Date post: | 04-Aug-2015 |
Category: |
Software |
Upload: | anna-ioceva |
View: | 44 times |
Download: | 1 times |
“Introduction to JIRA Portfolio
”Execution is the ability to mesh strategy with reality, align people with goals, and achieve the promised results.”
Larry Bossidy
Large initiative’s challenges
1. No visibility cross projects
2. Resources over or under utilized
3. Disconnect between strategic goals and development reality
4. PM’s time is primary occupied in schedule updates and reports preparation
A solution by
What is JIRA Portfolio?
S
Single view
G R
Align to goals
Track investments
across strategic
themes to ensure that
those investments
align with business
priorities
Realistic delivery forecasts
Generate realistic
delivery forecasts with
automatic scheduling
algorithms supporting
time-based estimates
as well as story points.
The best way to manage multiple JIRA projects!
A single, accurate view
for planning and
managing initiatives
across multiple teams
and projects with ease.
Our first impressions
1. Using JIRA Portfolio to gain visibility on existing JIRA projects:
• 4 hours to setup and import real JIRA data in
• Themes report showed us alignment of JIRA projects to strategic goals
• The new visibility lead to discussions and plan changes
• Epics usage proved to be more difficult (if not standardized across projects)
2. Using JIRA Portfolio to assess feasibility of a new project:
• 1 hour to setup the tasks and a team (no stages)
• We were able to asses feasibility of a new project-to-be having the load of our team on current projects