500 28250$ -$ 5000$ 15 11340$ 6 to 12 Jackson St LawrenceMonroe Roosevelt St 1600 18 3200 93530$ 29$ 28800$ 28800$ 10 10 16000$ 1000 25000$ 1 15000$ 2500$ 10 8730$
2 7th St Wilson St Holcomb St 450 16 800 23320$ 29$ 7200$ 7200$ 10 10 4000$ 400 10000$ -$ 10 2120$ 8 to 14 25th St Sherman St Sheridan St 800 20 1778 50061$ 28$ 16000$ 16000$ 10 5 7556$ 1 800 21500$ -$ 5000$ 10 5006$ 2 to 6 Hancock St SR 20 9th St 1100 20 2444 67833$ 28$ 22000$ 22000$ 15 5 14667$ 1000 25000$ -$ 10 6167$
Benton St Washington St Lawrence St 1160 22 2836 74468$ 26$ 25520$ 25520$ 10 10 14178$ 140 4 600 28000$ 10 6770$ W St San JuanAdmiralty Walnut St 2560 22 6258 163807$ 26$ 56320$ 56320$ 10 5 26596$ 200 4 2000 66000$ -$ 10 14892$
6 to 8 Walnut W Street Jackson 2300 22 5622 145194$ 26$ 50600$ 50600$ 10 5 23894$ 2300 57500$ -$ 10 13199$ 6 to 8 24th St Discovery Rd San Juan Ave 1250 18 2500 63938$ 26$ 22500$ 22500$ 10 5 10625$ 1000 25000$ -$ 10 5813$ 6 to 10 Tyler St Lawrence St Blaine St 900 32 3200 78980$ 25$ 28800$ 28800$ 5 5 8000$ 200 5000$ 2 30000$ 10 7180$ 4 to 12 McPherson St SR 20 Discovery Rd 2925 32 10400 244860$ 24$ 93600$ 93600$ 5 5 2925 84500$ 230 2 1200 44500$ -$ -$ 10 22260$
10 Landes St 12th St 19th St 1820 32 6471 151821$ 23$ 58240$ 58240$ 5 1400 39324$ 400 10000$ 2 30000$ 5000$ 10 14256$ 6 to 8 Discovery Rd 19th Hastings Ave 2900 22 7089 136565$ 19$ 63800$ 63800$ 15 10 47850$ 500 12500$ -$ 10 12415$ 8 to 12 Hastings Ave Discovery Rd County Line 8450 32 30044 542349$ 18$ 270400$ 270400$ 5 10 5000 197644$ 1000 25000$ -$ 10 49304$ 6 to 12 Washington St Van Buren St SR20 2025 30 6750 118388$ 18$ 60750$ 60750$ 5 5 16875$ 0 0 0 -$ 2 30000$ -$ 10 10763$
14 Blaine St San Juan Ave Walker St 1275 48 6800 113910$ 17$ 61200$ 61200$ 5 11900$ -$ 2 30000$ 5000$ 10 10810$ 6 Washington St Harrison St Taylor St 1175 33 4308 59240$ 14$ 38775$ 38775$ 10 15079$ -$ -$ 10 5385$
8 to 10 Sheridan St SR 20 19th St 4000 46 20444 272922$ 13$ 184000$ 184000$ 5 5 51111$ 200 2 13000$ -$ 10 24811$ 8 to 10 19th St San Juan Ave Sheridan St 3200 48 17067 197120$ 12$ 153600$ 153600$ 3 3 25600$ 0 0 0 -$ -$ 10 17920$
10 to 20 San Juan Ave F St Lopez Ave 2800 32 9956 110059$ 11$ 89600$ 89600$ 3 10453$ -$ -$ 10 10005$ 10 to 20 F St Hastings Ave Tyler St 5300 31 18256 180730$ 10$ 164300$ 164300$ -$ -$ -$ 10 16430$
9952406$ 1873288$ 31744$ 274803$ 32667$ 332896$ 1998646$ 4544044$ 1155207$ 1747625$ 1215000$ 1290529$
9 Stormwater Base Paving Costs Preperation EngineeringADA
Chip Seal
Pulverize amp Chip Seal
Pulverize amp Asphalt
Asphalt Overlay
Reconstruction
1 Insert summary table of average costs of ada sw eng digouts etc
Additional Paving Costs Average Cost per SY Percent of Paving CostDigouts amp Pre-Leveling $4 25Stormwater $7 38ADA $5 27Engineering amp Administration $5 28
Chip Seal
Pulverize amp Chip Seal
Pulverize amp Asphalt
Asphalt Overlay
Reconstruction
1 Insert total costs for the entire city based on pavement rating
RSL Length (FT) Area (SY) Condition Treatment Cost Total20 61834 138524 131 Good $0 $014 23656 49915 47 $147055212 43586 106382 100 $313413410 74803 193570 182 $57027908 96662 228046 215 $67184926 95452 261794 247 $174899304 6420 14536 14 $9711212 29238 60616 57 Poor Rehab $107 $64928500 3851 7532 07 Very Poor Rebuild $155 $1169719
$43149589
Satisfactory Chip Seal $29
Fair Overlay $67
Chip Seal
Pulverize amp Chip Seal
Pulverize amp Asphalt
Asphalt Overlay
Reconstruction
Fir Street Asphalt Overlay in early 1990s Inadequate Stormwater System Water Intrusion Inadequate Base Material
San Juan Avenue Reconstructed 1997
New ADA Sidewalks
Complete Stormwater System
Lawrence Street Chip Sealed in 2000
Inadequate Base
Water Intrusion
F Street Reconstructed 2001 2002
New ADA Sidewalks
Complete Stormwater System
Best Streets First
Stop the Continued Decay of our Streets
Slowly Rebuild Street System Investment
1 Introduction
2 Public Engagement
3 Street Operations
4 Street Improvements
5 Street Preservation
6 Street Programming
7 Funding Options
8 Recommendations
January
February
April
March
May
June
Encouraging the public to be involved through Engage PTwwwcityofptusengagept
Street Pavement Improvement Plan Projects | 9 | 110 | |||||||||||||||||||||||||||||||||||||||||||||
Road Name | From | To | Iworq ID | Length (ft) | Width (ft) | Area (yd^2) | Actual Area(SY) | Unit Cost per yd2 | Construction Cost | Prep Work | Survey Testing | ADA Curb Ramps | Storm Water | Mill amp Fill$50SY | Pre-Level$4SY | Total Construction | Project Cost + 10 | Unit Cost w Additional Costs no 10 | Engineering Costs | Notes | |||||||||||||||||||||||||||
Priority | Reconstruct | 2021 | 2022 | 2023 | 2024 | ||||||||||||||||||||||||||||||||||||||||||
1 | Reconstruct | Lawrence St | Cass St | Calhoun St | 1304 | 250 | 36 | 1000 | $ 80 | $ 80000 | $ 5000 | $ 20000 | $ 105000 | $ 115500 | $ 105 | Stormwater South Side Parking Raingarden on Cass | |||||||||||||||||||||||||||||||
2 | Reconstruct | Lawrence St | Walker St | Cass St | 250 | 36 | 1000 | $ 80 | $ 80000 | $ 5000 | $ 20000 | $ 5000 | $ 110000 | $ 121000 | $ 110 | Stormwater South Side Parking | |||||||||||||||||||||||||||||||
3 | Reconstruct Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | San Juan Ave | Lopez Ave | Admiralty | 2300 | 32 | 8178 | $ 50 | $ 408889 | $ 10000 | $ 100000 | $ 518889 | $ 570778 | $ 63 | Stormwater Problem 45th | ||||||||||||||||||||||||||||||||
4 | Reconstruct Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Polk St - Street Improvements | Lawrence St | 1056 Sarah Tiffany Sarah TiffanyGarfield | 1073 | 200 | 56 | 1244 | $ 50 | $ 62222 | X | X | X | $ 62222 | $ 68444 | $ 50 | Parking Theater 4 AC Watermain Infiltration or Rain Garden Parking on Condo Side | ||||||||||||||||||||||||||||||
Reconstruct | 47th Street | Pettygrove | McNeil | 500 | 18 | 1000 | 1548 | $ 50 | $ 50000 | $ 5000 | $ 40000 | $ 95000 | $ 104500 | $ 95 | $210000 Engineers Estimate With Engineering Cost Turnaround Spaghetti Waterline | ||||||||||||||||||||||||||||||||
Chip Seal - $50000 to $70000 per Mile | $6 No DigoutsPre-leveling | $10 with Additional Prep Work | |||||||||||||||||||||||||||||||||||||||||||||||
Chip Seal | Washington St | Van Buren St | SR20 | 2025 | 30 | 6750 | $ 10 | $ 67500 | $ 67500 | $ 74250 | Digouts Flagging | ||||||||||||||||||||||||||||||||||||
Chip Seal | Hastings Ave - Pre-level and widen shoulders | Discovery Rd | County Line | 8450 | 24 | 22533 | $ 6 | $ 135200 | $ 135200 | $ 148720 | Ditches amp Culverts Total Width change from 21 to 24 How wide will shoulders be | ||||||||||||||||||||||||||||||||||||
Tyler St | Jefferson St | Lawrence St | 900 | 32 | 3200 | $ 6 | $ 19200 | $ 19200 | $ 21120 | ||||||||||||||||||||||||||||||||||||||
Chip Seal | McPherson - Chip Seal | 4th St | Discovery Rd | 3100 | 32 | 11022 | $ 6 | $ 66133 | $ 66133 | $ 72747 | Ditches amp Culverts Shoulder Wideneing | ||||||||||||||||||||||||||||||||||||
Chip Seal | 19th St - Chip Seal | San Juan Ave | Sheridan St | 3200 | 48 | 17067 | $ 6 | $ 102400 | $ 102400 | $ 112640 | Bike Lanes amp Shoulder Prelevel | ||||||||||||||||||||||||||||||||||||
Chip Seal | Walnut | W Street | Jackson | 2300 | 22 | 5622 | $ 6 | $ 33733 | $ 33733 | $ 37107 | Dig-Outs Pre-Leveling Striping Shoulders | ||||||||||||||||||||||||||||||||||||
Chip Seal | Fir St - Chip Seal | F St | UCherry | 4360 | 22 | 10658 | $ 10 | $ 106578 | X | X | $ 106578 | $ 117236 | Dig-Outs Pre-Leveling Striping | ||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | |||||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | P St - Chip Seal | Redwood St | Cedar St | 0486 | 300 | 16 | 533 | $ 20 | $ 10667 | $ 10667 | $ 11733 | Watermain Looping Shouldnt this be part of Center | |||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 25th St - Chip Seal | Sheridan St | Holcomb St | 1200 | 18 | 2400 | $ 20 | $ 48000 | $ 48000 | $ 52800 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 14th St - Chip Seal | $ - | $ - | ||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Cedar St - Chip Seal | Redwood St | San Juan Ave | 1460 | 16 | 2596 | $ 20 | $ 51911 | $ 51911 | $ 57102 | Ex ChipSeal 22 Wide | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Center St - Chip Seal | Redwood St | San Juan Ave | 484 | 1660 | 16 | 2951 | $ 20 | $ 59022 | $ 59022 | $ 64924 | Ex ChipSeal 22 Wide Stormwater | |||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Grant St Chip Seal | 14th St | 16th St | 525 | 16 | 933 | $ 20 | $ 18667 | $ 18667 | $ 20533 | Ex Street 10 Wide | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 11th St Chip Seal | Hendricks St | Sheridan St | 550 | 16 | 978 | $ 20 | $ 19556 | $ 19556 | $ 21511 | Hospital Parking | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Hendricks St Chip Seal | 9th St | 12th St | 800 | 16 | 1422 | $ 20 | $ 28444 | $ 28444 | $ 31289 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 10th St Chip Seal | Hendricks St | Grant St | 1655 | 283 | 18 | 566 | $ 20 | $ 11320 | $ 11320 | $ 12452 | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Grant St Chip Seal | 14th St | 16th St | 525 | 18 | 1050 | $ 20 | $ 21000 | $ 21000 | $ 23100 | Ex Street 10 Wide Stormwater | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Hill St | 21st St | 19th St | 807 | 16 | 1435 | $ 20 | $ 28693 | $ 28693 | $ 31563 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Milo St -Chip seal | Olympic Ave | Pacific Ave | 0003 | 466 | 12 | 621 | $ 20 | $ 12427 | $ 12427 | $ 13669 | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Olympic St | Cedar St | Tremont St | 536 | 12 | 715 | $ 20 | $ 14293 | $ 14293 | $ 15723 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Benton St - street improvement | Blaine St | Lincoln Blg | 580 | 36 Sarah Tiffany Sarah TiffanyEstimated at 25-36 used higher number | Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Sarah Tiffany Sarah TiffanyGarfield | 2320 | $ 20 | $ 46400 | $ 46400 | $ 51040 | ||||||||||||||||||||||||||||||||||
Pave Gravel Road | |||||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Pacific St | Cedar St | Tremont St | 400 | 16 | 711 | $ 50 | $ 35556 | $ 6000 | $ 15000 | $ 56556 | $ 62211 | $ 80 | ||||||||||||||||||||||||||||||||||
58th St | Hill St | Kuhn St | 525 | 16 | 933 | $ 50 | $ 46667 | $ 6000 | $ 20000 | $ 72667 | $ 79933 | $ 78 | 4 AC Waterline Driveways Site Distance (Re-grade Slope) | ||||||||||||||||||||||||||||||||||
Sidewalks | |||||||||||||||||||||||||||||||||||||||||||||||
Harrison St | Franklin St | Clay St | 340 | 6 | 227 | $ 165 | $ 56100 | $ 5000 | $ 61100 | $ 67210 | $ 180 | ||||||||||||||||||||||||||||||||||||
9th St | Hancock St | McPherson St | 1300 | 6 | 867 | $ 165 | $ 214500 | $ 10000 | $ 15000 | $ 239500 | $ 263450 | $ 184 | |||||||||||||||||||||||||||||||||||
Asphalt Path | |||||||||||||||||||||||||||||||||||||||||||||||
Spruce St Easement | Cedar St | Center St | 150 | 8 | 133 | $ 50 | $ 6667 | $ 2000 | $ 8667 | $ 9533 | $ 65 | ||||||||||||||||||||||||||||||||||||
Cherry St | A St | E St | 990 | 10 | 1100 | $ 50 | $ 55000 | $ 10000 | $ 10000 | $ 15000 | $ 90000 | $ 99000 | $ 82 | ||||||||||||||||||||||||||||||||||
Gravel Path | |||||||||||||||||||||||||||||||||||||||||||||||
16th St | Thomas St | Grant St | 1700 | 6 | 1133 | $ 15 | $ 17000 | $ 1500 | $ 18500 | $ 20350 | |||||||||||||||||||||||||||||||||||||
Cleveland St | 21st St | 23rd St | 500 | 6 | 333 | $ 15 | $ 5000 | $ 5000 | $ 5500 | Need Easement | |||||||||||||||||||||||||||||||||||||
6 | - | $ 15 | $ - | $ - | $ - | Need Easement | |||||||||||||||||||||||||||||||||||||||||
6 | - | $ 15 | $ - | $ - | $ - | Need Easement | |||||||||||||||||||||||||||||||||||||||||
Total | $ 1582256 | $ 1792256 | $ 1971481 | ||||||||||||||||||||||||||||||||||||||||||||
Project Descriptioin | Length | Width | Construction Costs | ConstructionUnit Costs | Units | Engineering Costs | Total CostsUnit Cost | Total Costs | Total CostsUnit Cost | Notes | |||||||||||
Sidewalk | |||||||||||||||||||||
9th Street Sidewalk Grant Street to Hancock Street | 826 | 6 | $ 141506 | $ 17131 | LF | Construction Unit Cost per Foot | |||||||||||||||
Jefferson Street Sidewalk Washington Street to Taylor Street | 724 | 6 | $ 390502 | $ 53937 | LF | Construction Unit Cost per Foot | |||||||||||||||
Landis Street Sidewalk 10th Street to 19th Street | 1795 | 6 | $ 364550 | $ 20309 | LF | Construction Unit Cost per Foot | |||||||||||||||
ADA Corner Ramps | |||||||||||||||||||||
Washington Street amp Harrison Street | $ 42000 | $ 42000 | Each | ||||||||||||||||||
Washington Street amp Adams Street | $ 38150 | $ 19075 | Each | Two Corners Were Retrofitted | |||||||||||||||||
Chip Seal Pavement | |||||||||||||||||||||
Walker Street Washington Street to Lawrence Street | 1144 | 24 | $ 20000 | $ 656 | SY | Does not include flagging nor prep work | |||||||||||||||
Pulverize amp Asphalt Paving | |||||||||||||||||||||
Washington Street VanBuren Street to Harrison Street | 300 | 22 | $ 35000 | $ 4773 | SY | ||||||||||||||||
Asphalt Overlay | |||||||||||||||||||||
Sidewalks | ||||||||||||||||||||||||||||||||||||||
Harrison St | Franklin St | Clay St | 340 | 6 | 227 | |||||||||||||||||||||||||||||||||
9th St | Hancock St | McPherson St | 1300 | 6 | 867 | |||||||||||||||||||||||||||||||||
Asphalt Path | ||||||||||||||||||||||||||||||||||||||
Spruce St Easement | Cedar St | Center St | 150 | 8 | 133 | $ 2000 | $ 2000 | $ 2000 | ||||||||||||||||||||||||||||||
Cherry St | A St | E St | 990 | 10 | 1100 | $ 10000 | $ 10000 | $ 10000 | ||||||||||||||||||||||||||||||
Gravel Path | ||||||||||||||||||||||||||||||||||||||
16th St | Thomas St | Grant St | 1700 | 6 | 1133 | $ 1500 | $ 1500 | $ 1500 | ||||||||||||||||||||||||||||||
Cleveland St | 21st St | 23rd St | 500 | 6 | 333 | Need Easement | ||||||||||||||||||||||||||||||||
6 | - | Need Easement | ||||||||||||||||||||||||||||||||||||
6 | - | Need Easement | ||||||||||||||||||||||||||||||||||||
Total |
Type | Improvement | Cost Range SY | Cost Range LF | ||||||||
1 | Complete Road Rebuild | $80 | $100 | ||||||||
2 | Asphalt Overlay | $50 | $60 | ||||||||
3 | Pulverize amp Chip Seal | $20 | $30 | ||||||||
4 | Chip Seal | $6 | $10 | $12 | $25 | ||||||
5 | Seal Coat | ||||||||||
6 | |||||||||||
7 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 3-Inch | 413 | TONS | $ 15000 | $ 6187500 | 1000 x 22 x 025 httpwwwamerasphaltcomasphalthtm | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 1630 | CY | $ 4800 | $ 7824000 | Water Street Project = $48 CY (1000 x 22 x 2)27 = 1630 CY | ||||||
Gravel Borrow | 2282 | TONS | $ 3000 | $ 6846000 | (1000 x 22 x 2)27 = 1630 1630 CY x 14 = 2282 Tons | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 128 | Hours | $ 5728 | $ 733133 | (2) People for 64 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 25043033 | |||||||||||
$ 10247 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 2-Inch | 275 | TONS | $ 15000 | $ 4125000 | 1000 x 22 x 017 httpwwwamerasphaltcomasphalthtm | | ||||||
Digouts amp Pre-leveling | 122 | SY | $ 4900 | $ 597800 | |||||||
Flagging | 64 | Hours | $ 5728 | $ 366566 | (2) People for 32 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 180000 | $ 180000 | |||||||
$ 5403066 | |||||||||||
$ 2211 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 3-Inch | 413 | TONS | $ 15000 | $ 6187500 | 1000 x 22 x 025 httpwwwamerasphaltcomasphalthtm | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 150 | CY | $ 4800 | $ 720000 | Water Street Project = $48 CY | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 96 | Hours | $ 5728 | $ 549850 | (2) People for 48 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 10909750 | |||||||||||
$ 4464 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Chip Seal | 2444 | SY | $ 1050 | $ 2566200 | 1000 X 22 | Unit Cost $525 SY from Walker Street County Invoice Doubled to $1050 for Chip Seal Over Gravel | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 150 | CY | $ 4800 | $ 720000 | Water Street Project = $48 CY | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 80 | Hours | $ 5728 | $ 458208 | (2) People for 40 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | Hours | $ 12500 | $ - 0 | High Average Loaded Rate No Testing | ||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 7196808 | |||||||||||
$ 2945 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 1500000 | $614 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 500 | LF | $ 5000 | $ 2500000 | |||||||
Catch Basins | 4 | EACH | $ 150000 | $ 600000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Chip Seal | 2444 | SY | $ 525 | $ 1283100 | 1000 X 22 | Unit Cost from Walker Street County Invoice | ||||||
Digouts amp Pre-leveling | 122 | SY | $ 4900 | $ 598780 | Cost from 2018 Lakeside Mill amp Fill | Estimate Quanity Based on 5 | ||||||
Flagging | 32 | Hours | $ 5728 | $ 183283 | (2) People for 16 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | Hours | $ 12500 | $ - 0 | High Average Loaded Rate No Surveying or Testing | ||||||
Surveying | 1 | LS | $ - 0 | $ - 0 | |||||||
$ 2198863 | |||||||||||
$ 900 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 1500000 | $614 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY |
Project Descriptioin | Length | Width | Construction Costs | Engineering Costs | Engineering Total | Digouts Pre-Leveling Costs | Digouts Pre-Leveling Total | ADACosts | ADATotal | StormwaterCosts | StormwaterTotal | Total Costsby SY | Cost Per 250 Block | Length | Width | Notes | |||||||||||||||||
Chip Seal Pavement | |||||||||||||||||||||||||||||||||
Walker Street Washington Street to Lawrence Street | 1144 | 24 | $ 25000 | 15 | $ 3750 | 10 | $ 2500 | $ 1024 | $ 682911 | 250 | 24 | ||||||||||||||||||||||
Pulverize amp Chip Seal | |||||||||||||||||||||||||||||||||
Engineers Estimate | 250 | 24 | $ 22000 | 15 | $ 3300 | 0 | $ - | 20 | $ 4400 | $ 4455 | $ 2970000 | 250 | 24 | ||||||||||||||||||||
Pulverize amp Asphalt Paving | |||||||||||||||||||||||||||||||||
Washington Street VanBuren Street to Harrison Street | 300 | 22 | $ 35000 | 20 | $ 7000 | 0 | $ - | 10 | $ 3500 | 20 | $ 7000 | $ 7159 | $ 4772727 | 250 | 24 | ||||||||||||||||||
Asphalt Overlay (2) | |||||||||||||||||||||||||||||||||
Engineers Estimate | 250 | 24 | $ 21334 | 20 | $ 426680 | 10 | $ 2133 | 20 | $ 426680 | 20 | $ 426680 | $ 5440 | $ 4835707 | 250 | 32 | ||||||||||||||||||
Reconstruction | |||||||||||||||||||||||||||||||||
Walker Street Lawrence Street to Blaine Street | 650 | 36 | $ 184310 | 25 | $ 46078 | 0 | $ - | 20 | $ 36862 | 30 | $ 55293 | $ 12405 | $ 11027094 | 250 | 32 | ||||||||||||||||||
RSL | Length (FT) | Area (SY) | Condition | Treatment | Cost | Total | |||||||||
20 | 61834 | 138524 | 131 | Good | $0 | $0 | |||||||||
14 | 23656 | 49915 | 47 | Satisfactory | Chip Seal | $29 | $1470552 | ||||||||
12 | 43586 | 106382 | 100 | $3134134 | |||||||||||
10 | 74803 | 193570 | 182 | $5702790 | |||||||||||
8 | 96662 | 228046 | 215 | $6718492 | |||||||||||
6 | 95452 | 261794 | 247 | Fair | Overlay | $67 | $17489930 | ||||||||
4 | 6420 | 14536 | 14 | $971121 | |||||||||||
2 | 29238 | 60616 | 57 | Poor | Rehab | $107 | $6492850 | ||||||||
0 | 3851 | 7532 | 07 | Very Poor | Rebuild | $155 | $1169719 | ||||||||
$43149589 | |||||||||||||||
Additional Paving Costs | Average Cost per SY | Percent of Paving Cost | |||
Digouts amp Pre-Leveling | $4 | 25 | |||
Stormwater | $7 | 38 | |||
ADA | $5 | 27 | |||
Engineering amp Administration | $5 | 28 |
9 | Base Paving Costs | Preperation | Stormwater | ADA | Engineering | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Remaining Service Life | Road Name | From | To | Length (ft) | Width (ft) | Area (SY) | Total Construction | Price(SY) | Reconstruction | Pulverize amp Pave | Ashpalt Overlay | Pave Gravel Road | Pulverize amp Chip Seal | Chip Seal | Total Base Paving Costs | Digouts(SY) | Pre-Leveling(SY) | Construct Shoulders Both Sides (LF) | Preparation Total | StormwaterPipes (LF) | StormwaterCatchbasins | StormwaterSwales (LF) | Stormwater Total | Curb Ramps | Curb Ramps Total | Surveying | Engineering amp Administration | Engineering amp Administration Total | Other Work | ||||||||||||||||||||||||||||||
$102 | $45 | $22 | $35 | $29 | $9 | $35 | $15 | $20 | $50 | $1500 | $25 | $15000 | |||||||||||||||||||||||||||||||||||||||||||||||
2 | Polk St - Street | Lawrence St | 1056 | 200 | 56 | 1244 | $ 210679 | $ 169 | $ 127518 | $ 127518 | $ - | 150 | 1 | 1 | $ 9025 | 2 | $ 30000 | $ 10000 | 25 | $ 44136 | |||||||||||||||||||||||||||||||||||||||
6 | 47th Street | Pettygrove | McNeil | 500 | 18 | 1548 | $ 258717 | $ 167 | $ 158624 | $ 158624 | $ - | 687 | 8 | $ 46350 | $ - | $ 10000 | 25 | $ 53743 | |||||||||||||||||||||||||||||||||||||||||
6 to 10 | Lawrence St | Calhoun St | Harrison St | 1200 | 36 | 4800 | $ 786070 | $ 164 | $ 491856 | $ 491856 | 600 | $ 15000 | $ 8 | $ 120000 | $ 10000 | 25 | $ 159214 | ||||||||||||||||||||||||||||||||||||||||||
8 | Lawrence St | Cass St | Calhoun St | 250 | 36 | 1000 | $ 146213 | $ 146 | $ 102470 | $ 102470 | 0 | 0 | $ - | 75 | 350 | $ 12500 | $ - | $ 10000 | 25 | $ 31243 | |||||||||||||||||||||||||||||||||||||||
8 | Lawrence St | Walker St | Cass St | 250 | 36 | 1000 | $ 144650 | $ 145 | $ 102470 | $ 102470 | $ - | 100 | 250 | $ 11250 | $ - | $ 10000 | 25 | $ 30930 | |||||||||||||||||||||||||||||||||||||||||
4 to 8 | San Juan Ave | Lopez Ave | Admiralty | 2300 | 34 | 8689 | $ 1222938 | $ 141 | $ 890350 | $ 890350 | $ - | 800 | 5 | 1500 | $ 85000 | $ - | $ 15000 | 25 | $ 247588 | ||||||||||||||||||||||||||||||||||||||||
6 to 8 | Lawrence St | Harrison St | Monroe St | 2380 | 47 | 12429 | $ 1331314 | $ 107 | $ 274803 | $ 274803 | 15 | 5 | $ 74573 | 1900 | 10 | $ 110000 | 50 | $ 750000 | $ 10000 | 10 | $ 121938 | ||||||||||||||||||||||||||||||||||||||
2 to 4 | Center St | San Juan Ave | Redwood St | 1660 | 16 | 2951 | $ 295222 | $ 100 | $ 86910 | $ 86910 | $ - | 1600 | 9 | 3000 | $ 168500 | $ - | $ 10000 | 15 | $ 39812 | ||||||||||||||||||||||||||||||||||||||||
0 to 6 | Pacific St | Cedar St | Tremont St | 400 | 16 | 711 | $ 66581 | $ 94 | $ 31744 | $ 31744 | $ - | 100 | 2 | 700 | $ 25500 | $ - | $ 5000 | 15 | $ 9337 | ||||||||||||||||||||||||||||||||||||||||
0 to 6 | Benton St | Lawrence | Lincoln Blg | 580 | 36 | 2320 | $ 203265 | $ 88 | $ 20880 | $ 20880 | 20 | 10 | $ 19720 | 250 | 2 | $ 15500 | 8 | $ 120000 | $ 5000 | 15 | $ 27165 | ||||||||||||||||||||||||||||||||||||||
2 | Grant St | 14th St | 16th St | 525 | 16 | 933 | $ 73635 | $ 79 | $ 27487 | $ 27487 | $ - | 400 | 2 | 500 | $ 35500 | $ - | $ 8000 | 15 | $ 10648 | ||||||||||||||||||||||||||||||||||||||||
2 to 6 | Olympic St | Cedar St | Tremont St | 536 | 12 | 715 | $ 52716 | $ 74 | $ 21047 | $ 21047 | $ - | 950 | $ 23750 | $ - | $ 8000 | 15 | $ 7920 | ||||||||||||||||||||||||||||||||||||||||||
2 | Milo St | Olympic Ave | Pacific Ave | 466 | 12 | 621 | $ 44793 | $ 72 | $ 18298 | $ 18298 | $ - | 800 | $ 20000 | $ - | $ 5000 | 15 | $ 6495 | ||||||||||||||||||||||||||||||||||||||||||
0 | 11th St | Hendricks St | Sheridan St | 550 | 16 | 978 | $ 65077 | $ 67 | $ 28796 | $ 28796 | $ - | 100 | 2 | 750 | $ 26750 | $ - | $ 8000 | 15 | $ 9532 | ||||||||||||||||||||||||||||||||||||||||
0 | 58th St | Hill St | Kuhn St | 525 | 16 | 933 | $ 60329 | $ 65 | $ 32667 | $ 32667 | $ - | 750 | $ 18750 | $ - | $ 8000 | 15 | $ 8913 | ||||||||||||||||||||||||||||||||||||||||||
2 | 10th St | Hendricks St | Grant St | 283 | 18 | 566 | $ 34294 | $ 61 | $ 16669 | $ 16669 | $ - | 500 | $ 12500 | $ - | $ 5000 | 15 | $ 5125 | ||||||||||||||||||||||||||||||||||||||||||
4 to 10 | 31st St | Hancock St | Sheridan St | 1050 | 22 | 2567 | $ 150027 | $ 58 | $ 23100 | $ 23100 | 10 | 10 | $ 12833 | 1200 | 10 | 1000 | $ 100000 | $ - | $ 5000 | 10 | $ 14093 | ||||||||||||||||||||||||||||||||||||||
6 | 25th St | Sheridan St | Holcomb St | 1200 | 18 | 2400 | $ 125895 | $ 52 | $ 70680 | $ 70680 | $ - | 125 | 1 | 1200 | $ 37750 | $ - | $ 8000 | 15 | $ 17465 | ||||||||||||||||||||||||||||||||||||||||
6 | Holcomb St | 7th St | 10th St | 850 | 12 | 1133 | $ 58703 | $ 52 | $ 10200 | $ 10200 | 10 | 10 | $ 5667 | 1500 | $ 37500 | $ - | $ - | 10 | $ 5337 | ||||||||||||||||||||||||||||||||||||||||
2 | Hendricks St | 9th St | 12th St | 800 | 16 | 1422 | $ 70930 | $ 50 | $ 41884 | $ 41884 | $ - | 750 | $ 18750 | $ - | $ 8000 | 15 | $ 10295 | ||||||||||||||||||||||||||||||||||||||||||
2 to 6 | Hill St | 19th | 21st St | 807 | 16 | 1435 | $ 67443 | $ 47 | $ 21125 | $ 6456 | $ 27581 | 10 | $ 5021 | 1000 | $ 25000 | $ - | $ 8000 | 15 | $ 9840 | ||||||||||||||||||||||||||||||||||||||||
2 to 8 | 57th St | Jackman St | Kuhn St | 800 | 18 | 1600 | $ 66550 | $ 42 | $ 14400 | $ 14400 | 20 | 10 | $ 13600 | 1300 | $ 32500 | 10 | $ 6050 | ||||||||||||||||||||||||||||||||||||||||||
6 to 8 | Sheridan St | Hastings Ave | SilverUmatilla | 1750 | 22 | 4278 | $ 154115 | $ 36 | $ 38500 | $ 38500 | 20 | 10 | $ 36361 | 300 | 4 | 1500 | $ 58500 | $ - | $ 5000 | 15 | $ 20754 | ||||||||||||||||||||||||||||||||||||||
6 to 10 | Tyler St | Jefferson St | Lawrence St | 900 | 32 | 3200 | $ 115280 | $ 36 | $ 28800 | $ 28800 | 5 | 5 | $ 8000 | 100 | 2 | $ 8000 | 4 | $ 60000 | 10 | $ 10480 | |||||||||||||||||||||||||||||||||||||||
6 to 14 | 14th St | McPherson St | Sheridan St | 2375 | 21 | 5542 | $ 182027 | $ 33 | $ 49875 | $ 49875 | 20 | 10 | $ 47104 | 750 | 4 | 1000 | $ 68500 | $ - | 10 | $ 16548 | |||||||||||||||||||||||||||||||||||||||
8 | 49th St | Kuhn St | Admiralty Ave | 400 | 24 | 1067 | $ 34613 | $ 32 | $ 9600 | $ 9600 | 5 | $ 1867 | 800 | $ 20000 | $ - | 10 | $ 3147 | ||||||||||||||||||||||||||||||||||||||||||
6 to 10 | Fir St | F St | UCherry | 4360 | 22 | 10658 | $ 341621 | $ 32 | $ 95920 | $ 95920 | 5 | 5 | 4000 | $ 106644 | 100 | 2 | 4000 | $ 108000 | $ - | 10 | $ 31056 | ||||||||||||||||||||||||||||||||||||||
6 to 8 | Cedar St | San Juan Ave | Redwood St | 1460 | 16 | 2596 | $ 81747 | $ 31 | $ 23360 | $ 23360 | 20 | 20 | $ 25956 | 1000 | $ 25000 | $ - | 10 | $ 7432 | |||||||||||||||||||||||||||||||||||||||||
8 | Clallam St | McKinley St | Roosevelt St | 975 | 14 | 1517 | $ 46796 | $ 31 | $ 13650 | $ 13650 | 20 | 10 | $ 12892 | 200 | 4 | $ 16000 | $ - | 10 | $ 4254 | ||||||||||||||||||||||||||||||||||||||||
6 | San Juan Ave | 19th St | 20th St | 300 | 31 | 1033 | $ 31827 | $ 31 | $ 9300 | $ 9300 | 50 | 10 | $ 19633 | $ - | $ - | 10 | $ 2893 | ||||||||||||||||||||||||||||||||||||||||||
6 to 20 | Cherry St | F St | W St | 4200 | 32 | 14933 | $ 457307 | $ 31 | $ 134400 | $ 134400 | 5 | 5 | 4200 | $ 121333 | 200 | 6000 | $ 160000 | $ - | 10 | $ 41573 | |||||||||||||||||||||||||||||||||||||||
6 to 8 | Jackman St | 45th St | 49th St | 1100 | 22 | 2689 | $ 81940 | $ 30 | $ 24200 | $ 24200 | 15 | 10 | $ 18150 | 225 | 3 | 500 | $ 28250 | $ - | $ 5000 | 15 | $ 11340 | ||||||||||||||||||||||||||||||||||||||
6 to 12 | Jackson St | LawrenceMonroe | Roosevelt St | 1600 | 18 | 3200 | $ 93530 | $ 29 | $ 28800 | $ 28800 | 10 | 10 | $ 16000 | 1000 | $ 25000 | 1 | $ 15000 | $ 2500 | 10 | $ 8730 | |||||||||||||||||||||||||||||||||||||||
2 | 7th St | Wilson St | Holcomb St | 450 | 16 | 800 | $ 23320 | $ 29 | $ 7200 | $ 7200 | 10 | 10 | $ 4000 | 400 | $ 10000 | $ - | 10 | $ 2120 | |||||||||||||||||||||||||||||||||||||||||
8 to 14 | 25th St | Sherman St | Sheridan St | 800 | 20 | 1778 | $ 50061 | $ 28 | $ 16000 | $ 16000 | 10 | 5 | $ 7556 | 1 | 800 | $ 21500 | $ - | $ 5000 | 10 | $ 5006 | |||||||||||||||||||||||||||||||||||||||
2 to 6 | Hancock St | SR 20 | 9th St | 1100 | 20 | 2444 | $ 67833 | $ 28 | $ 22000 | $ 22000 | 15 | 5 | $ 14667 | 1000 | $ 25000 | $ - | 10 | $ 6167 | |||||||||||||||||||||||||||||||||||||||||
Benton St | Washington St | Lawrence St | 1160 | 22 | 2836 | $ 74468 | $ 26 | $ 25520 | $ 25520 | 10 | 10 | $ 14178 | 140 | 4 | 600 | $ 28000 | 10 | $ 6770 | |||||||||||||||||||||||||||||||||||||||||
W St | San JuanAdmiralty | Walnut St | 2560 | 22 | 6258 | $ 163807 | $ 26 | $ 56320 | $ 56320 | 10 | 5 | $ 26596 | 200 | 4 | 2000 | $ 66000 | $ - | 10 | $ 14892 | ||||||||||||||||||||||||||||||||||||||||
6 to 8 | Walnut | W Street | Jackson | 2300 | 22 | 5622 | $ 145194 | $ 26 | $ 50600 | $ 50600 | 10 | 5 | $ 23894 | 2300 | $ 57500 | $ - | 10 | $ 13199 | |||||||||||||||||||||||||||||||||||||||||
6 to 8 | 24th St | Discovery Rd | San Juan Ave | 1250 | 18 | 2500 | $ 63938 | $ 26 | $ 22500 | $ 22500 | 10 | 5 | $ 10625 | 1000 | $ 25000 | $ - | 10 | $ 5813 | |||||||||||||||||||||||||||||||||||||||||
6 to 10 | Tyler St | Lawrence St | Blaine St | 900 | 32 | 3200 | $ 78980 | $ 25 | $ 28800 | $ 28800 | 5 | 5 | $ 8000 | 200 | $ 5000 | 2 | $ 30000 | 10 | $ 7180 | ||||||||||||||||||||||||||||||||||||||||
4 to 12 | McPherson St | SR 20 | Discovery Rd | 2925 | 32 | 10400 | $ 244860 | $ 24 | $ 93600 | $ 93600 | 5 | 5 | 2925 | $ 84500 | 230 | 2 | 1200 | $ 44500 | $ - | $ - | 10 | $ 22260 | |||||||||||||||||||||||||||||||||||||
10 | Landes St | 12th St | 19th St | 1820 | 32 | 6471 | $ 151821 | $ 23 | $ 58240 | $ 58240 | 5 | 1400 | $ 39324 | 400 | $ 10000 | 2 | $ 30000 | $ 5000 | 10 | $ 14256 | |||||||||||||||||||||||||||||||||||||||
6 to 8 | Discovery Rd | 19th | Hastings Ave | 2900 | 22 | 7089 | $ 136565 | $ 19 | $ 63800 | $ 63800 | 15 | 10 | $ 47850 | 500 | $ 12500 | $ - | 10 | $ 12415 | |||||||||||||||||||||||||||||||||||||||||
8 to 12 | Hastings Ave | Discovery Rd | County Line | 8450 | 32 | 30044 | $ 542349 | $ 18 | $ 270400 | $ 270400 | 5 | 10 | 5000 | $ 197644 | 1000 | $ 25000 | $ - | 10 | $ 49304 | ||||||||||||||||||||||||||||||||||||||||
6 to 12 | Washington St | Van Buren St | SR20 | 2025 | 30 | 6750 | $ 118388 | $ 18 | $ 60750 | $ 60750 | 5 | 5 | $ 16875 | 0 | 0 | 0 | $ - | 2 | $ 30000 | $ - | 10 | $ 10763 | |||||||||||||||||||||||||||||||||||||
14 | Blaine St | San Juan Ave | Walker St | 1275 | 48 | 6800 | $ 113910 | $ 17 | $ 61200 | $ 61200 | 5 | $ 11900 | $ - | 2 | $ 30000 | $ 5000 | 10 | $ 10810 | |||||||||||||||||||||||||||||||||||||||||
6 | Washington St | Harrison St | Taylor St | 1175 | 33 | 4308 | $ 59240 | $ 14 | $ 38775 | $ 38775 | 10 | $ 15079 | $ - | $ - | 10 | $ 5385 | |||||||||||||||||||||||||||||||||||||||||||
8 to 10 | Sheridan St | SR 20 | 19th St | 4000 | 46 | 20444 | $ 272922 | $ 13 | $ 184000 | $ 184000 | 5 | 5 | $ 51111 | 200 | 2 | $ 13000 | $ - | 10 | $ 24811 | ||||||||||||||||||||||||||||||||||||||||
8 to 10 | 19th St | San Juan Ave | Sheridan St | 3200 | 48 | 17067 | $ 197120 | $ 12 | $ 153600 | $ 153600 | 3 | 3 | $ 25600 | 0 | 0 | 0 | $ - | $ - | 10 | $ 17920 | |||||||||||||||||||||||||||||||||||||||
10 to 20 | San Juan Ave | F St | Lopez Ave | 2800 | 32 | 9956 | $ 110059 | $ 11 | $ 89600 | $ 89600 | 3 | $ 10453 | $ - | $ - | 10 | $ 10005 | |||||||||||||||||||||||||||||||||||||||||||
10 to 20 | F St | Hastings Ave | Tyler St | 5300 | 31 | 18256 | $ 180730 | $ 10 | $ 164300 | $ 164300 | $ - | $ - | $ - | 10 | $ 16430 | ||||||||||||||||||||||||||||||||||||||||||||
$ 9952406 | $ 1873288 | $ 31744 | $ 274803 | $ 32667 | $ 332896 | $ 1998646 | $ 4544044 | $ 1155207 | $ 1747625 | $ 1215000 | $ 1290529 | $ - 0 | |||||||||||||||||||||||||||||||||||||||||||||||
Street Pavement Improvement Plan Projects | 9 | 110 | |||||||||||||||||||||||||||||||||||||||||||||
Road Name | From | To | Iworq ID | Length (ft) | Width (ft) | Area (yd^2) | Actual Area(SY) | Unit Cost per yd2 | Construction Cost | Prep Work | Survey Testing | ADA Curb Ramps | Storm Water | Mill amp Fill$50SY | Pre-Level$4SY | Total Construction | Project Cost + 10 | Unit Cost w Additional Costs no 10 | Engineering Costs | Notes | |||||||||||||||||||||||||||
Priority | Reconstruct | 2021 | 2022 | 2023 | 2024 | ||||||||||||||||||||||||||||||||||||||||||
1 | Reconstruct | Lawrence St | Cass St | Calhoun St | 1304 | 250 | 36 | 1000 | $ 80 | $ 80000 | $ 5000 | $ 20000 | $ 105000 | $ 115500 | $ 105 | Stormwater South Side Parking Raingarden on Cass | |||||||||||||||||||||||||||||||
2 | Reconstruct | Lawrence St | Walker St | Cass St | 250 | 36 | 1000 | $ 80 | $ 80000 | $ 5000 | $ 20000 | $ 5000 | $ 110000 | $ 121000 | $ 110 | Stormwater South Side Parking | |||||||||||||||||||||||||||||||
3 | Reconstruct Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | San Juan Ave | Lopez Ave | Admiralty | 2300 | 32 | 8178 | $ 50 | $ 408889 | $ 10000 | $ 100000 | $ 518889 | $ 570778 | $ 63 | Stormwater Problem 45th | ||||||||||||||||||||||||||||||||
4 | Reconstruct Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Polk St - Street Improvements | Lawrence St | 1056 Sarah Tiffany Sarah TiffanyGarfield | 1073 | 200 | 56 | 1244 | $ 50 | $ 62222 | X | X | X | $ 62222 | $ 68444 | $ 50 | Parking Theater 4 AC Watermain Infiltration or Rain Garden Parking on Condo Side | ||||||||||||||||||||||||||||||
Reconstruct | 47th Street | Pettygrove | McNeil | 500 | 18 | 1000 | 1548 | $ 50 | $ 50000 | $ 5000 | $ 40000 | $ 95000 | $ 104500 | $ 95 | $210000 Engineers Estimate With Engineering Cost Turnaround Spaghetti Waterline | ||||||||||||||||||||||||||||||||
Chip Seal - $50000 to $70000 per Mile | $6 No DigoutsPre-leveling | $10 with Additional Prep Work | |||||||||||||||||||||||||||||||||||||||||||||||
Chip Seal | Washington St | Van Buren St | SR20 | 2025 | 30 | 6750 | $ 10 | $ 67500 | $ 67500 | $ 74250 | Digouts Flagging | ||||||||||||||||||||||||||||||||||||
Chip Seal | Hastings Ave - Pre-level and widen shoulders | Discovery Rd | County Line | 8450 | 24 | 22533 | $ 6 | $ 135200 | $ 135200 | $ 148720 | Ditches amp Culverts Total Width change from 21 to 24 How wide will shoulders be | ||||||||||||||||||||||||||||||||||||
Tyler St | Jefferson St | Lawrence St | 900 | 32 | 3200 | $ 6 | $ 19200 | $ 19200 | $ 21120 | ||||||||||||||||||||||||||||||||||||||
Chip Seal | McPherson - Chip Seal | 4th St | Discovery Rd | 3100 | 32 | 11022 | $ 6 | $ 66133 | $ 66133 | $ 72747 | Ditches amp Culverts Shoulder Wideneing | ||||||||||||||||||||||||||||||||||||
Chip Seal | 19th St - Chip Seal | San Juan Ave | Sheridan St | 3200 | 48 | 17067 | $ 6 | $ 102400 | $ 102400 | $ 112640 | Bike Lanes amp Shoulder Prelevel | ||||||||||||||||||||||||||||||||||||
Chip Seal | Walnut | W Street | Jackson | 2300 | 22 | 5622 | $ 6 | $ 33733 | $ 33733 | $ 37107 | Dig-Outs Pre-Leveling Striping Shoulders | ||||||||||||||||||||||||||||||||||||
Chip Seal | Fir St - Chip Seal | F St | UCherry | 4360 | 22 | 10658 | $ 10 | $ 106578 | X | X | $ 106578 | $ 117236 | Dig-Outs Pre-Leveling Striping | ||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | |||||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | P St - Chip Seal | Redwood St | Cedar St | 0486 | 300 | 16 | 533 | $ 20 | $ 10667 | $ 10667 | $ 11733 | Watermain Looping Shouldnt this be part of Center | |||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 25th St - Chip Seal | Sheridan St | Holcomb St | 1200 | 18 | 2400 | $ 20 | $ 48000 | $ 48000 | $ 52800 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 14th St - Chip Seal | $ - | $ - | ||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Cedar St - Chip Seal | Redwood St | San Juan Ave | 1460 | 16 | 2596 | $ 20 | $ 51911 | $ 51911 | $ 57102 | Ex ChipSeal 22 Wide | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Center St - Chip Seal | Redwood St | San Juan Ave | 484 | 1660 | 16 | 2951 | $ 20 | $ 59022 | $ 59022 | $ 64924 | Ex ChipSeal 22 Wide Stormwater | |||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Grant St Chip Seal | 14th St | 16th St | 525 | 16 | 933 | $ 20 | $ 18667 | $ 18667 | $ 20533 | Ex Street 10 Wide | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 11th St Chip Seal | Hendricks St | Sheridan St | 550 | 16 | 978 | $ 20 | $ 19556 | $ 19556 | $ 21511 | Hospital Parking | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Hendricks St Chip Seal | 9th St | 12th St | 800 | 16 | 1422 | $ 20 | $ 28444 | $ 28444 | $ 31289 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 10th St Chip Seal | Hendricks St | Grant St | 1655 | 283 | 18 | 566 | $ 20 | $ 11320 | $ 11320 | $ 12452 | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Grant St Chip Seal | 14th St | 16th St | 525 | 18 | 1050 | $ 20 | $ 21000 | $ 21000 | $ 23100 | Ex Street 10 Wide Stormwater | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Hill St | 21st St | 19th St | 807 | 16 | 1435 | $ 20 | $ 28693 | $ 28693 | $ 31563 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Milo St -Chip seal | Olympic Ave | Pacific Ave | 0003 | 466 | 12 | 621 | $ 20 | $ 12427 | $ 12427 | $ 13669 | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Olympic St | Cedar St | Tremont St | 536 | 12 | 715 | $ 20 | $ 14293 | $ 14293 | $ 15723 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Benton St - street improvement | Blaine St | Lincoln Blg | 580 | 36 Sarah Tiffany Sarah TiffanyEstimated at 25-36 used higher number | Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Sarah Tiffany Sarah TiffanyGarfield | 2320 | $ 20 | $ 46400 | $ 46400 | $ 51040 | ||||||||||||||||||||||||||||||||||
Pave Gravel Road | |||||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Pacific St | Cedar St | Tremont St | 400 | 16 | 711 | $ 50 | $ 35556 | $ 6000 | $ 15000 | $ 56556 | $ 62211 | $ 80 | ||||||||||||||||||||||||||||||||||
58th St | Hill St | Kuhn St | 525 | 16 | 933 | $ 50 | $ 46667 | $ 6000 | $ 20000 | $ 72667 | $ 79933 | $ 78 | 4 AC Waterline Driveways Site Distance (Re-grade Slope) | ||||||||||||||||||||||||||||||||||
Sidewalks | |||||||||||||||||||||||||||||||||||||||||||||||
Harrison St | Franklin St | Clay St | 340 | 6 | 227 | $ 165 | $ 56100 | $ 5000 | $ 61100 | $ 67210 | $ 180 | ||||||||||||||||||||||||||||||||||||
9th St | Hancock St | McPherson St | 1300 | 6 | 867 | $ 165 | $ 214500 | $ 10000 | $ 15000 | $ 239500 | $ 263450 | $ 184 | |||||||||||||||||||||||||||||||||||
Asphalt Path | |||||||||||||||||||||||||||||||||||||||||||||||
Spruce St Easement | Cedar St | Center St | 150 | 8 | 133 | $ 50 | $ 6667 | $ 2000 | $ 8667 | $ 9533 | $ 65 | ||||||||||||||||||||||||||||||||||||
Cherry St | A St | E St | 990 | 10 | 1100 | $ 50 | $ 55000 | $ 10000 | $ 10000 | $ 15000 | $ 90000 | $ 99000 | $ 82 | ||||||||||||||||||||||||||||||||||
Gravel Path | |||||||||||||||||||||||||||||||||||||||||||||||
16th St | Thomas St | Grant St | 1700 | 6 | 1133 | $ 15 | $ 17000 | $ 1500 | $ 18500 | $ 20350 | |||||||||||||||||||||||||||||||||||||
Cleveland St | 21st St | 23rd St | 500 | 6 | 333 | $ 15 | $ 5000 | $ 5000 | $ 5500 | Need Easement | |||||||||||||||||||||||||||||||||||||
6 | - | $ 15 | $ - | $ - | $ - | Need Easement | |||||||||||||||||||||||||||||||||||||||||
6 | - | $ 15 | $ - | $ - | $ - | Need Easement | |||||||||||||||||||||||||||||||||||||||||
Total | $ 1582256 | $ 1792256 | $ 1971481 | ||||||||||||||||||||||||||||||||||||||||||||
Project Descriptioin | Length | Width | Construction Costs | ConstructionUnit Costs | Units | Engineering Costs | Total CostsUnit Cost | Total Costs | Total CostsUnit Cost | Notes | |||||||||||
Sidewalk | |||||||||||||||||||||
9th Street Sidewalk Grant Street to Hancock Street | 826 | 6 | $ 141506 | $ 17131 | LF | Construction Unit Cost per Foot | |||||||||||||||
Jefferson Street Sidewalk Washington Street to Taylor Street | 724 | 6 | $ 390502 | $ 53937 | LF | Construction Unit Cost per Foot | |||||||||||||||
Landis Street Sidewalk 10th Street to 19th Street | 1795 | 6 | $ 364550 | $ 20309 | LF | Construction Unit Cost per Foot | |||||||||||||||
ADA Corner Ramps | |||||||||||||||||||||
Washington Street amp Harrison Street | $ 42000 | $ 42000 | Each | ||||||||||||||||||
Washington Street amp Adams Street | $ 38150 | $ 19075 | Each | Two Corners Were Retrofitted | |||||||||||||||||
Chip Seal Pavement | |||||||||||||||||||||
Walker Street Washington Street to Lawrence Street | 1144 | 24 | $ 20000 | $ 656 | SY | Does not include flagging nor prep work | |||||||||||||||
Pulverize amp Asphalt Paving | |||||||||||||||||||||
Washington Street VanBuren Street to Harrison Street | 300 | 22 | $ 35000 | $ 4773 | SY | ||||||||||||||||
Asphalt Overlay | |||||||||||||||||||||
Sidewalks | ||||||||||||||||||||||||||||||||||||||
Harrison St | Franklin St | Clay St | 340 | 6 | 227 | |||||||||||||||||||||||||||||||||
9th St | Hancock St | McPherson St | 1300 | 6 | 867 | |||||||||||||||||||||||||||||||||
Asphalt Path | ||||||||||||||||||||||||||||||||||||||
Spruce St Easement | Cedar St | Center St | 150 | 8 | 133 | $ 2000 | $ 2000 | $ 2000 | ||||||||||||||||||||||||||||||
Cherry St | A St | E St | 990 | 10 | 1100 | $ 10000 | $ 10000 | $ 10000 | ||||||||||||||||||||||||||||||
Gravel Path | ||||||||||||||||||||||||||||||||||||||
16th St | Thomas St | Grant St | 1700 | 6 | 1133 | $ 1500 | $ 1500 | $ 1500 | ||||||||||||||||||||||||||||||
Cleveland St | 21st St | 23rd St | 500 | 6 | 333 | Need Easement | ||||||||||||||||||||||||||||||||
6 | - | Need Easement | ||||||||||||||||||||||||||||||||||||
6 | - | Need Easement | ||||||||||||||||||||||||||||||||||||
Total |
Type | Improvement | Cost Range SY | Cost Range LF | ||||||||
1 | Complete Road Rebuild | $80 | $100 | ||||||||
2 | Asphalt Overlay | $50 | $60 | ||||||||
3 | Pulverize amp Chip Seal | $20 | $30 | ||||||||
4 | Chip Seal | $6 | $10 | $12 | $25 | ||||||
5 | Seal Coat | ||||||||||
6 | |||||||||||
7 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 3-Inch | 413 | TONS | $ 15000 | $ 6187500 | 1000 x 22 x 025 httpwwwamerasphaltcomasphalthtm | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 1630 | CY | $ 4800 | $ 7824000 | Water Street Project = $48 CY (1000 x 22 x 2)27 = 1630 CY | ||||||
Gravel Borrow | 2282 | TONS | $ 3000 | $ 6846000 | (1000 x 22 x 2)27 = 1630 1630 CY x 14 = 2282 Tons | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 128 | Hours | $ 5728 | $ 733133 | (2) People for 64 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 25043033 | |||||||||||
$ 10247 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 2-Inch | 275 | TONS | $ 15000 | $ 4125000 | 1000 x 22 x 017 httpwwwamerasphaltcomasphalthtm | | ||||||
Digouts amp Pre-leveling | 122 | SY | $ 4900 | $ 597800 | |||||||
Flagging | 64 | Hours | $ 5728 | $ 366566 | (2) People for 32 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 180000 | $ 180000 | |||||||
$ 5403066 | |||||||||||
$ 2211 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 3-Inch | 413 | TONS | $ 15000 | $ 6187500 | 1000 x 22 x 025 httpwwwamerasphaltcomasphalthtm | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 150 | CY | $ 4800 | $ 720000 | Water Street Project = $48 CY | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 96 | Hours | $ 5728 | $ 549850 | (2) People for 48 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 10909750 | |||||||||||
$ 4464 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Chip Seal | 2444 | SY | $ 1050 | $ 2566200 | 1000 X 22 | Unit Cost $525 SY from Walker Street County Invoice Doubled to $1050 for Chip Seal Over Gravel | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 150 | CY | $ 4800 | $ 720000 | Water Street Project = $48 CY | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 80 | Hours | $ 5728 | $ 458208 | (2) People for 40 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | Hours | $ 12500 | $ - 0 | High Average Loaded Rate No Testing | ||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 7196808 | |||||||||||
$ 2945 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 1500000 | $614 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 500 | LF | $ 5000 | $ 2500000 | |||||||
Catch Basins | 4 | EACH | $ 150000 | $ 600000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Chip Seal | 2444 | SY | $ 525 | $ 1283100 | 1000 X 22 | Unit Cost from Walker Street County Invoice | ||||||
Digouts amp Pre-leveling | 122 | SY | $ 4900 | $ 598780 | Cost from 2018 Lakeside Mill amp Fill | Estimate Quanity Based on 5 | ||||||
Flagging | 32 | Hours | $ 5728 | $ 183283 | (2) People for 16 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | Hours | $ 12500 | $ - 0 | High Average Loaded Rate No Surveying or Testing | ||||||
Surveying | 1 | LS | $ - 0 | $ - 0 | |||||||
$ 2198863 | |||||||||||
$ 900 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 1500000 | $614 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY |
Project Descriptioin | Length | Width | Construction Costs | Engineering Costs | Engineering Total | Digouts Pre-Leveling Costs | Digouts Pre-Leveling Total | ADACosts | ADATotal | StormwaterCosts | StormwaterTotal | Total Costsby SY | Cost Per 250 Block | Length | Width | Notes | |||||||||||||||||
Chip Seal Pavement | |||||||||||||||||||||||||||||||||
Walker Street Washington Street to Lawrence Street | 1144 | 24 | $ 25000 | 15 | $ 3750 | 10 | $ 2500 | $ 1024 | $ 682911 | 250 | 24 | ||||||||||||||||||||||
Pulverize amp Chip Seal | |||||||||||||||||||||||||||||||||
Engineers Estimate | 250 | 24 | $ 22000 | 15 | $ 3300 | 0 | $ - | 20 | $ 4400 | $ 4455 | $ 2970000 | 250 | 24 | ||||||||||||||||||||
Pulverize amp Asphalt Paving | |||||||||||||||||||||||||||||||||
Washington Street VanBuren Street to Harrison Street | 300 | 22 | $ 35000 | 20 | $ 7000 | 0 | $ - | 10 | $ 3500 | 20 | $ 7000 | $ 7159 | $ 4772727 | 250 | 24 | ||||||||||||||||||
Asphalt Overlay (2) | |||||||||||||||||||||||||||||||||
Engineers Estimate | 250 | 24 | $ 21334 | 20 | $ 426680 | 10 | $ 2133 | 20 | $ 426680 | 20 | $ 426680 | $ 5440 | $ 4835707 | 250 | 32 | ||||||||||||||||||
Reconstruction | |||||||||||||||||||||||||||||||||
Walker Street Lawrence Street to Blaine Street | 650 | 36 | $ 184310 | 25 | $ 46078 | 0 | $ - | 20 | $ 36862 | 30 | $ 55293 | $ 12405 | $ 11027094 | 250 | 32 | ||||||||||||||||||
RSL | Length (FT) | Area (SY) | Condition | Treatment | Cost | Total | |||||||||
20 | 61834 | 138524 | 131 | Good | $0 | $0 | |||||||||
14 | 23656 | 49915 | 47 | Satisfactory | Chip Seal | $29 | $1470552 | ||||||||
12 | 43586 | 106382 | 100 | $3134134 | |||||||||||
10 | 74803 | 193570 | 182 | $5702790 | |||||||||||
8 | 96662 | 228046 | 215 | $6718492 | |||||||||||
6 | 95452 | 261794 | 247 | Fair | Overlay | $67 | $17489930 | ||||||||
4 | 6420 | 14536 | 14 | $971121 | |||||||||||
2 | 29238 | 60616 | 57 | Poor | Rehab | $107 | $6492850 | ||||||||
0 | 3851 | 7532 | 07 | Very Poor | Rebuild | $155 | $1169719 | ||||||||
$43149589 | |||||||||||||||
Additional Paving Costs | Average Cost per SY | Percent of Paving Cost | |||
Digouts amp Pre-Leveling | $4 | 25 | |||
Stormwater | $7 | 38 | |||
ADA | $5 | 27 | |||
Engineering amp Administration | $5 | 28 |
9 | Base Paving Costs | Preperation | Stormwater | ADA | Engineering | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Remaining Service Life | Road Name | From | To | Length (ft) | Width (ft) | Area (SY) | Total Construction | Price(SY) | Reconstruction | Pulverize amp Pave | Ashpalt Overlay | Pave Gravel Road | Pulverize amp Chip Seal | Chip Seal | Total Base Paving Costs | Digouts(SY) | Pre-Leveling(SY) | Construct Shoulders Both Sides (LF) | Preparation Total | StormwaterPipes (LF) | StormwaterCatchbasins | StormwaterSwales (LF) | Stormwater Total | Curb Ramps | Curb Ramps Total | Surveying | Engineering amp Administration | Engineering amp Administration Total | Other Work | ||||||||||||||||||||||||||||||
$102 | $45 | $22 | $35 | $29 | $9 | $35 | $15 | $20 | $50 | $1500 | $25 | $15000 | |||||||||||||||||||||||||||||||||||||||||||||||
2 | Polk St - Street | Lawrence St | 1056 | 200 | 56 | 1244 | $ 210679 | $ 169 | $ 127518 | $ 127518 | $ - | 150 | 1 | 1 | $ 9025 | 2 | $ 30000 | $ 10000 | 25 | $ 44136 | |||||||||||||||||||||||||||||||||||||||
6 | 47th Street | Pettygrove | McNeil | 500 | 18 | 1548 | $ 258717 | $ 167 | $ 158624 | $ 158624 | $ - | 687 | 8 | $ 46350 | $ - | $ 10000 | 25 | $ 53743 | |||||||||||||||||||||||||||||||||||||||||
6 to 10 | Lawrence St | Calhoun St | Harrison St | 1200 | 36 | 4800 | $ 786070 | $ 164 | $ 491856 | $ 491856 | 600 | $ 15000 | $ 8 | $ 120000 | $ 10000 | 25 | $ 159214 | ||||||||||||||||||||||||||||||||||||||||||
8 | Lawrence St | Cass St | Calhoun St | 250 | 36 | 1000 | $ 146213 | $ 146 | $ 102470 | $ 102470 | 0 | 0 | $ - | 75 | 350 | $ 12500 | $ - | $ 10000 | 25 | $ 31243 | |||||||||||||||||||||||||||||||||||||||
8 | Lawrence St | Walker St | Cass St | 250 | 36 | 1000 | $ 144650 | $ 145 | $ 102470 | $ 102470 | $ - | 100 | 250 | $ 11250 | $ - | $ 10000 | 25 | $ 30930 | |||||||||||||||||||||||||||||||||||||||||
4 to 8 | San Juan Ave | Lopez Ave | Admiralty | 2300 | 34 | 8689 | $ 1222938 | $ 141 | $ 890350 | $ 890350 | $ - | 800 | 5 | 1500 | $ 85000 | $ - | $ 15000 | 25 | $ 247588 | ||||||||||||||||||||||||||||||||||||||||
6 to 8 | Lawrence St | Harrison St | Monroe St | 2380 | 47 | 12429 | $ 1331314 | $ 107 | $ 274803 | $ 274803 | 15 | 5 | $ 74573 | 1900 | 10 | $ 110000 | 50 | $ 750000 | $ 10000 | 10 | $ 121938 | ||||||||||||||||||||||||||||||||||||||
2 to 4 | Center St | San Juan Ave | Redwood St | 1660 | 16 | 2951 | $ 295222 | $ 100 | $ 86910 | $ 86910 | $ - | 1600 | 9 | 3000 | $ 168500 | $ - | $ 10000 | 15 | $ 39812 | ||||||||||||||||||||||||||||||||||||||||
0 to 6 | Pacific St | Cedar St | Tremont St | 400 | 16 | 711 | $ 66581 | $ 94 | $ 31744 | $ 31744 | $ - | 100 | 2 | 700 | $ 25500 | $ - | $ 5000 | 15 | $ 9337 | ||||||||||||||||||||||||||||||||||||||||
0 to 6 | Benton St | Lawrence | Lincoln Blg | 580 | 36 | 2320 | $ 203265 | $ 88 | $ 20880 | $ 20880 | 20 | 10 | $ 19720 | 250 | 2 | $ 15500 | 8 | $ 120000 | $ 5000 | 15 | $ 27165 | ||||||||||||||||||||||||||||||||||||||
2 | Grant St | 14th St | 16th St | 525 | 16 | 933 | $ 73635 | $ 79 | $ 27487 | $ 27487 | $ - | 400 | 2 | 500 | $ 35500 | $ - | $ 8000 | 15 | $ 10648 | ||||||||||||||||||||||||||||||||||||||||
2 to 6 | Olympic St | Cedar St | Tremont St | 536 | 12 | 715 | $ 52716 | $ 74 | $ 21047 | $ 21047 | $ - | 950 | $ 23750 | $ - | $ 8000 | 15 | $ 7920 | ||||||||||||||||||||||||||||||||||||||||||
2 | Milo St | Olympic Ave | Pacific Ave | 466 | 12 | 621 | $ 44793 | $ 72 | $ 18298 | $ 18298 | $ - | 800 | $ 20000 | $ - | $ 5000 | 15 | $ 6495 | ||||||||||||||||||||||||||||||||||||||||||
0 | 11th St | Hendricks St | Sheridan St | 550 | 16 | 978 | $ 65077 | $ 67 | $ 28796 | $ 28796 | $ - | 100 | 2 | 750 | $ 26750 | $ - | $ 8000 | 15 | $ 9532 | ||||||||||||||||||||||||||||||||||||||||
0 | 58th St | Hill St | Kuhn St | 525 | 16 | 933 | $ 60329 | $ 65 | $ 32667 | $ 32667 | $ - | 750 | $ 18750 | $ - | $ 8000 | 15 | $ 8913 | ||||||||||||||||||||||||||||||||||||||||||
2 | 10th St | Hendricks St | Grant St | 283 | 18 | 566 | $ 34294 | $ 61 | $ 16669 | $ 16669 | $ - | 500 | $ 12500 | $ - | $ 5000 | 15 | $ 5125 | ||||||||||||||||||||||||||||||||||||||||||
4 to 10 | 31st St | Hancock St | Sheridan St | 1050 | 22 | 2567 | $ 150027 | $ 58 | $ 23100 | $ 23100 | 10 | 10 | $ 12833 | 1200 | 10 | 1000 | $ 100000 | $ - | $ 5000 | 10 | $ 14093 | ||||||||||||||||||||||||||||||||||||||
6 | 25th St | Sheridan St | Holcomb St | 1200 | 18 | 2400 | $ 125895 | $ 52 | $ 70680 | $ 70680 | $ - | 125 | 1 | 1200 | $ 37750 | $ - | $ 8000 | 15 | $ 17465 | ||||||||||||||||||||||||||||||||||||||||
6 | Holcomb St | 7th St | 10th St | 850 | 12 | 1133 | $ 58703 | $ 52 | $ 10200 | $ 10200 | 10 | 10 | $ 5667 | 1500 | $ 37500 | $ - | $ - | 10 | $ 5337 | ||||||||||||||||||||||||||||||||||||||||
2 | Hendricks St | 9th St | 12th St | 800 | 16 | 1422 | $ 70930 | $ 50 | $ 41884 | $ 41884 | $ - | 750 | $ 18750 | $ - | $ 8000 | 15 | $ 10295 | ||||||||||||||||||||||||||||||||||||||||||
2 to 6 | Hill St | 19th | 21st St | 807 | 16 | 1435 | $ 67443 | $ 47 | $ 21125 | $ 6456 | $ 27581 | 10 | $ 5021 | 1000 | $ 25000 | $ - | $ 8000 | 15 | $ 9840 | ||||||||||||||||||||||||||||||||||||||||
2 to 8 | 57th St | Jackman St | Kuhn St | 800 | 18 | 1600 | $ 66550 | $ 42 | $ 14400 | $ 14400 | 20 | 10 | $ 13600 | 1300 | $ 32500 | 10 | $ 6050 | ||||||||||||||||||||||||||||||||||||||||||
6 to 8 | Sheridan St | Hastings Ave | SilverUmatilla | 1750 | 22 | 4278 | $ 154115 | $ 36 | $ 38500 | $ 38500 | 20 | 10 | $ 36361 | 300 | 4 | 1500 | $ 58500 | $ - | $ 5000 | 15 | $ 20754 | ||||||||||||||||||||||||||||||||||||||
6 to 10 | Tyler St | Jefferson St | Lawrence St | 900 | 32 | 3200 | $ 115280 | $ 36 | $ 28800 | $ 28800 | 5 | 5 | $ 8000 | 100 | 2 | $ 8000 | 4 | $ 60000 | 10 | $ 10480 | |||||||||||||||||||||||||||||||||||||||
6 to 14 | 14th St | McPherson St | Sheridan St | 2375 | 21 | 5542 | $ 182027 | $ 33 | $ 49875 | $ 49875 | 20 | 10 | $ 47104 | 750 | 4 | 1000 | $ 68500 | $ - | 10 | $ 16548 | |||||||||||||||||||||||||||||||||||||||
8 | 49th St | Kuhn St | Admiralty Ave | 400 | 24 | 1067 | $ 34613 | $ 32 | $ 9600 | $ 9600 | 5 | $ 1867 | 800 | $ 20000 | $ - | 10 | $ 3147 | ||||||||||||||||||||||||||||||||||||||||||
6 to 10 | Fir St | F St | UCherry | 4360 | 22 | 10658 | $ 341621 | $ 32 | $ 95920 | $ 95920 | 5 | 5 | 4000 | $ 106644 | 100 | 2 | 4000 | $ 108000 | $ - | 10 | $ 31056 | ||||||||||||||||||||||||||||||||||||||
6 to 8 | Cedar St | San Juan Ave | Redwood St | 1460 | 16 | 2596 | $ 81747 | $ 31 | $ 23360 | $ 23360 | 20 | 20 | $ 25956 | 1000 | $ 25000 | $ - | 10 | $ 7432 | |||||||||||||||||||||||||||||||||||||||||
8 | Clallam St | McKinley St | Roosevelt St | 975 | 14 | 1517 | $ 46796 | $ 31 | $ 13650 | $ 13650 | 20 | 10 | $ 12892 | 200 | 4 | $ 16000 | $ - | 10 | $ 4254 | ||||||||||||||||||||||||||||||||||||||||
6 | San Juan Ave | 19th St | 20th St | 300 | 31 | 1033 | $ 31827 | $ 31 | $ 9300 | $ 9300 | 50 | 10 | $ 19633 | $ - | $ - | 10 | $ 2893 | ||||||||||||||||||||||||||||||||||||||||||
6 to 20 | Cherry St | F St | W St | 4200 | 32 | 14933 | $ 457307 | $ 31 | $ 134400 | $ 134400 | 5 | 5 | 4200 | $ 121333 | 200 | 6000 | $ 160000 | $ - | 10 | $ 41573 | |||||||||||||||||||||||||||||||||||||||
6 to 8 | Jackman St | 45th St | 49th St | 1100 | 22 | 2689 | $ 81940 | $ 30 | $ 24200 | $ 24200 | 15 | 10 | $ 18150 | 225 | 3 | 500 | $ 28250 | $ - | $ 5000 | 15 | $ 11340 | ||||||||||||||||||||||||||||||||||||||
6 to 12 | Jackson St | LawrenceMonroe | Roosevelt St | 1600 | 18 | 3200 | $ 93530 | $ 29 | $ 28800 | $ 28800 | 10 | 10 | $ 16000 | 1000 | $ 25000 | 1 | $ 15000 | $ 2500 | 10 | $ 8730 | |||||||||||||||||||||||||||||||||||||||
2 | 7th St | Wilson St | Holcomb St | 450 | 16 | 800 | $ 23320 | $ 29 | $ 7200 | $ 7200 | 10 | 10 | $ 4000 | 400 | $ 10000 | $ - | 10 | $ 2120 | |||||||||||||||||||||||||||||||||||||||||
8 to 14 | 25th St | Sherman St | Sheridan St | 800 | 20 | 1778 | $ 50061 | $ 28 | $ 16000 | $ 16000 | 10 | 5 | $ 7556 | 1 | 800 | $ 21500 | $ - | $ 5000 | 10 | $ 5006 | |||||||||||||||||||||||||||||||||||||||
2 to 6 | Hancock St | SR 20 | 9th St | 1100 | 20 | 2444 | $ 67833 | $ 28 | $ 22000 | $ 22000 | 15 | 5 | $ 14667 | 1000 | $ 25000 | $ - | 10 | $ 6167 | |||||||||||||||||||||||||||||||||||||||||
Benton St | Washington St | Lawrence St | 1160 | 22 | 2836 | $ 74468 | $ 26 | $ 25520 | $ 25520 | 10 | 10 | $ 14178 | 140 | 4 | 600 | $ 28000 | 10 | $ 6770 | |||||||||||||||||||||||||||||||||||||||||
W St | San JuanAdmiralty | Walnut St | 2560 | 22 | 6258 | $ 163807 | $ 26 | $ 56320 | $ 56320 | 10 | 5 | $ 26596 | 200 | 4 | 2000 | $ 66000 | $ - | 10 | $ 14892 | ||||||||||||||||||||||||||||||||||||||||
6 to 8 | Walnut | W Street | Jackson | 2300 | 22 | 5622 | $ 145194 | $ 26 | $ 50600 | $ 50600 | 10 | 5 | $ 23894 | 2300 | $ 57500 | $ - | 10 | $ 13199 | |||||||||||||||||||||||||||||||||||||||||
6 to 8 | 24th St | Discovery Rd | San Juan Ave | 1250 | 18 | 2500 | $ 63938 | $ 26 | $ 22500 | $ 22500 | 10 | 5 | $ 10625 | 1000 | $ 25000 | $ - | 10 | $ 5813 | |||||||||||||||||||||||||||||||||||||||||
6 to 10 | Tyler St | Lawrence St | Blaine St | 900 | 32 | 3200 | $ 78980 | $ 25 | $ 28800 | $ 28800 | 5 | 5 | $ 8000 | 200 | $ 5000 | 2 | $ 30000 | 10 | $ 7180 | ||||||||||||||||||||||||||||||||||||||||
4 to 12 | McPherson St | SR 20 | Discovery Rd | 2925 | 32 | 10400 | $ 244860 | $ 24 | $ 93600 | $ 93600 | 5 | 5 | 2925 | $ 84500 | 230 | 2 | 1200 | $ 44500 | $ - | $ - | 10 | $ 22260 | |||||||||||||||||||||||||||||||||||||
10 | Landes St | 12th St | 19th St | 1820 | 32 | 6471 | $ 151821 | $ 23 | $ 58240 | $ 58240 | 5 | 1400 | $ 39324 | 400 | $ 10000 | 2 | $ 30000 | $ 5000 | 10 | $ 14256 | |||||||||||||||||||||||||||||||||||||||
6 to 8 | Discovery Rd | 19th | Hastings Ave | 2900 | 22 | 7089 | $ 136565 | $ 19 | $ 63800 | $ 63800 | 15 | 10 | $ 47850 | 500 | $ 12500 | $ - | 10 | $ 12415 | |||||||||||||||||||||||||||||||||||||||||
8 to 12 | Hastings Ave | Discovery Rd | County Line | 8450 | 32 | 30044 | $ 542349 | $ 18 | $ 270400 | $ 270400 | 5 | 10 | 5000 | $ 197644 | 1000 | $ 25000 | $ - | 10 | $ 49304 | ||||||||||||||||||||||||||||||||||||||||
6 to 12 | Washington St | Van Buren St | SR20 | 2025 | 30 | 6750 | $ 118388 | $ 18 | $ 60750 | $ 60750 | 5 | 5 | $ 16875 | 0 | 0 | 0 | $ - | 2 | $ 30000 | $ - | 10 | $ 10763 | |||||||||||||||||||||||||||||||||||||
14 | Blaine St | San Juan Ave | Walker St | 1275 | 48 | 6800 | $ 113910 | $ 17 | $ 61200 | $ 61200 | 5 | $ 11900 | $ - | 2 | $ 30000 | $ 5000 | 10 | $ 10810 | |||||||||||||||||||||||||||||||||||||||||
6 | Washington St | Harrison St | Taylor St | 1175 | 33 | 4308 | $ 59240 | $ 14 | $ 38775 | $ 38775 | 10 | $ 15079 | $ - | $ - | 10 | $ 5385 | |||||||||||||||||||||||||||||||||||||||||||
8 to 10 | Sheridan St | SR 20 | 19th St | 4000 | 46 | 20444 | $ 272922 | $ 13 | $ 184000 | $ 184000 | 5 | 5 | $ 51111 | 200 | 2 | $ 13000 | $ - | 10 | $ 24811 | ||||||||||||||||||||||||||||||||||||||||
8 to 10 | 19th St | San Juan Ave | Sheridan St | 3200 | 48 | 17067 | $ 197120 | $ 12 | $ 153600 | $ 153600 | 3 | 3 | $ 25600 | 0 | 0 | 0 | $ - | $ - | 10 | $ 17920 | |||||||||||||||||||||||||||||||||||||||
10 to 20 | San Juan Ave | F St | Lopez Ave | 2800 | 32 | 9956 | $ 110059 | $ 11 | $ 89600 | $ 89600 | 3 | $ 10453 | $ - | $ - | 10 | $ 10005 | |||||||||||||||||||||||||||||||||||||||||||
10 to 20 | F St | Hastings Ave | Tyler St | 5300 | 31 | 18256 | $ 180730 | $ 10 | $ 164300 | $ 164300 | $ - | $ - | $ - | 10 | $ 16430 | ||||||||||||||||||||||||||||||||||||||||||||
$ 9952406 | $ 1873288 | $ 31744 | $ 274803 | $ 32667 | $ 332896 | $ 1998646 | $ 4544044 | $ 1155207 | $ 1747625 | $ 1215000 | $ 1290529 | $ - 0 | |||||||||||||||||||||||||||||||||||||||||||||||
Street Pavement Improvement Plan Projects | 9 | 110 | |||||||||||||||||||||||||||||||||||||||||||||
Road Name | From | To | Iworq ID | Length (ft) | Width (ft) | Area (yd^2) | Actual Area(SY) | Unit Cost per yd2 | Construction Cost | Prep Work | Survey Testing | ADA Curb Ramps | Storm Water | Mill amp Fill$50SY | Pre-Level$4SY | Total Construction | Project Cost + 10 | Unit Cost w Additional Costs no 10 | Engineering Costs | Notes | |||||||||||||||||||||||||||
Priority | Reconstruct | 2021 | 2022 | 2023 | 2024 | ||||||||||||||||||||||||||||||||||||||||||
1 | Reconstruct | Lawrence St | Cass St | Calhoun St | 1304 | 250 | 36 | 1000 | $ 80 | $ 80000 | $ 5000 | $ 20000 | $ 105000 | $ 115500 | $ 105 | Stormwater South Side Parking Raingarden on Cass | |||||||||||||||||||||||||||||||
2 | Reconstruct | Lawrence St | Walker St | Cass St | 250 | 36 | 1000 | $ 80 | $ 80000 | $ 5000 | $ 20000 | $ 5000 | $ 110000 | $ 121000 | $ 110 | Stormwater South Side Parking | |||||||||||||||||||||||||||||||
3 | Reconstruct Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | San Juan Ave | Lopez Ave | Admiralty | 2300 | 32 | 8178 | $ 50 | $ 408889 | $ 10000 | $ 100000 | $ 518889 | $ 570778 | $ 63 | Stormwater Problem 45th | ||||||||||||||||||||||||||||||||
4 | Reconstruct Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Polk St - Street Improvements | Lawrence St | 1056 Sarah Tiffany Sarah TiffanyGarfield | 1073 | 200 | 56 | 1244 | $ 50 | $ 62222 | X | X | X | $ 62222 | $ 68444 | $ 50 | Parking Theater 4 AC Watermain Infiltration or Rain Garden Parking on Condo Side | ||||||||||||||||||||||||||||||
Reconstruct | 47th Street | Pettygrove | McNeil | 500 | 18 | 1000 | 1548 | $ 50 | $ 50000 | $ 5000 | $ 40000 | $ 95000 | $ 104500 | $ 95 | $210000 Engineers Estimate With Engineering Cost Turnaround Spaghetti Waterline | ||||||||||||||||||||||||||||||||
Chip Seal - $50000 to $70000 per Mile | $6 No DigoutsPre-leveling | $10 with Additional Prep Work | |||||||||||||||||||||||||||||||||||||||||||||||
Chip Seal | Washington St | Van Buren St | SR20 | 2025 | 30 | 6750 | $ 10 | $ 67500 | $ 67500 | $ 74250 | Digouts Flagging | ||||||||||||||||||||||||||||||||||||
Chip Seal | Hastings Ave - Pre-level and widen shoulders | Discovery Rd | County Line | 8450 | 24 | 22533 | $ 6 | $ 135200 | $ 135200 | $ 148720 | Ditches amp Culverts Total Width change from 21 to 24 How wide will shoulders be | ||||||||||||||||||||||||||||||||||||
Tyler St | Jefferson St | Lawrence St | 900 | 32 | 3200 | $ 6 | $ 19200 | $ 19200 | $ 21120 | ||||||||||||||||||||||||||||||||||||||
Chip Seal | McPherson - Chip Seal | 4th St | Discovery Rd | 3100 | 32 | 11022 | $ 6 | $ 66133 | $ 66133 | $ 72747 | Ditches amp Culverts Shoulder Wideneing | ||||||||||||||||||||||||||||||||||||
Chip Seal | 19th St - Chip Seal | San Juan Ave | Sheridan St | 3200 | 48 | 17067 | $ 6 | $ 102400 | $ 102400 | $ 112640 | Bike Lanes amp Shoulder Prelevel | ||||||||||||||||||||||||||||||||||||
Chip Seal | Walnut | W Street | Jackson | 2300 | 22 | 5622 | $ 6 | $ 33733 | $ 33733 | $ 37107 | Dig-Outs Pre-Leveling Striping Shoulders | ||||||||||||||||||||||||||||||||||||
Chip Seal | Fir St - Chip Seal | F St | UCherry | 4360 | 22 | 10658 | $ 10 | $ 106578 | X | X | $ 106578 | $ 117236 | Dig-Outs Pre-Leveling Striping | ||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | |||||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | P St - Chip Seal | Redwood St | Cedar St | 0486 | 300 | 16 | 533 | $ 20 | $ 10667 | $ 10667 | $ 11733 | Watermain Looping Shouldnt this be part of Center | |||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 25th St - Chip Seal | Sheridan St | Holcomb St | 1200 | 18 | 2400 | $ 20 | $ 48000 | $ 48000 | $ 52800 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 14th St - Chip Seal | $ - | $ - | ||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Cedar St - Chip Seal | Redwood St | San Juan Ave | 1460 | 16 | 2596 | $ 20 | $ 51911 | $ 51911 | $ 57102 | Ex ChipSeal 22 Wide | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Center St - Chip Seal | Redwood St | San Juan Ave | 484 | 1660 | 16 | 2951 | $ 20 | $ 59022 | $ 59022 | $ 64924 | Ex ChipSeal 22 Wide Stormwater | |||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Grant St Chip Seal | 14th St | 16th St | 525 | 16 | 933 | $ 20 | $ 18667 | $ 18667 | $ 20533 | Ex Street 10 Wide | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 11th St Chip Seal | Hendricks St | Sheridan St | 550 | 16 | 978 | $ 20 | $ 19556 | $ 19556 | $ 21511 | Hospital Parking | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Hendricks St Chip Seal | 9th St | 12th St | 800 | 16 | 1422 | $ 20 | $ 28444 | $ 28444 | $ 31289 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 10th St Chip Seal | Hendricks St | Grant St | 1655 | 283 | 18 | 566 | $ 20 | $ 11320 | $ 11320 | $ 12452 | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Grant St Chip Seal | 14th St | 16th St | 525 | 18 | 1050 | $ 20 | $ 21000 | $ 21000 | $ 23100 | Ex Street 10 Wide Stormwater | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Hill St | 21st St | 19th St | 807 | 16 | 1435 | $ 20 | $ 28693 | $ 28693 | $ 31563 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Milo St -Chip seal | Olympic Ave | Pacific Ave | 0003 | 466 | 12 | 621 | $ 20 | $ 12427 | $ 12427 | $ 13669 | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Olympic St | Cedar St | Tremont St | 536 | 12 | 715 | $ 20 | $ 14293 | $ 14293 | $ 15723 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Benton St - street improvement | Blaine St | Lincoln Blg | 580 | 36 Sarah Tiffany Sarah TiffanyEstimated at 25-36 used higher number | Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Sarah Tiffany Sarah TiffanyGarfield | 2320 | $ 20 | $ 46400 | $ 46400 | $ 51040 | ||||||||||||||||||||||||||||||||||
Pave Gravel Road | |||||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Pacific St | Cedar St | Tremont St | 400 | 16 | 711 | $ 50 | $ 35556 | $ 6000 | $ 15000 | $ 56556 | $ 62211 | $ 80 | ||||||||||||||||||||||||||||||||||
58th St | Hill St | Kuhn St | 525 | 16 | 933 | $ 50 | $ 46667 | $ 6000 | $ 20000 | $ 72667 | $ 79933 | $ 78 | 4 AC Waterline Driveways Site Distance (Re-grade Slope) | ||||||||||||||||||||||||||||||||||
Sidewalks | |||||||||||||||||||||||||||||||||||||||||||||||
Harrison St | Franklin St | Clay St | 340 | 6 | 227 | $ 165 | $ 56100 | $ 5000 | $ 61100 | $ 67210 | $ 180 | ||||||||||||||||||||||||||||||||||||
9th St | Hancock St | McPherson St | 1300 | 6 | 867 | $ 165 | $ 214500 | $ 10000 | $ 15000 | $ 239500 | $ 263450 | $ 184 | |||||||||||||||||||||||||||||||||||
Asphalt Path | |||||||||||||||||||||||||||||||||||||||||||||||
Spruce St Easement | Cedar St | Center St | 150 | 8 | 133 | $ 50 | $ 6667 | $ 2000 | $ 8667 | $ 9533 | $ 65 | ||||||||||||||||||||||||||||||||||||
Cherry St | A St | E St | 990 | 10 | 1100 | $ 50 | $ 55000 | $ 10000 | $ 10000 | $ 15000 | $ 90000 | $ 99000 | $ 82 | ||||||||||||||||||||||||||||||||||
Gravel Path | |||||||||||||||||||||||||||||||||||||||||||||||
16th St | Thomas St | Grant St | 1700 | 6 | 1133 | $ 15 | $ 17000 | $ 1500 | $ 18500 | $ 20350 | |||||||||||||||||||||||||||||||||||||
Cleveland St | 21st St | 23rd St | 500 | 6 | 333 | $ 15 | $ 5000 | $ 5000 | $ 5500 | Need Easement | |||||||||||||||||||||||||||||||||||||
6 | - | $ 15 | $ - | $ - | $ - | Need Easement | |||||||||||||||||||||||||||||||||||||||||
6 | - | $ 15 | $ - | $ - | $ - | Need Easement | |||||||||||||||||||||||||||||||||||||||||
Total | $ 1582256 | $ 1792256 | $ 1971481 | ||||||||||||||||||||||||||||||||||||||||||||
Project Descriptioin | Length | Width | Construction Costs | ConstructionUnit Costs | Units | Engineering Costs | Total CostsUnit Cost | Total Costs | Total CostsUnit Cost | Notes | |||||||||||
Sidewalk | |||||||||||||||||||||
9th Street Sidewalk Grant Street to Hancock Street | 826 | 6 | $ 141506 | $ 17131 | LF | Construction Unit Cost per Foot | |||||||||||||||
Jefferson Street Sidewalk Washington Street to Taylor Street | 724 | 6 | $ 390502 | $ 53937 | LF | Construction Unit Cost per Foot | |||||||||||||||
Landis Street Sidewalk 10th Street to 19th Street | 1795 | 6 | $ 364550 | $ 20309 | LF | Construction Unit Cost per Foot | |||||||||||||||
ADA Corner Ramps | |||||||||||||||||||||
Washington Street amp Harrison Street | $ 42000 | $ 42000 | Each | ||||||||||||||||||
Washington Street amp Adams Street | $ 38150 | $ 19075 | Each | Two Corners Were Retrofitted | |||||||||||||||||
Chip Seal Pavement | |||||||||||||||||||||
Walker Street Washington Street to Lawrence Street | 1144 | 24 | $ 20000 | $ 656 | SY | Does not include flagging nor prep work | |||||||||||||||
Pulverize amp Asphalt Paving | |||||||||||||||||||||
Washington Street VanBuren Street to Harrison Street | 300 | 22 | $ 35000 | $ 4773 | SY | ||||||||||||||||
Asphalt Overlay | |||||||||||||||||||||
Sidewalks | ||||||||||||||||||||||||||||||||||||||
Harrison St | Franklin St | Clay St | 340 | 6 | 227 | |||||||||||||||||||||||||||||||||
9th St | Hancock St | McPherson St | 1300 | 6 | 867 | |||||||||||||||||||||||||||||||||
Asphalt Path | ||||||||||||||||||||||||||||||||||||||
Spruce St Easement | Cedar St | Center St | 150 | 8 | 133 | $ 2000 | $ 2000 | $ 2000 | ||||||||||||||||||||||||||||||
Cherry St | A St | E St | 990 | 10 | 1100 | $ 10000 | $ 10000 | $ 10000 | ||||||||||||||||||||||||||||||
Gravel Path | ||||||||||||||||||||||||||||||||||||||
16th St | Thomas St | Grant St | 1700 | 6 | 1133 | $ 1500 | $ 1500 | $ 1500 | ||||||||||||||||||||||||||||||
Cleveland St | 21st St | 23rd St | 500 | 6 | 333 | Need Easement | ||||||||||||||||||||||||||||||||
6 | - | Need Easement | ||||||||||||||||||||||||||||||||||||
6 | - | Need Easement | ||||||||||||||||||||||||||||||||||||
Total |
Type | Improvement | Cost Range SY | Cost Range LF | ||||||||
1 | Complete Road Rebuild | $80 | $100 | ||||||||
2 | Asphalt Overlay | $50 | $60 | ||||||||
3 | Pulverize amp Chip Seal | $20 | $30 | ||||||||
4 | Chip Seal | $6 | $10 | $12 | $25 | ||||||
5 | Seal Coat | ||||||||||
6 | |||||||||||
7 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 3-Inch | 413 | TONS | $ 15000 | $ 6187500 | 1000 x 22 x 025 httpwwwamerasphaltcomasphalthtm | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 1630 | CY | $ 4800 | $ 7824000 | Water Street Project = $48 CY (1000 x 22 x 2)27 = 1630 CY | ||||||
Gravel Borrow | 2282 | TONS | $ 3000 | $ 6846000 | (1000 x 22 x 2)27 = 1630 1630 CY x 14 = 2282 Tons | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 128 | Hours | $ 5728 | $ 733133 | (2) People for 64 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 25043033 | |||||||||||
$ 10247 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 2-Inch | 275 | TONS | $ 15000 | $ 4125000 | 1000 x 22 x 017 httpwwwamerasphaltcomasphalthtm | | ||||||
Digouts amp Pre-leveling | 122 | SY | $ 4900 | $ 597800 | |||||||
Flagging | 64 | Hours | $ 5728 | $ 366566 | (2) People for 32 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 180000 | $ 180000 | |||||||
$ 5403066 | |||||||||||
$ 2211 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 3-Inch | 413 | TONS | $ 15000 | $ 6187500 | 1000 x 22 x 025 httpwwwamerasphaltcomasphalthtm | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 150 | CY | $ 4800 | $ 720000 | Water Street Project = $48 CY | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 96 | Hours | $ 5728 | $ 549850 | (2) People for 48 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 10909750 | |||||||||||
$ 4464 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Chip Seal | 2444 | SY | $ 1050 | $ 2566200 | 1000 X 22 | Unit Cost $525 SY from Walker Street County Invoice Doubled to $1050 for Chip Seal Over Gravel | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 150 | CY | $ 4800 | $ 720000 | Water Street Project = $48 CY | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 80 | Hours | $ 5728 | $ 458208 | (2) People for 40 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | Hours | $ 12500 | $ - 0 | High Average Loaded Rate No Testing | ||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 7196808 | |||||||||||
$ 2945 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 1500000 | $614 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 500 | LF | $ 5000 | $ 2500000 | |||||||
Catch Basins | 4 | EACH | $ 150000 | $ 600000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Chip Seal | 2444 | SY | $ 525 | $ 1283100 | 1000 X 22 | Unit Cost from Walker Street County Invoice | ||||||
Digouts amp Pre-leveling | 122 | SY | $ 4900 | $ 598780 | Cost from 2018 Lakeside Mill amp Fill | Estimate Quanity Based on 5 | ||||||
Flagging | 32 | Hours | $ 5728 | $ 183283 | (2) People for 16 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | Hours | $ 12500 | $ - 0 | High Average Loaded Rate No Surveying or Testing | ||||||
Surveying | 1 | LS | $ - 0 | $ - 0 | |||||||
$ 2198863 | |||||||||||
$ 900 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 1500000 | $614 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY |
Project Descriptioin | Length | Width | Construction Costs | Engineering Costs | Engineering Total | Digouts Pre-Leveling Costs | Digouts Pre-Leveling Total | ADACosts | ADATotal | StormwaterCosts | StormwaterTotal | Total Costsby SY | Cost Per 250 Block | Length | Width | Notes | |||||||||||||||||
Chip Seal Pavement | |||||||||||||||||||||||||||||||||
Walker Street Washington Street to Lawrence Street | 1144 | 24 | $ 25000 | 15 | $ 3750 | 10 | $ 2500 | $ 1024 | $ 682911 | 250 | 24 | ||||||||||||||||||||||
Pulverize amp Chip Seal | |||||||||||||||||||||||||||||||||
Engineers Estimate | 250 | 24 | $ 22000 | 15 | $ 3300 | 0 | $ - | 20 | $ 4400 | $ 4455 | $ 2970000 | 250 | 24 | ||||||||||||||||||||
Pulverize amp Asphalt Paving | |||||||||||||||||||||||||||||||||
Washington Street VanBuren Street to Harrison Street | 300 | 22 | $ 35000 | 20 | $ 7000 | 0 | $ - | 10 | $ 3500 | 20 | $ 7000 | $ 7159 | $ 4772727 | 250 | 24 | ||||||||||||||||||
Asphalt Overlay (2) | |||||||||||||||||||||||||||||||||
Engineers Estimate | 250 | 24 | $ 21334 | 20 | $ 426680 | 10 | $ 2133 | 20 | $ 426680 | 20 | $ 426680 | $ 5440 | $ 4835707 | 250 | 32 | ||||||||||||||||||
Reconstruction | |||||||||||||||||||||||||||||||||
Walker Street Lawrence Street to Blaine Street | 650 | 36 | $ 184310 | 25 | $ 46078 | 0 | $ - | 20 | $ 36862 | 30 | $ 55293 | $ 12405 | $ 11027094 | 250 | 32 | ||||||||||||||||||
RSL | Length (FT) | Area (SY) | Condition | Treatment | Cost | Total | |||||||||
20 | 61834 | 138524 | 131 | Good | $0 | $0 | |||||||||
14 | 23656 | 49915 | 47 | Satisfactory | Chip Seal | $29 | $1470552 | ||||||||
12 | 43586 | 106382 | 100 | $3134134 | |||||||||||
10 | 74803 | 193570 | 182 | $5702790 | |||||||||||
8 | 96662 | 228046 | 215 | $6718492 | |||||||||||
6 | 95452 | 261794 | 247 | Fair | Overlay | $67 | $17489930 | ||||||||
4 | 6420 | 14536 | 14 | $971121 | |||||||||||
2 | 29238 | 60616 | 57 | Poor | Rehab | $107 | $6492850 | ||||||||
0 | 3851 | 7532 | 07 | Very Poor | Rebuild | $155 | $1169719 | ||||||||
$43149589 | |||||||||||||||
Additional Paving Costs | Average Cost per SY | Percent of Paving Cost | |||
Digouts amp Pre-Leveling | $4 | 25 | |||
Stormwater | $7 | 38 | |||
ADA | $5 | 27 | |||
Engineering amp Administration | $5 | 28 |
9 | Base Paving Costs | Preperation | Stormwater | ADA | Engineering | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Remaining Service Life | Road Name | From | To | Length (ft) | Width (ft) | Area (SY) | Total Construction | Price(SY) | Reconstruction | Pulverize amp Pave | Ashpalt Overlay | Pave Gravel Road | Pulverize amp Chip Seal | Chip Seal | Total Base Paving Costs | Digouts(SY) | Pre-Leveling(SY) | Construct Shoulders Both Sides (LF) | Preparation Total | StormwaterPipes (LF) | StormwaterCatchbasins | StormwaterSwales (LF) | Stormwater Total | Curb Ramps | Curb Ramps Total | Surveying | Engineering amp Administration | Engineering amp Administration Total | Other Work | ||||||||||||||||||||||||||||||
$102 | $45 | $22 | $35 | $29 | $9 | $35 | $15 | $20 | $50 | $1500 | $25 | $15000 | |||||||||||||||||||||||||||||||||||||||||||||||
2 | Polk St - Street | Lawrence St | 1056 | 200 | 56 | 1244 | $ 210679 | $ 169 | $ 127518 | $ 127518 | $ - | 150 | 1 | 1 | $ 9025 | 2 | $ 30000 | $ 10000 | 25 | $ 44136 | |||||||||||||||||||||||||||||||||||||||
6 | 47th Street | Pettygrove | McNeil | 500 | 18 | 1548 | $ 258717 | $ 167 | $ 158624 | $ 158624 | $ - | 687 | 8 | $ 46350 | $ - | $ 10000 | 25 | $ 53743 | |||||||||||||||||||||||||||||||||||||||||
6 to 10 | Lawrence St | Calhoun St | Harrison St | 1200 | 36 | 4800 | $ 786070 | $ 164 | $ 491856 | $ 491856 | 600 | $ 15000 | $ 8 | $ 120000 | $ 10000 | 25 | $ 159214 | ||||||||||||||||||||||||||||||||||||||||||
8 | Lawrence St | Cass St | Calhoun St | 250 | 36 | 1000 | $ 146213 | $ 146 | $ 102470 | $ 102470 | 0 | 0 | $ - | 75 | 350 | $ 12500 | $ - | $ 10000 | 25 | $ 31243 | |||||||||||||||||||||||||||||||||||||||
8 | Lawrence St | Walker St | Cass St | 250 | 36 | 1000 | $ 144650 | $ 145 | $ 102470 | $ 102470 | $ - | 100 | 250 | $ 11250 | $ - | $ 10000 | 25 | $ 30930 | |||||||||||||||||||||||||||||||||||||||||
4 to 8 | San Juan Ave | Lopez Ave | Admiralty | 2300 | 34 | 8689 | $ 1222938 | $ 141 | $ 890350 | $ 890350 | $ - | 800 | 5 | 1500 | $ 85000 | $ - | $ 15000 | 25 | $ 247588 | ||||||||||||||||||||||||||||||||||||||||
6 to 8 | Lawrence St | Harrison St | Monroe St | 2380 | 47 | 12429 | $ 1331314 | $ 107 | $ 274803 | $ 274803 | 15 | 5 | $ 74573 | 1900 | 10 | $ 110000 | 50 | $ 750000 | $ 10000 | 10 | $ 121938 | ||||||||||||||||||||||||||||||||||||||
2 to 4 | Center St | San Juan Ave | Redwood St | 1660 | 16 | 2951 | $ 295222 | $ 100 | $ 86910 | $ 86910 | $ - | 1600 | 9 | 3000 | $ 168500 | $ - | $ 10000 | 15 | $ 39812 | ||||||||||||||||||||||||||||||||||||||||
0 to 6 | Pacific St | Cedar St | Tremont St | 400 | 16 | 711 | $ 66581 | $ 94 | $ 31744 | $ 31744 | $ - | 100 | 2 | 700 | $ 25500 | $ - | $ 5000 | 15 | $ 9337 | ||||||||||||||||||||||||||||||||||||||||
0 to 6 | Benton St | Lawrence | Lincoln Blg | 580 | 36 | 2320 | $ 203265 | $ 88 | $ 20880 | $ 20880 | 20 | 10 | $ 19720 | 250 | 2 | $ 15500 | 8 | $ 120000 | $ 5000 | 15 | $ 27165 | ||||||||||||||||||||||||||||||||||||||
2 | Grant St | 14th St | 16th St | 525 | 16 | 933 | $ 73635 | $ 79 | $ 27487 | $ 27487 | $ - | 400 | 2 | 500 | $ 35500 | $ - | $ 8000 | 15 | $ 10648 | ||||||||||||||||||||||||||||||||||||||||
2 to 6 | Olympic St | Cedar St | Tremont St | 536 | 12 | 715 | $ 52716 | $ 74 | $ 21047 | $ 21047 | $ - | 950 | $ 23750 | $ - | $ 8000 | 15 | $ 7920 | ||||||||||||||||||||||||||||||||||||||||||
2 | Milo St | Olympic Ave | Pacific Ave | 466 | 12 | 621 | $ 44793 | $ 72 | $ 18298 | $ 18298 | $ - | 800 | $ 20000 | $ - | $ 5000 | 15 | $ 6495 | ||||||||||||||||||||||||||||||||||||||||||
0 | 11th St | Hendricks St | Sheridan St | 550 | 16 | 978 | $ 65077 | $ 67 | $ 28796 | $ 28796 | $ - | 100 | 2 | 750 | $ 26750 | $ - | $ 8000 | 15 | $ 9532 | ||||||||||||||||||||||||||||||||||||||||
0 | 58th St | Hill St | Kuhn St | 525 | 16 | 933 | $ 60329 | $ 65 | $ 32667 | $ 32667 | $ - | 750 | $ 18750 | $ - | $ 8000 | 15 | $ 8913 | ||||||||||||||||||||||||||||||||||||||||||
2 | 10th St | Hendricks St | Grant St | 283 | 18 | 566 | $ 34294 | $ 61 | $ 16669 | $ 16669 | $ - | 500 | $ 12500 | $ - | $ 5000 | 15 | $ 5125 | ||||||||||||||||||||||||||||||||||||||||||
4 to 10 | 31st St | Hancock St | Sheridan St | 1050 | 22 | 2567 | $ 150027 | $ 58 | $ 23100 | $ 23100 | 10 | 10 | $ 12833 | 1200 | 10 | 1000 | $ 100000 | $ - | $ 5000 | 10 | $ 14093 | ||||||||||||||||||||||||||||||||||||||
6 | 25th St | Sheridan St | Holcomb St | 1200 | 18 | 2400 | $ 125895 | $ 52 | $ 70680 | $ 70680 | $ - | 125 | 1 | 1200 | $ 37750 | $ - | $ 8000 | 15 | $ 17465 | ||||||||||||||||||||||||||||||||||||||||
6 | Holcomb St | 7th St | 10th St | 850 | 12 | 1133 | $ 58703 | $ 52 | $ 10200 | $ 10200 | 10 | 10 | $ 5667 | 1500 | $ 37500 | $ - | $ - | 10 | $ 5337 | ||||||||||||||||||||||||||||||||||||||||
2 | Hendricks St | 9th St | 12th St | 800 | 16 | 1422 | $ 70930 | $ 50 | $ 41884 | $ 41884 | $ - | 750 | $ 18750 | $ - | $ 8000 | 15 | $ 10295 | ||||||||||||||||||||||||||||||||||||||||||
2 to 6 | Hill St | 19th | 21st St | 807 | 16 | 1435 | $ 67443 | $ 47 | $ 21125 | $ 6456 | $ 27581 | 10 | $ 5021 | 1000 | $ 25000 | $ - | $ 8000 | 15 | $ 9840 | ||||||||||||||||||||||||||||||||||||||||
2 to 8 | 57th St | Jackman St | Kuhn St | 800 | 18 | 1600 | $ 66550 | $ 42 | $ 14400 | $ 14400 | 20 | 10 | $ 13600 | 1300 | $ 32500 | 10 | $ 6050 | ||||||||||||||||||||||||||||||||||||||||||
6 to 8 | Sheridan St | Hastings Ave | SilverUmatilla | 1750 | 22 | 4278 | $ 154115 | $ 36 | $ 38500 | $ 38500 | 20 | 10 | $ 36361 | 300 | 4 | 1500 | $ 58500 | $ - | $ 5000 | 15 | $ 20754 | ||||||||||||||||||||||||||||||||||||||
6 to 10 | Tyler St | Jefferson St | Lawrence St | 900 | 32 | 3200 | $ 115280 | $ 36 | $ 28800 | $ 28800 | 5 | 5 | $ 8000 | 100 | 2 | $ 8000 | 4 | $ 60000 | 10 | $ 10480 | |||||||||||||||||||||||||||||||||||||||
6 to 14 | 14th St | McPherson St | Sheridan St | 2375 | 21 | 5542 | $ 182027 | $ 33 | $ 49875 | $ 49875 | 20 | 10 | $ 47104 | 750 | 4 | 1000 | $ 68500 | $ - | 10 | $ 16548 | |||||||||||||||||||||||||||||||||||||||
