DEVELOPED BY HODGEVILLE RD EFFINGHAM PKWY NORFOLK SOUTHERN CSX MCCALL RD C2 A2-C A2-B B1 B2 E2 E1-D E1-C F1 F9 F8 F7 F6-A F6-E F4 F5 F3 F6-F F6-G F6-H F6-B F6-C F6-D E1-B E1-A D1 A2-C A1 C1 300’ BUFFER TO ADJACENCY WETLANDS D2 GATEWAY PKWY BLUE JAY RD CONCEPTUAL MASTER PLAN for the SAVANNAH GATEWAY INDUSTRIAL HUB MIKE MARTIN P: 770.645.7241 EMAIL: [email protected] 0’ 1000’’ 500’ 2000’ PHASE 4 PHASE 3 PHASE 2 PHASE 1 Tract Building SF F3 1,000,000 F4 1,000,000 F5 280,000 F6A 250,000 F6B 500,000 Tract Building SF F6C 500,000 Tract Building SF A1 350,000 F6D 250,000 D1 725,000 A2A 250,000 F6E 250,000 D2 to D1/ WETLANDS A2B 200,000 F6F 350,000 Tract F1/F2/F9 Building SF E1A 1,000,000 A2C 525,000 F6G 350,000 F1/F2 BLDG 1 3,200,000 E1B 500,000 B1 400,000 F6H 250,000 F1/F2 BLDG 2 900,000 E1C 750,000 B2 500,000 F7 700,000 F9 650,000 E1D 750,000 C1 250,000 F8 450,000 E2 12,500 C2 400,000 TOTAL 6,130,000 TOTAL 4,750,000 TOTAL 3,737,500 TOTAL 2,875,000 PHASE 2 PHASE 1 PHASE 4 PHASE 3
Transcript
Page 1: CONCEPTUAL MASTER PLAN for the SAVANNAH GATEWAY … · 2019. 11. 12. · b2 e2 e1-d e1-c f1 f9 f8 f7 f6-a f6-e f4 f5 f3 f6-f f6-g f6-h f6-b f6-c f6-d e1-b e1-a d1 a2-c a1 c1 300’

DEVELOPED BY

HO

DG

EVILLE RD

EFFING

HA

M PK

WY

NO

RFO

LK S

OU

THER

N

CSX

MCCALL RD

C2

A2-C

A2-B

B1

B2

E2

E1-DE1-C

F1

F9F8

F7

F6-A

F6-E

F4

F5

F3

F6-F F6-GF6-H

F6-B F6-CF6-D

E1-B

E1-A

D1

A2-C

A1

C1

300’ BUFFER TO ADJACENCY

WETLANDS

D2

GATEWAY PKWY

BLUE JAY RD

CONCEPTUAL MASTER PLAN for the SAVANNAH GATEWAY INDUSTRIAL HUB

MIKE MARTINP: 770.645.7241EMAIL: [email protected]

0’ 1000’’500’ 2000’

PHASE 4 PHASE 3 PHASE 2 PHASE 1

Tract Building SFF3 1,000,000              F4 1,000,000              F5 280,000                 F6‐A 250,000                 F6‐B 500,000                  Tract Building SFF6‐C 500,000                  Tract Building SF A1 350,000                 F6‐D 250,000                  D1 725,000                  A2‐A 250,000                 F6‐E 250,000                     D2 to D1/ WETLANDS A2‐B 200,000                 F6‐F 350,000                  Tract F1/F2/F9 Building SF E1‐A 1,000,000               A2‐C 525,000                 F6‐G 350,000                  F1/F2 ‐BLDG 1 3,200,000                                E1‐B 500,000                  B1 400,000                 F6‐H 250,000                  F1/F2 ‐BLDG 2 900,000                                    E1‐C 750,000                  B2 500,000                 F7 700,000                  F9 650,000                                    E1‐D 750,000                  C1 250,000                 F8 450,000                  E2 12,500                    C2 400,000                 TOTAL 6,130,000               TOTAL 4,750,000                               TOTAL 3,737,500               TOTAL 2,875,000              