1 Connecticut’s Bold Vision for a Transportation Future Middlesex Chamber October 15, 2015 Commissioner Jim Redeker
Transcript
Page 1: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

1

Connecticut’s

Bold Vision

for a Transportation

Future

Middlesex Chamber

October 15, 2015

Commissioner Jim Redeker

Page 2: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

2

The Challenge, Vision, & Plan

Page 3: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

3

The Challenge

our infrastructure, our economy,

our quality of life, & our future

Page 4: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

4

Our Transportation Infrastructure Is Large & Diverse

Challenge: Keeping it operating, in good condition, & safe is a major challenge

Highway System: • 85 million vehicle miles traveled per day

• 21,800 miles of state & local roads and ramps

• 7,400 state & local bridges

• 50 state highway maintenance garages

• 630 state plow trucks

Transit System• 42 million bus passenger trips per year

• 1,100 transit buses and paratransit vehicles

• 41 million rail passenger trips per year

• 226 route miles of passenger railroad

• 203 New Haven Line bridges

• 500 rail coaches and cars

Page 5: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

5

Condition of our Infrastructure

Condition forecasts:

• We cannot sustain even existing conditions

Already showing impacts of underinvestment

Bridges

• 10% are structurally deficient (24% of CT’s bridges are functionally obsolete)

Roadways

• 41% of all state & local roads are in “poor” condition.

• Cost to drivers: an additional $661/year in operating costs due to road conditions.

Rail

• 100-year old bridges Four movable bridges on nation’s busiest commuter rail line

are over 100 years old (Ramp-up plan is jump starting these replacements)

Page 6: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

6

about 50% of CT’s

highway bridges

built in 1950s & 60s

Page 7: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

7

# Highway Bridges in Poor Condition

Drop in 2013 reflects recent

increases in bridge program

10-year bridge program

after Mianus River bridge collapse

Page 8: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

8

• Drivers in Connecticut spend up to one work-week sitting in traffic – over

$1.6 B in lost time & wasted fuel

• Deficient roads & bridges cost CT drivers $2.6 B per year in higher

operating costs & accidents

Postponed investments also place

our economy & quality of life at risk

I-84 viaduct

50 yrs old & congested

Page 9: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

9

Where We are Today

Recent Achievements

Page 10: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

10

• Transportation investment has

grown 65%

• Condition levels & system reliability

are improving in some areas.

• Recent & current major projects:

– Moses Wheeler bridge

– West River bridge

– I-84 widening Waterbury

– CTfastrak

– Q Bridge

Recent Achievements

Page 11: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

11

New project delivery methods

Construction delivery:

I-84 bridge in Southington (ABC)

o Accelerated Bridge Construction

o Replaced in single weekend

More comprehensive: design, const, financing…

Tested some new methods

– Design-Build (bridges)

– Construction Manager At Risk (railyard)

– Transit-Oriented Development (Stamford

TOD)

Page 12: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

12

Response to the Challenge

30-year Vision

& Strategy

Page 13: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

13

• 30-year plan: all critical preservation &

enhancement needs

• 5-year ramp-up: projects within the 5-year

budget cycle to jump start investment

• Cost:

o 30-year Vision: $100 Billion investment

o 5-year ramp up: $10 Billion investment

o Base Capital Program is $7.2 Billion (fed + state)

o Ramp-Up funds $2.8 Billion (additional state)

“Best in Class” Vision

Page 14: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

14

Recommended Actions

Improve Project & Service Delivery

• Project delivery: provide tools needed for more efficient delivery

– Design/Build, CMAR, Accelerated Bridge Construction, P3

• Service delivery: implement more effective contracting methods

• DOT core capacity: build & develop staff in engineering, technology, …

– new methods to deliver larger program more efficiently.

• More “cash” funding for regular capital programs

– Supports basic repair & preservation programs & more cost-effective

• 100% state-funded “design”

– Use state funds for design; state & federal funds for construction

– More efficient, faster, stretches dollars farther

Page 15: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

15

Statewide Programs

Page 16: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

16

Best-in-Class pavement preservation program:

• $7 Billion over 30 years

• To achieve & maintain good state of repair

Best-in-Class bridge preservation program

• $25 Billion over 30 years

• To achieve & maintain good state of repair

Highways & Bridges: Preservation Programs

Page 17: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

17

• Upgrade bus maintenance facilities

• Integrate operating services, information, and customer service statewide

• Adopt technologies to improve service & information delivery, i.e. real time info

& smart card fare collection

• Improve & expand urban bus service by 25%, providing urban residents

access to bus service within half-mile of home

Bus Program

Page 18: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

18

• Design for Bikes & Pedestrians

Support livable & walkable communities:

o complete streets policy

o context sensitive designs that respect

community values.