8 | 49th St | Kuhn St | Admiralty Ave | 400 | 24 | 1067 | $ 34613 | $ 32 | $ 9600 | $ 9600 | 5 | $ 1867 | 800 | $ 20000 | $ - | 10 | $ 3147 | ||||||||||||||||||||||||||||||||||||||||||
6 to 10 | Fir St | F St | UCherry | 4360 | 22 | 10658 | $ 341621 | $ 32 | $ 95920 | $ 95920 | 5 | 5 | 4000 | $ 106644 | 100 | 2 | 4000 | $ 108000 | $ - | 10 | $ 31056 | ||||||||||||||||||||||||||||||||||||||
6 to 8 | Cedar St | San Juan Ave | Redwood St | 1460 | 16 | 2596 | $ 81747 | $ 31 | $ 23360 | $ 23360 | 20 | 20 | $ 25956 | 1000 | $ 25000 | $ - | 10 | $ 7432 | |||||||||||||||||||||||||||||||||||||||||
8 | Clallam St | McKinley St | Roosevelt St | 975 | 14 | 1517 | $ 46796 | $ 31 | $ 13650 | $ 13650 | 20 | 10 | $ 12892 | 200 | 4 | $ 16000 | $ - | 10 | $ 4254 | ||||||||||||||||||||||||||||||||||||||||
6 | San Juan Ave | 19th St | 20th St | 300 | 31 | 1033 | $ 31827 | $ 31 | $ 9300 | $ 9300 | 50 | 10 | $ 19633 | $ - | $ - | 10 | $ 2893 | ||||||||||||||||||||||||||||||||||||||||||
6 to 20 | Cherry St | F St | W St | 4200 | 32 | 14933 | $ 457307 | $ 31 | $ 134400 | $ 134400 | 5 | 5 | 4200 | $ 121333 | 200 | 6000 | $ 160000 | $ - | 10 | $ 41573 | |||||||||||||||||||||||||||||||||||||||
6 to 8 | Jackman St | 45th St | 49th St | 1100 | 22 | 2689 | $ 81940 | $ 30 | $ 24200 | $ 24200 | 15 | 10 | $ 18150 | 225 | 3 | 500 | $ 28250 | $ - | $ 5000 | 15 | $ 11340 | ||||||||||||||||||||||||||||||||||||||
6 to 12 | Jackson St | LawrenceMonroe | Roosevelt St | 1600 | 18 | 3200 | $ 93530 | $ 29 | $ 28800 | $ 28800 | 10 | 10 | $ 16000 | 1000 | $ 25000 | 1 | $ 15000 | $ 2500 | 10 | $ 8730 | |||||||||||||||||||||||||||||||||||||||
2 | 7th St | Wilson St | Holcomb St | 450 | 16 | 800 | $ 23320 | $ 29 | $ 7200 | $ 7200 | 10 | 10 | $ 4000 | 400 | $ 10000 | $ - | 10 | $ 2120 | |||||||||||||||||||||||||||||||||||||||||
8 to 14 | 25th St | Sherman St | Sheridan St | 800 | 20 | 1778 | $ 50061 | $ 28 | $ 16000 | $ 16000 | 10 | 5 | $ 7556 | 1 | 800 | $ 21500 | $ - | $ 5000 | 10 | $ 5006 | |||||||||||||||||||||||||||||||||||||||
2 to 6 | Hancock St | SR 20 | 9th St | 1100 | 20 | 2444 | $ 67833 | $ 28 | $ 22000 | $ 22000 | 15 | 5 | $ 14667 | 1000 | $ 25000 | $ - | 10 | $ 6167 | |||||||||||||||||||||||||||||||||||||||||
Benton St | Washington St | Lawrence St | 1160 | 22 | 2836 | $ 74468 | $ 26 | $ 25520 | $ 25520 | 10 | 10 | $ 14178 | 140 | 4 | 600 | $ 28000 | 10 | $ 6770 | |||||||||||||||||||||||||||||||||||||||||
W St | San JuanAdmiralty | Walnut St | 2560 | 22 | 6258 | $ 163807 | $ 26 | $ 56320 | $ 56320 | 10 | 5 | $ 26596 | 200 | 4 | 2000 | $ 66000 | $ - | 10 | $ 14892 | ||||||||||||||||||||||||||||||||||||||||
6 to 8 | Walnut | W Street | Jackson | 2300 | 22 | 5622 | $ 145194 | $ 26 | $ 50600 | $ 50600 | 10 | 5 | $ 23894 | 2300 | $ 57500 | $ - | 10 | $ 13199 | |||||||||||||||||||||||||||||||||||||||||
6 to 8 | 24th St | Discovery Rd | San Juan Ave | 1250 | 18 | 2500 | $ 63938 | $ 26 | $ 22500 | $ 22500 | 10 | 5 | $ 10625 | 1000 | $ 25000 | $ - | 10 | $ 5813 | |||||||||||||||||||||||||||||||||||||||||
6 to 10 | Tyler St | Lawrence St | Blaine St | 900 | 32 | 3200 | $ 78980 | $ 25 | $ 28800 | $ 28800 | 5 | 5 | $ 8000 | 200 | $ 5000 | 2 | $ 30000 | 10 | $ 7180 | ||||||||||||||||||||||||||||||||||||||||
4 to 12 | McPherson St | SR 20 | Discovery Rd | 2925 | 32 | 10400 | $ 244860 | $ 24 | $ 93600 | $ 93600 | 5 | 5 | 2925 | $ 84500 | 230 | 2 | 1200 | $ 44500 | $ - | $ - | 10 | $ 22260 | |||||||||||||||||||||||||||||||||||||
10 | Landes St | 12th St | 19th St | 1820 | 32 | 6471 | $ 151821 | $ 23 | $ 58240 | $ 58240 | 5 | 1400 | $ 39324 | 400 | $ 10000 | 2 | $ 30000 | $ 5000 | 10 | $ 14256 | |||||||||||||||||||||||||||||||||||||||
6 to 8 | Discovery Rd | 19th | Hastings Ave | 2900 | 22 | 7089 | $ 136565 | $ 19 | $ 63800 | $ 63800 | 15 | 10 | $ 47850 | 500 | $ 12500 | $ - | 10 | $ 12415 | |||||||||||||||||||||||||||||||||||||||||
8 to 12 | Hastings Ave | Discovery Rd | County Line | 8450 | 32 | 30044 | $ 542349 | $ 18 | $ 270400 | $ 270400 | 5 | 10 | 5000 | $ 197644 | 1000 | $ 25000 | $ - | 10 | $ 49304 | ||||||||||||||||||||||||||||||||||||||||
6 to 12 | Washington St | Van Buren St | SR20 | 2025 | 30 | 6750 | $ 118388 | $ 18 | $ 60750 | $ 60750 | 5 | 5 | $ 16875 | 0 | 0 | 0 | $ - | 2 | $ 30000 | $ - | 10 | $ 10763 | |||||||||||||||||||||||||||||||||||||
14 | Blaine St | San Juan Ave | Walker St | 1275 | 48 | 6800 | $ 113910 | $ 17 | $ 61200 | $ 61200 | 5 | $ 11900 | $ - | 2 | $ 30000 | $ 5000 | 10 | $ 10810 | |||||||||||||||||||||||||||||||||||||||||
6 | Washington St | Harrison St | Taylor St | 1175 | 33 | 4308 | $ 59240 | $ 14 | $ 38775 | $ 38775 | 10 | $ 15079 | $ - | $ - | 10 | $ 5385 | |||||||||||||||||||||||||||||||||||||||||||
8 to 10 | Sheridan St | SR 20 | 19th St | 4000 | 46 | 20444 | $ 272922 | $ 13 | $ 184000 | $ 184000 | 5 | 5 | $ 51111 | 200 | 2 | $ 13000 | $ - | 10 | $ 24811 | ||||||||||||||||||||||||||||||||||||||||
8 to 10 | 19th St | San Juan Ave | Sheridan St | 3200 | 48 | 17067 | $ 197120 | $ 12 | $ 153600 | $ 153600 | 3 | 3 | $ 25600 | 0 | 0 | 0 | $ - | $ - | 10 | $ 17920 | |||||||||||||||||||||||||||||||||||||||
10 to 20 | San Juan Ave | F St | Lopez Ave | 2800 | 32 | 9956 | $ 110059 | $ 11 | $ 89600 | $ 89600 | 3 | $ 10453 | $ - | $ - | 10 | $ 10005 | |||||||||||||||||||||||||||||||||||||||||||
10 to 20 | F St | Hastings Ave | Tyler St | 5300 | 31 | 18256 | $ 180730 | $ 10 | $ 164300 | $ 164300 | $ - | $ - | $ - | 10 | $ 16430 | ||||||||||||||||||||||||||||||||||||||||||||
$ 9952406 | $ 1873288 | $ 31744 | $ 274803 | $ 32667 | $ 332896 | $ 1998646 | $ 4544044 | $ 1155207 | $ 1747625 | $ 1215000 | $ 1290529 | $ - 0 | |||||||||||||||||||||||||||||||||||||||||||||||
1 Introduction
2 Public Engagement
3 Street Operations
4 Street Improvements
5 Street Preservation
6 Street Programming
7 Funding Options
8 Prioritization and Recommendations
Engage PT
ChaptersTodayrsquos Focus
Review Preservation Program
Review of Part 1 Present types of pavement treatments and costs
Part 2 Present what a hypothetical $10 Million Dollar over 10-year investment option looks like
What is Pavement Preservation
For the purpose of the Comprehensive Streets Program pavement preservation is the investment the City makes in managing existing pavement
Pavement preservation are not considered improvement projects (refer to Chapter 4) Improvements projects are typically the addition of sidewalks bike lanes public space etc Pavement preservation is investment in managing our existing roads as they are Side note 1 some improvement projects like Discovery Road impact
pavement preservation program in a positive way by eliminating the need for city investment over the next 20 years
Side note 2 pavement preservation makes nominal investments in safety by fixing shoulders
Lawrence near Monroe St
San Juan near the Cemetery
Estimated 2020 Revenues 2020Motor Vehicle Fuel Tax $217000
Utility Tax $695000
P A V E M E N TO P T I O N S
1 Chip Seal
2 Pulverize and Chip Seal
3 Asphalt Overlay
4 Pulverize and Asphalt Paving
5 Reconstruction
$
$$
$$
$$$
$$$$$
Cost Treatment______
C H I P S E A L
bull $7065 per Block (250rsquox24rsquo)
bull $1104 SY
bull Seals Cracks
bull Provides a Wear Course
bull 10 ndash 15 Year Longevity
P U L V E R I Z E C H I P S E A L
bull $21680 per Block (250rsquox24rsquo)
bull $3252 SY
bull Generally Requires Some Stormwater Infrastructure
bull 10 ndash 15 Year Longevity
A S P H A L TO V E R L A Y
bull $22596 per Block (250rsquox32rsquo)
bull $2542 SY
bull Generally Requires Some Stormwater Infrastructure
bull Requires ADA Ramp Upgrades If Adjacent
bull 15 ndash 25 Year Longevity
P U L V E R I Z E A S P H A L T
bull $34222 per Block (250rsquox24rsquo)
bull $5133 SY
bull Generally Requires Some Stormwater Infrastructure
bull Requires ADA Ramp Upgrades If Adjacent
bull 15 ndash 25 Year LongevityWashington Street amp Harrison Street
R E C O N S T R U C T I O N
bull $99004 per Block (250rsquox32rsquo)
bull $11138 SY
bull Generally Requires Stormwater Infrastructure
bull Requires ADA Ramp Upgrades If Adjacent
bull 20 ndash 25 Year LongevityWater Street amp Fillmore Street
A D D I T I O N A L C O S T S
bull Drainage Swales amp Stormwater Infrastructure
bull Digoutsbull ADA Curb Rampsbull EngineeringAdministrationbull Digouts and pre-level
Stormwater at Pacific Avenue amp Milo Street
ADA needs at Lawrence Street amp Adams Street
Insert I worq street rating
1 How many street segments were rated
1 Insert map of 10 year program
1 Insert table Too small to read is ok Wersquoll include it as a handout in 11x17
Rem
aini
ng
Serv
ice Li
feRoad Name From To
Length (ft)
Width (ft)
Area (SY)
Total Construction
Price(SY)
Re
cons
truc
tion
Pul
veriz
e amp
Pa
ve
Ash
palt
Ove
rlay
Pav
e Gr
avel
Ro
ad
Pul
veriz
e amp
Ch
ip S
eal
Chi
p Se
al
Tot
al B
ase
Pavi
ng C
osts
Dig
outs
(SY)
Pre
-Lev
elin
g(S
Y)
Con
stru
ct
Shou
lder
s Bot
h Si
des (
LF)
Pre
para
tion
Tota
l
Sto
rmw
ater
Pipe
s (LF
)
Sto
rmw
ater
Catc
hbas
ins
Sto
rmw
ater
Swal
es (L
F)
Sto
rmw
ater
To
tal
Cur
b Ra
mps
Cur
b Ra
mps
To
tal
Sur
veyi
ng
Eng
inee
ring
amp
Adm
inist
ratio
n
Eng
inee
ring
amp
Adm
inist
ratio
n To
tal
$102 $45 $22 $35 $29 $9 $35 $15 $20 $50 $1500 $25 $150002 Polk St - Street Lawrence St 1056 200 56 1244 210679$ 169$ 127518$ 127518$ -$ 150 1 1 9025$ 2 30000$ 10000$ 25 44136$ 6 47th Street Pettygrove McNeil 500 18 1548 258717$ 167$ 158624$ 158624$ -$ 687 8 46350$ -$ 10000$ 25 53743$
6 to 10 Lawrence St Calhoun St Harrison St 1200 36 4800 786070$ 164$ 491856$ 491856$ 600 15000$ 8$ 120000$ 10000$ 25 159214$ 8 Lawrence St Cass St Calhoun St 250 36 1000 146213$ 146$ 102470$ 102470$ 0 0 -$ 75 350 12500$ -$ 10000$ 25 31243$ 8 Lawrence St Walker St Cass St 250 36 1000 144650$ 145$ 102470$ 102470$ -$ 100 250 11250$ -$ 10000$ 25 30930$
4 to 8 San Juan Ave Lopez Ave Admiralty 2300 34 8689 1222938$ 141$ 890350$ 890350$ -$ 800 5 1500 85000$ -$ 15000$ 25 247588$ 6 to 8 Lawrence St Harrison St Monroe St 2380 47 12429 1331314$ 107$ 274803$ 274803$ 15 5 74573$ 1900 10 110000$ 50 750000$ 10000$ 10 121938$ 2 to 4 Center St San Juan Ave Redwood St 1660 16 2951 295222$ 100$ 86910$ 86910$ -$ 1600 9 3000 168500$ -$ 10000$ 15 39812$ 0 to 6 Pacific St Cedar St Tremont St 400 16 711 66581$ 94$ 31744$ 31744$ -$ 100 2 700 25500$ -$ 5000$ 15 9337$ 0 to 6 Benton St Lawrence Lincoln Blg 580 36 2320 203265$ 88$ 20880$ 20880$ 20 10 19720$ 250 2 15500$ 8 120000$ 5000$ 15 27165$
2 Grant St 14th St 16th St 525 16 933 73635$ 79$ 27487$ 27487$ -$ 400 2 500 35500$ -$ 8000$ 15 10648$ 2 to 6 Olympic St Cedar St Tremont St 536 12 715 52716$ 74$ 21047$ 21047$ -$ 950 23750$ -$ 8000$ 15 7920$
2 Milo St Olympic Ave Pacific Ave 466 12 621 44793$ 72$ 18298$ 18298$ -$ 800 20000$ -$ 5000$ 15 6495$ 0 11th St Hendricks St Sheridan St 550 16 978 65077$ 67$ 28796$ 28796$ -$ 100 2 750 26750$ -$ 8000$ 15 9532$ 0 58th St Hill St Kuhn St 525 16 933 60329$ 65$ 32667$ 32667$ -$ 750 18750$ -$ 8000$ 15 8913$ 2 10th St Hendricks St Grant St 283 18 566 34294$ 61$ 16669$ 16669$ -$ 500 12500$ -$ 5000$ 15 5125$
4 to 10 31st St Hancock St Sheridan St 1050 22 2567 150027$ 58$ 23100$ 23100$ 10 10 12833$ 1200 10 1000 100000$ -$ 5000$ 10 14093$ 6 25th St Sheridan St Holcomb St 1200 18 2400 125895$ 52$ 70680$ 70680$ -$ 125 1 1200 37750$ -$ 8000$ 15 17465$ 6 Holcomb St 7th St 10th St 850 12 1133 58703$ 52$ 10200$ 10200$ 10 10 5667$ 1500 37500$ -$ -$ 10 5337$ 2 Hendricks St 9th St 12th St 800 16 1422 70930$ 50$ 41884$ 41884$ -$ 750 18750$ -$ 8000$ 15 10295$
2 to 6 Hill St 19th 21st St 807 16 1435 67443$ 47$ 21125$ 6456$ 27581$ 10 5021$ 1000 25000$ -$ 8000$ 15 9840$ 2 to 8 57th St Jackman St Kuhn St 800 18 1600 66550$ 42$ 14400$ 14400$ 20 10 13600$ 1300 32500$ 10 6050$ 6 to 8 Sheridan St Hastings Ave SilverUmatilla 1750 22 4278 154115$ 36$ 38500$ 38500$ 20 10 36361$ 300 4 1500 58500$ -$ 5000$ 15 20754$ 6 to 10 Tyler St Jefferson St Lawrence St 900 32 3200 115280$ 36$ 28800$ 28800$ 5 5 8000$ 100 2 8000$ 4 60000$ 10 10480$ 6 to 14 14th St McPherson St Sheridan St 2375 21 5542 182027$ 33$ 49875$ 49875$ 20 10 47104$ 750 4 1000 68500$ -$ 10 16548$
8 49th St Kuhn St Admiralty Ave 400 24 1067 34613$ 32$ 9600$ 9600$ 5 1867$ 800 20000$ -$ 10 3147$ 6 to 10 Fir St F St UCherry 4360 22 10658 341621$ 32$ 95920$ 95920$ 5 5 4000 106644$ 100 2 4000 108000$ -$ 10 31056$ 6 to 8 Cedar St San Juan Ave Redwood St 1460 16 2596 81747$ 31$ 23360$ 23360$ 20 20 25956$ 1000 25000$ -$ 10 7432$
8 Clallam St McKinley St Roosevelt St 975 14 1517 46796$ 31$ 13650$ 13650$ 20 10 12892$ 200 4 16000$ -$ 10 4254$ 6 San Juan Ave 19th St 20th St 300 31 1033 31827$ 31$ 9300$ 9300$ 50 10 19633$ -$ -$ 10 2893$
6 to 20 Cherry St F St W St 4200 32 14933 457307$ 31$ 134400$ 134400$ 5 5 4200 121333$ 200 6000 160000$ -$ 10 41573$ 6 to 8 Jackman St 45th St 49th St 1100 22 2689 81940$ 30$ 24200$ 24200$ 15 10 18150$ 225 3 500 28250$ -$ 5000$ 15 11340$ 6 to 12 Jackson St LawrenceMonroe Roosevelt St 1600 18 3200 93530$ 29$ 28800$ 28800$ 10 10 16000$ 1000 25000$ 1 15000$ 2500$ 10 8730$
2 7th St Wilson St Holcomb St 450 16 800 23320$ 29$ 7200$ 7200$ 10 10 4000$ 400 10000$ -$ 10 2120$ 8 to 14 25th St Sherman St Sheridan St 800 20 1778 50061$ 28$ 16000$ 16000$ 10 5 7556$ 1 800 21500$ -$ 5000$ 10 5006$ 2 to 6 Hancock St SR 20 9th St 1100 20 2444 67833$ 28$ 22000$ 22000$ 15 5 14667$ 1000 25000$ -$ 10 6167$
Benton St Washington St Lawrence St 1160 22 2836 74468$ 26$ 25520$ 25520$ 10 10 14178$ 140 4 600 28000$ 10 6770$ W St San JuanAdmiralty Walnut St 2560 22 6258 163807$ 26$ 56320$ 56320$ 10 5 26596$ 200 4 2000 66000$ -$ 10 14892$
6 to 8 Walnut W Street Jackson 2300 22 5622 145194$ 26$ 50600$ 50600$ 10 5 23894$ 2300 57500$ -$ 10 13199$ 6 to 8 24th St Discovery Rd San Juan Ave 1250 18 2500 63938$ 26$ 22500$ 22500$ 10 5 10625$ 1000 25000$ -$ 10 5813$ 6 to 10 Tyler St Lawrence St Blaine St 900 32 3200 78980$ 25$ 28800$ 28800$ 5 5 8000$ 200 5000$ 2 30000$ 10 7180$ 4 to 12 McPherson St SR 20 Discovery Rd 2925 32 10400 244860$ 24$ 93600$ 93600$ 5 5 2925 84500$ 230 2 1200 44500$ -$ -$ 10 22260$
10 Landes St 12th St 19th St 1820 32 6471 151821$ 23$ 58240$ 58240$ 5 1400 39324$ 400 10000$ 2 30000$ 5000$ 10 14256$ 6 to 8 Discovery Rd 19th Hastings Ave 2900 22 7089 136565$ 19$ 63800$ 63800$ 15 10 47850$ 500 12500$ -$ 10 12415$ 8 to 12 Hastings Ave Discovery Rd County Line 8450 32 30044 542349$ 18$ 270400$ 270400$ 5 10 5000 197644$ 1000 25000$ -$ 10 49304$ 6 to 12 Washington St Van Buren St SR20 2025 30 6750 118388$ 18$ 60750$ 60750$ 5 5 16875$ 0 0 0 -$ 2 30000$ -$ 10 10763$
14 Blaine St San Juan Ave Walker St 1275 48 6800 113910$ 17$ 61200$ 61200$ 5 11900$ -$ 2 30000$ 5000$ 10 10810$ 6 Washington St Harrison St Taylor St 1175 33 4308 59240$ 14$ 38775$ 38775$ 10 15079$ -$ -$ 10 5385$
8 to 10 Sheridan St SR 20 19th St 4000 46 20444 272922$ 13$ 184000$ 184000$ 5 5 51111$ 200 2 13000$ -$ 10 24811$ 8 to 10 19th St San Juan Ave Sheridan St 3200 48 17067 197120$ 12$ 153600$ 153600$ 3 3 25600$ 0 0 0 -$ -$ 10 17920$
10 to 20 San Juan Ave F St Lopez Ave 2800 32 9956 110059$ 11$ 89600$ 89600$ 3 10453$ -$ -$ 10 10005$ 10 to 20 F St Hastings Ave Tyler St 5300 31 18256 180730$ 10$ 164300$ 164300$ -$ -$ -$ 10 16430$
9952406$ 1873288$ 31744$ 274803$ 32667$ 332896$ 1998646$ 4544044$ 1155207$ 1747625$ 1215000$ 1290529$
9 Stormwater Base Paving Costs Preperation EngineeringADA
Chip Seal
Pulverize amp Chip Seal
Pulverize amp Asphalt
Asphalt Overlay
Reconstruction
1 Insert summary table of average costs of ada sw eng digouts etc
Additional Paving Costs Average Cost per SY Percent of Paving CostDigouts amp Pre-Leveling $4 25Stormwater $7 38ADA $5 27Engineering amp Administration $5 28
Chip Seal
Pulverize amp Chip Seal
Pulverize amp Asphalt
Asphalt Overlay
Reconstruction
1 Insert total costs for the entire city based on pavement rating
RSL Length (FT) Area (SY) Condition Treatment Cost Total20 61834 138524 131 Good $0 $014 23656 49915 47 $147055212 43586 106382 100 $313413410 74803 193570 182 $57027908 96662 228046 215 $67184926 95452 261794 247 $174899304 6420 14536 14 $9711212 29238 60616 57 Poor Rehab $107 $64928500 3851 7532 07 Very Poor Rebuild $155 $1169719
$43149589
Satisfactory Chip Seal $29
Fair Overlay $67
Chip Seal
Pulverize amp Chip Seal
Pulverize amp Asphalt
Asphalt Overlay
Reconstruction
Fir Street Asphalt Overlay in early 1990s Inadequate Stormwater System Water Intrusion Inadequate Base Material
San Juan Avenue Reconstructed 1997
New ADA Sidewalks
Complete Stormwater System
Lawrence Street Chip Sealed in 2000
Inadequate Base
Water Intrusion
F Street Reconstructed 2001 2002
New ADA Sidewalks
Complete Stormwater System
Best Streets First
Stop the Continued Decay of our Streets
Slowly Rebuild Street System Investment
1 Introduction
2 Public Engagement
3 Street Operations
4 Street Improvements
5 Street Preservation
6 Street Programming
7 Funding Options
8 Recommendations
January
February
April
March
May
June
Encouraging the public to be involved through Engage PTwwwcityofptusengagept
Street Pavement Improvement Plan Projects | 9 | 110 | |||||||||||||||||||||||||||||||||||||||||||||
Road Name | From | To | Iworq ID | Length (ft) | Width (ft) | Area (yd^2) | Actual Area(SY) | Unit Cost per yd2 | Construction Cost | Prep Work | Survey Testing | ADA Curb Ramps | Storm Water | Mill amp Fill$50SY | Pre-Level$4SY | Total Construction | Project Cost + 10 | Unit Cost w Additional Costs no 10 | Engineering Costs | Notes | |||||||||||||||||||||||||||
Priority | Reconstruct | 2021 | 2022 | 2023 | 2024 | ||||||||||||||||||||||||||||||||||||||||||
1 | Reconstruct | Lawrence St | Cass St | Calhoun St | 1304 | 250 | 36 | 1000 | $ 80 | $ 80000 | $ 5000 | $ 20000 | $ 105000 | $ 115500 | $ 105 | Stormwater South Side Parking Raingarden on Cass | |||||||||||||||||||||||||||||||
2 | Reconstruct | Lawrence St | Walker St | Cass St | 250 | 36 | 1000 | $ 80 | $ 80000 | $ 5000 | $ 20000 | $ 5000 | $ 110000 | $ 121000 | $ 110 | Stormwater South Side Parking | |||||||||||||||||||||||||||||||
3 | Reconstruct Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | San Juan Ave | Lopez Ave | Admiralty | 2300 | 32 | 8178 | $ 50 | $ 408889 | $ 10000 | $ 100000 | $ 518889 | $ 570778 | $ 63 | Stormwater Problem 45th | ||||||||||||||||||||||||||||||||
4 | Reconstruct Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Polk St - Street Improvements | Lawrence St | 1056 Sarah Tiffany Sarah TiffanyGarfield | 1073 | 200 | 56 | 1244 | $ 50 | $ 62222 | X | X | X | $ 62222 | $ 68444 | $ 50 | Parking Theater 4 AC Watermain Infiltration or Rain Garden Parking on Condo Side | ||||||||||||||||||||||||||||||
Reconstruct | 47th Street | Pettygrove | McNeil | 500 | 18 | 1000 | 1548 | $ 50 | $ 50000 | $ 5000 | $ 40000 | $ 95000 | $ 104500 | $ 95 | $210000 Engineers Estimate With Engineering Cost Turnaround Spaghetti Waterline | ||||||||||||||||||||||||||||||||
Chip Seal - $50000 to $70000 per Mile | $6 No DigoutsPre-leveling | $10 with Additional Prep Work | |||||||||||||||||||||||||||||||||||||||||||||||
Chip Seal | Washington St | Van Buren St | SR20 | 2025 | 30 | 6750 | $ 10 | $ 67500 | $ 67500 | $ 74250 | Digouts Flagging | ||||||||||||||||||||||||||||||||||||
Chip Seal | Hastings Ave - Pre-level and widen shoulders | Discovery Rd | County Line | 8450 | 24 | 22533 | $ 6 | $ 135200 | $ 135200 | $ 148720 | Ditches amp Culverts Total Width change from 21 to 24 How wide will shoulders be | ||||||||||||||||||||||||||||||||||||
Tyler St | Jefferson St | Lawrence St | 900 | 32 | 3200 | $ 6 | $ 19200 | $ 19200 | $ 21120 | ||||||||||||||||||||||||||||||||||||||
Chip Seal | McPherson - Chip Seal | 4th St | Discovery Rd | 3100 | 32 | 11022 | $ 6 | $ 66133 | $ 66133 | $ 72747 | Ditches amp Culverts Shoulder Wideneing | ||||||||||||||||||||||||||||||||||||
Chip Seal | 19th St - Chip Seal | San Juan Ave | Sheridan St | 3200 | 48 | 17067 | $ 6 | $ 102400 | $ 102400 | $ 112640 | Bike Lanes amp Shoulder Prelevel | ||||||||||||||||||||||||||||||||||||
Chip Seal | Walnut | W Street | Jackson | 2300 | 22 | 5622 | $ 6 | $ 33733 | $ 33733 | $ 37107 | Dig-Outs Pre-Leveling Striping Shoulders | ||||||||||||||||||||||||||||||||||||
Chip Seal | Fir St - Chip Seal | F St | UCherry | 4360 | 22 | 10658 | $ 10 | $ 106578 | X | X | $ 106578 | $ 117236 | Dig-Outs Pre-Leveling Striping | ||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | |||||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | P St - Chip Seal | Redwood St | Cedar St | 0486 | 300 | 16 | 533 | $ 20 | $ 10667 | $ 10667 | $ 11733 | Watermain Looping Shouldnt this be part of Center | |||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 25th St - Chip Seal | Sheridan St | Holcomb St | 1200 | 18 | 2400 | $ 20 | $ 48000 | $ 48000 | $ 52800 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 14th St - Chip Seal | $ - | $ - | ||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Cedar St - Chip Seal | Redwood St | San Juan Ave | 1460 | 16 | 2596 | $ 20 | $ 51911 | $ 51911 | $ 57102 | Ex ChipSeal 22 Wide | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Center St - Chip Seal | Redwood St | San Juan Ave | 484 | 1660 | 16 | 2951 | $ 20 | $ 59022 | $ 59022 | $ 64924 | Ex ChipSeal 22 Wide Stormwater | |||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Grant St Chip Seal | 14th St | 16th St | 525 | 16 | 933 | $ 20 | $ 18667 | $ 18667 | $ 20533 | Ex Street 10 Wide | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 11th St Chip Seal | Hendricks St | Sheridan St | 550 | 16 | 978 | $ 20 | $ 19556 | $ 19556 | $ 21511 | Hospital Parking | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Hendricks St Chip Seal | 9th St | 12th St | 800 | 16 | 1422 | $ 20 | $ 28444 | $ 28444 | $ 31289 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 10th St Chip Seal | Hendricks St | Grant St | 1655 | 283 | 18 | 566 | $ 20 | $ 11320 | $ 11320 | $ 12452 | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Grant St Chip Seal | 14th St | 16th St | 525 | 18 | 1050 | $ 20 | $ 21000 | $ 21000 | $ 23100 | Ex Street 10 Wide Stormwater | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Hill St | 21st St | 19th St | 807 | 16 | 1435 | $ 20 | $ 28693 | $ 28693 | $ 31563 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Milo St -Chip seal | Olympic Ave | Pacific Ave | 0003 | 466 | 12 | 621 | $ 20 | $ 12427 | $ 12427 | $ 13669 | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Olympic St | Cedar St | Tremont St | 536 | 12 | 715 | $ 20 | $ 14293 | $ 14293 | $ 15723 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Benton St - street improvement | Blaine St | Lincoln Blg | 580 | 36 Sarah Tiffany Sarah TiffanyEstimated at 25-36 used higher number | Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Sarah Tiffany Sarah TiffanyGarfield | 2320 | $ 20 | $ 46400 | $ 46400 | $ 51040 | ||||||||||||||||||||||||||||||||||
Pave Gravel Road | |||||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Pacific St | Cedar St | Tremont St | 400 | 16 | 711 | $ 50 | $ 35556 | $ 6000 | $ 15000 | $ 56556 | $ 62211 | $ 80 | ||||||||||||||||||||||||||||||||||
58th St | Hill St | Kuhn St | 525 | 16 | 933 | $ 50 | $ 46667 | $ 6000 | $ 20000 | $ 72667 | $ 79933 | $ 78 | 4 AC Waterline Driveways Site Distance (Re-grade Slope) | ||||||||||||||||||||||||||||||||||
Sidewalks | |||||||||||||||||||||||||||||||||||||||||||||||
Harrison St | Franklin St | Clay St | 340 | 6 | 227 | $ 165 | $ 56100 | $ 5000 | $ 61100 | $ 67210 | $ 180 | ||||||||||||||||||||||||||||||||||||
9th St | Hancock St | McPherson St | 1300 | 6 | 867 | $ 165 | $ 214500 | $ 10000 | $ 15000 | $ 239500 | $ 263450 | $ 184 | |||||||||||||||||||||||||||||||||||
Asphalt Path | |||||||||||||||||||||||||||||||||||||||||||||||
Spruce St Easement | Cedar St | Center St | 150 | 8 | 133 | $ 50 | $ 6667 | $ 2000 | $ 8667 | $ 9533 | $ 65 | ||||||||||||||||||||||||||||||||||||
Cherry St | A St | E St | 990 | 10 | 1100 | $ 50 | $ 55000 | $ 10000 | $ 10000 | $ 15000 | $ 90000 | $ 99000 | $ 82 | ||||||||||||||||||||||||||||||||||
Gravel Path | |||||||||||||||||||||||||||||||||||||||||||||||
16th St | Thomas St | Grant St | 1700 | 6 | 1133 | $ 15 | $ 17000 | $ 1500 | $ 18500 | $ 20350 | |||||||||||||||||||||||||||||||||||||
Cleveland St | 21st St | 23rd St | 500 | 6 | 333 | $ 15 | $ 5000 | $ 5000 | $ 5500 | Need Easement | |||||||||||||||||||||||||||||||||||||
6 | - | $ 15 | $ - | $ - | $ - | Need Easement | |||||||||||||||||||||||||||||||||||||||||
6 | - | $ 15 | $ - | $ - | $ - | Need Easement | |||||||||||||||||||||||||||||||||||||||||
Total | $ 1582256 | $ 1792256 | $ 1971481 | ||||||||||||||||||||||||||||||||||||||||||||
Project Descriptioin | Length | Width | Construction Costs | ConstructionUnit Costs | Units | Engineering Costs | Total CostsUnit Cost | Total Costs | Total CostsUnit Cost | Notes | |||||||||||
Sidewalk | |||||||||||||||||||||
9th Street Sidewalk Grant Street to Hancock Street | 826 | 6 | $ 141506 | $ 17131 | LF | Construction Unit Cost per Foot | |||||||||||||||
Jefferson Street Sidewalk Washington Street to Taylor Street | 724 | 6 | $ 390502 | $ 53937 | LF | Construction Unit Cost per Foot | |||||||||||||||
Landis Street Sidewalk 10th Street to 19th Street | 1795 | 6 | $ 364550 | $ 20309 | LF | Construction Unit Cost per Foot | |||||||||||||||
ADA Corner Ramps | |||||||||||||||||||||
Washington Street amp Harrison Street | $ 42000 | $ 42000 | Each | ||||||||||||||||||
Washington Street amp Adams Street | $ 38150 | $ 19075 | Each | Two Corners Were Retrofitted | |||||||||||||||||
Chip Seal Pavement | |||||||||||||||||||||
Walker Street Washington Street to Lawrence Street | 1144 | 24 | $ 20000 | $ 656 | SY | Does not include flagging nor prep work | |||||||||||||||
Pulverize amp Asphalt Paving | |||||||||||||||||||||
Washington Street VanBuren Street to Harrison Street | 300 | 22 | $ 35000 | $ 4773 | SY | ||||||||||||||||
Asphalt Overlay | |||||||||||||||||||||
Sidewalks | ||||||||||||||||||||||||||||||||||||||
Harrison St | Franklin St | Clay St | 340 | 6 | 227 | |||||||||||||||||||||||||||||||||
9th St | Hancock St | McPherson St | 1300 | 6 | 867 | |||||||||||||||||||||||||||||||||
Asphalt Path | ||||||||||||||||||||||||||||||||||||||
Spruce St Easement | Cedar St | Center St | 150 | 8 | 133 | $ 2000 | $ 2000 | $ 2000 | ||||||||||||||||||||||||||||||
Cherry St | A St | E St | 990 | 10 | 1100 | $ 10000 | $ 10000 | $ 10000 | ||||||||||||||||||||||||||||||
Gravel Path | ||||||||||||||||||||||||||||||||||||||
16th St | Thomas St | Grant St | 1700 | 6 | 1133 | $ 1500 | $ 1500 | $ 1500 | ||||||||||||||||||||||||||||||
Cleveland St | 21st St | 23rd St | 500 | 6 | 333 | Need Easement | ||||||||||||||||||||||||||||||||
6 | - | Need Easement | ||||||||||||||||||||||||||||||||||||
6 | - | Need Easement | ||||||||||||||||||||||||||||||||||||
Total |
Type | Improvement | Cost Range SY | Cost Range LF | ||||||||
1 | Complete Road Rebuild | $80 | $100 | ||||||||
2 | Asphalt Overlay | $50 | $60 | ||||||||
3 | Pulverize amp Chip Seal | $20 | $30 | ||||||||
4 | Chip Seal | $6 | $10 | $12 | $25 | ||||||
5 | Seal Coat | ||||||||||
6 | |||||||||||
7 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 3-Inch | 413 | TONS | $ 15000 | $ 6187500 | 1000 x 22 x 025 httpwwwamerasphaltcomasphalthtm | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 1630 | CY | $ 4800 | $ 7824000 | Water Street Project = $48 CY (1000 x 22 x 2)27 = 1630 CY | ||||||
Gravel Borrow | 2282 | TONS | $ 3000 | $ 6846000 | (1000 x 22 x 2)27 = 1630 1630 CY x 14 = 2282 Tons | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 128 | Hours | $ 5728 | $ 733133 | (2) People for 64 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 25043033 | |||||||||||
$ 10247 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 2-Inch | 275 | TONS | $ 15000 | $ 4125000 | 1000 x 22 x 017 httpwwwamerasphaltcomasphalthtm | | ||||||
Digouts amp Pre-leveling | 122 | SY | $ 4900 | $ 597800 | |||||||
Flagging | 64 | Hours | $ 5728 | $ 366566 | (2) People for 32 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 180000 | $ 180000 | |||||||
$ 5403066 | |||||||||||
$ 2211 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 3-Inch | 413 | TONS | $ 15000 | $ 6187500 | 1000 x 22 x 025 httpwwwamerasphaltcomasphalthtm | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 150 | CY | $ 4800 | $ 720000 | Water Street Project = $48 CY | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 96 | Hours | $ 5728 | $ 549850 | (2) People for 48 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 10909750 | |||||||||||
$ 4464 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Chip Seal | 2444 | SY | $ 1050 | $ 2566200 | 1000 X 22 | Unit Cost $525 SY from Walker Street County Invoice Doubled to $1050 for Chip Seal Over Gravel | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 150 | CY | $ 4800 | $ 720000 | Water Street Project = $48 CY | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 80 | Hours | $ 5728 | $ 458208 | (2) People for 40 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | Hours | $ 12500 | $ - 0 | High Average Loaded Rate No Testing | ||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 7196808 | |||||||||||
$ 2945 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 1500000 | $614 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 500 | LF | $ 5000 | $ 2500000 | |||||||
Catch Basins | 4 | EACH | $ 150000 | $ 600000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Chip Seal | 2444 | SY | $ 525 | $ 1283100 | 1000 X 22 | Unit Cost from Walker Street County Invoice | ||||||
Digouts amp Pre-leveling | 122 | SY | $ 4900 | $ 598780 | Cost from 2018 Lakeside Mill amp Fill | Estimate Quanity Based on 5 | ||||||
Flagging | 32 | Hours | $ 5728 | $ 183283 | (2) People for 16 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | Hours | $ 12500 | $ - 0 | High Average Loaded Rate No Surveying or Testing | ||||||
Surveying | 1 | LS | $ - 0 | $ - 0 | |||||||
$ 2198863 | |||||||||||
$ 900 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 1500000 | $614 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY |
Project Descriptioin | Length | Width | Construction Costs | Engineering Costs | Engineering Total | Digouts Pre-Leveling Costs | Digouts Pre-Leveling Total | ADACosts | ADATotal | StormwaterCosts | StormwaterTotal | Total Costsby SY | Cost Per 250 Block | Length | Width | Notes | |||||||||||||||||
Chip Seal Pavement | |||||||||||||||||||||||||||||||||
Walker Street Washington Street to Lawrence Street | 1144 | 24 | $ 25000 | 15 | $ 3750 | 10 | $ 2500 | $ 1024 | $ 682911 | 250 | 24 | ||||||||||||||||||||||
Pulverize amp Chip Seal | |||||||||||||||||||||||||||||||||
Engineers Estimate | 250 | 24 | $ 22000 | 15 | $ 3300 | 0 | $ - | 20 | $ 4400 | $ 4455 | $ 2970000 | 250 | 24 | ||||||||||||||||||||
Pulverize amp Asphalt Paving | |||||||||||||||||||||||||||||||||
Washington Street VanBuren Street to Harrison Street | 300 | 22 | $ 35000 | 20 | $ 7000 | 0 | $ - | 10 | $ 3500 | 20 | $ 7000 | $ 7159 | $ 4772727 | 250 | 24 | ||||||||||||||||||
Asphalt Overlay (2) | |||||||||||||||||||||||||||||||||
Engineers Estimate | 250 | 24 | $ 21334 | 20 | $ 426680 | 10 | $ 2133 | 20 | $ 426680 | 20 | $ 426680 | $ 5440 | $ 4835707 | 250 | 32 | ||||||||||||||||||
Reconstruction | |||||||||||||||||||||||||||||||||
Walker Street Lawrence Street to Blaine Street | 650 | 36 | $ 184310 | 25 | $ 46078 | 0 | $ - | 20 | $ 36862 | 30 | $ 55293 | $ 12405 | $ 11027094 | 250 | 32 | ||||||||||||||||||
RSL | Length (FT) | Area (SY) | Condition | Treatment | Cost | Total | |||||||||
20 | 61834 | 138524 | 131 | Good | $0 | $0 | |||||||||
14 | 23656 | 49915 | 47 | Satisfactory | Chip Seal | $29 | $1470552 | ||||||||
12 | 43586 | 106382 | 100 | $3134134 | |||||||||||
10 | 74803 | 193570 | 182 | $5702790 | |||||||||||
8 | 96662 | 228046 | 215 | $6718492 | |||||||||||
6 | 95452 | 261794 | 247 | Fair | Overlay | $67 | $17489930 | ||||||||
4 | 6420 | 14536 | 14 | $971121 | |||||||||||
2 | 29238 | 60616 | 57 | Poor | Rehab | $107 | $6492850 | ||||||||
0 | 3851 | 7532 | 07 | Very Poor | Rebuild | $155 | $1169719 | ||||||||
$43149589 | |||||||||||||||
Additional Paving Costs | Average Cost per SY | Percent of Paving Cost | |||
Digouts amp Pre-Leveling | $4 | 25 | |||
Stormwater | $7 | 38 | |||
ADA | $5 | 27 | |||
Engineering amp Administration | $5 | 28 |
9 | Base Paving Costs | Preperation | Stormwater | ADA | Engineering | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Remaining Service Life | Road Name | From | To | Length (ft) | Width (ft) | Area (SY) | Total Construction | Price(SY) | Reconstruction | Pulverize amp Pave | Ashpalt Overlay | Pave Gravel Road | Pulverize amp Chip Seal | Chip Seal | Total Base Paving Costs | Digouts(SY) | Pre-Leveling(SY) | Construct Shoulders Both Sides (LF) | Preparation Total | StormwaterPipes (LF) | StormwaterCatchbasins | StormwaterSwales (LF) | Stormwater Total | Curb Ramps | Curb Ramps Total | Surveying | Engineering amp Administration | Engineering amp Administration Total | Other Work | ||||||||||||||||||||||||||||||
$102 | $45 | $22 | $35 | $29 | $9 | $35 | $15 | $20 | $50 | $1500 | $25 | $15000 | |||||||||||||||||||||||||||||||||||||||||||||||
2 | Polk St - Street | Lawrence St | 1056 | 200 | 56 | 1244 | $ 210679 | $ 169 | $ 127518 | $ 127518 | $ - | 150 | 1 | 1 | $ 9025 | 2 | $ 30000 | $ 10000 | 25 | $ 44136 | |||||||||||||||||||||||||||||||||||||||
6 | 47th Street | Pettygrove | McNeil | 500 | 18 | 1548 | $ 258717 | $ 167 | $ 158624 | $ 158624 | $ - | 687 | 8 | $ 46350 | $ - | $ 10000 | 25 | $ 53743 | |||||||||||||||||||||||||||||||||||||||||
6 to 10 | Lawrence St | Calhoun St | Harrison St | 1200 | 36 | 4800 | $ 786070 | $ 164 | $ 491856 | $ 491856 | 600 | $ 15000 | $ 8 | $ 120000 | $ 10000 | 25 | $ 159214 | ||||||||||||||||||||||||||||||||||||||||||
8 | Lawrence St | Cass St | Calhoun St | 250 | 36 | 1000 | $ 146213 | $ 146 | $ 102470 | $ 102470 | 0 | 0 | $ - | 75 | 350 | $ 12500 | $ - | $ 10000 | 25 | $ 31243 | |||||||||||||||||||||||||||||||||||||||
8 | Lawrence St | Walker St | Cass St | 250 | 36 | 1000 | $ 144650 | $ 145 | $ 102470 | $ 102470 | $ - | 100 | 250 | $ 11250 | $ - | $ 10000 | 25 | $ 30930 | |||||||||||||||||||||||||||||||||||||||||
4 to 8 | San Juan Ave | Lopez Ave | Admiralty | 2300 | 34 | 8689 | $ 1222938 | $ 141 | $ 890350 | $ 890350 | $ - | 800 | 5 | 1500 | $ 85000 | $ - | $ 15000 | 25 | $ 247588 | ||||||||||||||||||||||||||||||||||||||||
6 to 8 | Lawrence St | Harrison St | Monroe St | 2380 | 47 | 12429 | $ 1331314 | $ 107 | $ 274803 | $ 274803 | 15 | 5 | $ 74573 | 1900 | 10 | $ 110000 | 50 | $ 750000 | $ 10000 | 10 | $ 121938 | ||||||||||||||||||||||||||||||||||||||
2 to 4 | Center St | San Juan Ave | Redwood St | 1660 | 16 | 2951 | $ 295222 | $ 100 | $ 86910 | $ 86910 | $ - | 1600 | 9 | 3000 | $ 168500 | $ - | $ 10000 | 15 | $ 39812 | ||||||||||||||||||||||||||||||||||||||||
0 to 6 | Pacific St | Cedar St | Tremont St | 400 | 16 | 711 | $ 66581 | $ 94 | $ 31744 | $ 31744 | $ - | 100 | 2 | 700 | $ 25500 | $ - | $ 5000 | 15 | $ 9337 | ||||||||||||||||||||||||||||||||||||||||
0 to 6 | Benton St | Lawrence | Lincoln Blg | 580 | 36 | 2320 | $ 203265 | $ 88 | $ 20880 | $ 20880 | 20 | 10 | $ 19720 | 250 | 2 | $ 15500 | 8 | $ 120000 | $ 5000 | 15 | $ 27165 | ||||||||||||||||||||||||||||||||||||||
2 | Grant St | 14th St | 16th St | 525 | 16 | 933 | $ 73635 | $ 79 | $ 27487 | $ 27487 | $ - | 400 | 2 | 500 | $ 35500 | $ - | $ 8000 | 15 | $ 10648 | ||||||||||||||||||||||||||||||||||||||||
2 to 6 | Olympic St | Cedar St | Tremont St | 536 | 12 | 715 | $ 52716 | $ 74 | $ 21047 | $ 21047 | $ - | 950 | $ 23750 | $ - | $ 8000 | 15 | $ 7920 | ||||||||||||||||||||||||||||||||||||||||||
2 | Milo St | Olympic Ave | Pacific Ave | 466 | 12 | 621 | $ 44793 | $ 72 | $ 18298 | $ 18298 | $ - | 800 | $ 20000 | $ - | $ 5000 | 15 | $ 6495 | ||||||||||||||||||||||||||||||||||||||||||
0 | 11th St | Hendricks St | Sheridan St | 550 | 16 | 978 | $ 65077 | $ 67 | $ 28796 | $ 28796 | $ - | 100 | 2 | 750 | $ 26750 | $ - | $ 8000 | 15 | $ 9532 | ||||||||||||||||||||||||||||||||||||||||
0 | 58th St | Hill St | Kuhn St | 525 | 16 | 933 | $ 60329 | $ 65 | $ 32667 | $ 32667 | $ - | 750 | $ 18750 | $ - | $ 8000 | 15 | $ 8913 | ||||||||||||||||||||||||||||||||||||||||||
2 | 10th St | Hendricks St | Grant St | 283 | 18 | 566 | $ 34294 | $ 61 | $ 16669 | $ 16669 | $ - | 500 | $ 12500 | $ - | $ 5000 | 15 | $ 5125 | ||||||||||||||||||||||||||||||||||||||||||
4 to 10 | 31st St | Hancock St | Sheridan St | 1050 | 22 | 2567 | $ 150027 | $ 58 | $ 23100 | $ 23100 | 10 | 10 | $ 12833 | 1200 | 10 | 1000 | $ 100000 | $ - | $ 5000 | 10 | $ 14093 | ||||||||||||||||||||||||||||||||||||||
6 | 25th St | Sheridan St | Holcomb St | 1200 | 18 | 2400 | $ 125895 | $ 52 | $ 70680 | $ 70680 | $ - | 125 | 1 | 1200 | $ 37750 | $ - | $ 8000 | 15 | $ 17465 | ||||||||||||||||||||||||||||||||||||||||
6 | Holcomb St | 7th St | 10th St | 850 | 12 | 1133 | $ 58703 | $ 52 | $ 10200 | $ 10200 | 10 | 10 | $ 5667 | 1500 | $ 37500 | $ - | $ - | 10 | $ 5337 | ||||||||||||||||||||||||||||||||||||||||
2 | Hendricks St | 9th St | 12th St | 800 | 16 | 1422 | $ 70930 | $ 50 | $ 41884 | $ 41884 | $ - | 750 | $ 18750 | $ - | $ 8000 | 15 | $ 10295 | ||||||||||||||||||||||||||||||||||||||||||
2 to 6 | Hill St | 19th | 21st St | 807 | 16 | 1435 | $ 67443 | $ 47 | $ 21125 | $ 6456 | $ 27581 | 10 | $ 5021 | 1000 | $ 25000 | $ - | $ 8000 | 15 | $ 9840 | ||||||||||||||||||||||||||||||||||||||||
2 to 8 | 57th St | Jackman St | Kuhn St | 800 | 18 | 1600 | $ 66550 | $ 42 | $ 14400 | $ 14400 | 20 | 10 | $ 13600 | 1300 | $ 32500 | 10 | $ 6050 | ||||||||||||||||||||||||||||||||||||||||||
6 to 8 | Sheridan St | Hastings Ave | SilverUmatilla | 1750 | 22 | 4278 | $ 154115 | $ 36 | $ 38500 | $ 38500 | 20 | 10 | $ 36361 | 300 | 4 | 1500 | $ 58500 | $ - | $ 5000 | 15 | $ 20754 | ||||||||||||||||||||||||||||||||||||||
6 to 10 | Tyler St | Jefferson St | Lawrence St | 900 | 32 | 3200 | $ 115280 | $ 36 | $ 28800 | $ 28800 | 5 | 5 | $ 8000 | 100 | 2 | $ 8000 | 4 | $ 60000 | 10 | $ 10480 | |||||||||||||||||||||||||||||||||||||||
6 to 14 | 14th St | McPherson St | Sheridan St | 2375 | 21 | 5542 | $ 182027 | $ 33 | $ 49875 | $ 49875 | 20 | 10 | $ 47104 | 750 | 4 | 1000 | $ 68500 | $ - | 10 | $ 16548 | |||||||||||||||||||||||||||||||||||||||
8 | 49th St | Kuhn St | Admiralty Ave | 400 | 24 | 1067 | $ 34613 | $ 32 | $ 9600 | $ 9600 | 5 | $ 1867 | 800 | $ 20000 | $ - | 10 | $ 3147 | ||||||||||||||||||||||||||||||||||||||||||
6 to 10 | Fir St | F St | UCherry | 4360 | 22 | 10658 | $ 341621 | $ 32 | $ 95920 | $ 95920 | 5 | 5 | 4000 | $ 106644 | 100 | 2 | 4000 | $ 108000 | $ - | 10 | $ 31056 | ||||||||||||||||||||||||||||||||||||||
6 to 8 | Cedar St | San Juan Ave | Redwood St | 1460 | 16 | 2596 | $ 81747 | $ 31 | $ 23360 | $ 23360 | 20 | 20 | $ 25956 | 1000 | $ 25000 | $ - | 10 | $ 7432 | |||||||||||||||||||||||||||||||||||||||||
8 | Clallam St | McKinley St | Roosevelt St | 975 | 14 | 1517 | $ 46796 | $ 31 | $ 13650 | $ 13650 | 20 | 10 | $ 12892 | 200 | 4 | $ 16000 | $ - | 10 | $ 4254 | ||||||||||||||||||||||||||||||||||||||||
6 | San Juan Ave | 19th St | 20th St | 300 | 31 | 1033 | $ 31827 | $ 31 | $ 9300 | $ 9300 | 50 | 10 | $ 19633 | $ - | $ - | 10 | $ 2893 | ||||||||||||||||||||||||||||||||||||||||||
6 to 20 | Cherry St | F St | W St | 4200 | 32 | 14933 | $ 457307 | $ 31 | $ 134400 | $ 134400 | 5 | 5 | 4200 | $ 121333 | 200 | 6000 | $ 160000 | $ - | 10 | $ 41573 | |||||||||||||||||||||||||||||||||||||||
6 to 8 | Jackman St | 45th St | 49th St | 1100 | 22 | 2689 | $ 81940 | $ 30 | $ 24200 | $ 24200 | 15 | 10 | $ 18150 | 225 | 3 | 500 | $ 28250 | $ - | $ 5000 | 15 | $ 11340 | ||||||||||||||||||||||||||||||||||||||
6 to 12 | Jackson St | LawrenceMonroe | Roosevelt St | 1600 | 18 | 3200 | $ 93530 | $ 29 | $ 28800 | $ 28800 | 10 | 10 | $ 16000 | 1000 | $ 25000 | 1 | $ 15000 | $ 2500 | 10 | $ 8730 | |||||||||||||||||||||||||||||||||||||||
2 | 7th St | Wilson St | Holcomb St | 450 | 16 | 800 | $ 23320 | $ 29 | $ 7200 | $ 7200 | 10 | 10 | $ 4000 | 400 | $ 10000 | $ - | 10 | $ 2120 | |||||||||||||||||||||||||||||||||||||||||
8 to 14 | 25th St | Sherman St | Sheridan St | 800 | 20 | 1778 | $ 50061 | $ 28 | $ 16000 | $ 16000 | 10 | 5 | $ 7556 | 1 | 800 | $ 21500 | $ - | $ 5000 | 10 | $ 5006 | |||||||||||||||||||||||||||||||||||||||
2 to 6 | Hancock St | SR 20 | 9th St | 1100 | 20 | 2444 | $ 67833 | $ 28 | $ 22000 | $ 22000 | 15 | 5 | $ 14667 | 1000 | $ 25000 | $ - | 10 | $ 6167 | |||||||||||||||||||||||||||||||||||||||||
Benton St | Washington St | Lawrence St | 1160 | 22 | 2836 | $ 74468 | $ 26 | $ 25520 | $ 25520 | 10 | 10 | $ 14178 | 140 | 4 | 600 | $ 28000 | 10 | $ 6770 | |||||||||||||||||||||||||||||||||||||||||
W St | San JuanAdmiralty | Walnut St | 2560 | 22 | 6258 | $ 163807 | $ 26 | $ 56320 | $ 56320 | 10 | 5 | $ 26596 | 200 | 4 | 2000 | $ 66000 | $ - | 10 | $ 14892 | ||||||||||||||||||||||||||||||||||||||||
6 to 8 | Walnut | W Street | Jackson | 2300 | 22 | 5622 | $ 145194 | $ 26 | $ 50600 | $ 50600 | 10 | 5 | $ 23894 | 2300 | $ 57500 | $ - | 10 | $ 13199 | |||||||||||||||||||||||||||||||||||||||||
6 to 8 | 24th St | Discovery Rd | San Juan Ave | 1250 | 18 | 2500 | $ 63938 | $ 26 | $ 22500 | $ 22500 | 10 | 5 | $ 10625 | 1000 | $ 25000 | $ - | 10 | $ 5813 | |||||||||||||||||||||||||||||||||||||||||
6 to 10 | Tyler St | Lawrence St | Blaine St | 900 | 32 | 3200 | $ 78980 | $ 25 | $ 28800 | $ 28800 | 5 | 5 | $ 8000 | 200 | $ 5000 | 2 | $ 30000 | 10 | $ 7180 | ||||||||||||||||||||||||||||||||||||||||
4 to 12 | McPherson St | SR 20 | Discovery Rd | 2925 | 32 | 10400 | $ 244860 | $ 24 | $ 93600 | $ 93600 | 5 | 5 | 2925 | $ 84500 | 230 | 2 | 1200 | $ 44500 | $ - | $ - | 10 | $ 22260 | |||||||||||||||||||||||||||||||||||||
10 | Landes St | 12th St | 19th St | 1820 | 32 | 6471 | $ 151821 | $ 23 | $ 58240 | $ 58240 | 5 | 1400 | $ 39324 | 400 | $ 10000 | 2 | $ 30000 | $ 5000 | 10 | $ 14256 | |||||||||||||||||||||||||||||||||||||||
6 to 8 | Discovery Rd | 19th | Hastings Ave | 2900 | 22 | 7089 | $ 136565 | $ 19 | $ 63800 | $ 63800 | 15 | 10 | $ 47850 | 500 | $ 12500 | $ - | 10 | $ 12415 | |||||||||||||||||||||||||||||||||||||||||
8 to 12 | Hastings Ave | Discovery Rd | County Line | 8450 | 32 | 30044 | $ 542349 | $ 18 | $ 270400 | $ 270400 | 5 | 10 | 5000 | $ 197644 | 1000 | $ 25000 | $ - | 10 | $ 49304 | ||||||||||||||||||||||||||||||||||||||||
6 to 12 | Washington St | Van Buren St | SR20 | 2025 | 30 | 6750 | $ 118388 | $ 18 | $ 60750 | $ 60750 | 5 | 5 | $ 16875 | 0 | 0 | 0 | $ - | 2 | $ 30000 | $ - | 10 | $ 10763 | |||||||||||||||||||||||||||||||||||||
14 | Blaine St | San Juan Ave | Walker St | 1275 | 48 | 6800 | $ 113910 | $ 17 | $ 61200 | $ 61200 | 5 | $ 11900 | $ - | 2 | $ 30000 | $ 5000 | 10 | $ 10810 | |||||||||||||||||||||||||||||||||||||||||
6 | Washington St | Harrison St | Taylor St | 1175 | 33 | 4308 | $ 59240 | $ 14 | $ 38775 | $ 38775 | 10 | $ 15079 | $ - | $ - | 10 | $ 5385 | |||||||||||||||||||||||||||||||||||||||||||
8 to 10 | Sheridan St | SR 20 | 19th St | 4000 | 46 | 20444 | $ 272922 | $ 13 | $ 184000 | $ 184000 | 5 | 5 | $ 51111 | 200 | 2 | $ 13000 | $ - | 10 | $ 24811 | ||||||||||||||||||||||||||||||||||||||||
8 to 10 | 19th St | San Juan Ave | Sheridan St | 3200 | 48 | 17067 | $ 197120 | $ 12 | $ 153600 | $ 153600 | 3 | 3 | $ 25600 | 0 | 0 | 0 | $ - | $ - | 10 | $ 17920 | |||||||||||||||||||||||||||||||||||||||
10 to 20 | San Juan Ave | F St | Lopez Ave | 2800 | 32 | 9956 | $ 110059 | $ 11 | $ 89600 | $ 89600 | 3 | $ 10453 | $ - | $ - | 10 | $ 10005 | |||||||||||||||||||||||||||||||||||||||||||
10 to 20 | F St | Hastings Ave | Tyler St | 5300 | 31 | 18256 | $ 180730 | $ 10 | $ 164300 | $ 164300 | $ - | $ - | $ - | 10 | $ 16430 | ||||||||||||||||||||||||||||||||||||||||||||
$ 9952406 | $ 1873288 | $ 31744 | $ 274803 | $ 32667 | $ 332896 | $ 1998646 | $ 4544044 | $ 1155207 | $ 1747625 | $ 1215000 | $ 1290529 | $ - 0 | |||||||||||||||||||||||||||||||||||||||||||||||
Street Pavement Improvement Plan Projects | 9 | 110 | |||||||||||||||||||||||||||||||||||||||||||||
Road Name | From | To | Iworq ID | Length (ft) | Width (ft) | Area (yd^2) | Actual Area(SY) | Unit Cost per yd2 | Construction Cost | Prep Work | Survey Testing | ADA Curb Ramps | Storm Water | Mill amp Fill$50SY | Pre-Level$4SY | Total Construction | Project Cost + 10 | Unit Cost w Additional Costs no 10 | Engineering Costs | Notes | |||||||||||||||||||||||||||
Priority | Reconstruct | 2021 | 2022 | 2023 | 2024 | ||||||||||||||||||||||||||||||||||||||||||
1 | Reconstruct | Lawrence St | Cass St | Calhoun St | 1304 | 250 | 36 | 1000 | $ 80 | $ 80000 | $ 5000 | $ 20000 | $ 105000 | $ 115500 | $ 105 | Stormwater South Side Parking Raingarden on Cass | |||||||||||||||||||||||||||||||
2 | Reconstruct | Lawrence St | Walker St | Cass St | 250 | 36 | 1000 | $ 80 | $ 80000 | $ 5000 | $ 20000 | $ 5000 | $ 110000 | $ 121000 | $ 110 | Stormwater South Side Parking | |||||||||||||||||||||||||||||||
3 | Reconstruct Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | San Juan Ave | Lopez Ave | Admiralty | 2300 | 32 | 8178 | $ 50 | $ 408889 | $ 10000 | $ 100000 | $ 518889 | $ 570778 | $ 63 | Stormwater Problem 45th | ||||||||||||||||||||||||||||||||
4 | Reconstruct Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Polk St - Street Improvements | Lawrence St | 1056 Sarah Tiffany Sarah TiffanyGarfield | 1073 | 200 | 56 | 1244 | $ 50 | $ 62222 | X | X | X | $ 62222 | $ 68444 | $ 50 | Parking Theater 4 AC Watermain Infiltration or Rain Garden Parking on Condo Side | ||||||||||||||||||||||||||||||
Reconstruct | 47th Street | Pettygrove | McNeil | 500 | 18 | 1000 | 1548 | $ 50 | $ 50000 | $ 5000 | $ 40000 | $ 95000 | $ 104500 | $ 95 | $210000 Engineers Estimate With Engineering Cost Turnaround Spaghetti Waterline | ||||||||||||||||||||||||||||||||
Chip Seal - $50000 to $70000 per Mile | $6 No DigoutsPre-leveling | $10 with Additional Prep Work | |||||||||||||||||||||||||||||||||||||||||||||||
Chip Seal | Washington St | Van Buren St | SR20 | 2025 | 30 | 6750 | $ 10 | $ 67500 | $ 67500 | $ 74250 | Digouts Flagging | ||||||||||||||||||||||||||||||||||||
Chip Seal | Hastings Ave - Pre-level and widen shoulders | Discovery Rd | County Line | 8450 | 24 | 22533 | $ 6 | $ 135200 | $ 135200 | $ 148720 | Ditches amp Culverts Total Width change from 21 to 24 How wide will shoulders be | ||||||||||||||||||||||||||||||||||||
Tyler St | Jefferson St | Lawrence St | 900 | 32 | 3200 | $ 6 | $ 19200 | $ 19200 | $ 21120 | ||||||||||||||||||||||||||||||||||||||
Chip Seal | McPherson - Chip Seal | 4th St | Discovery Rd | 3100 | 32 | 11022 | $ 6 | $ 66133 | $ 66133 | $ 72747 | Ditches amp Culverts Shoulder Wideneing | ||||||||||||||||||||||||||||||||||||
Chip Seal | 19th St - Chip Seal | San Juan Ave | Sheridan St | 3200 | 48 | 17067 | $ 6 | $ 102400 | $ 102400 | $ 112640 | Bike Lanes amp Shoulder Prelevel | ||||||||||||||||||||||||||||||||||||
Chip Seal | Walnut | W Street | Jackson | 2300 | 22 | 5622 | $ 6 | $ 33733 | $ 33733 | $ 37107 | Dig-Outs Pre-Leveling Striping Shoulders | ||||||||||||||||||||||||||||||||||||
Chip Seal | Fir St - Chip Seal | F St | UCherry | 4360 | 22 | 10658 | $ 10 | $ 106578 | X | X | $ 106578 | $ 117236 | Dig-Outs Pre-Leveling Striping | ||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | |||||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | P St - Chip Seal | Redwood St | Cedar St | 0486 | 300 | 16 | 533 | $ 20 | $ 10667 | $ 10667 | $ 11733 | Watermain Looping Shouldnt this be part of Center | |||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 25th St - Chip Seal | Sheridan St | Holcomb St | 1200 | 18 | 2400 | $ 20 | $ 48000 | $ 48000 | $ 52800 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 14th St - Chip Seal | $ - | $ - | ||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Cedar St - Chip Seal | Redwood St | San Juan Ave | 1460 | 16 | 2596 | $ 20 | $ 51911 | $ 51911 | $ 57102 | Ex ChipSeal 22 Wide | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Center St - Chip Seal | Redwood St | San Juan Ave | 484 | 1660 | 16 | 2951 | $ 20 | $ 59022 | $ 59022 | $ 64924 | Ex ChipSeal 22 Wide Stormwater | |||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Grant St Chip Seal | 14th St | 16th St | 525 | 16 | 933 | $ 20 | $ 18667 | $ 18667 | $ 20533 | Ex Street 10 Wide | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 11th St Chip Seal | Hendricks St | Sheridan St | 550 | 16 | 978 | $ 20 | $ 19556 | $ 19556 | $ 21511 | Hospital Parking | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Hendricks St Chip Seal | 9th St | 12th St | 800 | 16 | 1422 | $ 20 | $ 28444 | $ 28444 | $ 31289 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 10th St Chip Seal | Hendricks St | Grant St | 1655 | 283 | 18 | 566 | $ 20 | $ 11320 | $ 11320 | $ 12452 | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Grant St Chip Seal | 14th St | 16th St | 525 | 18 | 1050 | $ 20 | $ 21000 | $ 21000 | $ 23100 | Ex Street 10 Wide Stormwater | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Hill St | 21st St | 19th St | 807 | 16 | 1435 | $ 20 | $ 28693 | $ 28693 | $ 31563 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Milo St -Chip seal | Olympic Ave | Pacific Ave | 0003 | 466 | 12 | 621 | $ 20 | $ 12427 | $ 12427 | $ 13669 | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Olympic St | Cedar St | Tremont St | 536 | 12 | 715 | $ 20 | $ 14293 | $ 14293 | $ 15723 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Benton St - street improvement | Blaine St | Lincoln Blg | 580 | 36 Sarah Tiffany Sarah TiffanyEstimated at 25-36 used higher number | Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Sarah Tiffany Sarah TiffanyGarfield | 2320 | $ 20 | $ 46400 | $ 46400 | $ 51040 | ||||||||||||||||||||||||||||||||||
Pave Gravel Road | |||||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Pacific St | Cedar St | Tremont St | 400 | 16 | 711 | $ 50 | $ 35556 | $ 6000 | $ 15000 | $ 56556 | $ 62211 | $ 80 | ||||||||||||||||||||||||||||||||||
58th St | Hill St | Kuhn St | 525 | 16 | 933 | $ 50 | $ 46667 | $ 6000 | $ 20000 | $ 72667 | $ 79933 | $ 78 | 4 AC Waterline Driveways Site Distance (Re-grade Slope) | ||||||||||||||||||||||||||||||||||
Sidewalks | |||||||||||||||||||||||||||||||||||||||||||||||
Harrison St | Franklin St | Clay St | 340 | 6 | 227 | $ 165 | $ 56100 | $ 5000 | $ 61100 | $ 67210 | $ 180 | ||||||||||||||||||||||||||||||||||||
9th St | Hancock St | McPherson St | 1300 | 6 | 867 | $ 165 | $ 214500 | $ 10000 | $ 15000 | $ 239500 | $ 263450 | $ 184 | |||||||||||||||||||||||||||||||||||
Asphalt Path | |||||||||||||||||||||||||||||||||||||||||||||||
Spruce St Easement | Cedar St | Center St | 150 | 8 | 133 | $ 50 | $ 6667 | $ 2000 | $ 8667 | $ 9533 | $ 65 | ||||||||||||||||||||||||||||||||||||
Cherry St | A St | E St | 990 | 10 | 1100 | $ 50 | $ 55000 | $ 10000 | $ 10000 | $ 15000 | $ 90000 | $ 99000 | $ 82 | ||||||||||||||||||||||||||||||||||
Gravel Path | |||||||||||||||||||||||||||||||||||||||||||||||
16th St | Thomas St | Grant St | 1700 | 6 | 1133 | $ 15 | $ 17000 | $ 1500 | $ 18500 | $ 20350 | |||||||||||||||||||||||||||||||||||||
Cleveland St | 21st St | 23rd St | 500 | 6 | 333 | $ 15 | $ 5000 | $ 5000 | $ 5500 | Need Easement | |||||||||||||||||||||||||||||||||||||
6 | - | $ 15 | $ - | $ - | $ - | Need Easement | |||||||||||||||||||||||||||||||||||||||||
6 | - | $ 15 | $ - | $ - | $ - | Need Easement | |||||||||||||||||||||||||||||||||||||||||
Total | $ 1582256 | $ 1792256 | $ 1971481 | ||||||||||||||||||||||||||||||||||||||||||||
Project Descriptioin | Length | Width | Construction Costs | ConstructionUnit Costs | Units | Engineering Costs | Total CostsUnit Cost | Total Costs | Total CostsUnit Cost | Notes | |||||||||||
Sidewalk | |||||||||||||||||||||
9th Street Sidewalk Grant Street to Hancock Street | 826 | 6 | $ 141506 | $ 17131 | LF | Construction Unit Cost per Foot | |||||||||||||||
Jefferson Street Sidewalk Washington Street to Taylor Street | 724 | 6 | $ 390502 | $ 53937 | LF | Construction Unit Cost per Foot | |||||||||||||||
Landis Street Sidewalk 10th Street to 19th Street | 1795 | 6 | $ 364550 | $ 20309 | LF | Construction Unit Cost per Foot | |||||||||||||||
ADA Corner Ramps | |||||||||||||||||||||
Washington Street amp Harrison Street | $ 42000 | $ 42000 | Each | ||||||||||||||||||
Washington Street amp Adams Street | $ 38150 | $ 19075 | Each | Two Corners Were Retrofitted | |||||||||||||||||
Chip Seal Pavement | |||||||||||||||||||||
Walker Street Washington Street to Lawrence Street | 1144 | 24 | $ 20000 | $ 656 | SY | Does not include flagging nor prep work | |||||||||||||||
Pulverize amp Asphalt Paving | |||||||||||||||||||||
Washington Street VanBuren Street to Harrison Street | 300 | 22 | $ 35000 | $ 4773 | SY | ||||||||||||||||
Asphalt Overlay | |||||||||||||||||||||
Sidewalks | ||||||||||||||||||||||||||||||||||||||
Harrison St | Franklin St | Clay St | 340 | 6 | 227 | |||||||||||||||||||||||||||||||||
9th St | Hancock St | McPherson St | 1300 | 6 | 867 | |||||||||||||||||||||||||||||||||
Asphalt Path | ||||||||||||||||||||||||||||||||||||||
Spruce St Easement | Cedar St | Center St | 150 | 8 | 133 | $ 2000 | $ 2000 | $ 2000 | ||||||||||||||||||||||||||||||
Cherry St | A St | E St | 990 | 10 | 1100 | $ 10000 | $ 10000 | $ 10000 | ||||||||||||||||||||||||||||||
Gravel Path | ||||||||||||||||||||||||||||||||||||||
16th St | Thomas St | Grant St | 1700 | 6 | 1133 | $ 1500 | $ 1500 | $ 1500 | ||||||||||||||||||||||||||||||
Cleveland St | 21st St | 23rd St | 500 | 6 | 333 | Need Easement | ||||||||||||||||||||||||||||||||
6 | - | Need Easement | ||||||||||||||||||||||||||||||||||||
6 | - | Need Easement | ||||||||||||||||||||||||||||||||||||
Total |
Type | Improvement | Cost Range SY | Cost Range LF | ||||||||
1 | Complete Road Rebuild | $80 | $100 | ||||||||
2 | Asphalt Overlay | $50 | $60 | ||||||||
3 | Pulverize amp Chip Seal | $20 | $30 | ||||||||
4 | Chip Seal | $6 | $10 | $12 | $25 | ||||||
5 | Seal Coat | ||||||||||
6 | |||||||||||
7 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 3-Inch | 413 | TONS | $ 15000 | $ 6187500 | 1000 x 22 x 025 httpwwwamerasphaltcomasphalthtm | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 1630 | CY | $ 4800 | $ 7824000 | Water Street Project = $48 CY (1000 x 22 x 2)27 = 1630 CY | ||||||
Gravel Borrow | 2282 | TONS | $ 3000 | $ 6846000 | (1000 x 22 x 2)27 = 1630 1630 CY x 14 = 2282 Tons | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 128 | Hours | $ 5728 | $ 733133 | (2) People for 64 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 25043033 | |||||||||||
$ 10247 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 2-Inch | 275 | TONS | $ 15000 | $ 4125000 | 1000 x 22 x 017 httpwwwamerasphaltcomasphalthtm | | ||||||
Digouts amp Pre-leveling | 122 | SY | $ 4900 | $ 597800 | |||||||
Flagging | 64 | Hours | $ 5728 | $ 366566 | (2) People for 32 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 180000 | $ 180000 | |||||||
$ 5403066 | |||||||||||
$ 2211 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 3-Inch | 413 | TONS | $ 15000 | $ 6187500 | 1000 x 22 x 025 httpwwwamerasphaltcomasphalthtm | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 150 | CY | $ 4800 | $ 720000 | Water Street Project = $48 CY | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 96 | Hours | $ 5728 | $ 549850 | (2) People for 48 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 10909750 | |||||||||||
$ 4464 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Chip Seal | 2444 | SY | $ 1050 | $ 2566200 | 1000 X 22 | Unit Cost $525 SY from Walker Street County Invoice Doubled to $1050 for Chip Seal Over Gravel | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 150 | CY | $ 4800 | $ 720000 | Water Street Project = $48 CY | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 80 | Hours | $ 5728 | $ 458208 | (2) People for 40 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | Hours | $ 12500 | $ - 0 | High Average Loaded Rate No Testing | ||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 7196808 | |||||||||||
$ 2945 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 1500000 | $614 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 500 | LF | $ 5000 | $ 2500000 | |||||||
Catch Basins | 4 | EACH | $ 150000 | $ 600000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Chip Seal | 2444 | SY | $ 525 | $ 1283100 | 1000 X 22 | Unit Cost from Walker Street County Invoice | ||||||
Digouts amp Pre-leveling | 122 | SY | $ 4900 | $ 598780 | Cost from 2018 Lakeside Mill amp Fill | Estimate Quanity Based on 5 | ||||||
Flagging | 32 | Hours | $ 5728 | $ 183283 | (2) People for 16 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | Hours | $ 12500 | $ - 0 | High Average Loaded Rate No Surveying or Testing | ||||||
Surveying | 1 | LS | $ - 0 | $ - 0 | |||||||
$ 2198863 | |||||||||||
$ 900 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 1500000 | $614 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY |
Project Descriptioin | Length | Width | Construction Costs | Engineering Costs | Engineering Total | Digouts Pre-Leveling Costs | Digouts Pre-Leveling Total | ADACosts | ADATotal | StormwaterCosts | StormwaterTotal | Total Costsby SY | Cost Per 250 Block | Length | Width | Notes | |||||||||||||||||
Chip Seal Pavement | |||||||||||||||||||||||||||||||||
Walker Street Washington Street to Lawrence Street | 1144 | 24 | $ 25000 | 15 | $ 3750 | 10 | $ 2500 | $ 1024 | $ 682911 | 250 | 24 | ||||||||||||||||||||||
Pulverize amp Chip Seal | |||||||||||||||||||||||||||||||||
Engineers Estimate | 250 | 24 | $ 22000 | 15 | $ 3300 | 0 | $ - | 20 | $ 4400 | $ 4455 | $ 2970000 | 250 | 24 | ||||||||||||||||||||
Pulverize amp Asphalt Paving | |||||||||||||||||||||||||||||||||
Washington Street VanBuren Street to Harrison Street | 300 | 22 | $ 35000 | 20 | $ 7000 | 0 | $ - | 10 | $ 3500 | 20 | $ 7000 | $ 7159 | $ 4772727 | 250 | 24 | ||||||||||||||||||
Asphalt Overlay (2) | |||||||||||||||||||||||||||||||||
Engineers Estimate | 250 | 24 | $ 21334 | 20 | $ 426680 | 10 | $ 2133 | 20 | $ 426680 | 20 | $ 426680 | $ 5440 | $ 4835707 | 250 | 32 | ||||||||||||||||||
Reconstruction | |||||||||||||||||||||||||||||||||
Walker Street Lawrence Street to Blaine Street | 650 | 36 | $ 184310 | 25 | $ 46078 | 0 | $ - | 20 | $ 36862 | 30 | $ 55293 | $ 12405 | $ 11027094 | 250 | 32 | ||||||||||||||||||
RSL | Length (FT) | Area (SY) | Condition | Treatment | Cost | Total | |||||||||
20 | 61834 | 138524 | 131 | Good | $0 | $0 | |||||||||
14 | 23656 | 49915 | 47 | Satisfactory | Chip Seal | $29 | $1470552 | ||||||||
12 | 43586 | 106382 | 100 | $3134134 | |||||||||||
10 | 74803 | 193570 | 182 | $5702790 | |||||||||||
8 | 96662 | 228046 | 215 | $6718492 | |||||||||||
6 | 95452 | 261794 | 247 | Fair | Overlay | $67 | $17489930 | ||||||||
4 | 6420 | 14536 | 14 | $971121 | |||||||||||
2 | 29238 | 60616 | 57 | Poor | Rehab | $107 | $6492850 | ||||||||
0 | 3851 | 7532 | 07 | Very Poor | Rebuild | $155 | $1169719 | ||||||||
$43149589 | |||||||||||||||
Additional Paving Costs | Average Cost per SY | Percent of Paving Cost | |||
Digouts amp Pre-Leveling | $4 | 25 | |||
Stormwater | $7 | 38 | |||
ADA | $5 | 27 | |||
Engineering amp Administration | $5 | 28 |
9 | Base Paving Costs | Preperation | Stormwater | ADA | Engineering | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Remaining Service Life | Road Name | From | To | Length (ft) | Width (ft) | Area (SY) | Total Construction | Price(SY) | Reconstruction | Pulverize amp Pave | Ashpalt Overlay | Pave Gravel Road | Pulverize amp Chip Seal | Chip Seal | Total Base Paving Costs | Digouts(SY) | Pre-Leveling(SY) | Construct Shoulders Both Sides (LF) | Preparation Total | StormwaterPipes (LF) | StormwaterCatchbasins | StormwaterSwales (LF) | Stormwater Total | Curb Ramps | Curb Ramps Total | Surveying | Engineering amp Administration | Engineering amp Administration Total | Other Work | ||||||||||||||||||||||||||||||
$102 | $45 | $22 | $35 | $29 | $9 | $35 | $15 | $20 | $50 | $1500 | $25 | $15000 | |||||||||||||||||||||||||||||||||||||||||||||||
2 | Polk St - Street | Lawrence St | 1056 | 200 | 56 | 1244 | $ 210679 | $ 169 | $ 127518 | $ 127518 | $ - | 150 | 1 | 1 | $ 9025 | 2 | $ 30000 | $ 10000 | 25 | $ 44136 | |||||||||||||||||||||||||||||||||||||||
6 | 47th Street | Pettygrove | McNeil | 500 | 18 | 1548 | $ 258717 | $ 167 | $ 158624 | $ 158624 | $ - | 687 | 8 | $ 46350 | $ - | $ 10000 | 25 | $ 53743 | |||||||||||||||||||||||||||||||||||||||||
6 to 10 | Lawrence St | Calhoun St | Harrison St | 1200 | 36 | 4800 | $ 786070 | $ 164 | $ 491856 | $ 491856 | 600 | $ 15000 | $ 8 | $ 120000 | $ 10000 | 25 | $ 159214 | ||||||||||||||||||||||||||||||||||||||||||
8 | Lawrence St | Cass St | Calhoun St | 250 | 36 | 1000 | $ 146213 | $ 146 | $ 102470 | $ 102470 | 0 | 0 | $ - | 75 | 350 | $ 12500 | $ - | $ 10000 | 25 | $ 31243 | |||||||||||||||||||||||||||||||||||||||
8 | Lawrence St | Walker St | Cass St | 250 | 36 | 1000 | $ 144650 | $ 145 | $ 102470 | $ 102470 | $ - | 100 | 250 | $ 11250 | $ - | $ 10000 | 25 | $ 30930 | |||||||||||||||||||||||||||||||||||||||||
4 to 8 | San Juan Ave | Lopez Ave | Admiralty | 2300 | 34 | 8689 | $ 1222938 | $ 141 | $ 890350 | $ 890350 | $ - | 800 | 5 | 1500 | $ 85000 | $ - | $ 15000 | 25 | $ 247588 | ||||||||||||||||||||||||||||||||||||||||
6 to 8 | Lawrence St | Harrison St | Monroe St | 2380 | 47 | 12429 | $ 1331314 | $ 107 | $ 274803 | $ 274803 | 15 | 5 | $ 74573 | 1900 | 10 | $ 110000 | 50 | $ 750000 | $ 10000 | 10 | $ 121938 | ||||||||||||||||||||||||||||||||||||||
2 to 4 | Center St | San Juan Ave | Redwood St | 1660 | 16 | 2951 | $ 295222 | $ 100 | $ 86910 | $ 86910 | $ - | 1600 | 9 | 3000 | $ 168500 | $ - | $ 10000 | 15 | $ 39812 | ||||||||||||||||||||||||||||||||||||||||
0 to 6 | Pacific St | Cedar St | Tremont St | 400 | 16 | 711 | $ 66581 | $ 94 | $ 31744 | $ 31744 | $ - | 100 | 2 | 700 | $ 25500 | $ - | $ 5000 | 15 | $ 9337 | ||||||||||||||||||||||||||||||||||||||||
0 to 6 | Benton St | Lawrence | Lincoln Blg | 580 | 36 | 2320 | $ 203265 | $ 88 | $ 20880 | $ 20880 | 20 | 10 | $ 19720 | 250 | 2 | $ 15500 | 8 | $ 120000 | $ 5000 | 15 | $ 27165 | ||||||||||||||||||||||||||||||||||||||
2 | Grant St | 14th St | 16th St | 525 | 16 | 933 | $ 73635 | $ 79 | $ 27487 | $ 27487 | $ - | 400 | 2 | 500 | $ 35500 | $ - | $ 8000 | 15 | $ 10648 | ||||||||||||||||||||||||||||||||||||||||
2 to 6 | Olympic St | Cedar St | Tremont St | 536 | 12 | 715 | $ 52716 | $ 74 | $ 21047 | $ 21047 | $ - | 950 | $ 23750 | $ - | $ 8000 | 15 | $ 7920 | ||||||||||||||||||||||||||||||||||||||||||
2 | Milo St | Olympic Ave | Pacific Ave | 466 | 12 | 621 | $ 44793 | $ 72 | $ 18298 | $ 18298 | $ - | 800 | $ 20000 | $ - | $ 5000 | 15 | $ 6495 | ||||||||||||||||||||||||||||||||||||||||||
0 | 11th St | Hendricks St | Sheridan St | 550 | 16 | 978 | $ 65077 | $ 67 | $ 28796 | $ 28796 | $ - | 100 | 2 | 750 | $ 26750 | $ - | $ 8000 | 15 | $ 9532 | ||||||||||||||||||||||||||||||||||||||||
0 | 58th St | Hill St | Kuhn St | 525 | 16 | 933 | $ 60329 | $ 65 | $ 32667 | $ 32667 | $ - | 750 | $ 18750 | $ - | $ 8000 | 15 | $ 8913 | ||||||||||||||||||||||||||||||||||||||||||
2 | 10th St | Hendricks St | Grant St | 283 | 18 | 566 | $ 34294 | $ 61 | $ 16669 | $ 16669 | $ - | 500 | $ 12500 | $ - | $ 5000 | 15 | $ 5125 | ||||||||||||||||||||||||||||||||||||||||||
4 to 10 | 31st St | Hancock St | Sheridan St | 1050 | 22 | 2567 | $ 150027 | $ 58 | $ 23100 | $ 23100 | 10 | 10 | $ 12833 | 1200 | 10 | 1000 | $ 100000 | $ - | $ 5000 | 10 | $ 14093 | ||||||||||||||||||||||||||||||||||||||
6 | 25th St | Sheridan St | Holcomb St | 1200 | 18 | 2400 | $ 125895 | $ 52 | $ 70680 | $ 70680 | $ - | 125 | 1 | 1200 | $ 37750 | $ - | $ 8000 | 15 | $ 17465 | ||||||||||||||||||||||||||||||||||||||||
6 | Holcomb St | 7th St | 10th St | 850 | 12 | 1133 | $ 58703 | $ 52 | $ 10200 | $ 10200 | 10 | 10 | $ 5667 | 1500 | $ 37500 | $ - | $ - | 10 | $ 5337 | ||||||||||||||||||||||||||||||||||||||||
2 | Hendricks St | 9th St | 12th St | 800 | 16 | 1422 | $ 70930 | $ 50 | $ 41884 | $ 41884 | $ - | 750 | $ 18750 | $ - | $ 8000 | 15 | $ 10295 | ||||||||||||||||||||||||||||||||||||||||||
2 to 6 | Hill St | 19th | 21st St | 807 | 16 | 1435 | $ 67443 | $ 47 | $ 21125 | $ 6456 | $ 27581 | 10 | $ 5021 | 1000 | $ 25000 | $ - | $ 8000 | 15 | $ 9840 | ||||||||||||||||||||||||||||||||||||||||
2 to 8 | 57th St | Jackman St | Kuhn St | 800 | 18 | 1600 | $ 66550 | $ 42 | $ 14400 | $ 14400 | 20 | 10 | $ 13600 | 1300 | $ 32500 | 10 | $ 6050 | ||||||||||||||||||||||||||||||||||||||||||
6 to 8 | Sheridan St | Hastings Ave | SilverUmatilla | 1750 | 22 | 4278 | $ 154115 | $ 36 | $ 38500 | $ 38500 | 20 | 10 | $ 36361 | 300 | 4 | 1500 | $ 58500 | $ - | $ 5000 | 15 | $ 20754 | ||||||||||||||||||||||||||||||||||||||
6 to 10 | Tyler St | Jefferson St | Lawrence St | 900 | 32 | 3200 | $ 115280 | $ 36 | $ 28800 | $ 28800 | 5 | 5 | $ 8000 | 100 | 2 | $ 8000 | 4 | $ 60000 | 10 | $ 10480 | |||||||||||||||||||||||||||||||||||||||
6 to 14 | 14th St | McPherson St | Sheridan St | 2375 | 21 | 5542 | $ 182027 | $ 33 | $ 49875 | $ 49875 | 20 | 10 | $ 47104 | 750 | 4 | 1000 | $ 68500 | $ - | 10 | $ 16548 | |||||||||||||||||||||||||||||||||||||||
8 | 49th St | Kuhn St | Admiralty Ave | 400 | 24 | 1067 | $ 34613 | $ 32 | $ 9600 | $ 9600 | 5 | $ 1867 | 800 | $ 20000 | $ - | 10 | $ 3147 | ||||||||||||||||||||||||||||||||||||||||||
6 to 10 | Fir St | F St | UCherry | 4360 | 22 | 10658 | $ 341621 | $ 32 | $ 95920 | $ 95920 | 5 | 5 | 4000 | $ 106644 | 100 | 2 | 4000 | $ 108000 | $ - | 10 | $ 31056 | ||||||||||||||||||||||||||||||||||||||
6 to 8 | Cedar St | San Juan Ave | Redwood St | 1460 | 16 | 2596 | $ 81747 | $ 31 | $ 23360 | $ 23360 | 20 | 20 | $ 25956 | 1000 | $ 25000 | $ - | 10 | $ 7432 | |||||||||||||||||||||||||||||||||||||||||
8 | Clallam St | McKinley St | Roosevelt St | 975 | 14 | 1517 | $ 46796 | $ 31 | $ 13650 | $ 13650 | 20 | 10 | $ 12892 | 200 | 4 | $ 16000 | $ - | 10 | $ 4254 | ||||||||||||||||||||||||||||||||||||||||
6 | San Juan Ave | 19th St | 20th St | 300 | 31 | 1033 | $ 31827 | $ 31 | $ 9300 | $ 9300 | 50 | 10 | $ 19633 | $ - | $ - | 10 | $ 2893 | ||||||||||||||||||||||||||||||||||||||||||
6 to 20 | Cherry St | F St | W St | 4200 | 32 | 14933 | $ 457307 | $ 31 | $ 134400 | $ 134400 | 5 | 5 | 4200 | $ 121333 | 200 | 6000 | $ 160000 | $ - | 10 | $ 41573 | |||||||||||||||||||||||||||||||||||||||
6 to 8 | Jackman St | 45th St | 49th St | 1100 | 22 | 2689 | $ 81940 | $ 30 | $ 24200 | $ 24200 | 15 | 10 | $ 18150 | 225 | 3 | 500 | $ 28250 | $ - | $ 5000 | 15 | $ 11340 | ||||||||||||||||||||||||||||||||||||||
6 to 12 | Jackson St | LawrenceMonroe | Roosevelt St | 1600 | 18 | 3200 | $ 93530 | $ 29 | $ 28800 | $ 28800 | 10 | 10 | $ 16000 | 1000 | $ 25000 | 1 | $ 15000 | $ 2500 | 10 | $ 8730 | |||||||||||||||||||||||||||||||||||||||
2 | 7th St | Wilson St | Holcomb St | 450 | 16 | 800 | $ 23320 | $ 29 | $ 7200 | $ 7200 | 10 | 10 | $ 4000 | 400 | $ 10000 | $ - | 10 | $ 2120 | |||||||||||||||||||||||||||||||||||||||||
8 to 14 | 25th St | Sherman St | Sheridan St | 800 | 20 | 1778 | $ 50061 | $ 28 | $ 16000 | $ 16000 | 10 | 5 | $ 7556 | 1 | 800 | $ 21500 | $ - | $ 5000 | 10 | $ 5006 | |||||||||||||||||||||||||||||||||||||||
2 to 6 | Hancock St | SR 20 | 9th St | 1100 | 20 | 2444 | $ 67833 | $ 28 | $ 22000 | $ 22000 | 15 | 5 | $ 14667 | 1000 | $ 25000 | $ - | 10 | $ 6167 | |||||||||||||||||||||||||||||||||||||||||
Benton St | Washington St | Lawrence St | 1160 | 22 | 2836 | $ 74468 | $ 26 | $ 25520 | $ 25520 | 10 | 10 | $ 14178 | 140 | 4 | 600 | $ 28000 | 10 | $ 6770 | |||||||||||||||||||||||||||||||||||||||||
W St | San JuanAdmiralty | Walnut St | 2560 | 22 | 6258 | $ 163807 | $ 26 | $ 56320 | $ 56320 | 10 | 5 | $ 26596 | 200 | 4 | 2000 | $ 66000 | $ - | 10 | $ 14892 | ||||||||||||||||||||||||||||||||||||||||
6 to 8 | Walnut | W Street | Jackson | 2300 | 22 | 5622 | $ 145194 | $ 26 | $ 50600 | $ 50600 | 10 | 5 | $ 23894 | 2300 | $ 57500 | $ - | 10 | $ 13199 | |||||||||||||||||||||||||||||||||||||||||
6 to 8 | 24th St | Discovery Rd | San Juan Ave | 1250 | 18 | 2500 | $ 63938 | $ 26 | $ 22500 | $ 22500 | 10 | 5 | $ 10625 | 1000 | $ 25000 | $ - | 10 | $ 5813 | |||||||||||||||||||||||||||||||||||||||||
6 to 10 | Tyler St | Lawrence St | Blaine St | 900 | 32 | 3200 | $ 78980 | $ 25 | $ 28800 | $ 28800 | 5 | 5 | $ 8000 | 200 | $ 5000 | 2 | $ 30000 | 10 | $ 7180 | ||||||||||||||||||||||||||||||||||||||||
4 to 12 | McPherson St | SR 20 | Discovery Rd | 2925 | 32 | 10400 | $ 244860 | $ 24 | $ 93600 | $ 93600 | 5 | 5 | 2925 | $ 84500 | 230 | 2 | 1200 | $ 44500 | $ - | $ - | 10 | $ 22260 | |||||||||||||||||||||||||||||||||||||
10 | Landes St | 12th St | 19th St | 1820 | 32 | 6471 | $ 151821 | $ 23 | $ 58240 | $ 58240 | 5 | 1400 | $ 39324 | 400 | $ 10000 | 2 | $ 30000 | $ 5000 | 10 | $ 14256 | |||||||||||||||||||||||||||||||||||||||
6 to 8 | Discovery Rd | 19th | Hastings Ave | 2900 | 22 | 7089 | $ 136565 | $ 19 | $ 63800 | $ 63800 | 15 | 10 | $ 47850 | 500 | $ 12500 | $ - | 10 | $ 12415 | |||||||||||||||||||||||||||||||||||||||||
8 to 12 | Hastings Ave | Discovery Rd | County Line | 8450 | 32 | 30044 | $ 542349 | $ 18 | $ 270400 | $ 270400 | 5 | 10 | 5000 | $ 197644 | 1000 | $ 25000 | $ - | 10 | $ 49304 | ||||||||||||||||||||||||||||||||||||||||
6 to 12 | Washington St | Van Buren St | SR20 | 2025 | 30 | 6750 | $ 118388 | $ 18 | $ 60750 | $ 60750 | 5 | 5 | $ 16875 | 0 | 0 | 0 | $ - | 2 | $ 30000 | $ - | 10 | $ 10763 | |||||||||||||||||||||||||||||||||||||
14 | Blaine St | San Juan Ave | Walker St | 1275 | 48 | 6800 | $ 113910 | $ 17 | $ 61200 | $ 61200 | 5 | $ 11900 | $ - | 2 | $ 30000 | $ 5000 | 10 | $ 10810 | |||||||||||||||||||||||||||||||||||||||||
6 | Washington St | Harrison St | Taylor St | 1175 | 33 | 4308 | $ 59240 | $ 14 | $ 38775 | $ 38775 | 10 | $ 15079 | $ - | $ - | 10 | $ 5385 | |||||||||||||||||||||||||||||||||||||||||||
8 to 10 | Sheridan St | SR 20 | 19th St | 4000 | 46 | 20444 | $ 272922 | $ 13 | $ 184000 | $ 184000 | 5 | 5 | $ 51111 | 200 | 2 | $ 13000 | $ - | 10 | $ 24811 | ||||||||||||||||||||||||||||||||||||||||
8 to 10 | 19th St | San Juan Ave | Sheridan St | 3200 | 48 | 17067 | $ 197120 | $ 12 | $ 153600 | $ 153600 | 3 | 3 | $ 25600 | 0 | 0 | 0 | $ - | $ - | 10 | $ 17920 | |||||||||||||||||||||||||||||||||||||||
10 to 20 | San Juan Ave | F St | Lopez Ave | 2800 | 32 | 9956 | $ 110059 | $ 11 | $ 89600 | $ 89600 | 3 | $ 10453 | $ - | $ - | 10 | $ 10005 | |||||||||||||||||||||||||||||||||||||||||||
10 to 20 | F St | Hastings Ave | Tyler St | 5300 | 31 | 18256 | $ 180730 | $ 10 | $ 164300 | $ 164300 | $ - | $ - | $ - | 10 | $ 16430 | ||||||||||||||||||||||||||||||||||||||||||||
$ 9952406 | $ 1873288 | $ 31744 | $ 274803 | $ 32667 | $ 332896 | $ 1998646 | $ 4544044 | $ 1155207 | $ 1747625 | $ 1215000 | $ 1290529 | $ - 0 | |||||||||||||||||||||||||||||||||||||||||||||||
Street Pavement Improvement Plan Projects | 9 | 110 | |||||||||||||||||||||||||||||||||||||||||||||
Road Name | From | To | Iworq ID | Length (ft) | Width (ft) | Area (yd^2) | Actual Area(SY) | Unit Cost per yd2 | Construction Cost | Prep Work | Survey Testing | ADA Curb Ramps | Storm Water | Mill amp Fill$50SY | Pre-Level$4SY | Total Construction | Project Cost + 10 | Unit Cost w Additional Costs no 10 | Engineering Costs | Notes | |||||||||||||||||||||||||||
Priority | Reconstruct | 2021 | 2022 | 2023 | 2024 | ||||||||||||||||||||||||||||||||||||||||||
1 | Reconstruct | Lawrence St | Cass St | Calhoun St | 1304 | 250 | 36 | 1000 | $ 80 | $ 80000 | $ 5000 | $ 20000 | $ 105000 | $ 115500 | $ 105 | Stormwater South Side Parking Raingarden on Cass | |||||||||||||||||||||||||||||||
2 | Reconstruct | Lawrence St | Walker St | Cass St | 250 | 36 | 1000 | $ 80 | $ 80000 | $ 5000 | $ 20000 | $ 5000 | $ 110000 | $ 121000 | $ 110 | Stormwater South Side Parking | |||||||||||||||||||||||||||||||
3 | Reconstruct Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | San Juan Ave | Lopez Ave | Admiralty | 2300 | 32 | 8178 | $ 50 | $ 408889 | $ 10000 | $ 100000 | $ 518889 | $ 570778 | $ 63 | Stormwater Problem 45th | ||||||||||||||||||||||||||||||||
4 | Reconstruct Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Polk St - Street Improvements | Lawrence St | 1056 Sarah Tiffany Sarah TiffanyGarfield | 1073 | 200 | 56 | 1244 | $ 50 | $ 62222 | X | X | X | $ 62222 | $ 68444 | $ 50 | Parking Theater 4 AC Watermain Infiltration or Rain Garden Parking on Condo Side | ||||||||||||||||||||||||||||||
Reconstruct | 47th Street | Pettygrove | McNeil | 500 | 18 | 1000 | 1548 | $ 50 | $ 50000 | $ 5000 | $ 40000 | $ 95000 | $ 104500 | $ 95 | $210000 Engineers Estimate With Engineering Cost Turnaround Spaghetti Waterline | ||||||||||||||||||||||||||||||||
Chip Seal - $50000 to $70000 per Mile | $6 No DigoutsPre-leveling | $10 with Additional Prep Work | |||||||||||||||||||||||||||||||||||||||||||||||
Chip Seal | Washington St | Van Buren St | SR20 | 2025 | 30 | 6750 | $ 10 | $ 67500 | $ 67500 | $ 74250 | Digouts Flagging | ||||||||||||||||||||||||||||||||||||
Chip Seal | Hastings Ave - Pre-level and widen shoulders | Discovery Rd | County Line | 8450 | 24 | 22533 | $ 6 | $ 135200 | $ 135200 | $ 148720 | Ditches amp Culverts Total Width change from 21 to 24 How wide will shoulders be | ||||||||||||||||||||||||||||||||||||
Tyler St | Jefferson St | Lawrence St | 900 | 32 | 3200 | $ 6 | $ 19200 | $ 19200 | $ 21120 | ||||||||||||||||||||||||||||||||||||||
Chip Seal | McPherson - Chip Seal | 4th St | Discovery Rd | 3100 | 32 | 11022 | $ 6 | $ 66133 | $ 66133 | $ 72747 | Ditches amp Culverts Shoulder Wideneing | ||||||||||||||||||||||||||||||||||||
Chip Seal | 19th St - Chip Seal | San Juan Ave | Sheridan St | 3200 | 48 | 17067 | $ 6 | $ 102400 | $ 102400 | $ 112640 | Bike Lanes amp Shoulder Prelevel | ||||||||||||||||||||||||||||||||||||
Chip Seal | Walnut | W Street | Jackson | 2300 | 22 | 5622 | $ 6 | $ 33733 | $ 33733 | $ 37107 | Dig-Outs Pre-Leveling Striping Shoulders | ||||||||||||||||||||||||||||||||||||
Chip Seal | Fir St - Chip Seal | F St | UCherry | 4360 | 22 | 10658 | $ 10 | $ 106578 | X | X | $ 106578 | $ 117236 | Dig-Outs Pre-Leveling Striping | ||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | |||||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | P St - Chip Seal | Redwood St | Cedar St | 0486 | 300 | 16 | 533 | $ 20 | $ 10667 | $ 10667 | $ 11733 | Watermain Looping Shouldnt this be part of Center | |||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 25th St - Chip Seal | Sheridan St | Holcomb St | 1200 | 18 | 2400 | $ 20 | $ 48000 | $ 48000 | $ 52800 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 14th St - Chip Seal | $ - | $ - | ||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Cedar St - Chip Seal | Redwood St | San Juan Ave | 1460 | 16 | 2596 | $ 20 | $ 51911 | $ 51911 | $ 57102 | Ex ChipSeal 22 Wide | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Center St - Chip Seal | Redwood St | San Juan Ave | 484 | 1660 | 16 | 2951 | $ 20 | $ 59022 | $ 59022 | $ 64924 | Ex ChipSeal 22 Wide Stormwater | |||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Grant St Chip Seal | 14th St | 16th St | 525 | 16 | 933 | $ 20 | $ 18667 | $ 18667 | $ 20533 | Ex Street 10 Wide | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 11th St Chip Seal | Hendricks St | Sheridan St | 550 | 16 | 978 | $ 20 | $ 19556 | $ 19556 | $ 21511 | Hospital Parking | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Hendricks St Chip Seal | 9th St | 12th St | 800 | 16 | 1422 | $ 20 | $ 28444 | $ 28444 | $ 31289 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 10th St Chip Seal | Hendricks St | Grant St | 1655 | 283 | 18 | 566 | $ 20 | $ 11320 | $ 11320 | $ 12452 | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Grant St Chip Seal | 14th St | 16th St | 525 | 18 | 1050 | $ 20 | $ 21000 | $ 21000 | $ 23100 | Ex Street 10 Wide Stormwater | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Hill St | 21st St | 19th St | 807 | 16 | 1435 | $ 20 | $ 28693 | $ 28693 | $ 31563 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Milo St -Chip seal | Olympic Ave | Pacific Ave | 0003 | 466 | 12 | 621 | $ 20 | $ 12427 | $ 12427 | $ 13669 | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Olympic St | Cedar St | Tremont St | 536 | 12 | 715 | $ 20 | $ 14293 | $ 14293 | $ 15723 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Benton St - street improvement | Blaine St | Lincoln Blg | 580 | 36 Sarah Tiffany Sarah TiffanyEstimated at 25-36 used higher number | Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Sarah Tiffany Sarah TiffanyGarfield | 2320 | $ 20 | $ 46400 | $ 46400 | $ 51040 | ||||||||||||||||||||||||||||||||||
Pave Gravel Road | |||||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Pacific St | Cedar St | Tremont St | 400 | 16 | 711 | $ 50 | $ 35556 | $ 6000 | $ 15000 | $ 56556 | $ 62211 | $ 80 | ||||||||||||||||||||||||||||||||||
58th St | Hill St | Kuhn St | 525 | 16 | 933 | $ 50 | $ 46667 | $ 6000 | $ 20000 | $ 72667 | $ 79933 | $ 78 | 4 AC Waterline Driveways Site Distance (Re-grade Slope) | ||||||||||||||||||||||||||||||||||
Sidewalks | |||||||||||||||||||||||||||||||||||||||||||||||
Harrison St | Franklin St | Clay St | 340 | 6 | 227 | $ 165 | $ 56100 | $ 5000 | $ 61100 | $ 67210 | $ 180 | ||||||||||||||||||||||||||||||||||||
9th St | Hancock St | McPherson St | 1300 | 6 | 867 | $ 165 | $ 214500 | $ 10000 | $ 15000 | $ 239500 | $ 263450 | $ 184 | |||||||||||||||||||||||||||||||||||
Asphalt Path | |||||||||||||||||||||||||||||||||||||||||||||||
Spruce St Easement | Cedar St | Center St | 150 | 8 | 133 | $ 50 | $ 6667 | $ 2000 | $ 8667 | $ 9533 | $ 65 | ||||||||||||||||||||||||||||||||||||
Cherry St | A St | E St | 990 | 10 | 1100 | $ 50 | $ 55000 | $ 10000 | $ 10000 | $ 15000 | $ 90000 | $ 99000 | $ 82 | ||||||||||||||||||||||||||||||||||
Gravel Path | |||||||||||||||||||||||||||||||||||||||||||||||
16th St | Thomas St | Grant St | 1700 | 6 | 1133 | $ 15 | $ 17000 | $ 1500 | $ 18500 | $ 20350 | |||||||||||||||||||||||||||||||||||||
Cleveland St | 21st St | 23rd St | 500 | 6 | 333 | $ 15 | $ 5000 | $ 5000 | $ 5500 | Need Easement | |||||||||||||||||||||||||||||||||||||
6 | - | $ 15 | $ - | $ - | $ - | Need Easement | |||||||||||||||||||||||||||||||||||||||||
6 | - | $ 15 | $ - | $ - | $ - | Need Easement | |||||||||||||||||||||||||||||||||||||||||
Total | $ 1582256 | $ 1792256 | $ 1971481 | ||||||||||||||||||||||||||||||||||||||||||||
Project Descriptioin | Length | Width | Construction Costs | ConstructionUnit Costs | Units | Engineering Costs | Total CostsUnit Cost | Total Costs | Total CostsUnit Cost | Notes | |||||||||||
Sidewalk | |||||||||||||||||||||
9th Street Sidewalk Grant Street to Hancock Street | 826 | 6 | $ 141506 | $ 17131 | LF | Construction Unit Cost per Foot | |||||||||||||||
Jefferson Street Sidewalk Washington Street to Taylor Street | 724 | 6 | $ 390502 | $ 53937 | LF | Construction Unit Cost per Foot | |||||||||||||||
Landis Street Sidewalk 10th Street to 19th Street | 1795 | 6 | $ 364550 | $ 20309 | LF | Construction Unit Cost per Foot | |||||||||||||||
ADA Corner Ramps | |||||||||||||||||||||
Washington Street amp Harrison Street | $ 42000 | $ 42000 | Each | ||||||||||||||||||
Washington Street amp Adams Street | $ 38150 | $ 19075 | Each | Two Corners Were Retrofitted | |||||||||||||||||
