1
Conference Schedule Overview
Wednesday, November 6, 2013
17:00 – 19:00 Registration
17:30 – 19:30 Reception
Thursday, November 7, 2103
08:30 – 09:30 Registration
09:30 – 09:50 Opening Ceremony
09:50 – 10:30 Keynote Lecture 1 by Mr. Naoyoshi Sato
10:30 – 10:40 Preparation
10:40 – 12:30 JACIC Session
12:30 – 13:30 Lunch
13:30 – 15:10 Parallel Sessions
15:10 – 15:30 Coffee Break
15:30 – 17:10 Parallel Sessions
17:45 Buses leave Tokyo International Exchange Center to Happo-en
19:00 – 21:00 Banquet at Happo-en
Friday, November 8, 2013
09:30 – 10:50 Parallel Sessions
10:50 – 11:10 Coffee Break
11:10 – 11:50 Keynote Lecture 2 by Prof. Ian F.C. Smith
11:50 – 12:30 Industry Keynote Lecture by Dr. Yoshihiko Fukuchi
12:30 – 13:30 Lunch
13:30 – 15:30 Parallel Sessions
15:30 – 15:50 Coffee Break
15:50 – 16:20 Closing Ceremony
2
Overview of Plenary and Parallel Sessions
Thursday, November 7, 2013 Time Event
09:30 – 09:50 Opening Ceremony
09:50 – 10:30 Keynote Lecture 1
10:40 – 12:30 JACIC Session
12:30 – 13:30 Lunch
Hall and
Room
International Conference
Hall
Media Hall Conference Room
2
Conference Room 3
13:30 – 15:10 CIM (BIM FOR INFRASTRUCTURE): BRIDGES (Sang-Ho Lee)
BIM: LIFECYCLE MANAGEMENT (Zhiliang Ma)
SENSING AND LASER SCANNING (1) (Tomohiro Mizoguchi)
NUMERICAL ANALYSIS AND ICT IN GEOTECHNICAL ENGINEERING (Yoshihisa Miyata)
15:10 – 15:30 Coffee Break
15:30 – 17:10 CIM (BIM FOR INFRASTRUCTURE): ROADS & TUNNELS AND LIFECYCLE MANAGEMENT (1) (Katsunori Miyamoto)
BIM: DESIGN & CONSTRUCTION AND BIM: DATA MANAGEMENT (1) (Tae-Wook Kang)
LASER SCANNING (2) (Satoshi Kanai)
ICT IN ENVIRONMENTAL ENGINEERING (J S Kuang)
Friday, November 8, 2013 Time Event
Hall and
Room
International
Conference Hall
Media Hall Conference
Room 2
Conference Room 3
09:30 – 10:50 CIM (BIM FOR INFRASTRUCTURE): LIFECYCLE MANAGEMENT (2) AND COMPUTER AIDED CONSTRUCTION (1) (Mani Golparvar-Fard)
BIM: DATA MANAGEMENT (2), PHOTOGRAMMETRY (1) (Tomohiro Fukuda)
--
ICT IN ARCHITECTURE & SMART HOUSES (Koji Makanae)
10:50 – 11:10 Coffee Break
11:10 – 11:50 Keynote Lecture 2
11:50 – 12:30 Industry Keynote Lecture
12:30 – 13:30 Lunch
13:30 – 15:30 COMPUTER AIDED CONSTRUCTION (2), ICT IN SIGNAGE PLANNING (Tomohiro Fukuda)
PHOTOGRAMMETRY (2), AUGMENTED REALITY, 3D MODELING (Yoshihiro Yasumuro)
-- DATA MINING AND MACHINE LEARNING (Jack C.P. Cheng)
15:30 -15:50 Coffee Break
15:50 – 16:20 Closing Ceremony
Persons in parentheses are chairpersons for sessions.