• Trail Program Expand funding to fill gaps

in the regional trail system & maintain

existing trails.

• Community Connectivity Program

New funding program to improve bike &

pedestrian access to and within in

community centers.

Bike & Pedestrian

Page 19: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

19

• Create best-in-class statewide Port Authority

• Improve rail & highway linkages to ports

• Improve & expand port infrastructure

o Piers, cranes, warehousing, etc.

• Provide regular maintenance dredging

• Support marinas & local maritime economy.

Ports & Maritime

Page 20: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

20

• Double the State’s investment in municipal roadways

• Double the State’s investment in municipal bridges

• New municipal traffic signal replacement program

• New community bike/ped program to make communities centers

more walkable, safe, & livable

• Support Transit-Oriented Development in community centers

Municipal: municipal needs will be addressed

Page 21: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

21

• Upgrade highway bridges to meet 100,000 lb. national standard

• Implement fully-automated truck permitting for wide & heavy loads

• Expand overnight parking for trucks

• Expand Rail Freight Improvement Program:

o upgrade freight rail lines across the entire state

o upgrade rail facilities to 286,000 lb. national standard

o upgrade & maintain freight lines to preserve potential for passenger service

• Increase intermodal connections:

o Improve intermodal facilities & infrastructure

o improve deep-water ports (New London, New Haven, Bridgeport)

Freight

Page 22: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

22

New York to New Haven Corridor

Key Corridor Objectives

• Reduce congestion on I-95 & Rt 15

(CT’s most congested corridor)

• Improve access to NYC (rail is primary means)

• Improve mobility & choices (goal in every corridor)

Page 23: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

23

New York to New Haven Corridor

HIGHWAY highlights

• Widen I-95: from NY to New Haven

o Start with most congested segment: Bridgeport to Stamford

o Institute congestion management practices

• Major preservation projects such as:

o I-95: Complete reconstruction of West River Bridge in New Haven

o RT 15: Reconstruct/replace West Rock Tunnel ($235M) in Woodbridge

• Fix traffic bottlenecks: like RT 7/RT 15 interchange & RT 8 in Shelton-Derby area

Page 24: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

24

New York to New Haven Corridor

RAIL highlights

New Haven Line:

o Restore rail infrastructure (movable & fixed bridges, track, catenary, etc.)

o Movable & fixed bridges, track, catenary, etc

o Improve safety & reliability of service

o Add & modernize stations, expand parking

o Fully utilize all 4 tracks to support: 2+2 concept

o 2 local tracks - more frequent local “subway” type service

o 2 express tracks - faster express service on

Branch Lines:

o Upgrade branch lines to provide full commuter service on all three lines

Page 25: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

25

Eastern Connecticut Corridor

Key Corridor Objectives

• Tourism: improve access from other regions

to recreational & tourism centers

• Freight: improve freight rail & port

infrastructure for more efficient freight

transport

• Reduce congestion on I-95

• Improve Shore Line East rail service

Page 26: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

26

New Haven – Hartford – Springfield Corridor

Key Corridor Objectives

• Reduce congestion

I-91 at Charter Oak Bridge: traffic bottleneck

• Complete Hartford Rail Line (New Haven to

Springfield)

• Expand CTfastrak

• Enhance Bradley Airport as key link to

national & global markets

$195 million: cost to build

$880 million: benefits over 25 yrsDirect Economic Benefits

Page 27: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

27

New York to Hartford Corridor

Key Corridor Objectives

• Replace I-84 viaducts

• Waterbury

• Hartford

Critical preservation projects

Combined cost = $12 Billion

• Reduce congestion on I-84

• Danbury (exits 3-8)

• Waterbury (Mixmaster)

• Hartford (Viaduct)

• Continuous 3 lanes (NY – Waterbury)

• Improve Branch rail lines

• Danbury

• Waterbury

Page 28: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

28

Funding: Current & Future,

Federal vs State

Page 29: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

29

Current Base 5 Year Capital Plan is funded

with Federal & State Monies

• Historically, Federal funding accounted for 70-80% of the Program

• State-Federal ratio is now close to 50% with State funding including:

• Fix it First Highway

• Bridge Program

• LOTCIP

Base Capital Plan

Total AnticipatedFederal Portion ofthe Current Program

Total AnticipatedState Portion of theCurrent Program

State

$3.2 B45%

Federal

$3.8 B55%

Page 30: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

30

Accepting Federal Funding Comes with:

• Federal Eligibility Requirements

• Less Flexibility in Use of Funds

• Stewardship Agreements

• MAP-21 Brings:

• State of Good Repair targets & penalties

• Asset Management requirements

• Performance-Based Planning requirements

Federal Funding & Eligibility

Page 31: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

31

Aging systems requires the State to fix problems first before

system enhancements.