Chip Seal Pavement | |||||||||||||||||||||
Walker Street Washington Street to Lawrence Street | 1144 | 24 | $ 20000 | $ 656 | SY | Does not include flagging nor prep work | |||||||||||||||
Pulverize amp Asphalt Paving | |||||||||||||||||||||
Washington Street VanBuren Street to Harrison Street | 300 | 22 | $ 35000 | $ 4773 | SY | ||||||||||||||||
Asphalt Overlay | |||||||||||||||||||||
Sidewalks | ||||||||||||||||||||||||||||||||||||||
Harrison St | Franklin St | Clay St | 340 | 6 | 227 | |||||||||||||||||||||||||||||||||
9th St | Hancock St | McPherson St | 1300 | 6 | 867 | |||||||||||||||||||||||||||||||||
Asphalt Path | ||||||||||||||||||||||||||||||||||||||
Spruce St Easement | Cedar St | Center St | 150 | 8 | 133 | $ 2000 | $ 2000 | $ 2000 | ||||||||||||||||||||||||||||||
Cherry St | A St | E St | 990 | 10 | 1100 | $ 10000 | $ 10000 | $ 10000 | ||||||||||||||||||||||||||||||
Gravel Path | ||||||||||||||||||||||||||||||||||||||
16th St | Thomas St | Grant St | 1700 | 6 | 1133 | $ 1500 | $ 1500 | $ 1500 | ||||||||||||||||||||||||||||||
Cleveland St | 21st St | 23rd St | 500 | 6 | 333 | Need Easement | ||||||||||||||||||||||||||||||||
6 | - | Need Easement | ||||||||||||||||||||||||||||||||||||
6 | - | Need Easement | ||||||||||||||||||||||||||||||||||||
Total |
Type | Improvement | Cost Range SY | Cost Range LF | ||||||||
1 | Complete Road Rebuild | $80 | $100 | ||||||||
2 | Asphalt Overlay | $50 | $60 | ||||||||
3 | Pulverize amp Chip Seal | $20 | $30 | ||||||||
4 | Chip Seal | $6 | $10 | $12 | $25 | ||||||
5 | Seal Coat | ||||||||||
6 | |||||||||||
7 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 3-Inch | 413 | TONS | $ 15000 | $ 6187500 | 1000 x 22 x 025 httpwwwamerasphaltcomasphalthtm | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 1630 | CY | $ 4800 | $ 7824000 | Water Street Project = $48 CY (1000 x 22 x 2)27 = 1630 CY | ||||||
Gravel Borrow | 2282 | TONS | $ 3000 | $ 6846000 | (1000 x 22 x 2)27 = 1630 1630 CY x 14 = 2282 Tons | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 128 | Hours | $ 5728 | $ 733133 | (2) People for 64 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 25043033 | |||||||||||
$ 10247 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 2-Inch | 275 | TONS | $ 15000 | $ 4125000 | 1000 x 22 x 017 httpwwwamerasphaltcomasphalthtm | | ||||||
Digouts amp Pre-leveling | 122 | SY | $ 4900 | $ 597800 | |||||||
Flagging | 64 | Hours | $ 5728 | $ 366566 | (2) People for 32 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 180000 | $ 180000 | |||||||
$ 5403066 | |||||||||||
$ 2211 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 3-Inch | 413 | TONS | $ 15000 | $ 6187500 | 1000 x 22 x 025 httpwwwamerasphaltcomasphalthtm | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 150 | CY | $ 4800 | $ 720000 | Water Street Project = $48 CY | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 96 | Hours | $ 5728 | $ 549850 | (2) People for 48 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 10909750 | |||||||||||
$ 4464 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Chip Seal | 2444 | SY | $ 1050 | $ 2566200 | 1000 X 22 | Unit Cost $525 SY from Walker Street County Invoice Doubled to $1050 for Chip Seal Over Gravel | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 150 | CY | $ 4800 | $ 720000 | Water Street Project = $48 CY | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 80 | Hours | $ 5728 | $ 458208 | (2) People for 40 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | Hours | $ 12500 | $ - 0 | High Average Loaded Rate No Testing | ||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 7196808 | |||||||||||
$ 2945 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 1500000 | $614 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 500 | LF | $ 5000 | $ 2500000 | |||||||
Catch Basins | 4 | EACH | $ 150000 | $ 600000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Chip Seal | 2444 | SY | $ 525 | $ 1283100 | 1000 X 22 | Unit Cost from Walker Street County Invoice | ||||||
Digouts amp Pre-leveling | 122 | SY | $ 4900 | $ 598780 | Cost from 2018 Lakeside Mill amp Fill | Estimate Quanity Based on 5 | ||||||
Flagging | 32 | Hours | $ 5728 | $ 183283 | (2) People for 16 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | Hours | $ 12500 | $ - 0 | High Average Loaded Rate No Surveying or Testing | ||||||
Surveying | 1 | LS | $ - 0 | $ - 0 | |||||||
$ 2198863 | |||||||||||
$ 900 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 1500000 | $614 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY |
Project Descriptioin | Length | Width | Construction Costs | Engineering Costs | Engineering Total | Digouts Pre-Leveling Costs | Digouts Pre-Leveling Total | ADACosts | ADATotal | StormwaterCosts | StormwaterTotal | Total Costsby SY | Cost Per 250 Block | Length | Width | Notes | |||||||||||||||||
Chip Seal Pavement | |||||||||||||||||||||||||||||||||
Walker Street Washington Street to Lawrence Street | 1144 | 24 | $ 25000 | 15 | $ 3750 | 10 | $ 2500 | $ 1024 | $ 682911 | 250 | 24 | ||||||||||||||||||||||
Pulverize amp Chip Seal | |||||||||||||||||||||||||||||||||
Engineers Estimate | 250 | 24 | $ 22000 | 15 | $ 3300 | 0 | $ - | 20 | $ 4400 | $ 4455 | $ 2970000 | 250 | 24 | ||||||||||||||||||||
Pulverize amp Asphalt Paving | |||||||||||||||||||||||||||||||||
Washington Street VanBuren Street to Harrison Street | 300 | 22 | $ 35000 | 20 | $ 7000 | 0 | $ - | 10 | $ 3500 | 20 | $ 7000 | $ 7159 | $ 4772727 | 250 | 24 | ||||||||||||||||||
Asphalt Overlay (2) | |||||||||||||||||||||||||||||||||
Engineers Estimate | 250 | 24 | $ 21334 | 20 | $ 426680 | 10 | $ 2133 | 20 | $ 426680 | 20 | $ 426680 | $ 5440 | $ 4835707 | 250 | 32 | ||||||||||||||||||
Reconstruction | |||||||||||||||||||||||||||||||||
Walker Street Lawrence Street to Blaine Street | 650 | 36 | $ 184310 | 25 | $ 46078 | 0 | $ - | 20 | $ 36862 | 30 | $ 55293 | $ 12405 | $ 11027094 | 250 | 32 | ||||||||||||||||||
RSL | Length (FT) | Area (SY) | Condition | Treatment | Cost | Total | |||||||||
20 | 61834 | 138524 | 131 | Good | $0 | $0 | |||||||||
14 | 23656 | 49915 | 47 | Satisfactory | Chip Seal | $29 | $1470552 | ||||||||
12 | 43586 | 106382 | 100 | $3134134 | |||||||||||
10 | 74803 | 193570 | 182 | $5702790 | |||||||||||
8 | 96662 | 228046 | 215 | $6718492 | |||||||||||
6 | 95452 | 261794 | 247 | Fair | Overlay | $67 | $17489930 | ||||||||
4 | 6420 | 14536 | 14 | $971121 | |||||||||||
2 | 29238 | 60616 | 57 | Poor | Rehab | $107 | $6492850 | ||||||||
0 | 3851 | 7532 | 07 | Very Poor | Rebuild | $155 | $1169719 | ||||||||
$43149589 | |||||||||||||||
Additional Paving Costs | Average Cost per SY | Percent of Paving Cost | |||
Digouts amp Pre-Leveling | $4 | 25 | |||
Stormwater | $7 | 38 | |||
ADA | $5 | 27 | |||
Engineering amp Administration | $5 | 28 |
9 | Base Paving Costs | Preperation | Stormwater | ADA | Engineering | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Remaining Service Life | Road Name | From | To | Length (ft) | Width (ft) | Area (SY) | Total Construction | Price(SY) | Reconstruction | Pulverize amp Pave | Ashpalt Overlay | Pave Gravel Road | Pulverize amp Chip Seal | Chip Seal | Total Base Paving Costs | Digouts(SY) | Pre-Leveling(SY) | Construct Shoulders Both Sides (LF) | Preparation Total | StormwaterPipes (LF) | StormwaterCatchbasins | StormwaterSwales (LF) | Stormwater Total | Curb Ramps | Curb Ramps Total | Surveying | Engineering amp Administration | Engineering amp Administration Total | Other Work | ||||||||||||||||||||||||||||||
$102 | $45 | $22 | $35 | $29 | $9 | $35 | $15 | $20 | $50 | $1500 | $25 | $15000 | |||||||||||||||||||||||||||||||||||||||||||||||
2 | Polk St - Street | Lawrence St | 1056 | 200 | 56 | 1244 | $ 210679 | $ 169 | $ 127518 | $ 127518 | $ - | 150 | 1 | 1 | $ 9025 | 2 | $ 30000 | $ 10000 | 25 | $ 44136 | |||||||||||||||||||||||||||||||||||||||
6 | 47th Street | Pettygrove | McNeil | 500 | 18 | 1548 | $ 258717 | $ 167 | $ 158624 | $ 158624 | $ - | 687 | 8 | $ 46350 | $ - | $ 10000 | 25 | $ 53743 | |||||||||||||||||||||||||||||||||||||||||
6 to 10 | Lawrence St | Calhoun St | Harrison St | 1200 | 36 | 4800 | $ 786070 | $ 164 | $ 491856 | $ 491856 | 600 | $ 15000 | $ 8 | $ 120000 | $ 10000 | 25 | $ 159214 | ||||||||||||||||||||||||||||||||||||||||||
8 | Lawrence St | Cass St | Calhoun St | 250 | 36 | 1000 | $ 146213 | $ 146 | $ 102470 | $ 102470 | 0 | 0 | $ - | 75 | 350 | $ 12500 | $ - | $ 10000 | 25 | $ 31243 | |||||||||||||||||||||||||||||||||||||||
8 | Lawrence St | Walker St | Cass St | 250 | 36 | 1000 | $ 144650 | $ 145 | $ 102470 | $ 102470 | $ - | 100 | 250 | $ 11250 | $ - | $ 10000 | 25 | $ 30930 | |||||||||||||||||||||||||||||||||||||||||
4 to 8 | San Juan Ave | Lopez Ave | Admiralty | 2300 | 34 | 8689 | $ 1222938 | $ 141 | $ 890350 | $ 890350 | $ - | 800 | 5 | 1500 | $ 85000 | $ - | $ 15000 | 25 | $ 247588 | ||||||||||||||||||||||||||||||||||||||||
6 to 8 | Lawrence St | Harrison St | Monroe St | 2380 | 47 | 12429 | $ 1331314 | $ 107 | $ 274803 | $ 274803 | 15 | 5 | $ 74573 | 1900 | 10 | $ 110000 | 50 | $ 750000 | $ 10000 | 10 | $ 121938 | ||||||||||||||||||||||||||||||||||||||
2 to 4 | Center St | San Juan Ave | Redwood St | 1660 | 16 | 2951 | $ 295222 | $ 100 | $ 86910 | $ 86910 | $ - | 1600 | 9 | 3000 | $ 168500 | $ - | $ 10000 | 15 | $ 39812 | ||||||||||||||||||||||||||||||||||||||||
0 to 6 | Pacific St | Cedar St | Tremont St | 400 | 16 | 711 | $ 66581 | $ 94 | $ 31744 | $ 31744 | $ - | 100 | 2 | 700 | $ 25500 | $ - | $ 5000 | 15 | $ 9337 | ||||||||||||||||||||||||||||||||||||||||
0 to 6 | Benton St | Lawrence | Lincoln Blg | 580 | 36 | 2320 | $ 203265 | $ 88 | $ 20880 | $ 20880 | 20 | 10 | $ 19720 | 250 | 2 | $ 15500 | 8 | $ 120000 | $ 5000 | 15 | $ 27165 | ||||||||||||||||||||||||||||||||||||||
2 | Grant St | 14th St | 16th St | 525 | 16 | 933 | $ 73635 | $ 79 | $ 27487 | $ 27487 | $ - | 400 | 2 | 500 | $ 35500 | $ - | $ 8000 | 15 | $ 10648 | ||||||||||||||||||||||||||||||||||||||||
2 to 6 | Olympic St | Cedar St | Tremont St | 536 | 12 | 715 | $ 52716 | $ 74 | $ 21047 | $ 21047 | $ - | 950 | $ 23750 | $ - | $ 8000 | 15 | $ 7920 | ||||||||||||||||||||||||||||||||||||||||||
2 | Milo St | Olympic Ave | Pacific Ave | 466 | 12 | 621 | $ 44793 | $ 72 | $ 18298 | $ 18298 | $ - | 800 | $ 20000 | $ - | $ 5000 | 15 | $ 6495 | ||||||||||||||||||||||||||||||||||||||||||
0 | 11th St | Hendricks St | Sheridan St | 550 | 16 | 978 | $ 65077 | $ 67 | $ 28796 | $ 28796 | $ - | 100 | 2 | 750 | $ 26750 | $ - | $ 8000 | 15 | $ 9532 | ||||||||||||||||||||||||||||||||||||||||
0 | 58th St | Hill St | Kuhn St | 525 | 16 | 933 | $ 60329 | $ 65 | $ 32667 | $ 32667 | $ - | 750 | $ 18750 | $ - | $ 8000 | 15 | $ 8913 | ||||||||||||||||||||||||||||||||||||||||||
2 | 10th St | Hendricks St | Grant St | 283 | 18 | 566 | $ 34294 | $ 61 | $ 16669 | $ 16669 | $ - | 500 | $ 12500 | $ - | $ 5000 | 15 | $ 5125 | ||||||||||||||||||||||||||||||||||||||||||
4 to 10 | 31st St | Hancock St | Sheridan St | 1050 | 22 | 2567 | $ 150027 | $ 58 | $ 23100 | $ 23100 | 10 | 10 | $ 12833 | 1200 | 10 | 1000 | $ 100000 | $ - | $ 5000 | 10 | $ 14093 | ||||||||||||||||||||||||||||||||||||||
6 | 25th St | Sheridan St | Holcomb St | 1200 | 18 | 2400 | $ 125895 | $ 52 | $ 70680 | $ 70680 | $ - | 125 | 1 | 1200 | $ 37750 | $ - | $ 8000 | 15 | $ 17465 | ||||||||||||||||||||||||||||||||||||||||
6 | Holcomb St | 7th St | 10th St | 850 | 12 | 1133 | $ 58703 | $ 52 | $ 10200 | $ 10200 | 10 | 10 | $ 5667 | 1500 | $ 37500 | $ - | $ - | 10 | $ 5337 | ||||||||||||||||||||||||||||||||||||||||
2 | Hendricks St | 9th St | 12th St | 800 | 16 | 1422 | $ 70930 | $ 50 | $ 41884 | $ 41884 | $ - | 750 | $ 18750 | $ - | $ 8000 | 15 | $ 10295 | ||||||||||||||||||||||||||||||||||||||||||
2 to 6 | Hill St | 19th | 21st St | 807 | 16 | 1435 | $ 67443 | $ 47 | $ 21125 | $ 6456 | $ 27581 | 10 | $ 5021 | 1000 | $ 25000 | $ - | $ 8000 | 15 | $ 9840 | ||||||||||||||||||||||||||||||||||||||||
2 to 8 | 57th St | Jackman St | Kuhn St | 800 | 18 | 1600 | $ 66550 | $ 42 | $ 14400 | $ 14400 | 20 | 10 | $ 13600 | 1300 | $ 32500 | 10 | $ 6050 | ||||||||||||||||||||||||||||||||||||||||||
6 to 8 | Sheridan St | Hastings Ave | SilverUmatilla | 1750 | 22 | 4278 | $ 154115 | $ 36 | $ 38500 | $ 38500 | 20 | 10 | $ 36361 | 300 | 4 | 1500 | $ 58500 | $ - | $ 5000 | 15 | $ 20754 | ||||||||||||||||||||||||||||||||||||||
6 to 10 | Tyler St | Jefferson St | Lawrence St | 900 | 32 | 3200 | $ 115280 | $ 36 | $ 28800 | $ 28800 | 5 | 5 | $ 8000 | 100 | 2 | $ 8000 | 4 | $ 60000 | 10 | $ 10480 | |||||||||||||||||||||||||||||||||||||||
6 to 14 | 14th St | McPherson St | Sheridan St | 2375 | 21 | 5542 | $ 182027 | $ 33 | $ 49875 | $ 49875 | 20 | 10 | $ 47104 | 750 | 4 | 1000 | $ 68500 | $ - | 10 | $ 16548 | |||||||||||||||||||||||||||||||||||||||
8 | 49th St | Kuhn St | Admiralty Ave | 400 | 24 | 1067 | $ 34613 | $ 32 | $ 9600 | $ 9600 | 5 | $ 1867 | 800 | $ 20000 | $ - | 10 | $ 3147 | ||||||||||||||||||||||||||||||||||||||||||
6 to 10 | Fir St | F St | UCherry | 4360 | 22 | 10658 | $ 341621 | $ 32 | $ 95920 | $ 95920 | 5 | 5 | 4000 | $ 106644 | 100 | 2 | 4000 | $ 108000 | $ - | 10 | $ 31056 | ||||||||||||||||||||||||||||||||||||||
6 to 8 | Cedar St | San Juan Ave | Redwood St | 1460 | 16 | 2596 | $ 81747 | $ 31 | $ 23360 | $ 23360 | 20 | 20 | $ 25956 | 1000 | $ 25000 | $ - | 10 | $ 7432 | |||||||||||||||||||||||||||||||||||||||||
8 | Clallam St | McKinley St | Roosevelt St | 975 | 14 | 1517 | $ 46796 | $ 31 | $ 13650 | $ 13650 | 20 | 10 | $ 12892 | 200 | 4 | $ 16000 | $ - | 10 | $ 4254 | ||||||||||||||||||||||||||||||||||||||||
6 | San Juan Ave | 19th St | 20th St | 300 | 31 | 1033 | $ 31827 | $ 31 | $ 9300 | $ 9300 | 50 | 10 | $ 19633 | $ - | $ - | 10 | $ 2893 | ||||||||||||||||||||||||||||||||||||||||||
6 to 20 | Cherry St | F St | W St | 4200 | 32 | 14933 | $ 457307 | $ 31 | $ 134400 | $ 134400 | 5 | 5 | 4200 | $ 121333 | 200 | 6000 | $ 160000 | $ - | 10 | $ 41573 | |||||||||||||||||||||||||||||||||||||||
6 to 8 | Jackman St | 45th St | 49th St | 1100 | 22 | 2689 | $ 81940 | $ 30 | $ 24200 | $ 24200 | 15 | 10 | $ 18150 | 225 | 3 | 500 | $ 28250 | $ - | $ 5000 | 15 | $ 11340 | ||||||||||||||||||||||||||||||||||||||
6 to 12 | Jackson St | LawrenceMonroe | Roosevelt St | 1600 | 18 | 3200 | $ 93530 | $ 29 | $ 28800 | $ 28800 | 10 | 10 | $ 16000 | 1000 | $ 25000 | 1 | $ 15000 | $ 2500 | 10 | $ 8730 | |||||||||||||||||||||||||||||||||||||||
2 | 7th St | Wilson St | Holcomb St | 450 | 16 | 800 | $ 23320 | $ 29 | $ 7200 | $ 7200 | 10 | 10 | $ 4000 | 400 | $ 10000 | $ - | 10 | $ 2120 | |||||||||||||||||||||||||||||||||||||||||
8 to 14 | 25th St | Sherman St | Sheridan St | 800 | 20 | 1778 | $ 50061 | $ 28 | $ 16000 | $ 16000 | 10 | 5 | $ 7556 | 1 | 800 | $ 21500 | $ - | $ 5000 | 10 | $ 5006 | |||||||||||||||||||||||||||||||||||||||
2 to 6 | Hancock St | SR 20 | 9th St | 1100 | 20 | 2444 | $ 67833 | $ 28 | $ 22000 | $ 22000 | 15 | 5 | $ 14667 | 1000 | $ 25000 | $ - | 10 | $ 6167 | |||||||||||||||||||||||||||||||||||||||||
Benton St | Washington St | Lawrence St | 1160 | 22 | 2836 | $ 74468 | $ 26 | $ 25520 | $ 25520 | 10 | 10 | $ 14178 | 140 | 4 | 600 | $ 28000 | 10 | $ 6770 | |||||||||||||||||||||||||||||||||||||||||
W St | San JuanAdmiralty | Walnut St | 2560 | 22 | 6258 | $ 163807 | $ 26 | $ 56320 | $ 56320 | 10 | 5 | $ 26596 | 200 | 4 | 2000 | $ 66000 | $ - | 10 | $ 14892 | ||||||||||||||||||||||||||||||||||||||||
6 to 8 | Walnut | W Street | Jackson | 2300 | 22 | 5622 | $ 145194 | $ 26 | $ 50600 | $ 50600 | 10 | 5 | $ 23894 | 2300 | $ 57500 | $ - | 10 | $ 13199 | |||||||||||||||||||||||||||||||||||||||||
6 to 8 | 24th St | Discovery Rd | San Juan Ave | 1250 | 18 | 2500 | $ 63938 | $ 26 | $ 22500 | $ 22500 | 10 | 5 | $ 10625 | 1000 | $ 25000 | $ - | 10 | $ 5813 | |||||||||||||||||||||||||||||||||||||||||
6 to 10 | Tyler St | Lawrence St | Blaine St | 900 | 32 | 3200 | $ 78980 | $ 25 | $ 28800 | $ 28800 | 5 | 5 | $ 8000 | 200 | $ 5000 | 2 | $ 30000 | 10 | $ 7180 | ||||||||||||||||||||||||||||||||||||||||
4 to 12 | McPherson St | SR 20 | Discovery Rd | 2925 | 32 | 10400 | $ 244860 | $ 24 | $ 93600 | $ 93600 | 5 | 5 | 2925 | $ 84500 | 230 | 2 | 1200 | $ 44500 | $ - | $ - | 10 | $ 22260 | |||||||||||||||||||||||||||||||||||||
10 | Landes St | 12th St | 19th St | 1820 | 32 | 6471 | $ 151821 | $ 23 | $ 58240 | $ 58240 | 5 | 1400 | $ 39324 | 400 | $ 10000 | 2 | $ 30000 | $ 5000 | 10 | $ 14256 | |||||||||||||||||||||||||||||||||||||||
6 to 8 | Discovery Rd | 19th | Hastings Ave | 2900 | 22 | 7089 | $ 136565 | $ 19 | $ 63800 | $ 63800 | 15 | 10 | $ 47850 | 500 | $ 12500 | $ - | 10 | $ 12415 | |||||||||||||||||||||||||||||||||||||||||
8 to 12 | Hastings Ave | Discovery Rd | County Line | 8450 | 32 | 30044 | $ 542349 | $ 18 | $ 270400 | $ 270400 | 5 | 10 | 5000 | $ 197644 | 1000 | $ 25000 | $ - | 10 | $ 49304 | ||||||||||||||||||||||||||||||||||||||||
6 to 12 | Washington St | Van Buren St | SR20 | 2025 | 30 | 6750 | $ 118388 | $ 18 | $ 60750 | $ 60750 | 5 | 5 | $ 16875 | 0 | 0 | 0 | $ - | 2 | $ 30000 | $ - | 10 | $ 10763 | |||||||||||||||||||||||||||||||||||||
14 | Blaine St | San Juan Ave | Walker St | 1275 | 48 | 6800 | $ 113910 | $ 17 | $ 61200 | $ 61200 | 5 | $ 11900 | $ - | 2 | $ 30000 | $ 5000 | 10 | $ 10810 | |||||||||||||||||||||||||||||||||||||||||
6 | Washington St | Harrison St | Taylor St | 1175 | 33 | 4308 | $ 59240 | $ 14 | $ 38775 | $ 38775 | 10 | $ 15079 | $ - | $ - | 10 | $ 5385 | |||||||||||||||||||||||||||||||||||||||||||
8 to 10 | Sheridan St | SR 20 | 19th St | 4000 | 46 | 20444 | $ 272922 | $ 13 | $ 184000 | $ 184000 | 5 | 5 | $ 51111 | 200 | 2 | $ 13000 | $ - | 10 | $ 24811 | ||||||||||||||||||||||||||||||||||||||||
8 to 10 | 19th St | San Juan Ave | Sheridan St | 3200 | 48 | 17067 | $ 197120 | $ 12 | $ 153600 | $ 153600 | 3 | 3 | $ 25600 | 0 | 0 | 0 | $ - | $ - | 10 | $ 17920 | |||||||||||||||||||||||||||||||||||||||
10 to 20 | San Juan Ave | F St | Lopez Ave | 2800 | 32 | 9956 | $ 110059 | $ 11 | $ 89600 | $ 89600 | 3 | $ 10453 | $ - | $ - | 10 | $ 10005 | |||||||||||||||||||||||||||||||||||||||||||
10 to 20 | F St | Hastings Ave | Tyler St | 5300 | 31 | 18256 | $ 180730 | $ 10 | $ 164300 | $ 164300 | $ - | $ - | $ - | 10 | $ 16430 | ||||||||||||||||||||||||||||||||||||||||||||
$ 9952406 | $ 1873288 | $ 31744 | $ 274803 | $ 32667 | $ 332896 | $ 1998646 | $ 4544044 | $ 1155207 | $ 1747625 | $ 1215000 | $ 1290529 | $ - 0 | |||||||||||||||||||||||||||||||||||||||||||||||
Review Preservation Program
Review of Part 1 Present types of pavement treatments and costs
Part 2 Present what a hypothetical $10 Million Dollar over 10-year investment option looks like
What is Pavement Preservation
For the purpose of the Comprehensive Streets Program pavement preservation is the investment the City makes in managing existing pavement
Pavement preservation are not considered improvement projects (refer to Chapter 4) Improvements projects are typically the addition of sidewalks bike lanes public space etc Pavement preservation is investment in managing our existing roads as they are Side note 1 some improvement projects like Discovery Road impact
pavement preservation program in a positive way by eliminating the need for city investment over the next 20 years
Side note 2 pavement preservation makes nominal investments in safety by fixing shoulders
Lawrence near Monroe St
San Juan near the Cemetery
Estimated 2020 Revenues 2020Motor Vehicle Fuel Tax $217000
Utility Tax $695000
P A V E M E N TO P T I O N S
1 Chip Seal
2 Pulverize and Chip Seal
3 Asphalt Overlay
4 Pulverize and Asphalt Paving
5 Reconstruction
$
$$
$$
$$$
$$$$$
Cost Treatment______
C H I P S E A L
bull $7065 per Block (250rsquox24rsquo)
bull $1104 SY
bull Seals Cracks
bull Provides a Wear Course
bull 10 ndash 15 Year Longevity
P U L V E R I Z E C H I P S E A L
bull $21680 per Block (250rsquox24rsquo)
bull $3252 SY
bull Generally Requires Some Stormwater Infrastructure
bull 10 ndash 15 Year Longevity
A S P H A L TO V E R L A Y
bull $22596 per Block (250rsquox32rsquo)
bull $2542 SY
bull Generally Requires Some Stormwater Infrastructure
bull Requires ADA Ramp Upgrades If Adjacent
bull 15 ndash 25 Year Longevity
P U L V E R I Z E A S P H A L T
bull $34222 per Block (250rsquox24rsquo)
bull $5133 SY
bull Generally Requires Some Stormwater Infrastructure
bull Requires ADA Ramp Upgrades If Adjacent
bull 15 ndash 25 Year LongevityWashington Street amp Harrison Street
R E C O N S T R U C T I O N
bull $99004 per Block (250rsquox32rsquo)
bull $11138 SY
bull Generally Requires Stormwater Infrastructure
bull Requires ADA Ramp Upgrades If Adjacent
bull 20 ndash 25 Year LongevityWater Street amp Fillmore Street
A D D I T I O N A L C O S T S
bull Drainage Swales amp Stormwater Infrastructure
bull Digoutsbull ADA Curb Rampsbull EngineeringAdministrationbull Digouts and pre-level
Stormwater at Pacific Avenue amp Milo Street
ADA needs at Lawrence Street amp Adams Street
Insert I worq street rating
1 How many street segments were rated
1 Insert map of 10 year program
1 Insert table Too small to read is ok Wersquoll include it as a handout in 11x17
Rem
aini
ng
Serv
ice Li
feRoad Name From To
Length (ft)
Width (ft)
Area (SY)
Total Construction
Price(SY)
Re
cons
truc
tion
Pul
veriz
e amp
Pa
ve
Ash
palt
Ove
rlay
Pav
e Gr
avel
Ro
ad
Pul
veriz
e amp
Ch
ip S
eal
Chi
p Se
al
Tot
al B
ase
Pavi
ng C
osts
Dig
outs
(SY)
Pre
-Lev
elin
g(S
Y)
Con
stru
ct
Shou
lder
s Bot
h Si
des (
LF)
Pre
para
tion
Tota
l
Sto
rmw
ater
Pipe
s (LF
)
Sto
rmw
ater
Catc
hbas
ins
Sto
rmw
ater
Swal
es (L
F)
Sto
rmw
ater
To
tal
Cur
b Ra
mps
Cur
b Ra
mps
To
tal
Sur
veyi
ng
Eng
inee
ring
amp
Adm
inist
ratio
n
Eng
inee
ring
amp
Adm
inist
ratio
n To
tal
$102 $45 $22 $35 $29 $9 $35 $15 $20 $50 $1500 $25 $150002 Polk St - Street Lawrence St 1056 200 56 1244 210679$ 169$ 127518$ 127518$ -$ 150 1 1 9025$ 2 30000$ 10000$ 25 44136$ 6 47th Street Pettygrove McNeil 500 18 1548 258717$ 167$ 158624$ 158624$ -$ 687 8 46350$ -$ 10000$ 25 53743$
6 to 10 Lawrence St Calhoun St Harrison St 1200 36 4800 786070$ 164$ 491856$ 491856$ 600 15000$ 8$ 120000$ 10000$ 25 159214$ 8 Lawrence St Cass St Calhoun St 250 36 1000 146213$ 146$ 102470$ 102470$ 0 0 -$ 75 350 12500$ -$ 10000$ 25 31243$ 8 Lawrence St Walker St Cass St 250 36 1000 144650$ 145$ 102470$ 102470$ -$ 100 250 11250$ -$ 10000$ 25 30930$
4 to 8 San Juan Ave Lopez Ave Admiralty 2300 34 8689 1222938$ 141$ 890350$ 890350$ -$ 800 5 1500 85000$ -$ 15000$ 25 247588$ 6 to 8 Lawrence St Harrison St Monroe St 2380 47 12429 1331314$ 107$ 274803$ 274803$ 15 5 74573$ 1900 10 110000$ 50 750000$ 10000$ 10 121938$ 2 to 4 Center St San Juan Ave Redwood St 1660 16 2951 295222$ 100$ 86910$ 86910$ -$ 1600 9 3000 168500$ -$ 10000$ 15 39812$ 0 to 6 Pacific St Cedar St Tremont St 400 16 711 66581$ 94$ 31744$ 31744$ -$ 100 2 700 25500$ -$ 5000$ 15 9337$ 0 to 6 Benton St Lawrence Lincoln Blg 580 36 2320 203265$ 88$ 20880$ 20880$ 20 10 19720$ 250 2 15500$ 8 120000$ 5000$ 15 27165$
2 Grant St 14th St 16th St 525 16 933 73635$ 79$ 27487$ 27487$ -$ 400 2 500 35500$ -$ 8000$ 15 10648$ 2 to 6 Olympic St Cedar St Tremont St 536 12 715 52716$ 74$ 21047$ 21047$ -$ 950 23750$ -$ 8000$ 15 7920$
2 Milo St Olympic Ave Pacific Ave 466 12 621 44793$ 72$ 18298$ 18298$ -$ 800 20000$ -$ 5000$ 15 6495$ 0 11th St Hendricks St Sheridan St 550 16 978 65077$ 67$ 28796$ 28796$ -$ 100 2 750 26750$ -$ 8000$ 15 9532$ 0 58th St Hill St Kuhn St 525 16 933 60329$ 65$ 32667$ 32667$ -$ 750 18750$ -$ 8000$ 15 8913$ 2 10th St Hendricks St Grant St 283 18 566 34294$ 61$ 16669$ 16669$ -$ 500 12500$ -$ 5000$ 15 5125$
4 to 10 31st St Hancock St Sheridan St 1050 22 2567 150027$ 58$ 23100$ 23100$ 10 10 12833$ 1200 10 1000 100000$ -$ 5000$ 10 14093$ 6 25th St Sheridan St Holcomb St 1200 18 2400 125895$ 52$ 70680$ 70680$ -$ 125 1 1200 37750$ -$ 8000$ 15 17465$ 6 Holcomb St 7th St 10th St 850 12 1133 58703$ 52$ 10200$ 10200$ 10 10 5667$ 1500 37500$ -$ -$ 10 5337$ 2 Hendricks St 9th St 12th St 800 16 1422 70930$ 50$ 41884$ 41884$ -$ 750 18750$ -$ 8000$ 15 10295$
2 to 6 Hill St 19th 21st St 807 16 1435 67443$ 47$ 21125$ 6456$ 27581$ 10 5021$ 1000 25000$ -$ 8000$ 15 9840$ 2 to 8 57th St Jackman St Kuhn St 800 18 1600 66550$ 42$ 14400$ 14400$ 20 10 13600$ 1300 32500$ 10 6050$ 6 to 8 Sheridan St Hastings Ave SilverUmatilla 1750 22 4278 154115$ 36$ 38500$ 38500$ 20 10 36361$ 300 4 1500 58500$ -$ 5000$ 15 20754$ 6 to 10 Tyler St Jefferson St Lawrence St 900 32 3200 115280$ 36$ 28800$ 28800$ 5 5 8000$ 100 2 8000$ 4 60000$ 10 10480$ 6 to 14 14th St McPherson St Sheridan St 2375 21 5542 182027$ 33$ 49875$ 49875$ 20 10 47104$ 750 4 1000 68500$ -$ 10 16548$
8 49th St Kuhn St Admiralty Ave 400 24 1067 34613$ 32$ 9600$ 9600$ 5 1867$ 800 20000$ -$ 10 3147$ 6 to 10 Fir St F St UCherry 4360 22 10658 341621$ 32$ 95920$ 95920$ 5 5 4000 106644$ 100 2 4000 108000$ -$ 10 31056$ 6 to 8 Cedar St San Juan Ave Redwood St 1460 16 2596 81747$ 31$ 23360$ 23360$ 20 20 25956$ 1000 25000$ -$ 10 7432$
8 Clallam St McKinley St Roosevelt St 975 14 1517 46796$ 31$ 13650$ 13650$ 20 10 12892$ 200 4 16000$ -$ 10 4254$ 6 San Juan Ave 19th St 20th St 300 31 1033 31827$ 31$ 9300$ 9300$ 50 10 19633$ -$ -$ 10 2893$
6 to 20 Cherry St F St W St 4200 32 14933 457307$ 31$ 134400$ 134400$ 5 5 4200 121333$ 200 6000 160000$ -$ 10 41573$ 6 to 8 Jackman St 45th St 49th St 1100 22 2689 81940$ 30$ 24200$ 24200$ 15 10 18150$ 225 3 500 28250$ -$ 5000$ 15 11340$ 6 to 12 Jackson St LawrenceMonroe Roosevelt St 1600 18 3200 93530$ 29$ 28800$ 28800$ 10 10 16000$ 1000 25000$ 1 15000$ 2500$ 10 8730$
2 7th St Wilson St Holcomb St 450 16 800 23320$ 29$ 7200$ 7200$ 10 10 4000$ 400 10000$ -$ 10 2120$ 8 to 14 25th St Sherman St Sheridan St 800 20 1778 50061$ 28$ 16000$ 16000$ 10 5 7556$ 1 800 21500$ -$ 5000$ 10 5006$ 2 to 6 Hancock St SR 20 9th St 1100 20 2444 67833$ 28$ 22000$ 22000$ 15 5 14667$ 1000 25000$ -$ 10 6167$
Benton St Washington St Lawrence St 1160 22 2836 74468$ 26$ 25520$ 25520$ 10 10 14178$ 140 4 600 28000$ 10 6770$ W St San JuanAdmiralty Walnut St 2560 22 6258 163807$ 26$ 56320$ 56320$ 10 5 26596$ 200 4 2000 66000$ -$ 10 14892$
6 to 8 Walnut W Street Jackson 2300 22 5622 145194$ 26$ 50600$ 50600$ 10 5 23894$ 2300 57500$ -$ 10 13199$ 6 to 8 24th St Discovery Rd San Juan Ave 1250 18 2500 63938$ 26$ 22500$ 22500$ 10 5 10625$ 1000 25000$ -$ 10 5813$ 6 to 10 Tyler St Lawrence St Blaine St 900 32 3200 78980$ 25$ 28800$ 28800$ 5 5 8000$ 200 5000$ 2 30000$ 10 7180$ 4 to 12 McPherson St SR 20 Discovery Rd 2925 32 10400 244860$ 24$ 93600$ 93600$ 5 5 2925 84500$ 230 2 1200 44500$ -$ -$ 10 22260$
10 Landes St 12th St 19th St 1820 32 6471 151821$ 23$ 58240$ 58240$ 5 1400 39324$ 400 10000$ 2 30000$ 5000$ 10 14256$ 6 to 8 Discovery Rd 19th Hastings Ave 2900 22 7089 136565$ 19$ 63800$ 63800$ 15 10 47850$ 500 12500$ -$ 10 12415$ 8 to 12 Hastings Ave Discovery Rd County Line 8450 32 30044 542349$ 18$ 270400$ 270400$ 5 10 5000 197644$ 1000 25000$ -$ 10 49304$ 6 to 12 Washington St Van Buren St SR20 2025 30 6750 118388$ 18$ 60750$ 60750$ 5 5 16875$ 0 0 0 -$ 2 30000$ -$ 10 10763$
14 Blaine St San Juan Ave Walker St 1275 48 6800 113910$ 17$ 61200$ 61200$ 5 11900$ -$ 2 30000$ 5000$ 10 10810$ 6 Washington St Harrison St Taylor St 1175 33 4308 59240$ 14$ 38775$ 38775$ 10 15079$ -$ -$ 10 5385$
8 to 10 Sheridan St SR 20 19th St 4000 46 20444 272922$ 13$ 184000$ 184000$ 5 5 51111$ 200 2 13000$ -$ 10 24811$ 8 to 10 19th St San Juan Ave Sheridan St 3200 48 17067 197120$ 12$ 153600$ 153600$ 3 3 25600$ 0 0 0 -$ -$ 10 17920$
10 to 20 San Juan Ave F St Lopez Ave 2800 32 9956 110059$ 11$ 89600$ 89600$ 3 10453$ -$ -$ 10 10005$ 10 to 20 F St Hastings Ave Tyler St 5300 31 18256 180730$ 10$ 164300$ 164300$ -$ -$ -$ 10 16430$
9952406$ 1873288$ 31744$ 274803$ 32667$ 332896$ 1998646$ 4544044$ 1155207$ 1747625$ 1215000$ 1290529$
9 Stormwater Base Paving Costs Preperation EngineeringADA
Chip Seal
Pulverize amp Chip Seal
Pulverize amp Asphalt
Asphalt Overlay
Reconstruction
1 Insert summary table of average costs of ada sw eng digouts etc
Additional Paving Costs Average Cost per SY Percent of Paving CostDigouts amp Pre-Leveling $4 25Stormwater $7 38ADA $5 27Engineering amp Administration $5 28
Chip Seal
Pulverize amp Chip Seal
Pulverize amp Asphalt
Asphalt Overlay
Reconstruction
1 Insert total costs for the entire city based on pavement rating
RSL Length (FT) Area (SY) Condition Treatment Cost Total20 61834 138524 131 Good $0 $014 23656 49915 47 $147055212 43586 106382 100 $313413410 74803 193570 182 $57027908 96662 228046 215 $67184926 95452 261794 247 $174899304 6420 14536 14 $9711212 29238 60616 57 Poor Rehab $107 $64928500 3851 7532 07 Very Poor Rebuild $155 $1169719
$43149589
Satisfactory Chip Seal $29
Fair Overlay $67
Chip Seal
Pulverize amp Chip Seal
Pulverize amp Asphalt
Asphalt Overlay
Reconstruction
Fir Street Asphalt Overlay in early 1990s Inadequate Stormwater System Water Intrusion Inadequate Base Material
San Juan Avenue Reconstructed 1997
New ADA Sidewalks
Complete Stormwater System
Lawrence Street Chip Sealed in 2000
Inadequate Base
Water Intrusion
F Street Reconstructed 2001 2002
New ADA Sidewalks
Complete Stormwater System
Best Streets First
Stop the Continued Decay of our Streets
Slowly Rebuild Street System Investment
1 Introduction
2 Public Engagement
3 Street Operations
4 Street Improvements
5 Street Preservation
6 Street Programming
7 Funding Options
8 Recommendations
January
February
April
March
May
June
Encouraging the public to be involved through Engage PTwwwcityofptusengagept
Street Pavement Improvement Plan Projects | 9 | 110 | |||||||||||||||||||||||||||||||||||||||||||||
Road Name | From | To | Iworq ID | Length (ft) | Width (ft) | Area (yd^2) | Actual Area(SY) | Unit Cost per yd2 | Construction Cost | Prep Work | Survey Testing | ADA Curb Ramps | Storm Water | Mill amp Fill$50SY | Pre-Level$4SY | Total Construction | Project Cost + 10 | Unit Cost w Additional Costs no 10 | Engineering Costs | Notes | |||||||||||||||||||||||||||
Priority | Reconstruct | 2021 | 2022 | 2023 | 2024 | ||||||||||||||||||||||||||||||||||||||||||
1 | Reconstruct | Lawrence St | Cass St | Calhoun St | 1304 | 250 | 36 | 1000 | $ 80 | $ 80000 | $ 5000 | $ 20000 | $ 105000 | $ 115500 | $ 105 | Stormwater South Side Parking Raingarden on Cass | |||||||||||||||||||||||||||||||
2 | Reconstruct | Lawrence St | Walker St | Cass St | 250 | 36 | 1000 | $ 80 | $ 80000 | $ 5000 | $ 20000 | $ 5000 | $ 110000 | $ 121000 | $ 110 | Stormwater South Side Parking | |||||||||||||||||||||||||||||||
3 | Reconstruct Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | San Juan Ave | Lopez Ave | Admiralty | 2300 | 32 | 8178 | $ 50 | $ 408889 | $ 10000 | $ 100000 | $ 518889 | $ 570778 | $ 63 | Stormwater Problem 45th | ||||||||||||||||||||||||||||||||
4 | Reconstruct Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Polk St - Street Improvements | Lawrence St | 1056 Sarah Tiffany Sarah TiffanyGarfield | 1073 | 200 | 56 | 1244 | $ 50 | $ 62222 | X | X | X | $ 62222 | $ 68444 | $ 50 | Parking Theater 4 AC Watermain Infiltration or Rain Garden Parking on Condo Side | ||||||||||||||||||||||||||||||
Reconstruct | 47th Street | Pettygrove | McNeil | 500 | 18 | 1000 | 1548 | $ 50 | $ 50000 | $ 5000 | $ 40000 | $ 95000 | $ 104500 | $ 95 | $210000 Engineers Estimate With Engineering Cost Turnaround Spaghetti Waterline | ||||||||||||||||||||||||||||||||
Chip Seal - $50000 to $70000 per Mile | $6 No DigoutsPre-leveling | $10 with Additional Prep Work | |||||||||||||||||||||||||||||||||||||||||||||||
Chip Seal | Washington St | Van Buren St | SR20 | 2025 | 30 | 6750 | $ 10 | $ 67500 | $ 67500 | $ 74250 | Digouts Flagging | ||||||||||||||||||||||||||||||||||||
Chip Seal | Hastings Ave - Pre-level and widen shoulders | Discovery Rd | County Line | 8450 | 24 | 22533 | $ 6 | $ 135200 | $ 135200 | $ 148720 | Ditches amp Culverts Total Width change from 21 to 24 How wide will shoulders be | ||||||||||||||||||||||||||||||||||||
Tyler St | Jefferson St | Lawrence St | 900 | 32 | 3200 | $ 6 | $ 19200 | $ 19200 | $ 21120 | ||||||||||||||||||||||||||||||||||||||
Chip Seal | McPherson - Chip Seal | 4th St | Discovery Rd | 3100 | 32 | 11022 | $ 6 | $ 66133 | $ 66133 | $ 72747 | Ditches amp Culverts Shoulder Wideneing | ||||||||||||||||||||||||||||||||||||
Chip Seal | 19th St - Chip Seal | San Juan Ave | Sheridan St | 3200 | 48 | 17067 | $ 6 | $ 102400 | $ 102400 | $ 112640 | Bike Lanes amp Shoulder Prelevel | ||||||||||||||||||||||||||||||||||||
Chip Seal | Walnut | W Street | Jackson | 2300 | 22 | 5622 | $ 6 | $ 33733 | $ 33733 | $ 37107 | Dig-Outs Pre-Leveling Striping Shoulders | ||||||||||||||||||||||||||||||||||||
Chip Seal | Fir St - Chip Seal | F St | UCherry | 4360 | 22 | 10658 | $ 10 | $ 106578 | X | X | $ 106578 | $ 117236 | Dig-Outs Pre-Leveling Striping | ||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | |||||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | P St - Chip Seal | Redwood St | Cedar St | 0486 | 300 | 16 | 533 | $ 20 | $ 10667 | $ 10667 | $ 11733 | Watermain Looping Shouldnt this be part of Center | |||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 25th St - Chip Seal | Sheridan St | Holcomb St | 1200 | 18 | 2400 | $ 20 | $ 48000 | $ 48000 | $ 52800 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 14th St - Chip Seal | $ - | $ - | ||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Cedar St - Chip Seal | Redwood St | San Juan Ave | 1460 | 16 | 2596 | $ 20 | $ 51911 | $ 51911 | $ 57102 | Ex ChipSeal 22 Wide | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Center St - Chip Seal | Redwood St | San Juan Ave | 484 | 1660 | 16 | 2951 | $ 20 | $ 59022 | $ 59022 | $ 64924 | Ex ChipSeal 22 Wide Stormwater | |||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Grant St Chip Seal | 14th St | 16th St | 525 | 16 | 933 | $ 20 | $ 18667 | $ 18667 | $ 20533 | Ex Street 10 Wide | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 11th St Chip Seal | Hendricks St | Sheridan St | 550 | 16 | 978 | $ 20 | $ 19556 | $ 19556 | $ 21511 | Hospital Parking | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Hendricks St Chip Seal | 9th St | 12th St | 800 | 16 | 1422 | $ 20 | $ 28444 | $ 28444 | $ 31289 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 10th St Chip Seal | Hendricks St | Grant St | 1655 | 283 | 18 | 566 | $ 20 | $ 11320 | $ 11320 | $ 12452 | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Grant St Chip Seal | 14th St | 16th St | 525 | 18 | 1050 | $ 20 | $ 21000 | $ 21000 | $ 23100 | Ex Street 10 Wide Stormwater | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Hill St | 21st St | 19th St | 807 | 16 | 1435 | $ 20 | $ 28693 | $ 28693 | $ 31563 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Milo St -Chip seal | Olympic Ave | Pacific Ave | 0003 | 466 | 12 | 621 | $ 20 | $ 12427 | $ 12427 | $ 13669 | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Olympic St | Cedar St | Tremont St | 536 | 12 | 715 | $ 20 | $ 14293 | $ 14293 | $ 15723 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Benton St - street improvement | Blaine St | Lincoln Blg | 580 | 36 Sarah Tiffany Sarah TiffanyEstimated at 25-36 used higher number | Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Sarah Tiffany Sarah TiffanyGarfield | 2320 | $ 20 | $ 46400 | $ 46400 | $ 51040 | ||||||||||||||||||||||||||||||||||
Pave Gravel Road | |||||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Pacific St | Cedar St | Tremont St | 400 | 16 | 711 | $ 50 | $ 35556 | $ 6000 | $ 15000 | $ 56556 | $ 62211 | $ 80 | ||||||||||||||||||||||||||||||||||
58th St | Hill St | Kuhn St | 525 | 16 | 933 | $ 50 | $ 46667 | $ 6000 | $ 20000 | $ 72667 | $ 79933 | $ 78 | 4 AC Waterline Driveways Site Distance (Re-grade Slope) | ||||||||||||||||||||||||||||||||||
Sidewalks | |||||||||||||||||||||||||||||||||||||||||||||||
Harrison St | Franklin St | Clay St | 340 | 6 | 227 | $ 165 | $ 56100 | $ 5000 | $ 61100 | $ 67210 | $ 180 | ||||||||||||||||||||||||||||||||||||
9th St | Hancock St | McPherson St | 1300 | 6 | 867 | $ 165 | $ 214500 | $ 10000 | $ 15000 | $ 239500 | $ 263450 | $ 184 | |||||||||||||||||||||||||||||||||||
Asphalt Path | |||||||||||||||||||||||||||||||||||||||||||||||
Spruce St Easement | Cedar St | Center St | 150 | 8 | 133 | $ 50 | $ 6667 | $ 2000 | $ 8667 | $ 9533 | $ 65 | ||||||||||||||||||||||||||||||||||||
Cherry St | A St | E St | 990 | 10 | 1100 | $ 50 | $ 55000 | $ 10000 | $ 10000 | $ 15000 | $ 90000 | $ 99000 | $ 82 | ||||||||||||||||||||||||||||||||||
Gravel Path | |||||||||||||||||||||||||||||||||||||||||||||||
16th St | Thomas St | Grant St | 1700 | 6 | 1133 | $ 15 | $ 17000 | $ 1500 | $ 18500 | $ 20350 | |||||||||||||||||||||||||||||||||||||
Cleveland St | 21st St | 23rd St | 500 | 6 | 333 | $ 15 | $ 5000 | $ 5000 | $ 5500 | Need Easement | |||||||||||||||||||||||||||||||||||||
6 | - | $ 15 | $ - | $ - | $ - | Need Easement | |||||||||||||||||||||||||||||||||||||||||
6 | - | $ 15 | $ - | $ - | $ - | Need Easement | |||||||||||||||||||||||||||||||||||||||||
Total | $ 1582256 | $ 1792256 | $ 1971481 | ||||||||||||||||||||||||||||||||||||||||||||
Project Descriptioin | Length | Width | Construction Costs | ConstructionUnit Costs | Units | Engineering Costs | Total CostsUnit Cost | Total Costs | Total CostsUnit Cost | Notes | |||||||||||
Sidewalk | |||||||||||||||||||||
9th Street Sidewalk Grant Street to Hancock Street | 826 | 6 | $ 141506 | $ 17131 | LF | Construction Unit Cost per Foot | |||||||||||||||
Jefferson Street Sidewalk Washington Street to Taylor Street | 724 | 6 | $ 390502 | $ 53937 | LF | Construction Unit Cost per Foot | |||||||||||||||
Landis Street Sidewalk 10th Street to 19th Street | 1795 | 6 | $ 364550 | $ 20309 | LF | Construction Unit Cost per Foot | |||||||||||||||
ADA Corner Ramps | |||||||||||||||||||||
Washington Street amp Harrison Street | $ 42000 | $ 42000 | Each | ||||||||||||||||||
Washington Street amp Adams Street | $ 38150 | $ 19075 | Each | Two Corners Were Retrofitted | |||||||||||||||||
Chip Seal Pavement | |||||||||||||||||||||
Walker Street Washington Street to Lawrence Street | 1144 | 24 | $ 20000 | $ 656 | SY | Does not include flagging nor prep work | |||||||||||||||
Pulverize amp Asphalt Paving | |||||||||||||||||||||
Washington Street VanBuren Street to Harrison Street | 300 | 22 | $ 35000 | $ 4773 | SY | ||||||||||||||||
Asphalt Overlay | |||||||||||||||||||||
Sidewalks | ||||||||||||||||||||||||||||||||||||||
Harrison St | Franklin St | Clay St | 340 | 6 | 227 | |||||||||||||||||||||||||||||||||
9th St | Hancock St | McPherson St | 1300 | 6 | 867 | |||||||||||||||||||||||||||||||||
Asphalt Path | ||||||||||||||||||||||||||||||||||||||
Spruce St Easement | Cedar St | Center St | 150 | 8 | 133 | $ 2000 | $ 2000 | $ 2000 | ||||||||||||||||||||||||||||||
Cherry St | A St | E St | 990 | 10 | 1100 | $ 10000 | $ 10000 | $ 10000 | ||||||||||||||||||||||||||||||
Gravel Path | ||||||||||||||||||||||||||||||||||||||
16th St | Thomas St | Grant St | 1700 | 6 | 1133 | $ 1500 | $ 1500 | $ 1500 | ||||||||||||||||||||||||||||||
Cleveland St | 21st St | 23rd St | 500 | 6 | 333 | Need Easement | ||||||||||||||||||||||||||||||||
6 | - | Need Easement | ||||||||||||||||||||||||||||||||||||
6 | - | Need Easement | ||||||||||||||||||||||||||||||||||||
Total |
Type | Improvement | Cost Range SY | Cost Range LF | ||||||||
1 | Complete Road Rebuild | $80 | $100 | ||||||||
2 | Asphalt Overlay | $50 | $60 | ||||||||
3 | Pulverize amp Chip Seal | $20 | $30 | ||||||||
4 | Chip Seal | $6 | $10 | $12 | $25 | ||||||
5 | Seal Coat | ||||||||||
6 | |||||||||||
7 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 3-Inch | 413 | TONS | $ 15000 | $ 6187500 | 1000 x 22 x 025 httpwwwamerasphaltcomasphalthtm | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 1630 | CY | $ 4800 | $ 7824000 | Water Street Project = $48 CY (1000 x 22 x 2)27 = 1630 CY | ||||||
Gravel Borrow | 2282 | TONS | $ 3000 | $ 6846000 | (1000 x 22 x 2)27 = 1630 1630 CY x 14 = 2282 Tons | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 128 | Hours | $ 5728 | $ 733133 | (2) People for 64 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 25043033 | |||||||||||
$ 10247 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 2-Inch | 275 | TONS | $ 15000 | $ 4125000 | 1000 x 22 x 017 httpwwwamerasphaltcomasphalthtm | | ||||||
Digouts amp Pre-leveling | 122 | SY | $ 4900 | $ 597800 | |||||||
Flagging | 64 | Hours | $ 5728 | $ 366566 | (2) People for 32 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 180000 | $ 180000 | |||||||
$ 5403066 | |||||||||||
$ 2211 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 3-Inch | 413 | TONS | $ 15000 | $ 6187500 | 1000 x 22 x 025 httpwwwamerasphaltcomasphalthtm | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 150 | CY | $ 4800 | $ 720000 | Water Street Project = $48 CY | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 96 | Hours | $ 5728 | $ 549850 | (2) People for 48 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 10909750 | |||||||||||
$ 4464 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Chip Seal | 2444 | SY | $ 1050 | $ 2566200 | 1000 X 22 | Unit Cost $525 SY from Walker Street County Invoice Doubled to $1050 for Chip Seal Over Gravel | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 150 | CY | $ 4800 | $ 720000 | Water Street Project = $48 CY | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 80 | Hours | $ 5728 | $ 458208 | (2) People for 40 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | Hours | $ 12500 | $ - 0 | High Average Loaded Rate No Testing | ||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 7196808 | |||||||||||
$ 2945 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 1500000 | $614 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 500 | LF | $ 5000 | $ 2500000 | |||||||
Catch Basins | 4 | EACH | $ 150000 | $ 600000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Chip Seal | 2444 | SY | $ 525 | $ 1283100 | 1000 X 22 | Unit Cost from Walker Street County Invoice | ||||||
Digouts amp Pre-leveling | 122 | SY | $ 4900 | $ 598780 | Cost from 2018 Lakeside Mill amp Fill | Estimate Quanity Based on 5 | ||||||
Flagging | 32 | Hours | $ 5728 | $ 183283 | (2) People for 16 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | Hours | $ 12500 | $ - 0 | High Average Loaded Rate No Surveying or Testing | ||||||
Surveying | 1 | LS | $ - 0 | $ - 0 | |||||||
$ 2198863 | |||||||||||
$ 900 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 1500000 | $614 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY |
Project Descriptioin | Length | Width | Construction Costs | Engineering Costs | Engineering Total | Digouts Pre-Leveling Costs | Digouts Pre-Leveling Total | ADACosts | ADATotal | StormwaterCosts | StormwaterTotal | Total Costsby SY | Cost Per 250 Block | Length | Width | Notes | |||||||||||||||||
Chip Seal Pavement | |||||||||||||||||||||||||||||||||
Walker Street Washington Street to Lawrence Street | 1144 | 24 | $ 25000 | 15 | $ 3750 | 10 | $ 2500 | $ 1024 | $ 682911 | 250 | 24 | ||||||||||||||||||||||
Pulverize amp Chip Seal | |||||||||||||||||||||||||||||||||
Engineers Estimate | 250 | 24 | $ 22000 | 15 | $ 3300 | 0 | $ - | 20 | $ 4400 | $ 4455 | $ 2970000 | 250 | 24 | ||||||||||||||||||||
Pulverize amp Asphalt Paving | |||||||||||||||||||||||||||||||||
Washington Street VanBuren Street to Harrison Street | 300 | 22 | $ 35000 | 20 | $ 7000 | 0 | $ - | 10 | $ 3500 | 20 | $ 7000 | $ 7159 | $ 4772727 | 250 | 24 | ||||||||||||||||||
Asphalt Overlay (2) | |||||||||||||||||||||||||||||||||
Engineers Estimate | 250 | 24 | $ 21334 | 20 | $ 426680 | 10 | $ 2133 | 20 | $ 426680 | 20 | $ 426680 | $ 5440 | $ 4835707 | 250 | 32 | ||||||||||||||||||
Reconstruction | |||||||||||||||||||||||||||||||||
Walker Street Lawrence Street to Blaine Street | 650 | 36 | $ 184310 | 25 | $ 46078 | 0 | $ - | 20 | $ 36862 | 30 | $ 55293 | $ 12405 | $ 11027094 | 250 | 32 | ||||||||||||||||||
RSL | Length (FT) | Area (SY) | Condition | Treatment | Cost | Total | |||||||||
20 | 61834 | 138524 | 131 | Good | $0 | $0 | |||||||||
14 | 23656 | 49915 | 47 | Satisfactory | Chip Seal | $29 | $1470552 | ||||||||
12 | 43586 | 106382 | 100 | $3134134 | |||||||||||
10 | 74803 | 193570 | 182 | $5702790 | |||||||||||
8 | 96662 | 228046 | 215 | $6718492 | |||||||||||
6 | 95452 | 261794 | 247 | Fair | Overlay | $67 | $17489930 | ||||||||
4 | 6420 | 14536 | 14 | $971121 | |||||||||||
2 | 29238 | 60616 | 57 | Poor | Rehab | $107 | $6492850 | ||||||||
0 | 3851 | 7532 | 07 | Very Poor | Rebuild | $155 | $1169719 | ||||||||
$43149589 | |||||||||||||||
Additional Paving Costs | Average Cost per SY | Percent of Paving Cost | |||
Digouts amp Pre-Leveling | $4 | 25 | |||
Stormwater | $7 | 38 | |||
ADA | $5 | 27 | |||
Engineering amp Administration | $5 | 28 |
9 | Base Paving Costs | Preperation | Stormwater | ADA | Engineering | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Remaining Service Life | Road Name | From | To | Length (ft) | Width (ft) | Area (SY) | Total Construction | Price(SY) | Reconstruction | Pulverize amp Pave | Ashpalt Overlay | Pave Gravel Road | Pulverize amp Chip Seal | Chip Seal | Total Base Paving Costs | Digouts(SY) | Pre-Leveling(SY) | Construct Shoulders Both Sides (LF) | Preparation Total | StormwaterPipes (LF) | StormwaterCatchbasins | StormwaterSwales (LF) | Stormwater Total | Curb Ramps | Curb Ramps Total | Surveying | Engineering amp Administration | Engineering amp Administration Total | Other Work | ||||||||||||||||||||||||||||||
$102 | $45 | $22 | $35 | $29 | $9 | $35 | $15 | $20 | $50 | $1500 | $25 | $15000 | |||||||||||||||||||||||||||||||||||||||||||||||
2 | Polk St - Street | Lawrence St | 1056 | 200 | 56 | 1244 | $ 210679 | $ 169 | $ 127518 | $ 127518 | $ - | 150 | 1 | 1 | $ 9025 | 2 | $ 30000 | $ 10000 | 25 | $ 44136 | |||||||||||||||||||||||||||||||||||||||
6 | 47th Street | Pettygrove | McNeil | 500 | 18 | 1548 | $ 258717 | $ 167 | $ 158624 | $ 158624 | $ - | 687 | 8 | $ 46350 | $ - | $ 10000 | 25 | $ 53743 | |||||||||||||||||||||||||||||||||||||||||
6 to 10 | Lawrence St | Calhoun St | Harrison St | 1200 | 36 | 4800 | $ 786070 | $ 164 | $ 491856 | $ 491856 | 600 | $ 15000 | $ 8 | $ 120000 | $ 10000 | 25 | $ 159214 | ||||||||||||||||||||||||||||||||||||||||||
8 | Lawrence St | Cass St | Calhoun St | 250 | 36 | 1000 | $ 146213 | $ 146 | $ 102470 | $ 102470 | 0 | 0 | $ - | 75 | 350 | $ 12500 | $ - | $ 10000 | 25 | $ 31243 | |||||||||||||||||||||||||||||||||||||||
8 | Lawrence St | Walker St | Cass St | 250 | 36 | 1000 | $ 144650 | $ 145 | $ 102470 | $ 102470 | $ - | 100 | 250 | $ 11250 | $ - | $ 10000 | 25 | $ 30930 | |||||||||||||||||||||||||||||||||||||||||
4 to 8 | San Juan Ave | Lopez Ave | Admiralty | 2300 | 34 | 8689 | $ 1222938 | $ 141 | $ 890350 | $ 890350 | $ - | 800 | 5 | 1500 | $ 85000 | $ - | $ 15000 | 25 | $ 247588 | ||||||||||||||||||||||||||||||||||||||||
6 to 8 | Lawrence St | Harrison St | Monroe St | 2380 | 47 | 12429 | $ 1331314 | $ 107 | $ 274803 | $ 274803 | 15 | 5 | $ 74573 | 1900 | 10 | $ 110000 | 50 | $ 750000 | $ 10000 | 10 | $ 121938 | ||||||||||||||||||||||||||||||||||||||
2 to 4 | Center St | San Juan Ave | Redwood St | 1660 | 16 | 2951 | $ 295222 | $ 100 | $ 86910 | $ 86910 | $ - | 1600 | 9 | 3000 | $ 168500 | $ - | $ 10000 | 15 | $ 39812 | ||||||||||||||||||||||||||||||||||||||||
0 to 6 | Pacific St | Cedar St | Tremont St | 400 | 16 | 711 | $ 66581 | $ 94 | $ 31744 | $ 31744 | $ - | 100 | 2 | 700 | $ 25500 | $ - | $ 5000 | 15 | $ 9337 | ||||||||||||||||||||||||||||||||||||||||
0 to 6 | Benton St | Lawrence | Lincoln Blg | 580 | 36 | 2320 | $ 203265 | $ 88 | $ 20880 | $ 20880 | 20 | 10 | $ 19720 | 250 | 2 | $ 15500 | 8 | $ 120000 | $ 5000 | 15 | $ 27165 | ||||||||||||||||||||||||||||||||||||||
2 | Grant St | 14th St | 16th St | 525 | 16 | 933 | $ 73635 | $ 79 | $ 27487 | $ 27487 | $ - | 400 | 2 | 500 | $ 35500 | $ - | $ 8000 | 15 | $ 10648 | ||||||||||||||||||||||||||||||||||||||||
2 to 6 | Olympic St | Cedar St | Tremont St | 536 | 12 | 715 | $ 52716 | $ 74 | $ 21047 | $ 21047 | $ - | 950 | $ 23750 | $ - | $ 8000 | 15 | $ 7920 | ||||||||||||||||||||||||||||||||||||||||||
2 | Milo St | Olympic Ave | Pacific Ave | 466 | 12 | 621 | $ 44793 | $ 72 | $ 18298 | $ 18298 | $ - | 800 | $ 20000 | $ - | $ 5000 | 15 | $ 6495 | ||||||||||||||||||||||||||||||||||||||||||
0 | 11th St | Hendricks St | Sheridan St | 550 | 16 | 978 | $ 65077 | $ 67 | $ 28796 | $ 28796 | $ - | 100 | 2 | 750 | $ 26750 | $ - | $ 8000 | 15 | $ 9532 | ||||||||||||||||||||||||||||||||||||||||
0 | 58th St | Hill St | Kuhn St | 525 | 16 | 933 | $ 60329 | $ 65 | $ 32667 | $ 32667 | $ - | 750 | $ 18750 | $ - | $ 8000 | 15 | $ 8913 | ||||||||||||||||||||||||||||||||||||||||||
2 | 10th St | Hendricks St | Grant St | 283 | 18 | 566 | $ 34294 | $ 61 | $ 16669 | $ 16669 | $ - | 500 | $ 12500 | $ - | $ 5000 | 15 | $ 5125 | ||||||||||||||||||||||||||||||||||||||||||
4 to 10 | 31st St | Hancock St | Sheridan St | 1050 | 22 | 2567 | $ 150027 | $ 58 | $ 23100 | $ 23100 | 10 | 10 | $ 12833 | 1200 | 10 | 1000 | $ 100000 | $ - | $ 5000 | 10 | $ 14093 | ||||||||||||||||||||||||||||||||||||||
6 | 25th St | Sheridan St | Holcomb St | 1200 | 18 | 2400 | $ 125895 | $ 52 | $ 70680 | $ 70680 | $ - | 125 | 1 | 1200 | $ 37750 | $ - | $ 8000 | 15 | $ 17465 | ||||||||||||||||||||||||||||||||||||||||
6 | Holcomb St | 7th St | 10th St | 850 | 12 | 1133 | $ 58703 | $ 52 | $ 10200 | $ 10200 | 10 | 10 | $ 5667 | 1500 | $ 37500 | $ - | $ - | 10 | $ 5337 | ||||||||||||||||||||||||||||||||||||||||
2 | Hendricks St | 9th St | 12th St | 800 | 16 | 1422 | $ 70930 | $ 50 | $ 41884 | $ 41884 | $ - | 750 | $ 18750 | $ - | $ 8000 | 15 | $ 10295 | ||||||||||||||||||||||||||||||||||||||||||
2 to 6 | Hill St | 19th | 21st St | 807 | 16 | 1435 | $ 67443 | $ 47 | $ 21125 | $ 6456 | $ 27581 | 10 | $ 5021 | 1000 | $ 25000 | $ - | $ 8000 | 15 | $ 9840 | ||||||||||||||||||||||||||||||||||||||||
2 to 8 | 57th St | Jackman St | Kuhn St | 800 | 18 | 1600 | $ 66550 | $ 42 | $ 14400 | $ 14400 | 20 | 10 | $ 13600 | 1300 | $ 32500 | 10 | $ 6050 | ||||||||||||||||||||||||||||||||||||||||||
6 to 8 | Sheridan St | Hastings Ave | SilverUmatilla | 1750 | 22 | 4278 | $ 154115 | $ 36 | $ 38500 | $ 38500 | 20 | 10 | $ 36361 | 300 | 4 | 1500 | $ 58500 | $ - | $ 5000 | 15 | $ 20754 | ||||||||||||||||||||||||||||||||||||||
6 to 10 | Tyler St | Jefferson St | Lawrence St | 900 | 32 | 3200 | $ 115280 | $ 36 | $ 28800 | $ 28800 | 5 | 5 | $ 8000 | 100 | 2 | $ 8000 | 4 | $ 60000 | 10 | $ 10480 | |||||||||||||||||||||||||||||||||||||||
6 to 14 | 14th St | McPherson St | Sheridan St | 2375 | 21 | 5542 | $ 182027 | $ 33 | $ 49875 | $ 49875 | 20 | 10 | $ 47104 | 750 | 4 | 1000 | $ 68500 | $ - | 10 | $ 16548 | |||||||||||||||||||||||||||||||||||||||
8 | 49th St | Kuhn St | Admiralty Ave | 400 | 24 | 1067 | $ 34613 | $ 32 | $ 9600 | $ 9600 | 5 | $ 1867 | 800 | $ 20000 | $ - | 10 | $ 3147 | ||||||||||||||||||||||||||||||||||||||||||
6 to 10 | Fir St | F St | UCherry | 4360 | 22 | 10658 | $ 341621 | $ 32 | $ 95920 | $ 95920 | 5 | 5 | 4000 | $ 106644 | 100 | 2 | 4000 | $ 108000 | $ - | 10 | $ 31056 | ||||||||||||||||||||||||||||||||||||||
6 to 8 | Cedar St | San Juan Ave | Redwood St | 1460 | 16 | 2596 | $ 81747 | $ 31 | $ 23360 | $ 23360 | 20 | 20 | $ 25956 | 1000 | $ 25000 | $ - | 10 | $ 7432 | |||||||||||||||||||||||||||||||||||||||||
8 | Clallam St | McKinley St | Roosevelt St | 975 | 14 | 1517 | $ 46796 | $ 31 | $ 13650 | $ 13650 | 20 | 10 | $ 12892 | 200 | 4 | $ 16000 | $ - | 10 | $ 4254 | ||||||||||||||||||||||||||||||||||||||||
6 | San Juan Ave | 19th St | 20th St | 300 | 31 | 1033 | $ 31827 | $ 31 | $ 9300 | $ 9300 | 50 | 10 | $ 19633 | $ - | $ - | 10 | $ 2893 | ||||||||||||||||||||||||||||||||||||||||||
6 to 20 | Cherry St | F St | W St | 4200 | 32 | 14933 | $ 457307 | $ 31 | $ 134400 | $ 134400 | 5 | 5 | 4200 | $ 121333 | 200 | 6000 | $ 160000 | $ - | 10 | $ 41573 | |||||||||||||||||||||||||||||||||||||||
6 to 8 | Jackman St | 45th St | 49th St | 1100 | 22 | 2689 | $ 81940 | $ 30 | $ 24200 | $ 24200 | 15 | 10 | $ 18150 | 225 | 3 | 500 | $ 28250 | $ - | $ 5000 | 15 | $ 11340 | ||||||||||||||||||||||||||||||||||||||
6 to 12 | Jackson St | LawrenceMonroe | Roosevelt St | 1600 | 18 | 3200 | $ 93530 | $ 29 | $ 28800 | $ 28800 | 10 | 10 | $ 16000 | 1000 | $ 25000 | 1 | $ 15000 | $ 2500 | 10 | $ 8730 | |||||||||||||||||||||||||||||||||||||||
2 | 7th St | Wilson St | Holcomb St | 450 | 16 | 800 | $ 23320 | $ 29 | $ 7200 | $ 7200 | 10 | 10 | $ 4000 | 400 | $ 10000 | $ - | 10 | $ 2120 | |||||||||||||||||||||||||||||||||||||||||
8 to 14 | 25th St | Sherman St | Sheridan St | 800 | 20 | 1778 | $ 50061 | $ 28 | $ 16000 | $ 16000 | 10 | 5 | $ 7556 | 1 | 800 | $ 21500 | $ - | $ 5000 | 10 | $ 5006 | |||||||||||||||||||||||||||||||||||||||
2 to 6 | Hancock St | SR 20 | 9th St | 1100 | 20 | 2444 | $ 67833 | $ 28 | $ 22000 | $ 22000 | 15 | 5 | $ 14667 | 1000 | $ 25000 | $ - | 10 | $ 6167 | |||||||||||||||||||||||||||||||||||||||||
Benton St | Washington St | Lawrence St | 1160 | 22 | 2836 | $ 74468 | $ 26 | $ 25520 | $ 25520 | 10 | 10 | $ 14178 | 140 | 4 | 600 | $ 28000 | 10 | $ 6770 | |||||||||||||||||||||||||||||||||||||||||
W St | San JuanAdmiralty | Walnut St | 2560 | 22 | 6258 | $ 163807 | $ 26 | $ 56320 | $ 56320 | 10 | 5 | $ 26596 | 200 | 4 | 2000 | $ 66000 | $ - | 10 | $ 14892 | ||||||||||||||||||||||||||||||||||||||||
6 to 8 | Walnut | W Street | Jackson | 2300 | 22 | 5622 | $ 145194 | $ 26 | $ 50600 | $ 50600 | 10 | 5 | $ 23894 | 2300 | $ 57500 | $ - | 10 | $ 13199 | |||||||||||||||||||||||||||||||||||||||||
6 to 8 | 24th St | Discovery Rd | San Juan Ave | 1250 | 18 | 2500 | $ 63938 | $ 26 | $ 22500 | $ 22500 | 10 | 5 | $ 10625 | 1000 | $ 25000 | $ - | 10 | $ 5813 | |||||||||||||||||||||||||||||||||||||||||
6 to 10 | Tyler St | Lawrence St | Blaine St | 900 | 32 | 3200 | $ 78980 | $ 25 | $ 28800 | $ 28800 | 5 | 5 | $ 8000 | 200 | $ 5000 | 2 | $ 30000 | 10 | $ 7180 | ||||||||||||||||||||||||||||||||||||||||
4 to 12 | McPherson St | SR 20 | Discovery Rd | 2925 | 32 | 10400 | $ 244860 | $ 24 | $ 93600 | $ 93600 | 5 | 5 | 2925 | $ 84500 | 230 | 2 | 1200 | $ 44500 | $ - | $ - | 10 | $ 22260 | |||||||||||||||||||||||||||||||||||||
10 | Landes St | 12th St | 19th St | 1820 | 32 | 6471 | $ 151821 | $ 23 | $ 58240 | $ 58240 | 5 | 1400 | $ 39324 | 400 | $ 10000 | 2 | $ 30000 | $ 5000 | 10 | $ 14256 | |||||||||||||||||||||||||||||||||||||||
6 to 8 | Discovery Rd | 19th | Hastings Ave | 2900 | 22 | 7089 | $ 136565 | $ 19 | $ 63800 | $ 63800 | 15 | 10 | $ 47850 | 500 | $ 12500 | $ - | 10 | $ 12415 | |||||||||||||||||||||||||||||||||||||||||
8 to 12 | Hastings Ave | Discovery Rd | County Line | 8450 | 32 | 30044 | $ 542349 | $ 18 | $ 270400 | $ 270400 | 5 | 10 | 5000 | $ 197644 | 1000 | $ 25000 | $ - | 10 | $ 49304 | ||||||||||||||||||||||||||||||||||||||||
6 to 12 | Washington St | Van Buren St | SR20 | 2025 | 30 | 6750 | $ 118388 | $ 18 | $ 60750 | $ 60750 | 5 | 5 | $ 16875 | 0 | 0 | 0 | $ - | 2 | $ 30000 | $ - | 10 | $ 10763 | |||||||||||||||||||||||||||||||||||||
14 | Blaine St | San Juan Ave | Walker St | 1275 | 48 | 6800 | $ 113910 | $ 17 | $ 61200 | $ 61200 | 5 | $ 11900 | $ - | 2 | $ 30000 | $ 5000 | 10 | $ 10810 | |||||||||||||||||||||||||||||||||||||||||
6 | Washington St | Harrison St | Taylor St | 1175 | 33 | 4308 | $ 59240 | $ 14 | $ 38775 | $ 38775 | 10 | $ 15079 | $ - | $ - | 10 | $ 5385 | |||||||||||||||||||||||||||||||||||||||||||
8 to 10 | Sheridan St | SR 20 | 19th St | 4000 | 46 | 20444 | $ 272922 | $ 13 | $ 184000 | $ 184000 | 5 | 5 | $ 51111 | 200 | 2 | $ 13000 | $ - | 10 | $ 24811 | ||||||||||||||||||||||||||||||||||||||||
8 to 10 | 19th St | San Juan Ave | Sheridan St | 3200 | 48 | 17067 | $ 197120 | $ 12 | $ 153600 | $ 153600 | 3 | 3 | $ 25600 | 0 | 0 | 0 | $ - | $ - | 10 | $ 17920 | |||||||||||||||||||||||||||||||||||||||
10 to 20 | San Juan Ave | F St | Lopez Ave | 2800 | 32 | 9956 | $ 110059 | $ 11 | $ 89600 | $ 89600 | 3 | $ 10453 | $ - | $ - | 10 | $ 10005 | |||||||||||||||||||||||||||||||||||||||||||
10 to 20 | F St | Hastings Ave | Tyler St | 5300 | 31 | 18256 | $ 180730 | $ 10 | $ 164300 | $ 164300 | $ - | $ - | $ - | 10 | $ 16430 | ||||||||||||||||||||||||||||||||||||||||||||
$ 9952406 | $ 1873288 | $ 31744 | $ 274803 | $ 32667 | $ 332896 | $ 1998646 | $ 4544044 | $ 1155207 | $ 1747625 | $ 1215000 | $ 1290529 | $ - 0 | |||||||||||||||||||||||||||||||||||||||||||||||
Street Pavement Improvement Plan Projects | 9 | 110 | |||||||||||||||||||||||||||||||||||||||||||||
Road Name | From | To | Iworq ID | Length (ft) | Width (ft) | Area (yd^2) | Actual Area(SY) | Unit Cost per yd2 | Construction Cost | Prep Work | Survey Testing | ADA Curb Ramps | Storm Water | Mill amp Fill$50SY | Pre-Level$4SY | Total Construction | Project Cost + 10 | Unit Cost w Additional Costs no 10 | Engineering Costs | Notes | |||||||||||||||||||||||||||
Priority | Reconstruct | 2021 | 2022 | 2023 | 2024 | ||||||||||||||||||||||||||||||||||||||||||
1 | Reconstruct | Lawrence St | Cass St | Calhoun St | 1304 | 250 | 36 | 1000 | $ 80 | $ 80000 | $ 5000 | $ 20000 | $ 105000 | $ 115500 | $ 105 | Stormwater South Side Parking Raingarden on Cass | |||||||||||||||||||||||||||||||
2 | Reconstruct | Lawrence St | Walker St | Cass St | 250 | 36 | 1000 | $ 80 | $ 80000 | $ 5000 | $ 20000 | $ 5000 | $ 110000 | $ 121000 | $ 110 | Stormwater South Side Parking | |||||||||||||||||||||||||||||||
3 | Reconstruct Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | San Juan Ave | Lopez Ave | Admiralty | 2300 | 32 | 8178 | $ 50 | $ 408889 | $ 10000 | $ 100000 | $ 518889 | $ 570778 | $ 63 | Stormwater Problem 45th | ||||||||||||||||||||||||||||||||
4 | Reconstruct Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Polk St - Street Improvements | Lawrence St | 1056 Sarah Tiffany Sarah TiffanyGarfield | 1073 | 200 | 56 | 1244 | $ 50 | $ 62222 | X | X | X | $ 62222 | $ 68444 | $ 50 | Parking Theater 4 AC Watermain Infiltration or Rain Garden Parking on Condo Side | ||||||||||||||||||||||||||||||
Reconstruct | 47th Street | Pettygrove | McNeil | 500 | 18 | 1000 | 1548 | $ 50 | $ 50000 | $ 5000 | $ 40000 | $ 95000 | $ 104500 | $ 95 | $210000 Engineers Estimate With Engineering Cost Turnaround Spaghetti Waterline | ||||||||||||||||||||||||||||||||
Chip Seal - $50000 to $70000 per Mile | $6 No DigoutsPre-leveling | $10 with Additional Prep Work | |||||||||||||||||||||||||||||||||||||||||||||||
Chip Seal | Washington St | Van Buren St | SR20 | 2025 | 30 | 6750 | $ 10 | $ 67500 | $ 67500 | $ 74250 | Digouts Flagging | ||||||||||||||||||||||||||||||||||||
Chip Seal | Hastings Ave - Pre-level and widen shoulders | Discovery Rd | County Line | 8450 | 24 | 22533 | $ 6 | $ 135200 | $ 135200 | $ 148720 | Ditches amp Culverts Total Width change from 21 to 24 How wide will shoulders be | ||||||||||||||||||||||||||||||||||||
Tyler St | Jefferson St | Lawrence St | 900 | 32 | 3200 | $ 6 | $ 19200 | $ 19200 | $ 21120 | ||||||||||||||||||||||||||||||||||||||
Chip Seal | McPherson - Chip Seal | 4th St | Discovery Rd | 3100 | 32 | 11022 | $ 6 | $ 66133 | $ 66133 | $ 72747 | Ditches amp Culverts Shoulder Wideneing | ||||||||||||||||||||||||||||||||||||
Chip Seal | 19th St - Chip Seal | San Juan Ave | Sheridan St | 3200 | 48 | 17067 | $ 6 | $ 102400 | $ 102400 | $ 112640 | Bike Lanes amp Shoulder Prelevel | ||||||||||||||||||||||||||||||||||||
Chip Seal | Walnut | W Street | Jackson | 2300 | 22 | 5622 | $ 6 | $ 33733 | $ 33733 | $ 37107 | Dig-Outs Pre-Leveling Striping Shoulders | ||||||||||||||||||||||||||||||||||||
Chip Seal | Fir St - Chip Seal | F St | UCherry | 4360 | 22 | 10658 | $ 10 | $ 106578 | X | X | $ 106578 | $ 117236 | Dig-Outs Pre-Leveling Striping | ||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | |||||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | P St - Chip Seal | Redwood St | Cedar St | 0486 | 300 | 16 | 533 | $ 20 | $ 10667 | $ 10667 | $ 11733 | Watermain Looping Shouldnt this be part of Center | |||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 25th St - Chip Seal | Sheridan St | Holcomb St | 1200 | 18 | 2400 | $ 20 | $ 48000 | $ 48000 | $ 52800 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 14th St - Chip Seal | $ - | $ - | ||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Cedar St - Chip Seal | Redwood St | San Juan Ave | 1460 | 16 | 2596 | $ 20 | $ 51911 | $ 51911 | $ 57102 | Ex ChipSeal 22 Wide | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Center St - Chip Seal | Redwood St | San Juan Ave | 484 | 1660 | 16 | 2951 | $ 20 | $ 59022 | $ 59022 | $ 64924 | Ex ChipSeal 22 Wide Stormwater | |||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Grant St Chip Seal | 14th St | 16th St | 525 | 16 | 933 | $ 20 | $ 18667 | $ 18667 | $ 20533 | Ex Street 10 Wide | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 11th St Chip Seal | Hendricks St | Sheridan St | 550 | 16 | 978 | $ 20 | $ 19556 | $ 19556 | $ 21511 | Hospital Parking | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Hendricks St Chip Seal | 9th St | 12th St | 800 | 16 | 1422 | $ 20 | $ 28444 | $ 28444 | $ 31289 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 10th St Chip Seal | Hendricks St | Grant St | 1655 | 283 | 18 | 566 | $ 20 | $ 11320 | $ 11320 | $ 12452 | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Grant St Chip Seal | 14th St | 16th St | 525 | 18 | 1050 | $ 20 | $ 21000 | $ 21000 | $ 23100 | Ex Street 10 Wide Stormwater | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Hill St | 21st St | 19th St | 807 | 16 | 1435 | $ 20 | $ 28693 | $ 28693 | $ 31563 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Milo St -Chip seal | Olympic Ave | Pacific Ave | 0003 | 466 | 12 | 621 | $ 20 | $ 12427 | $ 12427 | $ 13669 | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Olympic St | Cedar St | Tremont St | 536 | 12 | 715 | $ 20 | $ 14293 | $ 14293 | $ 15723 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Benton St - street improvement | Blaine St | Lincoln Blg | 580 | 36 Sarah Tiffany Sarah TiffanyEstimated at 25-36 used higher number | Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Sarah Tiffany Sarah TiffanyGarfield | 2320 | $ 20 | $ 46400 | $ 46400 | $ 51040 | ||||||||||||||||||||||||||||||||||
Pave Gravel Road | |||||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Pacific St | Cedar St | Tremont St | 400 | 16 | 711 | $ 50 | $ 35556 | $ 6000 | $ 15000 | $ 56556 | $ 62211 | $ 80 | ||||||||||||||||||||||||||||||||||
58th St | Hill St | Kuhn St | 525 | 16 | 933 | $ 50 | $ 46667 | $ 6000 | $ 20000 | $ 72667 | $ 79933 | $ 78 | 4 AC Waterline Driveways Site Distance (Re-grade Slope) | ||||||||||||||||||||||||||||||||||
Sidewalks | |||||||||||||||||||||||||||||||||||||||||||||||
Harrison St | Franklin St | Clay St | 340 | 6 | 227 | $ 165 | $ 56100 | $ 5000 | $ 61100 | $ 67210 | $ 180 | ||||||||||||||||||||||||||||||||||||
9th St | Hancock St | McPherson St | 1300 | 6 | 867 | $ 165 | $ 214500 | $ 10000 | $ 15000 | $ 239500 | $ 263450 | $ 184 | |||||||||||||||||||||||||||||||||||
Asphalt Path | |||||||||||||||||||||||||||||||||||||||||||||||
Spruce St Easement | Cedar St | Center St | 150 | 8 | 133 | $ 50 | $ 6667 | $ 2000 | $ 8667 | $ 9533 | $ 65 | ||||||||||||||||||||||||||||||||||||
Cherry St | A St | E St | 990 | 10 | 1100 | $ 50 | $ 55000 | $ 10000 | $ 10000 | $ 15000 | $ 90000 | $ 99000 | $ 82 | ||||||||||||||||||||||||||||||||||
Gravel Path | |||||||||||||||||||||||||||||||||||||||||||||||
16th St | Thomas St | Grant St | 1700 | 6 | 1133 | $ 15 | $ 17000 | $ 1500 | $ 18500 | $ 20350 | |||||||||||||||||||||||||||||||||||||
Cleveland St | 21st St | 23rd St | 500 | 6 | 333 | $ 15 | $ 5000 | $ 5000 | $ 5500 | Need Easement | |||||||||||||||||||||||||||||||||||||
6 | - | $ 15 | $ - | $ - | $ - | Need Easement | |||||||||||||||||||||||||||||||||||||||||
6 | - | $ 15 | $ - | $ - | $ - | Need Easement | |||||||||||||||||||||||||||||||||||||||||
Total | $ 1582256 | $ 1792256 | $ 1971481 | ||||||||||||||||||||||||||||||||||||||||||||
Project Descriptioin | Length | Width | Construction Costs | ConstructionUnit Costs | Units | Engineering Costs | Total CostsUnit Cost | Total Costs | Total CostsUnit Cost | Notes | |||||||||||
Sidewalk | |||||||||||||||||||||
9th Street Sidewalk Grant Street to Hancock Street | 826 | 6 | $ 141506 | $ 17131 | LF | Construction Unit Cost per Foot | |||||||||||||||
Jefferson Street Sidewalk Washington Street to Taylor Street | 724 | 6 | $ 390502 | $ 53937 | LF | Construction Unit Cost per Foot | |||||||||||||||
Landis Street Sidewalk 10th Street to 19th Street | 1795 | 6 | $ 364550 | $ 20309 | LF | Construction Unit Cost per Foot | |||||||||||||||
ADA Corner Ramps | |||||||||||||||||||||
Washington Street amp Harrison Street | $ 42000 | $ 42000 | Each | ||||||||||||||||||
Washington Street amp Adams Street | $ 38150 | $ 19075 | Each | Two Corners Were Retrofitted | |||||||||||||||||
Chip Seal Pavement | |||||||||||||||||||||
Walker Street Washington Street to Lawrence Street | 1144 | 24 | $ 20000 | $ 656 | SY | Does not include flagging nor prep work | |||||||||||||||
Pulverize amp Asphalt Paving | |||||||||||||||||||||
Washington Street VanBuren Street to Harrison Street | 300 | 22 | $ 35000 | $ 4773 | SY | ||||||||||||||||
Asphalt Overlay | |||||||||||||||||||||
Sidewalks | ||||||||||||||||||||||||||||||||||||||
Harrison St | Franklin St | Clay St | 340 | 6 | 227 | |||||||||||||||||||||||||||||||||
9th St | Hancock St | McPherson St | 1300 | 6 | 867 | |||||||||||||||||||||||||||||||||
Asphalt Path | ||||||||||||||||||||||||||||||||||||||
Spruce St Easement | Cedar St | Center St | 150 | 8 | 133 | $ 2000 | $ 2000 | $ 2000 | ||||||||||||||||||||||||||||||
Cherry St | A St | E St | 990 | 10 | 1100 | $ 10000 | $ 10000 | $ 10000 | ||||||||||||||||||||||||||||||
Gravel Path | ||||||||||||||||||||||||||||||||||||||
16th St | Thomas St | Grant St | 1700 | 6 | 1133 | $ 1500 | $ 1500 | $ 1500 | ||||||||||||||||||||||||||||||
Cleveland St | 21st St | 23rd St | 500 | 6 | 333 | Need Easement | ||||||||||||||||||||||||||||||||
6 | - | Need Easement | ||||||||||||||||||||||||||||||||||||
6 | - | Need Easement | ||||||||||||||||||||||||||||||||||||
Total |
Type | Improvement | Cost Range SY | Cost Range LF | ||||||||
1 | Complete Road Rebuild | $80 | $100 | ||||||||
2 | Asphalt Overlay | $50 | $60 | ||||||||
3 | Pulverize amp Chip Seal | $20 | $30 | ||||||||
4 | Chip Seal | $6 | $10 | $12 | $25 | ||||||
5 | Seal Coat | ||||||||||
6 | |||||||||||
7 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 3-Inch | 413 | TONS | $ 15000 | $ 6187500 | 1000 x 22 x 025 httpwwwamerasphaltcomasphalthtm | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 1630 | CY | $ 4800 | $ 7824000 | Water Street Project = $48 CY (1000 x 22 x 2)27 = 1630 CY | ||||||
Gravel Borrow | 2282 | TONS | $ 3000 | $ 6846000 | (1000 x 22 x 2)27 = 1630 1630 CY x 14 = 2282 Tons | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 128 | Hours | $ 5728 | $ 733133 | (2) People for 64 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 25043033 | |||||||||||
$ 10247 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 2-Inch | 275 | TONS | $ 15000 | $ 4125000 | 1000 x 22 x 017 httpwwwamerasphaltcomasphalthtm | | ||||||
Digouts amp Pre-leveling | 122 | SY | $ 4900 | $ 597800 | |||||||
Flagging | 64 | Hours | $ 5728 | $ 366566 | (2) People for 32 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 180000 | $ 180000 | |||||||
$ 5403066 | |||||||||||
$ 2211 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 3-Inch | 413 | TONS | $ 15000 | $ 6187500 | 1000 x 22 x 025 httpwwwamerasphaltcomasphalthtm | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 150 | CY | $ 4800 | $ 720000 | Water Street Project = $48 CY | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 96 | Hours | $ 5728 | $ 549850 | (2) People for 48 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 10909750 | |||||||||||
$ 4464 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Chip Seal | 2444 | SY | $ 1050 | $ 2566200 | 1000 X 22 | Unit Cost $525 SY from Walker Street County Invoice Doubled to $1050 for Chip Seal Over Gravel | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 150 | CY | $ 4800 | $ 720000 | Water Street Project = $48 CY | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 80 | Hours | $ 5728 | $ 458208 | (2) People for 40 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | Hours | $ 12500 | $ - 0 | High Average Loaded Rate No Testing | ||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 7196808 | |||||||||||
$ 2945 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 1500000 | $614 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 500 | LF | $ 5000 | $ 2500000 | |||||||
Catch Basins | 4 | EACH | $ 150000 | $ 600000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Chip Seal | 2444 | SY | $ 525 | $ 1283100 | 1000 X 22 | Unit Cost from Walker Street County Invoice | ||||||
Digouts amp Pre-leveling | 122 | SY | $ 4900 | $ 598780 | Cost from 2018 Lakeside Mill amp Fill | Estimate Quanity Based on 5 | ||||||
Flagging | 32 | Hours | $ 5728 | $ 183283 | (2) People for 16 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | Hours | $ 12500 | $ - 0 | High Average Loaded Rate No Surveying or Testing | ||||||
Surveying | 1 | LS | $ - 0 | $ - 0 | |||||||
$ 2198863 | |||||||||||
$ 900 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 1500000 | $614 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY |
Project Descriptioin | Length | Width | Construction Costs | Engineering Costs | Engineering Total | Digouts Pre-Leveling Costs | Digouts Pre-Leveling Total | ADACosts | ADATotal | StormwaterCosts | StormwaterTotal | Total Costsby SY | Cost Per 250 Block | Length | Width | Notes | |||||||||||||||||
Chip Seal Pavement | |||||||||||||||||||||||||||||||||
Walker Street Washington Street to Lawrence Street | 1144 | 24 | $ 25000 | 15 | $ 3750 | 10 | $ 2500 | $ 1024 | $ 682911 | 250 | 24 | ||||||||||||||||||||||
Pulverize amp Chip Seal | |||||||||||||||||||||||||||||||||
Engineers Estimate | 250 | 24 | $ 22000 | 15 | $ 3300 | 0 | $ - | 20 | $ 4400 | $ 4455 | $ 2970000 | 250 | 24 | ||||||||||||||||||||
Pulverize amp Asphalt Paving | |||||||||||||||||||||||||||||||||
Washington Street VanBuren Street to Harrison Street | 300 | 22 | $ 35000 | 20 | $ 7000 | 0 | $ - | 10 | $ 3500 | 20 | $ 7000 | $ 7159 | $ 4772727 | 250 | 24 | ||||||||||||||||||
Asphalt Overlay (2) | |||||||||||||||||||||||||||||||||
Engineers Estimate | 250 | 24 | $ 21334 | 20 | $ 426680 | 10 | $ 2133 | 20 | $ 426680 | 20 | $ 426680 | $ 5440 | $ 4835707 | 250 | 32 | ||||||||||||||||||
Reconstruction | |||||||||||||||||||||||||||||||||
Walker Street Lawrence Street to Blaine Street | 650 | 36 | $ 184310 | 25 | $ 46078 | 0 | $ - | 20 | $ 36862 | 30 | $ 55293 | $ 12405 | $ 11027094 | 250 | 32 | ||||||||||||||||||
RSL | Length (FT) | Area (SY) | Condition | Treatment | Cost | Total | |||||||||
20 | 61834 | 138524 | 131 | Good | $0 | $0 | |||||||||
14 | 23656 | 49915 | 47 | Satisfactory | Chip Seal | $29 | $1470552 | ||||||||
12 | 43586 | 106382 | 100 | $3134134 | |||||||||||
10 | 74803 | 193570 | 182 | $5702790 | |||||||||||
8 | 96662 | 228046 | 215 | $6718492 | |||||||||||
6 | 95452 | 261794 | 247 | Fair | Overlay | $67 | $17489930 | ||||||||
4 | 6420 | 14536 | 14 | $971121 | |||||||||||
2 | 29238 | 60616 | 57 | Poor | Rehab | $107 | $6492850 | ||||||||
0 | 3851 | 7532 | 07 | Very Poor | Rebuild | $155 | $1169719 | ||||||||
$43149589 | |||||||||||||||
Additional Paving Costs | Average Cost per SY | Percent of Paving Cost | |||
Digouts amp Pre-Leveling | $4 | 25 | |||
Stormwater | $7 | 38 | |||
ADA | $5 | 27 | |||
Engineering amp Administration | $5 | 28 |
9 | Base Paving Costs | Preperation | Stormwater | ADA | Engineering | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Remaining Service Life | Road Name | From | To | Length (ft) | Width (ft) | Area (SY) | Total Construction | Price(SY) | Reconstruction | Pulverize amp Pave | Ashpalt Overlay | Pave Gravel Road | Pulverize amp Chip Seal | Chip Seal | Total Base Paving Costs | Digouts(SY) | Pre-Leveling(SY) | Construct Shoulders Both Sides (LF) | Preparation Total | StormwaterPipes (LF) | StormwaterCatchbasins | StormwaterSwales (LF) | Stormwater Total | Curb Ramps | Curb Ramps Total | Surveying | Engineering amp Administration | Engineering amp Administration Total | Other Work | ||||||||||||||||||||||||||||||
$102 | $45 | $22 | $35 | $29 | $9 | $35 | $15 | $20 | $50 | $1500 | $25 | $15000 | |||||||||||||||||||||||||||||||||||||||||||||||
2 | Polk St - Street | Lawrence St | 1056 | 200 | 56 | 1244 | $ 210679 | $ 169 | $ 127518 | $ 127518 | $ - | 150 | 1 | 1 | $ 9025 | 2 | $ 30000 | $ 10000 | 25 | $ 44136 | |||||||||||||||||||||||||||||||||||||||
6 | 47th Street | Pettygrove | McNeil | 500 | 18 | 1548 | $ 258717 | $ 167 | $ 158624 | $ 158624 | $ - | 687 | 8 | $ 46350 | $ - | $ 10000 | 25 | $ 53743 | |||||||||||||||||||||||||||||||||||||||||
6 to 10 | Lawrence St | Calhoun St | Harrison St | 1200 | 36 | 4800 | $ 786070 | $ 164 | $ 491856 | $ 491856 | 600 | $ 15000 | $ 8 | $ 120000 | $ 10000 | 25 | $ 159214 | ||||||||||||||||||||||||||||||||||||||||||
8 | Lawrence St | Cass St | Calhoun St | 250 | 36 | 1000 | $ 146213 | $ 146 | $ 102470 | $ 102470 | 0 | 0 | $ - | 75 | 350 | $ 12500 | $ - | $ 10000 | 25 | $ 31243 | |||||||||||||||||||||||||||||||||||||||
8 | Lawrence St | Walker St | Cass St | 250 | 36 | 1000 | $ 144650 | $ 145 | $ 102470 | $ 102470 | $ - | 100 | 250 | $ 11250 | $ - | $ 10000 | 25 | $ 30930 | |||||||||||||||||||||||||||||||||||||||||
4 to 8 | San Juan Ave | Lopez Ave | Admiralty | 2300 | 34 | 8689 | $ 1222938 | $ 141 | $ 890350 | $ 890350 | $ - | 800 | 5 | 1500 | $ 85000 | $ - | $ 15000 | 25 | $ 247588 | ||||||||||||||||||||||||||||||||||||||||
6 to 8 | Lawrence St | Harrison St | Monroe St | 2380 | 47 | 12429 | $ 1331314 | $ 107 | $ 274803 | $ 274803 | 15 | 5 | $ 74573 | 1900 | 10 | $ 110000 | 50 | $ 750000 | $ 10000 | 10 | $ 121938 | ||||||||||||||||||||||||||||||||||||||
2 to 4 | Center St | San Juan Ave | Redwood St | 1660 | 16 | 2951 | $ 295222 | $ 100 | $ 86910 | $ 86910 | $ - | 1600 | 9 | 3000 | $ 168500 | $ - | $ 10000 | 15 | $ 39812 | ||||||||||||||||||||||||||||||||||||||||
0 to 6 | Pacific St | Cedar St | Tremont St | 400 | 16 | 711 | $ 66581 | $ 94 | $ 31744 | $ 31744 | $ - | 100 | 2 | 700 | $ 25500 | $ - | $ 5000 | 15 | $ 9337 | ||||||||||||||||||||||||||||||||||||||||
0 to 6 | Benton St | Lawrence | Lincoln Blg | 580 | 36 | 2320 | $ 203265 | $ 88 | $ 20880 | $ 20880 | 20 | 10 | $ 19720 | 250 | 2 | $ 15500 | 8 | $ 120000 | $ 5000 | 15 | $ 27165 | ||||||||||||||||||||||||||||||||||||||
2 | Grant St | 14th St | 16th St | 525 | 16 | 933 | $ 73635 | $ 79 | $ 27487 | $ 27487 | $ - | 400 | 2 | 500 | $ 35500 | $ - | $ 8000 | 15 | $ 10648 | ||||||||||||||||||||||||||||||||||||||||
2 to 6 | Olympic St | Cedar St | Tremont St | 536 | 12 | 715 | $ 52716 | $ 74 | $ 21047 | $ 21047 | $ - | 950 | $ 23750 | $ - | $ 8000 | 15 | $ 7920 | ||||||||||||||||||||||||||||||||||||||||||
2 | Milo St | Olympic Ave | Pacific Ave | 466 | 12 | 621 | $ 44793 | $ 72 | $ 18298 | $ 18298 | $ - | 800 | $ 20000 | $ - | $ 5000 | 15 | $ 6495 | ||||||||||||||||||||||||||||||||||||||||||
0 | 11th St | Hendricks St | Sheridan St | 550 | 16 | 978 | $ 65077 | $ 67 | $ 28796 | $ 28796 | $ - | 100 | 2 | 750 | $ 26750 | $ - | $ 8000 | 15 | $ 9532 | ||||||||||||||||||||||||||||||||||||||||
0 | 58th St | Hill St | Kuhn St | 525 | 16 | 933 | $ 60329 | $ 65 | $ 32667 | $ 32667 | $ - | 750 | $ 18750 | $ - | $ 8000 | 15 | $ 8913 | ||||||||||||||||||||||||||||||||||||||||||
2 | 10th St | Hendricks St | Grant St | 283 | 18 | 566 | $ 34294 | $ 61 | $ 16669 | $ 16669 | $ - | 500 | $ 12500 | $ - | $ 5000 | 15 | $ 5125 | ||||||||||||||||||||||||||||||||||||||||||
4 to 10 | 31st St | Hancock St | Sheridan St | 1050 | 22 | 2567 | $ 150027 | $ 58 | $ 23100 | $ 23100 | 10 | 10 | $ 12833 | 1200 | 10 | 1000 | $ 100000 | $ - | $ 5000 | 10 | $ 14093 | ||||||||||||||||||||||||||||||||||||||
6 | 25th St | Sheridan St | Holcomb St | 1200 | 18 | 2400 | $ 125895 | $ 52 | $ 70680 | $ 70680 | $ - | 125 | 1 | 1200 | $ 37750 | $ - | $ 8000 | 15 | $ 17465 | ||||||||||||||||||||||||||||||||||||||||
6 | Holcomb St | 7th St | 10th St | 850 | 12 | 1133 | $ 58703 | $ 52 | $ 10200 | $ 10200 | 10 | 10 | $ 5667 | 1500 | $ 37500 | $ - | $ - | 10 | $ 5337 | ||||||||||||||||||||||||||||||||||||||||
2 | Hendricks St | 9th St | 12th St | 800 | 16 | 1422 | $ 70930 | $ 50 | $ 41884 | $ 41884 | $ - | 750 | $ 18750 | $ - | $ 8000 | 15 | $ 10295 | ||||||||||||||||||||||||||||||||||||||||||
2 to 6 | Hill St | 19th | 21st St | 807 | 16 | 1435 | $ 67443 | $ 47 | $ 21125 | $ 6456 | $ 27581 | 10 | $ 5021 | 1000 | $ 25000 | $ - | $ 8000 | 15 | $ 9840 | ||||||||||||||||||||||||||||||||||||||||
2 to 8 | 57th St | Jackman St | Kuhn St | 800 | 18 | 1600 | $ 66550 | $ 42 | $ 14400 | $ 14400 | 20 | 10 | $ 13600 | 1300 | $ 32500 | 10 | $ 6050 | ||||||||||||||||||||||||||||||||||||||||||
6 to 8 | Sheridan St | Hastings Ave | SilverUmatilla | 1750 | 22 | 4278 | $ 154115 | $ 36 | $ 38500 | $ 38500 | 20 | 10 | $ 36361 | 300 | 4 | 1500 | $ 58500 | $ - | $ 5000 | 15 | $ 20754 | ||||||||||||||||||||||||||||||||||||||
6 to 10 | Tyler St | Jefferson St | Lawrence St | 900 | 32 | 3200 | $ 115280 | $ 36 | $ 28800 | $ 28800 | 5 | 5 | $ 8000 | 100 | 2 | $ 8000 | 4 | $ 60000 | 10 | $ 10480 | |||||||||||||||||||||||||||||||||||||||
6 to 14 | 14th St | McPherson St | Sheridan St | 2375 | 21 | 5542 | $ 182027 | $ 33 | $ 49875 | $ 49875 | 20 | 10 | $ 47104 | 750 | 4 | 1000 | $ 68500 | $ - | 10 | $ 16548 | |||||||||||||||||||||||||||||||||||||||
8 | 49th St | Kuhn St | Admiralty Ave | 400 | 24 | 1067 | $ 34613 | $ 32 | $ 9600 | $ 9600 | 5 | $ 1867 | 800 | $ 20000 | $ - | 10 | $ 3147 | ||||||||||||||||||||||||||||||||||||||||||
6 to 10 | Fir St | F St | UCherry | 4360 | 22 | 10658 | $ 341621 | $ 32 | $ 95920 | $ 95920 | 5 | 5 | 4000 | $ 106644 | 100 | 2 | 4000 | $ 108000 | $ - | 10 | $ 31056 | ||||||||||||||||||||||||||||||||||||||
6 to 8 | Cedar St | San Juan Ave | Redwood St | 1460 | 16 | 2596 | $ 81747 | $ 31 | $ 23360 | $ 23360 | 20 | 20 | $ 25956 | 1000 | $ 25000 | $ - | 10 | $ 7432 | |||||||||||||||||||||||||||||||||||||||||
8 | Clallam St | McKinley St | Roosevelt St | 975 | 14 | 1517 | $ 46796 | $ 31 | $ 13650 | $ 13650 | 20 | 10 | $ 12892 | 200 | 4 | $ 16000 | $ - | 10 | $ 4254 | ||||||||||||||||||||||||||||||||||||||||
6 | San Juan Ave | 19th St | 20th St | 300 | 31 | 1033 | $ 31827 | $ 31 | $ 9300 | $ 9300 | 50 | 10 | $ 19633 | $ - | $ - | 10 | $ 2893 | ||||||||||||||||||||||||||||||||||||||||||
6 to 20 | Cherry St | F St | W St | 4200 | 32 | 14933 | $ 457307 | $ 31 | $ 134400 | $ 134400 | 5 | 5 | 4200 | $ 121333 | 200 | 6000 | $ 160000 | $ - | 10 | $ 41573 | |||||||||||||||||||||||||||||||||||||||
6 to 8 | Jackman St | 45th St | 49th St | 1100 | 22 | 2689 | $ 81940 | $ 30 | $ 24200 | $ 24200 | 15 | 10 | $ 18150 | 225 | 3 | 500 | $ 28250 | $ - | $ 5000 | 15 | $ 11340 | ||||||||||||||||||||||||||||||||||||||
6 to 12 | Jackson St | LawrenceMonroe | Roosevelt St | 1600 | 18 | 3200 | $ 93530 | $ 29 | $ 28800 | $ 28800 | 10 | 10 | $ 16000 | 1000 | $ 25000 | 1 | $ 15000 | $ 2500 | 10 | $ 8730 | |||||||||||||||||||||||||||||||||||||||
