DORIS in few words
DORIS involvement along Moho Nord development
Key contributions to a successful Project
From wellhead to export§ Topsides
§ Subsea systems
§ UFR (Umbilicals, Flowlines, Risers)
§ Surface facilities (fixed or floating)
§ Mooring systems
§ Export systems (Pipeline, OLT, etc.)
FPSO | FPU as main production unit
TLP | SPAR | Semi-Sub for the wellhead platform
Full subsea development
Conceptual studies
Pre-Project
Basic Engineering | Hull & Topsides
Topsides Early Detailed Engineering for HHI
Mooring Detailed Design & Assistance during hook-up
Conceptual studies
Pre-Project
Design Competition with HHI / HOE
« Basic Detail » Engineering for HHI
Conceptual studies
Basic Engineering of UFR & SPS
UFR & SPS Contractors Follow-up
Parallel studies during Detailed Engineering
DORIS partnership with local engineering EMEXDIS
Integration to N’Kossa:
Detailed Engineering works
§ Structural design of supporting structures
§ I-tube installation
§ Pig trap installation cinematics
§ Brownfield tie-ins and modifications
MHN FPU, a singular floating unit
A multi-discipline challenge with
strong interfaces.
Small size unit…
.. with 14 topsides modules/areas
Highly sensitive to topsides weight
and CoG elevation
§ Methodologies set up with TOTAL
- Key follow-up parameter on a monthly basis
- Each Technical Query shall mention the impact on unit weight or not
- Weight control weekly meetings set up during Detailed Engineering
§ Close development & monitoring of interfaces (int.+ext.) to control weight
§ Culture handover and collaboration with HHI during Detailed Design
§ Minimal room left for uncertainty
§ Flexibility during EPC phases
§ Continuous and supportive discussions between teams to accommodate variations
along project life
Modifications of design at start of Detailed Engineering:
§ Modification of the production strategy (Abian & Miocene reservoir) –
New equipment
§ Additionnal equipment to improve availability & modification of LLI
§ New floor to the Technical Building
Engineering focused on keeping topsides weight controlled To
psid
es
we
igh
t| G
ross D
ry
Focus on keeping FPU topsides weight unchanged
Moho Nord TLP, an innovative drilling tool
Focus on keeping FPU topsides weight unchanged
Albian reservoirs challenge: a complicated reservoir
Numerous well interventions needed
Go for a Tension Leg Platform with surface wellheads
Innovation to overcome constraints
§ Reduce drilling campaign duration
§ SIMOPS: drilling, well intervention & production
§ On a congested upper deck
Put an idea into a workable “swiss-knife” tool
Coiled
Tubing Reel
Derrick
Equipment Set
Coiled Tubing
Unit
Coiled Tubing
Tower Base
Design of an integrated system for well
intervention: Fit for Purpose Coiled Tubing Unit
A skiddable unit to move underneath the drilling set
§ To reach any Xmas tree position
§ Stepping over the drilling set transverse beam
Motion-compensated
§ to accomodate the stroke between TLP and
Coiled Tubing string
From conceptual studies to integration :
Concept thought out with TOTAL
Engineering performed in parallel of HHI TLP Detailed Design
Call for Tenders launched in 2014 based on DORIS Basic Design.
Follow-up of Schlumberger within TOTAL teams up to integration
and interface management with Drilling contractor : laser survey
performed to ensure proper integration
Copyright © DORIS Engineering
All rights reserved. The information contained in this document is intended for general information only,
as it is summary in nature and subject to change. Any third-party brand names and/or trademarks
referenced are either registered or unregistered trademarks of their respective owners
Moho Nord Project
A Complex and Innovative DevelopmentA Complex and Innovative Development
SPE Conference – Paris - 12 October 2017
CG-MHN-00-MNQA-100027 Rev03
Introduction : Moho Bilondo (Congo)Moho Bilondo license75km off shore75km off shore
450 m WD (southern area)
1200 m WD (northern area)
Moho (southern area)developed in 2008 with FPU
Alima
capacity 90 kbopdcapacity 90 kbopd
Moho Nord Projectextension southern area
development of northern area
Production
exported to on-shore Djenoexported to on-shore Djeno
terminal
operated by Total (53.5%)
Chevron (31.5%), SNPC (15%)
P.2Moho Nord Project – SPE Conference - Paris 12 Oct 2017
Moho Nord project perimeter : two sub-projects & three reservoirs
km0 5
Miocene
Moho
N dExtension southern area
MIOCENE (northern
area)
Unconsolidated sand
1200 m water depth NordExtension southern area
Miocene reservoir
tied back to exisiting Alima FPU
1200 m water depth
1000 m reservoir burial
Albian
production in December 2015
Development northern area
ALBIAN (northern area)
Carbonates
800 m water depthTLPFPU Miocene reservoir
a subsea network with new FPU
first oil on 14th March 2017
800 m water depth
3000 m reservoir
burial
FPU
Alima
Albian reservoir
TLP with surface well heads