• The needs of the current system mandates preservation &

safety projects

• Current funding levels inadequate for existing system and do

not allow for necessary enhancements

Federal program constraints increasingly restrict our ability to

improve the system, due to elimination of discretionary

programs.

Fixing Problems: Not Providing Choices

Page 32: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

32

Governor’s Call to Action Increases Capital Funds to $2 Billion/Yr

during the 5-Year Ramp-up

• Includes Safety & Preservation Projects

• Creating the opportunity for Enhancement Projects

700 700 700 700 700 700 700 700 700 700 700

-

500 500 600 700 600 600

- - - - -

-

- --

-- -

672 693 610 610 610 - -

--

- -

274 520 547

750 691

-

- --

-- -

-

- -

- -

3,200

$0

$500

$1,000

$1,500

$2,000

$2,500

$3,000

$3,500Vision Level Capital Funding

5 Yr Ramp Up - Let's Go CT!Value = $2.8 Billion

Proposed "Base" State BondingAuthorizations (based on recenttrends)Past Years State BondingAuthorizations

Assumed Federal Funding

Current Biennial Budget

Page 33: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

33

5 Year Ramp Up Capital Budget

Base Program vs. Ramp Up

Base Capital Program

$3.2 Billion State $3.8 Billion Federal

Ramp Up$ 2.8 Billion - State Total = $10 Billion

investment over

the 5 year period

Page 34: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

34

5 Year Ramp Up – $2.8 B additional State Funds

Highways $613 Million

Highways

22%

I-95 Stamford to Bridgeport

I-95 Baldwin Br. to Gold Star Br.

I-91/I-691/Rt 15

I-91/Interchange 29

I-84 Exits 3-8

I-84 West Hartford

Route 9 – Middletown

Rt. 7/15 Interchange

Total Ramp Up = $2.8 Billion State Funds

Page 35: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

35

5 Year Ramp Up – $2.8 B additional State Funds

Bridges $281 Million

Bridges

10%

Innovative Bridge Program

I-84/Route 8 – Mixmaster

I-84 Hartford Viaduct

West Rock Tunnel & Interchange 59

Gold Star Bridge South Bound

Total Ramp Up = $2.8 Billion State Funds

Page 36: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

36

5 Year Ramp Up – $2.8 B additional State Funds

Bike/Ped/Trails $101 Million

Bike/Ped/Trails

4%

Trail Maintenance

Complete Gaps in Trail Network

Urban Bike/Ped Connectivity

Total Ramp Up = $2.8 Billion State Funds

Page 37: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

37

5 Year Ramp Up – $2.8 B additional State Funds

Bus $43 Million

Total Ramp Up = $2.8 Billion State Funds

Bus

2%

Bus service expansion - New Buses

Real Time Location/Bus Information

Paratransit Service Coordination

CTfastrak east to Manchester

Rt. 1 CTfastrak BRT (Norwalk/Stamford)

Page 38: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

38

5 Year Ramp Up – $2.8 B additional State Funds

Rail $1.75 Billion

Rail62%

Total Ramp Up = $2.8 Billion State Funds

Plan to Upgrade NHL capacity and speed

Real Time Audio and Video System NHL

NHL Interim Bridge Repairs

NHL Stations & Parking

NHL - New Danbury Branch Dock Yard

Waterbury Branch Signal System

NHL/SLE/NHHS Fleet Replacement

Hartford Line Expansion/Stations/Fleet

SLE Station & Parking Improvements

Page 39: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

39

Where Do We Go From Here?