3
Tokyo International Exchange Center (Plaza Heisei)
4
Floor Plan
5
3rd Floor
4th Floor
Registration International Conference Hall Main Foyer
Media Hall
Conference Room 2 Conference Room 3
6
Conference Program
DAY 0: Wednesday, November 6, 2013
17:00 – 19:00 Registration Main Foyer
17:30 – 19:30 Reception Main Foyer
DAY 1: Thursday, November 7, 2013
08:30 – 09:30 Registration Main Foyer
09:30 – 09:50 Plenary Session: Opening Ceremony International Conference Hall
09:50 – 10:30 Plenary Session: Keynote Lecture 1 International Conference Hall
CONSTRUCTION INFORMATION MODELING (CIM)
Naoyoshi Sato
10:30 – 10:40 Preparation for Panel Discussion (No Coffee Break)
10:40 – 12:30 Plenary Session: JACIC Session International Conference Hall
THEME: MOVEMENT OF CIM IN JAPAN AND DEVELOPMENT OF PRODUCT MODELS
THROUGH INTERNATIONAL COLLABORATION
Moderator: Nobuyoshi Yabuki
Panelists: Christophe Castaing
Patrick Shang-Hsien Hsieh
Yuhei Takamura
Shin Tsuboka
Junich Yamashita
12:30 – 13:30 Lunch Main Foyer
7
13:30 – 15:10 Parallel Sessions
International Conference Hall, Media Hall, Conference Room 2, and Conference Room 3
13:30 – 15:10 CIM (BIM FOR INFRASTRUCTURE): BRIDGES International Conference Hall
Chairperson: Sang-Ho Lee
INTEGRATED INFORMATION MANAGEMENT SYSTEM USING 3D MODEL FOR
MAINTENANCE OF BRIDGE CONSTRUCTION
Hisatoshi Taniguchi, Noriaki Aoyama, Koichi Shigetaka, Kenji Tsubomura, and Hiroaki Mori
3D INFORMATION MODELING OF MODULAR BRIDGE PIER
Jae-Hun Jo, Dong-Wook Kim, Bong-Young Yoo, and Kwang-Myong Lee
APPLICATION OF INFORMATION DELIVERY MANUALS FOR EFFECTIVE EXCHANGE OF BIM
INFORMATION IN MODULAR BRIDGE CONSTRUCTION
Bonsang Koo, Hyunji Joo, Hyun Jung An, and Sang-Ho Lee
DEVELOPMENT OF A WEB-BASED ASSEMBLY DESIGN AND CONSTRUCTION SIMULATION
SYSTEM FOR MODULAR BRIDGES
Hyun Jung An, Jung-Hoon Han, Sang-Hyeok Nam, and Sang-Ho Lee
IFC-BASED BRIDGE APPLICATION INFORMATION MODEL USING USER-DEFINED PROPERTY SETS
Sang-Ho Lee, Sang Il Park, and Junwon Park
13:30 – 15:10 BIM: LIFECYCLE MANAGEMENT Media Hall
Chairperson: Zhiliang Ma
A SYSTEM PLATFORM FOR BIM WEB SERVICES WITH INTEGRATION OF CLOUD COMPUTING
AND WEB3D TECHNOLOGY
Hung-Ming Chen, Chuan-Chien Hou, and Tsung-Hsi Lin
BIMATIZING PREFABRICATION HOUSING CONSTRUCTION IN HONG KONG: CONTEXTS,
FRAMEWORKS, AND CHALLENGES AHEAD
Weisheng Lu, George Huang, Qiping Shen, Thomas Ng, and Yan Gao
BIM AS PART OF PMIS APPLICATIONS: CASES AND IMPLICATIONS
Youngsoo Jung
TOWARD AN EXPERIENCE-ENHANCED BIM APPROACH FOR LIFECYCLE MANAGEMENT OF
PUBLIC LIVING SPACE
Shang-Hsien Hsieh, Shih-Chung Kang, and Huan-Ting Chen
DESIGN OF SYSTEM ARCHITECTURE OF BIM-BASED COLLABORATIVE WORK PLATFORM
