GIFFARD STREET
MELB
OURN
E RO
AD
60º ANGLE PARKING
HIGH STREET
HIGH STREET
4.0
4.0
2.5
4.0
4.0
SYMBOL
EXISTING DRAINAGE PIPE
DESCRIPTIONLEGEND
CONTINUITY LINE
PROPOSED SM2 KERB
UNBROKEN PAINTED LINE
LANE LINE 3m x 9m GAP
PROPOSED DRAINAGE PIPE
PROPOSED JUNCTION PIT
PROPOSED SIDE ENTRY PIT
PROPOSED PEDESTRIAN RAMP
BUS STOP LINE MARKING
PEDESTRIAN PATH
CONCRETE SHARED PATH
VEGETATED KERB OUTSTAND
FOR
CONT
INUA
TION
SEE
SHE
ET 1-
C02
CONCEPT
PECHELL STREET
PECHELL STREET
STATION STREET
60º ANGLE PARKING
HIGH STREET
HIGH STREET
4.0
4.0
4.0
4.0
2.3
6.0
6.5
6.5
6.0
SYMBOL
EXISTING DRAINAGE PIPE
DESCRIPTIONLEGEND
CONTINUITY LINE
PROPOSED SM2 KERB
UNBROKEN PAINTED LINE
LANE LINE 3m x 9m GAP
PROPOSED DRAINAGE PIPE
PROPOSED JUNCTION PIT
PROPOSED SIDE ENTRY PIT
PROPOSED PEDESTRIAN RAMP
BUS STOP LINE MARKING
PEDESTRIAN PATH
CONCRETE SHARED PATH
VEGETATED KERB OUTSTAND
FOR
CONT
INUA
TION
SEE
SHE
ET 1-
C01
FOR
CONT
INUA
TION
SEE
SHE
ET 1-
C03
CONCEPT
THE C
RESC
ENT
HIGH STREET
HIGH STREET
4.0
4.0
4.04.0
45º ANGLE PARKING
2.3
6.0
6.5
6.5
6.0
45º ANGLE PARKING
SYMBOL
EXISTING DRAINAGE PIPE
DESCRIPTIONLEGEND
CONTINUITY LINE
PROPOSED SM2 KERB
UNBROKEN PAINTED LINE
LANE LINE 3m x 9m GAP
PROPOSED DRAINAGE PIPE
PROPOSED JUNCTION PIT
PROPOSED SIDE ENTRY PIT
PROPOSED PEDESTRIAN RAMP
BUS STOP LINE MARKING
PEDESTRIAN PATH
CONCRETE SHARED PATH
VEGETATED KERB OUTSTAND
FOR
CONT
INUA
TION
SEE
SHE
ET 1-
C02
FOR
CONT
INUA
TION
SEE
SHE
ET 1-
C04
CONCEPT
HOOD STREET
WHATTON PLACE
HIGH STREET
HIGH STREET
45º ANGLE PARKING
SYMBOL
EXISTING DRAINAGE PIPE
DESCRIPTIONLEGEND
CONTINUITY LINE
PROPOSED SM2 KERB
UNBROKEN PAINTED LINE
LANE LINE 3m x 9m GAP
PROPOSED DRAINAGE PIPE
PROPOSED JUNCTION PIT
PROPOSED SIDE ENTRY PIT
PROPOSED PEDESTRIAN RAMP
BUS STOP LINE MARKING
PEDESTRIAN PATH
CONCRETE SHARED PATH
VEGETATED KERB OUTSTAND
FOR
CONT
INUA
TION
SEE
SHE
ET 1-
C03
CONCEPT