+ All Categories
Home > Documents > Confidential, Do Not Distribute. Innovation The purpose of the program is to use the fluctuations...

Confidential, Do Not Distribute. Innovation The purpose of the program is to use the fluctuations...

Date post: 16-Dec-2015
Category:
Upload: mariah-blount
View: 215 times
Download: 0 times
Share this document with a friend
Popular Tags:
16
Confidential, Do Not Distribute
Transcript

Confidential, Do Not Distribute

Innovation The purpose of the program is to use the fluctuations in the

Earth and convert it to the Electric Energy. Our technology will be capable to supply constantly electric

energy, with limited cost of maintenance.

No pollution No costly maintenance No costly initial setup

Confidential, Do Not Distribute

Description of the Technology

Confidential, Do Not Distribute

With our technology we can convert these fluctuations into the electric energy.

The shell of the earth is rapidly fluctuate (microns)

There are the materials that when you press on them, potential difference is created, like quartz or composite.

We estimate : 10m² = 1KWatt

Our technology is allowing us to use a very small space and still reach to large amount of MWatt

Why We?

Our Technology Don’t have to reinstall any parts. Amount of work hours is 24/7. Cost of the installation up to 1.5M Euro for 1MgW/h.

(depends on structure and cost of the land) ROI is SMALLER – up to 3 years.

Confidential, Do Not Distribute

Photo – Voltaic ROI is 6-10 years. After 7 years you have to reinstall most of the silicon cells. Amount of sun hours is limited.Cost of the installation is 1.5-2.5 million Euro for 1MgW/h.

Advantages Our Technology Photo Voltaic Normal

Initial Setup Low cost Low Cost High Cost

Pollution NO NO HIGH

Maintenance Very Low Each 7 years Always

Stability High Medium LOW

Cost of operation Very Low Medium Very High

Safety

ROI 3 years 6-10 years Very Long

Confidential, Do Not Distribute

Our technology contributes to improving the security of Europe's energy supply

Program is in 4 Phases

Phase 1 – producing scheme – 1000 watt

Phase 2 – pilot version 100 Kwatt.

Phase 3 – production 1MgW.

Phase 4 – production 5-100 MgW.

Confidential, Do Not DistributeConfidential, Do Not Distribute

Confidential, Do Not Distribute

Phase 1 Development of a laboratory prototype , producing and storing

energy: 1, 10, 100, 1000 WATTS.

Objective – Developing a basic scheme and producing and storing electric energy.

Time : 1-2 years

Personal : 7 people.

Money needed : 1.5-3 Million Euros.

Confidential, Do Not Distribute

Phase 1 - Steps Building laboratory, hiring people Selecting the source of oscillations - electrical, mechanical,

hydraulic, magnetic ... Selection of the principle of converting vibration - piezo,

magnetic, ... Selecting the connection method of the system Selecting the method of accumulation of finished energy (batteries,

dry cells and so on) Selecting materials for energy conversion, for example : natural

(quartz), artificial (composite) Choosing the materials for energy transfer: metal, semiconductor,

Confidential, Do Not Distribute

Phase 1 – Steps Development of a test design product for testing schemes (schemes).

Selecting devices Choosing accessories Making drawings Manufacturing, assembly and choosing stand

Testing. Objective - to check the various circuit elements and their interaction.

Finalization of the scheme for pilot.

Confidential, Do Not Distribute

Phase 2

Development of pilot plants for electric energy storage and production: 10 - 100 kWatts.

Objective – Developing a pilot version and producing and storing electric energy.

Time: Up to 1-2.5 years.

Personal: 8

Money needed: 1.5-3.5 Million Euros.

Confidential, Do Not Distribute

Phase 2 – Steps Selecting the location :

Collection of geophysical and geo-mechanical data. Collection of archaeological data.

Development of the design of the construction. Selection of the technological scheme. Selection of the control circuit. Selection of the basic equipment. Selection of the accessories. Selection of the devices. Creation of the drawings.

Confidential, Do Not Distribute

Phase 2 – Steps Production Setup

Manufacturing the parts of the installation. Building the installation, including the adaptation. Conducting pilot tests.

○ Objective – collection the data for development of a pilot plant for energy storage and production : 1 - 100 MgW.

Confidential, Do Not DistributeConfidential, Do Not Distribute

Phase 3 – Production Production of 1 MgWatt

Phase 4 – ProductionProduction of 5-100 MgWatt

Confidential, Do Not Distribute

Ready - Theoretical Model of working system (Algorithms, Mathematics, Formulas, Sketches)

Status of the Project

Algorithms

Mathematics

Formulas

Sketches

Confidential, Do Not Distribute

Team Abramov Alex – Project Leader. 33 years old. Alex has an

extensive knowledge in project management and company Business development. Alex now is managing director of Gazit Technologies, a start up company that sold it’s product and now acting as an outsourcing company in web development.http://www.linkedin.com/in/enigmatec

Shamuilov Boris – PhD in Physics and Chemistry. 59 years old. Boris has an extensive knowledge in R&D. Boris has 25 patents registered on him and on the group that it was developed.

Confidential, Do Not Distribute

Thank you

Contact us

Alex Abramov

Tel : +972 52 6408850

[email protected]


Recommended