SUPPORTING IPD PROJECTS
Zhiliang Ma and Dongdong Zhang
8
13:30 – 15:10 SENSING AND LASER SCANNING (1) Conference Room 2
Chairperson: Tomohiro Mizoguchi
WATER-LEVEL-SENSOR IC TAG AIDED MONITORING TECHNIQUES APPLIED TO
CLIMATE-CHANGE-INDUCED DISASTER MITIGATION
Osamu Saitou, Yuji Kuwahara, and Kazuya Yasuhara
STRUCTURAL SENSING METHOD USING THE ACCURATE ARTIFICIAL VIBRATOR AND
WIRELESS SENSOR NETWORK
Tatsuya Kurihara, Mika Tsukahara, Takuma Saitou, Kazuki Watanabe, and Masayuki Saeki
AN EFFICIENT SURFACE GENERATION METHOD FOR VEHICLE-BASED MOBILE MAPPING
SYSTEM
Jun He and Hiroshi Masuda
PRECISE SCAN ALIGNMENT FOR QUANTITATIVE SCALING EVALUATION OF CONCRETE
STRUCTURES
Tomohiro Mizoguchi, Yasuhiro Koda, Ichiro Iwaki, Hiroyuki Wakabayashi, and Yoshikazu Kobayashi
PEDESTRIAN BRIDGE REMOVAL PLAN USING POINT CLOUD DATA EDITOR
Yoichi Fujita, Seigo Ogata, Ichiro Kobayashi, and Takafumi Yamanaka
13:30 – 15:10 NUMERICAL ANALYSIS AND ICT IN GEOTECHNICAL ENGINEERING
Conference Room 3
Chairperson: Yoshihisa Miyata
AN APPROACH TO CURRENT VISUALIZATION FOR SEDIMENT TRANSPORT BEHIND A DAM
IN A HYDRAULIC MODEL USING THE PIV METHOD
Takahiro Kato, Shinichi Hiraki, Koichiro Tada, Yasuyuki Shimizu, and Ichiro Kimura
EVALUATING MODELING UNCERTAINTIES IN THE SIMULATION OF AIRFLOW IN CITIES
Didier G. Vernay, Benny Raphael, and Ian F.C. Smith
THE APPLICATION OF TRAIN-TRACK-BRIDGE DYNAMIC ANALYSIS ON BEIJING-SHANGHAI
HIGH-SPEED RAILWAY
Mangmang Gao, Wei Wang, Zhaojun Xu, and Yuchen Zhang
ICT-BASED REMEDIATION METHOD FOR CONTAMINATED GROUNDWATER WITH TCE
Yoshihisa Miyata and Toshiro Hata
CENTRIFUGE EVALUATION OF DATA ASSIMILATION FOR DEFORMATION BEHAVIOR OF CLAY
FOUNDATION
Takayuki Shuku, Shin-ichi Nishimura, and Toshifumi Shibata
15:10 – 15:30 Coffee Break Main Foyer
9
15:30 – 17:10 Parallel Sessions
International Conference Hall, Media Hall, Conference Room 2, and Conference Room 3
15:30 – 17:10 CIM (BIM FOR INFRASTRUCTURE): ROADS & TUNNELS AND LIFECYCLE
MANAGEMENT (1) International Conference Hall
Chairperson: Katsunori Miyamoto
A REFINED PRODUCT MODEL FOR SHIELD TUNNELS BASED ON A GENERALIZED APPROACH
FOR ALIGNMENT REPRESENTATION
Julian Amann, André Borrmann, Felix Hegemann, Javier R. Jubierre1, Matthias Flurl, Christian Koch, and
Markus König
ANALYSIS OF ROAD ELEMENTS FOR THE EXTENSION GEOMETRY PART OF IFC MODEL
SCHEMA
Geun-Ha Cho, Jong-Kwan Song, and Ki-Beom Ju
ANALYSIS OF ERRORS AND RELIABILITY IN EARTH-VOLUME AND STRUCTURES QUANTITY
ESTIMATION WITH 3D-BIM COMPARED WITH ROUTINE METHOD-BASED 2D
Jae-Choul Shin, Qu-Yong Lee, Jeong-Won Woo, Kyeong-Don Kang, and Min-Jung Song