2 | 7th St | Wilson St | Holcomb St | 450 | 16 | 800 | $ 23320 | $ 29 | $ 7200 | $ 7200 | 10 | 10 | $ 4000 | 400 | $ 10000 | $ - | 10 | $ 2120 | |||||||||||||||||||||||||||||||||||||||||
8 to 14 | 25th St | Sherman St | Sheridan St | 800 | 20 | 1778 | $ 50061 | $ 28 | $ 16000 | $ 16000 | 10 | 5 | $ 7556 | 1 | 800 | $ 21500 | $ - | $ 5000 | 10 | $ 5006 | |||||||||||||||||||||||||||||||||||||||
2 to 6 | Hancock St | SR 20 | 9th St | 1100 | 20 | 2444 | $ 67833 | $ 28 | $ 22000 | $ 22000 | 15 | 5 | $ 14667 | 1000 | $ 25000 | $ - | 10 | $ 6167 | |||||||||||||||||||||||||||||||||||||||||
Benton St | Washington St | Lawrence St | 1160 | 22 | 2836 | $ 74468 | $ 26 | $ 25520 | $ 25520 | 10 | 10 | $ 14178 | 140 | 4 | 600 | $ 28000 | 10 | $ 6770 | |||||||||||||||||||||||||||||||||||||||||
W St | San JuanAdmiralty | Walnut St | 2560 | 22 | 6258 | $ 163807 | $ 26 | $ 56320 | $ 56320 | 10 | 5 | $ 26596 | 200 | 4 | 2000 | $ 66000 | $ - | 10 | $ 14892 | ||||||||||||||||||||||||||||||||||||||||
6 to 8 | Walnut | W Street | Jackson | 2300 | 22 | 5622 | $ 145194 | $ 26 | $ 50600 | $ 50600 | 10 | 5 | $ 23894 | 2300 | $ 57500 | $ - | 10 | $ 13199 | |||||||||||||||||||||||||||||||||||||||||
6 to 8 | 24th St | Discovery Rd | San Juan Ave | 1250 | 18 | 2500 | $ 63938 | $ 26 | $ 22500 | $ 22500 | 10 | 5 | $ 10625 | 1000 | $ 25000 | $ - | 10 | $ 5813 | |||||||||||||||||||||||||||||||||||||||||
6 to 10 | Tyler St | Lawrence St | Blaine St | 900 | 32 | 3200 | $ 78980 | $ 25 | $ 28800 | $ 28800 | 5 | 5 | $ 8000 | 200 | $ 5000 | 2 | $ 30000 | 10 | $ 7180 | ||||||||||||||||||||||||||||||||||||||||
4 to 12 | McPherson St | SR 20 | Discovery Rd | 2925 | 32 | 10400 | $ 244860 | $ 24 | $ 93600 | $ 93600 | 5 | 5 | 2925 | $ 84500 | 230 | 2 | 1200 | $ 44500 | $ - | $ - | 10 | $ 22260 | |||||||||||||||||||||||||||||||||||||
10 | Landes St | 12th St | 19th St | 1820 | 32 | 6471 | $ 151821 | $ 23 | $ 58240 | $ 58240 | 5 | 1400 | $ 39324 | 400 | $ 10000 | 2 | $ 30000 | $ 5000 | 10 | $ 14256 | |||||||||||||||||||||||||||||||||||||||
6 to 8 | Discovery Rd | 19th | Hastings Ave | 2900 | 22 | 7089 | $ 136565 | $ 19 | $ 63800 | $ 63800 | 15 | 10 | $ 47850 | 500 | $ 12500 | $ - | 10 | $ 12415 | |||||||||||||||||||||||||||||||||||||||||
8 to 12 | Hastings Ave | Discovery Rd | County Line | 8450 | 32 | 30044 | $ 542349 | $ 18 | $ 270400 | $ 270400 | 5 | 10 | 5000 | $ 197644 | 1000 | $ 25000 | $ - | 10 | $ 49304 | ||||||||||||||||||||||||||||||||||||||||
6 to 12 | Washington St | Van Buren St | SR20 | 2025 | 30 | 6750 | $ 118388 | $ 18 | $ 60750 | $ 60750 | 5 | 5 | $ 16875 | 0 | 0 | 0 | $ - | 2 | $ 30000 | $ - | 10 | $ 10763 | |||||||||||||||||||||||||||||||||||||
14 | Blaine St | San Juan Ave | Walker St | 1275 | 48 | 6800 | $ 113910 | $ 17 | $ 61200 | $ 61200 | 5 | $ 11900 | $ - | 2 | $ 30000 | $ 5000 | 10 | $ 10810 | |||||||||||||||||||||||||||||||||||||||||
6 | Washington St | Harrison St | Taylor St | 1175 | 33 | 4308 | $ 59240 | $ 14 | $ 38775 | $ 38775 | 10 | $ 15079 | $ - | $ - | 10 | $ 5385 | |||||||||||||||||||||||||||||||||||||||||||
8 to 10 | Sheridan St | SR 20 | 19th St | 4000 | 46 | 20444 | $ 272922 | $ 13 | $ 184000 | $ 184000 | 5 | 5 | $ 51111 | 200 | 2 | $ 13000 | $ - | 10 | $ 24811 | ||||||||||||||||||||||||||||||||||||||||
8 to 10 | 19th St | San Juan Ave | Sheridan St | 3200 | 48 | 17067 | $ 197120 | $ 12 | $ 153600 | $ 153600 | 3 | 3 | $ 25600 | 0 | 0 | 0 | $ - | $ - | 10 | $ 17920 | |||||||||||||||||||||||||||||||||||||||
10 to 20 | San Juan Ave | F St | Lopez Ave | 2800 | 32 | 9956 | $ 110059 | $ 11 | $ 89600 | $ 89600 | 3 | $ 10453 | $ - | $ - | 10 | $ 10005 | |||||||||||||||||||||||||||||||||||||||||||
10 to 20 | F St | Hastings Ave | Tyler St | 5300 | 31 | 18256 | $ 180730 | $ 10 | $ 164300 | $ 164300 | $ - | $ - | $ - | 10 | $ 16430 | ||||||||||||||||||||||||||||||||||||||||||||
$ 9952406 | $ 1873288 | $ 31744 | $ 274803 | $ 32667 | $ 332896 | $ 1998646 | $ 4544044 | $ 1155207 | $ 1747625 | $ 1215000 | $ 1290529 | $ - 0 | |||||||||||||||||||||||||||||||||||||||||||||||
Street Pavement Improvement Plan Projects | 9 | 110 | |||||||||||||||||||||||||||||||||||||||||||||
Road Name | From | To | Iworq ID | Length (ft) | Width (ft) | Area (yd^2) | Actual Area(SY) | Unit Cost per yd2 | Construction Cost | Prep Work | Survey Testing | ADA Curb Ramps | Storm Water | Mill amp Fill$50SY | Pre-Level$4SY | Total Construction | Project Cost + 10 | Unit Cost w Additional Costs no 10 | Engineering Costs | Notes | |||||||||||||||||||||||||||
Priority | Reconstruct | 2021 | 2022 | 2023 | 2024 | ||||||||||||||||||||||||||||||||||||||||||
1 | Reconstruct | Lawrence St | Cass St | Calhoun St | 1304 | 250 | 36 | 1000 | $ 80 | $ 80000 | $ 5000 | $ 20000 | $ 105000 | $ 115500 | $ 105 | Stormwater South Side Parking Raingarden on Cass | |||||||||||||||||||||||||||||||
2 | Reconstruct | Lawrence St | Walker St | Cass St | 250 | 36 | 1000 | $ 80 | $ 80000 | $ 5000 | $ 20000 | $ 5000 | $ 110000 | $ 121000 | $ 110 | Stormwater South Side Parking | |||||||||||||||||||||||||||||||
3 | Reconstruct Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | San Juan Ave | Lopez Ave | Admiralty | 2300 | 32 | 8178 | $ 50 | $ 408889 | $ 10000 | $ 100000 | $ 518889 | $ 570778 | $ 63 | Stormwater Problem 45th | ||||||||||||||||||||||||||||||||
4 | Reconstruct Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Polk St - Street Improvements | Lawrence St | 1056 Sarah Tiffany Sarah TiffanyGarfield | 1073 | 200 | 56 | 1244 | $ 50 | $ 62222 | X | X | X | $ 62222 | $ 68444 | $ 50 | Parking Theater 4 AC Watermain Infiltration or Rain Garden Parking on Condo Side | ||||||||||||||||||||||||||||||
Reconstruct | 47th Street | Pettygrove | McNeil | 500 | 18 | 1000 | 1548 | $ 50 | $ 50000 | $ 5000 | $ 40000 | $ 95000 | $ 104500 | $ 95 | $210000 Engineers Estimate With Engineering Cost Turnaround Spaghetti Waterline | ||||||||||||||||||||||||||||||||
Chip Seal - $50000 to $70000 per Mile | $6 No DigoutsPre-leveling | $10 with Additional Prep Work | |||||||||||||||||||||||||||||||||||||||||||||||
Chip Seal | Washington St | Van Buren St | SR20 | 2025 | 30 | 6750 | $ 10 | $ 67500 | $ 67500 | $ 74250 | Digouts Flagging | ||||||||||||||||||||||||||||||||||||
Chip Seal | Hastings Ave - Pre-level and widen shoulders | Discovery Rd | County Line | 8450 | 24 | 22533 | $ 6 | $ 135200 | $ 135200 | $ 148720 | Ditches amp Culverts Total Width change from 21 to 24 How wide will shoulders be | ||||||||||||||||||||||||||||||||||||
Tyler St | Jefferson St | Lawrence St | 900 | 32 | 3200 | $ 6 | $ 19200 | $ 19200 | $ 21120 | ||||||||||||||||||||||||||||||||||||||
Chip Seal | McPherson - Chip Seal | 4th St | Discovery Rd | 3100 | 32 | 11022 | $ 6 | $ 66133 | $ 66133 | $ 72747 | Ditches amp Culverts Shoulder Wideneing | ||||||||||||||||||||||||||||||||||||
Chip Seal | 19th St - Chip Seal | San Juan Ave | Sheridan St | 3200 | 48 | 17067 | $ 6 | $ 102400 | $ 102400 | $ 112640 | Bike Lanes amp Shoulder Prelevel | ||||||||||||||||||||||||||||||||||||
Chip Seal | Walnut | W Street | Jackson | 2300 | 22 | 5622 | $ 6 | $ 33733 | $ 33733 | $ 37107 | Dig-Outs Pre-Leveling Striping Shoulders | ||||||||||||||||||||||||||||||||||||
Chip Seal | Fir St - Chip Seal | F St | UCherry | 4360 | 22 | 10658 | $ 10 | $ 106578 | X | X | $ 106578 | $ 117236 | Dig-Outs Pre-Leveling Striping | ||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | |||||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | P St - Chip Seal | Redwood St | Cedar St | 0486 | 300 | 16 | 533 | $ 20 | $ 10667 | $ 10667 | $ 11733 | Watermain Looping Shouldnt this be part of Center | |||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 25th St - Chip Seal | Sheridan St | Holcomb St | 1200 | 18 | 2400 | $ 20 | $ 48000 | $ 48000 | $ 52800 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 14th St - Chip Seal | $ - | $ - | ||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Cedar St - Chip Seal | Redwood St | San Juan Ave | 1460 | 16 | 2596 | $ 20 | $ 51911 | $ 51911 | $ 57102 | Ex ChipSeal 22 Wide | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Center St - Chip Seal | Redwood St | San Juan Ave | 484 | 1660 | 16 | 2951 | $ 20 | $ 59022 | $ 59022 | $ 64924 | Ex ChipSeal 22 Wide Stormwater | |||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Grant St Chip Seal | 14th St | 16th St | 525 | 16 | 933 | $ 20 | $ 18667 | $ 18667 | $ 20533 | Ex Street 10 Wide | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 11th St Chip Seal | Hendricks St | Sheridan St | 550 | 16 | 978 | $ 20 | $ 19556 | $ 19556 | $ 21511 | Hospital Parking | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Hendricks St Chip Seal | 9th St | 12th St | 800 | 16 | 1422 | $ 20 | $ 28444 | $ 28444 | $ 31289 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 10th St Chip Seal | Hendricks St | Grant St | 1655 | 283 | 18 | 566 | $ 20 | $ 11320 | $ 11320 | $ 12452 | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Grant St Chip Seal | 14th St | 16th St | 525 | 18 | 1050 | $ 20 | $ 21000 | $ 21000 | $ 23100 | Ex Street 10 Wide Stormwater | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Hill St | 21st St | 19th St | 807 | 16 | 1435 | $ 20 | $ 28693 | $ 28693 | $ 31563 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Milo St -Chip seal | Olympic Ave | Pacific Ave | 0003 | 466 | 12 | 621 | $ 20 | $ 12427 | $ 12427 | $ 13669 | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Olympic St | Cedar St | Tremont St | 536 | 12 | 715 | $ 20 | $ 14293 | $ 14293 | $ 15723 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Benton St - street improvement | Blaine St | Lincoln Blg | 580 | 36 Sarah Tiffany Sarah TiffanyEstimated at 25-36 used higher number | Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Sarah Tiffany Sarah TiffanyGarfield | 2320 | $ 20 | $ 46400 | $ 46400 | $ 51040 | ||||||||||||||||||||||||||||||||||
Pave Gravel Road | |||||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Pacific St | Cedar St | Tremont St | 400 | 16 | 711 | $ 50 | $ 35556 | $ 6000 | $ 15000 | $ 56556 | $ 62211 | $ 80 | ||||||||||||||||||||||||||||||||||
58th St | Hill St | Kuhn St | 525 | 16 | 933 | $ 50 | $ 46667 | $ 6000 | $ 20000 | $ 72667 | $ 79933 | $ 78 | 4 AC Waterline Driveways Site Distance (Re-grade Slope) | ||||||||||||||||||||||||||||||||||
Sidewalks | |||||||||||||||||||||||||||||||||||||||||||||||
Harrison St | Franklin St | Clay St | 340 | 6 | 227 | $ 165 | $ 56100 | $ 5000 | $ 61100 | $ 67210 | $ 180 | ||||||||||||||||||||||||||||||||||||
9th St | Hancock St | McPherson St | 1300 | 6 | 867 | $ 165 | $ 214500 | $ 10000 | $ 15000 | $ 239500 | $ 263450 | $ 184 | |||||||||||||||||||||||||||||||||||
Asphalt Path | |||||||||||||||||||||||||||||||||||||||||||||||
Spruce St Easement | Cedar St | Center St | 150 | 8 | 133 | $ 50 | $ 6667 | $ 2000 | $ 8667 | $ 9533 | $ 65 | ||||||||||||||||||||||||||||||||||||
Cherry St | A St | E St | 990 | 10 | 1100 | $ 50 | $ 55000 | $ 10000 | $ 10000 | $ 15000 | $ 90000 | $ 99000 | $ 82 | ||||||||||||||||||||||||||||||||||
Gravel Path | |||||||||||||||||||||||||||||||||||||||||||||||
16th St | Thomas St | Grant St | 1700 | 6 | 1133 | $ 15 | $ 17000 | $ 1500 | $ 18500 | $ 20350 | |||||||||||||||||||||||||||||||||||||
Cleveland St | 21st St | 23rd St | 500 | 6 | 333 | $ 15 | $ 5000 | $ 5000 | $ 5500 | Need Easement | |||||||||||||||||||||||||||||||||||||
6 | - | $ 15 | $ - | $ - | $ - | Need Easement | |||||||||||||||||||||||||||||||||||||||||
6 | - | $ 15 | $ - | $ - | $ - | Need Easement | |||||||||||||||||||||||||||||||||||||||||
Total | $ 1582256 | $ 1792256 | $ 1971481 | ||||||||||||||||||||||||||||||||||||||||||||
Project Descriptioin | Length | Width | Construction Costs | ConstructionUnit Costs | Units | Engineering Costs | Total CostsUnit Cost | Total Costs | Total CostsUnit Cost | Notes | |||||||||||
Sidewalk | |||||||||||||||||||||
9th Street Sidewalk Grant Street to Hancock Street | 826 | 6 | $ 141506 | $ 17131 | LF | Construction Unit Cost per Foot | |||||||||||||||
Jefferson Street Sidewalk Washington Street to Taylor Street | 724 | 6 | $ 390502 | $ 53937 | LF | Construction Unit Cost per Foot | |||||||||||||||
Landis Street Sidewalk 10th Street to 19th Street | 1795 | 6 | $ 364550 | $ 20309 | LF | Construction Unit Cost per Foot | |||||||||||||||
ADA Corner Ramps | |||||||||||||||||||||
Washington Street amp Harrison Street | $ 42000 | $ 42000 | Each | ||||||||||||||||||
Washington Street amp Adams Street | $ 38150 | $ 19075 | Each | Two Corners Were Retrofitted | |||||||||||||||||
Chip Seal Pavement | |||||||||||||||||||||
Walker Street Washington Street to Lawrence Street | 1144 | 24 | $ 20000 | $ 656 | SY | Does not include flagging nor prep work | |||||||||||||||
Pulverize amp Asphalt Paving | |||||||||||||||||||||
Washington Street VanBuren Street to Harrison Street | 300 | 22 | $ 35000 | $ 4773 | SY | ||||||||||||||||
Asphalt Overlay | |||||||||||||||||||||
Sidewalks | ||||||||||||||||||||||||||||||||||||||
Harrison St | Franklin St | Clay St | 340 | 6 | 227 | |||||||||||||||||||||||||||||||||
9th St | Hancock St | McPherson St | 1300 | 6 | 867 | |||||||||||||||||||||||||||||||||
Asphalt Path | ||||||||||||||||||||||||||||||||||||||
Spruce St Easement | Cedar St | Center St | 150 | 8 | 133 | $ 2000 | $ 2000 | $ 2000 | ||||||||||||||||||||||||||||||
Cherry St | A St | E St | 990 | 10 | 1100 | $ 10000 | $ 10000 | $ 10000 | ||||||||||||||||||||||||||||||
Gravel Path | ||||||||||||||||||||||||||||||||||||||
16th St | Thomas St | Grant St | 1700 | 6 | 1133 | $ 1500 | $ 1500 | $ 1500 | ||||||||||||||||||||||||||||||
Cleveland St | 21st St | 23rd St | 500 | 6 | 333 | Need Easement | ||||||||||||||||||||||||||||||||
6 | - | Need Easement | ||||||||||||||||||||||||||||||||||||
6 | - | Need Easement | ||||||||||||||||||||||||||||||||||||
Total |
Type | Improvement | Cost Range SY | Cost Range LF | ||||||||
1 | Complete Road Rebuild | $80 | $100 | ||||||||
2 | Asphalt Overlay | $50 | $60 | ||||||||
3 | Pulverize amp Chip Seal | $20 | $30 | ||||||||
4 | Chip Seal | $6 | $10 | $12 | $25 | ||||||
5 | Seal Coat | ||||||||||
6 | |||||||||||
7 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 3-Inch | 413 | TONS | $ 15000 | $ 6187500 | 1000 x 22 x 025 httpwwwamerasphaltcomasphalthtm | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 1630 | CY | $ 4800 | $ 7824000 | Water Street Project = $48 CY (1000 x 22 x 2)27 = 1630 CY | ||||||
Gravel Borrow | 2282 | TONS | $ 3000 | $ 6846000 | (1000 x 22 x 2)27 = 1630 1630 CY x 14 = 2282 Tons | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 128 | Hours | $ 5728 | $ 733133 | (2) People for 64 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 25043033 | |||||||||||
$ 10247 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 2-Inch | 275 | TONS | $ 15000 | $ 4125000 | 1000 x 22 x 017 httpwwwamerasphaltcomasphalthtm | | ||||||
Digouts amp Pre-leveling | 122 | SY | $ 4900 | $ 597800 | |||||||
Flagging | 64 | Hours | $ 5728 | $ 366566 | (2) People for 32 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 180000 | $ 180000 | |||||||
$ 5403066 | |||||||||||
$ 2211 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 3-Inch | 413 | TONS | $ 15000 | $ 6187500 | 1000 x 22 x 025 httpwwwamerasphaltcomasphalthtm | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 150 | CY | $ 4800 | $ 720000 | Water Street Project = $48 CY | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 96 | Hours | $ 5728 | $ 549850 | (2) People for 48 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 10909750 | |||||||||||
$ 4464 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Chip Seal | 2444 | SY | $ 1050 | $ 2566200 | 1000 X 22 | Unit Cost $525 SY from Walker Street County Invoice Doubled to $1050 for Chip Seal Over Gravel | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 150 | CY | $ 4800 | $ 720000 | Water Street Project = $48 CY | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 80 | Hours | $ 5728 | $ 458208 | (2) People for 40 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | Hours | $ 12500 | $ - 0 | High Average Loaded Rate No Testing | ||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 7196808 | |||||||||||
$ 2945 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 1500000 | $614 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 500 | LF | $ 5000 | $ 2500000 | |||||||
Catch Basins | 4 | EACH | $ 150000 | $ 600000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Chip Seal | 2444 | SY | $ 525 | $ 1283100 | 1000 X 22 | Unit Cost from Walker Street County Invoice | ||||||
Digouts amp Pre-leveling | 122 | SY | $ 4900 | $ 598780 | Cost from 2018 Lakeside Mill amp Fill | Estimate Quanity Based on 5 | ||||||
Flagging | 32 | Hours | $ 5728 | $ 183283 | (2) People for 16 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | Hours | $ 12500 | $ - 0 | High Average Loaded Rate No Surveying or Testing | ||||||
Surveying | 1 | LS | $ - 0 | $ - 0 | |||||||
$ 2198863 | |||||||||||
$ 900 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 1500000 | $614 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY |
Project Descriptioin | Length | Width | Construction Costs | Engineering Costs | Engineering Total | Digouts Pre-Leveling Costs | Digouts Pre-Leveling Total | ADACosts | ADATotal | StormwaterCosts | StormwaterTotal | Total Costsby SY | Cost Per 250 Block | Length | Width | Notes | |||||||||||||||||
Chip Seal Pavement | |||||||||||||||||||||||||||||||||
Walker Street Washington Street to Lawrence Street | 1144 | 24 | $ 25000 | 15 | $ 3750 | 10 | $ 2500 | $ 1024 | $ 682911 | 250 | 24 | ||||||||||||||||||||||
Pulverize amp Chip Seal | |||||||||||||||||||||||||||||||||
Engineers Estimate | 250 | 24 | $ 22000 | 15 | $ 3300 | 0 | $ - | 20 | $ 4400 | $ 4455 | $ 2970000 | 250 | 24 | ||||||||||||||||||||
Pulverize amp Asphalt Paving | |||||||||||||||||||||||||||||||||
Washington Street VanBuren Street to Harrison Street | 300 | 22 | $ 35000 | 20 | $ 7000 | 0 | $ - | 10 | $ 3500 | 20 | $ 7000 | $ 7159 | $ 4772727 | 250 | 24 | ||||||||||||||||||
Asphalt Overlay (2) | |||||||||||||||||||||||||||||||||
Engineers Estimate | 250 | 24 | $ 21334 | 20 | $ 426680 | 10 | $ 2133 | 20 | $ 426680 | 20 | $ 426680 | $ 5440 | $ 4835707 | 250 | 32 | ||||||||||||||||||
Reconstruction | |||||||||||||||||||||||||||||||||
Walker Street Lawrence Street to Blaine Street | 650 | 36 | $ 184310 | 25 | $ 46078 | 0 | $ - | 20 | $ 36862 | 30 | $ 55293 | $ 12405 | $ 11027094 | 250 | 32 | ||||||||||||||||||
RSL | Length (FT) | Area (SY) | Condition | Treatment | Cost | Total | |||||||||
20 | 61834 | 138524 | 131 | Good | $0 | $0 | |||||||||
14 | 23656 | 49915 | 47 | Satisfactory | Chip Seal | $29 | $1470552 | ||||||||
12 | 43586 | 106382 | 100 | $3134134 | |||||||||||
10 | 74803 | 193570 | 182 | $5702790 | |||||||||||
8 | 96662 | 228046 | 215 | $6718492 | |||||||||||
6 | 95452 | 261794 | 247 | Fair | Overlay | $67 | $17489930 | ||||||||
4 | 6420 | 14536 | 14 | $971121 | |||||||||||
2 | 29238 | 60616 | 57 | Poor | Rehab | $107 | $6492850 | ||||||||
0 | 3851 | 7532 | 07 | Very Poor | Rebuild | $155 | $1169719 | ||||||||
$43149589 | |||||||||||||||
Additional Paving Costs | Average Cost per SY | Percent of Paving Cost | |||
Digouts amp Pre-Leveling | $4 | 25 | |||
Stormwater | $7 | 38 | |||
ADA | $5 | 27 | |||
Engineering amp Administration | $5 | 28 |
9 | Base Paving Costs | Preperation | Stormwater | ADA | Engineering | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Remaining Service Life | Road Name | From | To | Length (ft) | Width (ft) | Area (SY) | Total Construction | Price(SY) | Reconstruction | Pulverize amp Pave | Ashpalt Overlay | Pave Gravel Road | Pulverize amp Chip Seal | Chip Seal | Total Base Paving Costs | Digouts(SY) | Pre-Leveling(SY) | Construct Shoulders Both Sides (LF) | Preparation Total | StormwaterPipes (LF) | StormwaterCatchbasins | StormwaterSwales (LF) | Stormwater Total | Curb Ramps | Curb Ramps Total | Surveying | Engineering amp Administration | Engineering amp Administration Total | Other Work | ||||||||||||||||||||||||||||||
$102 | $45 | $22 | $35 | $29 | $9 | $35 | $15 | $20 | $50 | $1500 | $25 | $15000 | |||||||||||||||||||||||||||||||||||||||||||||||
2 | Polk St - Street | Lawrence St | 1056 | 200 | 56 | 1244 | $ 210679 | $ 169 | $ 127518 | $ 127518 | $ - | 150 | 1 | 1 | $ 9025 | 2 | $ 30000 | $ 10000 | 25 | $ 44136 | |||||||||||||||||||||||||||||||||||||||
6 | 47th Street | Pettygrove | McNeil | 500 | 18 | 1548 | $ 258717 | $ 167 | $ 158624 | $ 158624 | $ - | 687 | 8 | $ 46350 | $ - | $ 10000 | 25 | $ 53743 | |||||||||||||||||||||||||||||||||||||||||
6 to 10 | Lawrence St | Calhoun St | Harrison St | 1200 | 36 | 4800 | $ 786070 | $ 164 | $ 491856 | $ 491856 | 600 | $ 15000 | $ 8 | $ 120000 | $ 10000 | 25 | $ 159214 | ||||||||||||||||||||||||||||||||||||||||||
8 | Lawrence St | Cass St | Calhoun St | 250 | 36 | 1000 | $ 146213 | $ 146 | $ 102470 | $ 102470 | 0 | 0 | $ - | 75 | 350 | $ 12500 | $ - | $ 10000 | 25 | $ 31243 | |||||||||||||||||||||||||||||||||||||||
8 | Lawrence St | Walker St | Cass St | 250 | 36 | 1000 | $ 144650 | $ 145 | $ 102470 | $ 102470 | $ - | 100 | 250 | $ 11250 | $ - | $ 10000 | 25 | $ 30930 | |||||||||||||||||||||||||||||||||||||||||
4 to 8 | San Juan Ave | Lopez Ave | Admiralty | 2300 | 34 | 8689 | $ 1222938 | $ 141 | $ 890350 | $ 890350 | $ - | 800 | 5 | 1500 | $ 85000 | $ - | $ 15000 | 25 | $ 247588 | ||||||||||||||||||||||||||||||||||||||||
6 to 8 | Lawrence St | Harrison St | Monroe St | 2380 | 47 | 12429 | $ 1331314 | $ 107 | $ 274803 | $ 274803 | 15 | 5 | $ 74573 | 1900 | 10 | $ 110000 | 50 | $ 750000 | $ 10000 | 10 | $ 121938 | ||||||||||||||||||||||||||||||||||||||
2 to 4 | Center St | San Juan Ave | Redwood St | 1660 | 16 | 2951 | $ 295222 | $ 100 | $ 86910 | $ 86910 | $ - | 1600 | 9 | 3000 | $ 168500 | $ - | $ 10000 | 15 | $ 39812 | ||||||||||||||||||||||||||||||||||||||||
0 to 6 | Pacific St | Cedar St | Tremont St | 400 | 16 | 711 | $ 66581 | $ 94 | $ 31744 | $ 31744 | $ - | 100 | 2 | 700 | $ 25500 | $ - | $ 5000 | 15 | $ 9337 | ||||||||||||||||||||||||||||||||||||||||
0 to 6 | Benton St | Lawrence | Lincoln Blg | 580 | 36 | 2320 | $ 203265 | $ 88 | $ 20880 | $ 20880 | 20 | 10 | $ 19720 | 250 | 2 | $ 15500 | 8 | $ 120000 | $ 5000 | 15 | $ 27165 | ||||||||||||||||||||||||||||||||||||||
2 | Grant St | 14th St | 16th St | 525 | 16 | 933 | $ 73635 | $ 79 | $ 27487 | $ 27487 | $ - | 400 | 2 | 500 | $ 35500 | $ - | $ 8000 | 15 | $ 10648 | ||||||||||||||||||||||||||||||||||||||||
2 to 6 | Olympic St | Cedar St | Tremont St | 536 | 12 | 715 | $ 52716 | $ 74 | $ 21047 | $ 21047 | $ - | 950 | $ 23750 | $ - | $ 8000 | 15 | $ 7920 | ||||||||||||||||||||||||||||||||||||||||||
2 | Milo St | Olympic Ave | Pacific Ave | 466 | 12 | 621 | $ 44793 | $ 72 | $ 18298 | $ 18298 | $ - | 800 | $ 20000 | $ - | $ 5000 | 15 | $ 6495 | ||||||||||||||||||||||||||||||||||||||||||
0 | 11th St | Hendricks St | Sheridan St | 550 | 16 | 978 | $ 65077 | $ 67 | $ 28796 | $ 28796 | $ - | 100 | 2 | 750 | $ 26750 | $ - | $ 8000 | 15 | $ 9532 | ||||||||||||||||||||||||||||||||||||||||
0 | 58th St | Hill St | Kuhn St | 525 | 16 | 933 | $ 60329 | $ 65 | $ 32667 | $ 32667 | $ - | 750 | $ 18750 | $ - | $ 8000 | 15 | $ 8913 | ||||||||||||||||||||||||||||||||||||||||||
2 | 10th St | Hendricks St | Grant St | 283 | 18 | 566 | $ 34294 | $ 61 | $ 16669 | $ 16669 | $ - | 500 | $ 12500 | $ - | $ 5000 | 15 | $ 5125 | ||||||||||||||||||||||||||||||||||||||||||
4 to 10 | 31st St | Hancock St | Sheridan St | 1050 | 22 | 2567 | $ 150027 | $ 58 | $ 23100 | $ 23100 | 10 | 10 | $ 12833 | 1200 | 10 | 1000 | $ 100000 | $ - | $ 5000 | 10 | $ 14093 | ||||||||||||||||||||||||||||||||||||||
6 | 25th St | Sheridan St | Holcomb St | 1200 | 18 | 2400 | $ 125895 | $ 52 | $ 70680 | $ 70680 | $ - | 125 | 1 | 1200 | $ 37750 | $ - | $ 8000 | 15 | $ 17465 | ||||||||||||||||||||||||||||||||||||||||
6 | Holcomb St | 7th St | 10th St | 850 | 12 | 1133 | $ 58703 | $ 52 | $ 10200 | $ 10200 | 10 | 10 | $ 5667 | 1500 | $ 37500 | $ - | $ - | 10 | $ 5337 | ||||||||||||||||||||||||||||||||||||||||
2 | Hendricks St | 9th St | 12th St | 800 | 16 | 1422 | $ 70930 | $ 50 | $ 41884 | $ 41884 | $ - | 750 | $ 18750 | $ - | $ 8000 | 15 | $ 10295 | ||||||||||||||||||||||||||||||||||||||||||
2 to 6 | Hill St | 19th | 21st St | 807 | 16 | 1435 | $ 67443 | $ 47 | $ 21125 | $ 6456 | $ 27581 | 10 | $ 5021 | 1000 | $ 25000 | $ - | $ 8000 | 15 | $ 9840 | ||||||||||||||||||||||||||||||||||||||||
2 to 8 | 57th St | Jackman St | Kuhn St | 800 | 18 | 1600 | $ 66550 | $ 42 | $ 14400 | $ 14400 | 20 | 10 | $ 13600 | 1300 | $ 32500 | 10 | $ 6050 | ||||||||||||||||||||||||||||||||||||||||||
6 to 8 | Sheridan St | Hastings Ave | SilverUmatilla | 1750 | 22 | 4278 | $ 154115 | $ 36 | $ 38500 | $ 38500 | 20 | 10 | $ 36361 | 300 | 4 | 1500 | $ 58500 | $ - | $ 5000 | 15 | $ 20754 | ||||||||||||||||||||||||||||||||||||||
6 to 10 | Tyler St | Jefferson St | Lawrence St | 900 | 32 | 3200 | $ 115280 | $ 36 | $ 28800 | $ 28800 | 5 | 5 | $ 8000 | 100 | 2 | $ 8000 | 4 | $ 60000 | 10 | $ 10480 | |||||||||||||||||||||||||||||||||||||||
6 to 14 | 14th St | McPherson St | Sheridan St | 2375 | 21 | 5542 | $ 182027 | $ 33 | $ 49875 | $ 49875 | 20 | 10 | $ 47104 | 750 | 4 | 1000 | $ 68500 | $ - | 10 | $ 16548 | |||||||||||||||||||||||||||||||||||||||
8 | 49th St | Kuhn St | Admiralty Ave | 400 | 24 | 1067 | $ 34613 | $ 32 | $ 9600 | $ 9600 | 5 | $ 1867 | 800 | $ 20000 | $ - | 10 | $ 3147 | ||||||||||||||||||||||||||||||||||||||||||
6 to 10 | Fir St | F St | UCherry | 4360 | 22 | 10658 | $ 341621 | $ 32 | $ 95920 | $ 95920 | 5 | 5 | 4000 | $ 106644 | 100 | 2 | 4000 | $ 108000 | $ - | 10 | $ 31056 | ||||||||||||||||||||||||||||||||||||||
6 to 8 | Cedar St | San Juan Ave | Redwood St | 1460 | 16 | 2596 | $ 81747 | $ 31 | $ 23360 | $ 23360 | 20 | 20 | $ 25956 | 1000 | $ 25000 | $ - | 10 | $ 7432 | |||||||||||||||||||||||||||||||||||||||||
8 | Clallam St | McKinley St | Roosevelt St | 975 | 14 | 1517 | $ 46796 | $ 31 | $ 13650 | $ 13650 | 20 | 10 | $ 12892 | 200 | 4 | $ 16000 | $ - | 10 | $ 4254 | ||||||||||||||||||||||||||||||||||||||||
6 | San Juan Ave | 19th St | 20th St | 300 | 31 | 1033 | $ 31827 | $ 31 | $ 9300 | $ 9300 | 50 | 10 | $ 19633 | $ - | $ - | 10 | $ 2893 | ||||||||||||||||||||||||||||||||||||||||||
6 to 20 | Cherry St | F St | W St | 4200 | 32 | 14933 | $ 457307 | $ 31 | $ 134400 | $ 134400 | 5 | 5 | 4200 | $ 121333 | 200 | 6000 | $ 160000 | $ - | 10 | $ 41573 | |||||||||||||||||||||||||||||||||||||||
6 to 8 | Jackman St | 45th St | 49th St | 1100 | 22 | 2689 | $ 81940 | $ 30 | $ 24200 | $ 24200 | 15 | 10 | $ 18150 | 225 | 3 | 500 | $ 28250 | $ - | $ 5000 | 15 | $ 11340 | ||||||||||||||||||||||||||||||||||||||
6 to 12 | Jackson St | LawrenceMonroe | Roosevelt St | 1600 | 18 | 3200 | $ 93530 | $ 29 | $ 28800 | $ 28800 | 10 | 10 | $ 16000 | 1000 | $ 25000 | 1 | $ 15000 | $ 2500 | 10 | $ 8730 | |||||||||||||||||||||||||||||||||||||||
2 | 7th St | Wilson St | Holcomb St | 450 | 16 | 800 | $ 23320 | $ 29 | $ 7200 | $ 7200 | 10 | 10 | $ 4000 | 400 | $ 10000 | $ - | 10 | $ 2120 | |||||||||||||||||||||||||||||||||||||||||
8 to 14 | 25th St | Sherman St | Sheridan St | 800 | 20 | 1778 | $ 50061 | $ 28 | $ 16000 | $ 16000 | 10 | 5 | $ 7556 | 1 | 800 | $ 21500 | $ - | $ 5000 | 10 | $ 5006 | |||||||||||||||||||||||||||||||||||||||
2 to 6 | Hancock St | SR 20 | 9th St | 1100 | 20 | 2444 | $ 67833 | $ 28 | $ 22000 | $ 22000 | 15 | 5 | $ 14667 | 1000 | $ 25000 | $ - | 10 | $ 6167 | |||||||||||||||||||||||||||||||||||||||||
Benton St | Washington St | Lawrence St | 1160 | 22 | 2836 | $ 74468 | $ 26 | $ 25520 | $ 25520 | 10 | 10 | $ 14178 | 140 | 4 | 600 | $ 28000 | 10 | $ 6770 | |||||||||||||||||||||||||||||||||||||||||
W St | San JuanAdmiralty | Walnut St | 2560 | 22 | 6258 | $ 163807 | $ 26 | $ 56320 | $ 56320 | 10 | 5 | $ 26596 | 200 | 4 | 2000 | $ 66000 | $ - | 10 | $ 14892 | ||||||||||||||||||||||||||||||||||||||||
6 to 8 | Walnut | W Street | Jackson | 2300 | 22 | 5622 | $ 145194 | $ 26 | $ 50600 | $ 50600 | 10 | 5 | $ 23894 | 2300 | $ 57500 | $ - | 10 | $ 13199 | |||||||||||||||||||||||||||||||||||||||||
6 to 8 | 24th St | Discovery Rd | San Juan Ave | 1250 | 18 | 2500 | $ 63938 | $ 26 | $ 22500 | $ 22500 | 10 | 5 | $ 10625 | 1000 | $ 25000 | $ - | 10 | $ 5813 | |||||||||||||||||||||||||||||||||||||||||
6 to 10 | Tyler St | Lawrence St | Blaine St | 900 | 32 | 3200 | $ 78980 | $ 25 | $ 28800 | $ 28800 | 5 | 5 | $ 8000 | 200 | $ 5000 | 2 | $ 30000 | 10 | $ 7180 | ||||||||||||||||||||||||||||||||||||||||
4 to 12 | McPherson St | SR 20 | Discovery Rd | 2925 | 32 | 10400 | $ 244860 | $ 24 | $ 93600 | $ 93600 | 5 | 5 | 2925 | $ 84500 | 230 | 2 | 1200 | $ 44500 | $ - | $ - | 10 | $ 22260 | |||||||||||||||||||||||||||||||||||||
10 | Landes St | 12th St | 19th St | 1820 | 32 | 6471 | $ 151821 | $ 23 | $ 58240 | $ 58240 | 5 | 1400 | $ 39324 | 400 | $ 10000 | 2 | $ 30000 | $ 5000 | 10 | $ 14256 | |||||||||||||||||||||||||||||||||||||||
6 to 8 | Discovery Rd | 19th | Hastings Ave | 2900 | 22 | 7089 | $ 136565 | $ 19 | $ 63800 | $ 63800 | 15 | 10 | $ 47850 | 500 | $ 12500 | $ - | 10 | $ 12415 | |||||||||||||||||||||||||||||||||||||||||
8 to 12 | Hastings Ave | Discovery Rd | County Line | 8450 | 32 | 30044 | $ 542349 | $ 18 | $ 270400 | $ 270400 | 5 | 10 | 5000 | $ 197644 | 1000 | $ 25000 | $ - | 10 | $ 49304 | ||||||||||||||||||||||||||||||||||||||||
6 to 12 | Washington St | Van Buren St | SR20 | 2025 | 30 | 6750 | $ 118388 | $ 18 | $ 60750 | $ 60750 | 5 | 5 | $ 16875 | 0 | 0 | 0 | $ - | 2 | $ 30000 | $ - | 10 | $ 10763 | |||||||||||||||||||||||||||||||||||||
14 | Blaine St | San Juan Ave | Walker St | 1275 | 48 | 6800 | $ 113910 | $ 17 | $ 61200 | $ 61200 | 5 | $ 11900 | $ - | 2 | $ 30000 | $ 5000 | 10 | $ 10810 | |||||||||||||||||||||||||||||||||||||||||
6 | Washington St | Harrison St | Taylor St | 1175 | 33 | 4308 | $ 59240 | $ 14 | $ 38775 | $ 38775 | 10 | $ 15079 | $ - | $ - | 10 | $ 5385 | |||||||||||||||||||||||||||||||||||||||||||
8 to 10 | Sheridan St | SR 20 | 19th St | 4000 | 46 | 20444 | $ 272922 | $ 13 | $ 184000 | $ 184000 | 5 | 5 | $ 51111 | 200 | 2 | $ 13000 | $ - | 10 | $ 24811 | ||||||||||||||||||||||||||||||||||||||||
8 to 10 | 19th St | San Juan Ave | Sheridan St | 3200 | 48 | 17067 | $ 197120 | $ 12 | $ 153600 | $ 153600 | 3 | 3 | $ 25600 | 0 | 0 | 0 | $ - | $ - | 10 | $ 17920 | |||||||||||||||||||||||||||||||||||||||
10 to 20 | San Juan Ave | F St | Lopez Ave | 2800 | 32 | 9956 | $ 110059 | $ 11 | $ 89600 | $ 89600 | 3 | $ 10453 | $ - | $ - | 10 | $ 10005 | |||||||||||||||||||||||||||||||||||||||||||
10 to 20 | F St | Hastings Ave | Tyler St | 5300 | 31 | 18256 | $ 180730 | $ 10 | $ 164300 | $ 164300 | $ - | $ - | $ - | 10 | $ 16430 | ||||||||||||||||||||||||||||||||||||||||||||
$ 9952406 | $ 1873288 | $ 31744 | $ 274803 | $ 32667 | $ 332896 | $ 1998646 | $ 4544044 | $ 1155207 | $ 1747625 | $ 1215000 | $ 1290529 | $ - 0 | |||||||||||||||||||||||||||||||||||||||||||||||
What is Pavement Preservation
For the purpose of the Comprehensive Streets Program pavement preservation is the investment the City makes in managing existing pavement
Pavement preservation are not considered improvement projects (refer to Chapter 4) Improvements projects are typically the addition of sidewalks bike lanes public space etc Pavement preservation is investment in managing our existing roads as they are Side note 1 some improvement projects like Discovery Road impact
pavement preservation program in a positive way by eliminating the need for city investment over the next 20 years
Side note 2 pavement preservation makes nominal investments in safety by fixing shoulders
Lawrence near Monroe St
San Juan near the Cemetery
Estimated 2020 Revenues 2020Motor Vehicle Fuel Tax $217000
Utility Tax $695000
P A V E M E N TO P T I O N S
1 Chip Seal
2 Pulverize and Chip Seal
3 Asphalt Overlay
4 Pulverize and Asphalt Paving
5 Reconstruction
$
$$
$$
$$$
$$$$$
Cost Treatment______
C H I P S E A L
bull $7065 per Block (250rsquox24rsquo)
bull $1104 SY
bull Seals Cracks
bull Provides a Wear Course
bull 10 ndash 15 Year Longevity
P U L V E R I Z E C H I P S E A L
bull $21680 per Block (250rsquox24rsquo)
bull $3252 SY
bull Generally Requires Some Stormwater Infrastructure
bull 10 ndash 15 Year Longevity
A S P H A L TO V E R L A Y
bull $22596 per Block (250rsquox32rsquo)
bull $2542 SY
bull Generally Requires Some Stormwater Infrastructure
bull Requires ADA Ramp Upgrades If Adjacent
bull 15 ndash 25 Year Longevity
P U L V E R I Z E A S P H A L T
bull $34222 per Block (250rsquox24rsquo)
bull $5133 SY
bull Generally Requires Some Stormwater Infrastructure
bull Requires ADA Ramp Upgrades If Adjacent
bull 15 ndash 25 Year LongevityWashington Street amp Harrison Street
R E C O N S T R U C T I O N
bull $99004 per Block (250rsquox32rsquo)
bull $11138 SY
bull Generally Requires Stormwater Infrastructure
bull Requires ADA Ramp Upgrades If Adjacent
bull 20 ndash 25 Year LongevityWater Street amp Fillmore Street
A D D I T I O N A L C O S T S
bull Drainage Swales amp Stormwater Infrastructure
bull Digoutsbull ADA Curb Rampsbull EngineeringAdministrationbull Digouts and pre-level
Stormwater at Pacific Avenue amp Milo Street
ADA needs at Lawrence Street amp Adams Street
Insert I worq street rating
1 How many street segments were rated
1 Insert map of 10 year program
1 Insert table Too small to read is ok Wersquoll include it as a handout in 11x17
Rem
aini
ng
Serv
ice Li
feRoad Name From To
Length (ft)
Width (ft)
Area (SY)
Total Construction
Price(SY)
Re
cons
truc
tion
Pul
veriz
e amp
Pa
ve
Ash
palt
Ove
rlay
Pav
e Gr
avel
Ro
ad
Pul
veriz
e amp
Ch
ip S
eal
Chi
p Se
al
Tot
al B
ase
Pavi
ng C
osts
Dig
outs
(SY)
Pre
-Lev
elin
g(S
Y)
Con
stru
ct
Shou
lder
s Bot
h Si
des (
LF)
Pre
para
tion
Tota
l
Sto
rmw
ater
Pipe
s (LF
)
Sto
rmw
ater
Catc
hbas
ins
Sto
rmw
ater
Swal
es (L
F)
Sto
rmw
ater
To
tal
Cur
b Ra
mps
Cur
b Ra
mps
To
tal
Sur
veyi
ng
Eng
inee
ring
amp
Adm
inist
ratio
n
Eng
inee
ring
amp
Adm
inist
ratio
n To
tal
$102 $45 $22 $35 $29 $9 $35 $15 $20 $50 $1500 $25 $150002 Polk St - Street Lawrence St 1056 200 56 1244 210679$ 169$ 127518$ 127518$ -$ 150 1 1 9025$ 2 30000$ 10000$ 25 44136$ 6 47th Street Pettygrove McNeil 500 18 1548 258717$ 167$ 158624$ 158624$ -$ 687 8 46350$ -$ 10000$ 25 53743$
6 to 10 Lawrence St Calhoun St Harrison St 1200 36 4800 786070$ 164$ 491856$ 491856$ 600 15000$ 8$ 120000$ 10000$ 25 159214$ 8 Lawrence St Cass St Calhoun St 250 36 1000 146213$ 146$ 102470$ 102470$ 0 0 -$ 75 350 12500$ -$ 10000$ 25 31243$ 8 Lawrence St Walker St Cass St 250 36 1000 144650$ 145$ 102470$ 102470$ -$ 100 250 11250$ -$ 10000$ 25 30930$
4 to 8 San Juan Ave Lopez Ave Admiralty 2300 34 8689 1222938$ 141$ 890350$ 890350$ -$ 800 5 1500 85000$ -$ 15000$ 25 247588$ 6 to 8 Lawrence St Harrison St Monroe St 2380 47 12429 1331314$ 107$ 274803$ 274803$ 15 5 74573$ 1900 10 110000$ 50 750000$ 10000$ 10 121938$ 2 to 4 Center St San Juan Ave Redwood St 1660 16 2951 295222$ 100$ 86910$ 86910$ -$ 1600 9 3000 168500$ -$ 10000$ 15 39812$ 0 to 6 Pacific St Cedar St Tremont St 400 16 711 66581$ 94$ 31744$ 31744$ -$ 100 2 700 25500$ -$ 5000$ 15 9337$ 0 to 6 Benton St Lawrence Lincoln Blg 580 36 2320 203265$ 88$ 20880$ 20880$ 20 10 19720$ 250 2 15500$ 8 120000$ 5000$ 15 27165$
2 Grant St 14th St 16th St 525 16 933 73635$ 79$ 27487$ 27487$ -$ 400 2 500 35500$ -$ 8000$ 15 10648$ 2 to 6 Olympic St Cedar St Tremont St 536 12 715 52716$ 74$ 21047$ 21047$ -$ 950 23750$ -$ 8000$ 15 7920$
2 Milo St Olympic Ave Pacific Ave 466 12 621 44793$ 72$ 18298$ 18298$ -$ 800 20000$ -$ 5000$ 15 6495$ 0 11th St Hendricks St Sheridan St 550 16 978 65077$ 67$ 28796$ 28796$ -$ 100 2 750 26750$ -$ 8000$ 15 9532$ 0 58th St Hill St Kuhn St 525 16 933 60329$ 65$ 32667$ 32667$ -$ 750 18750$ -$ 8000$ 15 8913$ 2 10th St Hendricks St Grant St 283 18 566 34294$ 61$ 16669$ 16669$ -$ 500 12500$ -$ 5000$ 15 5125$
4 to 10 31st St Hancock St Sheridan St 1050 22 2567 150027$ 58$ 23100$ 23100$ 10 10 12833$ 1200 10 1000 100000$ -$ 5000$ 10 14093$ 6 25th St Sheridan St Holcomb St 1200 18 2400 125895$ 52$ 70680$ 70680$ -$ 125 1 1200 37750$ -$ 8000$ 15 17465$ 6 Holcomb St 7th St 10th St 850 12 1133 58703$ 52$ 10200$ 10200$ 10 10 5667$ 1500 37500$ -$ -$ 10 5337$ 2 Hendricks St 9th St 12th St 800 16 1422 70930$ 50$ 41884$ 41884$ -$ 750 18750$ -$ 8000$ 15 10295$
2 to 6 Hill St 19th 21st St 807 16 1435 67443$ 47$ 21125$ 6456$ 27581$ 10 5021$ 1000 25000$ -$ 8000$ 15 9840$ 2 to 8 57th St Jackman St Kuhn St 800 18 1600 66550$ 42$ 14400$ 14400$ 20 10 13600$ 1300 32500$ 10 6050$ 6 to 8 Sheridan St Hastings Ave SilverUmatilla 1750 22 4278 154115$ 36$ 38500$ 38500$ 20 10 36361$ 300 4 1500 58500$ -$ 5000$ 15 20754$ 6 to 10 Tyler St Jefferson St Lawrence St 900 32 3200 115280$ 36$ 28800$ 28800$ 5 5 8000$ 100 2 8000$ 4 60000$ 10 10480$ 6 to 14 14th St McPherson St Sheridan St 2375 21 5542 182027$ 33$ 49875$ 49875$ 20 10 47104$ 750 4 1000 68500$ -$ 10 16548$
8 49th St Kuhn St Admiralty Ave 400 24 1067 34613$ 32$ 9600$ 9600$ 5 1867$ 800 20000$ -$ 10 3147$ 6 to 10 Fir St F St UCherry 4360 22 10658 341621$ 32$ 95920$ 95920$ 5 5 4000 106644$ 100 2 4000 108000$ -$ 10 31056$ 6 to 8 Cedar St San Juan Ave Redwood St 1460 16 2596 81747$ 31$ 23360$ 23360$ 20 20 25956$ 1000 25000$ -$ 10 7432$
8 Clallam St McKinley St Roosevelt St 975 14 1517 46796$ 31$ 13650$ 13650$ 20 10 12892$ 200 4 16000$ -$ 10 4254$ 6 San Juan Ave 19th St 20th St 300 31 1033 31827$ 31$ 9300$ 9300$ 50 10 19633$ -$ -$ 10 2893$
6 to 20 Cherry St F St W St 4200 32 14933 457307$ 31$ 134400$ 134400$ 5 5 4200 121333$ 200 6000 160000$ -$ 10 41573$ 6 to 8 Jackman St 45th St 49th St 1100 22 2689 81940$ 30$ 24200$ 24200$ 15 10 18150$ 225 3 500 28250$ -$ 5000$ 15 11340$ 6 to 12 Jackson St LawrenceMonroe Roosevelt St 1600 18 3200 93530$ 29$ 28800$ 28800$ 10 10 16000$ 1000 25000$ 1 15000$ 2500$ 10 8730$
2 7th St Wilson St Holcomb St 450 16 800 23320$ 29$ 7200$ 7200$ 10 10 4000$ 400 10000$ -$ 10 2120$ 8 to 14 25th St Sherman St Sheridan St 800 20 1778 50061$ 28$ 16000$ 16000$ 10 5 7556$ 1 800 21500$ -$ 5000$ 10 5006$ 2 to 6 Hancock St SR 20 9th St 1100 20 2444 67833$ 28$ 22000$ 22000$ 15 5 14667$ 1000 25000$ -$ 10 6167$
Benton St Washington St Lawrence St 1160 22 2836 74468$ 26$ 25520$ 25520$ 10 10 14178$ 140 4 600 28000$ 10 6770$ W St San JuanAdmiralty Walnut St 2560 22 6258 163807$ 26$ 56320$ 56320$ 10 5 26596$ 200 4 2000 66000$ -$ 10 14892$
6 to 8 Walnut W Street Jackson 2300 22 5622 145194$ 26$ 50600$ 50600$ 10 5 23894$ 2300 57500$ -$ 10 13199$ 6 to 8 24th St Discovery Rd San Juan Ave 1250 18 2500 63938$ 26$ 22500$ 22500$ 10 5 10625$ 1000 25000$ -$ 10 5813$ 6 to 10 Tyler St Lawrence St Blaine St 900 32 3200 78980$ 25$ 28800$ 28800$ 5 5 8000$ 200 5000$ 2 30000$ 10 7180$ 4 to 12 McPherson St SR 20 Discovery Rd 2925 32 10400 244860$ 24$ 93600$ 93600$ 5 5 2925 84500$ 230 2 1200 44500$ -$ -$ 10 22260$
10 Landes St 12th St 19th St 1820 32 6471 151821$ 23$ 58240$ 58240$ 5 1400 39324$ 400 10000$ 2 30000$ 5000$ 10 14256$ 6 to 8 Discovery Rd 19th Hastings Ave 2900 22 7089 136565$ 19$ 63800$ 63800$ 15 10 47850$ 500 12500$ -$ 10 12415$ 8 to 12 Hastings Ave Discovery Rd County Line 8450 32 30044 542349$ 18$ 270400$ 270400$ 5 10 5000 197644$ 1000 25000$ -$ 10 49304$ 6 to 12 Washington St Van Buren St SR20 2025 30 6750 118388$ 18$ 60750$ 60750$ 5 5 16875$ 0 0 0 -$ 2 30000$ -$ 10 10763$
14 Blaine St San Juan Ave Walker St 1275 48 6800 113910$ 17$ 61200$ 61200$ 5 11900$ -$ 2 30000$ 5000$ 10 10810$ 6 Washington St Harrison St Taylor St 1175 33 4308 59240$ 14$ 38775$ 38775$ 10 15079$ -$ -$ 10 5385$
8 to 10 Sheridan St SR 20 19th St 4000 46 20444 272922$ 13$ 184000$ 184000$ 5 5 51111$ 200 2 13000$ -$ 10 24811$ 8 to 10 19th St San Juan Ave Sheridan St 3200 48 17067 197120$ 12$ 153600$ 153600$ 3 3 25600$ 0 0 0 -$ -$ 10 17920$
10 to 20 San Juan Ave F St Lopez Ave 2800 32 9956 110059$ 11$ 89600$ 89600$ 3 10453$ -$ -$ 10 10005$ 10 to 20 F St Hastings Ave Tyler St 5300 31 18256 180730$ 10$ 164300$ 164300$ -$ -$ -$ 10 16430$
9952406$ 1873288$ 31744$ 274803$ 32667$ 332896$ 1998646$ 4544044$ 1155207$ 1747625$ 1215000$ 1290529$
9 Stormwater Base Paving Costs Preperation EngineeringADA
Chip Seal
Pulverize amp Chip Seal
Pulverize amp Asphalt
Asphalt Overlay
Reconstruction
1 Insert summary table of average costs of ada sw eng digouts etc
Additional Paving Costs Average Cost per SY Percent of Paving CostDigouts amp Pre-Leveling $4 25Stormwater $7 38ADA $5 27Engineering amp Administration $5 28
Chip Seal
Pulverize amp Chip Seal
Pulverize amp Asphalt
Asphalt Overlay
Reconstruction
1 Insert total costs for the entire city based on pavement rating
RSL Length (FT) Area (SY) Condition Treatment Cost Total20 61834 138524 131 Good $0 $014 23656 49915 47 $147055212 43586 106382 100 $313413410 74803 193570 182 $57027908 96662 228046 215 $67184926 95452 261794 247 $174899304 6420 14536 14 $9711212 29238 60616 57 Poor Rehab $107 $64928500 3851 7532 07 Very Poor Rebuild $155 $1169719
$43149589
Satisfactory Chip Seal $29
Fair Overlay $67
Chip Seal
Pulverize amp Chip Seal
Pulverize amp Asphalt
Asphalt Overlay
Reconstruction
Fir Street Asphalt Overlay in early 1990s Inadequate Stormwater System Water Intrusion Inadequate Base Material
San Juan Avenue Reconstructed 1997
New ADA Sidewalks
Complete Stormwater System
Lawrence Street Chip Sealed in 2000
Inadequate Base
Water Intrusion
F Street Reconstructed 2001 2002
New ADA Sidewalks
Complete Stormwater System
Best Streets First
Stop the Continued Decay of our Streets
Slowly Rebuild Street System Investment
1 Introduction
2 Public Engagement
3 Street Operations
4 Street Improvements
5 Street Preservation
6 Street Programming
7 Funding Options
8 Recommendations
January
February
April
March
May
June
Encouraging the public to be involved through Engage PTwwwcityofptusengagept
Street Pavement Improvement Plan Projects | 9 | 110 | |||||||||||||||||||||||||||||||||||||||||||||
Road Name | From | To | Iworq ID | Length (ft) | Width (ft) | Area (yd^2) | Actual Area(SY) | Unit Cost per yd2 | Construction Cost | Prep Work | Survey Testing | ADA Curb Ramps | Storm Water | Mill amp Fill$50SY | Pre-Level$4SY | Total Construction | Project Cost + 10 | Unit Cost w Additional Costs no 10 | Engineering Costs | Notes | |||||||||||||||||||||||||||
Priority | Reconstruct | 2021 | 2022 | 2023 | 2024 | ||||||||||||||||||||||||||||||||||||||||||
1 | Reconstruct | Lawrence St | Cass St | Calhoun St | 1304 | 250 | 36 | 1000 | $ 80 | $ 80000 | $ 5000 | $ 20000 | $ 105000 | $ 115500 | $ 105 | Stormwater South Side Parking Raingarden on Cass | |||||||||||||||||||||||||||||||
2 | Reconstruct | Lawrence St | Walker St | Cass St | 250 | 36 | 1000 | $ 80 | $ 80000 | $ 5000 | $ 20000 | $ 5000 | $ 110000 | $ 121000 | $ 110 | Stormwater South Side Parking | |||||||||||||||||||||||||||||||
3 | Reconstruct Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | San Juan Ave | Lopez Ave | Admiralty | 2300 | 32 | 8178 | $ 50 | $ 408889 | $ 10000 | $ 100000 | $ 518889 | $ 570778 | $ 63 | Stormwater Problem 45th | ||||||||||||||||||||||||||||||||
4 | Reconstruct Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Polk St - Street Improvements | Lawrence St | 1056 Sarah Tiffany Sarah TiffanyGarfield | 1073 | 200 | 56 | 1244 | $ 50 | $ 62222 | X | X | X | $ 62222 | $ 68444 | $ 50 | Parking Theater 4 AC Watermain Infiltration or Rain Garden Parking on Condo Side | ||||||||||||||||||||||||||||||
Reconstruct | 47th Street | Pettygrove | McNeil | 500 | 18 | 1000 | 1548 | $ 50 | $ 50000 | $ 5000 | $ 40000 | $ 95000 | $ 104500 | $ 95 | $210000 Engineers Estimate With Engineering Cost Turnaround Spaghetti Waterline | ||||||||||||||||||||||||||||||||
Chip Seal - $50000 to $70000 per Mile | $6 No DigoutsPre-leveling | $10 with Additional Prep Work | |||||||||||||||||||||||||||||||||||||||||||||||
Chip Seal | Washington St | Van Buren St | SR20 | 2025 | 30 | 6750 | $ 10 | $ 67500 | $ 67500 | $ 74250 | Digouts Flagging | ||||||||||||||||||||||||||||||||||||
Chip Seal | Hastings Ave - Pre-level and widen shoulders | Discovery Rd | County Line | 8450 | 24 | 22533 | $ 6 | $ 135200 | $ 135200 | $ 148720 | Ditches amp Culverts Total Width change from 21 to 24 How wide will shoulders be | ||||||||||||||||||||||||||||||||||||
Tyler St | Jefferson St | Lawrence St | 900 | 32 | 3200 | $ 6 | $ 19200 | $ 19200 | $ 21120 | ||||||||||||||||||||||||||||||||||||||
Chip Seal | McPherson - Chip Seal | 4th St | Discovery Rd | 3100 | 32 | 11022 | $ 6 | $ 66133 | $ 66133 | $ 72747 | Ditches amp Culverts Shoulder Wideneing | ||||||||||||||||||||||||||||||||||||
Chip Seal | 19th St - Chip Seal | San Juan Ave | Sheridan St | 3200 | 48 | 17067 | $ 6 | $ 102400 | $ 102400 | $ 112640 | Bike Lanes amp Shoulder Prelevel | ||||||||||||||||||||||||||||||||||||
Chip Seal | Walnut | W Street | Jackson | 2300 | 22 | 5622 | $ 6 | $ 33733 | $ 33733 | $ 37107 | Dig-Outs Pre-Leveling Striping Shoulders | ||||||||||||||||||||||||||||||||||||
Chip Seal | Fir St - Chip Seal | F St | UCherry | 4360 | 22 | 10658 | $ 10 | $ 106578 | X | X | $ 106578 | $ 117236 | Dig-Outs Pre-Leveling Striping | ||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | |||||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | P St - Chip Seal | Redwood St | Cedar St | 0486 | 300 | 16 | 533 | $ 20 | $ 10667 | $ 10667 | $ 11733 | Watermain Looping Shouldnt this be part of Center | |||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 25th St - Chip Seal | Sheridan St | Holcomb St | 1200 | 18 | 2400 | $ 20 | $ 48000 | $ 48000 | $ 52800 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 14th St - Chip Seal | $ - | $ - | ||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Cedar St - Chip Seal | Redwood St | San Juan Ave | 1460 | 16 | 2596 | $ 20 | $ 51911 | $ 51911 | $ 57102 | Ex ChipSeal 22 Wide | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Center St - Chip Seal | Redwood St | San Juan Ave | 484 | 1660 | 16 | 2951 | $ 20 | $ 59022 | $ 59022 | $ 64924 | Ex ChipSeal 22 Wide Stormwater | |||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Grant St Chip Seal | 14th St | 16th St | 525 | 16 | 933 | $ 20 | $ 18667 | $ 18667 | $ 20533 | Ex Street 10 Wide | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 11th St Chip Seal | Hendricks St | Sheridan St | 550 | 16 | 978 | $ 20 | $ 19556 | $ 19556 | $ 21511 | Hospital Parking | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Hendricks St Chip Seal | 9th St | 12th St | 800 | 16 | 1422 | $ 20 | $ 28444 | $ 28444 | $ 31289 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 10th St Chip Seal | Hendricks St | Grant St | 1655 | 283 | 18 | 566 | $ 20 | $ 11320 | $ 11320 | $ 12452 | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Grant St Chip Seal | 14th St | 16th St | 525 | 18 | 1050 | $ 20 | $ 21000 | $ 21000 | $ 23100 | Ex Street 10 Wide Stormwater | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Hill St | 21st St | 19th St | 807 | 16 | 1435 | $ 20 | $ 28693 | $ 28693 | $ 31563 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Milo St -Chip seal | Olympic Ave | Pacific Ave | 0003 | 466 | 12 | 621 | $ 20 | $ 12427 | $ 12427 | $ 13669 | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Olympic St | Cedar St | Tremont St | 536 | 12 | 715 | $ 20 | $ 14293 | $ 14293 | $ 15723 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Benton St - street improvement | Blaine St | Lincoln Blg | 580 | 36 Sarah Tiffany Sarah TiffanyEstimated at 25-36 used higher number | Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Sarah Tiffany Sarah TiffanyGarfield | 2320 | $ 20 | $ 46400 | $ 46400 | $ 51040 | ||||||||||||||||||||||||||||||||||
Pave Gravel Road | |||||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Pacific St | Cedar St | Tremont St | 400 | 16 | 711 | $ 50 | $ 35556 | $ 6000 | $ 15000 | $ 56556 | $ 62211 | $ 80 | ||||||||||||||||||||||||||||||||||
58th St | Hill St | Kuhn St | 525 | 16 | 933 | $ 50 | $ 46667 | $ 6000 | $ 20000 | $ 72667 | $ 79933 | $ 78 | 4 AC Waterline Driveways Site Distance (Re-grade Slope) | ||||||||||||||||||||||||||||||||||
Sidewalks | |||||||||||||||||||||||||||||||||||||||||||||||
Harrison St | Franklin St | Clay St | 340 | 6 | 227 | $ 165 | $ 56100 | $ 5000 | $ 61100 | $ 67210 | $ 180 | ||||||||||||||||||||||||||||||||||||
9th St | Hancock St | McPherson St | 1300 | 6 | 867 | $ 165 | $ 214500 | $ 10000 | $ 15000 | $ 239500 | $ 263450 | $ 184 | |||||||||||||||||||||||||||||||||||
Asphalt Path | |||||||||||||||||||||||||||||||||||||||||||||||
Spruce St Easement | Cedar St | Center St | 150 | 8 | 133 | $ 50 | $ 6667 | $ 2000 | $ 8667 | $ 9533 | $ 65 | ||||||||||||||||||||||||||||||||||||
Cherry St | A St | E St | 990 | 10 | 1100 | $ 50 | $ 55000 | $ 10000 | $ 10000 | $ 15000 | $ 90000 | $ 99000 | $ 82 | ||||||||||||||||||||||||||||||||||
Gravel Path | |||||||||||||||||||||||||||||||||||||||||||||||
16th St | Thomas St | Grant St | 1700 | 6 | 1133 | $ 15 | $ 17000 | $ 1500 | $ 18500 | $ 20350 | |||||||||||||||||||||||||||||||||||||
Cleveland St | 21st St | 23rd St | 500 | 6 | 333 | $ 15 | $ 5000 | $ 5000 | $ 5500 | Need Easement | |||||||||||||||||||||||||||||||||||||
6 | - | $ 15 | $ - | $ - | $ - | Need Easement | |||||||||||||||||||||||||||||||||||||||||
6 | - | $ 15 | $ - | $ - | $ - | Need Easement | |||||||||||||||||||||||||||||||||||||||||
Total | $ 1582256 | $ 1792256 | $ 1971481 | ||||||||||||||||||||||||||||||||||||||||||||
Project Descriptioin | Length | Width | Construction Costs | ConstructionUnit Costs | Units | Engineering Costs | Total CostsUnit Cost | Total Costs | Total CostsUnit Cost | Notes | |||||||||||
Sidewalk | |||||||||||||||||||||
9th Street Sidewalk Grant Street to Hancock Street | 826 | 6 | $ 141506 | $ 17131 | LF | Construction Unit Cost per Foot | |||||||||||||||
Jefferson Street Sidewalk Washington Street to Taylor Street | 724 | 6 | $ 390502 | $ 53937 | LF | Construction Unit Cost per Foot | |||||||||||||||
Landis Street Sidewalk 10th Street to 19th Street | 1795 | 6 | $ 364550 | $ 20309 | LF | Construction Unit Cost per Foot | |||||||||||||||
ADA Corner Ramps | |||||||||||||||||||||
Washington Street amp Harrison Street | $ 42000 | $ 42000 | Each | ||||||||||||||||||
Washington Street amp Adams Street | $ 38150 | $ 19075 | Each | Two Corners Were Retrofitted | |||||||||||||||||
Chip Seal Pavement | |||||||||||||||||||||
Walker Street Washington Street to Lawrence Street | 1144 | 24 | $ 20000 | $ 656 | SY | Does not include flagging nor prep work | |||||||||||||||
Pulverize amp Asphalt Paving | |||||||||||||||||||||
Washington Street VanBuren Street to Harrison Street | 300 | 22 | $ 35000 | $ 4773 | SY | ||||||||||||||||
Asphalt Overlay | |||||||||||||||||||||
Sidewalks | ||||||||||||||||||||||||||||||||||||||
Harrison St | Franklin St | Clay St | 340 | 6 | 227 | |||||||||||||||||||||||||||||||||
9th St | Hancock St | McPherson St | 1300 | 6 | 867 | |||||||||||||||||||||||||||||||||
Asphalt Path | ||||||||||||||||||||||||||||||||||||||
Spruce St Easement | Cedar St | Center St | 150 | 8 | 133 | $ 2000 | $ 2000 | $ 2000 | ||||||||||||||||||||||||||||||
Cherry St | A St | E St | 990 | 10 | 1100 | $ 10000 | $ 10000 | $ 10000 | ||||||||||||||||||||||||||||||
Gravel Path | ||||||||||||||||||||||||||||||||||||||
16th St | Thomas St | Grant St | 1700 | 6 | 1133 | $ 1500 | $ 1500 | $ 1500 | ||||||||||||||||||||||||||||||
Cleveland St | 21st St | 23rd St | 500 | 6 | 333 | Need Easement | ||||||||||||||||||||||||||||||||
6 | - | Need Easement | ||||||||||||||||||||||||||||||||||||
6 | - | Need Easement | ||||||||||||||||||||||||||||||||||||
Total |
Type | Improvement | Cost Range SY | Cost Range LF | ||||||||
1 | Complete Road Rebuild | $80 | $100 | ||||||||
2 | Asphalt Overlay | $50 | $60 | ||||||||
3 | Pulverize amp Chip Seal | $20 | $30 | ||||||||
4 | Chip Seal | $6 | $10 | $12 | $25 | ||||||
5 | Seal Coat | ||||||||||
6 | |||||||||||
7 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 3-Inch | 413 | TONS | $ 15000 | $ 6187500 | 1000 x 22 x 025 httpwwwamerasphaltcomasphalthtm | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 1630 | CY | $ 4800 | $ 7824000 | Water Street Project = $48 CY (1000 x 22 x 2)27 = 1630 CY | ||||||
Gravel Borrow | 2282 | TONS | $ 3000 | $ 6846000 | (1000 x 22 x 2)27 = 1630 1630 CY x 14 = 2282 Tons | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 128 | Hours | $ 5728 | $ 733133 | (2) People for 64 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 25043033 | |||||||||||
$ 10247 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 2-Inch | 275 | TONS | $ 15000 | $ 4125000 | 1000 x 22 x 017 httpwwwamerasphaltcomasphalthtm | | ||||||
Digouts amp Pre-leveling | 122 | SY | $ 4900 | $ 597800 | |||||||
Flagging | 64 | Hours | $ 5728 | $ 366566 | (2) People for 32 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 180000 | $ 180000 | |||||||
$ 5403066 | |||||||||||
$ 2211 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 3-Inch | 413 | TONS | $ 15000 | $ 6187500 | 1000 x 22 x 025 httpwwwamerasphaltcomasphalthtm | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 150 | CY | $ 4800 | $ 720000 | Water Street Project = $48 CY | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 96 | Hours | $ 5728 | $ 549850 | (2) People for 48 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 10909750 | |||||||||||
$ 4464 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Chip Seal | 2444 | SY | $ 1050 | $ 2566200 | 1000 X 22 | Unit Cost $525 SY from Walker Street County Invoice Doubled to $1050 for Chip Seal Over Gravel | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 150 | CY | $ 4800 | $ 720000 | Water Street Project = $48 CY | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 80 | Hours | $ 5728 | $ 458208 | (2) People for 40 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | Hours | $ 12500 | $ - 0 | High Average Loaded Rate No Testing | ||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 7196808 | |||||||||||
$ 2945 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 1500000 | $614 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 500 | LF | $ 5000 | $ 2500000 | |||||||
Catch Basins | 4 | EACH | $ 150000 | $ 600000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Chip Seal | 2444 | SY | $ 525 | $ 1283100 | 1000 X 22 | Unit Cost from Walker Street County Invoice | ||||||
Digouts amp Pre-leveling | 122 | SY | $ 4900 | $ 598780 | Cost from 2018 Lakeside Mill amp Fill | Estimate Quanity Based on 5 | ||||||
Flagging | 32 | Hours | $ 5728 | $ 183283 | (2) People for 16 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | Hours | $ 12500 | $ - 0 | High Average Loaded Rate No Surveying or Testing | ||||||
Surveying | 1 | LS | $ - 0 | $ - 0 | |||||||
$ 2198863 | |||||||||||
$ 900 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 1500000 | $614 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY |
Project Descriptioin | Length | Width | Construction Costs | Engineering Costs | Engineering Total | Digouts Pre-Leveling Costs | Digouts Pre-Leveling Total | ADACosts | ADATotal | StormwaterCosts | StormwaterTotal | Total Costsby SY | Cost Per 250 Block | Length | Width | Notes | |||||||||||||||||
Chip Seal Pavement | |||||||||||||||||||||||||||||||||
Walker Street Washington Street to Lawrence Street | 1144 | 24 | $ 25000 | 15 | $ 3750 | 10 | $ 2500 | $ 1024 | $ 682911 | 250 | 24 | ||||||||||||||||||||||
Pulverize amp Chip Seal | |||||||||||||||||||||||||||||||||
Engineers Estimate | 250 | 24 | $ 22000 | 15 | $ 3300 | 0 | $ - | 20 | $ 4400 | $ 4455 | $ 2970000 | 250 | 24 | ||||||||||||||||||||
Pulverize amp Asphalt Paving | |||||||||||||||||||||||||||||||||
Washington Street VanBuren Street to Harrison Street | 300 | 22 | $ 35000 | 20 | $ 7000 | 0 | $ - | 10 | $ 3500 | 20 | $ 7000 | $ 7159 | $ 4772727 | 250 | 24 | ||||||||||||||||||
Asphalt Overlay (2) | |||||||||||||||||||||||||||||||||
Engineers Estimate | 250 | 24 | $ 21334 | 20 | $ 426680 | 10 | $ 2133 | 20 | $ 426680 | 20 | $ 426680 | $ 5440 | $ 4835707 | 250 | 32 | ||||||||||||||||||
Reconstruction | |||||||||||||||||||||||||||||||||
Walker Street Lawrence Street to Blaine Street | 650 | 36 | $ 184310 | 25 | $ 46078 | 0 | $ - | 20 | $ 36862 | 30 | $ 55293 | $ 12405 | $ 11027094 | 250 | 32 | ||||||||||||||||||
RSL | Length (FT) | Area (SY) | Condition | Treatment | Cost | Total | |||||||||
20 | 61834 | 138524 | 131 | Good | $0 | $0 | |||||||||
14 | 23656 | 49915 | 47 | Satisfactory | Chip Seal | $29 | $1470552 | ||||||||
12 | 43586 | 106382 | 100 | $3134134 | |||||||||||
10 | 74803 | 193570 | 182 | $5702790 | |||||||||||
8 | 96662 | 228046 | 215 | $6718492 | |||||||||||
6 | 95452 | 261794 | 247 | Fair | Overlay | $67 | $17489930 | ||||||||
4 | 6420 | 14536 | 14 | $971121 | |||||||||||
2 | 29238 | 60616 | 57 | Poor | Rehab | $107 | $6492850 | ||||||||
0 | 3851 | 7532 | 07 | Very Poor | Rebuild | $155 | $1169719 | ||||||||
$43149589 | |||||||||||||||
Additional Paving Costs | Average Cost per SY | Percent of Paving Cost | |||
Digouts amp Pre-Leveling | $4 | 25 | |||
Stormwater | $7 | 38 | |||
ADA | $5 | 27 | |||
Engineering amp Administration | $5 | 28 |
9 | Base Paving Costs | Preperation | Stormwater | ADA | Engineering | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Remaining Service Life | Road Name | From | To | Length (ft) | Width (ft) | Area (SY) | Total Construction | Price(SY) | Reconstruction | Pulverize amp Pave | Ashpalt Overlay | Pave Gravel Road | Pulverize amp Chip Seal | Chip Seal | Total Base Paving Costs | Digouts(SY) | Pre-Leveling(SY) | Construct Shoulders Both Sides (LF) | Preparation Total | StormwaterPipes (LF) | StormwaterCatchbasins | StormwaterSwales (LF) | Stormwater Total | Curb Ramps | Curb Ramps Total | Surveying | Engineering amp Administration | Engineering amp Administration Total | Other Work | ||||||||||||||||||||||||||||||
$102 | $45 | $22 | $35 | $29 | $9 | $35 | $15 | $20 | $50 | $1500 | $25 | $15000 | |||||||||||||||||||||||||||||||||||||||||||||||
2 | Polk St - Street | Lawrence St | 1056 | 200 | 56 | 1244 | $ 210679 | $ 169 | $ 127518 | $ 127518 | $ - | 150 | 1 | 1 | $ 9025 | 2 | $ 30000 | $ 10000 | 25 | $ 44136 | |||||||||||||||||||||||||||||||||||||||
6 | 47th Street | Pettygrove | McNeil | 500 | 18 | 1548 | $ 258717 | $ 167 | $ 158624 | $ 158624 | $ - | 687 | 8 | $ 46350 | $ - | $ 10000 | 25 | $ 53743 | |||||||||||||||||||||||||||||||||||||||||
6 to 10 | Lawrence St | Calhoun St | Harrison St | 1200 | 36 | 4800 | $ 786070 | $ 164 | $ 491856 | $ 491856 | 600 | $ 15000 | $ 8 | $ 120000 | $ 10000 | 25 | $ 159214 | ||||||||||||||||||||||||||||||||||||||||||
8 | Lawrence St | Cass St | Calhoun St | 250 | 36 | 1000 | $ 146213 | $ 146 | $ 102470 | $ 102470 | 0 | 0 | $ - | 75 | 350 | $ 12500 | $ - | $ 10000 | 25 | $ 31243 | |||||||||||||||||||||||||||||||||||||||
8 | Lawrence St | Walker St | Cass St | 250 | 36 | 1000 | $ 144650 | $ 145 | $ 102470 | $ 102470 | $ - | 100 | 250 | $ 11250 | $ - | $ 10000 | 25 | $ 30930 | |||||||||||||||||||||||||||||||||||||||||
4 to 8 | San Juan Ave | Lopez Ave | Admiralty | 2300 | 34 | 8689 | $ 1222938 | $ 141 | $ 890350 | $ 890350 | $ - | 800 | 5 | 1500 | $ 85000 | $ - | $ 15000 | 25 | $ 247588 | ||||||||||||||||||||||||||||||||||||||||
6 to 8 | Lawrence St | Harrison St | Monroe St | 2380 | 47 | 12429 | $ 1331314 | $ 107 | $ 274803 | $ 274803 | 15 | 5 | $ 74573 | 1900 | 10 | $ 110000 | 50 | $ 750000 | $ 10000 | 10 | $ 121938 | ||||||||||||||||||||||||||||||||||||||
2 to 4 | Center St | San Juan Ave | Redwood St | 1660 | 16 | 2951 | $ 295222 | $ 100 | $ 86910 | $ 86910 | $ - | 1600 | 9 | 3000 | $ 168500 | $ - | $ 10000 | 15 | $ 39812 | ||||||||||||||||||||||||||||||||||||||||
0 to 6 | Pacific St | Cedar St | Tremont St | 400 | 16 | 711 | $ 66581 | $ 94 | $ 31744 | $ 31744 | $ - | 100 | 2 | 700 | $ 25500 | $ - | $ 5000 | 15 | $ 9337 | ||||||||||||||||||||||||||||||||||||||||
0 to 6 | Benton St | Lawrence | Lincoln Blg | 580 | 36 | 2320 | $ 203265 | $ 88 | $ 20880 | $ 20880 | 20 | 10 | $ 19720 | 250 | 2 | $ 15500 | 8 | $ 120000 | $ 5000 | 15 | $ 27165 | ||||||||||||||||||||||||||||||||||||||
2 | Grant St | 14th St | 16th St | 525 | 16 | 933 | $ 73635 | $ 79 | $ 27487 | $ 27487 | $ - | 400 | 2 | 500 | $ 35500 | $ - | $ 8000 | 15 | $ 10648 | ||||||||||||||||||||||||||||||||||||||||
2 to 6 | Olympic St | Cedar St | Tremont St | 536 | 12 | 715 | $ 52716 | $ 74 | $ 21047 | $ 21047 | $ - | 950 | $ 23750 | $ - | $ 8000 | 15 | $ 7920 | ||||||||||||||||||||||||||||||||||||||||||
2 | Milo St | Olympic Ave | Pacific Ave | 466 | 12 | 621 | $ 44793 | $ 72 | $ 18298 | $ 18298 | $ - | 800 | $ 20000 | $ - | $ 5000 | 15 | $ 6495 | ||||||||||||||||||||||||||||||||||||||||||
0 | 11th St | Hendricks St | Sheridan St | 550 | 16 | 978 | $ 65077 | $ 67 | $ 28796 | $ 28796 | $ - | 100 | 2 | 750 | $ 26750 | $ - | $ 8000 | 15 | $ 9532 | ||||||||||||||||||||||||||||||||||||||||
0 | 58th St | Hill St | Kuhn St | 525 | 16 | 933 | $ 60329 | $ 65 | $ 32667 | $ 32667 | $ - | 750 | $ 18750 | $ - | $ 8000 | 15 | $ 8913 | ||||||||||||||||||||||||||||||||||||||||||
2 | 10th St | Hendricks St | Grant St | 283 | 18 | 566 | $ 34294 | $ 61 | $ 16669 | $ 16669 | $ - | 500 | $ 12500 | $ - | $ 5000 | 15 | $ 5125 | ||||||||||||||||||||||||||||||||||||||||||
4 to 10 | 31st St | Hancock St | Sheridan St | 1050 | 22 | 2567 | $ 150027 | $ 58 | $ 23100 | $ 23100 | 10 | 10 | $ 12833 | 1200 | 10 | 1000 | $ 100000 | $ - | $ 5000 | 10 | $ 14093 | ||||||||||||||||||||||||||||||||||||||
6 | 25th St | Sheridan St | Holcomb St | 1200 | 18 | 2400 | $ 125895 | $ 52 | $ 70680 | $ 70680 | $ - | 125 | 1 | 1200 | $ 37750 | $ - | $ 8000 | 15 | $ 17465 | ||||||||||||||||||||||||||||||||||||||||
6 | Holcomb St | 7th St | 10th St | 850 | 12 | 1133 | $ 58703 | $ 52 | $ 10200 | $ 10200 | 10 | 10 | $ 5667 | 1500 | $ 37500 | $ - | $ - | 10 | $ 5337 | ||||||||||||||||||||||||||||||||||||||||
2 | Hendricks St | 9th St | 12th St | 800 | 16 | 1422 | $ 70930 | $ 50 | $ 41884 | $ 41884 | $ - | 750 | $ 18750 | $ - | $ 8000 | 15 | $ 10295 | ||||||||||||||||||||||||||||||||||||||||||
2 to 6 | Hill St | 19th | 21st St | 807 | 16 | 1435 | $ 67443 | $ 47 | $ 21125 | $ 6456 | $ 27581 | 10 | $ 5021 | 1000 | $ 25000 | $ - | $ 8000 | 15 | $ 9840 | ||||||||||||||||||||||||||||||||||||||||
2 to 8 | 57th St | Jackman St | Kuhn St | 800 | 18 | 1600 | $ 66550 | $ 42 | $ 14400 | $ 14400 | 20 | 10 | $ 13600 | 1300 | $ 32500 | 10 | $ 6050 | ||||||||||||||||||||||||||||||||||||||||||
6 to 8 | Sheridan St | Hastings Ave | SilverUmatilla | 1750 | 22 | 4278 | $ 154115 | $ 36 | $ 38500 | $ 38500 | 20 | 10 | $ 36361 | 300 | 4 | 1500 | $ 58500 | $ - | $ 5000 | 15 | $ 20754 | ||||||||||||||||||||||||||||||||||||||
6 to 10 | Tyler St | Jefferson St | Lawrence St | 900 | 32 | 3200 | $ 115280 | $ 36 | $ 28800 | $ 28800 | 5 | 5 | $ 8000 | 100 | 2 | $ 8000 | 4 | $ 60000 | 10 | $ 10480 | |||||||||||||||||||||||||||||||||||||||
6 to 14 | 14th St | McPherson St | Sheridan St | 2375 | 21 | 5542 | $ 182027 | $ 33 | $ 49875 | $ 49875 | 20 | 10 | $ 47104 | 750 | 4 | 1000 | $ 68500 | $ - | 10 | $ 16548 | |||||||||||||||||||||||||||||||||||||||
8 | 49th St | Kuhn St | Admiralty Ave | 400 | 24 | 1067 | $ 34613 | $ 32 | $ 9600 | $ 9600 | 5 | $ 1867 | 800 | $ 20000 | $ - | 10 | $ 3147 | ||||||||||||||||||||||||||||||||||||||||||
6 to 10 | Fir St | F St | UCherry | 4360 | 22 | 10658 | $ 341621 | $ 32 | $ 95920 | $ 95920 | 5 | 5 | 4000 | $ 106644 | 100 | 2 | 4000 | $ 108000 | $ - | 10 | $ 31056 | ||||||||||||||||||||||||||||||||||||||
6 to 8 | Cedar St | San Juan Ave | Redwood St | 1460 | 16 | 2596 | $ 81747 | $ 31 | $ 23360 | $ 23360 | 20 | 20 | $ 25956 | 1000 | $ 25000 | $ - | 10 | $ 7432 | |||||||||||||||||||||||||||||||||||||||||
8 | Clallam St | McKinley St | Roosevelt St | 975 | 14 | 1517 | $ 46796 | $ 31 | $ 13650 | $ 13650 | 20 | 10 | $ 12892 | 200 | 4 | $ 16000 | $ - | 10 | $ 4254 | ||||||||||||||||||||||||||||||||||||||||
6 | San Juan Ave | 19th St | 20th St | 300 | 31 | 1033 | $ 31827 | $ 31 | $ 9300 | $ 9300 | 50 | 10 | $ 19633 | $ - | $ - | 10 | $ 2893 | ||||||||||||||||||||||||||||||||||||||||||
6 to 20 | Cherry St | F St | W St | 4200 | 32 | 14933 | $ 457307 | $ 31 | $ 134400 | $ 134400 | 5 | 5 | 4200 | $ 121333 | 200 | 6000 | $ 160000 | $ - | 10 | $ 41573 | |||||||||||||||||||||||||||||||||||||||
6 to 8 | Jackman St | 45th St | 49th St | 1100 | 22 | 2689 | $ 81940 | $ 30 | $ 24200 | $ 24200 | 15 | 10 | $ 18150 | 225 | 3 | 500 | $ 28250 | $ - | $ 5000 | 15 | $ 11340 | ||||||||||||||||||||||||||||||||||||||
6 to 12 | Jackson St | LawrenceMonroe | Roosevelt St | 1600 | 18 | 3200 | $ 93530 | $ 29 | $ 28800 | $ 28800 | 10 | 10 | $ 16000 | 1000 | $ 25000 | 1 | $ 15000 | $ 2500 | 10 | $ 8730 | |||||||||||||||||||||||||||||||||||||||
2 | 7th St | Wilson St | Holcomb St | 450 | 16 | 800 | $ 23320 | $ 29 | $ 7200 | $ 7200 | 10 | 10 | $ 4000 | 400 | $ 10000 | $ - | 10 | $ 2120 | |||||||||||||||||||||||||||||||||||||||||
8 to 14 | 25th St | Sherman St | Sheridan St | 800 | 20 | 1778 | $ 50061 | $ 28 | $ 16000 | $ 16000 | 10 | 5 | $ 7556 | 1 | 800 | $ 21500 | $ - | $ 5000 | 10 | $ 5006 | |||||||||||||||||||||||||||||||||||||||
2 to 6 | Hancock St | SR 20 | 9th St | 1100 | 20 | 2444 | $ 67833 | $ 28 | $ 22000 | $ 22000 | 15 | 5 | $ 14667 | 1000 | $ 25000 | $ - | 10 | $ 6167 | |||||||||||||||||||||||||||||||||||||||||
Benton St | Washington St | Lawrence St | 1160 | 22 | 2836 | $ 74468 | $ 26 | $ 25520 | $ 25520 | 10 | 10 | $ 14178 | 140 | 4 | 600 | $ 28000 | 10 | $ 6770 | |||||||||||||||||||||||||||||||||||||||||
W St | San JuanAdmiralty | Walnut St | 2560 | 22 | 6258 | $ 163807 | $ 26 | $ 56320 | $ 56320 | 10 | 5 | $ 26596 | 200 | 4 | 2000 | $ 66000 | $ - | 10 | $ 14892 | ||||||||||||||||||||||||||||||||||||||||
6 to 8 | Walnut | W Street | Jackson | 2300 | 22 | 5622 | $ 145194 | $ 26 | $ 50600 | $ 50600 | 10 | 5 | $ 23894 | 2300 | $ 57500 | $ - | 10 | $ 13199 | |||||||||||||||||||||||||||||||||||||||||
6 to 8 | 24th St | Discovery Rd | San Juan Ave | 1250 | 18 | 2500 | $ 63938 | $ 26 | $ 22500 | $ 22500 | 10 | 5 | $ 10625 | 1000 | $ 25000 | $ - | 10 | $ 5813 | |||||||||||||||||||||||||||||||||||||||||
6 to 10 | Tyler St | Lawrence St | Blaine St | 900 | 32 | 3200 | $ 78980 | $ 25 | $ 28800 | $ 28800 | 5 | 5 | $ 8000 | 200 | $ 5000 | 2 | $ 30000 | 10 | $ 7180 | ||||||||||||||||||||||||||||||||||||||||
4 to 12 | McPherson St | SR 20 | Discovery Rd | 2925 | 32 | 10400 | $ 244860 | $ 24 | $ 93600 | $ 93600 | 5 | 5 | 2925 | $ 84500 | 230 | 2 | 1200 | $ 44500 | $ - | $ - | 10 | $ 22260 | |||||||||||||||||||||||||||||||||||||
10 | Landes St | 12th St | 19th St | 1820 | 32 | 6471 | $ 151821 | $ 23 | $ 58240 | $ 58240 | 5 | 1400 | $ 39324 | 400 | $ 10000 | 2 | $ 30000 | $ 5000 | 10 | $ 14256 | |||||||||||||||||||||||||||||||||||||||
6 to 8 | Discovery Rd | 19th | Hastings Ave | 2900 | 22 | 7089 | $ 136565 | $ 19 | $ 63800 | $ 63800 | 15 | 10 | $ 47850 | 500 | $ 12500 | $ - | 10 | $ 12415 | |||||||||||||||||||||||||||||||||||||||||
8 to 12 | Hastings Ave | Discovery Rd | County Line | 8450 | 32 | 30044 | $ 542349 | $ 18 | $ 270400 | $ 270400 | 5 | 10 | 5000 | $ 197644 | 1000 | $ 25000 | $ - | 10 | $ 49304 | ||||||||||||||||||||||||||||||||||||||||
6 to 12 | Washington St | Van Buren St | SR20 | 2025 | 30 | 6750 | $ 118388 | $ 18 | $ 60750 | $ 60750 | 5 | 5 | $ 16875 | 0 | 0 | 0 | $ - | 2 | $ 30000 | $ - | 10 | $ 10763 | |||||||||||||||||||||||||||||||||||||
14 | Blaine St | San Juan Ave | Walker St | 1275 | 48 | 6800 | $ 113910 | $ 17 | $ 61200 | $ 61200 | 5 | $ 11900 | $ - | 2 | $ 30000 | $ 5000 | 10 | $ 10810 | |||||||||||||||||||||||||||||||||||||||||
6 | Washington St | Harrison St | Taylor St | 1175 | 33 | 4308 | $ 59240 | $ 14 | $ 38775 | $ 38775 | 10 | $ 15079 | $ - | $ - | 10 | $ 5385 | |||||||||||||||||||||||||||||||||||||||||||
8 to 10 | Sheridan St | SR 20 | 19th St | 4000 | 46 | 20444 | $ 272922 | $ 13 | $ 184000 | $ 184000 | 5 | 5 | $ 51111 | 200 | 2 | $ 13000 | $ - | 10 | $ 24811 | ||||||||||||||||||||||||||||||||||||||||
8 to 10 | 19th St | San Juan Ave | Sheridan St | 3200 | 48 | 17067 | $ 197120 | $ 12 | $ 153600 | $ 153600 | 3 | 3 | $ 25600 | 0 | 0 | 0 | $ - | $ - | 10 | $ 17920 | |||||||||||||||||||||||||||||||||||||||
10 to 20 | San Juan Ave | F St | Lopez Ave | 2800 | 32 | 9956 | $ 110059 | $ 11 | $ 89600 | $ 89600 | 3 | $ 10453 | $ - | $ - | 10 | $ 10005 | |||||||||||||||||||||||||||||||||||||||||||
10 to 20 | F St | Hastings Ave | Tyler St | 5300 | 31 | 18256 | $ 180730 | $ 10 | $ 164300 | $ 164300 | $ - | $ - | $ - | 10 | $ 16430 | ||||||||||||||||||||||||||||||||||||||||||||
$ 9952406 | $ 1873288 | $ 31744 | $ 274803 | $ 32667 | $ 332896 | $ 1998646 | $ 4544044 | $ 1155207 | $ 1747625 | $ 1215000 | $ 1290529 | $ - 0 | |||||||||||||||||||||||||||||||||||||||||||||||
Street Pavement Improvement Plan Projects | 9 | 110 | |||||||||||||||||||||||||||||||||||||||||||||
Road Name | From | To | Iworq ID | Length (ft) | Width (ft) | Area (yd^2) | Actual Area(SY) | Unit Cost per yd2 | Construction Cost | Prep Work | Survey Testing | ADA Curb Ramps | Storm Water | Mill amp Fill$50SY | Pre-Level$4SY | Total Construction | Project Cost + 10 | Unit Cost w Additional Costs no 10 | Engineering Costs | Notes | |||||||||||||||||||||||||||
Priority | Reconstruct | 2021 | 2022 | 2023 | 2024 | ||||||||||||||||||||||||||||||||||||||||||
1 | Reconstruct | Lawrence St | Cass St | Calhoun St | 1304 | 250 | 36 | 1000 | $ 80 | $ 80000 | $ 5000 | $ 20000 | $ 105000 | $ 115500 | $ 105 | Stormwater South Side Parking Raingarden on Cass | |||||||||||||||||||||||||||||||
2 | Reconstruct | Lawrence St | Walker St | Cass St | 250 | 36 | 1000 | $ 80 | $ 80000 | $ 5000 | $ 20000 | $ 5000 | $ 110000 | $ 121000 | $ 110 | Stormwater South Side Parking | |||||||||||||||||||||||||||||||
3 | Reconstruct Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | San Juan Ave | Lopez Ave | Admiralty | 2300 | 32 | 8178 | $ 50 | $ 408889 | $ 10000 | $ 100000 | $ 518889 | $ 570778 | $ 63 | Stormwater Problem 45th | ||||||||||||||||||||||||||||||||
4 | Reconstruct Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Polk St - Street Improvements | Lawrence St | 1056 Sarah Tiffany Sarah TiffanyGarfield | 1073 | 200 | 56 | 1244 | $ 50 | $ 62222 | X | X | X | $ 62222 | $ 68444 | $ 50 | Parking Theater 4 AC Watermain Infiltration or Rain Garden Parking on Condo Side | ||||||||||||||||||||||||||||||
Reconstruct | 47th Street | Pettygrove | McNeil | 500 | 18 | 1000 | 1548 | $ 50 | $ 50000 | $ 5000 | $ 40000 | $ 95000 | $ 104500 | $ 95 | $210000 Engineers Estimate With Engineering Cost Turnaround Spaghetti Waterline | ||||||||||||||||||||||||||||||||
Chip Seal - $50000 to $70000 per Mile | $6 No DigoutsPre-leveling | $10 with Additional Prep Work | |||||||||||||||||||||||||||||||||||||||||||||||
Chip Seal | Washington St | Van Buren St | SR20 | 2025 | 30 | 6750 | $ 10 | $ 67500 | $ 67500 | $ 74250 | Digouts Flagging | ||||||||||||||||||||||||||||||||||||
Chip Seal | Hastings Ave - Pre-level and widen shoulders | Discovery Rd | County Line | 8450 | 24 | 22533 | $ 6 | $ 135200 | $ 135200 | $ 148720 | Ditches amp Culverts Total Width change from 21 to 24 How wide will shoulders be | ||||||||||||||||||||||||||||||||||||
Tyler St | Jefferson St | Lawrence St | 900 | 32 | 3200 | $ 6 | $ 19200 | $ 19200 | $ 21120 | ||||||||||||||||||||||||||||||||||||||
Chip Seal | McPherson - Chip Seal | 4th St | Discovery Rd | 3100 | 32 | 11022 | $ 6 | $ 66133 | $ 66133 | $ 72747 | Ditches amp Culverts Shoulder Wideneing | ||||||||||||||||||||||||||||||||||||
Chip Seal | 19th St - Chip Seal | San Juan Ave | Sheridan St | 3200 | 48 | 17067 | $ 6 | $ 102400 | $ 102400 | $ 112640 | Bike Lanes amp Shoulder Prelevel | ||||||||||||||||||||||||||||||||||||
Chip Seal | Walnut | W Street | Jackson | 2300 | 22 | 5622 | $ 6 | $ 33733 | $ 33733 | $ 37107 | Dig-Outs Pre-Leveling Striping Shoulders | ||||||||||||||||||||||||||||||||||||
Chip Seal | Fir St - Chip Seal | F St | UCherry | 4360 | 22 | 10658 | $ 10 | $ 106578 | X | X | $ 106578 | $ 117236 | Dig-Outs Pre-Leveling Striping | ||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | |||||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | P St - Chip Seal | Redwood St | Cedar St | 0486 | 300 | 16 | 533 | $ 20 | $ 10667 | $ 10667 | $ 11733 | Watermain Looping Shouldnt this be part of Center | |||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 25th St - Chip Seal | Sheridan St | Holcomb St | 1200 | 18 | 2400 | $ 20 | $ 48000 | $ 48000 | $ 52800 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 14th St - Chip Seal | $ - | $ - | ||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Cedar St - Chip Seal | Redwood St | San Juan Ave | 1460 | 16 | 2596 | $ 20 | $ 51911 | $ 51911 | $ 57102 | Ex ChipSeal 22 Wide | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Center St - Chip Seal | Redwood St | San Juan Ave | 484 | 1660 | 16 | 2951 | $ 20 | $ 59022 | $ 59022 | $ 64924 | Ex ChipSeal 22 Wide Stormwater | |||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Grant St Chip Seal | 14th St | 16th St | 525 | 16 | 933 | $ 20 | $ 18667 | $ 18667 | $ 20533 | Ex Street 10 Wide | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 11th St Chip Seal | Hendricks St | Sheridan St | 550 | 16 | 978 | $ 20 | $ 19556 | $ 19556 | $ 21511 | Hospital Parking | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Hendricks St Chip Seal | 9th St | 12th St | 800 | 16 | 1422 | $ 20 | $ 28444 | $ 28444 | $ 31289 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 10th St Chip Seal | Hendricks St | Grant St | 1655 | 283 | 18 | 566 | $ 20 | $ 11320 | $ 11320 | $ 12452 | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Grant St Chip Seal | 14th St | 16th St | 525 | 18 | 1050 | $ 20 | $ 21000 | $ 21000 | $ 23100 | Ex Street 10 Wide Stormwater | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Hill St | 21st St | 19th St | 807 | 16 | 1435 | $ 20 | $ 28693 | $ 28693 | $ 31563 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Milo St -Chip seal | Olympic Ave | Pacific Ave | 0003 | 466 | 12 | 621 | $ 20 | $ 12427 | $ 12427 | $ 13669 | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Olympic St | Cedar St | Tremont St | 536 | 12 | 715 | $ 20 | $ 14293 | $ 14293 | $ 15723 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Benton St - street improvement | Blaine St | Lincoln Blg | 580 | 36 Sarah Tiffany Sarah TiffanyEstimated at 25-36 used higher number | Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Sarah Tiffany Sarah TiffanyGarfield | 2320 | $ 20 | $ 46400 | $ 46400 | $ 51040 | ||||||||||||||||||||||||||||||||||
Pave Gravel Road | |||||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Pacific St | Cedar St | Tremont St | 400 | 16 | 711 | $ 50 | $ 35556 | $ 6000 | $ 15000 | $ 56556 | $ 62211 | $ 80 | ||||||||||||||||||||||||||||||||||
58th St | Hill St | Kuhn St | 525 | 16 | 933 | $ 50 | $ 46667 | $ 6000 | $ 20000 | $ 72667 | $ 79933 | $ 78 | 4 AC Waterline Driveways Site Distance (Re-grade Slope) | ||||||||||||||||||||||||||||||||||
Sidewalks | |||||||||||||||||||||||||||||||||||||||||||||||
Harrison St | Franklin St | Clay St | 340 | 6 | 227 | $ 165 | $ 56100 | $ 5000 | $ 61100 | $ 67210 | $ 180 | ||||||||||||||||||||||||||||||||||||
9th St | Hancock St | McPherson St | 1300 | 6 | 867 | $ 165 | $ 214500 | $ 10000 | $ 15000 | $ 239500 | $ 263450 | $ 184 | |||||||||||||||||||||||||||||||||||
Asphalt Path | |||||||||||||||||||||||||||||||||||||||||||||||
Spruce St Easement | Cedar St | Center St | 150 | 8 | 133 | $ 50 | $ 6667 | $ 2000 | $ 8667 | $ 9533 | $ 65 | ||||||||||||||||||||||||||||||||||||
Cherry St | A St | E St | 990 | 10 | 1100 | $ 50 | $ 55000 | $ 10000 | $ 10000 | $ 15000 | $ 90000 | $ 99000 | $ 82 | ||||||||||||||||||||||||||||||||||
Gravel Path | |||||||||||||||||||||||||||||||||||||||||||||||
16th St | Thomas St | Grant St | 1700 | 6 | 1133 | $ 15 | $ 17000 | $ 1500 | $ 18500 | $ 20350 | |||||||||||||||||||||||||||||||||||||
Cleveland St | 21st St | 23rd St | 500 | 6 | 333 | $ 15 | $ 5000 | $ 5000 | $ 5500 | Need Easement | |||||||||||||||||||||||||||||||||||||
6 | - | $ 15 | $ - | $ - | $ - | Need Easement | |||||||||||||||||||||||||||||||||||||||||
6 | - | $ 15 | $ - | $ - | $ - | Need Easement | |||||||||||||||||||||||||||||||||||||||||
Total | $ 1582256 | $ 1792256 | $ 1971481 | ||||||||||||||||||||||||||||||||||||||||||||
Project Descriptioin | Length | Width | Construction Costs | ConstructionUnit Costs | Units | Engineering Costs | Total CostsUnit Cost | Total Costs | Total CostsUnit Cost | Notes | |||||||||||
Sidewalk | |||||||||||||||||||||
9th Street Sidewalk Grant Street to Hancock Street | 826 | 6 | $ 141506 | $ 17131 | LF | Construction Unit Cost per Foot | |||||||||||||||
Jefferson Street Sidewalk Washington Street to Taylor Street | 724 | 6 | $ 390502 | $ 53937 | LF | Construction Unit Cost per Foot | |||||||||||||||
Landis Street Sidewalk 10th Street to 19th Street | 1795 | 6 | $ 364550 | $ 20309 | LF | Construction Unit Cost per Foot | |||||||||||||||
ADA Corner Ramps | |||||||||||||||||||||
Washington Street amp Harrison Street | $ 42000 | $ 42000 | Each | ||||||||||||||||||
Washington Street amp Adams Street | $ 38150 | $ 19075 | Each | Two Corners Were Retrofitted | |||||||||||||||||
Chip Seal Pavement | |||||||||||||||||||||
Walker Street Washington Street to Lawrence Street | 1144 | 24 | $ 20000 | $ 656 | SY | Does not include flagging nor prep work | |||||||||||||||
Pulverize amp Asphalt Paving | |||||||||||||||||||||
Washington Street VanBuren Street to Harrison Street | 300 | 22 | $ 35000 | $ 4773 | SY | ||||||||||||||||
Asphalt Overlay | |||||||||||||||||||||
Sidewalks | ||||||||||||||||||||||||||||||||||||||
Harrison St | Franklin St | Clay St | 340 | 6 | 227 | |||||||||||||||||||||||||||||||||
9th St | Hancock St | McPherson St | 1300 | 6 | 867 | |||||||||||||||||||||||||||||||||
Asphalt Path | ||||||||||||||||||||||||||||||||||||||
Spruce St Easement | Cedar St | Center St | 150 | 8 | 133 | $ 2000 | $ 2000 | $ 2000 | ||||||||||||||||||||||||||||||
Cherry St | A St | E St | 990 | 10 | 1100 | $ 10000 | $ 10000 | $ 10000 | ||||||||||||||||||||||||||||||
Gravel Path | ||||||||||||||||||||||||||||||||||||||
16th St | Thomas St | Grant St | 1700 | 6 | 1133 | $ 1500 | $ 1500 | $ 1500 | ||||||||||||||||||||||||||||||
Cleveland St | 21st St | 23rd St | 500 | 6 | 333 | Need Easement | ||||||||||||||||||||||||||||||||
6 | - | Need Easement | ||||||||||||||||||||||||||||||||||||
6 | - | Need Easement | ||||||||||||||||||||||||||||||||||||
Total |
Type | Improvement | Cost Range SY | Cost Range LF | ||||||||
1 | Complete Road Rebuild | $80 | $100 | ||||||||
2 | Asphalt Overlay | $50 | $60 | ||||||||
3 | Pulverize amp Chip Seal | $20 | $30 | ||||||||
4 | Chip Seal | $6 | $10 | $12 | $25 | ||||||
5 | Seal Coat | ||||||||||
6 | |||||||||||
7 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 3-Inch | 413 | TONS | $ 15000 | $ 6187500 | 1000 x 22 x 025 httpwwwamerasphaltcomasphalthtm | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 1630 | CY | $ 4800 | $ 7824000 | Water Street Project = $48 CY (1000 x 22 x 2)27 = 1630 CY | ||||||