MIOCENE (southern
area)
PHASE 1 BISAlima
Miocene on stream in May 2017PHASE 1 BIS
P.3Moho Nord Project – SPE Conference - Paris 12 Oct 2017
Phase 1bis
Southern area : tie back to MOHO FPU ALIMA (phase 1 Bis)
Alima existing FPU
upgrade and
debottlenecking
Extension
of exisiting
+ 40 kbopd
production
loop
(4 wells)
Addition of a new loop,
(7 wells + Multi Phase Pump)
P.4Moho Nord Project – SPE Conference - Paris 12 Oct 2017
Southern area : ALIMA FPU upgrade (phase 1 bis)
Capacity : 150 kbopd max liquid
1,500 tons new equipment
• Installation of valve
module
• Installation of new
separator
3.6 MM manhours in SIMOPS
Integrated team ‘ITEAM’
separator
(Alpha/Beta loop)
• Installation of E/I
room
• Installation of PCM
module (MPP
control center)
• Replacement of 2
dead oil pumps
(increased power)
• Replacement of 2Replacement of 2
methanol pumps
(increased power)
• Installation of new
EDG
• Installation of
transformers and HP
P.5Moho Nord Project – SPE Conference - Paris 12 Oct 2017
Northern area development concept : TLP + FPU
Miocene : FPU
conventional subsea network
Albi “ d” TLP FPUTLP
Albian: “unmanned” TLP
Deeper wells longer duration, drilling while
producing
FPU
Frequent well interventions, coil tubing tower
Minimal facilities. Process and power on FPU
Miocene & Albian incompatible watersMiocene & Albian incompatible waters
(Barium Sulphate Scales)
separate production trains on FPU
P.6Moho Nord Project – SPE Conference - Paris 12 Oct 2017
Subsea part of Moho Nord Development (SPS & UFR)
NkossaNkossaDjénoDjéno
Moho Nord FPUMoho Nord FPU
-1 oil export line to Djéno -Transfer lines
Moho Nord TLPMoho Nord TLP
DjénoDjéno
1 G lift li ( ith
p j
terminal ( 80 km of 16”)
- 1 gas exchange line with
Nkossa facilities (18 km of 6”)
Transfer lines
between TLP
& FPU
1 t i j ti li ith
-1 Gas lift line (with
3 In-line Tees)
-Length : 12 km
-Diameter : 6”
4 Slots
1 water injection line with
6 wells (4 In line tees)
Length : 12 km
Diameter : 10”
4 Slots
Manifolds
6 Slots Manifold-1 production loop with 11 wells
-Length : 2 x 12 km
-Diameter 10”UMBILICALS
P.7Moho Nord Project – SPE Conference - Paris 12 Oct 2017
UMBILICALS
Tension Leg Platform (TLP) – Albian reservoir
TLP allows drilling while producing
Well intervention by Coil Tubing without rig
Connected to FPU by Fluid Transfer Lines (FTL)
First TLP in Africa for Total
30 years Design Drilling from TLP (dry
60m x 60m x 60m
Unmanned
wellheads)
Drilling with Semi-Sub Tender
platform
Deck : 5 500 t
Assisted Rig and non
permanent derrick set
Hull : 9 900 t
27 slots available
Rigless work-overs (coiled
tubing)
P.8Moho Nord Project – SPE Conference - Paris 12 Oct 2017
Floating Production Unit – Miocene reservoir
Capacity ~ 150 kbopd liquid
Hull (250 x 44 x 18 m) ~ 35 kt
Topsides ~ 20 kt gross dry
Power generation : 75 MW
FPU & TLP controlled from
FPUFPU
Wash Tanks : final separation
& desalination (spec export)
Sulphate reduction of water
to inject into Miocene
Gas import/export to Nkossa
Crude export to Djeno
P.9Moho Nord Project – SPE Conference - Paris 12 Oct 2017
Best available technologies to minimise environnemental impact
All l t i FPU tiAll-electric FPU generating
all the power needed by the
facilityfacility
Produced water treatment
and reinjection with no
discharge
No routine flaring aided by
a flare gas recovery unit
P.10Moho Nord Project – SPE Conference - Paris 12 Oct 2017
Moho Nord project : key numbers
additional production : 140 kboe/d
45 development wells45 development wells
less than 4 years from FID to First
Oil
more than 50 MM manhoursmore than 50 MM manhours
TRIR 0.83, LTIF 0.15 (/MM manhours)
P.11Moho Nord Project – SPE Conference - Paris 12 Oct 2017
MOHO NORD – key dates timeline
Mar 2013 9 Dec 2015 Q1 2017 14 Mar 2017Oct 2016Jul 2015Oct 2014 Jan 2016Apr 2015
FID
9 Dec 2015
First Oil
Phase 1
Bis
FPU HUC.
Connection
to Djeno
First Oil
Moho
Nord
FPU
Sail-Away
Start offshore
Campaign
Start
Drilling
TLP
installation
Alima
modules
lifting
P.12Moho Nord Project – SPE Conference - Paris 12 Oct 2017
Moho Nord project : challenges
Execution during industry downturn
TLP i t ll d h t dTLP on pre-installed anchor tendons
Fast-track SPS deliveries
Complex UFR installation campaign
In Country Value createdIn Country Value created
P.13Moho Nord Project – SPE Conference - Paris 12 Oct 2017
Moho Nord project – Conclusions
Innovative development scheme
two reservoirs with two different floating units (FPU &
TLP)
Completed in less than 4 years within budget.
Oil water gas available within three weeks of start-upOil, water, gas available within three weeks of start-up
Limited environmental impact :
All-electric, PWRI, no routine flaring
Significant in-country value :
infrastructure, fabrication and training
Total -
confirmed as largest operator in Congo
Congo -
confirmed as a deepwater producer in Africa
P.14Moho Nord Project – SPE Conference - Paris 12 Oct 2017