MAINTENANCE PROCESS BEING REFLECTED IN DESIGN PROCESS ON PUBLIC WORKS
Hisakazu Ariki
A STUDY ON BIG DATA FOR LIFECYCLE INFRASTRUCTURE MANAGEMENT WITH SHARED
PRODUCT MODEL
Katsunori Miyamoto
15:30 – 17:10 BIM: DESIGN & CONSTRUCTION AND BIM: DATA MANAGEMENT (1)
Media Hall
Chairperson: Tae-Wook Kang
BIM BASED DESIGN OF PRECAST CONCRETE PLATFORM
Ji-Sook Jeong, Kwang-Myong Lee, Ki-Hyun Park, and Young-Shik Park
AUTOMATED DESIGN MODULE OF ADVANCED CES (CONCRETE ENCASED STEEL) DEVICE
FOR RC-COLUMN BASED ON S-BIM
Eun-Ju Kim, Jin-Hyang Kim, Jae-Hyouk Choi, and Kyong-Won Kim
DEVELOPMENT OF AUTOMATIC DESIGN SYSTEM FOR STEEL FRAME WITH CSPD BASED ON
S-BIM
So-Yeon Son, Jin-Hyang Kim, Jae-Hyouk Choi, and Kyong-Won Kim
FORMWORK DESIGN FOR CONCRETE STRUCTURES: VALIDATION OF A BIM PROPOSAL
Romeu Neiva Neto, Roger P. da Costa, and Regina C. Ruschel
10
FACILITY MANAGEMENT SYSTEM ARCHITECTURE CONSIDERING THE PERSPECTIVE VIEW
BASED ON BIM
Tae-Wook Kang and Hyun-Sang Choi
15:30 – 17:10 LASER SCANNING (2) Conference Room 2
Chairperson: Satoshi Kanai
DATA MODELING AND GEOMETRY REGISTRATION FOR THE INTEGTATED MANAGEMENT
OF THE BIM AND LASER-SCANNED POINT CLOUDS
Shinya Yamaoka, Satoshi Kanai, and Hiroaki Date
A PRACTICAL SCAN PLANNING FOR SHAPE MEASUREMENT OF OUTDOOR CONSTRUCTIONS
Hiroshige Dan, Yoshihiro Yasumuro, Taisuke Ishigaki, Tatsuaki Nishigata, and Masataka Imura
MAKING A DIGITAL HUMAN WALK DIRECTLY IN THE 3D LASER-SCANNED POINT CLOUDS
OF INDOOR ENVIRONMENTS
Tsubasa Maruyama, Satoshi Kanai, and Hiroaki Date
IMPROVE THE DATA MERGING ACCURACY OF TERRESTRIAL LIDAR IN INTERIOR SPACE
Hyoung Sig Cho, Hong Gyoo Shon, Nam Hoon Kim, and Bin Li
DEVELOPMENT OF NON-DESTRUCTIVE INSPECTION METHOD FOR CONCRETE ELEMENTS
IN TUNNEL LININGS USING REMOTE LASER SENSING
Norikazu Misaki, Toshihiro Asakura, Hideyuki Takinami, Yoshinori Shimada, Oleg Kotiaev,
Masahiro Shinoda, Hiroaki Sakamoto, Yasumasa Takahashi, and Yasuhiko Sakamoto
15:30 – 17:10 ICT IN ENVIRONMENTAL ENGINEERING Conference Room 3
Chairperson: J S Kuang
A WEB-BASED SYSTEM FOR EXAMINING WASTE GENERATION FROM BUILDING
CONSTRUCTION PROJECTS
Yashuai Li, Xueqing Zhang, and J S Kuang
DEVELOPING AN AGENT-BASED DECISION SUPPORT SYSTEM FOR CONSTRUCTION WASTE
MANAGEMENT
Vincent J.L. Gan and Jack C.P. Cheng
EFFECT OF URBANIZATION PROGRESS ON URBAN ENVIRONMENTAL CONTEXT IN HANOI,
VIETNAM - APPLYING RS AND GIS AS URBAN ANALYSIS AND PLANNING DECISION SUPPORT
Jin Yeu Tsou, Ming Chun CHAO, Xiang LI, and Mengmeng FAN
METHODOLOGY DEVELOPMENT TO ASSESS IMPACTS OF FLOOD DISASTER ON ISOLATED
COMMUNITIES USING WATER SUPPLY HAZARD MAP
11