Gravel Borrow | 2282 | TONS | $ 3000 | $ 6846000 | (1000 x 22 x 2)27 = 1630 1630 CY x 14 = 2282 Tons | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 128 | Hours | $ 5728 | $ 733133 | (2) People for 64 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 25043033 | |||||||||||
$ 10247 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 2-Inch | 275 | TONS | $ 15000 | $ 4125000 | 1000 x 22 x 017 httpwwwamerasphaltcomasphalthtm | | ||||||
Digouts amp Pre-leveling | 122 | SY | $ 4900 | $ 597800 | |||||||
Flagging | 64 | Hours | $ 5728 | $ 366566 | (2) People for 32 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 180000 | $ 180000 | |||||||
$ 5403066 | |||||||||||
$ 2211 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 3-Inch | 413 | TONS | $ 15000 | $ 6187500 | 1000 x 22 x 025 httpwwwamerasphaltcomasphalthtm | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 150 | CY | $ 4800 | $ 720000 | Water Street Project = $48 CY | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 96 | Hours | $ 5728 | $ 549850 | (2) People for 48 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 10909750 | |||||||||||
$ 4464 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Chip Seal | 2444 | SY | $ 1050 | $ 2566200 | 1000 X 22 | Unit Cost $525 SY from Walker Street County Invoice Doubled to $1050 for Chip Seal Over Gravel | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 150 | CY | $ 4800 | $ 720000 | Water Street Project = $48 CY | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 80 | Hours | $ 5728 | $ 458208 | (2) People for 40 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | Hours | $ 12500 | $ - 0 | High Average Loaded Rate No Testing | ||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 7196808 | |||||||||||
$ 2945 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 1500000 | $614 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 500 | LF | $ 5000 | $ 2500000 | |||||||
Catch Basins | 4 | EACH | $ 150000 | $ 600000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Chip Seal | 2444 | SY | $ 525 | $ 1283100 | 1000 X 22 | Unit Cost from Walker Street County Invoice | ||||||
Digouts amp Pre-leveling | 122 | SY | $ 4900 | $ 598780 | Cost from 2018 Lakeside Mill amp Fill | Estimate Quanity Based on 5 | ||||||
Flagging | 32 | Hours | $ 5728 | $ 183283 | (2) People for 16 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | Hours | $ 12500 | $ - 0 | High Average Loaded Rate No Surveying or Testing | ||||||
Surveying | 1 | LS | $ - 0 | $ - 0 | |||||||
$ 2198863 | |||||||||||
$ 900 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 1500000 | $614 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY |
Project Descriptioin | Length | Width | Construction Costs | Engineering Costs | Engineering Total | Digouts Pre-Leveling Costs | Digouts Pre-Leveling Total | ADACosts | ADATotal | StormwaterCosts | StormwaterTotal | Total Costsby SY | Cost Per 250 Block | Length | Width | Notes | |||||||||||||||||
Chip Seal Pavement | |||||||||||||||||||||||||||||||||
Walker Street Washington Street to Lawrence Street | 1144 | 24 | $ 25000 | 15 | $ 3750 | 10 | $ 2500 | $ 1024 | $ 682911 | 250 | 24 | ||||||||||||||||||||||
Pulverize amp Chip Seal | |||||||||||||||||||||||||||||||||
Engineers Estimate | 250 | 24 | $ 22000 | 15 | $ 3300 | 0 | $ - | 20 | $ 4400 | $ 4455 | $ 2970000 | 250 | 24 | ||||||||||||||||||||
Pulverize amp Asphalt Paving | |||||||||||||||||||||||||||||||||
Washington Street VanBuren Street to Harrison Street | 300 | 22 | $ 35000 | 20 | $ 7000 | 0 | $ - | 10 | $ 3500 | 20 | $ 7000 | $ 7159 | $ 4772727 | 250 | 24 | ||||||||||||||||||
Asphalt Overlay (2) | |||||||||||||||||||||||||||||||||
Engineers Estimate | 250 | 24 | $ 21334 | 20 | $ 426680 | 10 | $ 2133 | 20 | $ 426680 | 20 | $ 426680 | $ 5440 | $ 4835707 | 250 | 32 | ||||||||||||||||||
Reconstruction | |||||||||||||||||||||||||||||||||
Walker Street Lawrence Street to Blaine Street | 650 | 36 | $ 184310 | 25 | $ 46078 | 0 | $ - | 20 | $ 36862 | 30 | $ 55293 | $ 12405 | $ 11027094 | 250 | 32 | ||||||||||||||||||
RSL | Length (FT) | Area (SY) | Condition | Treatment | Cost | Total | |||||||||
20 | 61834 | 138524 | 131 | Good | $0 | $0 | |||||||||
14 | 23656 | 49915 | 47 | Satisfactory | Chip Seal | $29 | $1470552 | ||||||||
12 | 43586 | 106382 | 100 | $3134134 | |||||||||||
10 | 74803 | 193570 | 182 | $5702790 | |||||||||||
8 | 96662 | 228046 | 215 | $6718492 | |||||||||||
6 | 95452 | 261794 | 247 | Fair | Overlay | $67 | $17489930 | ||||||||
4 | 6420 | 14536 | 14 | $971121 | |||||||||||
2 | 29238 | 60616 | 57 | Poor | Rehab | $107 | $6492850 | ||||||||
0 | 3851 | 7532 | 07 | Very Poor | Rebuild | $155 | $1169719 | ||||||||
$43149589 | |||||||||||||||
Additional Paving Costs | Average Cost per SY | Percent of Paving Cost | |||
Digouts amp Pre-Leveling | $4 | 25 | |||
Stormwater | $7 | 38 | |||
ADA | $5 | 27 | |||
Engineering amp Administration | $5 | 28 |
9 | Base Paving Costs | Preperation | Stormwater | ADA | Engineering | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Remaining Service Life | Road Name | From | To | Length (ft) | Width (ft) | Area (SY) | Total Construction | Price(SY) | Reconstruction | Pulverize amp Pave | Ashpalt Overlay | Pave Gravel Road | Pulverize amp Chip Seal | Chip Seal | Total Base Paving Costs | Digouts(SY) | Pre-Leveling(SY) | Construct Shoulders Both Sides (LF) | Preparation Total | StormwaterPipes (LF) | StormwaterCatchbasins | StormwaterSwales (LF) | Stormwater Total | Curb Ramps | Curb Ramps Total | Surveying | Engineering amp Administration | Engineering amp Administration Total | Other Work | ||||||||||||||||||||||||||||||
$102 | $45 | $22 | $35 | $29 | $9 | $35 | $15 | $20 | $50 | $1500 | $25 | $15000 | |||||||||||||||||||||||||||||||||||||||||||||||
2 | Polk St - Street | Lawrence St | 1056 | 200 | 56 | 1244 | $ 210679 | $ 169 | $ 127518 | $ 127518 | $ - | 150 | 1 | 1 | $ 9025 | 2 | $ 30000 | $ 10000 | 25 | $ 44136 | |||||||||||||||||||||||||||||||||||||||
6 | 47th Street | Pettygrove | McNeil | 500 | 18 | 1548 | $ 258717 | $ 167 | $ 158624 | $ 158624 | $ - | 687 | 8 | $ 46350 | $ - | $ 10000 | 25 | $ 53743 | |||||||||||||||||||||||||||||||||||||||||
6 to 10 | Lawrence St | Calhoun St | Harrison St | 1200 | 36 | 4800 | $ 786070 | $ 164 | $ 491856 | $ 491856 | 600 | $ 15000 | $ 8 | $ 120000 | $ 10000 | 25 | $ 159214 | ||||||||||||||||||||||||||||||||||||||||||
8 | Lawrence St | Cass St | Calhoun St | 250 | 36 | 1000 | $ 146213 | $ 146 | $ 102470 | $ 102470 | 0 | 0 | $ - | 75 | 350 | $ 12500 | $ - | $ 10000 | 25 | $ 31243 | |||||||||||||||||||||||||||||||||||||||
8 | Lawrence St | Walker St | Cass St | 250 | 36 | 1000 | $ 144650 | $ 145 | $ 102470 | $ 102470 | $ - | 100 | 250 | $ 11250 | $ - | $ 10000 | 25 | $ 30930 | |||||||||||||||||||||||||||||||||||||||||
4 to 8 | San Juan Ave | Lopez Ave | Admiralty | 2300 | 34 | 8689 | $ 1222938 | $ 141 | $ 890350 | $ 890350 | $ - | 800 | 5 | 1500 | $ 85000 | $ - | $ 15000 | 25 | $ 247588 | ||||||||||||||||||||||||||||||||||||||||
6 to 8 | Lawrence St | Harrison St | Monroe St | 2380 | 47 | 12429 | $ 1331314 | $ 107 | $ 274803 | $ 274803 | 15 | 5 | $ 74573 | 1900 | 10 | $ 110000 | 50 | $ 750000 | $ 10000 | 10 | $ 121938 | ||||||||||||||||||||||||||||||||||||||
2 to 4 | Center St | San Juan Ave | Redwood St | 1660 | 16 | 2951 | $ 295222 | $ 100 | $ 86910 | $ 86910 | $ - | 1600 | 9 | 3000 | $ 168500 | $ - | $ 10000 | 15 | $ 39812 | ||||||||||||||||||||||||||||||||||||||||
0 to 6 | Pacific St | Cedar St | Tremont St | 400 | 16 | 711 | $ 66581 | $ 94 | $ 31744 | $ 31744 | $ - | 100 | 2 | 700 | $ 25500 | $ - | $ 5000 | 15 | $ 9337 | ||||||||||||||||||||||||||||||||||||||||
0 to 6 | Benton St | Lawrence | Lincoln Blg | 580 | 36 | 2320 | $ 203265 | $ 88 | $ 20880 | $ 20880 | 20 | 10 | $ 19720 | 250 | 2 | $ 15500 | 8 | $ 120000 | $ 5000 | 15 | $ 27165 | ||||||||||||||||||||||||||||||||||||||
2 | Grant St | 14th St | 16th St | 525 | 16 | 933 | $ 73635 | $ 79 | $ 27487 | $ 27487 | $ - | 400 | 2 | 500 | $ 35500 | $ - | $ 8000 | 15 | $ 10648 | ||||||||||||||||||||||||||||||||||||||||
2 to 6 | Olympic St | Cedar St | Tremont St | 536 | 12 | 715 | $ 52716 | $ 74 | $ 21047 | $ 21047 | $ - | 950 | $ 23750 | $ - | $ 8000 | 15 | $ 7920 | ||||||||||||||||||||||||||||||||||||||||||
2 | Milo St | Olympic Ave | Pacific Ave | 466 | 12 | 621 | $ 44793 | $ 72 | $ 18298 | $ 18298 | $ - | 800 | $ 20000 | $ - | $ 5000 | 15 | $ 6495 | ||||||||||||||||||||||||||||||||||||||||||
0 | 11th St | Hendricks St | Sheridan St | 550 | 16 | 978 | $ 65077 | $ 67 | $ 28796 | $ 28796 | $ - | 100 | 2 | 750 | $ 26750 | $ - | $ 8000 | 15 | $ 9532 | ||||||||||||||||||||||||||||||||||||||||
0 | 58th St | Hill St | Kuhn St | 525 | 16 | 933 | $ 60329 | $ 65 | $ 32667 | $ 32667 | $ - | 750 | $ 18750 | $ - | $ 8000 | 15 | $ 8913 | ||||||||||||||||||||||||||||||||||||||||||
2 | 10th St | Hendricks St | Grant St | 283 | 18 | 566 | $ 34294 | $ 61 | $ 16669 | $ 16669 | $ - | 500 | $ 12500 | $ - | $ 5000 | 15 | $ 5125 | ||||||||||||||||||||||||||||||||||||||||||
4 to 10 | 31st St | Hancock St | Sheridan St | 1050 | 22 | 2567 | $ 150027 | $ 58 | $ 23100 | $ 23100 | 10 | 10 | $ 12833 | 1200 | 10 | 1000 | $ 100000 | $ - | $ 5000 | 10 | $ 14093 | ||||||||||||||||||||||||||||||||||||||
6 | 25th St | Sheridan St | Holcomb St | 1200 | 18 | 2400 | $ 125895 | $ 52 | $ 70680 | $ 70680 | $ - | 125 | 1 | 1200 | $ 37750 | $ - | $ 8000 | 15 | $ 17465 | ||||||||||||||||||||||||||||||||||||||||
6 | Holcomb St | 7th St | 10th St | 850 | 12 | 1133 | $ 58703 | $ 52 | $ 10200 | $ 10200 | 10 | 10 | $ 5667 | 1500 | $ 37500 | $ - | $ - | 10 | $ 5337 | ||||||||||||||||||||||||||||||||||||||||
2 | Hendricks St | 9th St | 12th St | 800 | 16 | 1422 | $ 70930 | $ 50 | $ 41884 | $ 41884 | $ - | 750 | $ 18750 | $ - | $ 8000 | 15 | $ 10295 | ||||||||||||||||||||||||||||||||||||||||||
2 to 6 | Hill St | 19th | 21st St | 807 | 16 | 1435 | $ 67443 | $ 47 | $ 21125 | $ 6456 | $ 27581 | 10 | $ 5021 | 1000 | $ 25000 | $ - | $ 8000 | 15 | $ 9840 | ||||||||||||||||||||||||||||||||||||||||
2 to 8 | 57th St | Jackman St | Kuhn St | 800 | 18 | 1600 | $ 66550 | $ 42 | $ 14400 | $ 14400 | 20 | 10 | $ 13600 | 1300 | $ 32500 | 10 | $ 6050 | ||||||||||||||||||||||||||||||||||||||||||
6 to 8 | Sheridan St | Hastings Ave | SilverUmatilla | 1750 | 22 | 4278 | $ 154115 | $ 36 | $ 38500 | $ 38500 | 20 | 10 | $ 36361 | 300 | 4 | 1500 | $ 58500 | $ - | $ 5000 | 15 | $ 20754 | ||||||||||||||||||||||||||||||||||||||
6 to 10 | Tyler St | Jefferson St | Lawrence St | 900 | 32 | 3200 | $ 115280 | $ 36 | $ 28800 | $ 28800 | 5 | 5 | $ 8000 | 100 | 2 | $ 8000 | 4 | $ 60000 | 10 | $ 10480 | |||||||||||||||||||||||||||||||||||||||
6 to 14 | 14th St | McPherson St | Sheridan St | 2375 | 21 | 5542 | $ 182027 | $ 33 | $ 49875 | $ 49875 | 20 | 10 | $ 47104 | 750 | 4 | 1000 | $ 68500 | $ - | 10 | $ 16548 | |||||||||||||||||||||||||||||||||||||||
8 | 49th St | Kuhn St | Admiralty Ave | 400 | 24 | 1067 | $ 34613 | $ 32 | $ 9600 | $ 9600 | 5 | $ 1867 | 800 | $ 20000 | $ - | 10 | $ 3147 | ||||||||||||||||||||||||||||||||||||||||||
6 to 10 | Fir St | F St | UCherry | 4360 | 22 | 10658 | $ 341621 | $ 32 | $ 95920 | $ 95920 | 5 | 5 | 4000 | $ 106644 | 100 | 2 | 4000 | $ 108000 | $ - | 10 | $ 31056 | ||||||||||||||||||||||||||||||||||||||
6 to 8 | Cedar St | San Juan Ave | Redwood St | 1460 | 16 | 2596 | $ 81747 | $ 31 | $ 23360 | $ 23360 | 20 | 20 | $ 25956 | 1000 | $ 25000 | $ - | 10 | $ 7432 | |||||||||||||||||||||||||||||||||||||||||
8 | Clallam St | McKinley St | Roosevelt St | 975 | 14 | 1517 | $ 46796 | $ 31 | $ 13650 | $ 13650 | 20 | 10 | $ 12892 | 200 | 4 | $ 16000 | $ - | 10 | $ 4254 | ||||||||||||||||||||||||||||||||||||||||
6 | San Juan Ave | 19th St | 20th St | 300 | 31 | 1033 | $ 31827 | $ 31 | $ 9300 | $ 9300 | 50 | 10 | $ 19633 | $ - | $ - | 10 | $ 2893 | ||||||||||||||||||||||||||||||||||||||||||
6 to 20 | Cherry St | F St | W St | 4200 | 32 | 14933 | $ 457307 | $ 31 | $ 134400 | $ 134400 | 5 | 5 | 4200 | $ 121333 | 200 | 6000 | $ 160000 | $ - | 10 | $ 41573 | |||||||||||||||||||||||||||||||||||||||
6 to 8 | Jackman St | 45th St | 49th St | 1100 | 22 | 2689 | $ 81940 | $ 30 | $ 24200 | $ 24200 | 15 | 10 | $ 18150 | 225 | 3 | 500 | $ 28250 | $ - | $ 5000 | 15 | $ 11340 | ||||||||||||||||||||||||||||||||||||||
6 to 12 | Jackson St | LawrenceMonroe | Roosevelt St | 1600 | 18 | 3200 | $ 93530 | $ 29 | $ 28800 | $ 28800 | 10 | 10 | $ 16000 | 1000 | $ 25000 | 1 | $ 15000 | $ 2500 | 10 | $ 8730 | |||||||||||||||||||||||||||||||||||||||
2 | 7th St | Wilson St | Holcomb St | 450 | 16 | 800 | $ 23320 | $ 29 | $ 7200 | $ 7200 | 10 | 10 | $ 4000 | 400 | $ 10000 | $ - | 10 | $ 2120 | |||||||||||||||||||||||||||||||||||||||||
8 to 14 | 25th St | Sherman St | Sheridan St | 800 | 20 | 1778 | $ 50061 | $ 28 | $ 16000 | $ 16000 | 10 | 5 | $ 7556 | 1 | 800 | $ 21500 | $ - | $ 5000 | 10 | $ 5006 | |||||||||||||||||||||||||||||||||||||||
2 to 6 | Hancock St | SR 20 | 9th St | 1100 | 20 | 2444 | $ 67833 | $ 28 | $ 22000 | $ 22000 | 15 | 5 | $ 14667 | 1000 | $ 25000 | $ - | 10 | $ 6167 | |||||||||||||||||||||||||||||||||||||||||
Benton St | Washington St | Lawrence St | 1160 | 22 | 2836 | $ 74468 | $ 26 | $ 25520 | $ 25520 | 10 | 10 | $ 14178 | 140 | 4 | 600 | $ 28000 | 10 | $ 6770 | |||||||||||||||||||||||||||||||||||||||||
W St | San JuanAdmiralty | Walnut St | 2560 | 22 | 6258 | $ 163807 | $ 26 | $ 56320 | $ 56320 | 10 | 5 | $ 26596 | 200 | 4 | 2000 | $ 66000 | $ - | 10 | $ 14892 | ||||||||||||||||||||||||||||||||||||||||
6 to 8 | Walnut | W Street | Jackson | 2300 | 22 | 5622 | $ 145194 | $ 26 | $ 50600 | $ 50600 | 10 | 5 | $ 23894 | 2300 | $ 57500 | $ - | 10 | $ 13199 | |||||||||||||||||||||||||||||||||||||||||
6 to 8 | 24th St | Discovery Rd | San Juan Ave | 1250 | 18 | 2500 | $ 63938 | $ 26 | $ 22500 | $ 22500 | 10 | 5 | $ 10625 | 1000 | $ 25000 | $ - | 10 | $ 5813 | |||||||||||||||||||||||||||||||||||||||||
6 to 10 | Tyler St | Lawrence St | Blaine St | 900 | 32 | 3200 | $ 78980 | $ 25 | $ 28800 | $ 28800 | 5 | 5 | $ 8000 | 200 | $ 5000 | 2 | $ 30000 | 10 | $ 7180 | ||||||||||||||||||||||||||||||||||||||||
4 to 12 | McPherson St | SR 20 | Discovery Rd | 2925 | 32 | 10400 | $ 244860 | $ 24 | $ 93600 | $ 93600 | 5 | 5 | 2925 | $ 84500 | 230 | 2 | 1200 | $ 44500 | $ - | $ - | 10 | $ 22260 | |||||||||||||||||||||||||||||||||||||
10 | Landes St | 12th St | 19th St | 1820 | 32 | 6471 | $ 151821 | $ 23 | $ 58240 | $ 58240 | 5 | 1400 | $ 39324 | 400 | $ 10000 | 2 | $ 30000 | $ 5000 | 10 | $ 14256 | |||||||||||||||||||||||||||||||||||||||
6 to 8 | Discovery Rd | 19th | Hastings Ave | 2900 | 22 | 7089 | $ 136565 | $ 19 | $ 63800 | $ 63800 | 15 | 10 | $ 47850 | 500 | $ 12500 | $ - | 10 | $ 12415 | |||||||||||||||||||||||||||||||||||||||||
8 to 12 | Hastings Ave | Discovery Rd | County Line | 8450 | 32 | 30044 | $ 542349 | $ 18 | $ 270400 | $ 270400 | 5 | 10 | 5000 | $ 197644 | 1000 | $ 25000 | $ - | 10 | $ 49304 | ||||||||||||||||||||||||||||||||||||||||
6 to 12 | Washington St | Van Buren St | SR20 | 2025 | 30 | 6750 | $ 118388 | $ 18 | $ 60750 | $ 60750 | 5 | 5 | $ 16875 | 0 | 0 | 0 | $ - | 2 | $ 30000 | $ - | 10 | $ 10763 | |||||||||||||||||||||||||||||||||||||
14 | Blaine St | San Juan Ave | Walker St | 1275 | 48 | 6800 | $ 113910 | $ 17 | $ 61200 | $ 61200 | 5 | $ 11900 | $ - | 2 | $ 30000 | $ 5000 | 10 | $ 10810 | |||||||||||||||||||||||||||||||||||||||||
6 | Washington St | Harrison St | Taylor St | 1175 | 33 | 4308 | $ 59240 | $ 14 | $ 38775 | $ 38775 | 10 | $ 15079 | $ - | $ - | 10 | $ 5385 | |||||||||||||||||||||||||||||||||||||||||||
8 to 10 | Sheridan St | SR 20 | 19th St | 4000 | 46 | 20444 | $ 272922 | $ 13 | $ 184000 | $ 184000 | 5 | 5 | $ 51111 | 200 | 2 | $ 13000 | $ - | 10 | $ 24811 | ||||||||||||||||||||||||||||||||||||||||
8 to 10 | 19th St | San Juan Ave | Sheridan St | 3200 | 48 | 17067 | $ 197120 | $ 12 | $ 153600 | $ 153600 | 3 | 3 | $ 25600 | 0 | 0 | 0 | $ - | $ - | 10 | $ 17920 | |||||||||||||||||||||||||||||||||||||||
10 to 20 | San Juan Ave | F St | Lopez Ave | 2800 | 32 | 9956 | $ 110059 | $ 11 | $ 89600 | $ 89600 | 3 | $ 10453 | $ - | $ - | 10 | $ 10005 | |||||||||||||||||||||||||||||||||||||||||||
10 to 20 | F St | Hastings Ave | Tyler St | 5300 | 31 | 18256 | $ 180730 | $ 10 | $ 164300 | $ 164300 | $ - | $ - | $ - | 10 | $ 16430 | ||||||||||||||||||||||||||||||||||||||||||||
$ 9952406 | $ 1873288 | $ 31744 | $ 274803 | $ 32667 | $ 332896 | $ 1998646 | $ 4544044 | $ 1155207 | $ 1747625 | $ 1215000 | $ 1290529 | $ - 0 | |||||||||||||||||||||||||||||||||||||||||||||||
Street Pavement Improvement Plan Projects | 9 | 110 | |||||||||||||||||||||||||||||||||||||||||||||
Road Name | From | To | Iworq ID | Length (ft) | Width (ft) | Area (yd^2) | Actual Area(SY) | Unit Cost per yd2 | Construction Cost | Prep Work | Survey Testing | ADA Curb Ramps | Storm Water | Mill amp Fill$50SY | Pre-Level$4SY | Total Construction | Project Cost + 10 | Unit Cost w Additional Costs no 10 | Engineering Costs | Notes | |||||||||||||||||||||||||||
Priority | Reconstruct | 2021 | 2022 | 2023 | 2024 | ||||||||||||||||||||||||||||||||||||||||||
1 | Reconstruct | Lawrence St | Cass St | Calhoun St | 1304 | 250 | 36 | 1000 | $ 80 | $ 80000 | $ 5000 | $ 20000 | $ 105000 | $ 115500 | $ 105 | Stormwater South Side Parking Raingarden on Cass | |||||||||||||||||||||||||||||||
2 | Reconstruct | Lawrence St | Walker St | Cass St | 250 | 36 | 1000 | $ 80 | $ 80000 | $ 5000 | $ 20000 | $ 5000 | $ 110000 | $ 121000 | $ 110 | Stormwater South Side Parking | |||||||||||||||||||||||||||||||
3 | Reconstruct Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | San Juan Ave | Lopez Ave | Admiralty | 2300 | 32 | 8178 | $ 50 | $ 408889 | $ 10000 | $ 100000 | $ 518889 | $ 570778 | $ 63 | Stormwater Problem 45th | ||||||||||||||||||||||||||||||||
4 | Reconstruct Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Polk St - Street Improvements | Lawrence St | 1056 Sarah Tiffany Sarah TiffanyGarfield | 1073 | 200 | 56 | 1244 | $ 50 | $ 62222 | X | X | X | $ 62222 | $ 68444 | $ 50 | Parking Theater 4 AC Watermain Infiltration or Rain Garden Parking on Condo Side | ||||||||||||||||||||||||||||||
Reconstruct | 47th Street | Pettygrove | McNeil | 500 | 18 | 1000 | 1548 | $ 50 | $ 50000 | $ 5000 | $ 40000 | $ 95000 | $ 104500 | $ 95 | $210000 Engineers Estimate With Engineering Cost Turnaround Spaghetti Waterline | ||||||||||||||||||||||||||||||||
Chip Seal - $50000 to $70000 per Mile | $6 No DigoutsPre-leveling | $10 with Additional Prep Work | |||||||||||||||||||||||||||||||||||||||||||||||
Chip Seal | Washington St | Van Buren St | SR20 | 2025 | 30 | 6750 | $ 10 | $ 67500 | $ 67500 | $ 74250 | Digouts Flagging | ||||||||||||||||||||||||||||||||||||
Chip Seal | Hastings Ave - Pre-level and widen shoulders | Discovery Rd | County Line | 8450 | 24 | 22533 | $ 6 | $ 135200 | $ 135200 | $ 148720 | Ditches amp Culverts Total Width change from 21 to 24 How wide will shoulders be | ||||||||||||||||||||||||||||||||||||
Tyler St | Jefferson St | Lawrence St | 900 | 32 | 3200 | $ 6 | $ 19200 | $ 19200 | $ 21120 | ||||||||||||||||||||||||||||||||||||||
Chip Seal | McPherson - Chip Seal | 4th St | Discovery Rd | 3100 | 32 | 11022 | $ 6 | $ 66133 | $ 66133 | $ 72747 | Ditches amp Culverts Shoulder Wideneing | ||||||||||||||||||||||||||||||||||||
Chip Seal | 19th St - Chip Seal | San Juan Ave | Sheridan St | 3200 | 48 | 17067 | $ 6 | $ 102400 | $ 102400 | $ 112640 | Bike Lanes amp Shoulder Prelevel | ||||||||||||||||||||||||||||||||||||
Chip Seal | Walnut | W Street | Jackson | 2300 | 22 | 5622 | $ 6 | $ 33733 | $ 33733 | $ 37107 | Dig-Outs Pre-Leveling Striping Shoulders | ||||||||||||||||||||||||||||||||||||
Chip Seal | Fir St - Chip Seal | F St | UCherry | 4360 | 22 | 10658 | $ 10 | $ 106578 | X | X | $ 106578 | $ 117236 | Dig-Outs Pre-Leveling Striping | ||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | |||||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | P St - Chip Seal | Redwood St | Cedar St | 0486 | 300 | 16 | 533 | $ 20 | $ 10667 | $ 10667 | $ 11733 | Watermain Looping Shouldnt this be part of Center | |||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 25th St - Chip Seal | Sheridan St | Holcomb St | 1200 | 18 | 2400 | $ 20 | $ 48000 | $ 48000 | $ 52800 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 14th St - Chip Seal | $ - | $ - | ||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Cedar St - Chip Seal | Redwood St | San Juan Ave | 1460 | 16 | 2596 | $ 20 | $ 51911 | $ 51911 | $ 57102 | Ex ChipSeal 22 Wide | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Center St - Chip Seal | Redwood St | San Juan Ave | 484 | 1660 | 16 | 2951 | $ 20 | $ 59022 | $ 59022 | $ 64924 | Ex ChipSeal 22 Wide Stormwater | |||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Grant St Chip Seal | 14th St | 16th St | 525 | 16 | 933 | $ 20 | $ 18667 | $ 18667 | $ 20533 | Ex Street 10 Wide | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 11th St Chip Seal | Hendricks St | Sheridan St | 550 | 16 | 978 | $ 20 | $ 19556 | $ 19556 | $ 21511 | Hospital Parking | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Hendricks St Chip Seal | 9th St | 12th St | 800 | 16 | 1422 | $ 20 | $ 28444 | $ 28444 | $ 31289 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 10th St Chip Seal | Hendricks St | Grant St | 1655 | 283 | 18 | 566 | $ 20 | $ 11320 | $ 11320 | $ 12452 | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Grant St Chip Seal | 14th St | 16th St | 525 | 18 | 1050 | $ 20 | $ 21000 | $ 21000 | $ 23100 | Ex Street 10 Wide Stormwater | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Hill St | 21st St | 19th St | 807 | 16 | 1435 | $ 20 | $ 28693 | $ 28693 | $ 31563 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Milo St -Chip seal | Olympic Ave | Pacific Ave | 0003 | 466 | 12 | 621 | $ 20 | $ 12427 | $ 12427 | $ 13669 | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Olympic St | Cedar St | Tremont St | 536 | 12 | 715 | $ 20 | $ 14293 | $ 14293 | $ 15723 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Benton St - street improvement | Blaine St | Lincoln Blg | 580 | 36 Sarah Tiffany Sarah TiffanyEstimated at 25-36 used higher number | Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Sarah Tiffany Sarah TiffanyGarfield | 2320 | $ 20 | $ 46400 | $ 46400 | $ 51040 | ||||||||||||||||||||||||||||||||||
Pave Gravel Road | |||||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Pacific St | Cedar St | Tremont St | 400 | 16 | 711 | $ 50 | $ 35556 | $ 6000 | $ 15000 | $ 56556 | $ 62211 | $ 80 | ||||||||||||||||||||||||||||||||||
58th St | Hill St | Kuhn St | 525 | 16 | 933 | $ 50 | $ 46667 | $ 6000 | $ 20000 | $ 72667 | $ 79933 | $ 78 | 4 AC Waterline Driveways Site Distance (Re-grade Slope) | ||||||||||||||||||||||||||||||||||
Sidewalks | |||||||||||||||||||||||||||||||||||||||||||||||
Harrison St | Franklin St | Clay St | 340 | 6 | 227 | $ 165 | $ 56100 | $ 5000 | $ 61100 | $ 67210 | $ 180 | ||||||||||||||||||||||||||||||||||||
9th St | Hancock St | McPherson St | 1300 | 6 | 867 | $ 165 | $ 214500 | $ 10000 | $ 15000 | $ 239500 | $ 263450 | $ 184 | |||||||||||||||||||||||||||||||||||
Asphalt Path | |||||||||||||||||||||||||||||||||||||||||||||||
Spruce St Easement | Cedar St | Center St | 150 | 8 | 133 | $ 50 | $ 6667 | $ 2000 | $ 8667 | $ 9533 | $ 65 | ||||||||||||||||||||||||||||||||||||
Cherry St | A St | E St | 990 | 10 | 1100 | $ 50 | $ 55000 | $ 10000 | $ 10000 | $ 15000 | $ 90000 | $ 99000 | $ 82 | ||||||||||||||||||||||||||||||||||
Gravel Path | |||||||||||||||||||||||||||||||||||||||||||||||
16th St | Thomas St | Grant St | 1700 | 6 | 1133 | $ 15 | $ 17000 | $ 1500 | $ 18500 | $ 20350 | |||||||||||||||||||||||||||||||||||||
Cleveland St | 21st St | 23rd St | 500 | 6 | 333 | $ 15 | $ 5000 | $ 5000 | $ 5500 | Need Easement | |||||||||||||||||||||||||||||||||||||
6 | - | $ 15 | $ - | $ - | $ - | Need Easement | |||||||||||||||||||||||||||||||||||||||||
6 | - | $ 15 | $ - | $ - | $ - | Need Easement | |||||||||||||||||||||||||||||||||||||||||
Total | $ 1582256 | $ 1792256 | $ 1971481 | ||||||||||||||||||||||||||||||||||||||||||||
Project Descriptioin | Length | Width | Construction Costs | ConstructionUnit Costs | Units | Engineering Costs | Total CostsUnit Cost | Total Costs | Total CostsUnit Cost | Notes | |||||||||||
Sidewalk | |||||||||||||||||||||
9th Street Sidewalk Grant Street to Hancock Street | 826 | 6 | $ 141506 | $ 17131 | LF | Construction Unit Cost per Foot | |||||||||||||||
Jefferson Street Sidewalk Washington Street to Taylor Street | 724 | 6 | $ 390502 | $ 53937 | LF | Construction Unit Cost per Foot | |||||||||||||||
Landis Street Sidewalk 10th Street to 19th Street | 1795 | 6 | $ 364550 | $ 20309 | LF | Construction Unit Cost per Foot | |||||||||||||||
ADA Corner Ramps | |||||||||||||||||||||
Washington Street amp Harrison Street | $ 42000 | $ 42000 | Each | ||||||||||||||||||
Washington Street amp Adams Street | $ 38150 | $ 19075 | Each | Two Corners Were Retrofitted | |||||||||||||||||
Chip Seal Pavement | |||||||||||||||||||||
Walker Street Washington Street to Lawrence Street | 1144 | 24 | $ 20000 | $ 656 | SY | Does not include flagging nor prep work | |||||||||||||||
Pulverize amp Asphalt Paving | |||||||||||||||||||||
Washington Street VanBuren Street to Harrison Street | 300 | 22 | $ 35000 | $ 4773 | SY | ||||||||||||||||
Asphalt Overlay | |||||||||||||||||||||
Sidewalks | ||||||||||||||||||||||||||||||||||||||
Harrison St | Franklin St | Clay St | 340 | 6 | 227 | |||||||||||||||||||||||||||||||||
9th St | Hancock St | McPherson St | 1300 | 6 | 867 | |||||||||||||||||||||||||||||||||
Asphalt Path | ||||||||||||||||||||||||||||||||||||||
Spruce St Easement | Cedar St | Center St | 150 | 8 | 133 | $ 2000 | $ 2000 | $ 2000 | ||||||||||||||||||||||||||||||
Cherry St | A St | E St | 990 | 10 | 1100 | $ 10000 | $ 10000 | $ 10000 | ||||||||||||||||||||||||||||||
Gravel Path | ||||||||||||||||||||||||||||||||||||||
16th St | Thomas St | Grant St | 1700 | 6 | 1133 | $ 1500 | $ 1500 | $ 1500 | ||||||||||||||||||||||||||||||
Cleveland St | 21st St | 23rd St | 500 | 6 | 333 | Need Easement | ||||||||||||||||||||||||||||||||
6 | - | Need Easement | ||||||||||||||||||||||||||||||||||||
6 | - | Need Easement | ||||||||||||||||||||||||||||||||||||
Total |
Type | Improvement | Cost Range SY | Cost Range LF | ||||||||
1 | Complete Road Rebuild | $80 | $100 | ||||||||
2 | Asphalt Overlay | $50 | $60 | ||||||||
3 | Pulverize amp Chip Seal | $20 | $30 | ||||||||
4 | Chip Seal | $6 | $10 | $12 | $25 | ||||||
5 | Seal Coat | ||||||||||
6 | |||||||||||
7 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 3-Inch | 413 | TONS | $ 15000 | $ 6187500 | 1000 x 22 x 025 httpwwwamerasphaltcomasphalthtm | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 1630 | CY | $ 4800 | $ 7824000 | Water Street Project = $48 CY (1000 x 22 x 2)27 = 1630 CY | ||||||
Gravel Borrow | 2282 | TONS | $ 3000 | $ 6846000 | (1000 x 22 x 2)27 = 1630 1630 CY x 14 = 2282 Tons | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 128 | Hours | $ 5728 | $ 733133 | (2) People for 64 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 25043033 | |||||||||||
$ 10247 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 2-Inch | 275 | TONS | $ 15000 | $ 4125000 | 1000 x 22 x 017 httpwwwamerasphaltcomasphalthtm | | ||||||
Digouts amp Pre-leveling | 122 | SY | $ 4900 | $ 597800 | |||||||
Flagging | 64 | Hours | $ 5728 | $ 366566 | (2) People for 32 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 180000 | $ 180000 | |||||||
$ 5403066 | |||||||||||
$ 2211 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 3-Inch | 413 | TONS | $ 15000 | $ 6187500 | 1000 x 22 x 025 httpwwwamerasphaltcomasphalthtm | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 150 | CY | $ 4800 | $ 720000 | Water Street Project = $48 CY | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 96 | Hours | $ 5728 | $ 549850 | (2) People for 48 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 10909750 | |||||||||||
$ 4464 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Chip Seal | 2444 | SY | $ 1050 | $ 2566200 | 1000 X 22 | Unit Cost $525 SY from Walker Street County Invoice Doubled to $1050 for Chip Seal Over Gravel | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 150 | CY | $ 4800 | $ 720000 | Water Street Project = $48 CY | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 80 | Hours | $ 5728 | $ 458208 | (2) People for 40 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | Hours | $ 12500 | $ - 0 | High Average Loaded Rate No Testing | ||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 7196808 | |||||||||||
$ 2945 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 1500000 | $614 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 500 | LF | $ 5000 | $ 2500000 | |||||||
Catch Basins | 4 | EACH | $ 150000 | $ 600000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Chip Seal | 2444 | SY | $ 525 | $ 1283100 | 1000 X 22 | Unit Cost from Walker Street County Invoice | ||||||
Digouts amp Pre-leveling | 122 | SY | $ 4900 | $ 598780 | Cost from 2018 Lakeside Mill amp Fill | Estimate Quanity Based on 5 | ||||||
Flagging | 32 | Hours | $ 5728 | $ 183283 | (2) People for 16 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | Hours | $ 12500 | $ - 0 | High Average Loaded Rate No Surveying or Testing | ||||||
Surveying | 1 | LS | $ - 0 | $ - 0 | |||||||
$ 2198863 | |||||||||||
$ 900 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 1500000 | $614 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY |
Project Descriptioin | Length | Width | Construction Costs | Engineering Costs | Engineering Total | Digouts Pre-Leveling Costs | Digouts Pre-Leveling Total | ADACosts | ADATotal | StormwaterCosts | StormwaterTotal | Total Costsby SY | Cost Per 250 Block | Length | Width | Notes | |||||||||||||||||
Chip Seal Pavement | |||||||||||||||||||||||||||||||||
Walker Street Washington Street to Lawrence Street | 1144 | 24 | $ 25000 | 15 | $ 3750 | 10 | $ 2500 | $ 1024 | $ 682911 | 250 | 24 | ||||||||||||||||||||||
Pulverize amp Chip Seal | |||||||||||||||||||||||||||||||||
Engineers Estimate | 250 | 24 | $ 22000 | 15 | $ 3300 | 0 | $ - | 20 | $ 4400 | $ 4455 | $ 2970000 | 250 | 24 | ||||||||||||||||||||
Pulverize amp Asphalt Paving | |||||||||||||||||||||||||||||||||
Washington Street VanBuren Street to Harrison Street | 300 | 22 | $ 35000 | 20 | $ 7000 | 0 | $ - | 10 | $ 3500 | 20 | $ 7000 | $ 7159 | $ 4772727 | 250 | 24 | ||||||||||||||||||
Asphalt Overlay (2) | |||||||||||||||||||||||||||||||||
Engineers Estimate | 250 | 24 | $ 21334 | 20 | $ 426680 | 10 | $ 2133 | 20 | $ 426680 | 20 | $ 426680 | $ 5440 | $ 4835707 | 250 | 32 | ||||||||||||||||||
Reconstruction | |||||||||||||||||||||||||||||||||
Walker Street Lawrence Street to Blaine Street | 650 | 36 | $ 184310 | 25 | $ 46078 | 0 | $ - | 20 | $ 36862 | 30 | $ 55293 | $ 12405 | $ 11027094 | 250 | 32 | ||||||||||||||||||
RSL | Length (FT) | Area (SY) | Condition | Treatment | Cost | Total | |||||||||
20 | 61834 | 138524 | 131 | Good | $0 | $0 | |||||||||
14 | 23656 | 49915 | 47 | Satisfactory | Chip Seal | $29 | $1470552 | ||||||||
12 | 43586 | 106382 | 100 | $3134134 | |||||||||||
10 | 74803 | 193570 | 182 | $5702790 | |||||||||||
8 | 96662 | 228046 | 215 | $6718492 | |||||||||||
6 | 95452 | 261794 | 247 | Fair | Overlay | $67 | $17489930 | ||||||||
4 | 6420 | 14536 | 14 | $971121 | |||||||||||
2 | 29238 | 60616 | 57 | Poor | Rehab | $107 | $6492850 | ||||||||
0 | 3851 | 7532 | 07 | Very Poor | Rebuild | $155 | $1169719 | ||||||||
$43149589 | |||||||||||||||
Additional Paving Costs | Average Cost per SY | Percent of Paving Cost | |||
Digouts amp Pre-Leveling | $4 | 25 | |||
Stormwater | $7 | 38 | |||
ADA | $5 | 27 | |||
Engineering amp Administration | $5 | 28 |
9 | Base Paving Costs | Preperation | Stormwater | ADA | Engineering | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Remaining Service Life | Road Name | From | To | Length (ft) | Width (ft) | Area (SY) | Total Construction | Price(SY) | Reconstruction | Pulverize amp Pave | Ashpalt Overlay | Pave Gravel Road | Pulverize amp Chip Seal | Chip Seal | Total Base Paving Costs | Digouts(SY) | Pre-Leveling(SY) | Construct Shoulders Both Sides (LF) | Preparation Total | StormwaterPipes (LF) | StormwaterCatchbasins | StormwaterSwales (LF) | Stormwater Total | Curb Ramps | Curb Ramps Total | Surveying | Engineering amp Administration | Engineering amp Administration Total | Other Work | ||||||||||||||||||||||||||||||
$102 | $45 | $22 | $35 | $29 | $9 | $35 | $15 | $20 | $50 | $1500 | $25 | $15000 | |||||||||||||||||||||||||||||||||||||||||||||||
2 | Polk St - Street | Lawrence St | 1056 | 200 | 56 | 1244 | $ 210679 | $ 169 | $ 127518 | $ 127518 | $ - | 150 | 1 | 1 | $ 9025 | 2 | $ 30000 | $ 10000 | 25 | $ 44136 | |||||||||||||||||||||||||||||||||||||||
6 | 47th Street | Pettygrove | McNeil | 500 | 18 | 1548 | $ 258717 | $ 167 | $ 158624 | $ 158624 | $ - | 687 | 8 | $ 46350 | $ - | $ 10000 | 25 | $ 53743 | |||||||||||||||||||||||||||||||||||||||||
6 to 10 | Lawrence St | Calhoun St | Harrison St | 1200 | 36 | 4800 | $ 786070 | $ 164 | $ 491856 | $ 491856 | 600 | $ 15000 | $ 8 | $ 120000 | $ 10000 | 25 | $ 159214 | ||||||||||||||||||||||||||||||||||||||||||
8 | Lawrence St | Cass St | Calhoun St | 250 | 36 | 1000 | $ 146213 | $ 146 | $ 102470 | $ 102470 | 0 | 0 | $ - | 75 | 350 | $ 12500 | $ - | $ 10000 | 25 | $ 31243 | |||||||||||||||||||||||||||||||||||||||
8 | Lawrence St | Walker St | Cass St | 250 | 36 | 1000 | $ 144650 | $ 145 | $ 102470 | $ 102470 | $ - | 100 | 250 | $ 11250 | $ - | $ 10000 | 25 | $ 30930 | |||||||||||||||||||||||||||||||||||||||||
4 to 8 | San Juan Ave | Lopez Ave | Admiralty | 2300 | 34 | 8689 | $ 1222938 | $ 141 | $ 890350 | $ 890350 | $ - | 800 | 5 | 1500 | $ 85000 | $ - | $ 15000 | 25 | $ 247588 | ||||||||||||||||||||||||||||||||||||||||
6 to 8 | Lawrence St | Harrison St | Monroe St | 2380 | 47 | 12429 | $ 1331314 | $ 107 | $ 274803 | $ 274803 | 15 | 5 | $ 74573 | 1900 | 10 | $ 110000 | 50 | $ 750000 | $ 10000 | 10 | $ 121938 | ||||||||||||||||||||||||||||||||||||||
2 to 4 | Center St | San Juan Ave | Redwood St | 1660 | 16 | 2951 | $ 295222 | $ 100 | $ 86910 | $ 86910 | $ - | 1600 | 9 | 3000 | $ 168500 | $ - | $ 10000 | 15 | $ 39812 | ||||||||||||||||||||||||||||||||||||||||
0 to 6 | Pacific St | Cedar St | Tremont St | 400 | 16 | 711 | $ 66581 | $ 94 | $ 31744 | $ 31744 | $ - | 100 | 2 | 700 | $ 25500 | $ - | $ 5000 | 15 | $ 9337 | ||||||||||||||||||||||||||||||||||||||||
0 to 6 | Benton St | Lawrence | Lincoln Blg | 580 | 36 | 2320 | $ 203265 | $ 88 | $ 20880 | $ 20880 | 20 | 10 | $ 19720 | 250 | 2 | $ 15500 | 8 | $ 120000 | $ 5000 | 15 | $ 27165 | ||||||||||||||||||||||||||||||||||||||
2 | Grant St | 14th St | 16th St | 525 | 16 | 933 | $ 73635 | $ 79 | $ 27487 | $ 27487 | $ - | 400 | 2 | 500 | $ 35500 | $ - | $ 8000 | 15 | $ 10648 | ||||||||||||||||||||||||||||||||||||||||
2 to 6 | Olympic St | Cedar St | Tremont St | 536 | 12 | 715 | $ 52716 | $ 74 | $ 21047 | $ 21047 | $ - | 950 | $ 23750 | $ - | $ 8000 | 15 | $ 7920 | ||||||||||||||||||||||||||||||||||||||||||
2 | Milo St | Olympic Ave | Pacific Ave | 466 | 12 | 621 | $ 44793 | $ 72 | $ 18298 | $ 18298 | $ - | 800 | $ 20000 | $ - | $ 5000 | 15 | $ 6495 | ||||||||||||||||||||||||||||||||||||||||||
0 | 11th St | Hendricks St | Sheridan St | 550 | 16 | 978 | $ 65077 | $ 67 | $ 28796 | $ 28796 | $ - | 100 | 2 | 750 | $ 26750 | $ - | $ 8000 | 15 | $ 9532 | ||||||||||||||||||||||||||||||||||||||||
0 | 58th St | Hill St | Kuhn St | 525 | 16 | 933 | $ 60329 | $ 65 | $ 32667 | $ 32667 | $ - | 750 | $ 18750 | $ - | $ 8000 | 15 | $ 8913 | ||||||||||||||||||||||||||||||||||||||||||
2 | 10th St | Hendricks St | Grant St | 283 | 18 | 566 | $ 34294 | $ 61 | $ 16669 | $ 16669 | $ - | 500 | $ 12500 | $ - | $ 5000 | 15 | $ 5125 | ||||||||||||||||||||||||||||||||||||||||||
4 to 10 | 31st St | Hancock St | Sheridan St | 1050 | 22 | 2567 | $ 150027 | $ 58 | $ 23100 | $ 23100 | 10 | 10 | $ 12833 | 1200 | 10 | 1000 | $ 100000 | $ - | $ 5000 | 10 | $ 14093 | ||||||||||||||||||||||||||||||||||||||
6 | 25th St | Sheridan St | Holcomb St | 1200 | 18 | 2400 | $ 125895 | $ 52 | $ 70680 | $ 70680 | $ - | 125 | 1 | 1200 | $ 37750 | $ - | $ 8000 | 15 | $ 17465 | ||||||||||||||||||||||||||||||||||||||||
6 | Holcomb St | 7th St | 10th St | 850 | 12 | 1133 | $ 58703 | $ 52 | $ 10200 | $ 10200 | 10 | 10 | $ 5667 | 1500 | $ 37500 | $ - | $ - | 10 | $ 5337 | ||||||||||||||||||||||||||||||||||||||||
2 | Hendricks St | 9th St | 12th St | 800 | 16 | 1422 | $ 70930 | $ 50 | $ 41884 | $ 41884 | $ - | 750 | $ 18750 | $ - | $ 8000 | 15 | $ 10295 | ||||||||||||||||||||||||||||||||||||||||||
2 to 6 | Hill St | 19th | 21st St | 807 | 16 | 1435 | $ 67443 | $ 47 | $ 21125 | $ 6456 | $ 27581 | 10 | $ 5021 | 1000 | $ 25000 | $ - | $ 8000 | 15 | $ 9840 | ||||||||||||||||||||||||||||||||||||||||
2 to 8 | 57th St | Jackman St | Kuhn St | 800 | 18 | 1600 | $ 66550 | $ 42 | $ 14400 | $ 14400 | 20 | 10 | $ 13600 | 1300 | $ 32500 | 10 | $ 6050 | ||||||||||||||||||||||||||||||||||||||||||
6 to 8 | Sheridan St | Hastings Ave | SilverUmatilla | 1750 | 22 | 4278 | $ 154115 | $ 36 | $ 38500 | $ 38500 | 20 | 10 | $ 36361 | 300 | 4 | 1500 | $ 58500 | $ - | $ 5000 | 15 | $ 20754 | ||||||||||||||||||||||||||||||||||||||
6 to 10 | Tyler St | Jefferson St | Lawrence St | 900 | 32 | 3200 | $ 115280 | $ 36 | $ 28800 | $ 28800 | 5 | 5 | $ 8000 | 100 | 2 | $ 8000 | 4 | $ 60000 | 10 | $ 10480 | |||||||||||||||||||||||||||||||||||||||
6 to 14 | 14th St | McPherson St | Sheridan St | 2375 | 21 | 5542 | $ 182027 | $ 33 | $ 49875 | $ 49875 | 20 | 10 | $ 47104 | 750 | 4 | 1000 | $ 68500 | $ - | 10 | $ 16548 | |||||||||||||||||||||||||||||||||||||||
8 | 49th St | Kuhn St | Admiralty Ave | 400 | 24 | 1067 | $ 34613 | $ 32 | $ 9600 | $ 9600 | 5 | $ 1867 | 800 | $ 20000 | $ - | 10 | $ 3147 | ||||||||||||||||||||||||||||||||||||||||||
6 to 10 | Fir St | F St | UCherry | 4360 | 22 | 10658 | $ 341621 | $ 32 | $ 95920 | $ 95920 | 5 | 5 | 4000 | $ 106644 | 100 | 2 | 4000 | $ 108000 | $ - | 10 | $ 31056 | ||||||||||||||||||||||||||||||||||||||
6 to 8 | Cedar St | San Juan Ave | Redwood St | 1460 | 16 | 2596 | $ 81747 | $ 31 | $ 23360 | $ 23360 | 20 | 20 | $ 25956 | 1000 | $ 25000 | $ - | 10 | $ 7432 | |||||||||||||||||||||||||||||||||||||||||
8 | Clallam St | McKinley St | Roosevelt St | 975 | 14 | 1517 | $ 46796 | $ 31 | $ 13650 | $ 13650 | 20 | 10 | $ 12892 | 200 | 4 | $ 16000 | $ - | 10 | $ 4254 | ||||||||||||||||||||||||||||||||||||||||
6 | San Juan Ave | 19th St | 20th St | 300 | 31 | 1033 | $ 31827 | $ 31 | $ 9300 | $ 9300 | 50 | 10 | $ 19633 | $ - | $ - | 10 | $ 2893 | ||||||||||||||||||||||||||||||||||||||||||
6 to 20 | Cherry St | F St | W St | 4200 | 32 | 14933 | $ 457307 | $ 31 | $ 134400 | $ 134400 | 5 | 5 | 4200 | $ 121333 | 200 | 6000 | $ 160000 | $ - | 10 | $ 41573 | |||||||||||||||||||||||||||||||||||||||
6 to 8 | Jackman St | 45th St | 49th St | 1100 | 22 | 2689 | $ 81940 | $ 30 | $ 24200 | $ 24200 | 15 | 10 | $ 18150 | 225 | 3 | 500 | $ 28250 | $ - | $ 5000 | 15 | $ 11340 | ||||||||||||||||||||||||||||||||||||||
6 to 12 | Jackson St | LawrenceMonroe | Roosevelt St | 1600 | 18 | 3200 | $ 93530 | $ 29 | $ 28800 | $ 28800 | 10 | 10 | $ 16000 | 1000 | $ 25000 | 1 | $ 15000 | $ 2500 | 10 | $ 8730 | |||||||||||||||||||||||||||||||||||||||
2 | 7th St | Wilson St | Holcomb St | 450 | 16 | 800 | $ 23320 | $ 29 | $ 7200 | $ 7200 | 10 | 10 | $ 4000 | 400 | $ 10000 | $ - | 10 | $ 2120 | |||||||||||||||||||||||||||||||||||||||||
8 to 14 | 25th St | Sherman St | Sheridan St | 800 | 20 | 1778 | $ 50061 | $ 28 | $ 16000 | $ 16000 | 10 | 5 | $ 7556 | 1 | 800 | $ 21500 | $ - | $ 5000 | 10 | $ 5006 | |||||||||||||||||||||||||||||||||||||||
2 to 6 | Hancock St | SR 20 | 9th St | 1100 | 20 | 2444 | $ 67833 | $ 28 | $ 22000 | $ 22000 | 15 | 5 | $ 14667 | 1000 | $ 25000 | $ - | 10 | $ 6167 | |||||||||||||||||||||||||||||||||||||||||
Benton St | Washington St | Lawrence St | 1160 | 22 | 2836 | $ 74468 | $ 26 | $ 25520 | $ 25520 | 10 | 10 | $ 14178 | 140 | 4 | 600 | $ 28000 | 10 | $ 6770 | |||||||||||||||||||||||||||||||||||||||||
W St | San JuanAdmiralty | Walnut St | 2560 | 22 | 6258 | $ 163807 | $ 26 | $ 56320 | $ 56320 | 10 | 5 | $ 26596 | 200 | 4 | 2000 | $ 66000 | $ - | 10 | $ 14892 | ||||||||||||||||||||||||||||||||||||||||
6 to 8 | Walnut | W Street | Jackson | 2300 | 22 | 5622 | $ 145194 | $ 26 | $ 50600 | $ 50600 | 10 | 5 | $ 23894 | 2300 | $ 57500 | $ - | 10 | $ 13199 | |||||||||||||||||||||||||||||||||||||||||
6 to 8 | 24th St | Discovery Rd | San Juan Ave | 1250 | 18 | 2500 | $ 63938 | $ 26 | $ 22500 | $ 22500 | 10 | 5 | $ 10625 | 1000 | $ 25000 | $ - | 10 | $ 5813 | |||||||||||||||||||||||||||||||||||||||||
6 to 10 | Tyler St | Lawrence St | Blaine St | 900 | 32 | 3200 | $ 78980 | $ 25 | $ 28800 | $ 28800 | 5 | 5 | $ 8000 | 200 | $ 5000 | 2 | $ 30000 | 10 | $ 7180 | ||||||||||||||||||||||||||||||||||||||||
4 to 12 | McPherson St | SR 20 | Discovery Rd | 2925 | 32 | 10400 | $ 244860 | $ 24 | $ 93600 | $ 93600 | 5 | 5 | 2925 | $ 84500 | 230 | 2 | 1200 | $ 44500 | $ - | $ - | 10 | $ 22260 | |||||||||||||||||||||||||||||||||||||
10 | Landes St | 12th St | 19th St | 1820 | 32 | 6471 | $ 151821 | $ 23 | $ 58240 | $ 58240 | 5 | 1400 | $ 39324 | 400 | $ 10000 | 2 | $ 30000 | $ 5000 | 10 | $ 14256 | |||||||||||||||||||||||||||||||||||||||
6 to 8 | Discovery Rd | 19th | Hastings Ave | 2900 | 22 | 7089 | $ 136565 | $ 19 | $ 63800 | $ 63800 | 15 | 10 | $ 47850 | 500 | $ 12500 | $ - | 10 | $ 12415 | |||||||||||||||||||||||||||||||||||||||||
8 to 12 | Hastings Ave | Discovery Rd | County Line | 8450 | 32 | 30044 | $ 542349 | $ 18 | $ 270400 | $ 270400 | 5 | 10 | 5000 | $ 197644 | 1000 | $ 25000 | $ - | 10 | $ 49304 | ||||||||||||||||||||||||||||||||||||||||
6 to 12 | Washington St | Van Buren St | SR20 | 2025 | 30 | 6750 | $ 118388 | $ 18 | $ 60750 | $ 60750 | 5 | 5 | $ 16875 | 0 | 0 | 0 | $ - | 2 | $ 30000 | $ - | 10 | $ 10763 | |||||||||||||||||||||||||||||||||||||
14 | Blaine St | San Juan Ave | Walker St | 1275 | 48 | 6800 | $ 113910 | $ 17 | $ 61200 | $ 61200 | 5 | $ 11900 | $ - | 2 | $ 30000 | $ 5000 | 10 | $ 10810 | |||||||||||||||||||||||||||||||||||||||||
6 | Washington St | Harrison St | Taylor St | 1175 | 33 | 4308 | $ 59240 | $ 14 | $ 38775 | $ 38775 | 10 | $ 15079 | $ - | $ - | 10 | $ 5385 | |||||||||||||||||||||||||||||||||||||||||||
8 to 10 | Sheridan St | SR 20 | 19th St | 4000 | 46 | 20444 | $ 272922 | $ 13 | $ 184000 | $ 184000 | 5 | 5 | $ 51111 | 200 | 2 | $ 13000 | $ - | 10 | $ 24811 | ||||||||||||||||||||||||||||||||||||||||
8 to 10 | 19th St | San Juan Ave | Sheridan St | 3200 | 48 | 17067 | $ 197120 | $ 12 | $ 153600 | $ 153600 | 3 | 3 | $ 25600 | 0 | 0 | 0 | $ - | $ - | 10 | $ 17920 | |||||||||||||||||||||||||||||||||||||||
10 to 20 | San Juan Ave | F St | Lopez Ave | 2800 | 32 | 9956 | $ 110059 | $ 11 | $ 89600 | $ 89600 | 3 | $ 10453 | $ - | $ - | 10 | $ 10005 | |||||||||||||||||||||||||||||||||||||||||||
10 to 20 | F St | Hastings Ave | Tyler St | 5300 | 31 | 18256 | $ 180730 | $ 10 | $ 164300 | $ 164300 | $ - | $ - | $ - | 10 | $ 16430 | ||||||||||||||||||||||||||||||||||||||||||||
$ 9952406 | $ 1873288 | $ 31744 | $ 274803 | $ 32667 | $ 332896 | $ 1998646 | $ 4544044 | $ 1155207 | $ 1747625 | $ 1215000 | $ 1290529 | $ - 0 | |||||||||||||||||||||||||||||||||||||||||||||||
Lawrence near Monroe St
San Juan near the Cemetery
Estimated 2020 Revenues 2020Motor Vehicle Fuel Tax $217000
Utility Tax $695000
P A V E M E N TO P T I O N S
1 Chip Seal
2 Pulverize and Chip Seal
3 Asphalt Overlay
4 Pulverize and Asphalt Paving
5 Reconstruction
$
$$
$$
$$$
$$$$$
Cost Treatment______
C H I P S E A L
bull $7065 per Block (250rsquox24rsquo)
bull $1104 SY
bull Seals Cracks
bull Provides a Wear Course
bull 10 ndash 15 Year Longevity
P U L V E R I Z E C H I P S E A L
bull $21680 per Block (250rsquox24rsquo)
bull $3252 SY
bull Generally Requires Some Stormwater Infrastructure
bull 10 ndash 15 Year Longevity
A S P H A L TO V E R L A Y
bull $22596 per Block (250rsquox32rsquo)
bull $2542 SY
bull Generally Requires Some Stormwater Infrastructure
bull Requires ADA Ramp Upgrades If Adjacent
bull 15 ndash 25 Year Longevity
P U L V E R I Z E A S P H A L T
bull $34222 per Block (250rsquox24rsquo)
bull $5133 SY
bull Generally Requires Some Stormwater Infrastructure
bull Requires ADA Ramp Upgrades If Adjacent
bull 15 ndash 25 Year LongevityWashington Street amp Harrison Street
R E C O N S T R U C T I O N
bull $99004 per Block (250rsquox32rsquo)
bull $11138 SY
bull Generally Requires Stormwater Infrastructure
bull Requires ADA Ramp Upgrades If Adjacent
bull 20 ndash 25 Year LongevityWater Street amp Fillmore Street
A D D I T I O N A L C O S T S
bull Drainage Swales amp Stormwater Infrastructure
bull Digoutsbull ADA Curb Rampsbull EngineeringAdministrationbull Digouts and pre-level
Stormwater at Pacific Avenue amp Milo Street
ADA needs at Lawrence Street amp Adams Street
Insert I worq street rating
1 How many street segments were rated
1 Insert map of 10 year program
1 Insert table Too small to read is ok Wersquoll include it as a handout in 11x17
Rem
aini
ng
Serv
ice Li
feRoad Name From To
Length (ft)
Width (ft)
Area (SY)
Total Construction
Price(SY)
Re
cons
truc
tion
Pul
veriz
e amp
Pa
ve
Ash
palt
Ove
rlay
Pav
e Gr
avel
Ro
ad
Pul
veriz
e amp
Ch
ip S
eal
Chi
p Se
al
Tot
al B
ase
Pavi
ng C
osts
Dig
outs
(SY)
Pre
-Lev
elin
g(S
Y)
Con
stru
ct
Shou
lder
s Bot
h Si
des (
LF)
Pre
para
tion
Tota
l
Sto
rmw
ater
Pipe
s (LF
)
Sto
rmw
ater
Catc
hbas
ins
Sto
rmw
ater
Swal
es (L
F)
Sto
rmw
ater
To
tal
Cur
b Ra
mps
Cur
b Ra
mps
To
tal
Sur
veyi
ng
Eng
inee
ring
amp
Adm
inist
ratio
n
Eng
inee
ring
amp
Adm
inist
ratio
n To
tal
$102 $45 $22 $35 $29 $9 $35 $15 $20 $50 $1500 $25 $150002 Polk St - Street Lawrence St 1056 200 56 1244 210679$ 169$ 127518$ 127518$ -$ 150 1 1 9025$ 2 30000$ 10000$ 25 44136$ 6 47th Street Pettygrove McNeil 500 18 1548 258717$ 167$ 158624$ 158624$ -$ 687 8 46350$ -$ 10000$ 25 53743$
6 to 10 Lawrence St Calhoun St Harrison St 1200 36 4800 786070$ 164$ 491856$ 491856$ 600 15000$ 8$ 120000$ 10000$ 25 159214$ 8 Lawrence St Cass St Calhoun St 250 36 1000 146213$ 146$ 102470$ 102470$ 0 0 -$ 75 350 12500$ -$ 10000$ 25 31243$ 8 Lawrence St Walker St Cass St 250 36 1000 144650$ 145$ 102470$ 102470$ -$ 100 250 11250$ -$ 10000$ 25 30930$
4 to 8 San Juan Ave Lopez Ave Admiralty 2300 34 8689 1222938$ 141$ 890350$ 890350$ -$ 800 5 1500 85000$ -$ 15000$ 25 247588$ 6 to 8 Lawrence St Harrison St Monroe St 2380 47 12429 1331314$ 107$ 274803$ 274803$ 15 5 74573$ 1900 10 110000$ 50 750000$ 10000$ 10 121938$ 2 to 4 Center St San Juan Ave Redwood St 1660 16 2951 295222$ 100$ 86910$ 86910$ -$ 1600 9 3000 168500$ -$ 10000$ 15 39812$ 0 to 6 Pacific St Cedar St Tremont St 400 16 711 66581$ 94$ 31744$ 31744$ -$ 100 2 700 25500$ -$ 5000$ 15 9337$ 0 to 6 Benton St Lawrence Lincoln Blg 580 36 2320 203265$ 88$ 20880$ 20880$ 20 10 19720$ 250 2 15500$ 8 120000$ 5000$ 15 27165$
2 Grant St 14th St 16th St 525 16 933 73635$ 79$ 27487$ 27487$ -$ 400 2 500 35500$ -$ 8000$ 15 10648$ 2 to 6 Olympic St Cedar St Tremont St 536 12 715 52716$ 74$ 21047$ 21047$ -$ 950 23750$ -$ 8000$ 15 7920$
2 Milo St Olympic Ave Pacific Ave 466 12 621 44793$ 72$ 18298$ 18298$ -$ 800 20000$ -$ 5000$ 15 6495$ 0 11th St Hendricks St Sheridan St 550 16 978 65077$ 67$ 28796$ 28796$ -$ 100 2 750 26750$ -$ 8000$ 15 9532$ 0 58th St Hill St Kuhn St 525 16 933 60329$ 65$ 32667$ 32667$ -$ 750 18750$ -$ 8000$ 15 8913$ 2 10th St Hendricks St Grant St 283 18 566 34294$ 61$ 16669$ 16669$ -$ 500 12500$ -$ 5000$ 15 5125$
4 to 10 31st St Hancock St Sheridan St 1050 22 2567 150027$ 58$ 23100$ 23100$ 10 10 12833$ 1200 10 1000 100000$ -$ 5000$ 10 14093$ 6 25th St Sheridan St Holcomb St 1200 18 2400 125895$ 52$ 70680$ 70680$ -$ 125 1 1200 37750$ -$ 8000$ 15 17465$ 6 Holcomb St 7th St 10th St 850 12 1133 58703$ 52$ 10200$ 10200$ 10 10 5667$ 1500 37500$ -$ -$ 10 5337$ 2 Hendricks St 9th St 12th St 800 16 1422 70930$ 50$ 41884$ 41884$ -$ 750 18750$ -$ 8000$ 15 10295$
2 to 6 Hill St 19th 21st St 807 16 1435 67443$ 47$ 21125$ 6456$ 27581$ 10 5021$ 1000 25000$ -$ 8000$ 15 9840$ 2 to 8 57th St Jackman St Kuhn St 800 18 1600 66550$ 42$ 14400$ 14400$ 20 10 13600$ 1300 32500$ 10 6050$ 6 to 8 Sheridan St Hastings Ave SilverUmatilla 1750 22 4278 154115$ 36$ 38500$ 38500$ 20 10 36361$ 300 4 1500 58500$ -$ 5000$ 15 20754$ 6 to 10 Tyler St Jefferson St Lawrence St 900 32 3200 115280$ 36$ 28800$ 28800$ 5 5 8000$ 100 2 8000$ 4 60000$ 10 10480$ 6 to 14 14th St McPherson St Sheridan St 2375 21 5542 182027$ 33$ 49875$ 49875$ 20 10 47104$ 750 4 1000 68500$ -$ 10 16548$
8 49th St Kuhn St Admiralty Ave 400 24 1067 34613$ 32$ 9600$ 9600$ 5 1867$ 800 20000$ -$ 10 3147$ 6 to 10 Fir St F St UCherry 4360 22 10658 341621$ 32$ 95920$ 95920$ 5 5 4000 106644$ 100 2 4000 108000$ -$ 10 31056$ 6 to 8 Cedar St San Juan Ave Redwood St 1460 16 2596 81747$ 31$ 23360$ 23360$ 20 20 25956$ 1000 25000$ -$ 10 7432$
8 Clallam St McKinley St Roosevelt St 975 14 1517 46796$ 31$ 13650$ 13650$ 20 10 12892$ 200 4 16000$ -$ 10 4254$ 6 San Juan Ave 19th St 20th St 300 31 1033 31827$ 31$ 9300$ 9300$ 50 10 19633$ -$ -$ 10 2893$
6 to 20 Cherry St F St W St 4200 32 14933 457307$ 31$ 134400$ 134400$ 5 5 4200 121333$ 200 6000 160000$ -$ 10 41573$ 6 to 8 Jackman St 45th St 49th St 1100 22 2689 81940$ 30$ 24200$ 24200$ 15 10 18150$ 225 3 500 28250$ -$ 5000$ 15 11340$ 6 to 12 Jackson St LawrenceMonroe Roosevelt St 1600 18 3200 93530$ 29$ 28800$ 28800$ 10 10 16000$ 1000 25000$ 1 15000$ 2500$ 10 8730$
2 7th St Wilson St Holcomb St 450 16 800 23320$ 29$ 7200$ 7200$ 10 10 4000$ 400 10000$ -$ 10 2120$ 8 to 14 25th St Sherman St Sheridan St 800 20 1778 50061$ 28$ 16000$ 16000$ 10 5 7556$ 1 800 21500$ -$ 5000$ 10 5006$ 2 to 6 Hancock St SR 20 9th St 1100 20 2444 67833$ 28$ 22000$ 22000$ 15 5 14667$ 1000 25000$ -$ 10 6167$
Benton St Washington St Lawrence St 1160 22 2836 74468$ 26$ 25520$ 25520$ 10 10 14178$ 140 4 600 28000$ 10 6770$ W St San JuanAdmiralty Walnut St 2560 22 6258 163807$ 26$ 56320$ 56320$ 10 5 26596$ 200 4 2000 66000$ -$ 10 14892$
6 to 8 Walnut W Street Jackson 2300 22 5622 145194$ 26$ 50600$ 50600$ 10 5 23894$ 2300 57500$ -$ 10 13199$ 6 to 8 24th St Discovery Rd San Juan Ave 1250 18 2500 63938$ 26$ 22500$ 22500$ 10 5 10625$ 1000 25000$ -$ 10 5813$ 6 to 10 Tyler St Lawrence St Blaine St 900 32 3200 78980$ 25$ 28800$ 28800$ 5 5 8000$ 200 5000$ 2 30000$ 10 7180$ 4 to 12 McPherson St SR 20 Discovery Rd 2925 32 10400 244860$ 24$ 93600$ 93600$ 5 5 2925 84500$ 230 2 1200 44500$ -$ -$ 10 22260$
10 Landes St 12th St 19th St 1820 32 6471 151821$ 23$ 58240$ 58240$ 5 1400 39324$ 400 10000$ 2 30000$ 5000$ 10 14256$ 6 to 8 Discovery Rd 19th Hastings Ave 2900 22 7089 136565$ 19$ 63800$ 63800$ 15 10 47850$ 500 12500$ -$ 10 12415$ 8 to 12 Hastings Ave Discovery Rd County Line 8450 32 30044 542349$ 18$ 270400$ 270400$ 5 10 5000 197644$ 1000 25000$ -$ 10 49304$ 6 to 12 Washington St Van Buren St SR20 2025 30 6750 118388$ 18$ 60750$ 60750$ 5 5 16875$ 0 0 0 -$ 2 30000$ -$ 10 10763$
14 Blaine St San Juan Ave Walker St 1275 48 6800 113910$ 17$ 61200$ 61200$ 5 11900$ -$ 2 30000$ 5000$ 10 10810$ 6 Washington St Harrison St Taylor St 1175 33 4308 59240$ 14$ 38775$ 38775$ 10 15079$ -$ -$ 10 5385$
8 to 10 Sheridan St SR 20 19th St 4000 46 20444 272922$ 13$ 184000$ 184000$ 5 5 51111$ 200 2 13000$ -$ 10 24811$ 8 to 10 19th St San Juan Ave Sheridan St 3200 48 17067 197120$ 12$ 153600$ 153600$ 3 3 25600$ 0 0 0 -$ -$ 10 17920$
10 to 20 San Juan Ave F St Lopez Ave 2800 32 9956 110059$ 11$ 89600$ 89600$ 3 10453$ -$ -$ 10 10005$ 10 to 20 F St Hastings Ave Tyler St 5300 31 18256 180730$ 10$ 164300$ 164300$ -$ -$ -$ 10 16430$
9952406$ 1873288$ 31744$ 274803$ 32667$ 332896$ 1998646$ 4544044$ 1155207$ 1747625$ 1215000$ 1290529$
9 Stormwater Base Paving Costs Preperation EngineeringADA
Chip Seal
Pulverize amp Chip Seal
Pulverize amp Asphalt
Asphalt Overlay
Reconstruction
1 Insert summary table of average costs of ada sw eng digouts etc
Additional Paving Costs Average Cost per SY Percent of Paving CostDigouts amp Pre-Leveling $4 25Stormwater $7 38ADA $5 27Engineering amp Administration $5 28
Chip Seal
Pulverize amp Chip Seal
Pulverize amp Asphalt
Asphalt Overlay
Reconstruction
1 Insert total costs for the entire city based on pavement rating
RSL Length (FT) Area (SY) Condition Treatment Cost Total20 61834 138524 131 Good $0 $014 23656 49915 47 $147055212 43586 106382 100 $313413410 74803 193570 182 $57027908 96662 228046 215 $67184926 95452 261794 247 $174899304 6420 14536 14 $9711212 29238 60616 57 Poor Rehab $107 $64928500 3851 7532 07 Very Poor Rebuild $155 $1169719
$43149589
Satisfactory Chip Seal $29
Fair Overlay $67
Chip Seal
Pulverize amp Chip Seal
Pulverize amp Asphalt
Asphalt Overlay
Reconstruction
Fir Street Asphalt Overlay in early 1990s Inadequate Stormwater System Water Intrusion Inadequate Base Material
San Juan Avenue Reconstructed 1997
New ADA Sidewalks
Complete Stormwater System
Lawrence Street Chip Sealed in 2000
Inadequate Base
Water Intrusion
F Street Reconstructed 2001 2002
New ADA Sidewalks
Complete Stormwater System
Best Streets First
Stop the Continued Decay of our Streets
Slowly Rebuild Street System Investment
1 Introduction
2 Public Engagement
3 Street Operations
4 Street Improvements
5 Street Preservation
6 Street Programming
7 Funding Options
8 Recommendations
January
February
April
March
May
June
Encouraging the public to be involved through Engage PTwwwcityofptusengagept
Street Pavement Improvement Plan Projects | 9 | 110 | |||||||||||||||||||||||||||||||||||||||||||||
Road Name | From | To | Iworq ID | Length (ft) | Width (ft) | Area (yd^2) | Actual Area(SY) | Unit Cost per yd2 | Construction Cost | Prep Work | Survey Testing | ADA Curb Ramps | Storm Water | Mill amp Fill$50SY | Pre-Level$4SY | Total Construction | Project Cost + 10 | Unit Cost w Additional Costs no 10 | Engineering Costs | Notes | |||||||||||||||||||||||||||
Priority | Reconstruct | 2021 | 2022 | 2023 | 2024 | ||||||||||||||||||||||||||||||||||||||||||
1 | Reconstruct | Lawrence St | Cass St | Calhoun St | 1304 | 250 | 36 | 1000 | $ 80 | $ 80000 | $ 5000 | $ 20000 | $ 105000 | $ 115500 | $ 105 | Stormwater South Side Parking Raingarden on Cass | |||||||||||||||||||||||||||||||
2 | Reconstruct | Lawrence St | Walker St | Cass St | 250 | 36 | 1000 | $ 80 | $ 80000 | $ 5000 | $ 20000 | $ 5000 | $ 110000 | $ 121000 | $ 110 | Stormwater South Side Parking | |||||||||||||||||||||||||||||||
3 | Reconstruct Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | San Juan Ave | Lopez Ave | Admiralty | 2300 | 32 | 8178 | $ 50 | $ 408889 | $ 10000 | $ 100000 | $ 518889 | $ 570778 | $ 63 | Stormwater Problem 45th | ||||||||||||||||||||||||||||||||
4 | Reconstruct Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Polk St - Street Improvements | Lawrence St | 1056 Sarah Tiffany Sarah TiffanyGarfield | 1073 | 200 | 56 | 1244 | $ 50 | $ 62222 | X | X | X | $ 62222 | $ 68444 | $ 50 | Parking Theater 4 AC Watermain Infiltration or Rain Garden Parking on Condo Side | ||||||||||||||||||||||||||||||
Reconstruct | 47th Street | Pettygrove | McNeil | 500 | 18 | 1000 | 1548 | $ 50 | $ 50000 | $ 5000 | $ 40000 | $ 95000 | $ 104500 | $ 95 | $210000 Engineers Estimate With Engineering Cost Turnaround Spaghetti Waterline | ||||||||||||||||||||||||||||||||
Chip Seal - $50000 to $70000 per Mile | $6 No DigoutsPre-leveling | $10 with Additional Prep Work | |||||||||||||||||||||||||||||||||||||||||||||||
Chip Seal | Washington St | Van Buren St | SR20 | 2025 | 30 | 6750 | $ 10 | $ 67500 | $ 67500 | $ 74250 | Digouts Flagging | ||||||||||||||||||||||||||||||||||||
Chip Seal | Hastings Ave - Pre-level and widen shoulders | Discovery Rd | County Line | 8450 | 24 | 22533 | $ 6 | $ 135200 | $ 135200 | $ 148720 | Ditches amp Culverts Total Width change from 21 to 24 How wide will shoulders be | ||||||||||||||||||||||||||||||||||||
Tyler St | Jefferson St | Lawrence St | 900 | 32 | 3200 | $ 6 | $ 19200 | $ 19200 | $ 21120 | ||||||||||||||||||||||||||||||||||||||
Chip Seal | McPherson - Chip Seal | 4th St | Discovery Rd | 3100 | 32 | 11022 | $ 6 | $ 66133 | $ 66133 | $ 72747 | Ditches amp Culverts Shoulder Wideneing | ||||||||||||||||||||||||||||||||||||
Chip Seal | 19th St - Chip Seal | San Juan Ave | Sheridan St | 3200 | 48 | 17067 | $ 6 | $ 102400 | $ 102400 | $ 112640 | Bike Lanes amp Shoulder Prelevel | ||||||||||||||||||||||||||||||||||||
Chip Seal | Walnut | W Street | Jackson | 2300 | 22 | 5622 | $ 6 | $ 33733 | $ 33733 | $ 37107 | Dig-Outs Pre-Leveling Striping Shoulders | ||||||||||||||||||||||||||||||||||||
Chip Seal | Fir St - Chip Seal | F St | UCherry | 4360 | 22 | 10658 | $ 10 | $ 106578 | X | X | $ 106578 | $ 117236 | Dig-Outs Pre-Leveling Striping | ||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | |||||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | P St - Chip Seal | Redwood St | Cedar St | 0486 | 300 | 16 | 533 | $ 20 | $ 10667 | $ 10667 | $ 11733 | Watermain Looping Shouldnt this be part of Center | |||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 25th St - Chip Seal | Sheridan St | Holcomb St | 1200 | 18 | 2400 | $ 20 | $ 48000 | $ 48000 | $ 52800 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 14th St - Chip Seal | $ - | $ - | ||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Cedar St - Chip Seal | Redwood St | San Juan Ave | 1460 | 16 | 2596 | $ 20 | $ 51911 | $ 51911 | $ 57102 | Ex ChipSeal 22 Wide | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Center St - Chip Seal | Redwood St | San Juan Ave | 484 | 1660 | 16 | 2951 | $ 20 | $ 59022 | $ 59022 | $ 64924 | Ex ChipSeal 22 Wide Stormwater | |||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Grant St Chip Seal | 14th St | 16th St | 525 | 16 | 933 | $ 20 | $ 18667 | $ 18667 | $ 20533 | Ex Street 10 Wide | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 11th St Chip Seal | Hendricks St | Sheridan St | 550 | 16 | 978 | $ 20 | $ 19556 | $ 19556 | $ 21511 | Hospital Parking | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Hendricks St Chip Seal | 9th St | 12th St | 800 | 16 | 1422 | $ 20 | $ 28444 | $ 28444 | $ 31289 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 10th St Chip Seal | Hendricks St | Grant St | 1655 | 283 | 18 | 566 | $ 20 | $ 11320 | $ 11320 | $ 12452 | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Grant St Chip Seal | 14th St | 16th St | 525 | 18 | 1050 | $ 20 | $ 21000 | $ 21000 | $ 23100 | Ex Street 10 Wide Stormwater | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Hill St | 21st St | 19th St | 807 | 16 | 1435 | $ 20 | $ 28693 | $ 28693 | $ 31563 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Milo St -Chip seal | Olympic Ave | Pacific Ave | 0003 | 466 | 12 | 621 | $ 20 | $ 12427 | $ 12427 | $ 13669 | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Olympic St | Cedar St | Tremont St | 536 | 12 | 715 | $ 20 | $ 14293 | $ 14293 | $ 15723 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Benton St - street improvement | Blaine St | Lincoln Blg | 580 | 36 Sarah Tiffany Sarah TiffanyEstimated at 25-36 used higher number | Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Sarah Tiffany Sarah TiffanyGarfield | 2320 | $ 20 | $ 46400 | $ 46400 | $ 51040 | ||||||||||||||||||||||||||||||||||
Pave Gravel Road | |||||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Pacific St | Cedar St | Tremont St | 400 | 16 | 711 | $ 50 | $ 35556 | $ 6000 | $ 15000 | $ 56556 | $ 62211 | $ 80 | ||||||||||||||||||||||||||||||||||
58th St | Hill St | Kuhn St | 525 | 16 | 933 | $ 50 | $ 46667 | $ 6000 | $ 20000 | $ 72667 | $ 79933 | $ 78 | 4 AC Waterline Driveways Site Distance (Re-grade Slope) | ||||||||||||||||||||||||||||||||||
Sidewalks | |||||||||||||||||||||||||||||||||||||||||||||||
Harrison St | Franklin St | Clay St | 340 | 6 | 227 | $ 165 | $ 56100 | $ 5000 | $ 61100 | $ 67210 | $ 180 | ||||||||||||||||||||||||||||||||||||
9th St | Hancock St | McPherson St | 1300 | 6 | 867 | $ 165 | $ 214500 | $ 10000 | $ 15000 | $ 239500 | $ 263450 | $ 184 | |||||||||||||||||||||||||||||||||||
Asphalt Path | |||||||||||||||||||||||||||||||||||||||||||||||
Spruce St Easement | Cedar St | Center St | 150 | 8 | 133 | $ 50 | $ 6667 | $ 2000 | $ 8667 | $ 9533 | $ 65 | ||||||||||||||||||||||||||||||||||||
Cherry St | A St | E St | 990 | 10 | 1100 | $ 50 | $ 55000 | $ 10000 | $ 10000 | $ 15000 | $ 90000 | $ 99000 | $ 82 | ||||||||||||||||||||||||||||||||||
Gravel Path | |||||||||||||||||||||||||||||||||||||||||||||||
16th St | Thomas St | Grant St | 1700 | 6 | 1133 | $ 15 | $ 17000 | $ 1500 | $ 18500 | $ 20350 | |||||||||||||||||||||||||||||||||||||
Cleveland St | 21st St | 23rd St | 500 | 6 | 333 | $ 15 | $ 5000 | $ 5000 | $ 5500 | Need Easement | |||||||||||||||||||||||||||||||||||||
6 | - | $ 15 | $ - | $ - | $ - | Need Easement | |||||||||||||||||||||||||||||||||||||||||
6 | - | $ 15 | $ - | $ - | $ - | Need Easement | |||||||||||||||||||||||||||||||||||||||||
Total | $ 1582256 | $ 1792256 | $ 1971481 | ||||||||||||||||||||||||||||||||||||||||||||
Project Descriptioin | Length | Width | Construction Costs | ConstructionUnit Costs | Units | Engineering Costs | Total CostsUnit Cost | Total Costs | Total CostsUnit Cost | Notes | |||||||||||
Sidewalk | |||||||||||||||||||||
9th Street Sidewalk Grant Street to Hancock Street | 826 | 6 | $ 141506 | $ 17131 | LF | Construction Unit Cost per Foot | |||||||||||||||
Jefferson Street Sidewalk Washington Street to Taylor Street | 724 | 6 | $ 390502 | $ 53937 | LF | Construction Unit Cost per Foot | |||||||||||||||
Landis Street Sidewalk 10th Street to 19th Street | 1795 | 6 | $ 364550 | $ 20309 | LF | Construction Unit Cost per Foot | |||||||||||||||
ADA Corner Ramps | |||||||||||||||||||||
Washington Street amp Harrison Street | $ 42000 | $ 42000 | Each | ||||||||||||||||||
Washington Street amp Adams Street | $ 38150 | $ 19075 | Each | Two Corners Were Retrofitted | |||||||||||||||||
Chip Seal Pavement | |||||||||||||||||||||
Walker Street Washington Street to Lawrence Street | 1144 | 24 | $ 20000 | $ 656 | SY | Does not include flagging nor prep work | |||||||||||||||
Pulverize amp Asphalt Paving | |||||||||||||||||||||
Washington Street VanBuren Street to Harrison Street | 300 | 22 | $ 35000 | $ 4773 | SY | ||||||||||||||||
Asphalt Overlay | |||||||||||||||||||||
Sidewalks | ||||||||||||||||||||||||||||||||||||||
Harrison St | Franklin St | Clay St | 340 | 6 | 227 | |||||||||||||||||||||||||||||||||
9th St | Hancock St | McPherson St | 1300 | 6 | 867 | |||||||||||||||||||||||||||||||||
Asphalt Path | ||||||||||||||||||||||||||||||||||||||
Spruce St Easement | Cedar St | Center St | 150 | 8 | 133 | $ 2000 | $ 2000 | $ 2000 | ||||||||||||||||||||||||||||||
Cherry St | A St | E St | 990 | 10 | 1100 | $ 10000 | $ 10000 | $ 10000 | ||||||||||||||||||||||||||||||
Gravel Path | ||||||||||||||||||||||||||||||||||||||
16th St | Thomas St | Grant St | 1700 | 6 | 1133 | $ 1500 | $ 1500 | $ 1500 | ||||||||||||||||||||||||||||||
Cleveland St | 21st St | 23rd St | 500 | 6 | 333 | Need Easement | ||||||||||||||||||||||||||||||||
6 | - | Need Easement | ||||||||||||||||||||||||||||||||||||
6 | - | Need Easement | ||||||||||||||||||||||||||||||||||||
Total |
Type | Improvement | Cost Range SY | Cost Range LF | ||||||||
1 | Complete Road Rebuild | $80 | $100 | ||||||||
2 | Asphalt Overlay | $50 | $60 | ||||||||
3 | Pulverize amp Chip Seal | $20 | $30 | ||||||||
4 | Chip Seal | $6 | $10 | $12 | $25 | ||||||
5 | Seal Coat | ||||||||||
6 | |||||||||||
7 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 3-Inch | 413 | TONS | $ 15000 | $ 6187500 | 1000 x 22 x 025 httpwwwamerasphaltcomasphalthtm | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 1630 | CY | $ 4800 | $ 7824000 | Water Street Project = $48 CY (1000 x 22 x 2)27 = 1630 CY | ||||||
Gravel Borrow | 2282 | TONS | $ 3000 | $ 6846000 | (1000 x 22 x 2)27 = 1630 1630 CY x 14 = 2282 Tons | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 128 | Hours | $ 5728 | $ 733133 | (2) People for 64 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 25043033 | |||||||||||
$ 10247 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 2-Inch | 275 | TONS | $ 15000 | $ 4125000 | 1000 x 22 x 017 httpwwwamerasphaltcomasphalthtm | | ||||||
Digouts amp Pre-leveling | 122 | SY | $ 4900 | $ 597800 | |||||||
Flagging | 64 | Hours | $ 5728 | $ 366566 | (2) People for 32 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 180000 | $ 180000 | |||||||
$ 5403066 | |||||||||||
$ 2211 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 3-Inch | 413 | TONS | $ 15000 | $ 6187500 | 1000 x 22 x 025 httpwwwamerasphaltcomasphalthtm | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 150 | CY | $ 4800 | $ 720000 | Water Street Project = $48 CY | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 96 | Hours | $ 5728 | $ 549850 | (2) People for 48 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 10909750 | |||||||||||
$ 4464 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Chip Seal | 2444 | SY | $ 1050 | $ 2566200 | 1000 X 22 | Unit Cost $525 SY from Walker Street County Invoice Doubled to $1050 for Chip Seal Over Gravel | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 150 | CY | $ 4800 | $ 720000 | Water Street Project = $48 CY | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 80 | Hours | $ 5728 | $ 458208 | (2) People for 40 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | Hours | $ 12500 | $ - 0 | High Average Loaded Rate No Testing | ||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 7196808 | |||||||||||
$ 2945 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 1500000 | $614 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 500 | LF | $ 5000 | $ 2500000 | |||||||
Catch Basins | 4 | EACH | $ 150000 | $ 600000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Chip Seal | 2444 | SY | $ 525 | $ 1283100 | 1000 X 22 | Unit Cost from Walker Street County Invoice | ||||||
Digouts amp Pre-leveling | 122 | SY | $ 4900 | $ 598780 | Cost from 2018 Lakeside Mill amp Fill | Estimate Quanity Based on 5 | ||||||
Flagging | 32 | Hours | $ 5728 | $ 183283 | (2) People for 16 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | Hours | $ 12500 | $ - 0 | High Average Loaded Rate No Surveying or Testing | ||||||
Surveying | 1 | LS | $ - 0 | $ - 0 | |||||||
$ 2198863 | |||||||||||
$ 900 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 1500000 | $614 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY |
Project Descriptioin | Length | Width | Construction Costs | Engineering Costs | Engineering Total | Digouts Pre-Leveling Costs | Digouts Pre-Leveling Total | ADACosts | ADATotal | StormwaterCosts | StormwaterTotal | Total Costsby SY | Cost Per 250 Block | Length | Width | Notes | |||||||||||||||||
Chip Seal Pavement | |||||||||||||||||||||||||||||||||
Walker Street Washington Street to Lawrence Street | 1144 | 24 | $ 25000 | 15 | $ 3750 | 10 | $ 2500 | $ 1024 | $ 682911 | 250 | 24 | ||||||||||||||||||||||
Pulverize amp Chip Seal | |||||||||||||||||||||||||||||||||
Engineers Estimate | 250 | 24 | $ 22000 | 15 | $ 3300 | 0 | $ - | 20 | $ 4400 | $ 4455 | $ 2970000 | 250 | 24 | ||||||||||||||||||||
Pulverize amp Asphalt Paving | |||||||||||||||||||||||||||||||||
Washington Street VanBuren Street to Harrison Street | 300 | 22 | $ 35000 | 20 | $ 7000 | 0 | $ - | 10 | $ 3500 | 20 | $ 7000 | $ 7159 | $ 4772727 | 250 | 24 | ||||||||||||||||||
Asphalt Overlay (2) | |||||||||||||||||||||||||||||||||
Engineers Estimate | 250 | 24 | $ 21334 | 20 | $ 426680 | 10 | $ 2133 | 20 | $ 426680 | 20 | $ 426680 | $ 5440 | $ 4835707 | 250 | 32 | ||||||||||||||||||
Reconstruction | |||||||||||||||||||||||||||||||||
Walker Street Lawrence Street to Blaine Street | 650 | 36 | $ 184310 | 25 | $ 46078 | 0 | $ - | 20 | $ 36862 | 30 | $ 55293 | $ 12405 | $ 11027094 | 250 | 32 | ||||||||||||||||||
RSL | Length (FT) | Area (SY) | Condition | Treatment | Cost | Total | |||||||||
20 | 61834 | 138524 | 131 | Good | $0 | $0 | |||||||||
14 | 23656 | 49915 | 47 | Satisfactory | Chip Seal | $29 | $1470552 | ||||||||
12 | 43586 | 106382 | 100 | $3134134 | |||||||||||
10 | 74803 | 193570 | 182 | $5702790 | |||||||||||
8 | 96662 | 228046 | 215 | $6718492 | |||||||||||
6 | 95452 | 261794 | 247 | Fair | Overlay | $67 | $17489930 | ||||||||
4 | 6420 | 14536 | 14 | $971121 | |||||||||||
2 | 29238 | 60616 | 57 | Poor | Rehab | $107 | $6492850 | ||||||||
0 | 3851 | 7532 | 07 | Very Poor | Rebuild | $155 | $1169719 | ||||||||
$43149589 | |||||||||||||||
Additional Paving Costs | Average Cost per SY | Percent of Paving Cost | |||
Digouts amp Pre-Leveling | $4 | 25 | |||
Stormwater | $7 | 38 | |||
ADA | $5 | 27 | |||
Engineering amp Administration | $5 | 28 |
9 | Base Paving Costs | Preperation | Stormwater | ADA | Engineering | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Remaining Service Life | Road Name | From | To | Length (ft) | Width (ft) | Area (SY) | Total Construction | Price(SY) | Reconstruction | Pulverize amp Pave | Ashpalt Overlay | Pave Gravel Road | Pulverize amp Chip Seal | Chip Seal | Total Base Paving Costs | Digouts(SY) | Pre-Leveling(SY) | Construct Shoulders Both Sides (LF) | Preparation Total | StormwaterPipes (LF) | StormwaterCatchbasins | StormwaterSwales (LF) | Stormwater Total | Curb Ramps | Curb Ramps Total | Surveying | Engineering amp Administration | Engineering amp Administration Total | Other Work | ||||||||||||||||||||||||||||||
$102 | $45 | $22 | $35 | $29 | $9 | $35 | $15 | $20 | $50 | $1500 | $25 | $15000 | |||||||||||||||||||||||||||||||||||||||||||||||
2 | Polk St - Street | Lawrence St | 1056 | 200 | 56 | 1244 | $ 210679 | $ 169 | $ 127518 | $ 127518 | $ - | 150 | 1 | 1 | $ 9025 | 2 | $ 30000 | $ 10000 | 25 | $ 44136 | |||||||||||||||||||||||||||||||||||||||
6 | 47th Street | Pettygrove | McNeil | 500 | 18 | 1548 | $ 258717 | $ 167 | $ 158624 | $ 158624 | $ - | 687 | 8 | $ 46350 | $ - | $ 10000 | 25 | $ 53743 | |||||||||||||||||||||||||||||||||||||||||
6 to 10 | Lawrence St | Calhoun St | Harrison St | 1200 | 36 | 4800 | $ 786070 | $ 164 | $ 491856 | $ 491856 | 600 | $ 15000 | $ 8 | $ 120000 | $ 10000 | 25 | $ 159214 | ||||||||||||||||||||||||||||||||||||||||||
8 | Lawrence St | Cass St | Calhoun St | 250 | 36 | 1000 | $ 146213 | $ 146 | $ 102470 | $ 102470 | 0 | 0 | $ - | 75 | 350 | $ 12500 | $ - | $ 10000 | 25 | $ 31243 | |||||||||||||||||||||||||||||||||||||||
8 | Lawrence St | Walker St | Cass St | 250 | 36 | 1000 | $ 144650 | $ 145 | $ 102470 | $ 102470 | $ - | 100 | 250 | $ 11250 | $ - | $ 10000 | 25 | $ 30930 | |||||||||||||||||||||||||||||||||||||||||
4 to 8 | San Juan Ave | Lopez Ave | Admiralty | 2300 | 34 | 8689 | $ 1222938 | $ 141 | $ 890350 | $ 890350 | $ - | 800 | 5 | 1500 | $ 85000 | $ - | $ 15000 | 25 | $ 247588 | ||||||||||||||||||||||||||||||||||||||||
6 to 8 | Lawrence St | Harrison St | Monroe St | 2380 | 47 | 12429 | $ 1331314 | $ 107 | $ 274803 | $ 274803 | 15 | 5 | $ 74573 | 1900 | 10 | $ 110000 | 50 | $ 750000 | $ 10000 | 10 | $ 121938 | ||||||||||||||||||||||||||||||||||||||
2 to 4 | Center St | San Juan Ave | Redwood St | 1660 | 16 | 2951 | $ 295222 | $ 100 | $ 86910 | $ 86910 | $ - | 1600 | 9 | 3000 | $ 168500 | $ - | $ 10000 | 15 | $ 39812 | ||||||||||||||||||||||||||||||||||||||||
0 to 6 | Pacific St | Cedar St | Tremont St | 400 | 16 | 711 | $ 66581 | $ 94 | $ 31744 | $ 31744 | $ - | 100 | 2 | 700 | $ 25500 | $ - | $ 5000 | 15 | $ 9337 | ||||||||||||||||||||||||||||||||||||||||
0 to 6 | Benton St | Lawrence | Lincoln Blg | 580 | 36 | 2320 | $ 203265 | $ 88 | $ 20880 | $ 20880 | 20 | 10 | $ 19720 | 250 | 2 | $ 15500 | 8 | $ 120000 | $ 5000 | 15 | $ 27165 | ||||||||||||||||||||||||||||||||||||||
2 | Grant St | 14th St | 16th St | 525 | 16 | 933 | $ 73635 | $ 79 | $ 27487 | $ 27487 | $ - | 400 | 2 | 500 | $ 35500 | $ - | $ 8000 | 15 | $ 10648 | ||||||||||||||||||||||||||||||||||||||||
2 to 6 | Olympic St | Cedar St | Tremont St | 536 | 12 | 715 | $ 52716 | $ 74 | $ 21047 | $ 21047 | $ - | 950 | $ 23750 | $ - | $ 8000 | 15 | $ 7920 | ||||||||||||||||||||||||||||||||||||||||||
2 | Milo St | Olympic Ave | Pacific Ave | 466 | 12 | 621 | $ 44793 | $ 72 | $ 18298 | $ 18298 | $ - | 800 | $ 20000 | $ - | $ 5000 | 15 | $ 6495 | ||||||||||||||||||||||||||||||||||||||||||
0 | 11th St | Hendricks St | Sheridan St | 550 | 16 | 978 | $ 65077 | $ 67 | $ 28796 | $ 28796 | $ - | 100 | 2 | 750 | $ 26750 | $ - | $ 8000 | 15 | $ 9532 | ||||||||||||||||||||||||||||||||||||||||
0 | 58th St | Hill St | Kuhn St | 525 | 16 | 933 | $ 60329 | $ 65 | $ 32667 | $ 32667 | $ - | 750 | $ 18750 | $ - | $ 8000 | 15 | $ 8913 | ||||||||||||||||||||||||||||||||||||||||||
2 | 10th St | Hendricks St | Grant St | 283 | 18 | 566 | $ 34294 | $ 61 | $ 16669 | $ 16669 | $ - | 500 | $ 12500 | $ - | $ 5000 | 15 | $ 5125 | ||||||||||||||||||||||||||||||||||||||||||
4 to 10 | 31st St | Hancock St | Sheridan St | 1050 | 22 | 2567 | $ 150027 | $ 58 | $ 23100 | $ 23100 | 10 | 10 | $ 12833 | 1200 | 10 | 1000 | $ 100000 | $ - | $ 5000 | 10 | $ 14093 | ||||||||||||||||||||||||||||||||||||||
6 | 25th St | Sheridan St | Holcomb St | 1200 | 18 | 2400 | $ 125895 | $ 52 | $ 70680 | $ 70680 | $ - | 125 | 1 | 1200 | $ 37750 | $ - | $ 8000 | 15 | $ 17465 | ||||||||||||||||||||||||||||||||||||||||
6 | Holcomb St | 7th St | 10th St | 850 | 12 | 1133 | $ 58703 | $ 52 | $ 10200 | $ 10200 | 10 | 10 | $ 5667 | 1500 | $ 37500 | $ - | $ - | 10 | $ 5337 | ||||||||||||||||||||||||||||||||||||||||
2 | Hendricks St | 9th St | 12th St | 800 | 16 | 1422 | $ 70930 | $ 50 | $ 41884 | $ 41884 | $ - | 750 | $ 18750 | $ - | $ 8000 | 15 | $ 10295 | ||||||||||||||||||||||||||||||||||||||||||
2 to 6 | Hill St | 19th | 21st St | 807 | 16 | 1435 | $ 67443 | $ 47 | $ 21125 | $ 6456 | $ 27581 | 10 | $ 5021 | 1000 | $ 25000 | $ - | $ 8000 | 15 | $ 9840 | ||||||||||||||||||||||||||||||||||||||||
2 to 8 | 57th St | Jackman St | Kuhn St | 800 | 18 | 1600 | $ 66550 | $ 42 | $ 14400 | $ 14400 | 20 | 10 | $ 13600 | 1300 | $ 32500 | 10 | $ 6050 | ||||||||||||||||||||||||||||||||||||||||||
6 to 8 | Sheridan St | Hastings Ave | SilverUmatilla | 1750 | 22 | 4278 | $ 154115 | $ 36 | $ 38500 | $ 38500 | 20 | 10 | $ 36361 | 300 | 4 | 1500 | $ 58500 | $ - | $ 5000 | 15 | $ 20754 | ||||||||||||||||||||||||||||||||||||||
6 to 10 | Tyler St | Jefferson St | Lawrence St | 900 | 32 | 3200 | $ 115280 | $ 36 | $ 28800 | $ 28800 | 5 | 5 | $ 8000 | 100 | 2 | $ 8000 | 4 | $ 60000 | 10 | $ 10480 | |||||||||||||||||||||||||||||||||||||||
6 to 14 | 14th St | McPherson St | Sheridan St | 2375 | 21 | 5542 | $ 182027 | $ 33 | $ 49875 | $ 49875 | 20 | 10 | $ 47104 | 750 | 4 | 1000 | $ 68500 | $ - | 10 | $ 16548 | |||||||||||||||||||||||||||||||||||||||
8 | 49th St | Kuhn St | Admiralty Ave | 400 | 24 | 1067 | $ 34613 | $ 32 | $ 9600 | $ 9600 | 5 | $ 1867 | 800 | $ 20000 | $ - | 10 | $ 3147 | ||||||||||||||||||||||||||||||||||||||||||
6 to 10 | Fir St | F St | UCherry | 4360 | 22 | 10658 | $ 341621 | $ 32 | $ 95920 | $ 95920 | 5 | 5 | 4000 | $ 106644 | 100 | 2 | 4000 | $ 108000 | $ - | 10 | $ 31056 | ||||||||||||||||||||||||||||||||||||||
6 to 8 | Cedar St | San Juan Ave | Redwood St | 1460 | 16 | 2596 | $ 81747 | $ 31 | $ 23360 | $ 23360 | 20 | 20 | $ 25956 | 1000 | $ 25000 | $ - | 10 | $ 7432 | |||||||||||||||||||||||||||||||||||||||||
8 | Clallam St | McKinley St | Roosevelt St | 975 | 14 | 1517 | $ 46796 | $ 31 | $ 13650 | $ 13650 | 20 | 10 | $ 12892 | 200 | 4 | $ 16000 | $ - | 10 | $ 4254 | ||||||||||||||||||||||||||||||||||||||||
6 | San Juan Ave | 19th St | 20th St | 300 | 31 | 1033 | $ 31827 | $ 31 | $ 9300 | $ 9300 | 50 | 10 | $ 19633 | $ - | $ - | 10 | $ 2893 | ||||||||||||||||||||||||||||||||||||||||||
6 to 20 | Cherry St | F St | W St | 4200 | 32 | 14933 | $ 457307 | $ 31 | $ 134400 | $ 134400 | 5 | 5 | 4200 | $ 121333 | 200 | 6000 | $ 160000 | $ - | 10 | $ 41573 | |||||||||||||||||||||||||||||||||||||||
6 to 8 | Jackman St | 45th St | 49th St | 1100 | 22 | 2689 | $ 81940 | $ 30 | $ 24200 | $ 24200 | 15 | 10 | $ 18150 | 225 | 3 | 500 | $ 28250 | $ - | $ 5000 | 15 | $ 11340 | ||||||||||||||||||||||||||||||||||||||
6 to 12 | Jackson St | LawrenceMonroe | Roosevelt St | 1600 | 18 | 3200 | $ 93530 | $ 29 | $ 28800 | $ 28800 | 10 | 10 | $ 16000 | 1000 | $ 25000 | 1 | $ 15000 | $ 2500 | 10 | $ 8730 | |||||||||||||||||||||||||||||||||||||||
2 | 7th St | Wilson St | Holcomb St | 450 | 16 | 800 | $ 23320 | $ 29 | $ 7200 | $ 7200 | 10 | 10 | $ 4000 | 400 | $ 10000 | $ - | 10 | $ 2120 | |||||||||||||||||||||||||||||||||||||||||
8 to 14 | 25th St | Sherman St | Sheridan St | 800 | 20 | 1778 | $ 50061 | $ 28 | $ 16000 | $ 16000 | 10 | 5 | $ 7556 | 1 | 800 | $ 21500 | $ - | $ 5000 | 10 | $ 5006 | |||||||||||||||||||||||||||||||||||||||
2 to 6 | Hancock St | SR 20 | 9th St | 1100 | 20 | 2444 | $ 67833 | $ 28 | $ 22000 | $ 22000 | 15 | 5 | $ 14667 | 1000 | $ 25000 | $ - | 10 | $ 6167 | |||||||||||||||||||||||||||||||||||||||||
Benton St | Washington St | Lawrence St | 1160 | 22 | 2836 | $ 74468 | $ 26 | $ 25520 | $ 25520 | 10 | 10 | $ 14178 | 140 | 4 | 600 | $ 28000 | 10 | $ 6770 | |||||||||||||||||||||||||||||||||||||||||
W St | San JuanAdmiralty | Walnut St | 2560 | 22 | 6258 | $ 163807 | $ 26 | $ 56320 | $ 56320 | 10 | 5 | $ 26596 | 200 | 4 | 2000 | $ 66000 | $ - | 10 | $ 14892 | ||||||||||||||||||||||||||||||||||||||||
6 to 8 | Walnut | W Street | Jackson | 2300 | 22 | 5622 | $ 145194 | $ 26 | $ 50600 | $ 50600 | 10 | 5 | $ 23894 | 2300 | $ 57500 | $ - | 10 | $ 13199 | |||||||||||||||||||||||||||||||||||||||||
6 to 8 | 24th St | Discovery Rd | San Juan Ave | 1250 | 18 | 2500 | $ 63938 | $ 26 | $ 22500 | $ 22500 | 10 | 5 | $ 10625 | 1000 | $ 25000 | $ - | 10 | $ 5813 | |||||||||||||||||||||||||||||||||||||||||
6 to 10 | Tyler St | Lawrence St | Blaine St | 900 | 32 | 3200 | $ 78980 | $ 25 | $ 28800 | $ 28800 | 5 | 5 | $ 8000 | 200 | $ 5000 | 2 | $ 30000 | 10 | $ 7180 | ||||||||||||||||||||||||||||||||||||||||
4 to 12 | McPherson St | SR 20 | Discovery Rd | 2925 | 32 | 10400 | $ 244860 | $ 24 | $ 93600 | $ 93600 | 5 | 5 | 2925 | $ 84500 | 230 | 2 | 1200 | $ 44500 | $ - | $ - | 10 | $ 22260 | |||||||||||||||||||||||||||||||||||||
10 | Landes St | 12th St | 19th St | 1820 | 32 | 6471 | $ 151821 | $ 23 | $ 58240 | $ 58240 | 5 | 1400 | $ 39324 | 400 | $ 10000 | 2 | $ 30000 | $ 5000 | 10 | $ 14256 | |||||||||||||||||||||||||||||||||||||||
6 to 8 | Discovery Rd | 19th | Hastings Ave | 2900 | 22 | 7089 | $ 136565 | $ 19 | $ 63800 | $ 63800 | 15 | 10 | $ 47850 | 500 | $ 12500 | $ - | 10 | $ 12415 | |||||||||||||||||||||||||||||||||||||||||
8 to 12 | Hastings Ave | Discovery Rd | County Line | 8450 | 32 | 30044 | $ 542349 | $ 18 | $ 270400 | $ 270400 | 5 | 10 | 5000 | $ 197644 | 1000 | $ 25000 | $ - | 10 | $ 49304 | ||||||||||||||||||||||||||||||||||||||||
6 to 12 | Washington St | Van Buren St | SR20 | 2025 | 30 | 6750 | $ 118388 | $ 18 | $ 60750 | $ 60750 | 5 | 5 | $ 16875 | 0 | 0 | 0 | $ - | 2 | $ 30000 | $ - | 10 | $ 10763 | |||||||||||||||||||||||||||||||||||||
14 | Blaine St | San Juan Ave | Walker St | 1275 | 48 | 6800 | $ 113910 | $ 17 | $ 61200 | $ 61200 | 5 | $ 11900 | $ - | 2 | $ 30000 | $ 5000 | 10 | $ 10810 | |||||||||||||||||||||||||||||||||||||||||
