CONCEPTUAL MASTER PLAN for the SAVANNAH GATEWAY INDUSTRIAL HUB
MIKE MARTINP: 770.645.7241EMAIL: [email protected]
0’ 1000’’500’ 2000’
PHASE 4 PHASE 3 PHASE 2 PHASE 1
Tract Building SFF3 1,000,000 F4 1,000,000 F5 280,000 F6‐A 250,000 F6‐B 500,000 Tract Building SFF6‐C 500,000 Tract Building SF A1 350,000 F6‐D 250,000 D1 725,000 A2‐A 250,000 F6‐E 250,000 D2 to D1/ WETLANDS A2‐B 200,000 F6‐F 350,000 Tract F1/F2/F9 Building SF E1‐A 1,000,000 A2‐C 525,000 F6‐G 350,000 F1/F2 ‐BLDG 1 3,200,000 E1‐B 500,000 B1 400,000 F6‐H 250,000 F1/F2 ‐BLDG 2 900,000 E1‐C 750,000 B2 500,000 F7 700,000 F9 650,000 E1‐D 750,000 C1 250,000 F8 450,000 E2 12,500 C2 400,000 TOTAL 6,130,000 TOTAL 4,750,000 TOTAL 3,737,500 TOTAL 2,875,000