Yasuyo Yoshikawa, Hidenori Oyama, Hiroyuki Yabe, Makoto Koike, Tatsuo Morimoto, Kumiko Oguma,
Toshiya Aramaki, and Satoshi Takizawa
A REAL OPTIONS APPROACH FOR STRATEGIC SALES OF CERS TO MAXIMIZE
PROFITABILITY OF CDM PROJECTS
Bonsang Koo, Jong-Ho Park, and Cheong-Woon Kim
17:45 Buses leave Tokyo International Exchange Center to Happo-En
19:00 – 21:00 Banquet at Happo-En
DAY 2: Friday, November 7, 2013
09:30 – 10:50 Parallel Sessions
International Conference Hall, Media Hall, and Conference Room 3
09:30 – 10:50 CIM (BIM FOR INFRASTRUCTURE): LIFECYCLE MANAGEMENT (2) AND
COMPUTER AIDED CONSTRUCTION (1) International Conference Hall
Chairperson: Mani Golparvar-Fard
A PROPOSAL ON USAGE AND APPLICATION OF DATA ACQUIRED ON THE CONSTRUCTION
STAGE OF CONSTRUCTION MANAGEMENT
Yushi Shiiba , Seigo Ogata, Ichiro Kobayashi, and Takafumi Yamanaka
A HISTORICAL STUDY OF JAPANESE E-BIDDING IN THE FIELD OF PUBLIC CONSTRUCTION
Yasushi Kawanai
TRANSITIONING OF CRYPTOGRAPHIC ALGORITHMS IN THE ELECTRONIC BIDDING CORE
SYSTEM
Hiroyuki Ishiwata
IMAGE-BASED QUALITY MONITORING FOR ALIGNMENT AND PLACEMENT OF
PREFABRICATED BRIDGE STRUCTURAL COMPONENTS
Kevin K. Han, Zenichi Igarashi Yoshihiko Fukuchi, and Mani Golparvar-Fard
12
09:30 – 10:50 BIM: DATA MANAGEMENT (2), PHOTOGRAMMETRY (1) Media Hall
Chairperson: Tomohiro Fukuda
DATA PIPELINE FROM BIM TO ENERGY SIMULATOR AND VIRTUAL REALITY FOR
UPGRADING INTEROPERABILITY
Tomohiro Fukuda and Masaharu Taguchi
THE QUALITY CHECKING METHOD USING BIM GUIDELINES TO IMPROVE THE QUALITY
OF THE BIM MODEL
Jong-Kwan Song, Geun-Ha Cho, and Ki-Beom Ju
INNER SURFACE MEASUREMENT WITH RGB-D CAMERA FOR PIPELINE ASESSMEN
Yoshihiro Yasumuro, Arata Nagakusa, Hiroshige Dan, and Akira Kobayashi
PHOTOGRAMMETRY-INTEGRATED SYSTEM INFORMATION MODELING (SIM) FOR EFFECTIVE
INFORMATION ACCESS IN CONSTRUCTION OF POWER, CONTROL AND ICT SYSTEMS
Ying Wang Xiangyu Wang, Lei Hou, and Nicoleta Maynard
09:30 – 10:50 ICT IN ARCHITECTURE & SMART HOUSES Conference Room 3
Chairperson: Koji Makanae
DEVELOPMENT OF AN ARCHITECTURAL PROGRAMMING SUPPORT TOOL USING BUBBLE
DIAGRAMS
Junpei Koike and Koji Makanae
ESTABLISHING DIRECTIONS TOWARD SUSTAINABLE BUILDING SAFETY CHECK SYSTEM IN
KOREA – FOCUSING ON THE US AND KOREA SAFETY CHECK SYSTEM –
Sanghoon Park, Sang-Il Park, and Sang-Ho Lee
A SMART HOUSE FRAMEWORK FOR INTER-CONNECTING OBJECTS BASED ON THE
INTERNET-ORIENTED ARCHITECTURE
Takeshi Yashiro, Shinsuke Kobayashi, Noboru Koshizuka, and Ken Sakamura
SMART HOMES FROM VISION TO REALITY: ELICITING USERS' PREFERENCES OF SMART
HOMES BY A VIRTUAL EXPERIMENTAL METHOD
Erfaneh Allameh, Mohammadali Heidari, Bauke de Vries, Harry Timmermans, and Mohammad Masoud