6 | Washington St | Harrison St | Taylor St | 1175 | 33 | 4308 | $ 59240 | $ 14 | $ 38775 | $ 38775 | 10 | $ 15079 | $ - | $ - | 10 | $ 5385 | |||||||||||||||||||||||||||||||||||||||||||
8 to 10 | Sheridan St | SR 20 | 19th St | 4000 | 46 | 20444 | $ 272922 | $ 13 | $ 184000 | $ 184000 | 5 | 5 | $ 51111 | 200 | 2 | $ 13000 | $ - | 10 | $ 24811 | ||||||||||||||||||||||||||||||||||||||||
8 to 10 | 19th St | San Juan Ave | Sheridan St | 3200 | 48 | 17067 | $ 197120 | $ 12 | $ 153600 | $ 153600 | 3 | 3 | $ 25600 | 0 | 0 | 0 | $ - | $ - | 10 | $ 17920 | |||||||||||||||||||||||||||||||||||||||
10 to 20 | San Juan Ave | F St | Lopez Ave | 2800 | 32 | 9956 | $ 110059 | $ 11 | $ 89600 | $ 89600 | 3 | $ 10453 | $ - | $ - | 10 | $ 10005 | |||||||||||||||||||||||||||||||||||||||||||
10 to 20 | F St | Hastings Ave | Tyler St | 5300 | 31 | 18256 | $ 180730 | $ 10 | $ 164300 | $ 164300 | $ - | $ - | $ - | 10 | $ 16430 | ||||||||||||||||||||||||||||||||||||||||||||
$ 9952406 | $ 1873288 | $ 31744 | $ 274803 | $ 32667 | $ 332896 | $ 1998646 | $ 4544044 | $ 1155207 | $ 1747625 | $ 1215000 | $ 1290529 | $ - 0 | |||||||||||||||||||||||||||||||||||||||||||||||
Street Pavement Improvement Plan Projects | 9 | 110 | |||||||||||||||||||||||||||||||||||||||||||||
Road Name | From | To | Iworq ID | Length (ft) | Width (ft) | Area (yd^2) | Actual Area(SY) | Unit Cost per yd2 | Construction Cost | Prep Work | Survey Testing | ADA Curb Ramps | Storm Water | Mill amp Fill$50SY | Pre-Level$4SY | Total Construction | Project Cost + 10 | Unit Cost w Additional Costs no 10 | Engineering Costs | Notes | |||||||||||||||||||||||||||
Priority | Reconstruct | 2021 | 2022 | 2023 | 2024 | ||||||||||||||||||||||||||||||||||||||||||
1 | Reconstruct | Lawrence St | Cass St | Calhoun St | 1304 | 250 | 36 | 1000 | $ 80 | $ 80000 | $ 5000 | $ 20000 | $ 105000 | $ 115500 | $ 105 | Stormwater South Side Parking Raingarden on Cass | |||||||||||||||||||||||||||||||
2 | Reconstruct | Lawrence St | Walker St | Cass St | 250 | 36 | 1000 | $ 80 | $ 80000 | $ 5000 | $ 20000 | $ 5000 | $ 110000 | $ 121000 | $ 110 | Stormwater South Side Parking | |||||||||||||||||||||||||||||||
3 | Reconstruct Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | San Juan Ave | Lopez Ave | Admiralty | 2300 | 32 | 8178 | $ 50 | $ 408889 | $ 10000 | $ 100000 | $ 518889 | $ 570778 | $ 63 | Stormwater Problem 45th | ||||||||||||||||||||||||||||||||
4 | Reconstruct Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Polk St - Street Improvements | Lawrence St | 1056 Sarah Tiffany Sarah TiffanyGarfield | 1073 | 200 | 56 | 1244 | $ 50 | $ 62222 | X | X | X | $ 62222 | $ 68444 | $ 50 | Parking Theater 4 AC Watermain Infiltration or Rain Garden Parking on Condo Side | ||||||||||||||||||||||||||||||
Reconstruct | 47th Street | Pettygrove | McNeil | 500 | 18 | 1000 | 1548 | $ 50 | $ 50000 | $ 5000 | $ 40000 | $ 95000 | $ 104500 | $ 95 | $210000 Engineers Estimate With Engineering Cost Turnaround Spaghetti Waterline | ||||||||||||||||||||||||||||||||
Chip Seal - $50000 to $70000 per Mile | $6 No DigoutsPre-leveling | $10 with Additional Prep Work | |||||||||||||||||||||||||||||||||||||||||||||||
Chip Seal | Washington St | Van Buren St | SR20 | 2025 | 30 | 6750 | $ 10 | $ 67500 | $ 67500 | $ 74250 | Digouts Flagging | ||||||||||||||||||||||||||||||||||||
Chip Seal | Hastings Ave - Pre-level and widen shoulders | Discovery Rd | County Line | 8450 | 24 | 22533 | $ 6 | $ 135200 | $ 135200 | $ 148720 | Ditches amp Culverts Total Width change from 21 to 24 How wide will shoulders be | ||||||||||||||||||||||||||||||||||||
Tyler St | Jefferson St | Lawrence St | 900 | 32 | 3200 | $ 6 | $ 19200 | $ 19200 | $ 21120 | ||||||||||||||||||||||||||||||||||||||
Chip Seal | McPherson - Chip Seal | 4th St | Discovery Rd | 3100 | 32 | 11022 | $ 6 | $ 66133 | $ 66133 | $ 72747 | Ditches amp Culverts Shoulder Wideneing | ||||||||||||||||||||||||||||||||||||
Chip Seal | 19th St - Chip Seal | San Juan Ave | Sheridan St | 3200 | 48 | 17067 | $ 6 | $ 102400 | $ 102400 | $ 112640 | Bike Lanes amp Shoulder Prelevel | ||||||||||||||||||||||||||||||||||||
Chip Seal | Walnut | W Street | Jackson | 2300 | 22 | 5622 | $ 6 | $ 33733 | $ 33733 | $ 37107 | Dig-Outs Pre-Leveling Striping Shoulders | ||||||||||||||||||||||||||||||||||||
Chip Seal | Fir St - Chip Seal | F St | UCherry | 4360 | 22 | 10658 | $ 10 | $ 106578 | X | X | $ 106578 | $ 117236 | Dig-Outs Pre-Leveling Striping | ||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | |||||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | P St - Chip Seal | Redwood St | Cedar St | 0486 | 300 | 16 | 533 | $ 20 | $ 10667 | $ 10667 | $ 11733 | Watermain Looping Shouldnt this be part of Center | |||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 25th St - Chip Seal | Sheridan St | Holcomb St | 1200 | 18 | 2400 | $ 20 | $ 48000 | $ 48000 | $ 52800 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 14th St - Chip Seal | $ - | $ - | ||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Cedar St - Chip Seal | Redwood St | San Juan Ave | 1460 | 16 | 2596 | $ 20 | $ 51911 | $ 51911 | $ 57102 | Ex ChipSeal 22 Wide | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Center St - Chip Seal | Redwood St | San Juan Ave | 484 | 1660 | 16 | 2951 | $ 20 | $ 59022 | $ 59022 | $ 64924 | Ex ChipSeal 22 Wide Stormwater | |||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Grant St Chip Seal | 14th St | 16th St | 525 | 16 | 933 | $ 20 | $ 18667 | $ 18667 | $ 20533 | Ex Street 10 Wide | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 11th St Chip Seal | Hendricks St | Sheridan St | 550 | 16 | 978 | $ 20 | $ 19556 | $ 19556 | $ 21511 | Hospital Parking | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Hendricks St Chip Seal | 9th St | 12th St | 800 | 16 | 1422 | $ 20 | $ 28444 | $ 28444 | $ 31289 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 10th St Chip Seal | Hendricks St | Grant St | 1655 | 283 | 18 | 566 | $ 20 | $ 11320 | $ 11320 | $ 12452 | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Grant St Chip Seal | 14th St | 16th St | 525 | 18 | 1050 | $ 20 | $ 21000 | $ 21000 | $ 23100 | Ex Street 10 Wide Stormwater | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Hill St | 21st St | 19th St | 807 | 16 | 1435 | $ 20 | $ 28693 | $ 28693 | $ 31563 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Milo St -Chip seal | Olympic Ave | Pacific Ave | 0003 | 466 | 12 | 621 | $ 20 | $ 12427 | $ 12427 | $ 13669 | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Olympic St | Cedar St | Tremont St | 536 | 12 | 715 | $ 20 | $ 14293 | $ 14293 | $ 15723 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Benton St - street improvement | Blaine St | Lincoln Blg | 580 | 36 Sarah Tiffany Sarah TiffanyEstimated at 25-36 used higher number | Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Sarah Tiffany Sarah TiffanyGarfield | 2320 | $ 20 | $ 46400 | $ 46400 | $ 51040 | ||||||||||||||||||||||||||||||||||
Pave Gravel Road | |||||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Pacific St | Cedar St | Tremont St | 400 | 16 | 711 | $ 50 | $ 35556 | $ 6000 | $ 15000 | $ 56556 | $ 62211 | $ 80 | ||||||||||||||||||||||||||||||||||
58th St | Hill St | Kuhn St | 525 | 16 | 933 | $ 50 | $ 46667 | $ 6000 | $ 20000 | $ 72667 | $ 79933 | $ 78 | 4 AC Waterline Driveways Site Distance (Re-grade Slope) | ||||||||||||||||||||||||||||||||||
Sidewalks | |||||||||||||||||||||||||||||||||||||||||||||||
Harrison St | Franklin St | Clay St | 340 | 6 | 227 | $ 165 | $ 56100 | $ 5000 | $ 61100 | $ 67210 | $ 180 | ||||||||||||||||||||||||||||||||||||
9th St | Hancock St | McPherson St | 1300 | 6 | 867 | $ 165 | $ 214500 | $ 10000 | $ 15000 | $ 239500 | $ 263450 | $ 184 | |||||||||||||||||||||||||||||||||||
Asphalt Path | |||||||||||||||||||||||||||||||||||||||||||||||
Spruce St Easement | Cedar St | Center St | 150 | 8 | 133 | $ 50 | $ 6667 | $ 2000 | $ 8667 | $ 9533 | $ 65 | ||||||||||||||||||||||||||||||||||||
Cherry St | A St | E St | 990 | 10 | 1100 | $ 50 | $ 55000 | $ 10000 | $ 10000 | $ 15000 | $ 90000 | $ 99000 | $ 82 | ||||||||||||||||||||||||||||||||||
Gravel Path | |||||||||||||||||||||||||||||||||||||||||||||||
16th St | Thomas St | Grant St | 1700 | 6 | 1133 | $ 15 | $ 17000 | $ 1500 | $ 18500 | $ 20350 | |||||||||||||||||||||||||||||||||||||
Cleveland St | 21st St | 23rd St | 500 | 6 | 333 | $ 15 | $ 5000 | $ 5000 | $ 5500 | Need Easement | |||||||||||||||||||||||||||||||||||||
6 | - | $ 15 | $ - | $ - | $ - | Need Easement | |||||||||||||||||||||||||||||||||||||||||
6 | - | $ 15 | $ - | $ - | $ - | Need Easement | |||||||||||||||||||||||||||||||||||||||||
Total | $ 1582256 | $ 1792256 | $ 1971481 | ||||||||||||||||||||||||||||||||||||||||||||
Project Descriptioin | Length | Width | Construction Costs | ConstructionUnit Costs | Units | Engineering Costs | Total CostsUnit Cost | Total Costs | Total CostsUnit Cost | Notes | |||||||||||
Sidewalk | |||||||||||||||||||||
9th Street Sidewalk Grant Street to Hancock Street | 826 | 6 | $ 141506 | $ 17131 | LF | Construction Unit Cost per Foot | |||||||||||||||
Jefferson Street Sidewalk Washington Street to Taylor Street | 724 | 6 | $ 390502 | $ 53937 | LF | Construction Unit Cost per Foot | |||||||||||||||
Landis Street Sidewalk 10th Street to 19th Street | 1795 | 6 | $ 364550 | $ 20309 | LF | Construction Unit Cost per Foot | |||||||||||||||
ADA Corner Ramps | |||||||||||||||||||||
Washington Street amp Harrison Street | $ 42000 | $ 42000 | Each | ||||||||||||||||||
Washington Street amp Adams Street | $ 38150 | $ 19075 | Each | Two Corners Were Retrofitted | |||||||||||||||||
Chip Seal Pavement | |||||||||||||||||||||
Walker Street Washington Street to Lawrence Street | 1144 | 24 | $ 20000 | $ 656 | SY | Does not include flagging nor prep work | |||||||||||||||
Pulverize amp Asphalt Paving | |||||||||||||||||||||
Washington Street VanBuren Street to Harrison Street | 300 | 22 | $ 35000 | $ 4773 | SY | ||||||||||||||||
Asphalt Overlay | |||||||||||||||||||||
Sidewalks | ||||||||||||||||||||||||||||||||||||||
Harrison St | Franklin St | Clay St | 340 | 6 | 227 | |||||||||||||||||||||||||||||||||
9th St | Hancock St | McPherson St | 1300 | 6 | 867 | |||||||||||||||||||||||||||||||||
Asphalt Path | ||||||||||||||||||||||||||||||||||||||
Spruce St Easement | Cedar St | Center St | 150 | 8 | 133 | $ 2000 | $ 2000 | $ 2000 | ||||||||||||||||||||||||||||||
Cherry St | A St | E St | 990 | 10 | 1100 | $ 10000 | $ 10000 | $ 10000 | ||||||||||||||||||||||||||||||
Gravel Path | ||||||||||||||||||||||||||||||||||||||
16th St | Thomas St | Grant St | 1700 | 6 | 1133 | $ 1500 | $ 1500 | $ 1500 | ||||||||||||||||||||||||||||||
Cleveland St | 21st St | 23rd St | 500 | 6 | 333 | Need Easement | ||||||||||||||||||||||||||||||||
6 | - | Need Easement | ||||||||||||||||||||||||||||||||||||
6 | - | Need Easement | ||||||||||||||||||||||||||||||||||||
Total |
Type | Improvement | Cost Range SY | Cost Range LF | ||||||||
1 | Complete Road Rebuild | $80 | $100 | ||||||||
2 | Asphalt Overlay | $50 | $60 | ||||||||
3 | Pulverize amp Chip Seal | $20 | $30 | ||||||||
4 | Chip Seal | $6 | $10 | $12 | $25 | ||||||
5 | Seal Coat | ||||||||||
6 | |||||||||||
7 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 3-Inch | 413 | TONS | $ 15000 | $ 6187500 | 1000 x 22 x 025 httpwwwamerasphaltcomasphalthtm | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 1630 | CY | $ 4800 | $ 7824000 | Water Street Project = $48 CY (1000 x 22 x 2)27 = 1630 CY | ||||||
Gravel Borrow | 2282 | TONS | $ 3000 | $ 6846000 | (1000 x 22 x 2)27 = 1630 1630 CY x 14 = 2282 Tons | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 128 | Hours | $ 5728 | $ 733133 | (2) People for 64 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 25043033 | |||||||||||
$ 10247 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 2-Inch | 275 | TONS | $ 15000 | $ 4125000 | 1000 x 22 x 017 httpwwwamerasphaltcomasphalthtm | | ||||||
Digouts amp Pre-leveling | 122 | SY | $ 4900 | $ 597800 | |||||||
Flagging | 64 | Hours | $ 5728 | $ 366566 | (2) People for 32 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 180000 | $ 180000 | |||||||
$ 5403066 | |||||||||||
$ 2211 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 3-Inch | 413 | TONS | $ 15000 | $ 6187500 | 1000 x 22 x 025 httpwwwamerasphaltcomasphalthtm | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 150 | CY | $ 4800 | $ 720000 | Water Street Project = $48 CY | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 96 | Hours | $ 5728 | $ 549850 | (2) People for 48 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 10909750 | |||||||||||
$ 4464 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Chip Seal | 2444 | SY | $ 1050 | $ 2566200 | 1000 X 22 | Unit Cost $525 SY from Walker Street County Invoice Doubled to $1050 for Chip Seal Over Gravel | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 150 | CY | $ 4800 | $ 720000 | Water Street Project = $48 CY | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 80 | Hours | $ 5728 | $ 458208 | (2) People for 40 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | Hours | $ 12500 | $ - 0 | High Average Loaded Rate No Testing | ||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 7196808 | |||||||||||
$ 2945 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 1500000 | $614 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 500 | LF | $ 5000 | $ 2500000 | |||||||
Catch Basins | 4 | EACH | $ 150000 | $ 600000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Chip Seal | 2444 | SY | $ 525 | $ 1283100 | 1000 X 22 | Unit Cost from Walker Street County Invoice | ||||||
Digouts amp Pre-leveling | 122 | SY | $ 4900 | $ 598780 | Cost from 2018 Lakeside Mill amp Fill | Estimate Quanity Based on 5 | ||||||
Flagging | 32 | Hours | $ 5728 | $ 183283 | (2) People for 16 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | Hours | $ 12500 | $ - 0 | High Average Loaded Rate No Surveying or Testing | ||||||
Surveying | 1 | LS | $ - 0 | $ - 0 | |||||||
$ 2198863 | |||||||||||
$ 900 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 1500000 | $614 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY |
Project Descriptioin | Length | Width | Construction Costs | Engineering Costs | Engineering Total | Digouts Pre-Leveling Costs | Digouts Pre-Leveling Total | ADACosts | ADATotal | StormwaterCosts | StormwaterTotal | Total Costsby SY | Cost Per 250 Block | Length | Width | Notes | |||||||||||||||||
Chip Seal Pavement | |||||||||||||||||||||||||||||||||
Walker Street Washington Street to Lawrence Street | 1144 | 24 | $ 25000 | 15 | $ 3750 | 10 | $ 2500 | $ 1024 | $ 682911 | 250 | 24 | ||||||||||||||||||||||
Pulverize amp Chip Seal | |||||||||||||||||||||||||||||||||
Engineers Estimate | 250 | 24 | $ 22000 | 15 | $ 3300 | 0 | $ - | 20 | $ 4400 | $ 4455 | $ 2970000 | 250 | 24 | ||||||||||||||||||||
Pulverize amp Asphalt Paving | |||||||||||||||||||||||||||||||||
Washington Street VanBuren Street to Harrison Street | 300 | 22 | $ 35000 | 20 | $ 7000 | 0 | $ - | 10 | $ 3500 | 20 | $ 7000 | $ 7159 | $ 4772727 | 250 | 24 | ||||||||||||||||||
Asphalt Overlay (2) | |||||||||||||||||||||||||||||||||
Engineers Estimate | 250 | 24 | $ 21334 | 20 | $ 426680 | 10 | $ 2133 | 20 | $ 426680 | 20 | $ 426680 | $ 5440 | $ 4835707 | 250 | 32 | ||||||||||||||||||
Reconstruction | |||||||||||||||||||||||||||||||||
Walker Street Lawrence Street to Blaine Street | 650 | 36 | $ 184310 | 25 | $ 46078 | 0 | $ - | 20 | $ 36862 | 30 | $ 55293 | $ 12405 | $ 11027094 | 250 | 32 | ||||||||||||||||||
RSL | Length (FT) | Area (SY) | Condition | Treatment | Cost | Total | |||||||||
20 | 61834 | 138524 | 131 | Good | $0 | $0 | |||||||||
14 | 23656 | 49915 | 47 | Satisfactory | Chip Seal | $29 | $1470552 | ||||||||
12 | 43586 | 106382 | 100 | $3134134 | |||||||||||
10 | 74803 | 193570 | 182 | $5702790 | |||||||||||
8 | 96662 | 228046 | 215 | $6718492 | |||||||||||
6 | 95452 | 261794 | 247 | Fair | Overlay | $67 | $17489930 | ||||||||
4 | 6420 | 14536 | 14 | $971121 | |||||||||||
2 | 29238 | 60616 | 57 | Poor | Rehab | $107 | $6492850 | ||||||||
0 | 3851 | 7532 | 07 | Very Poor | Rebuild | $155 | $1169719 | ||||||||
$43149589 | |||||||||||||||
Additional Paving Costs | Average Cost per SY | Percent of Paving Cost | |||
Digouts amp Pre-Leveling | $4 | 25 | |||
Stormwater | $7 | 38 | |||
ADA | $5 | 27 | |||
Engineering amp Administration | $5 | 28 |
9 | Base Paving Costs | Preperation | Stormwater | ADA | Engineering | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Remaining Service Life | Road Name | From | To | Length (ft) | Width (ft) | Area (SY) | Total Construction | Price(SY) | Reconstruction | Pulverize amp Pave | Ashpalt Overlay | Pave Gravel Road | Pulverize amp Chip Seal | Chip Seal | Total Base Paving Costs | Digouts(SY) | Pre-Leveling(SY) | Construct Shoulders Both Sides (LF) | Preparation Total | StormwaterPipes (LF) | StormwaterCatchbasins | StormwaterSwales (LF) | Stormwater Total | Curb Ramps | Curb Ramps Total | Surveying | Engineering amp Administration | Engineering amp Administration Total | Other Work | ||||||||||||||||||||||||||||||
$102 | $45 | $22 | $35 | $29 | $9 | $35 | $15 | $20 | $50 | $1500 | $25 | $15000 | |||||||||||||||||||||||||||||||||||||||||||||||
2 | Polk St - Street | Lawrence St | 1056 | 200 | 56 | 1244 | $ 210679 | $ 169 | $ 127518 | $ 127518 | $ - | 150 | 1 | 1 | $ 9025 | 2 | $ 30000 | $ 10000 | 25 | $ 44136 | |||||||||||||||||||||||||||||||||||||||
6 | 47th Street | Pettygrove | McNeil | 500 | 18 | 1548 | $ 258717 | $ 167 | $ 158624 | $ 158624 | $ - | 687 | 8 | $ 46350 | $ - | $ 10000 | 25 | $ 53743 | |||||||||||||||||||||||||||||||||||||||||
6 to 10 | Lawrence St | Calhoun St | Harrison St | 1200 | 36 | 4800 | $ 786070 | $ 164 | $ 491856 | $ 491856 | 600 | $ 15000 | $ 8 | $ 120000 | $ 10000 | 25 | $ 159214 | ||||||||||||||||||||||||||||||||||||||||||
8 | Lawrence St | Cass St | Calhoun St | 250 | 36 | 1000 | $ 146213 | $ 146 | $ 102470 | $ 102470 | 0 | 0 | $ - | 75 | 350 | $ 12500 | $ - | $ 10000 | 25 | $ 31243 | |||||||||||||||||||||||||||||||||||||||
8 | Lawrence St | Walker St | Cass St | 250 | 36 | 1000 | $ 144650 | $ 145 | $ 102470 | $ 102470 | $ - | 100 | 250 | $ 11250 | $ - | $ 10000 | 25 | $ 30930 | |||||||||||||||||||||||||||||||||||||||||
4 to 8 | San Juan Ave | Lopez Ave | Admiralty | 2300 | 34 | 8689 | $ 1222938 | $ 141 | $ 890350 | $ 890350 | $ - | 800 | 5 | 1500 | $ 85000 | $ - | $ 15000 | 25 | $ 247588 | ||||||||||||||||||||||||||||||||||||||||
6 to 8 | Lawrence St | Harrison St | Monroe St | 2380 | 47 | 12429 | $ 1331314 | $ 107 | $ 274803 | $ 274803 | 15 | 5 | $ 74573 | 1900 | 10 | $ 110000 | 50 | $ 750000 | $ 10000 | 10 | $ 121938 | ||||||||||||||||||||||||||||||||||||||
2 to 4 | Center St | San Juan Ave | Redwood St | 1660 | 16 | 2951 | $ 295222 | $ 100 | $ 86910 | $ 86910 | $ - | 1600 | 9 | 3000 | $ 168500 | $ - | $ 10000 | 15 | $ 39812 | ||||||||||||||||||||||||||||||||||||||||
0 to 6 | Pacific St | Cedar St | Tremont St | 400 | 16 | 711 | $ 66581 | $ 94 | $ 31744 | $ 31744 | $ - | 100 | 2 | 700 | $ 25500 | $ - | $ 5000 | 15 | $ 9337 | ||||||||||||||||||||||||||||||||||||||||
0 to 6 | Benton St | Lawrence | Lincoln Blg | 580 | 36 | 2320 | $ 203265 | $ 88 | $ 20880 | $ 20880 | 20 | 10 | $ 19720 | 250 | 2 | $ 15500 | 8 | $ 120000 | $ 5000 | 15 | $ 27165 | ||||||||||||||||||||||||||||||||||||||
2 | Grant St | 14th St | 16th St | 525 | 16 | 933 | $ 73635 | $ 79 | $ 27487 | $ 27487 | $ - | 400 | 2 | 500 | $ 35500 | $ - | $ 8000 | 15 | $ 10648 | ||||||||||||||||||||||||||||||||||||||||
2 to 6 | Olympic St | Cedar St | Tremont St | 536 | 12 | 715 | $ 52716 | $ 74 | $ 21047 | $ 21047 | $ - | 950 | $ 23750 | $ - | $ 8000 | 15 | $ 7920 | ||||||||||||||||||||||||||||||||||||||||||
2 | Milo St | Olympic Ave | Pacific Ave | 466 | 12 | 621 | $ 44793 | $ 72 | $ 18298 | $ 18298 | $ - | 800 | $ 20000 | $ - | $ 5000 | 15 | $ 6495 | ||||||||||||||||||||||||||||||||||||||||||
0 | 11th St | Hendricks St | Sheridan St | 550 | 16 | 978 | $ 65077 | $ 67 | $ 28796 | $ 28796 | $ - | 100 | 2 | 750 | $ 26750 | $ - | $ 8000 | 15 | $ 9532 | ||||||||||||||||||||||||||||||||||||||||
0 | 58th St | Hill St | Kuhn St | 525 | 16 | 933 | $ 60329 | $ 65 | $ 32667 | $ 32667 | $ - | 750 | $ 18750 | $ - | $ 8000 | 15 | $ 8913 | ||||||||||||||||||||||||||||||||||||||||||
2 | 10th St | Hendricks St | Grant St | 283 | 18 | 566 | $ 34294 | $ 61 | $ 16669 | $ 16669 | $ - | 500 | $ 12500 | $ - | $ 5000 | 15 | $ 5125 | ||||||||||||||||||||||||||||||||||||||||||
4 to 10 | 31st St | Hancock St | Sheridan St | 1050 | 22 | 2567 | $ 150027 | $ 58 | $ 23100 | $ 23100 | 10 | 10 | $ 12833 | 1200 | 10 | 1000 | $ 100000 | $ - | $ 5000 | 10 | $ 14093 | ||||||||||||||||||||||||||||||||||||||
6 | 25th St | Sheridan St | Holcomb St | 1200 | 18 | 2400 | $ 125895 | $ 52 | $ 70680 | $ 70680 | $ - | 125 | 1 | 1200 | $ 37750 | $ - | $ 8000 | 15 | $ 17465 | ||||||||||||||||||||||||||||||||||||||||
6 | Holcomb St | 7th St | 10th St | 850 | 12 | 1133 | $ 58703 | $ 52 | $ 10200 | $ 10200 | 10 | 10 | $ 5667 | 1500 | $ 37500 | $ - | $ - | 10 | $ 5337 | ||||||||||||||||||||||||||||||||||||||||
2 | Hendricks St | 9th St | 12th St | 800 | 16 | 1422 | $ 70930 | $ 50 | $ 41884 | $ 41884 | $ - | 750 | $ 18750 | $ - | $ 8000 | 15 | $ 10295 | ||||||||||||||||||||||||||||||||||||||||||
2 to 6 | Hill St | 19th | 21st St | 807 | 16 | 1435 | $ 67443 | $ 47 | $ 21125 | $ 6456 | $ 27581 | 10 | $ 5021 | 1000 | $ 25000 | $ - | $ 8000 | 15 | $ 9840 | ||||||||||||||||||||||||||||||||||||||||
2 to 8 | 57th St | Jackman St | Kuhn St | 800 | 18 | 1600 | $ 66550 | $ 42 | $ 14400 | $ 14400 | 20 | 10 | $ 13600 | 1300 | $ 32500 | 10 | $ 6050 | ||||||||||||||||||||||||||||||||||||||||||
6 to 8 | Sheridan St | Hastings Ave | SilverUmatilla | 1750 | 22 | 4278 | $ 154115 | $ 36 | $ 38500 | $ 38500 | 20 | 10 | $ 36361 | 300 | 4 | 1500 | $ 58500 | $ - | $ 5000 | 15 | $ 20754 | ||||||||||||||||||||||||||||||||||||||
6 to 10 | Tyler St | Jefferson St | Lawrence St | 900 | 32 | 3200 | $ 115280 | $ 36 | $ 28800 | $ 28800 | 5 | 5 | $ 8000 | 100 | 2 | $ 8000 | 4 | $ 60000 | 10 | $ 10480 | |||||||||||||||||||||||||||||||||||||||
6 to 14 | 14th St | McPherson St | Sheridan St | 2375 | 21 | 5542 | $ 182027 | $ 33 | $ 49875 | $ 49875 | 20 | 10 | $ 47104 | 750 | 4 | 1000 | $ 68500 | $ - | 10 | $ 16548 | |||||||||||||||||||||||||||||||||||||||
8 | 49th St | Kuhn St | Admiralty Ave | 400 | 24 | 1067 | $ 34613 | $ 32 | $ 9600 | $ 9600 | 5 | $ 1867 | 800 | $ 20000 | $ - | 10 | $ 3147 | ||||||||||||||||||||||||||||||||||||||||||
6 to 10 | Fir St | F St | UCherry | 4360 | 22 | 10658 | $ 341621 | $ 32 | $ 95920 | $ 95920 | 5 | 5 | 4000 | $ 106644 | 100 | 2 | 4000 | $ 108000 | $ - | 10 | $ 31056 | ||||||||||||||||||||||||||||||||||||||
6 to 8 | Cedar St | San Juan Ave | Redwood St | 1460 | 16 | 2596 | $ 81747 | $ 31 | $ 23360 | $ 23360 | 20 | 20 | $ 25956 | 1000 | $ 25000 | $ - | 10 | $ 7432 | |||||||||||||||||||||||||||||||||||||||||
8 | Clallam St | McKinley St | Roosevelt St | 975 | 14 | 1517 | $ 46796 | $ 31 | $ 13650 | $ 13650 | 20 | 10 | $ 12892 | 200 | 4 | $ 16000 | $ - | 10 | $ 4254 | ||||||||||||||||||||||||||||||||||||||||
6 | San Juan Ave | 19th St | 20th St | 300 | 31 | 1033 | $ 31827 | $ 31 | $ 9300 | $ 9300 | 50 | 10 | $ 19633 | $ - | $ - | 10 | $ 2893 | ||||||||||||||||||||||||||||||||||||||||||
6 to 20 | Cherry St | F St | W St | 4200 | 32 | 14933 | $ 457307 | $ 31 | $ 134400 | $ 134400 | 5 | 5 | 4200 | $ 121333 | 200 | 6000 | $ 160000 | $ - | 10 | $ 41573 | |||||||||||||||||||||||||||||||||||||||
6 to 8 | Jackman St | 45th St | 49th St | 1100 | 22 | 2689 | $ 81940 | $ 30 | $ 24200 | $ 24200 | 15 | 10 | $ 18150 | 225 | 3 | 500 | $ 28250 | $ - | $ 5000 | 15 | $ 11340 | ||||||||||||||||||||||||||||||||||||||
6 to 12 | Jackson St | LawrenceMonroe | Roosevelt St | 1600 | 18 | 3200 | $ 93530 | $ 29 | $ 28800 | $ 28800 | 10 | 10 | $ 16000 | 1000 | $ 25000 | 1 | $ 15000 | $ 2500 | 10 | $ 8730 | |||||||||||||||||||||||||||||||||||||||
2 | 7th St | Wilson St | Holcomb St | 450 | 16 | 800 | $ 23320 | $ 29 | $ 7200 | $ 7200 | 10 | 10 | $ 4000 | 400 | $ 10000 | $ - | 10 | $ 2120 | |||||||||||||||||||||||||||||||||||||||||
8 to 14 | 25th St | Sherman St | Sheridan St | 800 | 20 | 1778 | $ 50061 | $ 28 | $ 16000 | $ 16000 | 10 | 5 | $ 7556 | 1 | 800 | $ 21500 | $ - | $ 5000 | 10 | $ 5006 | |||||||||||||||||||||||||||||||||||||||
2 to 6 | Hancock St | SR 20 | 9th St | 1100 | 20 | 2444 | $ 67833 | $ 28 | $ 22000 | $ 22000 | 15 | 5 | $ 14667 | 1000 | $ 25000 | $ - | 10 | $ 6167 | |||||||||||||||||||||||||||||||||||||||||
Benton St | Washington St | Lawrence St | 1160 | 22 | 2836 | $ 74468 | $ 26 | $ 25520 | $ 25520 | 10 | 10 | $ 14178 | 140 | 4 | 600 | $ 28000 | 10 | $ 6770 | |||||||||||||||||||||||||||||||||||||||||
W St | San JuanAdmiralty | Walnut St | 2560 | 22 | 6258 | $ 163807 | $ 26 | $ 56320 | $ 56320 | 10 | 5 | $ 26596 | 200 | 4 | 2000 | $ 66000 | $ - | 10 | $ 14892 | ||||||||||||||||||||||||||||||||||||||||
6 to 8 | Walnut | W Street | Jackson | 2300 | 22 | 5622 | $ 145194 | $ 26 | $ 50600 | $ 50600 | 10 | 5 | $ 23894 | 2300 | $ 57500 | $ - | 10 | $ 13199 | |||||||||||||||||||||||||||||||||||||||||
6 to 8 | 24th St | Discovery Rd | San Juan Ave | 1250 | 18 | 2500 | $ 63938 | $ 26 | $ 22500 | $ 22500 | 10 | 5 | $ 10625 | 1000 | $ 25000 | $ - | 10 | $ 5813 | |||||||||||||||||||||||||||||||||||||||||
6 to 10 | Tyler St | Lawrence St | Blaine St | 900 | 32 | 3200 | $ 78980 | $ 25 | $ 28800 | $ 28800 | 5 | 5 | $ 8000 | 200 | $ 5000 | 2 | $ 30000 | 10 | $ 7180 | ||||||||||||||||||||||||||||||||||||||||
4 to 12 | McPherson St | SR 20 | Discovery Rd | 2925 | 32 | 10400 | $ 244860 | $ 24 | $ 93600 | $ 93600 | 5 | 5 | 2925 | $ 84500 | 230 | 2 | 1200 | $ 44500 | $ - | $ - | 10 | $ 22260 | |||||||||||||||||||||||||||||||||||||
10 | Landes St | 12th St | 19th St | 1820 | 32 | 6471 | $ 151821 | $ 23 | $ 58240 | $ 58240 | 5 | 1400 | $ 39324 | 400 | $ 10000 | 2 | $ 30000 | $ 5000 | 10 | $ 14256 | |||||||||||||||||||||||||||||||||||||||
6 to 8 | Discovery Rd | 19th | Hastings Ave | 2900 | 22 | 7089 | $ 136565 | $ 19 | $ 63800 | $ 63800 | 15 | 10 | $ 47850 | 500 | $ 12500 | $ - | 10 | $ 12415 | |||||||||||||||||||||||||||||||||||||||||
8 to 12 | Hastings Ave | Discovery Rd | County Line | 8450 | 32 | 30044 | $ 542349 | $ 18 | $ 270400 | $ 270400 | 5 | 10 | 5000 | $ 197644 | 1000 | $ 25000 | $ - | 10 | $ 49304 | ||||||||||||||||||||||||||||||||||||||||
6 to 12 | Washington St | Van Buren St | SR20 | 2025 | 30 | 6750 | $ 118388 | $ 18 | $ 60750 | $ 60750 | 5 | 5 | $ 16875 | 0 | 0 | 0 | $ - | 2 | $ 30000 | $ - | 10 | $ 10763 | |||||||||||||||||||||||||||||||||||||
14 | Blaine St | San Juan Ave | Walker St | 1275 | 48 | 6800 | $ 113910 | $ 17 | $ 61200 | $ 61200 | 5 | $ 11900 | $ - | 2 | $ 30000 | $ 5000 | 10 | $ 10810 | |||||||||||||||||||||||||||||||||||||||||
6 | Washington St | Harrison St | Taylor St | 1175 | 33 | 4308 | $ 59240 | $ 14 | $ 38775 | $ 38775 | 10 | $ 15079 | $ - | $ - | 10 | $ 5385 | |||||||||||||||||||||||||||||||||||||||||||
8 to 10 | Sheridan St | SR 20 | 19th St | 4000 | 46 | 20444 | $ 272922 | $ 13 | $ 184000 | $ 184000 | 5 | 5 | $ 51111 | 200 | 2 | $ 13000 | $ - | 10 | $ 24811 | ||||||||||||||||||||||||||||||||||||||||
8 to 10 | 19th St | San Juan Ave | Sheridan St | 3200 | 48 | 17067 | $ 197120 | $ 12 | $ 153600 | $ 153600 | 3 | 3 | $ 25600 | 0 | 0 | 0 | $ - | $ - | 10 | $ 17920 | |||||||||||||||||||||||||||||||||||||||
10 to 20 | San Juan Ave | F St | Lopez Ave | 2800 | 32 | 9956 | $ 110059 | $ 11 | $ 89600 | $ 89600 | 3 | $ 10453 | $ - | $ - | 10 | $ 10005 | |||||||||||||||||||||||||||||||||||||||||||
10 to 20 | F St | Hastings Ave | Tyler St | 5300 | 31 | 18256 | $ 180730 | $ 10 | $ 164300 | $ 164300 | $ - | $ - | $ - | 10 | $ 16430 | ||||||||||||||||||||||||||||||||||||||||||||
$ 9952406 | $ 1873288 | $ 31744 | $ 274803 | $ 32667 | $ 332896 | $ 1998646 | $ 4544044 | $ 1155207 | $ 1747625 | $ 1215000 | $ 1290529 | $ - 0 | |||||||||||||||||||||||||||||||||||||||||||||||
Street Pavement Improvement Plan Projects | 9 | 110 | |||||||||||||||||||||||||||||||||||||||||||||
Road Name | From | To | Iworq ID | Length (ft) | Width (ft) | Area (yd^2) | Actual Area(SY) | Unit Cost per yd2 | Construction Cost | Prep Work | Survey Testing | ADA Curb Ramps | Storm Water | Mill amp Fill$50SY | Pre-Level$4SY | Total Construction | Project Cost + 10 | Unit Cost w Additional Costs no 10 | Engineering Costs | Notes | |||||||||||||||||||||||||||
Priority | Reconstruct | 2021 | 2022 | 2023 | 2024 | ||||||||||||||||||||||||||||||||||||||||||
1 | Reconstruct | Lawrence St | Cass St | Calhoun St | 1304 | 250 | 36 | 1000 | $ 80 | $ 80000 | $ 5000 | $ 20000 | $ 105000 | $ 115500 | $ 105 | Stormwater South Side Parking Raingarden on Cass | |||||||||||||||||||||||||||||||
2 | Reconstruct | Lawrence St | Walker St | Cass St | 250 | 36 | 1000 | $ 80 | $ 80000 | $ 5000 | $ 20000 | $ 5000 | $ 110000 | $ 121000 | $ 110 | Stormwater South Side Parking | |||||||||||||||||||||||||||||||
3 | Reconstruct Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | San Juan Ave | Lopez Ave | Admiralty | 2300 | 32 | 8178 | $ 50 | $ 408889 | $ 10000 | $ 100000 | $ 518889 | $ 570778 | $ 63 | Stormwater Problem 45th | ||||||||||||||||||||||||||||||||
4 | Reconstruct Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Polk St - Street Improvements | Lawrence St | 1056 Sarah Tiffany Sarah TiffanyGarfield | 1073 | 200 | 56 | 1244 | $ 50 | $ 62222 | X | X | X | $ 62222 | $ 68444 | $ 50 | Parking Theater 4 AC Watermain Infiltration or Rain Garden Parking on Condo Side | ||||||||||||||||||||||||||||||
Reconstruct | 47th Street | Pettygrove | McNeil | 500 | 18 | 1000 | 1548 | $ 50 | $ 50000 | $ 5000 | $ 40000 | $ 95000 | $ 104500 | $ 95 | $210000 Engineers Estimate With Engineering Cost Turnaround Spaghetti Waterline | ||||||||||||||||||||||||||||||||
Chip Seal - $50000 to $70000 per Mile | $6 No DigoutsPre-leveling | $10 with Additional Prep Work | |||||||||||||||||||||||||||||||||||||||||||||||
Chip Seal | Washington St | Van Buren St | SR20 | 2025 | 30 | 6750 | $ 10 | $ 67500 | $ 67500 | $ 74250 | Digouts Flagging | ||||||||||||||||||||||||||||||||||||
Chip Seal | Hastings Ave - Pre-level and widen shoulders | Discovery Rd | County Line | 8450 | 24 | 22533 | $ 6 | $ 135200 | $ 135200 | $ 148720 | Ditches amp Culverts Total Width change from 21 to 24 How wide will shoulders be | ||||||||||||||||||||||||||||||||||||
Tyler St | Jefferson St | Lawrence St | 900 | 32 | 3200 | $ 6 | $ 19200 | $ 19200 | $ 21120 | ||||||||||||||||||||||||||||||||||||||
Chip Seal | McPherson - Chip Seal | 4th St | Discovery Rd | 3100 | 32 | 11022 | $ 6 | $ 66133 | $ 66133 | $ 72747 | Ditches amp Culverts Shoulder Wideneing | ||||||||||||||||||||||||||||||||||||
Chip Seal | 19th St - Chip Seal | San Juan Ave | Sheridan St | 3200 | 48 | 17067 | $ 6 | $ 102400 | $ 102400 | $ 112640 | Bike Lanes amp Shoulder Prelevel | ||||||||||||||||||||||||||||||||||||
Chip Seal | Walnut | W Street | Jackson | 2300 | 22 | 5622 | $ 6 | $ 33733 | $ 33733 | $ 37107 | Dig-Outs Pre-Leveling Striping Shoulders | ||||||||||||||||||||||||||||||||||||
Chip Seal | Fir St - Chip Seal | F St | UCherry | 4360 | 22 | 10658 | $ 10 | $ 106578 | X | X | $ 106578 | $ 117236 | Dig-Outs Pre-Leveling Striping | ||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | |||||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | P St - Chip Seal | Redwood St | Cedar St | 0486 | 300 | 16 | 533 | $ 20 | $ 10667 | $ 10667 | $ 11733 | Watermain Looping Shouldnt this be part of Center | |||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 25th St - Chip Seal | Sheridan St | Holcomb St | 1200 | 18 | 2400 | $ 20 | $ 48000 | $ 48000 | $ 52800 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 14th St - Chip Seal | $ - | $ - | ||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Cedar St - Chip Seal | Redwood St | San Juan Ave | 1460 | 16 | 2596 | $ 20 | $ 51911 | $ 51911 | $ 57102 | Ex ChipSeal 22 Wide | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Center St - Chip Seal | Redwood St | San Juan Ave | 484 | 1660 | 16 | 2951 | $ 20 | $ 59022 | $ 59022 | $ 64924 | Ex ChipSeal 22 Wide Stormwater | |||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Grant St Chip Seal | 14th St | 16th St | 525 | 16 | 933 | $ 20 | $ 18667 | $ 18667 | $ 20533 | Ex Street 10 Wide | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 11th St Chip Seal | Hendricks St | Sheridan St | 550 | 16 | 978 | $ 20 | $ 19556 | $ 19556 | $ 21511 | Hospital Parking | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Hendricks St Chip Seal | 9th St | 12th St | 800 | 16 | 1422 | $ 20 | $ 28444 | $ 28444 | $ 31289 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 10th St Chip Seal | Hendricks St | Grant St | 1655 | 283 | 18 | 566 | $ 20 | $ 11320 | $ 11320 | $ 12452 | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Grant St Chip Seal | 14th St | 16th St | 525 | 18 | 1050 | $ 20 | $ 21000 | $ 21000 | $ 23100 | Ex Street 10 Wide Stormwater | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Hill St | 21st St | 19th St | 807 | 16 | 1435 | $ 20 | $ 28693 | $ 28693 | $ 31563 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Milo St -Chip seal | Olympic Ave | Pacific Ave | 0003 | 466 | 12 | 621 | $ 20 | $ 12427 | $ 12427 | $ 13669 | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Olympic St | Cedar St | Tremont St | 536 | 12 | 715 | $ 20 | $ 14293 | $ 14293 | $ 15723 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Benton St - street improvement | Blaine St | Lincoln Blg | 580 | 36 Sarah Tiffany Sarah TiffanyEstimated at 25-36 used higher number | Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Sarah Tiffany Sarah TiffanyGarfield | 2320 | $ 20 | $ 46400 | $ 46400 | $ 51040 | ||||||||||||||||||||||||||||||||||
Pave Gravel Road | |||||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Pacific St | Cedar St | Tremont St | 400 | 16 | 711 | $ 50 | $ 35556 | $ 6000 | $ 15000 | $ 56556 | $ 62211 | $ 80 | ||||||||||||||||||||||||||||||||||
58th St | Hill St | Kuhn St | 525 | 16 | 933 | $ 50 | $ 46667 | $ 6000 | $ 20000 | $ 72667 | $ 79933 | $ 78 | 4 AC Waterline Driveways Site Distance (Re-grade Slope) | ||||||||||||||||||||||||||||||||||
Sidewalks | |||||||||||||||||||||||||||||||||||||||||||||||
Harrison St | Franklin St | Clay St | 340 | 6 | 227 | $ 165 | $ 56100 | $ 5000 | $ 61100 | $ 67210 | $ 180 | ||||||||||||||||||||||||||||||||||||
9th St | Hancock St | McPherson St | 1300 | 6 | 867 | $ 165 | $ 214500 | $ 10000 | $ 15000 | $ 239500 | $ 263450 | $ 184 | |||||||||||||||||||||||||||||||||||
Asphalt Path | |||||||||||||||||||||||||||||||||||||||||||||||
Spruce St Easement | Cedar St | Center St | 150 | 8 | 133 | $ 50 | $ 6667 | $ 2000 | $ 8667 | $ 9533 | $ 65 | ||||||||||||||||||||||||||||||||||||
Cherry St | A St | E St | 990 | 10 | 1100 | $ 50 | $ 55000 | $ 10000 | $ 10000 | $ 15000 | $ 90000 | $ 99000 | $ 82 | ||||||||||||||||||||||||||||||||||
Gravel Path | |||||||||||||||||||||||||||||||||||||||||||||||
16th St | Thomas St | Grant St | 1700 | 6 | 1133 | $ 15 | $ 17000 | $ 1500 | $ 18500 | $ 20350 | |||||||||||||||||||||||||||||||||||||
Cleveland St | 21st St | 23rd St | 500 | 6 | 333 | $ 15 | $ 5000 | $ 5000 | $ 5500 | Need Easement | |||||||||||||||||||||||||||||||||||||
6 | - | $ 15 | $ - | $ - | $ - | Need Easement | |||||||||||||||||||||||||||||||||||||||||
6 | - | $ 15 | $ - | $ - | $ - | Need Easement | |||||||||||||||||||||||||||||||||||||||||
Total | $ 1582256 | $ 1792256 | $ 1971481 | ||||||||||||||||||||||||||||||||||||||||||||
Project Descriptioin | Length | Width | Construction Costs | ConstructionUnit Costs | Units | Engineering Costs | Total CostsUnit Cost | Total Costs | Total CostsUnit Cost | Notes | |||||||||||
Sidewalk | |||||||||||||||||||||
9th Street Sidewalk Grant Street to Hancock Street | 826 | 6 | $ 141506 | $ 17131 | LF | Construction Unit Cost per Foot | |||||||||||||||
Jefferson Street Sidewalk Washington Street to Taylor Street | 724 | 6 | $ 390502 | $ 53937 | LF | Construction Unit Cost per Foot | |||||||||||||||
Landis Street Sidewalk 10th Street to 19th Street | 1795 | 6 | $ 364550 | $ 20309 | LF | Construction Unit Cost per Foot | |||||||||||||||
ADA Corner Ramps | |||||||||||||||||||||
Washington Street amp Harrison Street | $ 42000 | $ 42000 | Each | ||||||||||||||||||
Washington Street amp Adams Street | $ 38150 | $ 19075 | Each | Two Corners Were Retrofitted | |||||||||||||||||
Chip Seal Pavement | |||||||||||||||||||||
Walker Street Washington Street to Lawrence Street | 1144 | 24 | $ 20000 | $ 656 | SY | Does not include flagging nor prep work | |||||||||||||||
Pulverize amp Asphalt Paving | |||||||||||||||||||||
Washington Street VanBuren Street to Harrison Street | 300 | 22 | $ 35000 | $ 4773 | SY | ||||||||||||||||
Asphalt Overlay | |||||||||||||||||||||
Sidewalks | ||||||||||||||||||||||||||||||||||||||
Harrison St | Franklin St | Clay St | 340 | 6 | 227 | |||||||||||||||||||||||||||||||||
9th St | Hancock St | McPherson St | 1300 | 6 | 867 | |||||||||||||||||||||||||||||||||
Asphalt Path | ||||||||||||||||||||||||||||||||||||||
Spruce St Easement | Cedar St | Center St | 150 | 8 | 133 | $ 2000 | $ 2000 | $ 2000 | ||||||||||||||||||||||||||||||
Cherry St | A St | E St | 990 | 10 | 1100 | $ 10000 | $ 10000 | $ 10000 | ||||||||||||||||||||||||||||||
Gravel Path | ||||||||||||||||||||||||||||||||||||||
16th St | Thomas St | Grant St | 1700 | 6 | 1133 | $ 1500 | $ 1500 | $ 1500 | ||||||||||||||||||||||||||||||
Cleveland St | 21st St | 23rd St | 500 | 6 | 333 | Need Easement | ||||||||||||||||||||||||||||||||
6 | - | Need Easement | ||||||||||||||||||||||||||||||||||||
6 | - | Need Easement | ||||||||||||||||||||||||||||||||||||
Total |
Type | Improvement | Cost Range SY | Cost Range LF | ||||||||
1 | Complete Road Rebuild | $80 | $100 | ||||||||
2 | Asphalt Overlay | $50 | $60 | ||||||||
3 | Pulverize amp Chip Seal | $20 | $30 | ||||||||
4 | Chip Seal | $6 | $10 | $12 | $25 | ||||||
5 | Seal Coat | ||||||||||
6 | |||||||||||
7 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 3-Inch | 413 | TONS | $ 15000 | $ 6187500 | 1000 x 22 x 025 httpwwwamerasphaltcomasphalthtm | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 1630 | CY | $ 4800 | $ 7824000 | Water Street Project = $48 CY (1000 x 22 x 2)27 = 1630 CY | ||||||
Gravel Borrow | 2282 | TONS | $ 3000 | $ 6846000 | (1000 x 22 x 2)27 = 1630 1630 CY x 14 = 2282 Tons | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 128 | Hours | $ 5728 | $ 733133 | (2) People for 64 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 25043033 | |||||||||||
$ 10247 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 2-Inch | 275 | TONS | $ 15000 | $ 4125000 | 1000 x 22 x 017 httpwwwamerasphaltcomasphalthtm | | ||||||
Digouts amp Pre-leveling | 122 | SY | $ 4900 | $ 597800 | |||||||
Flagging | 64 | Hours | $ 5728 | $ 366566 | (2) People for 32 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 180000 | $ 180000 | |||||||
$ 5403066 | |||||||||||
$ 2211 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 3-Inch | 413 | TONS | $ 15000 | $ 6187500 | 1000 x 22 x 025 httpwwwamerasphaltcomasphalthtm | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 150 | CY | $ 4800 | $ 720000 | Water Street Project = $48 CY | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 96 | Hours | $ 5728 | $ 549850 | (2) People for 48 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 10909750 | |||||||||||
$ 4464 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Chip Seal | 2444 | SY | $ 1050 | $ 2566200 | 1000 X 22 | Unit Cost $525 SY from Walker Street County Invoice Doubled to $1050 for Chip Seal Over Gravel | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 150 | CY | $ 4800 | $ 720000 | Water Street Project = $48 CY | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 80 | Hours | $ 5728 | $ 458208 | (2) People for 40 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | Hours | $ 12500 | $ - 0 | High Average Loaded Rate No Testing | ||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 7196808 | |||||||||||
$ 2945 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 1500000 | $614 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 500 | LF | $ 5000 | $ 2500000 | |||||||
Catch Basins | 4 | EACH | $ 150000 | $ 600000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Chip Seal | 2444 | SY | $ 525 | $ 1283100 | 1000 X 22 | Unit Cost from Walker Street County Invoice | ||||||
Digouts amp Pre-leveling | 122 | SY | $ 4900 | $ 598780 | Cost from 2018 Lakeside Mill amp Fill | Estimate Quanity Based on 5 | ||||||
Flagging | 32 | Hours | $ 5728 | $ 183283 | (2) People for 16 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | Hours | $ 12500 | $ - 0 | High Average Loaded Rate No Surveying or Testing | ||||||
Surveying | 1 | LS | $ - 0 | $ - 0 | |||||||
$ 2198863 | |||||||||||
$ 900 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 1500000 | $614 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY |
Project Descriptioin | Length | Width | Construction Costs | Engineering Costs | Engineering Total | Digouts Pre-Leveling Costs | Digouts Pre-Leveling Total | ADACosts | ADATotal | StormwaterCosts | StormwaterTotal | Total Costsby SY | Cost Per 250 Block | Length | Width | Notes | |||||||||||||||||
Chip Seal Pavement | |||||||||||||||||||||||||||||||||
Walker Street Washington Street to Lawrence Street | 1144 | 24 | $ 25000 | 15 | $ 3750 | 10 | $ 2500 | $ 1024 | $ 682911 | 250 | 24 | ||||||||||||||||||||||
Pulverize amp Chip Seal | |||||||||||||||||||||||||||||||||
Engineers Estimate | 250 | 24 | $ 22000 | 15 | $ 3300 | 0 | $ - | 20 | $ 4400 | $ 4455 | $ 2970000 | 250 | 24 | ||||||||||||||||||||
Pulverize amp Asphalt Paving | |||||||||||||||||||||||||||||||||
Washington Street VanBuren Street to Harrison Street | 300 | 22 | $ 35000 | 20 | $ 7000 | 0 | $ - | 10 | $ 3500 | 20 | $ 7000 | $ 7159 | $ 4772727 | 250 | 24 | ||||||||||||||||||
Asphalt Overlay (2) | |||||||||||||||||||||||||||||||||
Engineers Estimate | 250 | 24 | $ 21334 | 20 | $ 426680 | 10 | $ 2133 | 20 | $ 426680 | 20 | $ 426680 | $ 5440 | $ 4835707 | 250 | 32 | ||||||||||||||||||
Reconstruction | |||||||||||||||||||||||||||||||||
Walker Street Lawrence Street to Blaine Street | 650 | 36 | $ 184310 | 25 | $ 46078 | 0 | $ - | 20 | $ 36862 | 30 | $ 55293 | $ 12405 | $ 11027094 | 250 | 32 | ||||||||||||||||||
RSL | Length (FT) | Area (SY) | Condition | Treatment | Cost | Total | |||||||||
20 | 61834 | 138524 | 131 | Good | $0 | $0 | |||||||||
14 | 23656 | 49915 | 47 | Satisfactory | Chip Seal | $29 | $1470552 | ||||||||
12 | 43586 | 106382 | 100 | $3134134 | |||||||||||
10 | 74803 | 193570 | 182 | $5702790 | |||||||||||
8 | 96662 | 228046 | 215 | $6718492 | |||||||||||
6 | 95452 | 261794 | 247 | Fair | Overlay | $67 | $17489930 | ||||||||
4 | 6420 | 14536 | 14 | $971121 | |||||||||||
2 | 29238 | 60616 | 57 | Poor | Rehab | $107 | $6492850 | ||||||||
0 | 3851 | 7532 | 07 | Very Poor | Rebuild | $155 | $1169719 | ||||||||
$43149589 | |||||||||||||||
Additional Paving Costs | Average Cost per SY | Percent of Paving Cost | |||
Digouts amp Pre-Leveling | $4 | 25 | |||
Stormwater | $7 | 38 | |||
ADA | $5 | 27 | |||
Engineering amp Administration | $5 | 28 |
9 | Base Paving Costs | Preperation | Stormwater | ADA | Engineering | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Remaining Service Life | Road Name | From | To | Length (ft) | Width (ft) | Area (SY) | Total Construction | Price(SY) | Reconstruction | Pulverize amp Pave | Ashpalt Overlay | Pave Gravel Road | Pulverize amp Chip Seal | Chip Seal | Total Base Paving Costs | Digouts(SY) | Pre-Leveling(SY) | Construct Shoulders Both Sides (LF) | Preparation Total | StormwaterPipes (LF) | StormwaterCatchbasins | StormwaterSwales (LF) | Stormwater Total | Curb Ramps | Curb Ramps Total | Surveying | Engineering amp Administration | Engineering amp Administration Total | Other Work | ||||||||||||||||||||||||||||||
$102 | $45 | $22 | $35 | $29 | $9 | $35 | $15 | $20 | $50 | $1500 | $25 | $15000 | |||||||||||||||||||||||||||||||||||||||||||||||
2 | Polk St - Street | Lawrence St | 1056 | 200 | 56 | 1244 | $ 210679 | $ 169 | $ 127518 | $ 127518 | $ - | 150 | 1 | 1 | $ 9025 | 2 | $ 30000 | $ 10000 | 25 | $ 44136 | |||||||||||||||||||||||||||||||||||||||
6 | 47th Street | Pettygrove | McNeil | 500 | 18 | 1548 | $ 258717 | $ 167 | $ 158624 | $ 158624 | $ - | 687 | 8 | $ 46350 | $ - | $ 10000 | 25 | $ 53743 | |||||||||||||||||||||||||||||||||||||||||
6 to 10 | Lawrence St | Calhoun St | Harrison St | 1200 | 36 | 4800 | $ 786070 | $ 164 | $ 491856 | $ 491856 | 600 | $ 15000 | $ 8 | $ 120000 | $ 10000 | 25 | $ 159214 | ||||||||||||||||||||||||||||||||||||||||||
8 | Lawrence St | Cass St | Calhoun St | 250 | 36 | 1000 | $ 146213 | $ 146 | $ 102470 | $ 102470 | 0 | 0 | $ - | 75 | 350 | $ 12500 | $ - | $ 10000 | 25 | $ 31243 | |||||||||||||||||||||||||||||||||||||||
8 | Lawrence St | Walker St | Cass St | 250 | 36 | 1000 | $ 144650 | $ 145 | $ 102470 | $ 102470 | $ - | 100 | 250 | $ 11250 | $ - | $ 10000 | 25 | $ 30930 | |||||||||||||||||||||||||||||||||||||||||
4 to 8 | San Juan Ave | Lopez Ave | Admiralty | 2300 | 34 | 8689 | $ 1222938 | $ 141 | $ 890350 | $ 890350 | $ - | 800 | 5 | 1500 | $ 85000 | $ - | $ 15000 | 25 | $ 247588 | ||||||||||||||||||||||||||||||||||||||||
6 to 8 | Lawrence St | Harrison St | Monroe St | 2380 | 47 | 12429 | $ 1331314 | $ 107 | $ 274803 | $ 274803 | 15 | 5 | $ 74573 | 1900 | 10 | $ 110000 | 50 | $ 750000 | $ 10000 | 10 | $ 121938 | ||||||||||||||||||||||||||||||||||||||
2 to 4 | Center St | San Juan Ave | Redwood St | 1660 | 16 | 2951 | $ 295222 | $ 100 | $ 86910 | $ 86910 | $ - | 1600 | 9 | 3000 | $ 168500 | $ - | $ 10000 | 15 | $ 39812 | ||||||||||||||||||||||||||||||||||||||||
0 to 6 | Pacific St | Cedar St | Tremont St | 400 | 16 | 711 | $ 66581 | $ 94 | $ 31744 | $ 31744 | $ - | 100 | 2 | 700 | $ 25500 | $ - | $ 5000 | 15 | $ 9337 | ||||||||||||||||||||||||||||||||||||||||
0 to 6 | Benton St | Lawrence | Lincoln Blg | 580 | 36 | 2320 | $ 203265 | $ 88 | $ 20880 | $ 20880 | 20 | 10 | $ 19720 | 250 | 2 | $ 15500 | 8 | $ 120000 | $ 5000 | 15 | $ 27165 | ||||||||||||||||||||||||||||||||||||||
2 | Grant St | 14th St | 16th St | 525 | 16 | 933 | $ 73635 | $ 79 | $ 27487 | $ 27487 | $ - | 400 | 2 | 500 | $ 35500 | $ - | $ 8000 | 15 | $ 10648 | ||||||||||||||||||||||||||||||||||||||||
2 to 6 | Olympic St | Cedar St | Tremont St | 536 | 12 | 715 | $ 52716 | $ 74 | $ 21047 | $ 21047 | $ - | 950 | $ 23750 | $ - | $ 8000 | 15 | $ 7920 | ||||||||||||||||||||||||||||||||||||||||||
2 | Milo St | Olympic Ave | Pacific Ave | 466 | 12 | 621 | $ 44793 | $ 72 | $ 18298 | $ 18298 | $ - | 800 | $ 20000 | $ - | $ 5000 | 15 | $ 6495 | ||||||||||||||||||||||||||||||||||||||||||
0 | 11th St | Hendricks St | Sheridan St | 550 | 16 | 978 | $ 65077 | $ 67 | $ 28796 | $ 28796 | $ - | 100 | 2 | 750 | $ 26750 | $ - | $ 8000 | 15 | $ 9532 | ||||||||||||||||||||||||||||||||||||||||
0 | 58th St | Hill St | Kuhn St | 525 | 16 | 933 | $ 60329 | $ 65 | $ 32667 | $ 32667 | $ - | 750 | $ 18750 | $ - | $ 8000 | 15 | $ 8913 | ||||||||||||||||||||||||||||||||||||||||||
2 | 10th St | Hendricks St | Grant St | 283 | 18 | 566 | $ 34294 | $ 61 | $ 16669 | $ 16669 | $ - | 500 | $ 12500 | $ - | $ 5000 | 15 | $ 5125 | ||||||||||||||||||||||||||||||||||||||||||
4 to 10 | 31st St | Hancock St | Sheridan St | 1050 | 22 | 2567 | $ 150027 | $ 58 | $ 23100 | $ 23100 | 10 | 10 | $ 12833 | 1200 | 10 | 1000 | $ 100000 | $ - | $ 5000 | 10 | $ 14093 | ||||||||||||||||||||||||||||||||||||||
6 | 25th St | Sheridan St | Holcomb St | 1200 | 18 | 2400 | $ 125895 | $ 52 | $ 70680 | $ 70680 | $ - | 125 | 1 | 1200 | $ 37750 | $ - | $ 8000 | 15 | $ 17465 | ||||||||||||||||||||||||||||||||||||||||
6 | Holcomb St | 7th St | 10th St | 850 | 12 | 1133 | $ 58703 | $ 52 | $ 10200 | $ 10200 | 10 | 10 | $ 5667 | 1500 | $ 37500 | $ - | $ - | 10 | $ 5337 | ||||||||||||||||||||||||||||||||||||||||
2 | Hendricks St | 9th St | 12th St | 800 | 16 | 1422 | $ 70930 | $ 50 | $ 41884 | $ 41884 | $ - | 750 | $ 18750 | $ - | $ 8000 | 15 | $ 10295 | ||||||||||||||||||||||||||||||||||||||||||
2 to 6 | Hill St | 19th | 21st St | 807 | 16 | 1435 | $ 67443 | $ 47 | $ 21125 | $ 6456 | $ 27581 | 10 | $ 5021 | 1000 | $ 25000 | $ - | $ 8000 | 15 | $ 9840 | ||||||||||||||||||||||||||||||||||||||||
2 to 8 | 57th St | Jackman St | Kuhn St | 800 | 18 | 1600 | $ 66550 | $ 42 | $ 14400 | $ 14400 | 20 | 10 | $ 13600 | 1300 | $ 32500 | 10 | $ 6050 | ||||||||||||||||||||||||||||||||||||||||||
6 to 8 | Sheridan St | Hastings Ave | SilverUmatilla | 1750 | 22 | 4278 | $ 154115 | $ 36 | $ 38500 | $ 38500 | 20 | 10 | $ 36361 | 300 | 4 | 1500 | $ 58500 | $ - | $ 5000 | 15 | $ 20754 | ||||||||||||||||||||||||||||||||||||||
6 to 10 | Tyler St | Jefferson St | Lawrence St | 900 | 32 | 3200 | $ 115280 | $ 36 | $ 28800 | $ 28800 | 5 | 5 | $ 8000 | 100 | 2 | $ 8000 | 4 | $ 60000 | 10 | $ 10480 | |||||||||||||||||||||||||||||||||||||||
6 to 14 | 14th St | McPherson St | Sheridan St | 2375 | 21 | 5542 | $ 182027 | $ 33 | $ 49875 | $ 49875 | 20 | 10 | $ 47104 | 750 | 4 | 1000 | $ 68500 | $ - | 10 | $ 16548 | |||||||||||||||||||||||||||||||||||||||
8 | 49th St | Kuhn St | Admiralty Ave | 400 | 24 | 1067 | $ 34613 | $ 32 | $ 9600 | $ 9600 | 5 | $ 1867 | 800 | $ 20000 | $ - | 10 | $ 3147 | ||||||||||||||||||||||||||||||||||||||||||
6 to 10 | Fir St | F St | UCherry | 4360 | 22 | 10658 | $ 341621 | $ 32 | $ 95920 | $ 95920 | 5 | 5 | 4000 | $ 106644 | 100 | 2 | 4000 | $ 108000 | $ - | 10 | $ 31056 | ||||||||||||||||||||||||||||||||||||||
6 to 8 | Cedar St | San Juan Ave | Redwood St | 1460 | 16 | 2596 | $ 81747 | $ 31 | $ 23360 | $ 23360 | 20 | 20 | $ 25956 | 1000 | $ 25000 | $ - | 10 | $ 7432 | |||||||||||||||||||||||||||||||||||||||||
8 | Clallam St | McKinley St | Roosevelt St | 975 | 14 | 1517 | $ 46796 | $ 31 | $ 13650 | $ 13650 | 20 | 10 | $ 12892 | 200 | 4 | $ 16000 | $ - | 10 | $ 4254 | ||||||||||||||||||||||||||||||||||||||||
6 | San Juan Ave | 19th St | 20th St | 300 | 31 | 1033 | $ 31827 | $ 31 | $ 9300 | $ 9300 | 50 | 10 | $ 19633 | $ - | $ - | 10 | $ 2893 | ||||||||||||||||||||||||||||||||||||||||||
6 to 20 | Cherry St | F St | W St | 4200 | 32 | 14933 | $ 457307 | $ 31 | $ 134400 | $ 134400 | 5 | 5 | 4200 | $ 121333 | 200 | 6000 | $ 160000 | $ - | 10 | $ 41573 | |||||||||||||||||||||||||||||||||||||||
6 to 8 | Jackman St | 45th St | 49th St | 1100 | 22 | 2689 | $ 81940 | $ 30 | $ 24200 | $ 24200 | 15 | 10 | $ 18150 | 225 | 3 | 500 | $ 28250 | $ - | $ 5000 | 15 | $ 11340 | ||||||||||||||||||||||||||||||||||||||
6 to 12 | Jackson St | LawrenceMonroe | Roosevelt St | 1600 | 18 | 3200 | $ 93530 | $ 29 | $ 28800 | $ 28800 | 10 | 10 | $ 16000 | 1000 | $ 25000 | 1 | $ 15000 | $ 2500 | 10 | $ 8730 | |||||||||||||||||||||||||||||||||||||||
2 | 7th St | Wilson St | Holcomb St | 450 | 16 | 800 | $ 23320 | $ 29 | $ 7200 | $ 7200 | 10 | 10 | $ 4000 | 400 | $ 10000 | $ - | 10 | $ 2120 | |||||||||||||||||||||||||||||||||||||||||
8 to 14 | 25th St | Sherman St | Sheridan St | 800 | 20 | 1778 | $ 50061 | $ 28 | $ 16000 | $ 16000 | 10 | 5 | $ 7556 | 1 | 800 | $ 21500 | $ - | $ 5000 | 10 | $ 5006 | |||||||||||||||||||||||||||||||||||||||
2 to 6 | Hancock St | SR 20 | 9th St | 1100 | 20 | 2444 | $ 67833 | $ 28 | $ 22000 | $ 22000 | 15 | 5 | $ 14667 | 1000 | $ 25000 | $ - | 10 | $ 6167 | |||||||||||||||||||||||||||||||||||||||||
Benton St | Washington St | Lawrence St | 1160 | 22 | 2836 | $ 74468 | $ 26 | $ 25520 | $ 25520 | 10 | 10 | $ 14178 | 140 | 4 | 600 | $ 28000 | 10 | $ 6770 | |||||||||||||||||||||||||||||||||||||||||
W St | San JuanAdmiralty | Walnut St | 2560 | 22 | 6258 | $ 163807 | $ 26 | $ 56320 | $ 56320 | 10 | 5 | $ 26596 | 200 | 4 | 2000 | $ 66000 | $ - | 10 | $ 14892 | ||||||||||||||||||||||||||||||||||||||||
6 to 8 | Walnut | W Street | Jackson | 2300 | 22 | 5622 | $ 145194 | $ 26 | $ 50600 | $ 50600 | 10 | 5 | $ 23894 | 2300 | $ 57500 | $ - | 10 | $ 13199 | |||||||||||||||||||||||||||||||||||||||||
6 to 8 | 24th St | Discovery Rd | San Juan Ave | 1250 | 18 | 2500 | $ 63938 | $ 26 | $ 22500 | $ 22500 | 10 | 5 | $ 10625 | 1000 | $ 25000 | $ - | 10 | $ 5813 | |||||||||||||||||||||||||||||||||||||||||
6 to 10 | Tyler St | Lawrence St | Blaine St | 900 | 32 | 3200 | $ 78980 | $ 25 | $ 28800 | $ 28800 | 5 | 5 | $ 8000 | 200 | $ 5000 | 2 | $ 30000 | 10 | $ 7180 | ||||||||||||||||||||||||||||||||||||||||
4 to 12 | McPherson St | SR 20 | Discovery Rd | 2925 | 32 | 10400 | $ 244860 | $ 24 | $ 93600 | $ 93600 | 5 | 5 | 2925 | $ 84500 | 230 | 2 | 1200 | $ 44500 | $ - | $ - | 10 | $ 22260 | |||||||||||||||||||||||||||||||||||||
10 | Landes St | 12th St | 19th St | 1820 | 32 | 6471 | $ 151821 | $ 23 | $ 58240 | $ 58240 | 5 | 1400 | $ 39324 | 400 | $ 10000 | 2 | $ 30000 | $ 5000 | 10 | $ 14256 | |||||||||||||||||||||||||||||||||||||||
6 to 8 | Discovery Rd | 19th | Hastings Ave | 2900 | 22 | 7089 | $ 136565 | $ 19 | $ 63800 | $ 63800 | 15 | 10 | $ 47850 | 500 | $ 12500 | $ - | 10 | $ 12415 | |||||||||||||||||||||||||||||||||||||||||
8 to 12 | Hastings Ave | Discovery Rd | County Line | 8450 | 32 | 30044 | $ 542349 | $ 18 | $ 270400 | $ 270400 | 5 | 10 | 5000 | $ 197644 | 1000 | $ 25000 | $ - | 10 | $ 49304 | ||||||||||||||||||||||||||||||||||||||||
6 to 12 | Washington St | Van Buren St | SR20 | 2025 | 30 | 6750 | $ 118388 | $ 18 | $ 60750 | $ 60750 | 5 | 5 | $ 16875 | 0 | 0 | 0 | $ - | 2 | $ 30000 | $ - | 10 | $ 10763 | |||||||||||||||||||||||||||||||||||||
14 | Blaine St | San Juan Ave | Walker St | 1275 | 48 | 6800 | $ 113910 | $ 17 | $ 61200 | $ 61200 | 5 | $ 11900 | $ - | 2 | $ 30000 | $ 5000 | 10 | $ 10810 | |||||||||||||||||||||||||||||||||||||||||
6 | Washington St | Harrison St | Taylor St | 1175 | 33 | 4308 | $ 59240 | $ 14 | $ 38775 | $ 38775 | 10 | $ 15079 | $ - | $ - | 10 | $ 5385 | |||||||||||||||||||||||||||||||||||||||||||
8 to 10 | Sheridan St | SR 20 | 19th St | 4000 | 46 | 20444 | $ 272922 | $ 13 | $ 184000 | $ 184000 | 5 | 5 | $ 51111 | 200 | 2 | $ 13000 | $ - | 10 | $ 24811 | ||||||||||||||||||||||||||||||||||||||||
8 to 10 | 19th St | San Juan Ave | Sheridan St | 3200 | 48 | 17067 | $ 197120 | $ 12 | $ 153600 | $ 153600 | 3 | 3 | $ 25600 | 0 | 0 | 0 | $ - | $ - | 10 | $ 17920 | |||||||||||||||||||||||||||||||||||||||
10 to 20 | San Juan Ave | F St | Lopez Ave | 2800 | 32 | 9956 | $ 110059 | $ 11 | $ 89600 | $ 89600 | 3 | $ 10453 | $ - | $ - | 10 | $ 10005 | |||||||||||||||||||||||||||||||||||||||||||
10 to 20 | F St | Hastings Ave | Tyler St | 5300 | 31 | 18256 | $ 180730 | $ 10 | $ 164300 | $ 164300 | $ - | $ - | $ - | 10 | $ 16430 | ||||||||||||||||||||||||||||||||||||||||||||
$ 9952406 | $ 1873288 | $ 31744 | $ 274803 | $ 32667 | $ 332896 | $ 1998646 | $ 4544044 | $ 1155207 | $ 1747625 | $ 1215000 | $ 1290529 | $ - 0 | |||||||||||||||||||||||||||||||||||||||||||||||
Estimated 2020 Revenues 2020Motor Vehicle Fuel Tax $217000
Utility Tax $695000
P A V E M E N TO P T I O N S
1 Chip Seal
2 Pulverize and Chip Seal
3 Asphalt Overlay
4 Pulverize and Asphalt Paving
5 Reconstruction
$
$$
$$
$$$
$$$$$
Cost Treatment______
C H I P S E A L
bull $7065 per Block (250rsquox24rsquo)
bull $1104 SY
bull Seals Cracks
bull Provides a Wear Course
bull 10 ndash 15 Year Longevity
P U L V E R I Z E C H I P S E A L
bull $21680 per Block (250rsquox24rsquo)
bull $3252 SY
bull Generally Requires Some Stormwater Infrastructure
bull 10 ndash 15 Year Longevity
A S P H A L TO V E R L A Y
bull $22596 per Block (250rsquox32rsquo)
bull $2542 SY
bull Generally Requires Some Stormwater Infrastructure
bull Requires ADA Ramp Upgrades If Adjacent
bull 15 ndash 25 Year Longevity
P U L V E R I Z E A S P H A L T
bull $34222 per Block (250rsquox24rsquo)
bull $5133 SY
bull Generally Requires Some Stormwater Infrastructure
bull Requires ADA Ramp Upgrades If Adjacent
bull 15 ndash 25 Year LongevityWashington Street amp Harrison Street
R E C O N S T R U C T I O N
bull $99004 per Block (250rsquox32rsquo)
bull $11138 SY
bull Generally Requires Stormwater Infrastructure
bull Requires ADA Ramp Upgrades If Adjacent
bull 20 ndash 25 Year LongevityWater Street amp Fillmore Street
A D D I T I O N A L C O S T S
bull Drainage Swales amp Stormwater Infrastructure
bull Digoutsbull ADA Curb Rampsbull EngineeringAdministrationbull Digouts and pre-level
Stormwater at Pacific Avenue amp Milo Street
ADA needs at Lawrence Street amp Adams Street
Insert I worq street rating
1 How many street segments were rated
1 Insert map of 10 year program
1 Insert table Too small to read is ok Wersquoll include it as a handout in 11x17
Rem
aini
ng
Serv
ice Li
feRoad Name From To
Length (ft)
Width (ft)
Area (SY)
Total Construction
Price(SY)
Re
cons
truc
tion
Pul
veriz
e amp
Pa
ve
Ash
palt
Ove
rlay
Pav
e Gr
avel
Ro
ad
Pul
veriz
e amp
Ch
ip S
eal
Chi
p Se
al
Tot
al B
ase
Pavi
ng C
osts
Dig
outs
(SY)
Pre
-Lev
elin
g(S
Y)
Con
stru
ct
Shou
lder
s Bot
h Si
des (
LF)
Pre
para
tion
Tota
l
Sto
rmw
ater
Pipe
s (LF
)
Sto
rmw
ater
Catc
hbas
ins
Sto
rmw
ater
Swal
es (L
F)
Sto
rmw
ater
To
tal
Cur
b Ra
mps
Cur
b Ra
mps
To
tal
Sur
veyi
ng
Eng
inee
ring
amp
Adm
inist
ratio
n
Eng
inee
ring
amp
Adm
inist
ratio
n To
tal
$102 $45 $22 $35 $29 $9 $35 $15 $20 $50 $1500 $25 $150002 Polk St - Street Lawrence St 1056 200 56 1244 210679$ 169$ 127518$ 127518$ -$ 150 1 1 9025$ 2 30000$ 10000$ 25 44136$ 6 47th Street Pettygrove McNeil 500 18 1548 258717$ 167$ 158624$ 158624$ -$ 687 8 46350$ -$ 10000$ 25 53743$
6 to 10 Lawrence St Calhoun St Harrison St 1200 36 4800 786070$ 164$ 491856$ 491856$ 600 15000$ 8$ 120000$ 10000$ 25 159214$ 8 Lawrence St Cass St Calhoun St 250 36 1000 146213$ 146$ 102470$ 102470$ 0 0 -$ 75 350 12500$ -$ 10000$ 25 31243$ 8 Lawrence St Walker St Cass St 250 36 1000 144650$ 145$ 102470$ 102470$ -$ 100 250 11250$ -$ 10000$ 25 30930$
4 to 8 San Juan Ave Lopez Ave Admiralty 2300 34 8689 1222938$ 141$ 890350$ 890350$ -$ 800 5 1500 85000$ -$ 15000$ 25 247588$ 6 to 8 Lawrence St Harrison St Monroe St 2380 47 12429 1331314$ 107$ 274803$ 274803$ 15 5 74573$ 1900 10 110000$ 50 750000$ 10000$ 10 121938$ 2 to 4 Center St San Juan Ave Redwood St 1660 16 2951 295222$ 100$ 86910$ 86910$ -$ 1600 9 3000 168500$ -$ 10000$ 15 39812$ 0 to 6 Pacific St Cedar St Tremont St 400 16 711 66581$ 94$ 31744$ 31744$ -$ 100 2 700 25500$ -$ 5000$ 15 9337$ 0 to 6 Benton St Lawrence Lincoln Blg 580 36 2320 203265$ 88$ 20880$ 20880$ 20 10 19720$ 250 2 15500$ 8 120000$ 5000$ 15 27165$
2 Grant St 14th St 16th St 525 16 933 73635$ 79$ 27487$ 27487$ -$ 400 2 500 35500$ -$ 8000$ 15 10648$ 2 to 6 Olympic St Cedar St Tremont St 536 12 715 52716$ 74$ 21047$ 21047$ -$ 950 23750$ -$ 8000$ 15 7920$
2 Milo St Olympic Ave Pacific Ave 466 12 621 44793$ 72$ 18298$ 18298$ -$ 800 20000$ -$ 5000$ 15 6495$ 0 11th St Hendricks St Sheridan St 550 16 978 65077$ 67$ 28796$ 28796$ -$ 100 2 750 26750$ -$ 8000$ 15 9532$ 0 58th St Hill St Kuhn St 525 16 933 60329$ 65$ 32667$ 32667$ -$ 750 18750$ -$ 8000$ 15 8913$ 2 10th St Hendricks St Grant St 283 18 566 34294$ 61$ 16669$ 16669$ -$ 500 12500$ -$ 5000$ 15 5125$
4 to 10 31st St Hancock St Sheridan St 1050 22 2567 150027$ 58$ 23100$ 23100$ 10 10 12833$ 1200 10 1000 100000$ -$ 5000$ 10 14093$ 6 25th St Sheridan St Holcomb St 1200 18 2400 125895$ 52$ 70680$ 70680$ -$ 125 1 1200 37750$ -$ 8000$ 15 17465$ 6 Holcomb St 7th St 10th St 850 12 1133 58703$ 52$ 10200$ 10200$ 10 10 5667$ 1500 37500$ -$ -$ 10 5337$ 2 Hendricks St 9th St 12th St 800 16 1422 70930$ 50$ 41884$ 41884$ -$ 750 18750$ -$ 8000$ 15 10295$
2 to 6 Hill St 19th 21st St 807 16 1435 67443$ 47$ 21125$ 6456$ 27581$ 10 5021$ 1000 25000$ -$ 8000$ 15 9840$ 2 to 8 57th St Jackman St Kuhn St 800 18 1600 66550$ 42$ 14400$ 14400$ 20 10 13600$ 1300 32500$ 10 6050$ 6 to 8 Sheridan St Hastings Ave SilverUmatilla 1750 22 4278 154115$ 36$ 38500$ 38500$ 20 10 36361$ 300 4 1500 58500$ -$ 5000$ 15 20754$ 6 to 10 Tyler St Jefferson St Lawrence St 900 32 3200 115280$ 36$ 28800$ 28800$ 5 5 8000$ 100 2 8000$ 4 60000$ 10 10480$ 6 to 14 14th St McPherson St Sheridan St 2375 21 5542 182027$ 33$ 49875$ 49875$ 20 10 47104$ 750 4 1000 68500$ -$ 10 16548$
8 49th St Kuhn St Admiralty Ave 400 24 1067 34613$ 32$ 9600$ 9600$ 5 1867$ 800 20000$ -$ 10 3147$ 6 to 10 Fir St F St UCherry 4360 22 10658 341621$ 32$ 95920$ 95920$ 5 5 4000 106644$ 100 2 4000 108000$ -$ 10 31056$ 6 to 8 Cedar St San Juan Ave Redwood St 1460 16 2596 81747$ 31$ 23360$ 23360$ 20 20 25956$ 1000 25000$ -$ 10 7432$
8 Clallam St McKinley St Roosevelt St 975 14 1517 46796$ 31$ 13650$ 13650$ 20 10 12892$ 200 4 16000$ -$ 10 4254$ 6 San Juan Ave 19th St 20th St 300 31 1033 31827$ 31$ 9300$ 9300$ 50 10 19633$ -$ -$ 10 2893$
6 to 20 Cherry St F St W St 4200 32 14933 457307$ 31$ 134400$ 134400$ 5 5 4200 121333$ 200 6000 160000$ -$ 10 41573$ 6 to 8 Jackman St 45th St 49th St 1100 22 2689 81940$ 30$ 24200$ 24200$ 15 10 18150$ 225 3 500 28250$ -$ 5000$ 15 11340$ 6 to 12 Jackson St LawrenceMonroe Roosevelt St 1600 18 3200 93530$ 29$ 28800$ 28800$ 10 10 16000$ 1000 25000$ 1 15000$ 2500$ 10 8730$
2 7th St Wilson St Holcomb St 450 16 800 23320$ 29$ 7200$ 7200$ 10 10 4000$ 400 10000$ -$ 10 2120$ 8 to 14 25th St Sherman St Sheridan St 800 20 1778 50061$ 28$ 16000$ 16000$ 10 5 7556$ 1 800 21500$ -$ 5000$ 10 5006$ 2 to 6 Hancock St SR 20 9th St 1100 20 2444 67833$ 28$ 22000$ 22000$ 15 5 14667$ 1000 25000$ -$ 10 6167$
Benton St Washington St Lawrence St 1160 22 2836 74468$ 26$ 25520$ 25520$ 10 10 14178$ 140 4 600 28000$ 10 6770$ W St San JuanAdmiralty Walnut St 2560 22 6258 163807$ 26$ 56320$ 56320$ 10 5 26596$ 200 4 2000 66000$ -$ 10 14892$
6 to 8 Walnut W Street Jackson 2300 22 5622 145194$ 26$ 50600$ 50600$ 10 5 23894$ 2300 57500$ -$ 10 13199$ 6 to 8 24th St Discovery Rd San Juan Ave 1250 18 2500 63938$ 26$ 22500$ 22500$ 10 5 10625$ 1000 25000$ -$ 10 5813$ 6 to 10 Tyler St Lawrence St Blaine St 900 32 3200 78980$ 25$ 28800$ 28800$ 5 5 8000$ 200 5000$ 2 30000$ 10 7180$ 4 to 12 McPherson St SR 20 Discovery Rd 2925 32 10400 244860$ 24$ 93600$ 93600$ 5 5 2925 84500$ 230 2 1200 44500$ -$ -$ 10 22260$
10 Landes St 12th St 19th St 1820 32 6471 151821$ 23$ 58240$ 58240$ 5 1400 39324$ 400 10000$ 2 30000$ 5000$ 10 14256$ 6 to 8 Discovery Rd 19th Hastings Ave 2900 22 7089 136565$ 19$ 63800$ 63800$ 15 10 47850$ 500 12500$ -$ 10 12415$ 8 to 12 Hastings Ave Discovery Rd County Line 8450 32 30044 542349$ 18$ 270400$ 270400$ 5 10 5000 197644$ 1000 25000$ -$ 10 49304$ 6 to 12 Washington St Van Buren St SR20 2025 30 6750 118388$ 18$ 60750$ 60750$ 5 5 16875$ 0 0 0 -$ 2 30000$ -$ 10 10763$
14 Blaine St San Juan Ave Walker St 1275 48 6800 113910$ 17$ 61200$ 61200$ 5 11900$ -$ 2 30000$ 5000$ 10 10810$ 6 Washington St Harrison St Taylor St 1175 33 4308 59240$ 14$ 38775$ 38775$ 10 15079$ -$ -$ 10 5385$
8 to 10 Sheridan St SR 20 19th St 4000 46 20444 272922$ 13$ 184000$ 184000$ 5 5 51111$ 200 2 13000$ -$ 10 24811$ 8 to 10 19th St San Juan Ave Sheridan St 3200 48 17067 197120$ 12$ 153600$ 153600$ 3 3 25600$ 0 0 0 -$ -$ 10 17920$
10 to 20 San Juan Ave F St Lopez Ave 2800 32 9956 110059$ 11$ 89600$ 89600$ 3 10453$ -$ -$ 10 10005$ 10 to 20 F St Hastings Ave Tyler St 5300 31 18256 180730$ 10$ 164300$ 164300$ -$ -$ -$ 10 16430$
9952406$ 1873288$ 31744$ 274803$ 32667$ 332896$ 1998646$ 4544044$ 1155207$ 1747625$ 1215000$ 1290529$
9 Stormwater Base Paving Costs Preperation EngineeringADA
Chip Seal
Pulverize amp Chip Seal
Pulverize amp Asphalt
Asphalt Overlay
Reconstruction
1 Insert summary table of average costs of ada sw eng digouts etc
Additional Paving Costs Average Cost per SY Percent of Paving CostDigouts amp Pre-Leveling $4 25Stormwater $7 38ADA $5 27Engineering amp Administration $5 28
Chip Seal
Pulverize amp Chip Seal
Pulverize amp Asphalt
Asphalt Overlay
Reconstruction
1 Insert total costs for the entire city based on pavement rating
RSL Length (FT) Area (SY) Condition Treatment Cost Total20 61834 138524 131 Good $0 $014 23656 49915 47 $147055212 43586 106382 100 $313413410 74803 193570 182 $57027908 96662 228046 215 $67184926 95452 261794 247 $174899304 6420 14536 14 $9711212 29238 60616 57 Poor Rehab $107 $64928500 3851 7532 07 Very Poor Rebuild $155 $1169719
$43149589
Satisfactory Chip Seal $29
Fair Overlay $67
Chip Seal
Pulverize amp Chip Seal
Pulverize amp Asphalt
Asphalt Overlay
Reconstruction
Fir Street Asphalt Overlay in early 1990s Inadequate Stormwater System Water Intrusion Inadequate Base Material
San Juan Avenue Reconstructed 1997
New ADA Sidewalks
Complete Stormwater System
Lawrence Street Chip Sealed in 2000
Inadequate Base
Water Intrusion
F Street Reconstructed 2001 2002
New ADA Sidewalks
Complete Stormwater System
Best Streets First
Stop the Continued Decay of our Streets
Slowly Rebuild Street System Investment
1 Introduction
2 Public Engagement
3 Street Operations
4 Street Improvements
5 Street Preservation
6 Street Programming
7 Funding Options
8 Recommendations
January
February
April
March
May
June
Encouraging the public to be involved through Engage PTwwwcityofptusengagept
Street Pavement Improvement Plan Projects | 9 | 110 | |||||||||||||||||||||||||||||||||||||||||||||
Road Name | From | To | Iworq ID | Length (ft) | Width (ft) | Area (yd^2) | Actual Area(SY) | Unit Cost per yd2 | Construction Cost | Prep Work | Survey Testing | ADA Curb Ramps | Storm Water | Mill amp Fill$50SY | Pre-Level$4SY | Total Construction | Project Cost + 10 | Unit Cost w Additional Costs no 10 | Engineering Costs | Notes | |||||||||||||||||||||||||||
Priority | Reconstruct | 2021 | 2022 | 2023 | 2024 | ||||||||||||||||||||||||||||||||||||||||||
1 | Reconstruct | Lawrence St | Cass St | Calhoun St | 1304 | 250 | 36 | 1000 | $ 80 | $ 80000 | $ 5000 | $ 20000 | $ 105000 | $ 115500 | $ 105 | Stormwater South Side Parking Raingarden on Cass | |||||||||||||||||||||||||||||||
2 | Reconstruct | Lawrence St | Walker St | Cass St | 250 | 36 | 1000 | $ 80 | $ 80000 | $ 5000 | $ 20000 | $ 5000 | $ 110000 | $ 121000 | $ 110 | Stormwater South Side Parking | |||||||||||||||||||||||||||||||
3 | Reconstruct Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | San Juan Ave | Lopez Ave | Admiralty | 2300 | 32 | 8178 | $ 50 | $ 408889 | $ 10000 | $ 100000 | $ 518889 | $ 570778 | $ 63 | Stormwater Problem 45th | ||||||||||||||||||||||||||||||||
4 | Reconstruct Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Polk St - Street Improvements | Lawrence St | 1056 Sarah Tiffany Sarah TiffanyGarfield | 1073 | 200 | 56 | 1244 | $ 50 | $ 62222 | X | X | X | $ 62222 | $ 68444 | $ 50 | Parking Theater 4 AC Watermain Infiltration or Rain Garden Parking on Condo Side | ||||||||||||||||||||||||||||||
Reconstruct | 47th Street | Pettygrove | McNeil | 500 | 18 | 1000 | 1548 | $ 50 | $ 50000 | $ 5000 | $ 40000 | $ 95000 | $ 104500 | $ 95 | $210000 Engineers Estimate With Engineering Cost Turnaround Spaghetti Waterline | ||||||||||||||||||||||||||||||||
Chip Seal - $50000 to $70000 per Mile | $6 No DigoutsPre-leveling | $10 with Additional Prep Work | |||||||||||||||||||||||||||||||||||||||||||||||
Chip Seal | Washington St | Van Buren St | SR20 | 2025 | 30 | 6750 | $ 10 | $ 67500 | $ 67500 | $ 74250 | Digouts Flagging | ||||||||||||||||||||||||||||||||||||
Chip Seal | Hastings Ave - Pre-level and widen shoulders | Discovery Rd | County Line | 8450 | 24 | 22533 | $ 6 | $ 135200 | $ 135200 | $ 148720 | Ditches amp Culverts Total Width change from 21 to 24 How wide will shoulders be | ||||||||||||||||||||||||||||||||||||
Tyler St | Jefferson St | Lawrence St | 900 | 32 | 3200 | $ 6 | $ 19200 | $ 19200 | $ 21120 | ||||||||||||||||||||||||||||||||||||||
Chip Seal | McPherson - Chip Seal | 4th St | Discovery Rd | 3100 | 32 | 11022 | $ 6 | $ 66133 | $ 66133 | $ 72747 | Ditches amp Culverts Shoulder Wideneing | ||||||||||||||||||||||||||||||||||||
Chip Seal | 19th St - Chip Seal | San Juan Ave | Sheridan St | 3200 | 48 | 17067 | $ 6 | $ 102400 | $ 102400 | $ 112640 | Bike Lanes amp Shoulder Prelevel | ||||||||||||||||||||||||||||||||||||
Chip Seal | Walnut | W Street | Jackson | 2300 | 22 | 5622 | $ 6 | $ 33733 | $ 33733 | $ 37107 | Dig-Outs Pre-Leveling Striping Shoulders | ||||||||||||||||||||||||||||||||||||
Chip Seal | Fir St - Chip Seal | F St | UCherry | 4360 | 22 | 10658 | $ 10 | $ 106578 | X | X | $ 106578 | $ 117236 | Dig-Outs Pre-Leveling Striping | ||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | |||||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | P St - Chip Seal | Redwood St | Cedar St | 0486 | 300 | 16 | 533 | $ 20 | $ 10667 | $ 10667 | $ 11733 | Watermain Looping Shouldnt this be part of Center | |||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 25th St - Chip Seal | Sheridan St | Holcomb St | 1200 | 18 | 2400 | $ 20 | $ 48000 | $ 48000 | $ 52800 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 14th St - Chip Seal | $ - | $ - | ||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Cedar St - Chip Seal | Redwood St | San Juan Ave | 1460 | 16 | 2596 | $ 20 | $ 51911 | $ 51911 | $ 57102 | Ex ChipSeal 22 Wide | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Center St - Chip Seal | Redwood St | San Juan Ave | 484 | 1660 | 16 | 2951 | $ 20 | $ 59022 | $ 59022 | $ 64924 | Ex ChipSeal 22 Wide Stormwater | |||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Grant St Chip Seal | 14th St | 16th St | 525 | 16 | 933 | $ 20 | $ 18667 | $ 18667 | $ 20533 | Ex Street 10 Wide | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 11th St Chip Seal | Hendricks St | Sheridan St | 550 | 16 | 978 | $ 20 | $ 19556 | $ 19556 | $ 21511 | Hospital Parking | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Hendricks St Chip Seal | 9th St | 12th St | 800 | 16 | 1422 | $ 20 | $ 28444 | $ 28444 | $ 31289 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 10th St Chip Seal | Hendricks St | Grant St | 1655 | 283 | 18 | 566 | $ 20 | $ 11320 | $ 11320 | $ 12452 | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Grant St Chip Seal | 14th St | 16th St | 525 | 18 | 1050 | $ 20 | $ 21000 | $ 21000 | $ 23100 | Ex Street 10 Wide Stormwater | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Hill St | 21st St | 19th St | 807 | 16 | 1435 | $ 20 | $ 28693 | $ 28693 | $ 31563 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Milo St -Chip seal | Olympic Ave | Pacific Ave | 0003 | 466 | 12 | 621 | $ 20 | $ 12427 | $ 12427 | $ 13669 | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Olympic St | Cedar St | Tremont St | 536 | 12 | 715 | $ 20 | $ 14293 | $ 14293 | $ 15723 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Benton St - street improvement | Blaine St | Lincoln Blg | 580 | 36 Sarah Tiffany Sarah TiffanyEstimated at 25-36 used higher number | Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Sarah Tiffany Sarah TiffanyGarfield | 2320 | $ 20 | $ 46400 | $ 46400 | $ 51040 | ||||||||||||||||||||||||||||||||||
Pave Gravel Road | |||||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Pacific St | Cedar St | Tremont St | 400 | 16 | 711 | $ 50 | $ 35556 | $ 6000 | $ 15000 | $ 56556 | $ 62211 | $ 80 | ||||||||||||||||||||||||||||||||||
58th St | Hill St | Kuhn St | 525 | 16 | 933 | $ 50 | $ 46667 | $ 6000 | $ 20000 | $ 72667 | $ 79933 | $ 78 | 4 AC Waterline Driveways Site Distance (Re-grade Slope) | ||||||||||||||||||||||||||||||||||
Sidewalks | |||||||||||||||||||||||||||||||||||||||||||||||
Harrison St | Franklin St | Clay St | 340 | 6 | 227 | $ 165 | $ 56100 | $ 5000 | $ 61100 | $ 67210 | $ 180 | ||||||||||||||||||||||||||||||||||||
9th St | Hancock St | McPherson St | 1300 | 6 | 867 | $ 165 | $ 214500 | $ 10000 | $ 15000 | $ 239500 | $ 263450 | $ 184 | |||||||||||||||||||||||||||||||||||
Asphalt Path | |||||||||||||||||||||||||||||||||||||||||||||||
Spruce St Easement | Cedar St | Center St | 150 | 8 | 133 | $ 50 | $ 6667 | $ 2000 | $ 8667 | $ 9533 | $ 65 | ||||||||||||||||||||||||||||||||||||
Cherry St | A St | E St | 990 | 10 | 1100 | $ 50 | $ 55000 | $ 10000 | $ 10000 | $ 15000 | $ 90000 | $ 99000 | $ 82 | ||||||||||||||||||||||||||||||||||
Gravel Path | |||||||||||||||||||||||||||||||||||||||||||||||
16th St | Thomas St | Grant St | 1700 | 6 | 1133 | $ 15 | $ 17000 | $ 1500 | $ 18500 | $ 20350 | |||||||||||||||||||||||||||||||||||||
Cleveland St | 21st St | 23rd St | 500 | 6 | 333 | $ 15 | $ 5000 | $ 5000 | $ 5500 | Need Easement | |||||||||||||||||||||||||||||||||||||
6 | - | $ 15 | $ - | $ - | $ - | Need Easement | |||||||||||||||||||||||||||||||||||||||||
6 | - | $ 15 | $ - | $ - | $ - | Need Easement | |||||||||||||||||||||||||||||||||||||||||
Total | $ 1582256 | $ 1792256 | $ 1971481 | ||||||||||||||||||||||||||||||||||||||||||||
Project Descriptioin | Length | Width | Construction Costs | ConstructionUnit Costs | Units | Engineering Costs | Total CostsUnit Cost | Total Costs | Total CostsUnit Cost | Notes | |||||||||||
Sidewalk | |||||||||||||||||||||
9th Street Sidewalk Grant Street to Hancock Street | 826 | 6 | $ 141506 | $ 17131 | LF | Construction Unit Cost per Foot | |||||||||||||||
Jefferson Street Sidewalk Washington Street to Taylor Street | 724 | 6 | $ 390502 | $ 53937 | LF | Construction Unit Cost per Foot | |||||||||||||||
Landis Street Sidewalk 10th Street to 19th Street | 1795 | 6 | $ 364550 | $ 20309 | LF | Construction Unit Cost per Foot | |||||||||||||||
ADA Corner Ramps | |||||||||||||||||||||
Washington Street amp Harrison Street | $ 42000 | $ 42000 | Each | ||||||||||||||||||
Washington Street amp Adams Street | $ 38150 | $ 19075 | Each | Two Corners Were Retrofitted | |||||||||||||||||
Chip Seal Pavement | |||||||||||||||||||||
Walker Street Washington Street to Lawrence Street | 1144 | 24 | $ 20000 | $ 656 | SY | Does not include flagging nor prep work | |||||||||||||||
Pulverize amp Asphalt Paving | |||||||||||||||||||||
Washington Street VanBuren Street to Harrison Street | 300 | 22 | $ 35000 | $ 4773 | SY | ||||||||||||||||
Asphalt Overlay | |||||||||||||||||||||
Sidewalks | ||||||||||||||||||||||||||||||||||||||
Harrison St | Franklin St | Clay St | 340 | 6 | 227 | |||||||||||||||||||||||||||||||||
9th St | Hancock St | McPherson St | 1300 | 6 | 867 | |||||||||||||||||||||||||||||||||
Asphalt Path | ||||||||||||||||||||||||||||||||||||||
Spruce St Easement | Cedar St | Center St | 150 | 8 | 133 | $ 2000 | $ 2000 | $ 2000 | ||||||||||||||||||||||||||||||
Cherry St | A St | E St | 990 | 10 | 1100 | $ 10000 | $ 10000 | $ 10000 | ||||||||||||||||||||||||||||||
Gravel Path | ||||||||||||||||||||||||||||||||||||||
16th St | Thomas St | Grant St | 1700 | 6 | 1133 | $ 1500 | $ 1500 | $ 1500 | ||||||||||||||||||||||||||||||
Cleveland St | 21st St | 23rd St | 500 | 6 | 333 | Need Easement | ||||||||||||||||||||||||||||||||
6 | - | Need Easement | ||||||||||||||||||||||||||||||||||||
6 | - | Need Easement | ||||||||||||||||||||||||||||||||||||
Total |
Type | Improvement | Cost Range SY | Cost Range LF | ||||||||
1 | Complete Road Rebuild | $80 | $100 | ||||||||
2 | Asphalt Overlay | $50 | $60 | ||||||||
3 | Pulverize amp Chip Seal | $20 | $30 | ||||||||
4 | Chip Seal | $6 | $10 | $12 | $25 | ||||||
5 | Seal Coat | ||||||||||
6 | |||||||||||
7 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 3-Inch | 413 | TONS | $ 15000 | $ 6187500 | 1000 x 22 x 025 httpwwwamerasphaltcomasphalthtm | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 1630 | CY | $ 4800 | $ 7824000 | Water Street Project = $48 CY (1000 x 22 x 2)27 = 1630 CY | ||||||
Gravel Borrow | 2282 | TONS | $ 3000 | $ 6846000 | (1000 x 22 x 2)27 = 1630 1630 CY x 14 = 2282 Tons | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 128 | Hours | $ 5728 | $ 733133 | (2) People for 64 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 25043033 | |||||||||||
$ 10247 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 2-Inch | 275 | TONS | $ 15000 | $ 4125000 | 1000 x 22 x 017 httpwwwamerasphaltcomasphalthtm | | ||||||
Digouts amp Pre-leveling | 122 | SY | $ 4900 | $ 597800 | |||||||
Flagging | 64 | Hours | $ 5728 | $ 366566 | (2) People for 32 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 180000 | $ 180000 | |||||||
$ 5403066 | |||||||||||
$ 2211 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 3-Inch | 413 | TONS | $ 15000 | $ 6187500 | 1000 x 22 x 025 httpwwwamerasphaltcomasphalthtm | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 150 | CY | $ 4800 | $ 720000 | Water Street Project = $48 CY | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 96 | Hours | $ 5728 | $ 549850 | (2) People for 48 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 10909750 | |||||||||||
$ 4464 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Chip Seal | 2444 | SY | $ 1050 | $ 2566200 | 1000 X 22 | Unit Cost $525 SY from Walker Street County Invoice Doubled to $1050 for Chip Seal Over Gravel | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 150 | CY | $ 4800 | $ 720000 | Water Street Project = $48 CY | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 80 | Hours | $ 5728 | $ 458208 | (2) People for 40 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | Hours | $ 12500 | $ - 0 | High Average Loaded Rate No Testing | ||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 7196808 | |||||||||||
$ 2945 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 1500000 | $614 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 500 | LF | $ 5000 | $ 2500000 | |||||||
Catch Basins | 4 | EACH | $ 150000 | $ 600000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Chip Seal | 2444 | SY | $ 525 | $ 1283100 | 1000 X 22 | Unit Cost from Walker Street County Invoice | ||||||
Digouts amp Pre-leveling | 122 | SY | $ 4900 | $ 598780 | Cost from 2018 Lakeside Mill amp Fill | Estimate Quanity Based on 5 | ||||||
Flagging | 32 | Hours | $ 5728 | $ 183283 | (2) People for 16 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | Hours | $ 12500 | $ - 0 | High Average Loaded Rate No Surveying or Testing | ||||||
Surveying | 1 | LS | $ - 0 | $ - 0 | |||||||
$ 2198863 | |||||||||||
$ 900 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 1500000 | $614 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY |
Project Descriptioin | Length | Width | Construction Costs | Engineering Costs | Engineering Total | Digouts Pre-Leveling Costs | Digouts Pre-Leveling Total | ADACosts | ADATotal | StormwaterCosts | StormwaterTotal | Total Costsby SY | Cost Per 250 Block | Length | Width | Notes | |||||||||||||||||
Chip Seal Pavement | |||||||||||||||||||||||||||||||||
Walker Street Washington Street to Lawrence Street | 1144 | 24 | $ 25000 | 15 | $ 3750 | 10 | $ 2500 | $ 1024 | $ 682911 | 250 | 24 | ||||||||||||||||||||||
Pulverize amp Chip Seal | |||||||||||||||||||||||||||||||||
Engineers Estimate | 250 | 24 | $ 22000 | 15 | $ 3300 | 0 | $ - | 20 | $ 4400 | $ 4455 | $ 2970000 | 250 | 24 | ||||||||||||||||||||
Pulverize amp Asphalt Paving | |||||||||||||||||||||||||||||||||
Washington Street VanBuren Street to Harrison Street | 300 | 22 | $ 35000 | 20 | $ 7000 | 0 | $ - | 10 | $ 3500 | 20 | $ 7000 | $ 7159 | $ 4772727 | 250 | 24 | ||||||||||||||||||
Asphalt Overlay (2) | |||||||||||||||||||||||||||||||||
