CONCOURSE EXPANSION PROGRAM
MARK H ADAMS, P.E.SENIOR PROGRAM DIRECTOR FOR EXPANSIONNOVEMBER 1, 2018
2
GATE EXPANSION INITIATIVE
3
A-WEST EXPANSION
• Adds 12 gates • Adds 5 international nodes• 530,000 sq. ft• 130,000 sq. ft foot print• 109,000 sq. yd apron paving• 10,000 sq. ft concessions• FIS Corridor
A
B
C
• De-ice facility• Relocates A26/A28/A31• Right Sizes four hold rooms• Integrated int’l nodes
4
A-WEST EXPANSION
5
A-WEST EXPANSION
6
A-WEST EXPANSION
7
A-WEST EXPANSION
8
B-WEST EXPANSION
9
B-WEST EXPANSION
10
B-WEST EXPANSION
11
B-WEST EXPANSION
12
B-EAST EXPANSION
13
B-EAST EXPANSION
14
B-EAST EXPANSION
15
B-EAST EXPANSION
• Adds 16 gates• 521,000 sq. ft• 185,000 sq. ft footprint• 66,740 sq. yd apron paving• 8,800 sq. ft concessions
16
C-EAST EXPANSION
A
B
C
• Right sizes four (4) hold rooms
17
C-EAST EXPANSION
18
C-EAST EXPANSION
19
C-EAST EXPANSION