10:50 – 11:10 Coffee Break Main Foyer
11:10 – 11:50 Plenary Session: Keynote Lecture 2 International Conference Hall
SENSOR-DATA INTERPRETATION IN CIVIL AND BUILDING-ENGINEERING CONTEXTS
Ian F.C. Smith
13
11:50 – 12:30 Plenary Session: Industry Keynote Lecture International Conference Hall
BIM/CIM FOR INFRASTRUCTURE LIFECYCLE MANAGEMENT AND DELIVERY
Yoshihiko Fukuchi
12:30 – 13:30 Lunch Main Foyer
13:30 – 15:10 Parallel Sessions
International Conference Hall, Media Hall, Conference Room 2, and Conference Room 3
13:30 – 15:30 COMPUTER AIDED CONSTRUCTION (2), ICT IN SIGNAGE PLANNING
International Conference Hall
Chairperson: Tomohiro Fukuda
MEASUREMENT OF DEPTH OF SURFACE CRACKS IN CONCRETE BY LASER-ULTRASONIC
TECHNIQUE
S. Kurahashi, Y. Shimada, O. Kotyaev,T. Norimatsu, Y. Kono, S. Nakata, and M. Ishii
EXCHANGE OF DESIGN DATA OPTIMIZED FOR INTELLIGENT CONSTRUCTION IN JAPAN
Kenichi Fujino, and Takashi Yamaguchi
NETWORK COMMUNICATION NOTE AND VISUALIZATION OF WORK PROCESS TO ENHANCE
UNMANNED CONSTRUCTION
Shigeomi Nishigaki, Katsutoshi Sibara, Shigeo Kitahara, Kouji Sakanishi, Hitoshi Okamoto, Fujio Matsuda,
Yasuo Fujisawa, Masaharu Moteki, and Kenichi Fujino
RECURRENT USE OF STRUCTURAL DATA VIA THE MODEL SPACE AND WEB OF
REDEVELOPMENT PLAN AROUND THE STATION
Fumio Yoshida, Seigo Ogata, Ichiro Kobayashi, and Takafumi Yamanaka
BIM APPLICATION ON THE SIGNAGE SYSTEM OF PUBLIC BUILDING AT DESIGN STAGE
Ya-Yu Tseng, Szu-Min Kang, and Richard Moh
A DATA MODEL FOR CHECKING DIRECTIONAL SIGNAGE AT RAILWAY STATIONS
Shuhei Furubayashi, Nobuyoshi Yabuki, and Tomohiro Fukuda
13:30 – 15:30 PHOTOGRAMMETRY (2), AUGMENTED REALITY, 3D MODELING
Media Hall
Chairperson: Yoshihiro Yasumuro
ACQUISITION OF DSM WITH HOME USE DIGITAL CAMERA
Masaru Kaidzu and Hiroyuki Takiguchi
14
STUDY ON CRACK MONITORING METHOD USING DIGITAL PHOTOGRAMMETRY
Nao Minakata, Satoshi Nishiyama, Takao Yano, and Teruyuki Kikuchi
EVALUATION OF 3D MODELS OF LEISURE EQUIPMENT RECOGNITION IN AUGMENTED
REALITY
Ana Regina M. Cuperschmid, Regina C. Ruschel, and Ana Maria R. de G. Monteiro
DIMINISHED REALITY FOR AR SIMULATION OF DEMOLITION AND REMOVAL OF URBAN
OBJECTS
Takashi Tanemura, Nobuyoshi Yabuki, and Tomohiro Fukuda
3D IMAGING TECHNOLOGIES AND MARKET TRENDS AND THE IMPACT ON THE FUTURE OF
JAPAN
Koji Kawamura
OBJECT SURFACE MODELING FOR PARTICLE-BASED FLUID SIMULATION
Yoshihiro Yasumuro , Masanori Aoki, Hiroshige Dan, Tatsuaki Nishigata, Taisuke Ishigaki, and
Masataka Imura
13:30 – 15:30 DATA MINING AND MACHINE LEARNING Conference Room 3
Chairperson: Jack C. P. Cheng
DESIGN REQUIREMENTS OF AN AUTOMATED DATA-DRIVEN SIMULATION MODEL