Engineers Estimate | 250 | 24 | $ 21334 | 20 | $ 426680 | 10 | $ 2133 | 20 | $ 426680 | 20 | $ 426680 | $ 5440 | $ 4835707 | 250 | 32 | ||||||||||||||||||
Reconstruction | |||||||||||||||||||||||||||||||||
Walker Street Lawrence Street to Blaine Street | 650 | 36 | $ 184310 | 25 | $ 46078 | 0 | $ - | 20 | $ 36862 | 30 | $ 55293 | $ 12405 | $ 11027094 | 250 | 32 | ||||||||||||||||||
RSL | Length (FT) | Area (SY) | Condition | Treatment | Cost | Total | |||||||||
20 | 61834 | 138524 | 131 | Good | $0 | $0 | |||||||||
14 | 23656 | 49915 | 47 | Satisfactory | Chip Seal | $29 | $1470552 | ||||||||
12 | 43586 | 106382 | 100 | $3134134 | |||||||||||
10 | 74803 | 193570 | 182 | $5702790 | |||||||||||
8 | 96662 | 228046 | 215 | $6718492 | |||||||||||
6 | 95452 | 261794 | 247 | Fair | Overlay | $67 | $17489930 | ||||||||
4 | 6420 | 14536 | 14 | $971121 | |||||||||||
2 | 29238 | 60616 | 57 | Poor | Rehab | $107 | $6492850 | ||||||||
0 | 3851 | 7532 | 07 | Very Poor | Rebuild | $155 | $1169719 | ||||||||
$43149589 | |||||||||||||||
Additional Paving Costs | Average Cost per SY | Percent of Paving Cost | |||
Digouts amp Pre-Leveling | $4 | 25 | |||
Stormwater | $7 | 38 | |||
ADA | $5 | 27 | |||
Engineering amp Administration | $5 | 28 |
9 | Base Paving Costs | Preperation | Stormwater | ADA | Engineering | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Remaining Service Life | Road Name | From | To | Length (ft) | Width (ft) | Area (SY) | Total Construction | Price(SY) | Reconstruction | Pulverize amp Pave | Ashpalt Overlay | Pave Gravel Road | Pulverize amp Chip Seal | Chip Seal | Total Base Paving Costs | Digouts(SY) | Pre-Leveling(SY) | Construct Shoulders Both Sides (LF) | Preparation Total | StormwaterPipes (LF) | StormwaterCatchbasins | StormwaterSwales (LF) | Stormwater Total | Curb Ramps | Curb Ramps Total | Surveying | Engineering amp Administration | Engineering amp Administration Total | Other Work | ||||||||||||||||||||||||||||||
$102 | $45 | $22 | $35 | $29 | $9 | $35 | $15 | $20 | $50 | $1500 | $25 | $15000 | |||||||||||||||||||||||||||||||||||||||||||||||
2 | Polk St - Street | Lawrence St | 1056 | 200 | 56 | 1244 | $ 210679 | $ 169 | $ 127518 | $ 127518 | $ - | 150 | 1 | 1 | $ 9025 | 2 | $ 30000 | $ 10000 | 25 | $ 44136 | |||||||||||||||||||||||||||||||||||||||
6 | 47th Street | Pettygrove | McNeil | 500 | 18 | 1548 | $ 258717 | $ 167 | $ 158624 | $ 158624 | $ - | 687 | 8 | $ 46350 | $ - | $ 10000 | 25 | $ 53743 | |||||||||||||||||||||||||||||||||||||||||
6 to 10 | Lawrence St | Calhoun St | Harrison St | 1200 | 36 | 4800 | $ 786070 | $ 164 | $ 491856 | $ 491856 | 600 | $ 15000 | $ 8 | $ 120000 | $ 10000 | 25 | $ 159214 | ||||||||||||||||||||||||||||||||||||||||||
8 | Lawrence St | Cass St | Calhoun St | 250 | 36 | 1000 | $ 146213 | $ 146 | $ 102470 | $ 102470 | 0 | 0 | $ - | 75 | 350 | $ 12500 | $ - | $ 10000 | 25 | $ 31243 | |||||||||||||||||||||||||||||||||||||||
8 | Lawrence St | Walker St | Cass St | 250 | 36 | 1000 | $ 144650 | $ 145 | $ 102470 | $ 102470 | $ - | 100 | 250 | $ 11250 | $ - | $ 10000 | 25 | $ 30930 | |||||||||||||||||||||||||||||||||||||||||
4 to 8 | San Juan Ave | Lopez Ave | Admiralty | 2300 | 34 | 8689 | $ 1222938 | $ 141 | $ 890350 | $ 890350 | $ - | 800 | 5 | 1500 | $ 85000 | $ - | $ 15000 | 25 | $ 247588 | ||||||||||||||||||||||||||||||||||||||||
6 to 8 | Lawrence St | Harrison St | Monroe St | 2380 | 47 | 12429 | $ 1331314 | $ 107 | $ 274803 | $ 274803 | 15 | 5 | $ 74573 | 1900 | 10 | $ 110000 | 50 | $ 750000 | $ 10000 | 10 | $ 121938 | ||||||||||||||||||||||||||||||||||||||
2 to 4 | Center St | San Juan Ave | Redwood St | 1660 | 16 | 2951 | $ 295222 | $ 100 | $ 86910 | $ 86910 | $ - | 1600 | 9 | 3000 | $ 168500 | $ - | $ 10000 | 15 | $ 39812 | ||||||||||||||||||||||||||||||||||||||||
0 to 6 | Pacific St | Cedar St | Tremont St | 400 | 16 | 711 | $ 66581 | $ 94 | $ 31744 | $ 31744 | $ - | 100 | 2 | 700 | $ 25500 | $ - | $ 5000 | 15 | $ 9337 | ||||||||||||||||||||||||||||||||||||||||
0 to 6 | Benton St | Lawrence | Lincoln Blg | 580 | 36 | 2320 | $ 203265 | $ 88 | $ 20880 | $ 20880 | 20 | 10 | $ 19720 | 250 | 2 | $ 15500 | 8 | $ 120000 | $ 5000 | 15 | $ 27165 | ||||||||||||||||||||||||||||||||||||||
2 | Grant St | 14th St | 16th St | 525 | 16 | 933 | $ 73635 | $ 79 | $ 27487 | $ 27487 | $ - | 400 | 2 | 500 | $ 35500 | $ - | $ 8000 | 15 | $ 10648 | ||||||||||||||||||||||||||||||||||||||||
2 to 6 | Olympic St | Cedar St | Tremont St | 536 | 12 | 715 | $ 52716 | $ 74 | $ 21047 | $ 21047 | $ - | 950 | $ 23750 | $ - | $ 8000 | 15 | $ 7920 | ||||||||||||||||||||||||||||||||||||||||||
2 | Milo St | Olympic Ave | Pacific Ave | 466 | 12 | 621 | $ 44793 | $ 72 | $ 18298 | $ 18298 | $ - | 800 | $ 20000 | $ - | $ 5000 | 15 | $ 6495 | ||||||||||||||||||||||||||||||||||||||||||
0 | 11th St | Hendricks St | Sheridan St | 550 | 16 | 978 | $ 65077 | $ 67 | $ 28796 | $ 28796 | $ - | 100 | 2 | 750 | $ 26750 | $ - | $ 8000 | 15 | $ 9532 | ||||||||||||||||||||||||||||||||||||||||
0 | 58th St | Hill St | Kuhn St | 525 | 16 | 933 | $ 60329 | $ 65 | $ 32667 | $ 32667 | $ - | 750 | $ 18750 | $ - | $ 8000 | 15 | $ 8913 | ||||||||||||||||||||||||||||||||||||||||||
2 | 10th St | Hendricks St | Grant St | 283 | 18 | 566 | $ 34294 | $ 61 | $ 16669 | $ 16669 | $ - | 500 | $ 12500 | $ - | $ 5000 | 15 | $ 5125 | ||||||||||||||||||||||||||||||||||||||||||
4 to 10 | 31st St | Hancock St | Sheridan St | 1050 | 22 | 2567 | $ 150027 | $ 58 | $ 23100 | $ 23100 | 10 | 10 | $ 12833 | 1200 | 10 | 1000 | $ 100000 | $ - | $ 5000 | 10 | $ 14093 | ||||||||||||||||||||||||||||||||||||||
6 | 25th St | Sheridan St | Holcomb St | 1200 | 18 | 2400 | $ 125895 | $ 52 | $ 70680 | $ 70680 | $ - | 125 | 1 | 1200 | $ 37750 | $ - | $ 8000 | 15 | $ 17465 | ||||||||||||||||||||||||||||||||||||||||
6 | Holcomb St | 7th St | 10th St | 850 | 12 | 1133 | $ 58703 | $ 52 | $ 10200 | $ 10200 | 10 | 10 | $ 5667 | 1500 | $ 37500 | $ - | $ - | 10 | $ 5337 | ||||||||||||||||||||||||||||||||||||||||
2 | Hendricks St | 9th St | 12th St | 800 | 16 | 1422 | $ 70930 | $ 50 | $ 41884 | $ 41884 | $ - | 750 | $ 18750 | $ - | $ 8000 | 15 | $ 10295 | ||||||||||||||||||||||||||||||||||||||||||
2 to 6 | Hill St | 19th | 21st St | 807 | 16 | 1435 | $ 67443 | $ 47 | $ 21125 | $ 6456 | $ 27581 | 10 | $ 5021 | 1000 | $ 25000 | $ - | $ 8000 | 15 | $ 9840 | ||||||||||||||||||||||||||||||||||||||||
2 to 8 | 57th St | Jackman St | Kuhn St | 800 | 18 | 1600 | $ 66550 | $ 42 | $ 14400 | $ 14400 | 20 | 10 | $ 13600 | 1300 | $ 32500 | 10 | $ 6050 | ||||||||||||||||||||||||||||||||||||||||||
6 to 8 | Sheridan St | Hastings Ave | SilverUmatilla | 1750 | 22 | 4278 | $ 154115 | $ 36 | $ 38500 | $ 38500 | 20 | 10 | $ 36361 | 300 | 4 | 1500 | $ 58500 | $ - | $ 5000 | 15 | $ 20754 | ||||||||||||||||||||||||||||||||||||||
6 to 10 | Tyler St | Jefferson St | Lawrence St | 900 | 32 | 3200 | $ 115280 | $ 36 | $ 28800 | $ 28800 | 5 | 5 | $ 8000 | 100 | 2 | $ 8000 | 4 | $ 60000 | 10 | $ 10480 | |||||||||||||||||||||||||||||||||||||||
6 to 14 | 14th St | McPherson St | Sheridan St | 2375 | 21 | 5542 | $ 182027 | $ 33 | $ 49875 | $ 49875 | 20 | 10 | $ 47104 | 750 | 4 | 1000 | $ 68500 | $ - | 10 | $ 16548 | |||||||||||||||||||||||||||||||||||||||
8 | 49th St | Kuhn St | Admiralty Ave | 400 | 24 | 1067 | $ 34613 | $ 32 | $ 9600 | $ 9600 | 5 | $ 1867 | 800 | $ 20000 | $ - | 10 | $ 3147 | ||||||||||||||||||||||||||||||||||||||||||
6 to 10 | Fir St | F St | UCherry | 4360 | 22 | 10658 | $ 341621 | $ 32 | $ 95920 | $ 95920 | 5 | 5 | 4000 | $ 106644 | 100 | 2 | 4000 | $ 108000 | $ - | 10 | $ 31056 | ||||||||||||||||||||||||||||||||||||||
6 to 8 | Cedar St | San Juan Ave | Redwood St | 1460 | 16 | 2596 | $ 81747 | $ 31 | $ 23360 | $ 23360 | 20 | 20 | $ 25956 | 1000 | $ 25000 | $ - | 10 | $ 7432 | |||||||||||||||||||||||||||||||||||||||||
8 | Clallam St | McKinley St | Roosevelt St | 975 | 14 | 1517 | $ 46796 | $ 31 | $ 13650 | $ 13650 | 20 | 10 | $ 12892 | 200 | 4 | $ 16000 | $ - | 10 | $ 4254 | ||||||||||||||||||||||||||||||||||||||||
6 | San Juan Ave | 19th St | 20th St | 300 | 31 | 1033 | $ 31827 | $ 31 | $ 9300 | $ 9300 | 50 | 10 | $ 19633 | $ - | $ - | 10 | $ 2893 | ||||||||||||||||||||||||||||||||||||||||||
6 to 20 | Cherry St | F St | W St | 4200 | 32 | 14933 | $ 457307 | $ 31 | $ 134400 | $ 134400 | 5 | 5 | 4200 | $ 121333 | 200 | 6000 | $ 160000 | $ - | 10 | $ 41573 | |||||||||||||||||||||||||||||||||||||||
6 to 8 | Jackman St | 45th St | 49th St | 1100 | 22 | 2689 | $ 81940 | $ 30 | $ 24200 | $ 24200 | 15 | 10 | $ 18150 | 225 | 3 | 500 | $ 28250 | $ - | $ 5000 | 15 | $ 11340 | ||||||||||||||||||||||||||||||||||||||
6 to 12 | Jackson St | LawrenceMonroe | Roosevelt St | 1600 | 18 | 3200 | $ 93530 | $ 29 | $ 28800 | $ 28800 | 10 | 10 | $ 16000 | 1000 | $ 25000 | 1 | $ 15000 | $ 2500 | 10 | $ 8730 | |||||||||||||||||||||||||||||||||||||||
2 | 7th St | Wilson St | Holcomb St | 450 | 16 | 800 | $ 23320 | $ 29 | $ 7200 | $ 7200 | 10 | 10 | $ 4000 | 400 | $ 10000 | $ - | 10 | $ 2120 | |||||||||||||||||||||||||||||||||||||||||
8 to 14 | 25th St | Sherman St | Sheridan St | 800 | 20 | 1778 | $ 50061 | $ 28 | $ 16000 | $ 16000 | 10 | 5 | $ 7556 | 1 | 800 | $ 21500 | $ - | $ 5000 | 10 | $ 5006 | |||||||||||||||||||||||||||||||||||||||
2 to 6 | Hancock St | SR 20 | 9th St | 1100 | 20 | 2444 | $ 67833 | $ 28 | $ 22000 | $ 22000 | 15 | 5 | $ 14667 | 1000 | $ 25000 | $ - | 10 | $ 6167 | |||||||||||||||||||||||||||||||||||||||||
Benton St | Washington St | Lawrence St | 1160 | 22 | 2836 | $ 74468 | $ 26 | $ 25520 | $ 25520 | 10 | 10 | $ 14178 | 140 | 4 | 600 | $ 28000 | 10 | $ 6770 | |||||||||||||||||||||||||||||||||||||||||
W St | San JuanAdmiralty | Walnut St | 2560 | 22 | 6258 | $ 163807 | $ 26 | $ 56320 | $ 56320 | 10 | 5 | $ 26596 | 200 | 4 | 2000 | $ 66000 | $ - | 10 | $ 14892 | ||||||||||||||||||||||||||||||||||||||||
6 to 8 | Walnut | W Street | Jackson | 2300 | 22 | 5622 | $ 145194 | $ 26 | $ 50600 | $ 50600 | 10 | 5 | $ 23894 | 2300 | $ 57500 | $ - | 10 | $ 13199 | |||||||||||||||||||||||||||||||||||||||||
6 to 8 | 24th St | Discovery Rd | San Juan Ave | 1250 | 18 | 2500 | $ 63938 | $ 26 | $ 22500 | $ 22500 | 10 | 5 | $ 10625 | 1000 | $ 25000 | $ - | 10 | $ 5813 | |||||||||||||||||||||||||||||||||||||||||
6 to 10 | Tyler St | Lawrence St | Blaine St | 900 | 32 | 3200 | $ 78980 | $ 25 | $ 28800 | $ 28800 | 5 | 5 | $ 8000 | 200 | $ 5000 | 2 | $ 30000 | 10 | $ 7180 | ||||||||||||||||||||||||||||||||||||||||
4 to 12 | McPherson St | SR 20 | Discovery Rd | 2925 | 32 | 10400 | $ 244860 | $ 24 | $ 93600 | $ 93600 | 5 | 5 | 2925 | $ 84500 | 230 | 2 | 1200 | $ 44500 | $ - | $ - | 10 | $ 22260 | |||||||||||||||||||||||||||||||||||||
10 | Landes St | 12th St | 19th St | 1820 | 32 | 6471 | $ 151821 | $ 23 | $ 58240 | $ 58240 | 5 | 1400 | $ 39324 | 400 | $ 10000 | 2 | $ 30000 | $ 5000 | 10 | $ 14256 | |||||||||||||||||||||||||||||||||||||||
6 to 8 | Discovery Rd | 19th | Hastings Ave | 2900 | 22 | 7089 | $ 136565 | $ 19 | $ 63800 | $ 63800 | 15 | 10 | $ 47850 | 500 | $ 12500 | $ - | 10 | $ 12415 | |||||||||||||||||||||||||||||||||||||||||
8 to 12 | Hastings Ave | Discovery Rd | County Line | 8450 | 32 | 30044 | $ 542349 | $ 18 | $ 270400 | $ 270400 | 5 | 10 | 5000 | $ 197644 | 1000 | $ 25000 | $ - | 10 | $ 49304 | ||||||||||||||||||||||||||||||||||||||||
6 to 12 | Washington St | Van Buren St | SR20 | 2025 | 30 | 6750 | $ 118388 | $ 18 | $ 60750 | $ 60750 | 5 | 5 | $ 16875 | 0 | 0 | 0 | $ - | 2 | $ 30000 | $ - | 10 | $ 10763 | |||||||||||||||||||||||||||||||||||||
14 | Blaine St | San Juan Ave | Walker St | 1275 | 48 | 6800 | $ 113910 | $ 17 | $ 61200 | $ 61200 | 5 | $ 11900 | $ - | 2 | $ 30000 | $ 5000 | 10 | $ 10810 | |||||||||||||||||||||||||||||||||||||||||
6 | Washington St | Harrison St | Taylor St | 1175 | 33 | 4308 | $ 59240 | $ 14 | $ 38775 | $ 38775 | 10 | $ 15079 | $ - | $ - | 10 | $ 5385 | |||||||||||||||||||||||||||||||||||||||||||
8 to 10 | Sheridan St | SR 20 | 19th St | 4000 | 46 | 20444 | $ 272922 | $ 13 | $ 184000 | $ 184000 | 5 | 5 | $ 51111 | 200 | 2 | $ 13000 | $ - | 10 | $ 24811 | ||||||||||||||||||||||||||||||||||||||||
8 to 10 | 19th St | San Juan Ave | Sheridan St | 3200 | 48 | 17067 | $ 197120 | $ 12 | $ 153600 | $ 153600 | 3 | 3 | $ 25600 | 0 | 0 | 0 | $ - | $ - | 10 | $ 17920 | |||||||||||||||||||||||||||||||||||||||
10 to 20 | San Juan Ave | F St | Lopez Ave | 2800 | 32 | 9956 | $ 110059 | $ 11 | $ 89600 | $ 89600 | 3 | $ 10453 | $ - | $ - | 10 | $ 10005 | |||||||||||||||||||||||||||||||||||||||||||
10 to 20 | F St | Hastings Ave | Tyler St | 5300 | 31 | 18256 | $ 180730 | $ 10 | $ 164300 | $ 164300 | $ - | $ - | $ - | 10 | $ 16430 | ||||||||||||||||||||||||||||||||||||||||||||
$ 9952406 | $ 1873288 | $ 31744 | $ 274803 | $ 32667 | $ 332896 | $ 1998646 | $ 4544044 | $ 1155207 | $ 1747625 | $ 1215000 | $ 1290529 | $ - 0 | |||||||||||||||||||||||||||||||||||||||||||||||
Street Pavement Improvement Plan Projects | 9 | 110 | |||||||||||||||||||||||||||||||||||||||||||||
Road Name | From | To | Iworq ID | Length (ft) | Width (ft) | Area (yd^2) | Actual Area(SY) | Unit Cost per yd2 | Construction Cost | Prep Work | Survey Testing | ADA Curb Ramps | Storm Water | Mill amp Fill$50SY | Pre-Level$4SY | Total Construction | Project Cost + 10 | Unit Cost w Additional Costs no 10 | Engineering Costs | Notes | |||||||||||||||||||||||||||
Priority | Reconstruct | 2021 | 2022 | 2023 | 2024 | ||||||||||||||||||||||||||||||||||||||||||
1 | Reconstruct | Lawrence St | Cass St | Calhoun St | 1304 | 250 | 36 | 1000 | $ 80 | $ 80000 | $ 5000 | $ 20000 | $ 105000 | $ 115500 | $ 105 | Stormwater South Side Parking Raingarden on Cass | |||||||||||||||||||||||||||||||
2 | Reconstruct | Lawrence St | Walker St | Cass St | 250 | 36 | 1000 | $ 80 | $ 80000 | $ 5000 | $ 20000 | $ 5000 | $ 110000 | $ 121000 | $ 110 | Stormwater South Side Parking | |||||||||||||||||||||||||||||||
3 | Reconstruct Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | San Juan Ave | Lopez Ave | Admiralty | 2300 | 32 | 8178 | $ 50 | $ 408889 | $ 10000 | $ 100000 | $ 518889 | $ 570778 | $ 63 | Stormwater Problem 45th | ||||||||||||||||||||||||||||||||
4 | Reconstruct Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Polk St - Street Improvements | Lawrence St | 1056 Sarah Tiffany Sarah TiffanyGarfield | 1073 | 200 | 56 | 1244 | $ 50 | $ 62222 | X | X | X | $ 62222 | $ 68444 | $ 50 | Parking Theater 4 AC Watermain Infiltration or Rain Garden Parking on Condo Side | ||||||||||||||||||||||||||||||
Reconstruct | 47th Street | Pettygrove | McNeil | 500 | 18 | 1000 | 1548 | $ 50 | $ 50000 | $ 5000 | $ 40000 | $ 95000 | $ 104500 | $ 95 | $210000 Engineers Estimate With Engineering Cost Turnaround Spaghetti Waterline | ||||||||||||||||||||||||||||||||
Chip Seal - $50000 to $70000 per Mile | $6 No DigoutsPre-leveling | $10 with Additional Prep Work | |||||||||||||||||||||||||||||||||||||||||||||||
Chip Seal | Washington St | Van Buren St | SR20 | 2025 | 30 | 6750 | $ 10 | $ 67500 | $ 67500 | $ 74250 | Digouts Flagging | ||||||||||||||||||||||||||||||||||||
Chip Seal | Hastings Ave - Pre-level and widen shoulders | Discovery Rd | County Line | 8450 | 24 | 22533 | $ 6 | $ 135200 | $ 135200 | $ 148720 | Ditches amp Culverts Total Width change from 21 to 24 How wide will shoulders be | ||||||||||||||||||||||||||||||||||||
Tyler St | Jefferson St | Lawrence St | 900 | 32 | 3200 | $ 6 | $ 19200 | $ 19200 | $ 21120 | ||||||||||||||||||||||||||||||||||||||
Chip Seal | McPherson - Chip Seal | 4th St | Discovery Rd | 3100 | 32 | 11022 | $ 6 | $ 66133 | $ 66133 | $ 72747 | Ditches amp Culverts Shoulder Wideneing | ||||||||||||||||||||||||||||||||||||
Chip Seal | 19th St - Chip Seal | San Juan Ave | Sheridan St | 3200 | 48 | 17067 | $ 6 | $ 102400 | $ 102400 | $ 112640 | Bike Lanes amp Shoulder Prelevel | ||||||||||||||||||||||||||||||||||||
Chip Seal | Walnut | W Street | Jackson | 2300 | 22 | 5622 | $ 6 | $ 33733 | $ 33733 | $ 37107 | Dig-Outs Pre-Leveling Striping Shoulders | ||||||||||||||||||||||||||||||||||||
Chip Seal | Fir St - Chip Seal | F St | UCherry | 4360 | 22 | 10658 | $ 10 | $ 106578 | X | X | $ 106578 | $ 117236 | Dig-Outs Pre-Leveling Striping | ||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | |||||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | P St - Chip Seal | Redwood St | Cedar St | 0486 | 300 | 16 | 533 | $ 20 | $ 10667 | $ 10667 | $ 11733 | Watermain Looping Shouldnt this be part of Center | |||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 25th St - Chip Seal | Sheridan St | Holcomb St | 1200 | 18 | 2400 | $ 20 | $ 48000 | $ 48000 | $ 52800 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 14th St - Chip Seal | $ - | $ - | ||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Cedar St - Chip Seal | Redwood St | San Juan Ave | 1460 | 16 | 2596 | $ 20 | $ 51911 | $ 51911 | $ 57102 | Ex ChipSeal 22 Wide | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Center St - Chip Seal | Redwood St | San Juan Ave | 484 | 1660 | 16 | 2951 | $ 20 | $ 59022 | $ 59022 | $ 64924 | Ex ChipSeal 22 Wide Stormwater | |||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Grant St Chip Seal | 14th St | 16th St | 525 | 16 | 933 | $ 20 | $ 18667 | $ 18667 | $ 20533 | Ex Street 10 Wide | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 11th St Chip Seal | Hendricks St | Sheridan St | 550 | 16 | 978 | $ 20 | $ 19556 | $ 19556 | $ 21511 | Hospital Parking | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Hendricks St Chip Seal | 9th St | 12th St | 800 | 16 | 1422 | $ 20 | $ 28444 | $ 28444 | $ 31289 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 10th St Chip Seal | Hendricks St | Grant St | 1655 | 283 | 18 | 566 | $ 20 | $ 11320 | $ 11320 | $ 12452 | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Grant St Chip Seal | 14th St | 16th St | 525 | 18 | 1050 | $ 20 | $ 21000 | $ 21000 | $ 23100 | Ex Street 10 Wide Stormwater | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Hill St | 21st St | 19th St | 807 | 16 | 1435 | $ 20 | $ 28693 | $ 28693 | $ 31563 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Milo St -Chip seal | Olympic Ave | Pacific Ave | 0003 | 466 | 12 | 621 | $ 20 | $ 12427 | $ 12427 | $ 13669 | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Olympic St | Cedar St | Tremont St | 536 | 12 | 715 | $ 20 | $ 14293 | $ 14293 | $ 15723 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Benton St - street improvement | Blaine St | Lincoln Blg | 580 | 36 Sarah Tiffany Sarah TiffanyEstimated at 25-36 used higher number | Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Sarah Tiffany Sarah TiffanyGarfield | 2320 | $ 20 | $ 46400 | $ 46400 | $ 51040 | ||||||||||||||||||||||||||||||||||
Pave Gravel Road | |||||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Pacific St | Cedar St | Tremont St | 400 | 16 | 711 | $ 50 | $ 35556 | $ 6000 | $ 15000 | $ 56556 | $ 62211 | $ 80 | ||||||||||||||||||||||||||||||||||
58th St | Hill St | Kuhn St | 525 | 16 | 933 | $ 50 | $ 46667 | $ 6000 | $ 20000 | $ 72667 | $ 79933 | $ 78 | 4 AC Waterline Driveways Site Distance (Re-grade Slope) | ||||||||||||||||||||||||||||||||||
Sidewalks | |||||||||||||||||||||||||||||||||||||||||||||||
Harrison St | Franklin St | Clay St | 340 | 6 | 227 | $ 165 | $ 56100 | $ 5000 | $ 61100 | $ 67210 | $ 180 | ||||||||||||||||||||||||||||||||||||
9th St | Hancock St | McPherson St | 1300 | 6 | 867 | $ 165 | $ 214500 | $ 10000 | $ 15000 | $ 239500 | $ 263450 | $ 184 | |||||||||||||||||||||||||||||||||||
Asphalt Path | |||||||||||||||||||||||||||||||||||||||||||||||
Spruce St Easement | Cedar St | Center St | 150 | 8 | 133 | $ 50 | $ 6667 | $ 2000 | $ 8667 | $ 9533 | $ 65 | ||||||||||||||||||||||||||||||||||||
Cherry St | A St | E St | 990 | 10 | 1100 | $ 50 | $ 55000 | $ 10000 | $ 10000 | $ 15000 | $ 90000 | $ 99000 | $ 82 | ||||||||||||||||||||||||||||||||||
Gravel Path | |||||||||||||||||||||||||||||||||||||||||||||||
16th St | Thomas St | Grant St | 1700 | 6 | 1133 | $ 15 | $ 17000 | $ 1500 | $ 18500 | $ 20350 | |||||||||||||||||||||||||||||||||||||
Cleveland St | 21st St | 23rd St | 500 | 6 | 333 | $ 15 | $ 5000 | $ 5000 | $ 5500 | Need Easement | |||||||||||||||||||||||||||||||||||||
6 | - | $ 15 | $ - | $ - | $ - | Need Easement | |||||||||||||||||||||||||||||||||||||||||
6 | - | $ 15 | $ - | $ - | $ - | Need Easement | |||||||||||||||||||||||||||||||||||||||||
Total | $ 1582256 | $ 1792256 | $ 1971481 | ||||||||||||||||||||||||||||||||||||||||||||
Project Descriptioin | Length | Width | Construction Costs | ConstructionUnit Costs | Units | Engineering Costs | Total CostsUnit Cost | Total Costs | Total CostsUnit Cost | Notes | |||||||||||
Sidewalk | |||||||||||||||||||||
9th Street Sidewalk Grant Street to Hancock Street | 826 | 6 | $ 141506 | $ 17131 | LF | Construction Unit Cost per Foot | |||||||||||||||
Jefferson Street Sidewalk Washington Street to Taylor Street | 724 | 6 | $ 390502 | $ 53937 | LF | Construction Unit Cost per Foot | |||||||||||||||
Landis Street Sidewalk 10th Street to 19th Street | 1795 | 6 | $ 364550 | $ 20309 | LF | Construction Unit Cost per Foot | |||||||||||||||
ADA Corner Ramps | |||||||||||||||||||||
Washington Street amp Harrison Street | $ 42000 | $ 42000 | Each | ||||||||||||||||||
Washington Street amp Adams Street | $ 38150 | $ 19075 | Each | Two Corners Were Retrofitted | |||||||||||||||||
Chip Seal Pavement | |||||||||||||||||||||
Walker Street Washington Street to Lawrence Street | 1144 | 24 | $ 20000 | $ 656 | SY | Does not include flagging nor prep work | |||||||||||||||
Pulverize amp Asphalt Paving | |||||||||||||||||||||
Washington Street VanBuren Street to Harrison Street | 300 | 22 | $ 35000 | $ 4773 | SY | ||||||||||||||||
Asphalt Overlay | |||||||||||||||||||||
Sidewalks | ||||||||||||||||||||||||||||||||||||||
Harrison St | Franklin St | Clay St | 340 | 6 | 227 | |||||||||||||||||||||||||||||||||
9th St | Hancock St | McPherson St | 1300 | 6 | 867 | |||||||||||||||||||||||||||||||||
Asphalt Path | ||||||||||||||||||||||||||||||||||||||
Spruce St Easement | Cedar St | Center St | 150 | 8 | 133 | $ 2000 | $ 2000 | $ 2000 | ||||||||||||||||||||||||||||||
Cherry St | A St | E St | 990 | 10 | 1100 | $ 10000 | $ 10000 | $ 10000 | ||||||||||||||||||||||||||||||
Gravel Path | ||||||||||||||||||||||||||||||||||||||
16th St | Thomas St | Grant St | 1700 | 6 | 1133 | $ 1500 | $ 1500 | $ 1500 | ||||||||||||||||||||||||||||||
Cleveland St | 21st St | 23rd St | 500 | 6 | 333 | Need Easement | ||||||||||||||||||||||||||||||||
6 | - | Need Easement | ||||||||||||||||||||||||||||||||||||
6 | - | Need Easement | ||||||||||||||||||||||||||||||||||||
Total |
Type | Improvement | Cost Range SY | Cost Range LF | ||||||||
1 | Complete Road Rebuild | $80 | $100 | ||||||||
2 | Asphalt Overlay | $50 | $60 | ||||||||
3 | Pulverize amp Chip Seal | $20 | $30 | ||||||||
4 | Chip Seal | $6 | $10 | $12 | $25 | ||||||
5 | Seal Coat | ||||||||||
6 | |||||||||||
7 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 3-Inch | 413 | TONS | $ 15000 | $ 6187500 | 1000 x 22 x 025 httpwwwamerasphaltcomasphalthtm | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 1630 | CY | $ 4800 | $ 7824000 | Water Street Project = $48 CY (1000 x 22 x 2)27 = 1630 CY | ||||||
Gravel Borrow | 2282 | TONS | $ 3000 | $ 6846000 | (1000 x 22 x 2)27 = 1630 1630 CY x 14 = 2282 Tons | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 128 | Hours | $ 5728 | $ 733133 | (2) People for 64 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 25043033 | |||||||||||
$ 10247 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 2-Inch | 275 | TONS | $ 15000 | $ 4125000 | 1000 x 22 x 017 httpwwwamerasphaltcomasphalthtm | | ||||||
Digouts amp Pre-leveling | 122 | SY | $ 4900 | $ 597800 | |||||||
Flagging | 64 | Hours | $ 5728 | $ 366566 | (2) People for 32 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 180000 | $ 180000 | |||||||
$ 5403066 | |||||||||||
$ 2211 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 3-Inch | 413 | TONS | $ 15000 | $ 6187500 | 1000 x 22 x 025 httpwwwamerasphaltcomasphalthtm | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 150 | CY | $ 4800 | $ 720000 | Water Street Project = $48 CY | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 96 | Hours | $ 5728 | $ 549850 | (2) People for 48 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 10909750 | |||||||||||
$ 4464 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Chip Seal | 2444 | SY | $ 1050 | $ 2566200 | 1000 X 22 | Unit Cost $525 SY from Walker Street County Invoice Doubled to $1050 for Chip Seal Over Gravel | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 150 | CY | $ 4800 | $ 720000 | Water Street Project = $48 CY | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 80 | Hours | $ 5728 | $ 458208 | (2) People for 40 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | Hours | $ 12500 | $ - 0 | High Average Loaded Rate No Testing | ||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 7196808 | |||||||||||
$ 2945 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 1500000 | $614 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 500 | LF | $ 5000 | $ 2500000 | |||||||
Catch Basins | 4 | EACH | $ 150000 | $ 600000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Chip Seal | 2444 | SY | $ 525 | $ 1283100 | 1000 X 22 | Unit Cost from Walker Street County Invoice | ||||||
Digouts amp Pre-leveling | 122 | SY | $ 4900 | $ 598780 | Cost from 2018 Lakeside Mill amp Fill | Estimate Quanity Based on 5 | ||||||
Flagging | 32 | Hours | $ 5728 | $ 183283 | (2) People for 16 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | Hours | $ 12500 | $ - 0 | High Average Loaded Rate No Surveying or Testing | ||||||
Surveying | 1 | LS | $ - 0 | $ - 0 | |||||||
$ 2198863 | |||||||||||
$ 900 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 1500000 | $614 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY |
Project Descriptioin | Length | Width | Construction Costs | Engineering Costs | Engineering Total | Digouts Pre-Leveling Costs | Digouts Pre-Leveling Total | ADACosts | ADATotal | StormwaterCosts | StormwaterTotal | Total Costsby SY | Cost Per 250 Block | Length | Width | Notes | |||||||||||||||||
Chip Seal Pavement | |||||||||||||||||||||||||||||||||
Walker Street Washington Street to Lawrence Street | 1144 | 24 | $ 25000 | 15 | $ 3750 | 10 | $ 2500 | $ 1024 | $ 682911 | 250 | 24 | ||||||||||||||||||||||
Pulverize amp Chip Seal | |||||||||||||||||||||||||||||||||
Engineers Estimate | 250 | 24 | $ 22000 | 15 | $ 3300 | 0 | $ - | 20 | $ 4400 | $ 4455 | $ 2970000 | 250 | 24 | ||||||||||||||||||||
Pulverize amp Asphalt Paving | |||||||||||||||||||||||||||||||||
Washington Street VanBuren Street to Harrison Street | 300 | 22 | $ 35000 | 20 | $ 7000 | 0 | $ - | 10 | $ 3500 | 20 | $ 7000 | $ 7159 | $ 4772727 | 250 | 24 | ||||||||||||||||||
Asphalt Overlay (2) | |||||||||||||||||||||||||||||||||
Engineers Estimate | 250 | 24 | $ 21334 | 20 | $ 426680 | 10 | $ 2133 | 20 | $ 426680 | 20 | $ 426680 | $ 5440 | $ 4835707 | 250 | 32 | ||||||||||||||||||
Reconstruction | |||||||||||||||||||||||||||||||||
Walker Street Lawrence Street to Blaine Street | 650 | 36 | $ 184310 | 25 | $ 46078 | 0 | $ - | 20 | $ 36862 | 30 | $ 55293 | $ 12405 | $ 11027094 | 250 | 32 | ||||||||||||||||||
RSL | Length (FT) | Area (SY) | Condition | Treatment | Cost | Total | |||||||||
20 | 61834 | 138524 | 131 | Good | $0 | $0 | |||||||||
14 | 23656 | 49915 | 47 | Satisfactory | Chip Seal | $29 | $1470552 | ||||||||
12 | 43586 | 106382 | 100 | $3134134 | |||||||||||
10 | 74803 | 193570 | 182 | $5702790 | |||||||||||
8 | 96662 | 228046 | 215 | $6718492 | |||||||||||
6 | 95452 | 261794 | 247 | Fair | Overlay | $67 | $17489930 | ||||||||
4 | 6420 | 14536 | 14 | $971121 | |||||||||||
2 | 29238 | 60616 | 57 | Poor | Rehab | $107 | $6492850 | ||||||||
0 | 3851 | 7532 | 07 | Very Poor | Rebuild | $155 | $1169719 | ||||||||
$43149589 | |||||||||||||||
Additional Paving Costs | Average Cost per SY | Percent of Paving Cost | |||
Digouts amp Pre-Leveling | $4 | 25 | |||
Stormwater | $7 | 38 | |||
ADA | $5 | 27 | |||
Engineering amp Administration | $5 | 28 |
9 | Base Paving Costs | Preperation | Stormwater | ADA | Engineering | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Remaining Service Life | Road Name | From | To | Length (ft) | Width (ft) | Area (SY) | Total Construction | Price(SY) | Reconstruction | Pulverize amp Pave | Ashpalt Overlay | Pave Gravel Road | Pulverize amp Chip Seal | Chip Seal | Total Base Paving Costs | Digouts(SY) | Pre-Leveling(SY) | Construct Shoulders Both Sides (LF) | Preparation Total | StormwaterPipes (LF) | StormwaterCatchbasins | StormwaterSwales (LF) | Stormwater Total | Curb Ramps | Curb Ramps Total | Surveying | Engineering amp Administration | Engineering amp Administration Total | Other Work | ||||||||||||||||||||||||||||||
$102 | $45 | $22 | $35 | $29 | $9 | $35 | $15 | $20 | $50 | $1500 | $25 | $15000 | |||||||||||||||||||||||||||||||||||||||||||||||
2 | Polk St - Street | Lawrence St | 1056 | 200 | 56 | 1244 | $ 210679 | $ 169 | $ 127518 | $ 127518 | $ - | 150 | 1 | 1 | $ 9025 | 2 | $ 30000 | $ 10000 | 25 | $ 44136 | |||||||||||||||||||||||||||||||||||||||
6 | 47th Street | Pettygrove | McNeil | 500 | 18 | 1548 | $ 258717 | $ 167 | $ 158624 | $ 158624 | $ - | 687 | 8 | $ 46350 | $ - | $ 10000 | 25 | $ 53743 | |||||||||||||||||||||||||||||||||||||||||
6 to 10 | Lawrence St | Calhoun St | Harrison St | 1200 | 36 | 4800 | $ 786070 | $ 164 | $ 491856 | $ 491856 | 600 | $ 15000 | $ 8 | $ 120000 | $ 10000 | 25 | $ 159214 | ||||||||||||||||||||||||||||||||||||||||||
8 | Lawrence St | Cass St | Calhoun St | 250 | 36 | 1000 | $ 146213 | $ 146 | $ 102470 | $ 102470 | 0 | 0 | $ - | 75 | 350 | $ 12500 | $ - | $ 10000 | 25 | $ 31243 | |||||||||||||||||||||||||||||||||||||||
8 | Lawrence St | Walker St | Cass St | 250 | 36 | 1000 | $ 144650 | $ 145 | $ 102470 | $ 102470 | $ - | 100 | 250 | $ 11250 | $ - | $ 10000 | 25 | $ 30930 | |||||||||||||||||||||||||||||||||||||||||
4 to 8 | San Juan Ave | Lopez Ave | Admiralty | 2300 | 34 | 8689 | $ 1222938 | $ 141 | $ 890350 | $ 890350 | $ - | 800 | 5 | 1500 | $ 85000 | $ - | $ 15000 | 25 | $ 247588 | ||||||||||||||||||||||||||||||||||||||||
6 to 8 | Lawrence St | Harrison St | Monroe St | 2380 | 47 | 12429 | $ 1331314 | $ 107 | $ 274803 | $ 274803 | 15 | 5 | $ 74573 | 1900 | 10 | $ 110000 | 50 | $ 750000 | $ 10000 | 10 | $ 121938 | ||||||||||||||||||||||||||||||||||||||
2 to 4 | Center St | San Juan Ave | Redwood St | 1660 | 16 | 2951 | $ 295222 | $ 100 | $ 86910 | $ 86910 | $ - | 1600 | 9 | 3000 | $ 168500 | $ - | $ 10000 | 15 | $ 39812 | ||||||||||||||||||||||||||||||||||||||||
0 to 6 | Pacific St | Cedar St | Tremont St | 400 | 16 | 711 | $ 66581 | $ 94 | $ 31744 | $ 31744 | $ - | 100 | 2 | 700 | $ 25500 | $ - | $ 5000 | 15 | $ 9337 | ||||||||||||||||||||||||||||||||||||||||
0 to 6 | Benton St | Lawrence | Lincoln Blg | 580 | 36 | 2320 | $ 203265 | $ 88 | $ 20880 | $ 20880 | 20 | 10 | $ 19720 | 250 | 2 | $ 15500 | 8 | $ 120000 | $ 5000 | 15 | $ 27165 | ||||||||||||||||||||||||||||||||||||||
2 | Grant St | 14th St | 16th St | 525 | 16 | 933 | $ 73635 | $ 79 | $ 27487 | $ 27487 | $ - | 400 | 2 | 500 | $ 35500 | $ - | $ 8000 | 15 | $ 10648 | ||||||||||||||||||||||||||||||||||||||||
2 to 6 | Olympic St | Cedar St | Tremont St | 536 | 12 | 715 | $ 52716 | $ 74 | $ 21047 | $ 21047 | $ - | 950 | $ 23750 | $ - | $ 8000 | 15 | $ 7920 | ||||||||||||||||||||||||||||||||||||||||||
2 | Milo St | Olympic Ave | Pacific Ave | 466 | 12 | 621 | $ 44793 | $ 72 | $ 18298 | $ 18298 | $ - | 800 | $ 20000 | $ - | $ 5000 | 15 | $ 6495 | ||||||||||||||||||||||||||||||||||||||||||
0 | 11th St | Hendricks St | Sheridan St | 550 | 16 | 978 | $ 65077 | $ 67 | $ 28796 | $ 28796 | $ - | 100 | 2 | 750 | $ 26750 | $ - | $ 8000 | 15 | $ 9532 | ||||||||||||||||||||||||||||||||||||||||
0 | 58th St | Hill St | Kuhn St | 525 | 16 | 933 | $ 60329 | $ 65 | $ 32667 | $ 32667 | $ - | 750 | $ 18750 | $ - | $ 8000 | 15 | $ 8913 | ||||||||||||||||||||||||||||||||||||||||||
2 | 10th St | Hendricks St | Grant St | 283 | 18 | 566 | $ 34294 | $ 61 | $ 16669 | $ 16669 | $ - | 500 | $ 12500 | $ - | $ 5000 | 15 | $ 5125 | ||||||||||||||||||||||||||||||||||||||||||
4 to 10 | 31st St | Hancock St | Sheridan St | 1050 | 22 | 2567 | $ 150027 | $ 58 | $ 23100 | $ 23100 | 10 | 10 | $ 12833 | 1200 | 10 | 1000 | $ 100000 | $ - | $ 5000 | 10 | $ 14093 | ||||||||||||||||||||||||||||||||||||||
6 | 25th St | Sheridan St | Holcomb St | 1200 | 18 | 2400 | $ 125895 | $ 52 | $ 70680 | $ 70680 | $ - | 125 | 1 | 1200 | $ 37750 | $ - | $ 8000 | 15 | $ 17465 | ||||||||||||||||||||||||||||||||||||||||
6 | Holcomb St | 7th St | 10th St | 850 | 12 | 1133 | $ 58703 | $ 52 | $ 10200 | $ 10200 | 10 | 10 | $ 5667 | 1500 | $ 37500 | $ - | $ - | 10 | $ 5337 | ||||||||||||||||||||||||||||||||||||||||
2 | Hendricks St | 9th St | 12th St | 800 | 16 | 1422 | $ 70930 | $ 50 | $ 41884 | $ 41884 | $ - | 750 | $ 18750 | $ - | $ 8000 | 15 | $ 10295 | ||||||||||||||||||||||||||||||||||||||||||
2 to 6 | Hill St | 19th | 21st St | 807 | 16 | 1435 | $ 67443 | $ 47 | $ 21125 | $ 6456 | $ 27581 | 10 | $ 5021 | 1000 | $ 25000 | $ - | $ 8000 | 15 | $ 9840 | ||||||||||||||||||||||||||||||||||||||||
2 to 8 | 57th St | Jackman St | Kuhn St | 800 | 18 | 1600 | $ 66550 | $ 42 | $ 14400 | $ 14400 | 20 | 10 | $ 13600 | 1300 | $ 32500 | 10 | $ 6050 | ||||||||||||||||||||||||||||||||||||||||||
6 to 8 | Sheridan St | Hastings Ave | SilverUmatilla | 1750 | 22 | 4278 | $ 154115 | $ 36 | $ 38500 | $ 38500 | 20 | 10 | $ 36361 | 300 | 4 | 1500 | $ 58500 | $ - | $ 5000 | 15 | $ 20754 | ||||||||||||||||||||||||||||||||||||||
6 to 10 | Tyler St | Jefferson St | Lawrence St | 900 | 32 | 3200 | $ 115280 | $ 36 | $ 28800 | $ 28800 | 5 | 5 | $ 8000 | 100 | 2 | $ 8000 | 4 | $ 60000 | 10 | $ 10480 | |||||||||||||||||||||||||||||||||||||||
6 to 14 | 14th St | McPherson St | Sheridan St | 2375 | 21 | 5542 | $ 182027 | $ 33 | $ 49875 | $ 49875 | 20 | 10 | $ 47104 | 750 | 4 | 1000 | $ 68500 | $ - | 10 | $ 16548 | |||||||||||||||||||||||||||||||||||||||
8 | 49th St | Kuhn St | Admiralty Ave | 400 | 24 | 1067 | $ 34613 | $ 32 | $ 9600 | $ 9600 | 5 | $ 1867 | 800 | $ 20000 | $ - | 10 | $ 3147 | ||||||||||||||||||||||||||||||||||||||||||
6 to 10 | Fir St | F St | UCherry | 4360 | 22 | 10658 | $ 341621 | $ 32 | $ 95920 | $ 95920 | 5 | 5 | 4000 | $ 106644 | 100 | 2 | 4000 | $ 108000 | $ - | 10 | $ 31056 | ||||||||||||||||||||||||||||||||||||||
6 to 8 | Cedar St | San Juan Ave | Redwood St | 1460 | 16 | 2596 | $ 81747 | $ 31 | $ 23360 | $ 23360 | 20 | 20 | $ 25956 | 1000 | $ 25000 | $ - | 10 | $ 7432 | |||||||||||||||||||||||||||||||||||||||||
8 | Clallam St | McKinley St | Roosevelt St | 975 | 14 | 1517 | $ 46796 | $ 31 | $ 13650 | $ 13650 | 20 | 10 | $ 12892 | 200 | 4 | $ 16000 | $ - | 10 | $ 4254 | ||||||||||||||||||||||||||||||||||||||||
6 | San Juan Ave | 19th St | 20th St | 300 | 31 | 1033 | $ 31827 | $ 31 | $ 9300 | $ 9300 | 50 | 10 | $ 19633 | $ - | $ - | 10 | $ 2893 | ||||||||||||||||||||||||||||||||||||||||||
6 to 20 | Cherry St | F St | W St | 4200 | 32 | 14933 | $ 457307 | $ 31 | $ 134400 | $ 134400 | 5 | 5 | 4200 | $ 121333 | 200 | 6000 | $ 160000 | $ - | 10 | $ 41573 | |||||||||||||||||||||||||||||||||||||||
6 to 8 | Jackman St | 45th St | 49th St | 1100 | 22 | 2689 | $ 81940 | $ 30 | $ 24200 | $ 24200 | 15 | 10 | $ 18150 | 225 | 3 | 500 | $ 28250 | $ - | $ 5000 | 15 | $ 11340 | ||||||||||||||||||||||||||||||||||||||
6 to 12 | Jackson St | LawrenceMonroe | Roosevelt St | 1600 | 18 | 3200 | $ 93530 | $ 29 | $ 28800 | $ 28800 | 10 | 10 | $ 16000 | 1000 | $ 25000 | 1 | $ 15000 | $ 2500 | 10 | $ 8730 | |||||||||||||||||||||||||||||||||||||||
2 | 7th St | Wilson St | Holcomb St | 450 | 16 | 800 | $ 23320 | $ 29 | $ 7200 | $ 7200 | 10 | 10 | $ 4000 | 400 | $ 10000 | $ - | 10 | $ 2120 | |||||||||||||||||||||||||||||||||||||||||
8 to 14 | 25th St | Sherman St | Sheridan St | 800 | 20 | 1778 | $ 50061 | $ 28 | $ 16000 | $ 16000 | 10 | 5 | $ 7556 | 1 | 800 | $ 21500 | $ - | $ 5000 | 10 | $ 5006 | |||||||||||||||||||||||||||||||||||||||
2 to 6 | Hancock St | SR 20 | 9th St | 1100 | 20 | 2444 | $ 67833 | $ 28 | $ 22000 | $ 22000 | 15 | 5 | $ 14667 | 1000 | $ 25000 | $ - | 10 | $ 6167 | |||||||||||||||||||||||||||||||||||||||||
Benton St | Washington St | Lawrence St | 1160 | 22 | 2836 | $ 74468 | $ 26 | $ 25520 | $ 25520 | 10 | 10 | $ 14178 | 140 | 4 | 600 | $ 28000 | 10 | $ 6770 | |||||||||||||||||||||||||||||||||||||||||
W St | San JuanAdmiralty | Walnut St | 2560 | 22 | 6258 | $ 163807 | $ 26 | $ 56320 | $ 56320 | 10 | 5 | $ 26596 | 200 | 4 | 2000 | $ 66000 | $ - | 10 | $ 14892 | ||||||||||||||||||||||||||||||||||||||||
6 to 8 | Walnut | W Street | Jackson | 2300 | 22 | 5622 | $ 145194 | $ 26 | $ 50600 | $ 50600 | 10 | 5 | $ 23894 | 2300 | $ 57500 | $ - | 10 | $ 13199 | |||||||||||||||||||||||||||||||||||||||||
6 to 8 | 24th St | Discovery Rd | San Juan Ave | 1250 | 18 | 2500 | $ 63938 | $ 26 | $ 22500 | $ 22500 | 10 | 5 | $ 10625 | 1000 | $ 25000 | $ - | 10 | $ 5813 | |||||||||||||||||||||||||||||||||||||||||
6 to 10 | Tyler St | Lawrence St | Blaine St | 900 | 32 | 3200 | $ 78980 | $ 25 | $ 28800 | $ 28800 | 5 | 5 | $ 8000 | 200 | $ 5000 | 2 | $ 30000 | 10 | $ 7180 | ||||||||||||||||||||||||||||||||||||||||
4 to 12 | McPherson St | SR 20 | Discovery Rd | 2925 | 32 | 10400 | $ 244860 | $ 24 | $ 93600 | $ 93600 | 5 | 5 | 2925 | $ 84500 | 230 | 2 | 1200 | $ 44500 | $ - | $ - | 10 | $ 22260 | |||||||||||||||||||||||||||||||||||||
10 | Landes St | 12th St | 19th St | 1820 | 32 | 6471 | $ 151821 | $ 23 | $ 58240 | $ 58240 | 5 | 1400 | $ 39324 | 400 | $ 10000 | 2 | $ 30000 | $ 5000 | 10 | $ 14256 | |||||||||||||||||||||||||||||||||||||||
6 to 8 | Discovery Rd | 19th | Hastings Ave | 2900 | 22 | 7089 | $ 136565 | $ 19 | $ 63800 | $ 63800 | 15 | 10 | $ 47850 | 500 | $ 12500 | $ - | 10 | $ 12415 | |||||||||||||||||||||||||||||||||||||||||
8 to 12 | Hastings Ave | Discovery Rd | County Line | 8450 | 32 | 30044 | $ 542349 | $ 18 | $ 270400 | $ 270400 | 5 | 10 | 5000 | $ 197644 | 1000 | $ 25000 | $ - | 10 | $ 49304 | ||||||||||||||||||||||||||||||||||||||||
6 to 12 | Washington St | Van Buren St | SR20 | 2025 | 30 | 6750 | $ 118388 | $ 18 | $ 60750 | $ 60750 | 5 | 5 | $ 16875 | 0 | 0 | 0 | $ - | 2 | $ 30000 | $ - | 10 | $ 10763 | |||||||||||||||||||||||||||||||||||||
14 | Blaine St | San Juan Ave | Walker St | 1275 | 48 | 6800 | $ 113910 | $ 17 | $ 61200 | $ 61200 | 5 | $ 11900 | $ - | 2 | $ 30000 | $ 5000 | 10 | $ 10810 | |||||||||||||||||||||||||||||||||||||||||
6 | Washington St | Harrison St | Taylor St | 1175 | 33 | 4308 | $ 59240 | $ 14 | $ 38775 | $ 38775 | 10 | $ 15079 | $ - | $ - | 10 | $ 5385 | |||||||||||||||||||||||||||||||||||||||||||
8 to 10 | Sheridan St | SR 20 | 19th St | 4000 | 46 | 20444 | $ 272922 | $ 13 | $ 184000 | $ 184000 | 5 | 5 | $ 51111 | 200 | 2 | $ 13000 | $ - | 10 | $ 24811 | ||||||||||||||||||||||||||||||||||||||||
8 to 10 | 19th St | San Juan Ave | Sheridan St | 3200 | 48 | 17067 | $ 197120 | $ 12 | $ 153600 | $ 153600 | 3 | 3 | $ 25600 | 0 | 0 | 0 | $ - | $ - | 10 | $ 17920 | |||||||||||||||||||||||||||||||||||||||
10 to 20 | San Juan Ave | F St | Lopez Ave | 2800 | 32 | 9956 | $ 110059 | $ 11 | $ 89600 | $ 89600 | 3 | $ 10453 | $ - | $ - | 10 | $ 10005 | |||||||||||||||||||||||||||||||||||||||||||
10 to 20 | F St | Hastings Ave | Tyler St | 5300 | 31 | 18256 | $ 180730 | $ 10 | $ 164300 | $ 164300 | $ - | $ - | $ - | 10 | $ 16430 | ||||||||||||||||||||||||||||||||||||||||||||
$ 9952406 | $ 1873288 | $ 31744 | $ 274803 | $ 32667 | $ 332896 | $ 1998646 | $ 4544044 | $ 1155207 | $ 1747625 | $ 1215000 | $ 1290529 | $ - 0 | |||||||||||||||||||||||||||||||||||||||||||||||
Street Pavement Improvement Plan Projects | 9 | 110 | |||||||||||||||||||||||||||||||||||||||||||||
Road Name | From | To | Iworq ID | Length (ft) | Width (ft) | Area (yd^2) | Actual Area(SY) | Unit Cost per yd2 | Construction Cost | Prep Work | Survey Testing | ADA Curb Ramps | Storm Water | Mill amp Fill$50SY | Pre-Level$4SY | Total Construction | Project Cost + 10 | Unit Cost w Additional Costs no 10 | Engineering Costs | Notes | |||||||||||||||||||||||||||
Priority | Reconstruct | 2021 | 2022 | 2023 | 2024 | ||||||||||||||||||||||||||||||||||||||||||
1 | Reconstruct | Lawrence St | Cass St | Calhoun St | 1304 | 250 | 36 | 1000 | $ 80 | $ 80000 | $ 5000 | $ 20000 | $ 105000 | $ 115500 | $ 105 | Stormwater South Side Parking Raingarden on Cass | |||||||||||||||||||||||||||||||
2 | Reconstruct | Lawrence St | Walker St | Cass St | 250 | 36 | 1000 | $ 80 | $ 80000 | $ 5000 | $ 20000 | $ 5000 | $ 110000 | $ 121000 | $ 110 | Stormwater South Side Parking | |||||||||||||||||||||||||||||||
3 | Reconstruct Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | San Juan Ave | Lopez Ave | Admiralty | 2300 | 32 | 8178 | $ 50 | $ 408889 | $ 10000 | $ 100000 | $ 518889 | $ 570778 | $ 63 | Stormwater Problem 45th | ||||||||||||||||||||||||||||||||
4 | Reconstruct Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Polk St - Street Improvements | Lawrence St | 1056 Sarah Tiffany Sarah TiffanyGarfield | 1073 | 200 | 56 | 1244 | $ 50 | $ 62222 | X | X | X | $ 62222 | $ 68444 | $ 50 | Parking Theater 4 AC Watermain Infiltration or Rain Garden Parking on Condo Side | ||||||||||||||||||||||||||||||
Reconstruct | 47th Street | Pettygrove | McNeil | 500 | 18 | 1000 | 1548 | $ 50 | $ 50000 | $ 5000 | $ 40000 | $ 95000 | $ 104500 | $ 95 | $210000 Engineers Estimate With Engineering Cost Turnaround Spaghetti Waterline | ||||||||||||||||||||||||||||||||
Chip Seal - $50000 to $70000 per Mile | $6 No DigoutsPre-leveling | $10 with Additional Prep Work | |||||||||||||||||||||||||||||||||||||||||||||||
Chip Seal | Washington St | Van Buren St | SR20 | 2025 | 30 | 6750 | $ 10 | $ 67500 | $ 67500 | $ 74250 | Digouts Flagging | ||||||||||||||||||||||||||||||||||||
Chip Seal | Hastings Ave - Pre-level and widen shoulders | Discovery Rd | County Line | 8450 | 24 | 22533 | $ 6 | $ 135200 | $ 135200 | $ 148720 | Ditches amp Culverts Total Width change from 21 to 24 How wide will shoulders be | ||||||||||||||||||||||||||||||||||||
Tyler St | Jefferson St | Lawrence St | 900 | 32 | 3200 | $ 6 | $ 19200 | $ 19200 | $ 21120 | ||||||||||||||||||||||||||||||||||||||
Chip Seal | McPherson - Chip Seal | 4th St | Discovery Rd | 3100 | 32 | 11022 | $ 6 | $ 66133 | $ 66133 | $ 72747 | Ditches amp Culverts Shoulder Wideneing | ||||||||||||||||||||||||||||||||||||
Chip Seal | 19th St - Chip Seal | San Juan Ave | Sheridan St | 3200 | 48 | 17067 | $ 6 | $ 102400 | $ 102400 | $ 112640 | Bike Lanes amp Shoulder Prelevel | ||||||||||||||||||||||||||||||||||||
Chip Seal | Walnut | W Street | Jackson | 2300 | 22 | 5622 | $ 6 | $ 33733 | $ 33733 | $ 37107 | Dig-Outs Pre-Leveling Striping Shoulders | ||||||||||||||||||||||||||||||||||||
Chip Seal | Fir St - Chip Seal | F St | UCherry | 4360 | 22 | 10658 | $ 10 | $ 106578 | X | X | $ 106578 | $ 117236 | Dig-Outs Pre-Leveling Striping | ||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | |||||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | P St - Chip Seal | Redwood St | Cedar St | 0486 | 300 | 16 | 533 | $ 20 | $ 10667 | $ 10667 | $ 11733 | Watermain Looping Shouldnt this be part of Center | |||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 25th St - Chip Seal | Sheridan St | Holcomb St | 1200 | 18 | 2400 | $ 20 | $ 48000 | $ 48000 | $ 52800 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 14th St - Chip Seal | $ - | $ - | ||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Cedar St - Chip Seal | Redwood St | San Juan Ave | 1460 | 16 | 2596 | $ 20 | $ 51911 | $ 51911 | $ 57102 | Ex ChipSeal 22 Wide | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Center St - Chip Seal | Redwood St | San Juan Ave | 484 | 1660 | 16 | 2951 | $ 20 | $ 59022 | $ 59022 | $ 64924 | Ex ChipSeal 22 Wide Stormwater | |||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Grant St Chip Seal | 14th St | 16th St | 525 | 16 | 933 | $ 20 | $ 18667 | $ 18667 | $ 20533 | Ex Street 10 Wide | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 11th St Chip Seal | Hendricks St | Sheridan St | 550 | 16 | 978 | $ 20 | $ 19556 | $ 19556 | $ 21511 | Hospital Parking | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Hendricks St Chip Seal | 9th St | 12th St | 800 | 16 | 1422 | $ 20 | $ 28444 | $ 28444 | $ 31289 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 10th St Chip Seal | Hendricks St | Grant St | 1655 | 283 | 18 | 566 | $ 20 | $ 11320 | $ 11320 | $ 12452 | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Grant St Chip Seal | 14th St | 16th St | 525 | 18 | 1050 | $ 20 | $ 21000 | $ 21000 | $ 23100 | Ex Street 10 Wide Stormwater | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Hill St | 21st St | 19th St | 807 | 16 | 1435 | $ 20 | $ 28693 | $ 28693 | $ 31563 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Milo St -Chip seal | Olympic Ave | Pacific Ave | 0003 | 466 | 12 | 621 | $ 20 | $ 12427 | $ 12427 | $ 13669 | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Olympic St | Cedar St | Tremont St | 536 | 12 | 715 | $ 20 | $ 14293 | $ 14293 | $ 15723 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Benton St - street improvement | Blaine St | Lincoln Blg | 580 | 36 Sarah Tiffany Sarah TiffanyEstimated at 25-36 used higher number | Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Sarah Tiffany Sarah TiffanyGarfield | 2320 | $ 20 | $ 46400 | $ 46400 | $ 51040 | ||||||||||||||||||||||||||||||||||
Pave Gravel Road | |||||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Pacific St | Cedar St | Tremont St | 400 | 16 | 711 | $ 50 | $ 35556 | $ 6000 | $ 15000 | $ 56556 | $ 62211 | $ 80 | ||||||||||||||||||||||||||||||||||
58th St | Hill St | Kuhn St | 525 | 16 | 933 | $ 50 | $ 46667 | $ 6000 | $ 20000 | $ 72667 | $ 79933 | $ 78 | 4 AC Waterline Driveways Site Distance (Re-grade Slope) | ||||||||||||||||||||||||||||||||||
Sidewalks | |||||||||||||||||||||||||||||||||||||||||||||||
Harrison St | Franklin St | Clay St | 340 | 6 | 227 | $ 165 | $ 56100 | $ 5000 | $ 61100 | $ 67210 | $ 180 | ||||||||||||||||||||||||||||||||||||
9th St | Hancock St | McPherson St | 1300 | 6 | 867 | $ 165 | $ 214500 | $ 10000 | $ 15000 | $ 239500 | $ 263450 | $ 184 | |||||||||||||||||||||||||||||||||||
Asphalt Path | |||||||||||||||||||||||||||||||||||||||||||||||
Spruce St Easement | Cedar St | Center St | 150 | 8 | 133 | $ 50 | $ 6667 | $ 2000 | $ 8667 | $ 9533 | $ 65 | ||||||||||||||||||||||||||||||||||||
Cherry St | A St | E St | 990 | 10 | 1100 | $ 50 | $ 55000 | $ 10000 | $ 10000 | $ 15000 | $ 90000 | $ 99000 | $ 82 | ||||||||||||||||||||||||||||||||||
Gravel Path | |||||||||||||||||||||||||||||||||||||||||||||||
16th St | Thomas St | Grant St | 1700 | 6 | 1133 | $ 15 | $ 17000 | $ 1500 | $ 18500 | $ 20350 | |||||||||||||||||||||||||||||||||||||
Cleveland St | 21st St | 23rd St | 500 | 6 | 333 | $ 15 | $ 5000 | $ 5000 | $ 5500 | Need Easement | |||||||||||||||||||||||||||||||||||||
6 | - | $ 15 | $ - | $ - | $ - | Need Easement | |||||||||||||||||||||||||||||||||||||||||
6 | - | $ 15 | $ - | $ - | $ - | Need Easement | |||||||||||||||||||||||||||||||||||||||||
Total | $ 1582256 | $ 1792256 | $ 1971481 | ||||||||||||||||||||||||||||||||||||||||||||
Project Descriptioin | Length | Width | Construction Costs | ConstructionUnit Costs | Units | Engineering Costs | Total CostsUnit Cost | Total Costs | Total CostsUnit Cost | Notes | |||||||||||
Sidewalk | |||||||||||||||||||||
9th Street Sidewalk Grant Street to Hancock Street | 826 | 6 | $ 141506 | $ 17131 | LF | Construction Unit Cost per Foot | |||||||||||||||
Jefferson Street Sidewalk Washington Street to Taylor Street | 724 | 6 | $ 390502 | $ 53937 | LF | Construction Unit Cost per Foot | |||||||||||||||
Landis Street Sidewalk 10th Street to 19th Street | 1795 | 6 | $ 364550 | $ 20309 | LF | Construction Unit Cost per Foot | |||||||||||||||
ADA Corner Ramps | |||||||||||||||||||||
Washington Street amp Harrison Street | $ 42000 | $ 42000 | Each | ||||||||||||||||||
Washington Street amp Adams Street | $ 38150 | $ 19075 | Each | Two Corners Were Retrofitted | |||||||||||||||||
Chip Seal Pavement | |||||||||||||||||||||
Walker Street Washington Street to Lawrence Street | 1144 | 24 | $ 20000 | $ 656 | SY | Does not include flagging nor prep work | |||||||||||||||
Pulverize amp Asphalt Paving | |||||||||||||||||||||
Washington Street VanBuren Street to Harrison Street | 300 | 22 | $ 35000 | $ 4773 | SY | ||||||||||||||||
Asphalt Overlay | |||||||||||||||||||||
Sidewalks | ||||||||||||||||||||||||||||||||||||||
Harrison St | Franklin St | Clay St | 340 | 6 | 227 | |||||||||||||||||||||||||||||||||
9th St | Hancock St | McPherson St | 1300 | 6 | 867 | |||||||||||||||||||||||||||||||||
Asphalt Path | ||||||||||||||||||||||||||||||||||||||
Spruce St Easement | Cedar St | Center St | 150 | 8 | 133 | $ 2000 | $ 2000 | $ 2000 | ||||||||||||||||||||||||||||||
Cherry St | A St | E St | 990 | 10 | 1100 | $ 10000 | $ 10000 | $ 10000 | ||||||||||||||||||||||||||||||
Gravel Path | ||||||||||||||||||||||||||||||||||||||
16th St | Thomas St | Grant St | 1700 | 6 | 1133 | $ 1500 | $ 1500 | $ 1500 | ||||||||||||||||||||||||||||||
Cleveland St | 21st St | 23rd St | 500 | 6 | 333 | Need Easement | ||||||||||||||||||||||||||||||||
6 | - | Need Easement | ||||||||||||||||||||||||||||||||||||
6 | - | Need Easement | ||||||||||||||||||||||||||||||||||||
Total |
Type | Improvement | Cost Range SY | Cost Range LF | ||||||||
1 | Complete Road Rebuild | $80 | $100 | ||||||||
2 | Asphalt Overlay | $50 | $60 | ||||||||
3 | Pulverize amp Chip Seal | $20 | $30 | ||||||||
4 | Chip Seal | $6 | $10 | $12 | $25 | ||||||
5 | Seal Coat | ||||||||||
6 | |||||||||||
7 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 3-Inch | 413 | TONS | $ 15000 | $ 6187500 | 1000 x 22 x 025 httpwwwamerasphaltcomasphalthtm | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 1630 | CY | $ 4800 | $ 7824000 | Water Street Project = $48 CY (1000 x 22 x 2)27 = 1630 CY | ||||||
Gravel Borrow | 2282 | TONS | $ 3000 | $ 6846000 | (1000 x 22 x 2)27 = 1630 1630 CY x 14 = 2282 Tons | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 128 | Hours | $ 5728 | $ 733133 | (2) People for 64 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 25043033 | |||||||||||
$ 10247 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 2-Inch | 275 | TONS | $ 15000 | $ 4125000 | 1000 x 22 x 017 httpwwwamerasphaltcomasphalthtm | | ||||||
Digouts amp Pre-leveling | 122 | SY | $ 4900 | $ 597800 | |||||||
Flagging | 64 | Hours | $ 5728 | $ 366566 | (2) People for 32 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 180000 | $ 180000 | |||||||
$ 5403066 | |||||||||||
$ 2211 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 3-Inch | 413 | TONS | $ 15000 | $ 6187500 | 1000 x 22 x 025 httpwwwamerasphaltcomasphalthtm | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 150 | CY | $ 4800 | $ 720000 | Water Street Project = $48 CY | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 96 | Hours | $ 5728 | $ 549850 | (2) People for 48 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 10909750 | |||||||||||
$ 4464 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Chip Seal | 2444 | SY | $ 1050 | $ 2566200 | 1000 X 22 | Unit Cost $525 SY from Walker Street County Invoice Doubled to $1050 for Chip Seal Over Gravel | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 150 | CY | $ 4800 | $ 720000 | Water Street Project = $48 CY | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 80 | Hours | $ 5728 | $ 458208 | (2) People for 40 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | Hours | $ 12500 | $ - 0 | High Average Loaded Rate No Testing | ||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 7196808 | |||||||||||
$ 2945 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 1500000 | $614 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 500 | LF | $ 5000 | $ 2500000 | |||||||
Catch Basins | 4 | EACH | $ 150000 | $ 600000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Chip Seal | 2444 | SY | $ 525 | $ 1283100 | 1000 X 22 | Unit Cost from Walker Street County Invoice | ||||||
Digouts amp Pre-leveling | 122 | SY | $ 4900 | $ 598780 | Cost from 2018 Lakeside Mill amp Fill | Estimate Quanity Based on 5 | ||||||
Flagging | 32 | Hours | $ 5728 | $ 183283 | (2) People for 16 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | Hours | $ 12500 | $ - 0 | High Average Loaded Rate No Surveying or Testing | ||||||
Surveying | 1 | LS | $ - 0 | $ - 0 | |||||||
$ 2198863 | |||||||||||
$ 900 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 1500000 | $614 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY |
Project Descriptioin | Length | Width | Construction Costs | Engineering Costs | Engineering Total | Digouts Pre-Leveling Costs | Digouts Pre-Leveling Total | ADACosts | ADATotal | StormwaterCosts | StormwaterTotal | Total Costsby SY | Cost Per 250 Block | Length | Width | Notes | |||||||||||||||||
Chip Seal Pavement | |||||||||||||||||||||||||||||||||
Walker Street Washington Street to Lawrence Street | 1144 | 24 | $ 25000 | 15 | $ 3750 | 10 | $ 2500 | $ 1024 | $ 682911 | 250 | 24 | ||||||||||||||||||||||
Pulverize amp Chip Seal | |||||||||||||||||||||||||||||||||
Engineers Estimate | 250 | 24 | $ 22000 | 15 | $ 3300 | 0 | $ - | 20 | $ 4400 | $ 4455 | $ 2970000 | 250 | 24 | ||||||||||||||||||||
Pulverize amp Asphalt Paving | |||||||||||||||||||||||||||||||||
Washington Street VanBuren Street to Harrison Street | 300 | 22 | $ 35000 | 20 | $ 7000 | 0 | $ - | 10 | $ 3500 | 20 | $ 7000 | $ 7159 | $ 4772727 | 250 | 24 | ||||||||||||||||||
Asphalt Overlay (2) | |||||||||||||||||||||||||||||||||
Engineers Estimate | 250 | 24 | $ 21334 | 20 | $ 426680 | 10 | $ 2133 | 20 | $ 426680 | 20 | $ 426680 | $ 5440 | $ 4835707 | 250 | 32 | ||||||||||||||||||
Reconstruction | |||||||||||||||||||||||||||||||||
Walker Street Lawrence Street to Blaine Street | 650 | 36 | $ 184310 | 25 | $ 46078 | 0 | $ - | 20 | $ 36862 | 30 | $ 55293 | $ 12405 | $ 11027094 | 250 | 32 | ||||||||||||||||||
RSL | Length (FT) | Area (SY) | Condition | Treatment | Cost | Total | |||||||||
20 | 61834 | 138524 | 131 | Good | $0 | $0 | |||||||||
14 | 23656 | 49915 | 47 | Satisfactory | Chip Seal | $29 | $1470552 | ||||||||
12 | 43586 | 106382 | 100 | $3134134 | |||||||||||
10 | 74803 | 193570 | 182 | $5702790 | |||||||||||
8 | 96662 | 228046 | 215 | $6718492 | |||||||||||
6 | 95452 | 261794 | 247 | Fair | Overlay | $67 | $17489930 | ||||||||
4 | 6420 | 14536 | 14 | $971121 | |||||||||||
2 | 29238 | 60616 | 57 | Poor | Rehab | $107 | $6492850 | ||||||||
0 | 3851 | 7532 | 07 | Very Poor | Rebuild | $155 | $1169719 | ||||||||
$43149589 | |||||||||||||||
Additional Paving Costs | Average Cost per SY | Percent of Paving Cost | |||
Digouts amp Pre-Leveling | $4 | 25 | |||
Stormwater | $7 | 38 | |||
ADA | $5 | 27 | |||
Engineering amp Administration | $5 | 28 |
9 | Base Paving Costs | Preperation | Stormwater | ADA | Engineering | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Remaining Service Life | Road Name | From | To | Length (ft) | Width (ft) | Area (SY) | Total Construction | Price(SY) | Reconstruction | Pulverize amp Pave | Ashpalt Overlay | Pave Gravel Road | Pulverize amp Chip Seal | Chip Seal | Total Base Paving Costs | Digouts(SY) | Pre-Leveling(SY) | Construct Shoulders Both Sides (LF) | Preparation Total | StormwaterPipes (LF) | StormwaterCatchbasins | StormwaterSwales (LF) | Stormwater Total | Curb Ramps | Curb Ramps Total | Surveying | Engineering amp Administration | Engineering amp Administration Total | Other Work | ||||||||||||||||||||||||||||||
$102 | $45 | $22 | $35 | $29 | $9 | $35 | $15 | $20 | $50 | $1500 | $25 | $15000 | |||||||||||||||||||||||||||||||||||||||||||||||
2 | Polk St - Street | Lawrence St | 1056 | 200 | 56 | 1244 | $ 210679 | $ 169 | $ 127518 | $ 127518 | $ - | 150 | 1 | 1 | $ 9025 | 2 | $ 30000 | $ 10000 | 25 | $ 44136 | |||||||||||||||||||||||||||||||||||||||
6 | 47th Street | Pettygrove | McNeil | 500 | 18 | 1548 | $ 258717 | $ 167 | $ 158624 | $ 158624 | $ - | 687 | 8 | $ 46350 | $ - | $ 10000 | 25 | $ 53743 | |||||||||||||||||||||||||||||||||||||||||
6 to 10 | Lawrence St | Calhoun St | Harrison St | 1200 | 36 | 4800 | $ 786070 | $ 164 | $ 491856 | $ 491856 | 600 | $ 15000 | $ 8 | $ 120000 | $ 10000 | 25 | $ 159214 | ||||||||||||||||||||||||||||||||||||||||||
8 | Lawrence St | Cass St | Calhoun St | 250 | 36 | 1000 | $ 146213 | $ 146 | $ 102470 | $ 102470 | 0 | 0 | $ - | 75 | 350 | $ 12500 | $ - | $ 10000 | 25 | $ 31243 | |||||||||||||||||||||||||||||||||||||||
8 | Lawrence St | Walker St | Cass St | 250 | 36 | 1000 | $ 144650 | $ 145 | $ 102470 | $ 102470 | $ - | 100 | 250 | $ 11250 | $ - | $ 10000 | 25 | $ 30930 | |||||||||||||||||||||||||||||||||||||||||
4 to 8 | San Juan Ave | Lopez Ave | Admiralty | 2300 | 34 | 8689 | $ 1222938 | $ 141 | $ 890350 | $ 890350 | $ - | 800 | 5 | 1500 | $ 85000 | $ - | $ 15000 | 25 | $ 247588 | ||||||||||||||||||||||||||||||||||||||||
6 to 8 | Lawrence St | Harrison St | Monroe St | 2380 | 47 | 12429 | $ 1331314 | $ 107 | $ 274803 | $ 274803 | 15 | 5 | $ 74573 | 1900 | 10 | $ 110000 | 50 | $ 750000 | $ 10000 | 10 | $ 121938 | ||||||||||||||||||||||||||||||||||||||
2 to 4 | Center St | San Juan Ave | Redwood St | 1660 | 16 | 2951 | $ 295222 | $ 100 | $ 86910 | $ 86910 | $ - | 1600 | 9 | 3000 | $ 168500 | $ - | $ 10000 | 15 | $ 39812 | ||||||||||||||||||||||||||||||||||||||||
0 to 6 | Pacific St | Cedar St | Tremont St | 400 | 16 | 711 | $ 66581 | $ 94 | $ 31744 | $ 31744 | $ - | 100 | 2 | 700 | $ 25500 | $ - | $ 5000 | 15 | $ 9337 | ||||||||||||||||||||||||||||||||||||||||
0 to 6 | Benton St | Lawrence | Lincoln Blg | 580 | 36 | 2320 | $ 203265 | $ 88 | $ 20880 | $ 20880 | 20 | 10 | $ 19720 | 250 | 2 | $ 15500 | 8 | $ 120000 | $ 5000 | 15 | $ 27165 | ||||||||||||||||||||||||||||||||||||||
2 | Grant St | 14th St | 16th St | 525 | 16 | 933 | $ 73635 | $ 79 | $ 27487 | $ 27487 | $ - | 400 | 2 | 500 | $ 35500 | $ - | $ 8000 | 15 | $ 10648 | ||||||||||||||||||||||||||||||||||||||||
2 to 6 | Olympic St | Cedar St | Tremont St | 536 | 12 | 715 | $ 52716 | $ 74 | $ 21047 | $ 21047 | $ - | 950 | $ 23750 | $ - | $ 8000 | 15 | $ 7920 | ||||||||||||||||||||||||||||||||||||||||||
2 | Milo St | Olympic Ave | Pacific Ave | 466 | 12 | 621 | $ 44793 | $ 72 | $ 18298 | $ 18298 | $ - | 800 | $ 20000 | $ - | $ 5000 | 15 | $ 6495 | ||||||||||||||||||||||||||||||||||||||||||
0 | 11th St | Hendricks St | Sheridan St | 550 | 16 | 978 | $ 65077 | $ 67 | $ 28796 | $ 28796 | $ - | 100 | 2 | 750 | $ 26750 | $ - | $ 8000 | 15 | $ 9532 | ||||||||||||||||||||||||||||||||||||||||
0 | 58th St | Hill St | Kuhn St | 525 | 16 | 933 | $ 60329 | $ 65 | $ 32667 | $ 32667 | $ - | 750 | $ 18750 | $ - | $ 8000 | 15 | $ 8913 | ||||||||||||||||||||||||||||||||||||||||||
2 | 10th St | Hendricks St | Grant St | 283 | 18 | 566 | $ 34294 | $ 61 | $ 16669 | $ 16669 | $ - | 500 | $ 12500 | $ - | $ 5000 | 15 | $ 5125 | ||||||||||||||||||||||||||||||||||||||||||
4 to 10 | 31st St | Hancock St | Sheridan St | 1050 | 22 | 2567 | $ 150027 | $ 58 | $ 23100 | $ 23100 | 10 | 10 | $ 12833 | 1200 | 10 | 1000 | $ 100000 | $ - | $ 5000 | 10 | $ 14093 | ||||||||||||||||||||||||||||||||||||||
6 | 25th St | Sheridan St | Holcomb St | 1200 | 18 | 2400 | $ 125895 | $ 52 | $ 70680 | $ 70680 | $ - | 125 | 1 | 1200 | $ 37750 | $ - | $ 8000 | 15 | $ 17465 | ||||||||||||||||||||||||||||||||||||||||
6 | Holcomb St | 7th St | 10th St | 850 | 12 | 1133 | $ 58703 | $ 52 | $ 10200 | $ 10200 | 10 | 10 | $ 5667 | 1500 | $ 37500 | $ - | $ - | 10 | $ 5337 | ||||||||||||||||||||||||||||||||||||||||
2 | Hendricks St | 9th St | 12th St | 800 | 16 | 1422 | $ 70930 | $ 50 | $ 41884 | $ 41884 | $ - | 750 | $ 18750 | $ - | $ 8000 | 15 | $ 10295 | ||||||||||||||||||||||||||||||||||||||||||
2 to 6 | Hill St | 19th | 21st St | 807 | 16 | 1435 | $ 67443 | $ 47 | $ 21125 | $ 6456 | $ 27581 | 10 | $ 5021 | 1000 | $ 25000 | $ - | $ 8000 | 15 | $ 9840 | ||||||||||||||||||||||||||||||||||||||||
2 to 8 | 57th St | Jackman St | Kuhn St | 800 | 18 | 1600 | $ 66550 | $ 42 | $ 14400 | $ 14400 | 20 | 10 | $ 13600 | 1300 | $ 32500 | 10 | $ 6050 | ||||||||||||||||||||||||||||||||||||||||||
6 to 8 | Sheridan St | Hastings Ave | SilverUmatilla | 1750 | 22 | 4278 | $ 154115 | $ 36 | $ 38500 | $ 38500 | 20 | 10 | $ 36361 | 300 | 4 | 1500 | $ 58500 | $ - | $ 5000 | 15 | $ 20754 | ||||||||||||||||||||||||||||||||||||||
6 to 10 | Tyler St | Jefferson St | Lawrence St | 900 | 32 | 3200 | $ 115280 | $ 36 | $ 28800 | $ 28800 | 5 | 5 | $ 8000 | 100 | 2 | $ 8000 | 4 | $ 60000 | 10 | $ 10480 | |||||||||||||||||||||||||||||||||||||||
6 to 14 | 14th St | McPherson St | Sheridan St | 2375 | 21 | 5542 | $ 182027 | $ 33 | $ 49875 | $ 49875 | 20 | 10 | $ 47104 | 750 | 4 | 1000 | $ 68500 | $ - | 10 | $ 16548 | |||||||||||||||||||||||||||||||||||||||
8 | 49th St | Kuhn St | Admiralty Ave | 400 | 24 | 1067 | $ 34613 | $ 32 | $ 9600 | $ 9600 | 5 | $ 1867 | 800 | $ 20000 | $ - | 10 | $ 3147 | ||||||||||||||||||||||||||||||||||||||||||
6 to 10 | Fir St | F St | UCherry | 4360 | 22 | 10658 | $ 341621 | $ 32 | $ 95920 | $ 95920 | 5 | 5 | 4000 | $ 106644 | 100 | 2 | 4000 | $ 108000 | $ - | 10 | $ 31056 | ||||||||||||||||||||||||||||||||||||||
6 to 8 | Cedar St | San Juan Ave | Redwood St | 1460 | 16 | 2596 | $ 81747 | $ 31 | $ 23360 | $ 23360 | 20 | 20 | $ 25956 | 1000 | $ 25000 | $ - | 10 | $ 7432 | |||||||||||||||||||||||||||||||||||||||||
8 | Clallam St | McKinley St | Roosevelt St | 975 | 14 | 1517 | $ 46796 | $ 31 | $ 13650 | $ 13650 | 20 | 10 | $ 12892 | 200 | 4 | $ 16000 | $ - | 10 | $ 4254 | ||||||||||||||||||||||||||||||||||||||||
6 | San Juan Ave | 19th St | 20th St | 300 | 31 | 1033 | $ 31827 | $ 31 | $ 9300 | $ 9300 | 50 | 10 | $ 19633 | $ - | $ - | 10 | $ 2893 | ||||||||||||||||||||||||||||||||||||||||||
6 to 20 | Cherry St | F St | W St | 4200 | 32 | 14933 | $ 457307 | $ 31 | $ 134400 | $ 134400 | 5 | 5 | 4200 | $ 121333 | 200 | 6000 | $ 160000 | $ - | 10 | $ 41573 | |||||||||||||||||||||||||||||||||||||||
6 to 8 | Jackman St | 45th St | 49th St | 1100 | 22 | 2689 | $ 81940 | $ 30 | $ 24200 | $ 24200 | 15 | 10 | $ 18150 | 225 | 3 | 500 | $ 28250 | $ - | $ 5000 | 15 | $ 11340 | ||||||||||||||||||||||||||||||||||||||
6 to 12 | Jackson St | LawrenceMonroe | Roosevelt St | 1600 | 18 | 3200 | $ 93530 | $ 29 | $ 28800 | $ 28800 | 10 | 10 | $ 16000 | 1000 | $ 25000 | 1 | $ 15000 | $ 2500 | 10 | $ 8730 | |||||||||||||||||||||||||||||||||||||||
2 | 7th St | Wilson St | Holcomb St | 450 | 16 | 800 | $ 23320 | $ 29 | $ 7200 | $ 7200 | 10 | 10 | $ 4000 | 400 | $ 10000 | $ - | 10 | $ 2120 | |||||||||||||||||||||||||||||||||||||||||
8 to 14 | 25th St | Sherman St | Sheridan St | 800 | 20 | 1778 | $ 50061 | $ 28 | $ 16000 | $ 16000 | 10 | 5 | $ 7556 | 1 | 800 | $ 21500 | $ - | $ 5000 | 10 | $ 5006 | |||||||||||||||||||||||||||||||||||||||
2 to 6 | Hancock St | SR 20 | 9th St | 1100 | 20 | 2444 | $ 67833 | $ 28 | $ 22000 | $ 22000 | 15 | 5 | $ 14667 | 1000 | $ 25000 | $ - | 10 | $ 6167 | |||||||||||||||||||||||||||||||||||||||||
Benton St | Washington St | Lawrence St | 1160 | 22 | 2836 | $ 74468 | $ 26 | $ 25520 | $ 25520 | 10 | 10 | $ 14178 | 140 | 4 | 600 | $ 28000 | 10 | $ 6770 | |||||||||||||||||||||||||||||||||||||||||
W St | San JuanAdmiralty | Walnut St | 2560 | 22 | 6258 | $ 163807 | $ 26 | $ 56320 | $ 56320 | 10 | 5 | $ 26596 | 200 | 4 | 2000 | $ 66000 | $ - | 10 | $ 14892 | ||||||||||||||||||||||||||||||||||||||||
6 to 8 | Walnut | W Street | Jackson | 2300 | 22 | 5622 | $ 145194 | $ 26 | $ 50600 | $ 50600 | 10 | 5 | $ 23894 | 2300 | $ 57500 | $ - | 10 | $ 13199 | |||||||||||||||||||||||||||||||||||||||||
6 to 8 | 24th St | Discovery Rd | San Juan Ave | 1250 | 18 | 2500 | $ 63938 | $ 26 | $ 22500 | $ 22500 | 10 | 5 | $ 10625 | 1000 | $ 25000 | $ - | 10 | $ 5813 | |||||||||||||||||||||||||||||||||||||||||
6 to 10 | Tyler St | Lawrence St | Blaine St | 900 | 32 | 3200 | $ 78980 | $ 25 | $ 28800 | $ 28800 | 5 | 5 | $ 8000 | 200 | $ 5000 | 2 | $ 30000 | 10 | $ 7180 | ||||||||||||||||||||||||||||||||||||||||
4 to 12 | McPherson St | SR 20 | Discovery Rd | 2925 | 32 | 10400 | $ 244860 | $ 24 | $ 93600 | $ 93600 | 5 | 5 | 2925 | $ 84500 | 230 | 2 | 1200 | $ 44500 | $ - | $ - | 10 | $ 22260 | |||||||||||||||||||||||||||||||||||||
10 | Landes St | 12th St | 19th St | 1820 | 32 | 6471 | $ 151821 | $ 23 | $ 58240 | $ 58240 | 5 | 1400 | $ 39324 | 400 | $ 10000 | 2 | $ 30000 | $ 5000 | 10 | $ 14256 | |||||||||||||||||||||||||||||||||||||||
6 to 8 | Discovery Rd | 19th | Hastings Ave | 2900 | 22 | 7089 | $ 136565 | $ 19 | $ 63800 | $ 63800 | 15 | 10 | $ 47850 | 500 | $ 12500 | $ - | 10 | $ 12415 | |||||||||||||||||||||||||||||||||||||||||
8 to 12 | Hastings Ave | Discovery Rd | County Line | 8450 | 32 | 30044 | $ 542349 | $ 18 | $ 270400 | $ 270400 | 5 | 10 | 5000 | $ 197644 | 1000 | $ 25000 | $ - | 10 | $ 49304 | ||||||||||||||||||||||||||||||||||||||||
6 to 12 | Washington St | Van Buren St | SR20 | 2025 | 30 | 6750 | $ 118388 | $ 18 | $ 60750 | $ 60750 | 5 | 5 | $ 16875 | 0 | 0 | 0 | $ - | 2 | $ 30000 | $ - | 10 | $ 10763 | |||||||||||||||||||||||||||||||||||||
14 | Blaine St | San Juan Ave | Walker St | 1275 | 48 | 6800 | $ 113910 | $ 17 | $ 61200 | $ 61200 | 5 | $ 11900 | $ - | 2 | $ 30000 | $ 5000 | 10 | $ 10810 | |||||||||||||||||||||||||||||||||||||||||
6 | Washington St | Harrison St | Taylor St | 1175 | 33 | 4308 | $ 59240 | $ 14 | $ 38775 | $ 38775 | 10 | $ 15079 | $ - | $ - | 10 | $ 5385 | |||||||||||||||||||||||||||||||||||||||||||
8 to 10 | Sheridan St | SR 20 | 19th St | 4000 | 46 | 20444 | $ 272922 | $ 13 | $ 184000 | $ 184000 | 5 | 5 | $ 51111 | 200 | 2 | $ 13000 | $ - | 10 | $ 24811 | ||||||||||||||||||||||||||||||||||||||||
8 to 10 | 19th St | San Juan Ave | Sheridan St | 3200 | 48 | 17067 | $ 197120 | $ 12 | $ 153600 | $ 153600 | 3 | 3 | $ 25600 | 0 | 0 | 0 | $ - | $ - | 10 | $ 17920 | |||||||||||||||||||||||||||||||||||||||
10 to 20 | San Juan Ave | F St | Lopez Ave | 2800 | 32 | 9956 | $ 110059 | $ 11 | $ 89600 | $ 89600 | 3 | $ 10453 | $ - | $ - | 10 | $ 10005 | |||||||||||||||||||||||||||||||||||||||||||
10 to 20 | F St | Hastings Ave | Tyler St | 5300 | 31 | 18256 | $ 180730 | $ 10 | $ 164300 | $ 164300 | $ - | $ - | $ - | 10 | $ 16430 | ||||||||||||||||||||||||||||||||||||||||||||
$ 9952406 | $ 1873288 | $ 31744 | $ 274803 | $ 32667 | $ 332896 | $ 1998646 | $ 4544044 | $ 1155207 | $ 1747625 | $ 1215000 | $ 1290529 | $ - 0 | |||||||||||||||||||||||||||||||||||||||||||||||
P A V E M E N TO P T I O N S
1 Chip Seal
2 Pulverize and Chip Seal
3 Asphalt Overlay
4 Pulverize and Asphalt Paving
5 Reconstruction
$
$$
$$
$$$
$$$$$
Cost Treatment______
C H I P S E A L
bull $7065 per Block (250rsquox24rsquo)
bull $1104 SY
bull Seals Cracks
bull Provides a Wear Course
bull 10 ndash 15 Year Longevity
P U L V E R I Z E C H I P S E A L
bull $21680 per Block (250rsquox24rsquo)
bull $3252 SY
bull Generally Requires Some Stormwater Infrastructure
bull 10 ndash 15 Year Longevity
A S P H A L TO V E R L A Y
bull $22596 per Block (250rsquox32rsquo)
bull $2542 SY
bull Generally Requires Some Stormwater Infrastructure
bull Requires ADA Ramp Upgrades If Adjacent
bull 15 ndash 25 Year Longevity
P U L V E R I Z E A S P H A L T
bull $34222 per Block (250rsquox24rsquo)
bull $5133 SY
bull Generally Requires Some Stormwater Infrastructure
bull Requires ADA Ramp Upgrades If Adjacent
bull 15 ndash 25 Year LongevityWashington Street amp Harrison Street
R E C O N S T R U C T I O N
bull $99004 per Block (250rsquox32rsquo)
bull $11138 SY
bull Generally Requires Stormwater Infrastructure
bull Requires ADA Ramp Upgrades If Adjacent
bull 20 ndash 25 Year LongevityWater Street amp Fillmore Street
A D D I T I O N A L C O S T S
bull Drainage Swales amp Stormwater Infrastructure
bull Digoutsbull ADA Curb Rampsbull EngineeringAdministrationbull Digouts and pre-level
Stormwater at Pacific Avenue amp Milo Street
ADA needs at Lawrence Street amp Adams Street
Insert I worq street rating
1 How many street segments were rated
1 Insert map of 10 year program
1 Insert table Too small to read is ok Wersquoll include it as a handout in 11x17
Rem
aini
ng
Serv
ice Li
feRoad Name From To
Length (ft)
Width (ft)
Area (SY)
Total Construction
Price(SY)
Re
cons
truc
tion
Pul
veriz
e amp
Pa
ve
Ash
palt
Ove
rlay
Pav
e Gr
avel
Ro
ad
Pul
veriz
e amp
Ch
ip S
eal
Chi
p Se
al
Tot
al B
ase
Pavi
ng C
osts
Dig
outs
(SY)
Pre
-Lev
elin
g(S
Y)
Con
stru
ct
Shou
lder
s Bot
h Si
des (
LF)
Pre
para
tion
Tota
l
Sto
rmw
ater
Pipe
s (LF
)
Sto
rmw
ater
Catc
hbas
ins
Sto
rmw
ater
Swal
es (L
F)
Sto
rmw
ater
To
tal
Cur
b Ra
mps
Cur
b Ra
mps
To
tal
Sur
veyi
ng
Eng
inee
ring
amp
Adm
inist
ratio
n
Eng
inee
ring
amp
Adm
inist
ratio
n To
tal
$102 $45 $22 $35 $29 $9 $35 $15 $20 $50 $1500 $25 $150002 Polk St - Street Lawrence St 1056 200 56 1244 210679$ 169$ 127518$ 127518$ -$ 150 1 1 9025$ 2 30000$ 10000$ 25 44136$ 6 47th Street Pettygrove McNeil 500 18 1548 258717$ 167$ 158624$ 158624$ -$ 687 8 46350$ -$ 10000$ 25 53743$
6 to 10 Lawrence St Calhoun St Harrison St 1200 36 4800 786070$ 164$ 491856$ 491856$ 600 15000$ 8$ 120000$ 10000$ 25 159214$ 8 Lawrence St Cass St Calhoun St 250 36 1000 146213$ 146$ 102470$ 102470$ 0 0 -$ 75 350 12500$ -$ 10000$ 25 31243$ 8 Lawrence St Walker St Cass St 250 36 1000 144650$ 145$ 102470$ 102470$ -$ 100 250 11250$ -$ 10000$ 25 30930$
4 to 8 San Juan Ave Lopez Ave Admiralty 2300 34 8689 1222938$ 141$ 890350$ 890350$ -$ 800 5 1500 85000$ -$ 15000$ 25 247588$ 6 to 8 Lawrence St Harrison St Monroe St 2380 47 12429 1331314$ 107$ 274803$ 274803$ 15 5 74573$ 1900 10 110000$ 50 750000$ 10000$ 10 121938$ 2 to 4 Center St San Juan Ave Redwood St 1660 16 2951 295222$ 100$ 86910$ 86910$ -$ 1600 9 3000 168500$ -$ 10000$ 15 39812$ 0 to 6 Pacific St Cedar St Tremont St 400 16 711 66581$ 94$ 31744$ 31744$ -$ 100 2 700 25500$ -$ 5000$ 15 9337$ 0 to 6 Benton St Lawrence Lincoln Blg 580 36 2320 203265$ 88$ 20880$ 20880$ 20 10 19720$ 250 2 15500$ 8 120000$ 5000$ 15 27165$
2 Grant St 14th St 16th St 525 16 933 73635$ 79$ 27487$ 27487$ -$ 400 2 500 35500$ -$ 8000$ 15 10648$ 2 to 6 Olympic St Cedar St Tremont St 536 12 715 52716$ 74$ 21047$ 21047$ -$ 950 23750$ -$ 8000$ 15 7920$
2 Milo St Olympic Ave Pacific Ave 466 12 621 44793$ 72$ 18298$ 18298$ -$ 800 20000$ -$ 5000$ 15 6495$ 0 11th St Hendricks St Sheridan St 550 16 978 65077$ 67$ 28796$ 28796$ -$ 100 2 750 26750$ -$ 8000$ 15 9532$ 0 58th St Hill St Kuhn St 525 16 933 60329$ 65$ 32667$ 32667$ -$ 750 18750$ -$ 8000$ 15 8913$ 2 10th St Hendricks St Grant St 283 18 566 34294$ 61$ 16669$ 16669$ -$ 500 12500$ -$ 5000$ 15 5125$
4 to 10 31st St Hancock St Sheridan St 1050 22 2567 150027$ 58$ 23100$ 23100$ 10 10 12833$ 1200 10 1000 100000$ -$ 5000$ 10 14093$ 6 25th St Sheridan St Holcomb St 1200 18 2400 125895$ 52$ 70680$ 70680$ -$ 125 1 1200 37750$ -$ 8000$ 15 17465$ 6 Holcomb St 7th St 10th St 850 12 1133 58703$ 52$ 10200$ 10200$ 10 10 5667$ 1500 37500$ -$ -$ 10 5337$ 2 Hendricks St 9th St 12th St 800 16 1422 70930$ 50$ 41884$ 41884$ -$ 750 18750$ -$ 8000$ 15 10295$
2 to 6 Hill St 19th 21st St 807 16 1435 67443$ 47$ 21125$ 6456$ 27581$ 10 5021$ 1000 25000$ -$ 8000$ 15 9840$ 2 to 8 57th St Jackman St Kuhn St 800 18 1600 66550$ 42$ 14400$ 14400$ 20 10 13600$ 1300 32500$ 10 6050$ 6 to 8 Sheridan St Hastings Ave SilverUmatilla 1750 22 4278 154115$ 36$ 38500$ 38500$ 20 10 36361$ 300 4 1500 58500$ -$ 5000$ 15 20754$ 6 to 10 Tyler St Jefferson St Lawrence St 900 32 3200 115280$ 36$ 28800$ 28800$ 5 5 8000$ 100 2 8000$ 4 60000$ 10 10480$ 6 to 14 14th St McPherson St Sheridan St 2375 21 5542 182027$ 33$ 49875$ 49875$ 20 10 47104$ 750 4 1000 68500$ -$ 10 16548$
8 49th St Kuhn St Admiralty Ave 400 24 1067 34613$ 32$ 9600$ 9600$ 5 1867$ 800 20000$ -$ 10 3147$ 6 to 10 Fir St F St UCherry 4360 22 10658 341621$ 32$ 95920$ 95920$ 5 5 4000 106644$ 100 2 4000 108000$ -$ 10 31056$ 6 to 8 Cedar St San Juan Ave Redwood St 1460 16 2596 81747$ 31$ 23360$ 23360$ 20 20 25956$ 1000 25000$ -$ 10 7432$
8 Clallam St McKinley St Roosevelt St 975 14 1517 46796$ 31$ 13650$ 13650$ 20 10 12892$ 200 4 16000$ -$ 10 4254$ 6 San Juan Ave 19th St 20th St 300 31 1033 31827$ 31$ 9300$ 9300$ 50 10 19633$ -$ -$ 10 2893$
6 to 20 Cherry St F St W St 4200 32 14933 457307$ 31$ 134400$ 134400$ 5 5 4200 121333$ 200 6000 160000$ -$ 10 41573$ 6 to 8 Jackman St 45th St 49th St 1100 22 2689 81940$ 30$ 24200$ 24200$ 15 10 18150$ 225 3 500 28250$ -$ 5000$ 15 11340$ 6 to 12 Jackson St LawrenceMonroe Roosevelt St 1600 18 3200 93530$ 29$ 28800$ 28800$ 10 10 16000$ 1000 25000$ 1 15000$ 2500$ 10 8730$
2 7th St Wilson St Holcomb St 450 16 800 23320$ 29$ 7200$ 7200$ 10 10 4000$ 400 10000$ -$ 10 2120$ 8 to 14 25th St Sherman St Sheridan St 800 20 1778 50061$ 28$ 16000$ 16000$ 10 5 7556$ 1 800 21500$ -$ 5000$ 10 5006$ 2 to 6 Hancock St SR 20 9th St 1100 20 2444 67833$ 28$ 22000$ 22000$ 15 5 14667$ 1000 25000$ -$ 10 6167$
Benton St Washington St Lawrence St 1160 22 2836 74468$ 26$ 25520$ 25520$ 10 10 14178$ 140 4 600 28000$ 10 6770$ W St San JuanAdmiralty Walnut St 2560 22 6258 163807$ 26$ 56320$ 56320$ 10 5 26596$ 200 4 2000 66000$ -$ 10 14892$
6 to 8 Walnut W Street Jackson 2300 22 5622 145194$ 26$ 50600$ 50600$ 10 5 23894$ 2300 57500$ -$ 10 13199$ 6 to 8 24th St Discovery Rd San Juan Ave 1250 18 2500 63938$ 26$ 22500$ 22500$ 10 5 10625$ 1000 25000$ -$ 10 5813$ 6 to 10 Tyler St Lawrence St Blaine St 900 32 3200 78980$ 25$ 28800$ 28800$ 5 5 8000$ 200 5000$ 2 30000$ 10 7180$ 4 to 12 McPherson St SR 20 Discovery Rd 2925 32 10400 244860$ 24$ 93600$ 93600$ 5 5 2925 84500$ 230 2 1200 44500$ -$ -$ 10 22260$
10 Landes St 12th St 19th St 1820 32 6471 151821$ 23$ 58240$ 58240$ 5 1400 39324$ 400 10000$ 2 30000$ 5000$ 10 14256$ 6 to 8 Discovery Rd 19th Hastings Ave 2900 22 7089 136565$ 19$ 63800$ 63800$ 15 10 47850$ 500 12500$ -$ 10 12415$ 8 to 12 Hastings Ave Discovery Rd County Line 8450 32 30044 542349$ 18$ 270400$ 270400$ 5 10 5000 197644$ 1000 25000$ -$ 10 49304$ 6 to 12 Washington St Van Buren St SR20 2025 30 6750 118388$ 18$ 60750$ 60750$ 5 5 16875$ 0 0 0 -$ 2 30000$ -$ 10 10763$
14 Blaine St San Juan Ave Walker St 1275 48 6800 113910$ 17$ 61200$ 61200$ 5 11900$ -$ 2 30000$ 5000$ 10 10810$ 6 Washington St Harrison St Taylor St 1175 33 4308 59240$ 14$ 38775$ 38775$ 10 15079$ -$ -$ 10 5385$
8 to 10 Sheridan St SR 20 19th St 4000 46 20444 272922$ 13$ 184000$ 184000$ 5 5 51111$ 200 2 13000$ -$ 10 24811$ 8 to 10 19th St San Juan Ave Sheridan St 3200 48 17067 197120$ 12$ 153600$ 153600$ 3 3 25600$ 0 0 0 -$ -$ 10 17920$
10 to 20 San Juan Ave F St Lopez Ave 2800 32 9956 110059$ 11$ 89600$ 89600$ 3 10453$ -$ -$ 10 10005$ 10 to 20 F St Hastings Ave Tyler St 5300 31 18256 180730$ 10$ 164300$ 164300$ -$ -$ -$ 10 16430$
9952406$ 1873288$ 31744$ 274803$ 32667$ 332896$ 1998646$ 4544044$ 1155207$ 1747625$ 1215000$ 1290529$
9 Stormwater Base Paving Costs Preperation EngineeringADA
Chip Seal
Pulverize amp Chip Seal
Pulverize amp Asphalt
Asphalt Overlay
Reconstruction
1 Insert summary table of average costs of ada sw eng digouts etc
Additional Paving Costs Average Cost per SY Percent of Paving CostDigouts amp Pre-Leveling $4 25Stormwater $7 38ADA $5 27Engineering amp Administration $5 28
Chip Seal
Pulverize amp Chip Seal
Pulverize amp Asphalt
Asphalt Overlay
Reconstruction
1 Insert total costs for the entire city based on pavement rating
RSL Length (FT) Area (SY) Condition Treatment Cost Total20 61834 138524 131 Good $0 $014 23656 49915 47 $147055212 43586 106382 100 $313413410 74803 193570 182 $57027908 96662 228046 215 $67184926 95452 261794 247 $174899304 6420 14536 14 $9711212 29238 60616 57 Poor Rehab $107 $64928500 3851 7532 07 Very Poor Rebuild $155 $1169719
$43149589
Satisfactory Chip Seal $29
Fair Overlay $67
Chip Seal
Pulverize amp Chip Seal
Pulverize amp Asphalt
Asphalt Overlay
Reconstruction
Fir Street Asphalt Overlay in early 1990s Inadequate Stormwater System Water Intrusion Inadequate Base Material
San Juan Avenue Reconstructed 1997
New ADA Sidewalks
Complete Stormwater System
Lawrence Street Chip Sealed in 2000
Inadequate Base
Water Intrusion
F Street Reconstructed 2001 2002
New ADA Sidewalks
Complete Stormwater System
Best Streets First
Stop the Continued Decay of our Streets
Slowly Rebuild Street System Investment
1 Introduction
2 Public Engagement
3 Street Operations
4 Street Improvements
5 Street Preservation
6 Street Programming
7 Funding Options
8 Recommendations
January
February
April
March
May
June
Encouraging the public to be involved through Engage PTwwwcityofptusengagept
Street Pavement Improvement Plan Projects | 9 | 110 | |||||||||||||||||||||||||||||||||||||||||||||
Road Name | From | To | Iworq ID | Length (ft) | Width (ft) | Area (yd^2) | Actual Area(SY) | Unit Cost per yd2 | Construction Cost | Prep Work | Survey Testing | ADA Curb Ramps | Storm Water | Mill amp Fill$50SY | Pre-Level$4SY | Total Construction | Project Cost + 10 | Unit Cost w Additional Costs no 10 | Engineering Costs | Notes | |||||||||||||||||||||||||||
Priority | Reconstruct | 2021 | 2022 | 2023 | 2024 | ||||||||||||||||||||||||||||||||||||||||||
1 | Reconstruct | Lawrence St | Cass St | Calhoun St | 1304 | 250 | 36 | 1000 | $ 80 | $ 80000 | $ 5000 | $ 20000 | $ 105000 | $ 115500 | $ 105 | Stormwater South Side Parking Raingarden on Cass | |||||||||||||||||||||||||||||||
2 | Reconstruct | Lawrence St | Walker St | Cass St | 250 | 36 | 1000 | $ 80 | $ 80000 | $ 5000 | $ 20000 | $ 5000 | $ 110000 | $ 121000 | $ 110 | Stormwater South Side Parking | |||||||||||||||||||||||||||||||
3 | Reconstruct Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | San Juan Ave | Lopez Ave | Admiralty | 2300 | 32 | 8178 | $ 50 | $ 408889 | $ 10000 | $ 100000 | $ 518889 | $ 570778 | $ 63 | Stormwater Problem 45th | ||||||||||||||||||||||||||||||||
4 | Reconstruct Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Polk St - Street Improvements | Lawrence St | 1056 Sarah Tiffany Sarah TiffanyGarfield | 1073 | 200 | 56 | 1244 | $ 50 | $ 62222 | X | X | X | $ 62222 | $ 68444 | $ 50 | Parking Theater 4 AC Watermain Infiltration or Rain Garden Parking on Condo Side | ||||||||||||||||||||||||||||||
Reconstruct | 47th Street | Pettygrove | McNeil | 500 | 18 | 1000 | 1548 | $ 50 | $ 50000 | $ 5000 | $ 40000 | $ 95000 | $ 104500 | $ 95 | $210000 Engineers Estimate With Engineering Cost Turnaround Spaghetti Waterline | ||||||||||||||||||||||||||||||||
Chip Seal - $50000 to $70000 per Mile | $6 No DigoutsPre-leveling | $10 with Additional Prep Work | |||||||||||||||||||||||||||||||||||||||||||||||
Chip Seal | Washington St | Van Buren St | SR20 | 2025 | 30 | 6750 | $ 10 | $ 67500 | $ 67500 | $ 74250 | Digouts Flagging | ||||||||||||||||||||||||||||||||||||
Chip Seal | Hastings Ave - Pre-level and widen shoulders | Discovery Rd | County Line | 8450 | 24 | 22533 | $ 6 | $ 135200 | $ 135200 | $ 148720 | Ditches amp Culverts Total Width change from 21 to 24 How wide will shoulders be | ||||||||||||||||||||||||||||||||||||
Tyler St | Jefferson St | Lawrence St | 900 | 32 | 3200 | $ 6 | $ 19200 | $ 19200 | $ 21120 | ||||||||||||||||||||||||||||||||||||||
