+ All Categories
Home > Documents > ConnectDER Product Overview MWCOG – BEEAC Meeting 7/17/14

ConnectDER Product Overview MWCOG – BEEAC Meeting 7/17/14

Date post: 04-Jan-2016
Category:
Upload: jalen
View: 50 times
Download: 2 times
Share this document with a friend
Description:
ConnectDER Product Overview MWCOG – BEEAC Meeting 7/17/14. A Home Goes Solar Every 4 Minutes. Wiring Can Be Complicated. Equipment + Labor = $800 5% of cost. The Connect DER ( x DER ). “Plug-and-play” solar via meter case Integration and revenue models for utilities - PowerPoint PPT Presentation
Popular Tags:
9
ConnectDER Product Overview MWCOG – BEEAC Meeting 7/17/14
Transcript
Page 1: ConnectDER Product Overview MWCOG – BEEAC Meeting 7/17/14

ConnectDER Product Overview

MWCOG – BEEAC Meeting

7/17/14

Page 2: ConnectDER Product Overview MWCOG – BEEAC Meeting 7/17/14

2

A Home Goes Solar Every 4 Minutes

Page 3: ConnectDER Product Overview MWCOG – BEEAC Meeting 7/17/14

3

Wiring Can Be Complicated

Equipment + Labor = $800 5% of cost

Page 4: ConnectDER Product Overview MWCOG – BEEAC Meeting 7/17/14

4

The ConnectDER (xDER)

“Plug-and-play” solar via meter case

Integration and revenue models for utilities

Key installation costs eliminated

Page 5: ConnectDER Product Overview MWCOG – BEEAC Meeting 7/17/14

Inverter

Solar panels

ConnectDER

Power grid

cellular wifi

zigbee AMI Cloud

API

Reporting& controls

Home

5

Page 6: ConnectDER Product Overview MWCOG – BEEAC Meeting 7/17/14

Connector

Metering Circuit Breaker

Hardware

6

Page 7: ConnectDER Product Overview MWCOG – BEEAC Meeting 7/17/14

Connection

Software

7

Metering

Status

Page 8: ConnectDER Product Overview MWCOG – BEEAC Meeting 7/17/14

8

MEA Game Changer 2.0 Project• Install xDER on 10 MD homes; Demonstrate positive user

experience and cost savings from technology

• Team of Infinite, Standard Solar, Bill Brooks (Solar and NEC code expert), PEPCO

• Schedule• May-July: Prep, training, scheduling• August-September: installation, reporting• Oct 2014 – Sep 2015: performance tracking and reporting

Page 9: ConnectDER Product Overview MWCOG – BEEAC Meeting 7/17/14

9

ContactWhitman Fulton

CEO

202-207-6882

[email protected]


Recommended