GENERATOR FOR CONSTRUCTION OPERATIONS
Reza Akhavian and Amir H. Behzadan
A STUDY ON THE INFLUENCE OF CLIMATE FACTORS ON LEED GREEN BUILDING CREDIT
SELECTION USING DATA MINING TECHNIQUES
Lucky J. Ma and Jack C. P. CHENG
PREDICTING ROAD CHANGES FROM CONSTRUCTION RECORDS: A COMPARISON OF
MACHINE LEARNING ALGORITHMS AND DATASETS
Wataru Kobayashi, Ryosuke Shibasaki, and Yoshihide Sekimoto
PREDICTING CONSTRUCTION PROJECT COST OVERRUNS USING TEXT DATA
Trefor P. Williams
DATA MINING AND KNOWLEDGE SYSTEM FOR IMPROVING ENERGY CONSUMPTION OF
BUILDINGS
Kazuki Nakayama, Nobuyoshi Yabuki, Shota Tsukamoto, and Tomohiro Fukuda
15:30 – 15:50 Coffee Break Main Foyer
15:50 – 16:20 Plenary Session: Closing Ceremony
International Conference Hall
15
Notice to Paper Presenters
Each speaker who will give presentation on the accepted paper has 15 minutes for presentation and 5 minutes for
questions and answers, total of 20 minutes. The Chairperson will give a 5 minute warning and then a 1 minute
warning. If you see a Finish sign, you should finish your talk immediately.
Each speaker should bring his or her own laptop PC and presentation file and should check the connection of the
PC to the beamer (projector) at the designated hall or room. We prepare laptop PCs for all rooms. However, we
do not guarantee that your presentation file is compatible with our software and hardware. Especially, if you are
going to show videos or special graphics files, you should bring your own PC.
Notice to Chairpersons
All chairpersons should keep the time as planned. Please show the 5 minute warning after 10 minutes passed and
the 1 minute warning after 14 minutes passed. When 15 minutes passed, please show Finish sign. If the speaker
continues to speak, please tell him or her to finish.
After the presentation, please encourage the audience to ask questions or give comments. It is very important for
speakers to be asked questions in order to improve the contents for publishing journal papers in the future. If no
one asks questions, please ask the speaker by yourself. In the large halls, please use the chairperson’s
microphone. Our staff student will bring a microphone to the questioner. The total time for each speaker is 20
minutes. If many people raise hands for questions, please control and finish Q&A session as planned. If you
encounter a rude questioner, who gives very harsh and rough comments to speakers, please give him or her a
mild warning.
Please introduce each speaker before presentation. Each speaker is asked to fill out a short CV so that you can
read it. After the presentation, please give a hand to each speaker.