+ All Categories
Home > Documents > Concepts for New Recycler Lambertons GW Foster Dec 2000.

Concepts for New Recycler Lambertons GW Foster Dec 2000.

Date post: 19-Jan-2016
Category:
Upload: elmer-griffith
View: 215 times
Download: 2 times
Share this document with a friend
Popular Tags:
17
Concepts for New Recycler Lambertons GW Foster Dec 2000
Transcript
Page 1: Concepts for New Recycler Lambertons GW Foster Dec 2000.

Concepts for New Recycler Lambertons

GW Foster

Dec 2000

Page 2: Concepts for New Recycler Lambertons GW Foster Dec 2000.

Concepts for New Recycler Lambertons

GW Foster Dec 2000

YOU CAN NEVER BE:

• Too Thin

• Too Rich

• Have too much Aperture

for Beam Transfers

Page 3: Concepts for New Recycler Lambertons GW Foster Dec 2000.

Lambertson Challenges

• Septum Width– Lamination die ~2x material

~0.125”

• Septum Straightness– Stacking– Overall Warpage

• Vacuum– Laminations have large area– Iron Rusts

• Bend Field– Iron Limit ~1 T– Perm. Mag. (Ferrite) Limit ~0.5T

Page 4: Concepts for New Recycler Lambertons GW Foster Dec 2000.

Recycler Lambertson

Page 5: Concepts for New Recycler Lambertons GW Foster Dec 2000.

Recycler LambertsonField Map

Page 6: Concepts for New Recycler Lambertons GW Foster Dec 2000.

Recycler Lambertson Specifications

Page 7: Concepts for New Recycler Lambertons GW Foster Dec 2000.

Specific Problems with Recycler Lambertsons

• Brick Trim of field shape (skew quad) not exact– ~1% skew quad field defect

• Gun Boring of Field-free region not very precise– Effective Septum Width ~0.2”– Septum extremely thin some

places

• Vacuum problems required Stainless beam pipe insert

• Overall Septum Width ~0.3”

Page 8: Concepts for New Recycler Lambertons GW Foster Dec 2000.

Trimming Skew Quad With Side Brick Position

Lambertson Field Defects vs. Side Brick Position

-200

-100

0

100

200

300

400

500

600

0 0.25 0.5 0.75 1

Side Brick Overhang Distance Below Pole Tip Surface (in.)

Cal

cula

ted

Fie

ld D

efec

t (

un

its

at 1

")

Calc. Skew Quad

Calc. Skew Octupole

As-Built (approx)

Page 9: Concepts for New Recycler Lambertons GW Foster Dec 2000.

New Lambertson Concepts

• Copper-Plated Steel to solve vacuum problems– (Suggested by Helen Edwards)

• Vacuum Shell: either– Brazed Connections to Stainless– Thin Stainless Skin on Insert

• Separates Vacuum & Septum design from Structure & Magnetics.

Page 10: Concepts for New Recycler Lambertons GW Foster Dec 2000.

Copper Plated Steel

Field Free Region

BendRegion

Stainless Vacuum Bridge

BrazeJoints

New LambertsonSeptum And Vacuum Pipe

Page 11: Concepts for New Recycler Lambertons GW Foster Dec 2000.

Welded Stainless Skin Option

Page 12: Concepts for New Recycler Lambertons GW Foster Dec 2000.

Vacuum Flange at Ends(Brazed or Welded)

Page 13: Concepts for New Recycler Lambertons GW Foster Dec 2000.

Pole Tip For Permanent Magnet

Page 14: Concepts for New Recycler Lambertons GW Foster Dec 2000.

Machined Steel Base Plate for Lambertson

Page 15: Concepts for New Recycler Lambertons GW Foster Dec 2000.

Permanent Magnet Ferrite(3 Layers for B~0.3T)

Page 16: Concepts for New Recycler Lambertons GW Foster Dec 2000.

Steel Cover Plates

Page 17: Concepts for New Recycler Lambertons GW Foster Dec 2000.

New Recycler Lambertson?


Recommended