Chip Seal | McPherson - Chip Seal | 4th St | Discovery Rd | 3100 | 32 | 11022 | $ 6 | $ 66133 | $ 66133 | $ 72747 | Ditches amp Culverts Shoulder Wideneing | ||||||||||||||||||||||||||||||||||||
Chip Seal | 19th St - Chip Seal | San Juan Ave | Sheridan St | 3200 | 48 | 17067 | $ 6 | $ 102400 | $ 102400 | $ 112640 | Bike Lanes amp Shoulder Prelevel | ||||||||||||||||||||||||||||||||||||
Chip Seal | Walnut | W Street | Jackson | 2300 | 22 | 5622 | $ 6 | $ 33733 | $ 33733 | $ 37107 | Dig-Outs Pre-Leveling Striping Shoulders | ||||||||||||||||||||||||||||||||||||
Chip Seal | Fir St - Chip Seal | F St | UCherry | 4360 | 22 | 10658 | $ 10 | $ 106578 | X | X | $ 106578 | $ 117236 | Dig-Outs Pre-Leveling Striping | ||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | |||||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | P St - Chip Seal | Redwood St | Cedar St | 0486 | 300 | 16 | 533 | $ 20 | $ 10667 | $ 10667 | $ 11733 | Watermain Looping Shouldnt this be part of Center | |||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 25th St - Chip Seal | Sheridan St | Holcomb St | 1200 | 18 | 2400 | $ 20 | $ 48000 | $ 48000 | $ 52800 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 14th St - Chip Seal | $ - | $ - | ||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Cedar St - Chip Seal | Redwood St | San Juan Ave | 1460 | 16 | 2596 | $ 20 | $ 51911 | $ 51911 | $ 57102 | Ex ChipSeal 22 Wide | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Center St - Chip Seal | Redwood St | San Juan Ave | 484 | 1660 | 16 | 2951 | $ 20 | $ 59022 | $ 59022 | $ 64924 | Ex ChipSeal 22 Wide Stormwater | |||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Grant St Chip Seal | 14th St | 16th St | 525 | 16 | 933 | $ 20 | $ 18667 | $ 18667 | $ 20533 | Ex Street 10 Wide | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 11th St Chip Seal | Hendricks St | Sheridan St | 550 | 16 | 978 | $ 20 | $ 19556 | $ 19556 | $ 21511 | Hospital Parking | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Hendricks St Chip Seal | 9th St | 12th St | 800 | 16 | 1422 | $ 20 | $ 28444 | $ 28444 | $ 31289 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 10th St Chip Seal | Hendricks St | Grant St | 1655 | 283 | 18 | 566 | $ 20 | $ 11320 | $ 11320 | $ 12452 | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Grant St Chip Seal | 14th St | 16th St | 525 | 18 | 1050 | $ 20 | $ 21000 | $ 21000 | $ 23100 | Ex Street 10 Wide Stormwater | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Hill St | 21st St | 19th St | 807 | 16 | 1435 | $ 20 | $ 28693 | $ 28693 | $ 31563 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Milo St -Chip seal | Olympic Ave | Pacific Ave | 0003 | 466 | 12 | 621 | $ 20 | $ 12427 | $ 12427 | $ 13669 | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Olympic St | Cedar St | Tremont St | 536 | 12 | 715 | $ 20 | $ 14293 | $ 14293 | $ 15723 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Benton St - street improvement | Blaine St | Lincoln Blg | 580 | 36 Sarah Tiffany Sarah TiffanyEstimated at 25-36 used higher number | Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Sarah Tiffany Sarah TiffanyGarfield | 2320 | $ 20 | $ 46400 | $ 46400 | $ 51040 | ||||||||||||||||||||||||||||||||||
Pave Gravel Road | |||||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Pacific St | Cedar St | Tremont St | 400 | 16 | 711 | $ 50 | $ 35556 | $ 6000 | $ 15000 | $ 56556 | $ 62211 | $ 80 | ||||||||||||||||||||||||||||||||||
58th St | Hill St | Kuhn St | 525 | 16 | 933 | $ 50 | $ 46667 | $ 6000 | $ 20000 | $ 72667 | $ 79933 | $ 78 | 4 AC Waterline Driveways Site Distance (Re-grade Slope) | ||||||||||||||||||||||||||||||||||
Sidewalks | |||||||||||||||||||||||||||||||||||||||||||||||
Harrison St | Franklin St | Clay St | 340 | 6 | 227 | $ 165 | $ 56100 | $ 5000 | $ 61100 | $ 67210 | $ 180 | ||||||||||||||||||||||||||||||||||||
9th St | Hancock St | McPherson St | 1300 | 6 | 867 | $ 165 | $ 214500 | $ 10000 | $ 15000 | $ 239500 | $ 263450 | $ 184 | |||||||||||||||||||||||||||||||||||
Asphalt Path | |||||||||||||||||||||||||||||||||||||||||||||||
Spruce St Easement | Cedar St | Center St | 150 | 8 | 133 | $ 50 | $ 6667 | $ 2000 | $ 8667 | $ 9533 | $ 65 | ||||||||||||||||||||||||||||||||||||
Cherry St | A St | E St | 990 | 10 | 1100 | $ 50 | $ 55000 | $ 10000 | $ 10000 | $ 15000 | $ 90000 | $ 99000 | $ 82 | ||||||||||||||||||||||||||||||||||
Gravel Path | |||||||||||||||||||||||||||||||||||||||||||||||
16th St | Thomas St | Grant St | 1700 | 6 | 1133 | $ 15 | $ 17000 | $ 1500 | $ 18500 | $ 20350 | |||||||||||||||||||||||||||||||||||||
Cleveland St | 21st St | 23rd St | 500 | 6 | 333 | $ 15 | $ 5000 | $ 5000 | $ 5500 | Need Easement | |||||||||||||||||||||||||||||||||||||
6 | - | $ 15 | $ - | $ - | $ - | Need Easement | |||||||||||||||||||||||||||||||||||||||||
6 | - | $ 15 | $ - | $ - | $ - | Need Easement | |||||||||||||||||||||||||||||||||||||||||
Total | $ 1582256 | $ 1792256 | $ 1971481 | ||||||||||||||||||||||||||||||||||||||||||||
Project Descriptioin | Length | Width | Construction Costs | ConstructionUnit Costs | Units | Engineering Costs | Total CostsUnit Cost | Total Costs | Total CostsUnit Cost | Notes | |||||||||||
Sidewalk | |||||||||||||||||||||
9th Street Sidewalk Grant Street to Hancock Street | 826 | 6 | $ 141506 | $ 17131 | LF | Construction Unit Cost per Foot | |||||||||||||||
Jefferson Street Sidewalk Washington Street to Taylor Street | 724 | 6 | $ 390502 | $ 53937 | LF | Construction Unit Cost per Foot | |||||||||||||||
Landis Street Sidewalk 10th Street to 19th Street | 1795 | 6 | $ 364550 | $ 20309 | LF | Construction Unit Cost per Foot | |||||||||||||||
ADA Corner Ramps | |||||||||||||||||||||
Washington Street amp Harrison Street | $ 42000 | $ 42000 | Each | ||||||||||||||||||
Washington Street amp Adams Street | $ 38150 | $ 19075 | Each | Two Corners Were Retrofitted | |||||||||||||||||
Chip Seal Pavement | |||||||||||||||||||||
Walker Street Washington Street to Lawrence Street | 1144 | 24 | $ 20000 | $ 656 | SY | Does not include flagging nor prep work | |||||||||||||||
Pulverize amp Asphalt Paving | |||||||||||||||||||||
Washington Street VanBuren Street to Harrison Street | 300 | 22 | $ 35000 | $ 4773 | SY | ||||||||||||||||
Asphalt Overlay | |||||||||||||||||||||
Sidewalks | ||||||||||||||||||||||||||||||||||||||
Harrison St | Franklin St | Clay St | 340 | 6 | 227 | |||||||||||||||||||||||||||||||||
9th St | Hancock St | McPherson St | 1300 | 6 | 867 | |||||||||||||||||||||||||||||||||
Asphalt Path | ||||||||||||||||||||||||||||||||||||||
Spruce St Easement | Cedar St | Center St | 150 | 8 | 133 | $ 2000 | $ 2000 | $ 2000 | ||||||||||||||||||||||||||||||
Cherry St | A St | E St | 990 | 10 | 1100 | $ 10000 | $ 10000 | $ 10000 | ||||||||||||||||||||||||||||||
Gravel Path | ||||||||||||||||||||||||||||||||||||||
16th St | Thomas St | Grant St | 1700 | 6 | 1133 | $ 1500 | $ 1500 | $ 1500 | ||||||||||||||||||||||||||||||
Cleveland St | 21st St | 23rd St | 500 | 6 | 333 | Need Easement | ||||||||||||||||||||||||||||||||
6 | - | Need Easement | ||||||||||||||||||||||||||||||||||||
6 | - | Need Easement | ||||||||||||||||||||||||||||||||||||
Total |
Type | Improvement | Cost Range SY | Cost Range LF | ||||||||
1 | Complete Road Rebuild | $80 | $100 | ||||||||
2 | Asphalt Overlay | $50 | $60 | ||||||||
3 | Pulverize amp Chip Seal | $20 | $30 | ||||||||
4 | Chip Seal | $6 | $10 | $12 | $25 | ||||||
5 | Seal Coat | ||||||||||
6 | |||||||||||
7 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 3-Inch | 413 | TONS | $ 15000 | $ 6187500 | 1000 x 22 x 025 httpwwwamerasphaltcomasphalthtm | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 1630 | CY | $ 4800 | $ 7824000 | Water Street Project = $48 CY (1000 x 22 x 2)27 = 1630 CY | ||||||
Gravel Borrow | 2282 | TONS | $ 3000 | $ 6846000 | (1000 x 22 x 2)27 = 1630 1630 CY x 14 = 2282 Tons | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 128 | Hours | $ 5728 | $ 733133 | (2) People for 64 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 25043033 | |||||||||||
$ 10247 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 2-Inch | 275 | TONS | $ 15000 | $ 4125000 | 1000 x 22 x 017 httpwwwamerasphaltcomasphalthtm | | ||||||
Digouts amp Pre-leveling | 122 | SY | $ 4900 | $ 597800 | |||||||
Flagging | 64 | Hours | $ 5728 | $ 366566 | (2) People for 32 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 180000 | $ 180000 | |||||||
$ 5403066 | |||||||||||
$ 2211 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 3-Inch | 413 | TONS | $ 15000 | $ 6187500 | 1000 x 22 x 025 httpwwwamerasphaltcomasphalthtm | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 150 | CY | $ 4800 | $ 720000 | Water Street Project = $48 CY | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 96 | Hours | $ 5728 | $ 549850 | (2) People for 48 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 10909750 | |||||||||||
$ 4464 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Chip Seal | 2444 | SY | $ 1050 | $ 2566200 | 1000 X 22 | Unit Cost $525 SY from Walker Street County Invoice Doubled to $1050 for Chip Seal Over Gravel | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 150 | CY | $ 4800 | $ 720000 | Water Street Project = $48 CY | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 80 | Hours | $ 5728 | $ 458208 | (2) People for 40 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | Hours | $ 12500 | $ - 0 | High Average Loaded Rate No Testing | ||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 7196808 | |||||||||||
$ 2945 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 1500000 | $614 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 500 | LF | $ 5000 | $ 2500000 | |||||||
Catch Basins | 4 | EACH | $ 150000 | $ 600000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Chip Seal | 2444 | SY | $ 525 | $ 1283100 | 1000 X 22 | Unit Cost from Walker Street County Invoice | ||||||
Digouts amp Pre-leveling | 122 | SY | $ 4900 | $ 598780 | Cost from 2018 Lakeside Mill amp Fill | Estimate Quanity Based on 5 | ||||||
Flagging | 32 | Hours | $ 5728 | $ 183283 | (2) People for 16 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | Hours | $ 12500 | $ - 0 | High Average Loaded Rate No Surveying or Testing | ||||||
Surveying | 1 | LS | $ - 0 | $ - 0 | |||||||
$ 2198863 | |||||||||||
$ 900 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 1500000 | $614 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY |
Project Descriptioin | Length | Width | Construction Costs | Engineering Costs | Engineering Total | Digouts Pre-Leveling Costs | Digouts Pre-Leveling Total | ADACosts | ADATotal | StormwaterCosts | StormwaterTotal | Total Costsby SY | Cost Per 250 Block | Length | Width | Notes | |||||||||||||||||
Chip Seal Pavement | |||||||||||||||||||||||||||||||||
Walker Street Washington Street to Lawrence Street | 1144 | 24 | $ 25000 | 15 | $ 3750 | 10 | $ 2500 | $ 1024 | $ 682911 | 250 | 24 | ||||||||||||||||||||||
Pulverize amp Chip Seal | |||||||||||||||||||||||||||||||||
Engineers Estimate | 250 | 24 | $ 22000 | 15 | $ 3300 | 0 | $ - | 20 | $ 4400 | $ 4455 | $ 2970000 | 250 | 24 | ||||||||||||||||||||
Pulverize amp Asphalt Paving | |||||||||||||||||||||||||||||||||
Washington Street VanBuren Street to Harrison Street | 300 | 22 | $ 35000 | 20 | $ 7000 | 0 | $ - | 10 | $ 3500 | 20 | $ 7000 | $ 7159 | $ 4772727 | 250 | 24 | ||||||||||||||||||
Asphalt Overlay (2) | |||||||||||||||||||||||||||||||||
Engineers Estimate | 250 | 24 | $ 21334 | 20 | $ 426680 | 10 | $ 2133 | 20 | $ 426680 | 20 | $ 426680 | $ 5440 | $ 4835707 | 250 | 32 | ||||||||||||||||||
Reconstruction | |||||||||||||||||||||||||||||||||
Walker Street Lawrence Street to Blaine Street | 650 | 36 | $ 184310 | 25 | $ 46078 | 0 | $ - | 20 | $ 36862 | 30 | $ 55293 | $ 12405 | $ 11027094 | 250 | 32 | ||||||||||||||||||
RSL | Length (FT) | Area (SY) | Condition | Treatment | Cost | Total | |||||||||
20 | 61834 | 138524 | 131 | Good | $0 | $0 | |||||||||
14 | 23656 | 49915 | 47 | Satisfactory | Chip Seal | $29 | $1470552 | ||||||||
12 | 43586 | 106382 | 100 | $3134134 | |||||||||||
10 | 74803 | 193570 | 182 | $5702790 | |||||||||||
8 | 96662 | 228046 | 215 | $6718492 | |||||||||||
6 | 95452 | 261794 | 247 | Fair | Overlay | $67 | $17489930 | ||||||||
4 | 6420 | 14536 | 14 | $971121 | |||||||||||
2 | 29238 | 60616 | 57 | Poor | Rehab | $107 | $6492850 | ||||||||
0 | 3851 | 7532 | 07 | Very Poor | Rebuild | $155 | $1169719 | ||||||||
$43149589 | |||||||||||||||
Additional Paving Costs | Average Cost per SY | Percent of Paving Cost | |||
Digouts amp Pre-Leveling | $4 | 25 | |||
Stormwater | $7 | 38 | |||
ADA | $5 | 27 | |||
Engineering amp Administration | $5 | 28 |
9 | Base Paving Costs | Preperation | Stormwater | ADA | Engineering | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Remaining Service Life | Road Name | From | To | Length (ft) | Width (ft) | Area (SY) | Total Construction | Price(SY) | Reconstruction | Pulverize amp Pave | Ashpalt Overlay | Pave Gravel Road | Pulverize amp Chip Seal | Chip Seal | Total Base Paving Costs | Digouts(SY) | Pre-Leveling(SY) | Construct Shoulders Both Sides (LF) | Preparation Total | StormwaterPipes (LF) | StormwaterCatchbasins | StormwaterSwales (LF) | Stormwater Total | Curb Ramps | Curb Ramps Total | Surveying | Engineering amp Administration | Engineering amp Administration Total | Other Work | ||||||||||||||||||||||||||||||
$102 | $45 | $22 | $35 | $29 | $9 | $35 | $15 | $20 | $50 | $1500 | $25 | $15000 | |||||||||||||||||||||||||||||||||||||||||||||||
2 | Polk St - Street | Lawrence St | 1056 | 200 | 56 | 1244 | $ 210679 | $ 169 | $ 127518 | $ 127518 | $ - | 150 | 1 | 1 | $ 9025 | 2 | $ 30000 | $ 10000 | 25 | $ 44136 | |||||||||||||||||||||||||||||||||||||||
6 | 47th Street | Pettygrove | McNeil | 500 | 18 | 1548 | $ 258717 | $ 167 | $ 158624 | $ 158624 | $ - | 687 | 8 | $ 46350 | $ - | $ 10000 | 25 | $ 53743 | |||||||||||||||||||||||||||||||||||||||||
6 to 10 | Lawrence St | Calhoun St | Harrison St | 1200 | 36 | 4800 | $ 786070 | $ 164 | $ 491856 | $ 491856 | 600 | $ 15000 | $ 8 | $ 120000 | $ 10000 | 25 | $ 159214 | ||||||||||||||||||||||||||||||||||||||||||
8 | Lawrence St | Cass St | Calhoun St | 250 | 36 | 1000 | $ 146213 | $ 146 | $ 102470 | $ 102470 | 0 | 0 | $ - | 75 | 350 | $ 12500 | $ - | $ 10000 | 25 | $ 31243 | |||||||||||||||||||||||||||||||||||||||
8 | Lawrence St | Walker St | Cass St | 250 | 36 | 1000 | $ 144650 | $ 145 | $ 102470 | $ 102470 | $ - | 100 | 250 | $ 11250 | $ - | $ 10000 | 25 | $ 30930 | |||||||||||||||||||||||||||||||||||||||||
4 to 8 | San Juan Ave | Lopez Ave | Admiralty | 2300 | 34 | 8689 | $ 1222938 | $ 141 | $ 890350 | $ 890350 | $ - | 800 | 5 | 1500 | $ 85000 | $ - | $ 15000 | 25 | $ 247588 | ||||||||||||||||||||||||||||||||||||||||
6 to 8 | Lawrence St | Harrison St | Monroe St | 2380 | 47 | 12429 | $ 1331314 | $ 107 | $ 274803 | $ 274803 | 15 | 5 | $ 74573 | 1900 | 10 | $ 110000 | 50 | $ 750000 | $ 10000 | 10 | $ 121938 | ||||||||||||||||||||||||||||||||||||||
2 to 4 | Center St | San Juan Ave | Redwood St | 1660 | 16 | 2951 | $ 295222 | $ 100 | $ 86910 | $ 86910 | $ - | 1600 | 9 | 3000 | $ 168500 | $ - | $ 10000 | 15 | $ 39812 | ||||||||||||||||||||||||||||||||||||||||
0 to 6 | Pacific St | Cedar St | Tremont St | 400 | 16 | 711 | $ 66581 | $ 94 | $ 31744 | $ 31744 | $ - | 100 | 2 | 700 | $ 25500 | $ - | $ 5000 | 15 | $ 9337 | ||||||||||||||||||||||||||||||||||||||||
0 to 6 | Benton St | Lawrence | Lincoln Blg | 580 | 36 | 2320 | $ 203265 | $ 88 | $ 20880 | $ 20880 | 20 | 10 | $ 19720 | 250 | 2 | $ 15500 | 8 | $ 120000 | $ 5000 | 15 | $ 27165 | ||||||||||||||||||||||||||||||||||||||
2 | Grant St | 14th St | 16th St | 525 | 16 | 933 | $ 73635 | $ 79 | $ 27487 | $ 27487 | $ - | 400 | 2 | 500 | $ 35500 | $ - | $ 8000 | 15 | $ 10648 | ||||||||||||||||||||||||||||||||||||||||
2 to 6 | Olympic St | Cedar St | Tremont St | 536 | 12 | 715 | $ 52716 | $ 74 | $ 21047 | $ 21047 | $ - | 950 | $ 23750 | $ - | $ 8000 | 15 | $ 7920 | ||||||||||||||||||||||||||||||||||||||||||
2 | Milo St | Olympic Ave | Pacific Ave | 466 | 12 | 621 | $ 44793 | $ 72 | $ 18298 | $ 18298 | $ - | 800 | $ 20000 | $ - | $ 5000 | 15 | $ 6495 | ||||||||||||||||||||||||||||||||||||||||||
0 | 11th St | Hendricks St | Sheridan St | 550 | 16 | 978 | $ 65077 | $ 67 | $ 28796 | $ 28796 | $ - | 100 | 2 | 750 | $ 26750 | $ - | $ 8000 | 15 | $ 9532 | ||||||||||||||||||||||||||||||||||||||||
0 | 58th St | Hill St | Kuhn St | 525 | 16 | 933 | $ 60329 | $ 65 | $ 32667 | $ 32667 | $ - | 750 | $ 18750 | $ - | $ 8000 | 15 | $ 8913 | ||||||||||||||||||||||||||||||||||||||||||
2 | 10th St | Hendricks St | Grant St | 283 | 18 | 566 | $ 34294 | $ 61 | $ 16669 | $ 16669 | $ - | 500 | $ 12500 | $ - | $ 5000 | 15 | $ 5125 | ||||||||||||||||||||||||||||||||||||||||||
4 to 10 | 31st St | Hancock St | Sheridan St | 1050 | 22 | 2567 | $ 150027 | $ 58 | $ 23100 | $ 23100 | 10 | 10 | $ 12833 | 1200 | 10 | 1000 | $ 100000 | $ - | $ 5000 | 10 | $ 14093 | ||||||||||||||||||||||||||||||||||||||
6 | 25th St | Sheridan St | Holcomb St | 1200 | 18 | 2400 | $ 125895 | $ 52 | $ 70680 | $ 70680 | $ - | 125 | 1 | 1200 | $ 37750 | $ - | $ 8000 | 15 | $ 17465 | ||||||||||||||||||||||||||||||||||||||||
6 | Holcomb St | 7th St | 10th St | 850 | 12 | 1133 | $ 58703 | $ 52 | $ 10200 | $ 10200 | 10 | 10 | $ 5667 | 1500 | $ 37500 | $ - | $ - | 10 | $ 5337 | ||||||||||||||||||||||||||||||||||||||||
2 | Hendricks St | 9th St | 12th St | 800 | 16 | 1422 | $ 70930 | $ 50 | $ 41884 | $ 41884 | $ - | 750 | $ 18750 | $ - | $ 8000 | 15 | $ 10295 | ||||||||||||||||||||||||||||||||||||||||||
2 to 6 | Hill St | 19th | 21st St | 807 | 16 | 1435 | $ 67443 | $ 47 | $ 21125 | $ 6456 | $ 27581 | 10 | $ 5021 | 1000 | $ 25000 | $ - | $ 8000 | 15 | $ 9840 | ||||||||||||||||||||||||||||||||||||||||
2 to 8 | 57th St | Jackman St | Kuhn St | 800 | 18 | 1600 | $ 66550 | $ 42 | $ 14400 | $ 14400 | 20 | 10 | $ 13600 | 1300 | $ 32500 | 10 | $ 6050 | ||||||||||||||||||||||||||||||||||||||||||
6 to 8 | Sheridan St | Hastings Ave | SilverUmatilla | 1750 | 22 | 4278 | $ 154115 | $ 36 | $ 38500 | $ 38500 | 20 | 10 | $ 36361 | 300 | 4 | 1500 | $ 58500 | $ - | $ 5000 | 15 | $ 20754 | ||||||||||||||||||||||||||||||||||||||
6 to 10 | Tyler St | Jefferson St | Lawrence St | 900 | 32 | 3200 | $ 115280 | $ 36 | $ 28800 | $ 28800 | 5 | 5 | $ 8000 | 100 | 2 | $ 8000 | 4 | $ 60000 | 10 | $ 10480 | |||||||||||||||||||||||||||||||||||||||
6 to 14 | 14th St | McPherson St | Sheridan St | 2375 | 21 | 5542 | $ 182027 | $ 33 | $ 49875 | $ 49875 | 20 | 10 | $ 47104 | 750 | 4 | 1000 | $ 68500 | $ - | 10 | $ 16548 | |||||||||||||||||||||||||||||||||||||||
8 | 49th St | Kuhn St | Admiralty Ave | 400 | 24 | 1067 | $ 34613 | $ 32 | $ 9600 | $ 9600 | 5 | $ 1867 | 800 | $ 20000 | $ - | 10 | $ 3147 | ||||||||||||||||||||||||||||||||||||||||||
6 to 10 | Fir St | F St | UCherry | 4360 | 22 | 10658 | $ 341621 | $ 32 | $ 95920 | $ 95920 | 5 | 5 | 4000 | $ 106644 | 100 | 2 | 4000 | $ 108000 | $ - | 10 | $ 31056 | ||||||||||||||||||||||||||||||||||||||
6 to 8 | Cedar St | San Juan Ave | Redwood St | 1460 | 16 | 2596 | $ 81747 | $ 31 | $ 23360 | $ 23360 | 20 | 20 | $ 25956 | 1000 | $ 25000 | $ - | 10 | $ 7432 | |||||||||||||||||||||||||||||||||||||||||
8 | Clallam St | McKinley St | Roosevelt St | 975 | 14 | 1517 | $ 46796 | $ 31 | $ 13650 | $ 13650 | 20 | 10 | $ 12892 | 200 | 4 | $ 16000 | $ - | 10 | $ 4254 | ||||||||||||||||||||||||||||||||||||||||
6 | San Juan Ave | 19th St | 20th St | 300 | 31 | 1033 | $ 31827 | $ 31 | $ 9300 | $ 9300 | 50 | 10 | $ 19633 | $ - | $ - | 10 | $ 2893 | ||||||||||||||||||||||||||||||||||||||||||
6 to 20 | Cherry St | F St | W St | 4200 | 32 | 14933 | $ 457307 | $ 31 | $ 134400 | $ 134400 | 5 | 5 | 4200 | $ 121333 | 200 | 6000 | $ 160000 | $ - | 10 | $ 41573 | |||||||||||||||||||||||||||||||||||||||
6 to 8 | Jackman St | 45th St | 49th St | 1100 | 22 | 2689 | $ 81940 | $ 30 | $ 24200 | $ 24200 | 15 | 10 | $ 18150 | 225 | 3 | 500 | $ 28250 | $ - | $ 5000 | 15 | $ 11340 | ||||||||||||||||||||||||||||||||||||||
6 to 12 | Jackson St | LawrenceMonroe | Roosevelt St | 1600 | 18 | 3200 | $ 93530 | $ 29 | $ 28800 | $ 28800 | 10 | 10 | $ 16000 | 1000 | $ 25000 | 1 | $ 15000 | $ 2500 | 10 | $ 8730 | |||||||||||||||||||||||||||||||||||||||
2 | 7th St | Wilson St | Holcomb St | 450 | 16 | 800 | $ 23320 | $ 29 | $ 7200 | $ 7200 | 10 | 10 | $ 4000 | 400 | $ 10000 | $ - | 10 | $ 2120 | |||||||||||||||||||||||||||||||||||||||||
8 to 14 | 25th St | Sherman St | Sheridan St | 800 | 20 | 1778 | $ 50061 | $ 28 | $ 16000 | $ 16000 | 10 | 5 | $ 7556 | 1 | 800 | $ 21500 | $ - | $ 5000 | 10 | $ 5006 | |||||||||||||||||||||||||||||||||||||||
2 to 6 | Hancock St | SR 20 | 9th St | 1100 | 20 | 2444 | $ 67833 | $ 28 | $ 22000 | $ 22000 | 15 | 5 | $ 14667 | 1000 | $ 25000 | $ - | 10 | $ 6167 | |||||||||||||||||||||||||||||||||||||||||
Benton St | Washington St | Lawrence St | 1160 | 22 | 2836 | $ 74468 | $ 26 | $ 25520 | $ 25520 | 10 | 10 | $ 14178 | 140 | 4 | 600 | $ 28000 | 10 | $ 6770 | |||||||||||||||||||||||||||||||||||||||||
W St | San JuanAdmiralty | Walnut St | 2560 | 22 | 6258 | $ 163807 | $ 26 | $ 56320 | $ 56320 | 10 | 5 | $ 26596 | 200 | 4 | 2000 | $ 66000 | $ - | 10 | $ 14892 | ||||||||||||||||||||||||||||||||||||||||
6 to 8 | Walnut | W Street | Jackson | 2300 | 22 | 5622 | $ 145194 | $ 26 | $ 50600 | $ 50600 | 10 | 5 | $ 23894 | 2300 | $ 57500 | $ - | 10 | $ 13199 | |||||||||||||||||||||||||||||||||||||||||
6 to 8 | 24th St | Discovery Rd | San Juan Ave | 1250 | 18 | 2500 | $ 63938 | $ 26 | $ 22500 | $ 22500 | 10 | 5 | $ 10625 | 1000 | $ 25000 | $ - | 10 | $ 5813 | |||||||||||||||||||||||||||||||||||||||||
6 to 10 | Tyler St | Lawrence St | Blaine St | 900 | 32 | 3200 | $ 78980 | $ 25 | $ 28800 | $ 28800 | 5 | 5 | $ 8000 | 200 | $ 5000 | 2 | $ 30000 | 10 | $ 7180 | ||||||||||||||||||||||||||||||||||||||||
4 to 12 | McPherson St | SR 20 | Discovery Rd | 2925 | 32 | 10400 | $ 244860 | $ 24 | $ 93600 | $ 93600 | 5 | 5 | 2925 | $ 84500 | 230 | 2 | 1200 | $ 44500 | $ - | $ - | 10 | $ 22260 | |||||||||||||||||||||||||||||||||||||
10 | Landes St | 12th St | 19th St | 1820 | 32 | 6471 | $ 151821 | $ 23 | $ 58240 | $ 58240 | 5 | 1400 | $ 39324 | 400 | $ 10000 | 2 | $ 30000 | $ 5000 | 10 | $ 14256 | |||||||||||||||||||||||||||||||||||||||
6 to 8 | Discovery Rd | 19th | Hastings Ave | 2900 | 22 | 7089 | $ 136565 | $ 19 | $ 63800 | $ 63800 | 15 | 10 | $ 47850 | 500 | $ 12500 | $ - | 10 | $ 12415 | |||||||||||||||||||||||||||||||||||||||||
8 to 12 | Hastings Ave | Discovery Rd | County Line | 8450 | 32 | 30044 | $ 542349 | $ 18 | $ 270400 | $ 270400 | 5 | 10 | 5000 | $ 197644 | 1000 | $ 25000 | $ - | 10 | $ 49304 | ||||||||||||||||||||||||||||||||||||||||
6 to 12 | Washington St | Van Buren St | SR20 | 2025 | 30 | 6750 | $ 118388 | $ 18 | $ 60750 | $ 60750 | 5 | 5 | $ 16875 | 0 | 0 | 0 | $ - | 2 | $ 30000 | $ - | 10 | $ 10763 | |||||||||||||||||||||||||||||||||||||
14 | Blaine St | San Juan Ave | Walker St | 1275 | 48 | 6800 | $ 113910 | $ 17 | $ 61200 | $ 61200 | 5 | $ 11900 | $ - | 2 | $ 30000 | $ 5000 | 10 | $ 10810 | |||||||||||||||||||||||||||||||||||||||||
6 | Washington St | Harrison St | Taylor St | 1175 | 33 | 4308 | $ 59240 | $ 14 | $ 38775 | $ 38775 | 10 | $ 15079 | $ - | $ - | 10 | $ 5385 | |||||||||||||||||||||||||||||||||||||||||||
8 to 10 | Sheridan St | SR 20 | 19th St | 4000 | 46 | 20444 | $ 272922 | $ 13 | $ 184000 | $ 184000 | 5 | 5 | $ 51111 | 200 | 2 | $ 13000 | $ - | 10 | $ 24811 | ||||||||||||||||||||||||||||||||||||||||
8 to 10 | 19th St | San Juan Ave | Sheridan St | 3200 | 48 | 17067 | $ 197120 | $ 12 | $ 153600 | $ 153600 | 3 | 3 | $ 25600 | 0 | 0 | 0 | $ - | $ - | 10 | $ 17920 | |||||||||||||||||||||||||||||||||||||||
10 to 20 | San Juan Ave | F St | Lopez Ave | 2800 | 32 | 9956 | $ 110059 | $ 11 | $ 89600 | $ 89600 | 3 | $ 10453 | $ - | $ - | 10 | $ 10005 | |||||||||||||||||||||||||||||||||||||||||||
10 to 20 | F St | Hastings Ave | Tyler St | 5300 | 31 | 18256 | $ 180730 | $ 10 | $ 164300 | $ 164300 | $ - | $ - | $ - | 10 | $ 16430 | ||||||||||||||||||||||||||||||||||||||||||||
$ 9952406 | $ 1873288 | $ 31744 | $ 274803 | $ 32667 | $ 332896 | $ 1998646 | $ 4544044 | $ 1155207 | $ 1747625 | $ 1215000 | $ 1290529 | $ - 0 | |||||||||||||||||||||||||||||||||||||||||||||||
Street Pavement Improvement Plan Projects | 9 | 110 | |||||||||||||||||||||||||||||||||||||||||||||
Road Name | From | To | Iworq ID | Length (ft) | Width (ft) | Area (yd^2) | Actual Area(SY) | Unit Cost per yd2 | Construction Cost | Prep Work | Survey Testing | ADA Curb Ramps | Storm Water | Mill amp Fill$50SY | Pre-Level$4SY | Total Construction | Project Cost + 10 | Unit Cost w Additional Costs no 10 | Engineering Costs | Notes | |||||||||||||||||||||||||||
Priority | Reconstruct | 2021 | 2022 | 2023 | 2024 | ||||||||||||||||||||||||||||||||||||||||||
1 | Reconstruct | Lawrence St | Cass St | Calhoun St | 1304 | 250 | 36 | 1000 | $ 80 | $ 80000 | $ 5000 | $ 20000 | $ 105000 | $ 115500 | $ 105 | Stormwater South Side Parking Raingarden on Cass | |||||||||||||||||||||||||||||||
2 | Reconstruct | Lawrence St | Walker St | Cass St | 250 | 36 | 1000 | $ 80 | $ 80000 | $ 5000 | $ 20000 | $ 5000 | $ 110000 | $ 121000 | $ 110 | Stormwater South Side Parking | |||||||||||||||||||||||||||||||
3 | Reconstruct Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | San Juan Ave | Lopez Ave | Admiralty | 2300 | 32 | 8178 | $ 50 | $ 408889 | $ 10000 | $ 100000 | $ 518889 | $ 570778 | $ 63 | Stormwater Problem 45th | ||||||||||||||||||||||||||||||||
4 | Reconstruct Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Polk St - Street Improvements | Lawrence St | 1056 Sarah Tiffany Sarah TiffanyGarfield | 1073 | 200 | 56 | 1244 | $ 50 | $ 62222 | X | X | X | $ 62222 | $ 68444 | $ 50 | Parking Theater 4 AC Watermain Infiltration or Rain Garden Parking on Condo Side | ||||||||||||||||||||||||||||||
Reconstruct | 47th Street | Pettygrove | McNeil | 500 | 18 | 1000 | 1548 | $ 50 | $ 50000 | $ 5000 | $ 40000 | $ 95000 | $ 104500 | $ 95 | $210000 Engineers Estimate With Engineering Cost Turnaround Spaghetti Waterline | ||||||||||||||||||||||||||||||||
Chip Seal - $50000 to $70000 per Mile | $6 No DigoutsPre-leveling | $10 with Additional Prep Work | |||||||||||||||||||||||||||||||||||||||||||||||
Chip Seal | Washington St | Van Buren St | SR20 | 2025 | 30 | 6750 | $ 10 | $ 67500 | $ 67500 | $ 74250 | Digouts Flagging | ||||||||||||||||||||||||||||||||||||
Chip Seal | Hastings Ave - Pre-level and widen shoulders | Discovery Rd | County Line | 8450 | 24 | 22533 | $ 6 | $ 135200 | $ 135200 | $ 148720 | Ditches amp Culverts Total Width change from 21 to 24 How wide will shoulders be | ||||||||||||||||||||||||||||||||||||
Tyler St | Jefferson St | Lawrence St | 900 | 32 | 3200 | $ 6 | $ 19200 | $ 19200 | $ 21120 | ||||||||||||||||||||||||||||||||||||||
Chip Seal | McPherson - Chip Seal | 4th St | Discovery Rd | 3100 | 32 | 11022 | $ 6 | $ 66133 | $ 66133 | $ 72747 | Ditches amp Culverts Shoulder Wideneing | ||||||||||||||||||||||||||||||||||||
Chip Seal | 19th St - Chip Seal | San Juan Ave | Sheridan St | 3200 | 48 | 17067 | $ 6 | $ 102400 | $ 102400 | $ 112640 | Bike Lanes amp Shoulder Prelevel | ||||||||||||||||||||||||||||||||||||
Chip Seal | Walnut | W Street | Jackson | 2300 | 22 | 5622 | $ 6 | $ 33733 | $ 33733 | $ 37107 | Dig-Outs Pre-Leveling Striping Shoulders | ||||||||||||||||||||||||||||||||||||
Chip Seal | Fir St - Chip Seal | F St | UCherry | 4360 | 22 | 10658 | $ 10 | $ 106578 | X | X | $ 106578 | $ 117236 | Dig-Outs Pre-Leveling Striping | ||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | |||||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | P St - Chip Seal | Redwood St | Cedar St | 0486 | 300 | 16 | 533 | $ 20 | $ 10667 | $ 10667 | $ 11733 | Watermain Looping Shouldnt this be part of Center | |||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 25th St - Chip Seal | Sheridan St | Holcomb St | 1200 | 18 | 2400 | $ 20 | $ 48000 | $ 48000 | $ 52800 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 14th St - Chip Seal | $ - | $ - | ||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Cedar St - Chip Seal | Redwood St | San Juan Ave | 1460 | 16 | 2596 | $ 20 | $ 51911 | $ 51911 | $ 57102 | Ex ChipSeal 22 Wide | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Center St - Chip Seal | Redwood St | San Juan Ave | 484 | 1660 | 16 | 2951 | $ 20 | $ 59022 | $ 59022 | $ 64924 | Ex ChipSeal 22 Wide Stormwater | |||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Grant St Chip Seal | 14th St | 16th St | 525 | 16 | 933 | $ 20 | $ 18667 | $ 18667 | $ 20533 | Ex Street 10 Wide | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 11th St Chip Seal | Hendricks St | Sheridan St | 550 | 16 | 978 | $ 20 | $ 19556 | $ 19556 | $ 21511 | Hospital Parking | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Hendricks St Chip Seal | 9th St | 12th St | 800 | 16 | 1422 | $ 20 | $ 28444 | $ 28444 | $ 31289 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 10th St Chip Seal | Hendricks St | Grant St | 1655 | 283 | 18 | 566 | $ 20 | $ 11320 | $ 11320 | $ 12452 | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Grant St Chip Seal | 14th St | 16th St | 525 | 18 | 1050 | $ 20 | $ 21000 | $ 21000 | $ 23100 | Ex Street 10 Wide Stormwater | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Hill St | 21st St | 19th St | 807 | 16 | 1435 | $ 20 | $ 28693 | $ 28693 | $ 31563 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Milo St -Chip seal | Olympic Ave | Pacific Ave | 0003 | 466 | 12 | 621 | $ 20 | $ 12427 | $ 12427 | $ 13669 | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Olympic St | Cedar St | Tremont St | 536 | 12 | 715 | $ 20 | $ 14293 | $ 14293 | $ 15723 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Benton St - street improvement | Blaine St | Lincoln Blg | 580 | 36 Sarah Tiffany Sarah TiffanyEstimated at 25-36 used higher number | Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Sarah Tiffany Sarah TiffanyGarfield | 2320 | $ 20 | $ 46400 | $ 46400 | $ 51040 | ||||||||||||||||||||||||||||||||||
Pave Gravel Road | |||||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Pacific St | Cedar St | Tremont St | 400 | 16 | 711 | $ 50 | $ 35556 | $ 6000 | $ 15000 | $ 56556 | $ 62211 | $ 80 | ||||||||||||||||||||||||||||||||||
58th St | Hill St | Kuhn St | 525 | 16 | 933 | $ 50 | $ 46667 | $ 6000 | $ 20000 | $ 72667 | $ 79933 | $ 78 | 4 AC Waterline Driveways Site Distance (Re-grade Slope) | ||||||||||||||||||||||||||||||||||
Sidewalks | |||||||||||||||||||||||||||||||||||||||||||||||
Harrison St | Franklin St | Clay St | 340 | 6 | 227 | $ 165 | $ 56100 | $ 5000 | $ 61100 | $ 67210 | $ 180 | ||||||||||||||||||||||||||||||||||||
9th St | Hancock St | McPherson St | 1300 | 6 | 867 | $ 165 | $ 214500 | $ 10000 | $ 15000 | $ 239500 | $ 263450 | $ 184 | |||||||||||||||||||||||||||||||||||
Asphalt Path | |||||||||||||||||||||||||||||||||||||||||||||||
Spruce St Easement | Cedar St | Center St | 150 | 8 | 133 | $ 50 | $ 6667 | $ 2000 | $ 8667 | $ 9533 | $ 65 | ||||||||||||||||||||||||||||||||||||
Cherry St | A St | E St | 990 | 10 | 1100 | $ 50 | $ 55000 | $ 10000 | $ 10000 | $ 15000 | $ 90000 | $ 99000 | $ 82 | ||||||||||||||||||||||||||||||||||
Gravel Path | |||||||||||||||||||||||||||||||||||||||||||||||
16th St | Thomas St | Grant St | 1700 | 6 | 1133 | $ 15 | $ 17000 | $ 1500 | $ 18500 | $ 20350 | |||||||||||||||||||||||||||||||||||||
Cleveland St | 21st St | 23rd St | 500 | 6 | 333 | $ 15 | $ 5000 | $ 5000 | $ 5500 | Need Easement | |||||||||||||||||||||||||||||||||||||
6 | - | $ 15 | $ - | $ - | $ - | Need Easement | |||||||||||||||||||||||||||||||||||||||||
6 | - | $ 15 | $ - | $ - | $ - | Need Easement | |||||||||||||||||||||||||||||||||||||||||
Total | $ 1582256 | $ 1792256 | $ 1971481 | ||||||||||||||||||||||||||||||||||||||||||||
Project Descriptioin | Length | Width | Construction Costs | ConstructionUnit Costs | Units | Engineering Costs | Total CostsUnit Cost | Total Costs | Total CostsUnit Cost | Notes | |||||||||||
Sidewalk | |||||||||||||||||||||
9th Street Sidewalk Grant Street to Hancock Street | 826 | 6 | $ 141506 | $ 17131 | LF | Construction Unit Cost per Foot | |||||||||||||||
Jefferson Street Sidewalk Washington Street to Taylor Street | 724 | 6 | $ 390502 | $ 53937 | LF | Construction Unit Cost per Foot | |||||||||||||||
Landis Street Sidewalk 10th Street to 19th Street | 1795 | 6 | $ 364550 | $ 20309 | LF | Construction Unit Cost per Foot | |||||||||||||||
ADA Corner Ramps | |||||||||||||||||||||
Washington Street amp Harrison Street | $ 42000 | $ 42000 | Each | ||||||||||||||||||
Washington Street amp Adams Street | $ 38150 | $ 19075 | Each | Two Corners Were Retrofitted | |||||||||||||||||
Chip Seal Pavement | |||||||||||||||||||||
Walker Street Washington Street to Lawrence Street | 1144 | 24 | $ 20000 | $ 656 | SY | Does not include flagging nor prep work | |||||||||||||||
Pulverize amp Asphalt Paving | |||||||||||||||||||||
Washington Street VanBuren Street to Harrison Street | 300 | 22 | $ 35000 | $ 4773 | SY | ||||||||||||||||
Asphalt Overlay | |||||||||||||||||||||
Sidewalks | ||||||||||||||||||||||||||||||||||||||
Harrison St | Franklin St | Clay St | 340 | 6 | 227 | |||||||||||||||||||||||||||||||||
9th St | Hancock St | McPherson St | 1300 | 6 | 867 | |||||||||||||||||||||||||||||||||
Asphalt Path | ||||||||||||||||||||||||||||||||||||||
Spruce St Easement | Cedar St | Center St | 150 | 8 | 133 | $ 2000 | $ 2000 | $ 2000 | ||||||||||||||||||||||||||||||
Cherry St | A St | E St | 990 | 10 | 1100 | $ 10000 | $ 10000 | $ 10000 | ||||||||||||||||||||||||||||||
Gravel Path | ||||||||||||||||||||||||||||||||||||||
16th St | Thomas St | Grant St | 1700 | 6 | 1133 | $ 1500 | $ 1500 | $ 1500 | ||||||||||||||||||||||||||||||
Cleveland St | 21st St | 23rd St | 500 | 6 | 333 | Need Easement | ||||||||||||||||||||||||||||||||
6 | - | Need Easement | ||||||||||||||||||||||||||||||||||||
6 | - | Need Easement | ||||||||||||||||||||||||||||||||||||
Total |
Type | Improvement | Cost Range SY | Cost Range LF | ||||||||
1 | Complete Road Rebuild | $80 | $100 | ||||||||
2 | Asphalt Overlay | $50 | $60 | ||||||||
3 | Pulverize amp Chip Seal | $20 | $30 | ||||||||
4 | Chip Seal | $6 | $10 | $12 | $25 | ||||||
5 | Seal Coat | ||||||||||
6 | |||||||||||
7 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 3-Inch | 413 | TONS | $ 15000 | $ 6187500 | 1000 x 22 x 025 httpwwwamerasphaltcomasphalthtm | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 1630 | CY | $ 4800 | $ 7824000 | Water Street Project = $48 CY (1000 x 22 x 2)27 = 1630 CY | ||||||
Gravel Borrow | 2282 | TONS | $ 3000 | $ 6846000 | (1000 x 22 x 2)27 = 1630 1630 CY x 14 = 2282 Tons | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 128 | Hours | $ 5728 | $ 733133 | (2) People for 64 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 25043033 | |||||||||||
$ 10247 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 2-Inch | 275 | TONS | $ 15000 | $ 4125000 | 1000 x 22 x 017 httpwwwamerasphaltcomasphalthtm | | ||||||
Digouts amp Pre-leveling | 122 | SY | $ 4900 | $ 597800 | |||||||
Flagging | 64 | Hours | $ 5728 | $ 366566 | (2) People for 32 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 180000 | $ 180000 | |||||||
$ 5403066 | |||||||||||
$ 2211 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 3-Inch | 413 | TONS | $ 15000 | $ 6187500 | 1000 x 22 x 025 httpwwwamerasphaltcomasphalthtm | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 150 | CY | $ 4800 | $ 720000 | Water Street Project = $48 CY | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 96 | Hours | $ 5728 | $ 549850 | (2) People for 48 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 10909750 | |||||||||||
$ 4464 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Chip Seal | 2444 | SY | $ 1050 | $ 2566200 | 1000 X 22 | Unit Cost $525 SY from Walker Street County Invoice Doubled to $1050 for Chip Seal Over Gravel | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 150 | CY | $ 4800 | $ 720000 | Water Street Project = $48 CY | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 80 | Hours | $ 5728 | $ 458208 | (2) People for 40 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | Hours | $ 12500 | $ - 0 | High Average Loaded Rate No Testing | ||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 7196808 | |||||||||||
$ 2945 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 1500000 | $614 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 500 | LF | $ 5000 | $ 2500000 | |||||||
Catch Basins | 4 | EACH | $ 150000 | $ 600000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Chip Seal | 2444 | SY | $ 525 | $ 1283100 | 1000 X 22 | Unit Cost from Walker Street County Invoice | ||||||
Digouts amp Pre-leveling | 122 | SY | $ 4900 | $ 598780 | Cost from 2018 Lakeside Mill amp Fill | Estimate Quanity Based on 5 | ||||||
Flagging | 32 | Hours | $ 5728 | $ 183283 | (2) People for 16 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | Hours | $ 12500 | $ - 0 | High Average Loaded Rate No Surveying or Testing | ||||||
Surveying | 1 | LS | $ - 0 | $ - 0 | |||||||
$ 2198863 | |||||||||||
$ 900 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 1500000 | $614 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY |
Project Descriptioin | Length | Width | Construction Costs | Engineering Costs | Engineering Total | Digouts Pre-Leveling Costs | Digouts Pre-Leveling Total | ADACosts | ADATotal | StormwaterCosts | StormwaterTotal | Total Costsby SY | Cost Per 250 Block | Length | Width | Notes | |||||||||||||||||
Chip Seal Pavement | |||||||||||||||||||||||||||||||||
Walker Street Washington Street to Lawrence Street | 1144 | 24 | $ 25000 | 15 | $ 3750 | 10 | $ 2500 | $ 1024 | $ 682911 | 250 | 24 | ||||||||||||||||||||||
Pulverize amp Chip Seal | |||||||||||||||||||||||||||||||||
Engineers Estimate | 250 | 24 | $ 22000 | 15 | $ 3300 | 0 | $ - | 20 | $ 4400 | $ 4455 | $ 2970000 | 250 | 24 | ||||||||||||||||||||
Pulverize amp Asphalt Paving | |||||||||||||||||||||||||||||||||
Washington Street VanBuren Street to Harrison Street | 300 | 22 | $ 35000 | 20 | $ 7000 | 0 | $ - | 10 | $ 3500 | 20 | $ 7000 | $ 7159 | $ 4772727 | 250 | 24 | ||||||||||||||||||
Asphalt Overlay (2) | |||||||||||||||||||||||||||||||||
Engineers Estimate | 250 | 24 | $ 21334 | 20 | $ 426680 | 10 | $ 2133 | 20 | $ 426680 | 20 | $ 426680 | $ 5440 | $ 4835707 | 250 | 32 | ||||||||||||||||||
Reconstruction | |||||||||||||||||||||||||||||||||
Walker Street Lawrence Street to Blaine Street | 650 | 36 | $ 184310 | 25 | $ 46078 | 0 | $ - | 20 | $ 36862 | 30 | $ 55293 | $ 12405 | $ 11027094 | 250 | 32 | ||||||||||||||||||
RSL | Length (FT) | Area (SY) | Condition | Treatment | Cost | Total | |||||||||
20 | 61834 | 138524 | 131 | Good | $0 | $0 | |||||||||
14 | 23656 | 49915 | 47 | Satisfactory | Chip Seal | $29 | $1470552 | ||||||||
12 | 43586 | 106382 | 100 | $3134134 | |||||||||||
10 | 74803 | 193570 | 182 | $5702790 | |||||||||||
8 | 96662 | 228046 | 215 | $6718492 | |||||||||||
6 | 95452 | 261794 | 247 | Fair | Overlay | $67 | $17489930 | ||||||||
4 | 6420 | 14536 | 14 | $971121 | |||||||||||
2 | 29238 | 60616 | 57 | Poor | Rehab | $107 | $6492850 | ||||||||
0 | 3851 | 7532 | 07 | Very Poor | Rebuild | $155 | $1169719 | ||||||||
$43149589 | |||||||||||||||
Additional Paving Costs | Average Cost per SY | Percent of Paving Cost | |||
Digouts amp Pre-Leveling | $4 | 25 | |||
Stormwater | $7 | 38 | |||
ADA | $5 | 27 | |||
Engineering amp Administration | $5 | 28 |
9 | Base Paving Costs | Preperation | Stormwater | ADA | Engineering | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Remaining Service Life | Road Name | From | To | Length (ft) | Width (ft) | Area (SY) | Total Construction | Price(SY) | Reconstruction | Pulverize amp Pave | Ashpalt Overlay | Pave Gravel Road | Pulverize amp Chip Seal | Chip Seal | Total Base Paving Costs | Digouts(SY) | Pre-Leveling(SY) | Construct Shoulders Both Sides (LF) | Preparation Total | StormwaterPipes (LF) | StormwaterCatchbasins | StormwaterSwales (LF) | Stormwater Total | Curb Ramps | Curb Ramps Total | Surveying | Engineering amp Administration | Engineering amp Administration Total | Other Work | ||||||||||||||||||||||||||||||
$102 | $45 | $22 | $35 | $29 | $9 | $35 | $15 | $20 | $50 | $1500 | $25 | $15000 | |||||||||||||||||||||||||||||||||||||||||||||||
2 | Polk St - Street | Lawrence St | 1056 | 200 | 56 | 1244 | $ 210679 | $ 169 | $ 127518 | $ 127518 | $ - | 150 | 1 | 1 | $ 9025 | 2 | $ 30000 | $ 10000 | 25 | $ 44136 | |||||||||||||||||||||||||||||||||||||||
6 | 47th Street | Pettygrove | McNeil | 500 | 18 | 1548 | $ 258717 | $ 167 | $ 158624 | $ 158624 | $ - | 687 | 8 | $ 46350 | $ - | $ 10000 | 25 | $ 53743 | |||||||||||||||||||||||||||||||||||||||||
6 to 10 | Lawrence St | Calhoun St | Harrison St | 1200 | 36 | 4800 | $ 786070 | $ 164 | $ 491856 | $ 491856 | 600 | $ 15000 | $ 8 | $ 120000 | $ 10000 | 25 | $ 159214 | ||||||||||||||||||||||||||||||||||||||||||
8 | Lawrence St | Cass St | Calhoun St | 250 | 36 | 1000 | $ 146213 | $ 146 | $ 102470 | $ 102470 | 0 | 0 | $ - | 75 | 350 | $ 12500 | $ - | $ 10000 | 25 | $ 31243 | |||||||||||||||||||||||||||||||||||||||
8 | Lawrence St | Walker St | Cass St | 250 | 36 | 1000 | $ 144650 | $ 145 | $ 102470 | $ 102470 | $ - | 100 | 250 | $ 11250 | $ - | $ 10000 | 25 | $ 30930 | |||||||||||||||||||||||||||||||||||||||||
4 to 8 | San Juan Ave | Lopez Ave | Admiralty | 2300 | 34 | 8689 | $ 1222938 | $ 141 | $ 890350 | $ 890350 | $ - | 800 | 5 | 1500 | $ 85000 | $ - | $ 15000 | 25 | $ 247588 | ||||||||||||||||||||||||||||||||||||||||
6 to 8 | Lawrence St | Harrison St | Monroe St | 2380 | 47 | 12429 | $ 1331314 | $ 107 | $ 274803 | $ 274803 | 15 | 5 | $ 74573 | 1900 | 10 | $ 110000 | 50 | $ 750000 | $ 10000 | 10 | $ 121938 | ||||||||||||||||||||||||||||||||||||||
2 to 4 | Center St | San Juan Ave | Redwood St | 1660 | 16 | 2951 | $ 295222 | $ 100 | $ 86910 | $ 86910 | $ - | 1600 | 9 | 3000 | $ 168500 | $ - | $ 10000 | 15 | $ 39812 | ||||||||||||||||||||||||||||||||||||||||
0 to 6 | Pacific St | Cedar St | Tremont St | 400 | 16 | 711 | $ 66581 | $ 94 | $ 31744 | $ 31744 | $ - | 100 | 2 | 700 | $ 25500 | $ - | $ 5000 | 15 | $ 9337 | ||||||||||||||||||||||||||||||||||||||||
0 to 6 | Benton St | Lawrence | Lincoln Blg | 580 | 36 | 2320 | $ 203265 | $ 88 | $ 20880 | $ 20880 | 20 | 10 | $ 19720 | 250 | 2 | $ 15500 | 8 | $ 120000 | $ 5000 | 15 | $ 27165 | ||||||||||||||||||||||||||||||||||||||
2 | Grant St | 14th St | 16th St | 525 | 16 | 933 | $ 73635 | $ 79 | $ 27487 | $ 27487 | $ - | 400 | 2 | 500 | $ 35500 | $ - | $ 8000 | 15 | $ 10648 | ||||||||||||||||||||||||||||||||||||||||
2 to 6 | Olympic St | Cedar St | Tremont St | 536 | 12 | 715 | $ 52716 | $ 74 | $ 21047 | $ 21047 | $ - | 950 | $ 23750 | $ - | $ 8000 | 15 | $ 7920 | ||||||||||||||||||||||||||||||||||||||||||
2 | Milo St | Olympic Ave | Pacific Ave | 466 | 12 | 621 | $ 44793 | $ 72 | $ 18298 | $ 18298 | $ - | 800 | $ 20000 | $ - | $ 5000 | 15 | $ 6495 | ||||||||||||||||||||||||||||||||||||||||||
0 | 11th St | Hendricks St | Sheridan St | 550 | 16 | 978 | $ 65077 | $ 67 | $ 28796 | $ 28796 | $ - | 100 | 2 | 750 | $ 26750 | $ - | $ 8000 | 15 | $ 9532 | ||||||||||||||||||||||||||||||||||||||||
0 | 58th St | Hill St | Kuhn St | 525 | 16 | 933 | $ 60329 | $ 65 | $ 32667 | $ 32667 | $ - | 750 | $ 18750 | $ - | $ 8000 | 15 | $ 8913 | ||||||||||||||||||||||||||||||||||||||||||
2 | 10th St | Hendricks St | Grant St | 283 | 18 | 566 | $ 34294 | $ 61 | $ 16669 | $ 16669 | $ - | 500 | $ 12500 | $ - | $ 5000 | 15 | $ 5125 | ||||||||||||||||||||||||||||||||||||||||||
4 to 10 | 31st St | Hancock St | Sheridan St | 1050 | 22 | 2567 | $ 150027 | $ 58 | $ 23100 | $ 23100 | 10 | 10 | $ 12833 | 1200 | 10 | 1000 | $ 100000 | $ - | $ 5000 | 10 | $ 14093 | ||||||||||||||||||||||||||||||||||||||
6 | 25th St | Sheridan St | Holcomb St | 1200 | 18 | 2400 | $ 125895 | $ 52 | $ 70680 | $ 70680 | $ - | 125 | 1 | 1200 | $ 37750 | $ - | $ 8000 | 15 | $ 17465 | ||||||||||||||||||||||||||||||||||||||||
6 | Holcomb St | 7th St | 10th St | 850 | 12 | 1133 | $ 58703 | $ 52 | $ 10200 | $ 10200 | 10 | 10 | $ 5667 | 1500 | $ 37500 | $ - | $ - | 10 | $ 5337 | ||||||||||||||||||||||||||||||||||||||||
2 | Hendricks St | 9th St | 12th St | 800 | 16 | 1422 | $ 70930 | $ 50 | $ 41884 | $ 41884 | $ - | 750 | $ 18750 | $ - | $ 8000 | 15 | $ 10295 | ||||||||||||||||||||||||||||||||||||||||||
2 to 6 | Hill St | 19th | 21st St | 807 | 16 | 1435 | $ 67443 | $ 47 | $ 21125 | $ 6456 | $ 27581 | 10 | $ 5021 | 1000 | $ 25000 | $ - | $ 8000 | 15 | $ 9840 | ||||||||||||||||||||||||||||||||||||||||
2 to 8 | 57th St | Jackman St | Kuhn St | 800 | 18 | 1600 | $ 66550 | $ 42 | $ 14400 | $ 14400 | 20 | 10 | $ 13600 | 1300 | $ 32500 | 10 | $ 6050 | ||||||||||||||||||||||||||||||||||||||||||
6 to 8 | Sheridan St | Hastings Ave | SilverUmatilla | 1750 | 22 | 4278 | $ 154115 | $ 36 | $ 38500 | $ 38500 | 20 | 10 | $ 36361 | 300 | 4 | 1500 | $ 58500 | $ - | $ 5000 | 15 | $ 20754 | ||||||||||||||||||||||||||||||||||||||
6 to 10 | Tyler St | Jefferson St | Lawrence St | 900 | 32 | 3200 | $ 115280 | $ 36 | $ 28800 | $ 28800 | 5 | 5 | $ 8000 | 100 | 2 | $ 8000 | 4 | $ 60000 | 10 | $ 10480 | |||||||||||||||||||||||||||||||||||||||
6 to 14 | 14th St | McPherson St | Sheridan St | 2375 | 21 | 5542 | $ 182027 | $ 33 | $ 49875 | $ 49875 | 20 | 10 | $ 47104 | 750 | 4 | 1000 | $ 68500 | $ - | 10 | $ 16548 | |||||||||||||||||||||||||||||||||||||||
8 | 49th St | Kuhn St | Admiralty Ave | 400 | 24 | 1067 | $ 34613 | $ 32 | $ 9600 | $ 9600 | 5 | $ 1867 | 800 | $ 20000 | $ - | 10 | $ 3147 | ||||||||||||||||||||||||||||||||||||||||||
6 to 10 | Fir St | F St | UCherry | 4360 | 22 | 10658 | $ 341621 | $ 32 | $ 95920 | $ 95920 | 5 | 5 | 4000 | $ 106644 | 100 | 2 | 4000 | $ 108000 | $ - | 10 | $ 31056 | ||||||||||||||||||||||||||||||||||||||
6 to 8 | Cedar St | San Juan Ave | Redwood St | 1460 | 16 | 2596 | $ 81747 | $ 31 | $ 23360 | $ 23360 | 20 | 20 | $ 25956 | 1000 | $ 25000 | $ - | 10 | $ 7432 | |||||||||||||||||||||||||||||||||||||||||
8 | Clallam St | McKinley St | Roosevelt St | 975 | 14 | 1517 | $ 46796 | $ 31 | $ 13650 | $ 13650 | 20 | 10 | $ 12892 | 200 | 4 | $ 16000 | $ - | 10 | $ 4254 | ||||||||||||||||||||||||||||||||||||||||
6 | San Juan Ave | 19th St | 20th St | 300 | 31 | 1033 | $ 31827 | $ 31 | $ 9300 | $ 9300 | 50 | 10 | $ 19633 | $ - | $ - | 10 | $ 2893 | ||||||||||||||||||||||||||||||||||||||||||
6 to 20 | Cherry St | F St | W St | 4200 | 32 | 14933 | $ 457307 | $ 31 | $ 134400 | $ 134400 | 5 | 5 | 4200 | $ 121333 | 200 | 6000 | $ 160000 | $ - | 10 | $ 41573 | |||||||||||||||||||||||||||||||||||||||
6 to 8 | Jackman St | 45th St | 49th St | 1100 | 22 | 2689 | $ 81940 | $ 30 | $ 24200 | $ 24200 | 15 | 10 | $ 18150 | 225 | 3 | 500 | $ 28250 | $ - | $ 5000 | 15 | $ 11340 | ||||||||||||||||||||||||||||||||||||||
6 to 12 | Jackson St | LawrenceMonroe | Roosevelt St | 1600 | 18 | 3200 | $ 93530 | $ 29 | $ 28800 | $ 28800 | 10 | 10 | $ 16000 | 1000 | $ 25000 | 1 | $ 15000 | $ 2500 | 10 | $ 8730 | |||||||||||||||||||||||||||||||||||||||
2 | 7th St | Wilson St | Holcomb St | 450 | 16 | 800 | $ 23320 | $ 29 | $ 7200 | $ 7200 | 10 | 10 | $ 4000 | 400 | $ 10000 | $ - | 10 | $ 2120 | |||||||||||||||||||||||||||||||||||||||||
8 to 14 | 25th St | Sherman St | Sheridan St | 800 | 20 | 1778 | $ 50061 | $ 28 | $ 16000 | $ 16000 | 10 | 5 | $ 7556 | 1 | 800 | $ 21500 | $ - | $ 5000 | 10 | $ 5006 | |||||||||||||||||||||||||||||||||||||||
2 to 6 | Hancock St | SR 20 | 9th St | 1100 | 20 | 2444 | $ 67833 | $ 28 | $ 22000 | $ 22000 | 15 | 5 | $ 14667 | 1000 | $ 25000 | $ - | 10 | $ 6167 | |||||||||||||||||||||||||||||||||||||||||
Benton St | Washington St | Lawrence St | 1160 | 22 | 2836 | $ 74468 | $ 26 | $ 25520 | $ 25520 | 10 | 10 | $ 14178 | 140 | 4 | 600 | $ 28000 | 10 | $ 6770 | |||||||||||||||||||||||||||||||||||||||||
W St | San JuanAdmiralty | Walnut St | 2560 | 22 | 6258 | $ 163807 | $ 26 | $ 56320 | $ 56320 | 10 | 5 | $ 26596 | 200 | 4 | 2000 | $ 66000 | $ - | 10 | $ 14892 | ||||||||||||||||||||||||||||||||||||||||
6 to 8 | Walnut | W Street | Jackson | 2300 | 22 | 5622 | $ 145194 | $ 26 | $ 50600 | $ 50600 | 10 | 5 | $ 23894 | 2300 | $ 57500 | $ - | 10 | $ 13199 | |||||||||||||||||||||||||||||||||||||||||
6 to 8 | 24th St | Discovery Rd | San Juan Ave | 1250 | 18 | 2500 | $ 63938 | $ 26 | $ 22500 | $ 22500 | 10 | 5 | $ 10625 | 1000 | $ 25000 | $ - | 10 | $ 5813 | |||||||||||||||||||||||||||||||||||||||||
6 to 10 | Tyler St | Lawrence St | Blaine St | 900 | 32 | 3200 | $ 78980 | $ 25 | $ 28800 | $ 28800 | 5 | 5 | $ 8000 | 200 | $ 5000 | 2 | $ 30000 | 10 | $ 7180 | ||||||||||||||||||||||||||||||||||||||||
4 to 12 | McPherson St | SR 20 | Discovery Rd | 2925 | 32 | 10400 | $ 244860 | $ 24 | $ 93600 | $ 93600 | 5 | 5 | 2925 | $ 84500 | 230 | 2 | 1200 | $ 44500 | $ - | $ - | 10 | $ 22260 | |||||||||||||||||||||||||||||||||||||
10 | Landes St | 12th St | 19th St | 1820 | 32 | 6471 | $ 151821 | $ 23 | $ 58240 | $ 58240 | 5 | 1400 | $ 39324 | 400 | $ 10000 | 2 | $ 30000 | $ 5000 | 10 | $ 14256 | |||||||||||||||||||||||||||||||||||||||
6 to 8 | Discovery Rd | 19th | Hastings Ave | 2900 | 22 | 7089 | $ 136565 | $ 19 | $ 63800 | $ 63800 | 15 | 10 | $ 47850 | 500 | $ 12500 | $ - | 10 | $ 12415 | |||||||||||||||||||||||||||||||||||||||||
8 to 12 | Hastings Ave | Discovery Rd | County Line | 8450 | 32 | 30044 | $ 542349 | $ 18 | $ 270400 | $ 270400 | 5 | 10 | 5000 | $ 197644 | 1000 | $ 25000 | $ - | 10 | $ 49304 | ||||||||||||||||||||||||||||||||||||||||
6 to 12 | Washington St | Van Buren St | SR20 | 2025 | 30 | 6750 | $ 118388 | $ 18 | $ 60750 | $ 60750 | 5 | 5 | $ 16875 | 0 | 0 | 0 | $ - | 2 | $ 30000 | $ - | 10 | $ 10763 | |||||||||||||||||||||||||||||||||||||
14 | Blaine St | San Juan Ave | Walker St | 1275 | 48 | 6800 | $ 113910 | $ 17 | $ 61200 | $ 61200 | 5 | $ 11900 | $ - | 2 | $ 30000 | $ 5000 | 10 | $ 10810 | |||||||||||||||||||||||||||||||||||||||||
6 | Washington St | Harrison St | Taylor St | 1175 | 33 | 4308 | $ 59240 | $ 14 | $ 38775 | $ 38775 | 10 | $ 15079 | $ - | $ - | 10 | $ 5385 | |||||||||||||||||||||||||||||||||||||||||||
8 to 10 | Sheridan St | SR 20 | 19th St | 4000 | 46 | 20444 | $ 272922 | $ 13 | $ 184000 | $ 184000 | 5 | 5 | $ 51111 | 200 | 2 | $ 13000 | $ - | 10 | $ 24811 | ||||||||||||||||||||||||||||||||||||||||
8 to 10 | 19th St | San Juan Ave | Sheridan St | 3200 | 48 | 17067 | $ 197120 | $ 12 | $ 153600 | $ 153600 | 3 | 3 | $ 25600 | 0 | 0 | 0 | $ - | $ - | 10 | $ 17920 | |||||||||||||||||||||||||||||||||||||||
10 to 20 | San Juan Ave | F St | Lopez Ave | 2800 | 32 | 9956 | $ 110059 | $ 11 | $ 89600 | $ 89600 | 3 | $ 10453 | $ - | $ - | 10 | $ 10005 | |||||||||||||||||||||||||||||||||||||||||||
10 to 20 | F St | Hastings Ave | Tyler St | 5300 | 31 | 18256 | $ 180730 | $ 10 | $ 164300 | $ 164300 | $ - | $ - | $ - | 10 | $ 16430 | ||||||||||||||||||||||||||||||||||||||||||||
$ 9952406 | $ 1873288 | $ 31744 | $ 274803 | $ 32667 | $ 332896 | $ 1998646 | $ 4544044 | $ 1155207 | $ 1747625 | $ 1215000 | $ 1290529 | $ - 0 | |||||||||||||||||||||||||||||||||||||||||||||||
Street Pavement Improvement Plan Projects | 9 | 110 | |||||||||||||||||||||||||||||||||||||||||||||
Road Name | From | To | Iworq ID | Length (ft) | Width (ft) | Area (yd^2) | Actual Area(SY) | Unit Cost per yd2 | Construction Cost | Prep Work | Survey Testing | ADA Curb Ramps | Storm Water | Mill amp Fill$50SY | Pre-Level$4SY | Total Construction | Project Cost + 10 | Unit Cost w Additional Costs no 10 | Engineering Costs | Notes | |||||||||||||||||||||||||||
Priority | Reconstruct | 2021 | 2022 | 2023 | 2024 | ||||||||||||||||||||||||||||||||||||||||||
1 | Reconstruct | Lawrence St | Cass St | Calhoun St | 1304 | 250 | 36 | 1000 | $ 80 | $ 80000 | $ 5000 | $ 20000 | $ 105000 | $ 115500 | $ 105 | Stormwater South Side Parking Raingarden on Cass | |||||||||||||||||||||||||||||||
2 | Reconstruct | Lawrence St | Walker St | Cass St | 250 | 36 | 1000 | $ 80 | $ 80000 | $ 5000 | $ 20000 | $ 5000 | $ 110000 | $ 121000 | $ 110 | Stormwater South Side Parking | |||||||||||||||||||||||||||||||
3 | Reconstruct Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | San Juan Ave | Lopez Ave | Admiralty | 2300 | 32 | 8178 | $ 50 | $ 408889 | $ 10000 | $ 100000 | $ 518889 | $ 570778 | $ 63 | Stormwater Problem 45th | ||||||||||||||||||||||||||||||||
4 | Reconstruct Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Polk St - Street Improvements | Lawrence St | 1056 Sarah Tiffany Sarah TiffanyGarfield | 1073 | 200 | 56 | 1244 | $ 50 | $ 62222 | X | X | X | $ 62222 | $ 68444 | $ 50 | Parking Theater 4 AC Watermain Infiltration or Rain Garden Parking on Condo Side | ||||||||||||||||||||||||||||||
Reconstruct | 47th Street | Pettygrove | McNeil | 500 | 18 | 1000 | 1548 | $ 50 | $ 50000 | $ 5000 | $ 40000 | $ 95000 | $ 104500 | $ 95 | $210000 Engineers Estimate With Engineering Cost Turnaround Spaghetti Waterline | ||||||||||||||||||||||||||||||||
Chip Seal - $50000 to $70000 per Mile | $6 No DigoutsPre-leveling | $10 with Additional Prep Work | |||||||||||||||||||||||||||||||||||||||||||||||
Chip Seal | Washington St | Van Buren St | SR20 | 2025 | 30 | 6750 | $ 10 | $ 67500 | $ 67500 | $ 74250 | Digouts Flagging | ||||||||||||||||||||||||||||||||||||
Chip Seal | Hastings Ave - Pre-level and widen shoulders | Discovery Rd | County Line | 8450 | 24 | 22533 | $ 6 | $ 135200 | $ 135200 | $ 148720 | Ditches amp Culverts Total Width change from 21 to 24 How wide will shoulders be | ||||||||||||||||||||||||||||||||||||
Tyler St | Jefferson St | Lawrence St | 900 | 32 | 3200 | $ 6 | $ 19200 | $ 19200 | $ 21120 | ||||||||||||||||||||||||||||||||||||||
Chip Seal | McPherson - Chip Seal | 4th St | Discovery Rd | 3100 | 32 | 11022 | $ 6 | $ 66133 | $ 66133 | $ 72747 | Ditches amp Culverts Shoulder Wideneing | ||||||||||||||||||||||||||||||||||||
Chip Seal | 19th St - Chip Seal | San Juan Ave | Sheridan St | 3200 | 48 | 17067 | $ 6 | $ 102400 | $ 102400 | $ 112640 | Bike Lanes amp Shoulder Prelevel | ||||||||||||||||||||||||||||||||||||
Chip Seal | Walnut | W Street | Jackson | 2300 | 22 | 5622 | $ 6 | $ 33733 | $ 33733 | $ 37107 | Dig-Outs Pre-Leveling Striping Shoulders | ||||||||||||||||||||||||||||||||||||
Chip Seal | Fir St - Chip Seal | F St | UCherry | 4360 | 22 | 10658 | $ 10 | $ 106578 | X | X | $ 106578 | $ 117236 | Dig-Outs Pre-Leveling Striping | ||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | |||||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | P St - Chip Seal | Redwood St | Cedar St | 0486 | 300 | 16 | 533 | $ 20 | $ 10667 | $ 10667 | $ 11733 | Watermain Looping Shouldnt this be part of Center | |||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 25th St - Chip Seal | Sheridan St | Holcomb St | 1200 | 18 | 2400 | $ 20 | $ 48000 | $ 48000 | $ 52800 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 14th St - Chip Seal | $ - | $ - | ||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Cedar St - Chip Seal | Redwood St | San Juan Ave | 1460 | 16 | 2596 | $ 20 | $ 51911 | $ 51911 | $ 57102 | Ex ChipSeal 22 Wide | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Center St - Chip Seal | Redwood St | San Juan Ave | 484 | 1660 | 16 | 2951 | $ 20 | $ 59022 | $ 59022 | $ 64924 | Ex ChipSeal 22 Wide Stormwater | |||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Grant St Chip Seal | 14th St | 16th St | 525 | 16 | 933 | $ 20 | $ 18667 | $ 18667 | $ 20533 | Ex Street 10 Wide | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 11th St Chip Seal | Hendricks St | Sheridan St | 550 | 16 | 978 | $ 20 | $ 19556 | $ 19556 | $ 21511 | Hospital Parking | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Hendricks St Chip Seal | 9th St | 12th St | 800 | 16 | 1422 | $ 20 | $ 28444 | $ 28444 | $ 31289 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | 10th St Chip Seal | Hendricks St | Grant St | 1655 | 283 | 18 | 566 | $ 20 | $ 11320 | $ 11320 | $ 12452 | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Grant St Chip Seal | 14th St | 16th St | 525 | 18 | 1050 | $ 20 | $ 21000 | $ 21000 | $ 23100 | Ex Street 10 Wide Stormwater | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Hill St | 21st St | 19th St | 807 | 16 | 1435 | $ 20 | $ 28693 | $ 28693 | $ 31563 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Milo St -Chip seal | Olympic Ave | Pacific Ave | 0003 | 466 | 12 | 621 | $ 20 | $ 12427 | $ 12427 | $ 13669 | ||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Olympic St | Cedar St | Tremont St | 536 | 12 | 715 | $ 20 | $ 14293 | $ 14293 | $ 15723 | |||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Benton St - street improvement | Blaine St | Lincoln Blg | 580 | 36 Sarah Tiffany Sarah TiffanyEstimated at 25-36 used higher number | Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Sarah Tiffany Sarah TiffanyPulverize and Chip Seal | Sarah Tiffany Sarah TiffanyGarfield | 2320 | $ 20 | $ 46400 | $ 46400 | $ 51040 | ||||||||||||||||||||||||||||||||||
Pave Gravel Road | |||||||||||||||||||||||||||||||||||||||||||||||
Pulverize and Chip Seal | Pacific St | Cedar St | Tremont St | 400 | 16 | 711 | $ 50 | $ 35556 | $ 6000 | $ 15000 | $ 56556 | $ 62211 | $ 80 | ||||||||||||||||||||||||||||||||||
58th St | Hill St | Kuhn St | 525 | 16 | 933 | $ 50 | $ 46667 | $ 6000 | $ 20000 | $ 72667 | $ 79933 | $ 78 | 4 AC Waterline Driveways Site Distance (Re-grade Slope) | ||||||||||||||||||||||||||||||||||
Sidewalks | |||||||||||||||||||||||||||||||||||||||||||||||
Harrison St | Franklin St | Clay St | 340 | 6 | 227 | $ 165 | $ 56100 | $ 5000 | $ 61100 | $ 67210 | $ 180 | ||||||||||||||||||||||||||||||||||||
9th St | Hancock St | McPherson St | 1300 | 6 | 867 | $ 165 | $ 214500 | $ 10000 | $ 15000 | $ 239500 | $ 263450 | $ 184 | |||||||||||||||||||||||||||||||||||
Asphalt Path | |||||||||||||||||||||||||||||||||||||||||||||||
Spruce St Easement | Cedar St | Center St | 150 | 8 | 133 | $ 50 | $ 6667 | $ 2000 | $ 8667 | $ 9533 | $ 65 | ||||||||||||||||||||||||||||||||||||
Cherry St | A St | E St | 990 | 10 | 1100 | $ 50 | $ 55000 | $ 10000 | $ 10000 | $ 15000 | $ 90000 | $ 99000 | $ 82 | ||||||||||||||||||||||||||||||||||
Gravel Path | |||||||||||||||||||||||||||||||||||||||||||||||
16th St | Thomas St | Grant St | 1700 | 6 | 1133 | $ 15 | $ 17000 | $ 1500 | $ 18500 | $ 20350 | |||||||||||||||||||||||||||||||||||||
Cleveland St | 21st St | 23rd St | 500 | 6 | 333 | $ 15 | $ 5000 | $ 5000 | $ 5500 | Need Easement | |||||||||||||||||||||||||||||||||||||
6 | - | $ 15 | $ - | $ - | $ - | Need Easement | |||||||||||||||||||||||||||||||||||||||||
6 | - | $ 15 | $ - | $ - | $ - | Need Easement | |||||||||||||||||||||||||||||||||||||||||
Total | $ 1582256 | $ 1792256 | $ 1971481 | ||||||||||||||||||||||||||||||||||||||||||||
Project Descriptioin | Length | Width | Construction Costs | ConstructionUnit Costs | Units | Engineering Costs | Total CostsUnit Cost | Total Costs | Total CostsUnit Cost | Notes | |||||||||||
Sidewalk | |||||||||||||||||||||
9th Street Sidewalk Grant Street to Hancock Street | 826 | 6 | $ 141506 | $ 17131 | LF | Construction Unit Cost per Foot | |||||||||||||||
Jefferson Street Sidewalk Washington Street to Taylor Street | 724 | 6 | $ 390502 | $ 53937 | LF | Construction Unit Cost per Foot | |||||||||||||||
Landis Street Sidewalk 10th Street to 19th Street | 1795 | 6 | $ 364550 | $ 20309 | LF | Construction Unit Cost per Foot | |||||||||||||||
ADA Corner Ramps | |||||||||||||||||||||
Washington Street amp Harrison Street | $ 42000 | $ 42000 | Each | ||||||||||||||||||
Washington Street amp Adams Street | $ 38150 | $ 19075 | Each | Two Corners Were Retrofitted | |||||||||||||||||
Chip Seal Pavement | |||||||||||||||||||||
Walker Street Washington Street to Lawrence Street | 1144 | 24 | $ 20000 | $ 656 | SY | Does not include flagging nor prep work | |||||||||||||||
Pulverize amp Asphalt Paving | |||||||||||||||||||||
Washington Street VanBuren Street to Harrison Street | 300 | 22 | $ 35000 | $ 4773 | SY | ||||||||||||||||
Asphalt Overlay | |||||||||||||||||||||
Sidewalks | ||||||||||||||||||||||||||||||||||||||
Harrison St | Franklin St | Clay St | 340 | 6 | 227 | |||||||||||||||||||||||||||||||||
9th St | Hancock St | McPherson St | 1300 | 6 | 867 | |||||||||||||||||||||||||||||||||
Asphalt Path | ||||||||||||||||||||||||||||||||||||||
Spruce St Easement | Cedar St | Center St | 150 | 8 | 133 | $ 2000 | $ 2000 | $ 2000 | ||||||||||||||||||||||||||||||
Cherry St | A St | E St | 990 | 10 | 1100 | $ 10000 | $ 10000 | $ 10000 | ||||||||||||||||||||||||||||||
Gravel Path | ||||||||||||||||||||||||||||||||||||||
16th St | Thomas St | Grant St | 1700 | 6 | 1133 | $ 1500 | $ 1500 | $ 1500 | ||||||||||||||||||||||||||||||
Cleveland St | 21st St | 23rd St | 500 | 6 | 333 | Need Easement | ||||||||||||||||||||||||||||||||
6 | - | Need Easement | ||||||||||||||||||||||||||||||||||||
6 | - | Need Easement | ||||||||||||||||||||||||||||||||||||
Total |
Type | Improvement | Cost Range SY | Cost Range LF | ||||||||
1 | Complete Road Rebuild | $80 | $100 | ||||||||
2 | Asphalt Overlay | $50 | $60 | ||||||||
3 | Pulverize amp Chip Seal | $20 | $30 | ||||||||
4 | Chip Seal | $6 | $10 | $12 | $25 | ||||||
5 | Seal Coat | ||||||||||
6 | |||||||||||
7 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 3-Inch | 413 | TONS | $ 15000 | $ 6187500 | 1000 x 22 x 025 httpwwwamerasphaltcomasphalthtm | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 1630 | CY | $ 4800 | $ 7824000 | Water Street Project = $48 CY (1000 x 22 x 2)27 = 1630 CY | ||||||
Gravel Borrow | 2282 | TONS | $ 3000 | $ 6846000 | (1000 x 22 x 2)27 = 1630 1630 CY x 14 = 2282 Tons | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 128 | Hours | $ 5728 | $ 733133 | (2) People for 64 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 25043033 | |||||||||||
$ 10247 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 2-Inch | 275 | TONS | $ 15000 | $ 4125000 | 1000 x 22 x 017 httpwwwamerasphaltcomasphalthtm | | ||||||
Digouts amp Pre-leveling | 122 | SY | $ 4900 | $ 597800 | |||||||
Flagging | 64 | Hours | $ 5728 | $ 366566 | (2) People for 32 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 180000 | $ 180000 | |||||||
$ 5403066 | |||||||||||
$ 2211 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Asphalt 3-Inch | 413 | TONS | $ 15000 | $ 6187500 | 1000 x 22 x 025 httpwwwamerasphaltcomasphalthtm | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 150 | CY | $ 4800 | $ 720000 | Water Street Project = $48 CY | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 96 | Hours | $ 5728 | $ 549850 | (2) People for 48 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | $ - 0 | $ - 0 | ||||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 10909750 | |||||||||||
$ 4464 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 3000000 | $1228 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 1000 | LF | $ 5000 | $ 5000000 | |||||||
Catch Basins | 8 | EACH | $ 150000 | $ 1200000 | |||||||
ADA Curb Ramp | 2 | EACH | $ 2000000 | $ 4000000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Chip Seal | 2444 | SY | $ 1050 | $ 2566200 | 1000 X 22 | Unit Cost $525 SY from Walker Street County Invoice Doubled to $1050 for Chip Seal Over Gravel | | ||||||
Pulverize | 2444 | SY | $ 950 | $ 2321800 | Water Street Project = $950 for Asphalt Removal | ||||||
Roadway Excavation amp Haul | 150 | CY | $ 4800 | $ 720000 | Water Street Project = $48 CY | ||||||
Crushed Surfacing Top Course 2-Inch | 194 | TONS | $ 3850 | $ 746900 | (1000 x 22 x 017 )27 = 1385 1385 CY x 14 = 194 Tons | ||||||
Flagging | 80 | Hours | $ 5728 | $ 458208 | (2) People for 40 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | Hours | $ 12500 | $ - 0 | High Average Loaded Rate No Testing | ||||||
Surveying | 1 | LS | $ 250000 | $ 250000 | |||||||
$ 7196808 | |||||||||||
$ 2945 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 1500000 | $614 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY | ||||||
Stormwater Pipe | 500 | LF | $ 5000 | $ 2500000 | |||||||
Catch Basins | 4 | EACH | $ 150000 | $ 600000 |
ITEM | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Chip Seal | 2444 | SY | $ 525 | $ 1283100 | 1000 X 22 | Unit Cost from Walker Street County Invoice | ||||||
Digouts amp Pre-leveling | 122 | SY | $ 4900 | $ 598780 | Cost from 2018 Lakeside Mill amp Fill | Estimate Quanity Based on 5 | ||||||
Flagging | 32 | Hours | $ 5728 | $ 183283 | (2) People for 16 Hours $4440 Prevailing Wage + 29 Overhead | ||||||
Striping | 1 | LS | $ 133700 | $ 133700 | (1) Day (2) People Equipment Materials Mobilization $4540 Prevailing Wage + 29 Overhead + $400 for Equipment amp Materials | ||||||
Engineering | 0 | Hours | $ 12500 | $ - 0 | High Average Loaded Rate No Surveying or Testing | ||||||
Surveying | 1 | LS | $ - 0 | $ - 0 | |||||||
$ 2198863 | |||||||||||
$ 900 | Price per SY | ||||||||||
ADDITIONAL ITEMS TO CONSIDER | QUANTITY | UNITS | UNIT COST | TOTAL | NOTES | ||||||
Drainage Swales amp Stormwater | 1 | LS | $ 3000000 | $ 1500000 | $614 per SY | ||||||
ADA Curb Ramps | 2 | LS | $ 2000000 | $ 4000000 | $1637 per SY |
Project Descriptioin | Length | Width | Construction Costs | Engineering Costs | Engineering Total | Digouts Pre-Leveling Costs | Digouts Pre-Leveling Total | ADACosts | ADATotal | StormwaterCosts | StormwaterTotal | Total Costsby SY | Cost Per 250 Block | Length | Width | Notes | |||||||||||||||||
Chip Seal Pavement | |||||||||||||||||||||||||||||||||
Walker Street Washington Street to Lawrence Street | 1144 | 24 | $ 25000 | 15 | $ 3750 | 10 | $ 2500 | $ 1024 | $ 682911 | 250 | 24 | ||||||||||||||||||||||
Pulverize amp Chip Seal | |||||||||||||||||||||||||||||||||
Engineers Estimate | 250 | 24 | $ 22000 | 15 | $ 3300 | 0 | $ - | 20 | $ 4400 | $ 4455 | $ 2970000 | 250 | 24 | ||||||||||||||||||||
Pulverize amp Asphalt Paving | |||||||||||||||||||||||||||||||||
Washington Street VanBuren Street to Harrison Street | 300 | 22 | $ 35000 | 20 | $ 7000 | 0 | $ - | 10 | $ 3500 | 20 | $ 7000 | $ 7159 | $ 4772727 | 250 | 24 | ||||||||||||||||||
Asphalt Overlay (2) | |||||||||||||||||||||||||||||||||
Engineers Estimate | 250 | 24 | $ 21334 | 20 | $ 426680 | 10 | $ 2133 | 20 | $ 426680 | 20 | $ 426680 | $ 5440 | $ 4835707 | 250 | 32 | ||||||||||||||||||
Reconstruction | |||||||||||||||||||||||||||||||||
Walker Street Lawrence Street to Blaine Street | 650 | 36 | $ 184310 | 25 | $ 46078 | 0 | $ - | 20 | $ 36862 | 30 | $ 55293 | $ 12405 | $ 11027094 | 250 | 32 | ||||||||||||||||||
RSL | Length (FT) | Area (SY) | Condition | Treatment | Cost | Total | |||||||||
20 | 61834 | 138524 | 131 | Good | $0 | $0 | |||||||||
14 | 23656 | 49915 | 47 | Satisfactory | Chip Seal | $29 | $1470552 | ||||||||
12 | 43586 | 106382 | 100 | $3134134 | |||||||||||
10 | 74803 | 193570 | 182 | $5702790 | |||||||||||
8 | 96662 | 228046 | 215 | $6718492 | |||||||||||
6 | 95452 | 261794 | 247 | Fair | Overlay | $67 | $17489930 | ||||||||
4 | 6420 | 14536 | 14 | $971121 | |||||||||||
2 | 29238 | 60616 | 57 | Poor | Rehab | $107 | $6492850 | ||||||||
0 | 3851 | 7532 | 07 | Very Poor | Rebuild | $155 | $1169719 | ||||||||
$43149589 | |||||||||||||||
Additional Paving Costs | Average Cost per SY | Percent of Paving Cost | |||
Digouts amp Pre-Leveling | $4 | 25 | |||
Stormwater | $7 | 38 | |||
ADA | $5 | 27 | |||
Engineering amp Administration | $5 | 28 |
9 | Base Paving Costs | Preperation | Stormwater | ADA | Engineering | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Remaining Service Life | Road Name | From | To | Length (ft) | Width (ft) | Area (SY) | Total Construction | Price(SY) | Reconstruction | Pulverize amp Pave | Ashpalt Overlay | Pave Gravel Road | Pulverize amp Chip Seal | Chip Seal | Total Base Paving Costs | Digouts(SY) | Pre-Leveling(SY) | Construct Shoulders Both Sides (LF) | Preparation Total | StormwaterPipes (LF) | StormwaterCatchbasins | StormwaterSwales (LF) | Stormwater Total | Curb Ramps | Curb Ramps Total | Surveying | Engineering amp Administration | Engineering amp Administration Total | Other Work | ||||||||||||||||||||||||||||||
$102 | $45 | $22 | $35 | $29 | $9 | $35 | $15 | $20 | $50 | $1500 | $25 | $15000 | |||||||||||||||||||||||||||||||||||||||||||||||
2 | Polk St - Street | Lawrence St | 1056 | 200 | 56 | 1244 | $ 210679 | $ 169 | $ 127518 | $ 127518 | $ - | 150 | 1 | 1 | $ 9025 | 2 | $ 30000 | $ 10000 | 25 | $ 44136 | |||||||||||||||||||||||||||||||||||||||
6 | 47th Street | Pettygrove | McNeil | 500 | 18 | 1548 | $ 258717 | $ 167 | $ 158624 | $ 158624 | $ - | 687 | 8 | $ 46350 | $ - | $ 10000 | 25 | $ 53743 | |||||||||||||||||||||||||||||||||||||||||
6 to 10 | Lawrence St | Calhoun St | Harrison St | 1200 | 36 | 4800 | $ 786070 | $ 164 | $ 491856 | $ 491856 | 600 | $ 15000 | $ 8 | $ 120000 | $ 10000 | 25 | $ 159214 | ||||||||||||||||||||||||||||||||||||||||||
8 | Lawrence St | Cass St | Calhoun St | 250 | 36 | 1000 | $ 146213 | $ 146 | $ 102470 | $ 102470 | 0 | 0 | $ - | 75 | 350 | $ 12500 | $ - | $ 10000 | 25 | $ 31243 | |||||||||||||||||||||||||||||||||||||||
8 | Lawrence St | Walker St | Cass St | 250 | 36 | 1000 | $ 144650 | $ 145 | $ 102470 | $ 102470 | $ - | 100 | 250 | $ 11250 | $ - | $ 10000 | 25 | $ 30930 | |||||||||||||||||||||||||||||||||||||||||
4 to 8 | San Juan Ave | Lopez Ave | Admiralty | 2300 | 34 | 8689 | $ 1222938 | $ 141 | $ 890350 | $ 890350 | $ - | 800 | 5 | 1500 | $ 85000 | $ - | $ 15000 | 25 | $ 247588 | ||||||||||||||||||||||||||||||||||||||||
6 to 8 | Lawrence St | Harrison St | Monroe St | 2380 | 47 | 12429 | $ 1331314 | $ 107 | $ 274803 | $ 274803 | 15 | 5 | $ 74573 | 1900 | 10 | $ 110000 | 50 | $ 750000 | $ 10000 | 10 | $ 121938 | ||||||||||||||||||||||||||||||||||||||
2 to 4 | Center St | San Juan Ave | Redwood St | 1660 | 16 | 2951 | $ 295222 | $ 100 | $ 86910 | $ 86910 | $ - | 1600 | 9 | 3000 | $ 168500 | $ - | $ 10000 | 15 | $ 39812 | ||||||||||||||||||||||||||||||||||||||||
0 to 6 | Pacific St | Cedar St | Tremont St | 400 | 16 | 711 | $ 66581 | $ 94 | $ 31744 | $ 31744 | $ - | 100 | 2 | 700 | $ 25500 | $ - | $ 5000 | 15 | $ 9337 | ||||||||||||||||||||||||||||||||||||||||
0 to 6 | Benton St | Lawrence | Lincoln Blg | 580 | 36 | 2320 | $ 203265 | $ 88 | $ 20880 | $ 20880 | 20 | 10 | $ 19720 | 250 | 2 | $ 15500 | 8 | $ 120000 | $ 5000 | 15 | $ 27165 | ||||||||||||||||||||||||||||||||||||||
2 | Grant St | 14th St | 16th St | 525 | 16 | 933 | $ 73635 | $ 79 | $ 27487 | $ 27487 | $ - | 400 | 2 | 500 | $ 35500 | $ - | $ 8000 | 15 | $ 10648 | ||||||||||||||||||||||||||||||||||||||||
2 to 6 | Olympic St | Cedar St | Tremont St | 536 | 12 | 715 | $ 52716 | $ 74 | $ 21047 | $ 21047 | $ - | 950 | $ 23750 | $ - | $ 8000 | 15 | $ 7920 | ||||||||||||||||||||||||||||||||||||||||||
2 | Milo St | Olympic Ave | Pacific Ave | 466 | 12 | 621 | $ 44793 | $ 72 | $ 18298 | $ 18298 | $ - | 800 | $ 20000 | $ - | $ 5000 | 15 | $ 6495 | ||||||||||||||||||||||||||||||||||||||||||
0 | 11th St | Hendricks St | Sheridan St | 550 | 16 | 978 | $ 65077 | $ 67 | $ 28796 | $ 28796 | $ - | 100 | 2 | 750 | $ 26750 | $ - | $ 8000 | 15 | $ 9532 | ||||||||||||||||||||||||||||||||||||||||
0 | 58th St | Hill St | Kuhn St | 525 | 16 | 933 | $ 60329 | $ 65 | $ 32667 | $ 32667 | $ - | 750 | $ 18750 | $ - | $ 8000 | 15 | $ 8913 | ||||||||||||||||||||||||||||||||||||||||||
2 | 10th St | Hendricks St | Grant St | 283 | 18 | 566 | $ 34294 | $ 61 | $ 16669 | $ 16669 | $ - | 500 | $ 12500 | $ - | $ 5000 | 15 | $ 5125 | ||||||||||||||||||||||||||||||||||||||||||
4 to 10 | 31st St | Hancock St | Sheridan St | 1050 | 22 | 2567 | $ 150027 | $ 58 | $ 23100 | $ 23100 | 10 | 10 | $ 12833 | 1200 | 10 | 1000 | $ 100000 | $ - | $ 5000 | 10 | $ 14093 | ||||||||||||||||||||||||||||||||||||||
6 | 25th St | Sheridan St | Holcomb St | 1200 | 18 | 2400 | $ 125895 | $ 52 | $ 70680 | $ 70680 | $ - | 125 | 1 | 1200 | $ 37750 | $ - | $ 8000 | 15 | $ 17465 | ||||||||||||||||||||||||||||||||||||||||
6 | Holcomb St | 7th St | 10th St | 850 | 12 | 1133 | $ 58703 | $ 52 | $ 10200 | $ 10200 | 10 | 10 | $ 5667 | 1500 | $ 37500 | $ - | $ - | 10 | $ 5337 | ||||||||||||||||||||||||||||||||||||||||
2 | Hendricks St | 9th St | 12th St | 800 | 16 | 1422 | $ 70930 | $ 50 | $ 41884 | $ 41884 | $ - | 750 | $ 18750 | $ - | $ 8000 | 15 | $ 10295 | ||||||||||||||||||||||||||||||||||||||||||
2 to 6 | Hill St | 19th | 21st St | 807 | 16 | 1435 | $ 67443 | $ 47 | $ 21125 | $ 6456 | $ 27581 | 10 | $ 5021 | 1000 | $ 25000 | $ - | $ 8000 | 15 | $ 9840 | ||||||||||||||||||||||||||||||||||||||||
2 to 8 | 57th St | Jackman St | Kuhn St | 800 | 18 | 1600 | $ 66550 | $ 42 | $ 14400 | $ 14400 | 20 | 10 | $ 13600 | 1300 | $ 32500 | 10 | $ 6050 | ||||||||||||||||||||||||||||||||||||||||||
6 to 8 | Sheridan St | Hastings Ave | SilverUmatilla | 1750 | 22 | 4278 | $ 154115 | $ 36 | $ 38500 | $ 38500 | 20 | 10 | $ 36361 | 300 | 4 | 1500 | $ 58500 | $ - | $ 5000 | 15 | $ 20754 | ||||||||||||||||||||||||||||||||||||||
6 to 10 | Tyler St | Jefferson St | Lawrence St | 900 | 32 | 3200 | $ 115280 | $ 36 | $ 28800 | $ 28800 | 5 | 5 | $ 8000 | 100 | 2 | $ 8000 | 4 | $ 60000 | 10 | $ 10480 | |||||||||||||||||||||||||||||||||||||||
6 to 14 | 14th St | McPherson St | Sheridan St | 2375 | 21 | 5542 | $ 182027 | $ 33 | $ 49875 | $ 49875 | 20 | 10 | $ 47104 | 750 | 4 | 1000 | $ 68500 | $ - | 10 | $ 16548 | |||||||||||||||||||||||||||||||||||||||
8 | 49th St | Kuhn St | Admiralty Ave | 400 | 24 | 1067 | $ 34613 | $ 32 | $ 9600 | $ 9600 | 5 | $ 1867 | 800 | $ 20000 | $ - | 10 | $ 3147 | ||||||||||||||||||||||||||||||||||||||||||
6 to 10 | Fir St | F St | UCherry | 4360 | 22 | 10658 | $ 341621 | $ 32 | $ 95920 | $ 95920 | 5 | 5 | 4000 | $ 106644 | 100 | 2 | 4000 | $ 108000 | $ - | 10 | $ 31056 | ||||||||||||||||||||||||||||||||||||||
6 to 8 | Cedar St | San Juan Ave | Redwood St | 1460 | 16 | 2596 | $ 81747 | $ 31 | $ 23360 | $ 23360 | 20 | 20 | $ 25956 | 1000 | $ 25000 | $ - | 10 | $ 7432 | |||||||||||||||||||||||||||||||||||||||||
8 | Clallam St | McKinley St | Roosevelt St | 975 | 14 | 1517 | $ 46796 | $ 31 | $ 13650 | $ 13650 | 20 | 10 | $ 12892 | 200 | 4 | $ 16000 | $ - | 10 | $ 4254 | ||||||||||||||||||||||||||||||||||||||||
6 | San Juan Ave | 19th St | 20th St | 300 | 31 | 1033 | $ 31827 | $ 31 | $ 9300 | $ 9300 | 50 | 10 | $ 19633 | $ - | $ - | 10 | $ 2893 | ||||||||||||||||||||||||||||||||||||||||||
6 to 20 | Cherry St | F St | W St | 4200 | 32 | 14933 | $ 457307 | $ 31 | $ 134400 | $ 134400 | 5 | 5 | 4200 | $ 121333 | 200 | 6000 | $ 160000 | $ - | 10 | $ 41573 | |||||||||||||||||||||||||||||||||||||||
6 to 8 | Jackman St | 45th St | 49th St | 1100 | 22 | 2689 | $ 81940 | $ 30 | $ 24200 | $ 24200 | 15 | 10 | $ 18150 | 225 | 3 | 500 | $ 28250 | $ - | $ 5000 | 15 | $ 11340 | ||||||||||||||||||||||||||||||||||||||
6 to 12 | Jackson St | LawrenceMonroe | Roosevelt St | 1600 | 18 | 3200 | $ 93530 | $ 29 | $ 28800 | $ 28800 | 10 | 10 | $ 16000 | 1000 | $ 25000 | 1 | $ 15000 | $ 2500 | 10 | $ 8730 | |||||||||||||||||||||||||||||||||||||||
2 | 7th St | Wilson St | Holcomb St | 450 | 16 | 800 | $ 23320 | $ 29 | $ 7200 | $ 7200 | 10 | 10 | $ 4000 | 400 | $ 10000 | $ - | 10 | $ 2120 | |||||||||||||||||||||||||||||||||||||||||
8 to 14 | 25th St | Sherman St | Sheridan St | 800 | 20 | 1778 | $ 50061 | $ 28 | $ 16000 | $ 16000 | 10 | 5 | $ 7556 | 1 | 800 | $ 21500 | $ - | $ 5000 | 10 | $ 5006 | |||||||||||||||||||||||||||||||||||||||
2 to 6 | Hancock St | SR 20 | 9th St | 1100 | 20 | 2444 | $ 67833 | $ 28 | $ 22000 | $ 22000 | 15 | 5 | $ 14667 | 1000 | $ 25000 | $ - | 10 | $ 6167 | |||||||||||||||||||||||||||||||||||||||||
Benton St | Washington St | Lawrence St | 1160 | 22 | 2836 | $ 74468 | $ 26 | $ 25520 | $ 25520 | 10 | 10 | $ 14178 | 140 | 4 | 600 | $ 28000 | 10 | $ 6770 | |||||||||||||||||||||||||||||||||||||||||
W St | San JuanAdmiralty | Walnut St | 2560 | 22 | 6258 | $ 163807 | $ 26 | $ 56320 | $ 56320 | 10 | 5 | $ 26596 | 200 | 4 | 2000 | $ 66000 | $ - | 10 | $ 14892 | ||||||||||||||||||||||||||||||||||||||||
6 to 8 | Walnut | W Street | Jackson | 2300 | 22 | 5622 | $ 145194 | $ 26 | $ 50600 | $ 50600 | 10 | 5 | $ 23894 | 2300 | $ 57500 | $ - | 10 | $ 13199 | |||||||||||||||||||||||||||||||||||||||||
6 to 8 | 24th St | Discovery Rd | San Juan Ave | 1250 | 18 | 2500 | $ 63938 | $ 26 | $ 22500 | $ 22500 | 10 | 5 | $ 10625 | 1000 | $ 25000 | $ - | 10 | $ 5813 | |||||||||||||||||||||||||||||||||||||||||
6 to 10 | Tyler St | Lawrence St | Blaine St | 900 | 32 | 3200 | $ 78980 | $ 25 | $ 28800 | $ 28800 | 5 | 5 | $ 8000 | 200 | $ 5000 | 2 | $ 30000 | 10 | $ 7180 | ||||||||||||||||||||||||||||||||||||||||
4 to 12 | McPherson St | SR 20 | Discovery Rd | 2925 | 32 | 10400 | $ 244860 | $ 24 | $ 93600 | $ 93600 | 5 | 5 | 2925 | $ 84500 | 230 | 2 | 1200 | $ 44500 | $ - | $ - | 10 | $ 22260 | |||||||||||||||||||||||||||||||||||||
10 | Landes St | 12th St | 19th St | 1820 | 32 | 6471 | $ 151821 | $ 23 | $ 58240 | $ 58240 | 5 | 1400 | $ 39324 | 400 | $ 10000 | 2 | $ 30000 | $ 5000 | 10 | $ 14256 | |||||||||||||||||||||||||||||||||||||||
6 to 8 | Discovery Rd | 19th | Hastings Ave | 2900 | 22 | 7089 | $ 136565 | $ 19 | $ 63800 | $ 63800 | 15 | 10 | $ 47850 | 500 | $ 12500 | $ - | 10 | $ 12415 | |||||||||||||||||||||||||||||||||||||||||
8 to 12 | Hastings Ave | Discovery Rd | County Line | 8450 | 32 | 30044 | $ 542349 | $ 18 | $ 270400 | $ 270400 | 5 | 10 | 5000 | $ 197644 | 1000 | $ 25000 | $ - | 10 | $ 49304 | ||||||||||||||||||||||||||||||||||||||||
6 to 12 | Washington St | Van Buren St | SR20 | 2025 | 30 | 6750 | $ 118388 | $ 18 | $ 60750 | $ 60750 | 5 | 5 | $ 16875 | 0 | 0 | 0 | $ - | 2 | $ 30000 | $ - | 10 | $ 10763 | |||||||||||||||||||||||||||||||||||||
14 | Blaine St | San Juan Ave | Walker St | 1275 | 48 | 6800 | $ 113910 | $ 17 | $ 61200 | $ 61200 | 5 | $ 11900 | $ - | 2 | $ 30000 | $ 5000 | 10 | $ 10810 | |||||||||||||||||||||||||||||||||||||||||
6 | Washington St | Harrison St | Taylor St | 1175 | 33 | 4308 | $ 59240 | $ 14 | $ 38775 | $ 38775 | 10 | $ 15079 | $ - | $ - | 10 | $ 5385 | |||||||||||||||||||||||||||||||||||||||||||
8 to 10 | Sheridan St | SR 20 | 19th St | 4000 | 46 | 20444 | $ 272922 | $ 13 | $ 184000 | $ 184000 | 5 | 5 | $ 51111 | 200 | 2 | $ 13000 | $ - | 10 | $ 24811 | ||||||||||||||||||||||||||||||||||||||||
8 to 10 | 19th St | San Juan Ave | Sheridan St | 3200 | 48 | 17067 | $ 197120 | $ 12 | $ 153600 | $ 153600 | 3 | 3 | $ 25600 | 0 | 0 | 0 | $ - | $ - | 10 | $ 17920 | |||||||||||||||||||||||||||||||||||||||
10 to 20 | San Juan Ave | F St | Lopez Ave | 2800 | 32 | 9956 | $ 110059 | $ 11 | $ 89600 | $ 89600 | 3 | $ 10453 | $ - | $ - | 10 | $ 10005 | |||||||||||||||||||||||||||||||||||||||||||
10 to 20 | F St | Hastings Ave | Tyler St | 5300 | 31 | 18256 | $ 180730 | $ 10 | $ 164300 | $ 164300 | $ - | $ - | $ - | 10 | $ 16430 | ||||||||||||||||||||||||||||||||||||||||||||
$ 9952406 | $ 1873288 | $ 31744 | $ 274803 | $ 32667 | $ 332896 | $ 1998646 | $ 4544044 | $ 1155207 | $ 1747625 | $ 1215000 | $ 1290529 | $ - 0 | |||||||||||||||||||||||||||||||||||||||||||||||