+ All Categories
Home > Documents > Concept alignment in 5 Phases

Concept alignment in 5 Phases

Date post: 14-Apr-2022
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
24
STREETCAR FEASIBILITY STUDY Concept alignment in 5 Phases
Transcript
Page 1: Concept alignment in 5 Phases

STREETCARFEASIBILITY STUDYConcept alignment in 5 Phases

Page 2: Concept alignment in 5 Phases

TIG/m is a Green Transportation Engineering Firmand Rolling Stock Manufacturer

We have been engaged by the City of Riverside to Study the Feasibility of building a state-of-the-art self-powered (overhead-wire free) electric/hydrogenstreetcar system and establishing a world headquarters for transportationtechnology research and development, with an associated manufacturing facility and test-track, in Riverside.

We are currently located in Chatsworth, CA and have designed or design/built street running rail systems in 6 countries around the world.

STREETCAR Feasibility Study

Page 3: Concept alignment in 5 Phases

STREETCAR Feasibility Study

• Operations Concepts• Alignment Options• Ridership Projections

(Demand Analysis)

Page 4: Concept alignment in 5 Phases

OPERATIONS: Reciprocation vs. Circulation

• Reciprocation: (Traveling back and forth on a single track or set of tracks). No turnaround required; but requires double-ended cars, and layover & recovery at every cycle.

• Circulation: (Traveling in a single direction on a continuous track). Requires turnarounds or loop configuration; but can use single-ended cars and avoids layover & recovery.

TIG/m favors CIRCULATION

Double-ended cars• More complex

• More expensive• Higher maintenance costs

• Fewer seats

Single-ended cars• Less expensive• Less complex

• Lower maintenance costs• More seats

STREETCAR Concept alignment in 5 Phases

Page 5: Concept alignment in 5 Phases

To Tyler St.

Example: Double Pinched Loop

STREETCAR Concept alignment in 5 Phases

LOOPS

Page 6: Concept alignment in 5 Phases

5 / 2 7 / 2 0 2 16

CONCEPTA single pinched loop with several open sections can serve as

the spine (Phase 1) for a multiple loop system built-out over time.

The completed system is envisioned as providing service from Downtown, east to UCR, west to La Sierra, and north to the

North Specific Plan.

Each loop would operate single-ended trams on an 8-minute headway with transfer between loops at selected passenger stations.

Phase 1 would be built with turnouts in place in order to facilitate theaddition of future loops without the need to interrupt service.

STREETCAR Concept alignment in 5 Phases

Page 7: Concept alignment in 5 Phases

5 / 2 7 / 2 0 2 17

UCR

Metrolink

City Center

Convention Center

5-minute Pedestrian Catchment

Page 8: Concept alignment in 5 Phases

5 / 2 7 / 2 0 2 18

UCR

Metrolink

City Center

Convention Center

Page 9: Concept alignment in 5 Phases

5 / 2 7 / 2 0 2 19

Depot

UCR

Metrolink

City Center

Convention Center

Page 10: Concept alignment in 5 Phases

5 / 2 7 / 2 0 2 110

Depot

UCR

Metrolink

City Center

Convention Center

Page 11: Concept alignment in 5 Phases

5 / 2 7 / 2 0 2 111

Depot

UCR

Metrolink

City Center

Convention Center 5-minute Pedestrian Catchment

Page 12: Concept alignment in 5 Phases

5 / 2 7 / 2 0 2 112

North Specific Plan

UCR

La Sierra

City Center

Total Track Length: 35 miles

5-minute Pedestrian Catchment

Page 13: Concept alignment in 5 Phases

5 / 2 7 / 2 0 2 115

UTILITIES

Page 14: Concept alignment in 5 Phases

UCR STATIONDepending on availability of land, this should be a major multi-modal transportation hub

with streetcar, bus, and bicycle facilities as well as public spaces.

Page 15: Concept alignment in 5 Phases

TRACK INSTALLATION

Low-Impact Trackform + Panelized Track = Minimize or Eliminate Utilities Relocation

1. Low-Impact cast-in-place:• Non-Electrified• Shallow (10-12 inches)• Rapid Installation

2. Panelized over Utilities

Page 16: Concept alignment in 5 Phases

Goal from within:Generate more transit trips and

reduce VMT by providing a more regular service based on a

shorter headway (8 minutes).

Our current demand analysis is focusedon calculating this potential increase in ridership.

5-minute Pedestrian Catchment

Page 17: Concept alignment in 5 Phases

Goal from without:Generate more transit trips and reduce VMT by providing a ring

of Park-and-Ride facilities feeding automobile drivers to the

bus lines and ultimately to the streetcar system and micro-

mobility at the core.

Page 18: Concept alignment in 5 Phases

Current data shows that the ratio of automobile-based trips to bus-based trips in and out of the highlighted

area is 25 : 1.

By adding a 1-acre P&R at these locations, this ratio could be reduced to 21 : 1.

This action alone represents a potential increase in Public Transportation ridership in this local area of

16%.

Page 19: Concept alignment in 5 Phases

Automobile • Cost of ownership• Insurance• Depreciation• Maintenance & Repairs• Parking Fees• Fuel Costs• Emissions Pollution

By instituting a single-platform fare system for bus, tram and micro-mobility, a very good case

can be made for the economic attractiveness of public transportation vs. automobile use

vs.

Page 20: Concept alignment in 5 Phases

5 / 2 7 / 2 0 2 122

TIG/m MRV-4 and MRV-3 on Market St. in Downtown Riverside.

Page 21: Concept alignment in 5 Phases

5 / 2 7 / 2 0 2 123

TIG/m MRV-3 on Market St. in Downtown Riverside.

Page 22: Concept alignment in 5 Phases
Page 23: Concept alignment in 5 Phases

www.riversideca.gov/streetcar

Page 24: Concept alignment in 5 Phases

THANK YOUCOMMENTS?

QUESTIONS?


Recommended