Page 40: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

40

Governor’s Call to Action Increases Capital Funds to $2 Billion/Yr

during the 5-Year Ramp-up

• Safety & Preservation program backlog first

• Creating the opportunity for Enhancement Projects

700 700 700 700 700 700 820 880 710 710 710

-

500 500 600 700 600 600 - -

- - -

-

- --

-- -

672 693

610 610 610 - -

--

- -

274

520

547 750 691

-

- --

-- -

-

-

-

- -

3,200

$0

$500

$1,000

$1,500

$2,000

$2,500

$3,000

$3,500Vision Level Capital Funding

5 Yr Ramp Up - Let's Go CT!Value = $2.8 Billion

Proposed "Base" State BondingAuthorizations (based on recenttrends)Past Years State BondingAuthorizations

Assumed Federal Funding

Current Biennial Budget

Page 41: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

• Experts in transportation, finance, and economic

development

• Funding options and recommendations to support the

$100 billion vision

• Report-out by end of the year

41

Governor’s Transportation

Finance Panel

Page 42: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

Economic Analysesof Let’s Go CT Transportation Investments

Where we are in the process:

• ready to deliver new type of information to assist decision makers

• to assess value of investments relative to cost

Economic assessment: of transportation investments

• new measures to gauge the worth of investments

• beyond standard transportation measures like accident & congestion reduction

Today’s presentation: first part of economic analysis

• corridor-level analysis

• 3 highway corridors

– with the largest & boldest improvements

– important conduits of commerce

– among our most congested.

Summary of initial findings: clear and compelling return on investment

• Demonstrate that transportation investments will spur growth in jobs, business, & income.

• Economic benefits will far exceed the cost of building the projects

Page 43: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

Three Major Highway Corridors

43

I-84 West

Hartford

Viaduct &

Waterbury

Mixmaster

not included

I-95 West

I-95 East

Page 44: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

Three Major Highway Corridorscurrent conditions

44

I-95 West I-95 East I-84 West

Length (Miles) 50 60 37

Daily Traffic 135,000 84,000 80,000

% Trucks 13.6% 10.5% 12.7%

Daily VMTVehicle Miles Traveled

6,500,000 miles 3,700,000 miles 3,100,000 miles

Annual VHT Vehicle Hours Traveled

45.1M hours 24.0M hours 29.2M hours

Annual DelayHours of congestion

5.3M hours 2.1M hours 2.6M hours

Page 45: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

45

I-95 West: NY to New Haven Highway Corridor Package

Page 46: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

I-95 East: Branford to R.I. Highway Corridor Package

46

Page 47: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

I-84 West Corridor plus Mixmaster & Viaduct

47

heavily

congested

Danbury

section

Waterbury

Mixmaster

Hartford

Viaduct

Page 48: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

Why we conducted economic analysis

48

Traditionally, transportation plans were based on standard measures

of safety, congestion, & mobility. For this strategic plan, we need

to go beyond standard measures.

Purpose of economic analysis:

Assess project’s ability to support other strategic goals of CT

(especially economic growth)

• Assess “economic value” of safety, congestion, & mobility

improvements

• Assess a project’s potential to facilitate or spur economic growth

Page 49: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

Economic Impact Analysis

49

Evaluation of changes in economy due to monetary transactions.

Transportation Improvement

Travel Benefits

Industry Response & Change in

Access

Economic Growth (Impact)

Travel Inputs

Econ. Analysis

Benefit Cost

Econ Impact

Interpret Results

Page 50: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

Factors Impacting Economic Impacts

50

Benefit Categories Travel Factors

Economic Impact Factors

Vehicle Operating Costs VMT, Mix of Vehicle Types, Congestion

Time & Reliability (Business) VHT, Trip Purpose, Congestion

Logistics Productivity Truck Fleet Mix, Commodity Mix, Congestion

Market Access Effective Size of Labor and Delivery markets

Other Societal Benefits

Personal Time (Not Business) VHT, Trip Purpose, Congestion

Safety VMT, Speed, Road Class/Design

Environment Fleet Mix, VMT, Congestion

Page 51: Connecticut’s Bold Visionc.ymcdn.com/sites/construction.org/resource/collection/99C53AF2-69... · New project delivery methods ... New York to New Haven Corridor HIGHWAY highlights

ResultsWidening I-95 and I-84 will produce over $40 billion in economic

benefits to Connecticut, over 4 times the cost of implementing the projects.

Widening I-95

• Will produce $15.5 billion in new business sales, $9 billion in CT gross state product and add $6.3 billion in new wage income to workers. The widening will cost $10.7 billion.

• The project will generate between 11,000 and 19,000 construction jobs.

• Over 14 million hours of delay will be saved.

Widening I-84

• Will produce $4.4 billion in new business sales, add $2.6 billion to CT gross state product, and add $1.8 billion in new wage income to workers. The total cost of the project is $1.5 billion.

• The project will generate approximately 4000 jobs.

• Over 4.7 million hours of delay will be saved. 51