Considering DER at Arizona Public Service Stephen Kerr September 19, 2016
Transcript
Page 1: Considering DER Concepts at Arizona Public Service€¦ · Smart HVAC –Study usage ... Maximo Interconnects. 11 Data Sources •APS bills on net metering, but has two AMI meters

Considering DER at Arizona Public Service

Stephen Kerr

September 19, 2016

Page 2: Considering DER Concepts at Arizona Public Service€¦ · Smart HVAC –Study usage ... Maximo Interconnects. 11 Data Sources •APS bills on net metering, but has two AMI meters

Overview of Today’s Presentation

• APS System Overview

• DER Team and Pilots

• Data, data, and more data

• Future of Distribution Planning with DER

• Lessons Learned

2

Page 3: Considering DER Concepts at Arizona Public Service€¦ · Smart HVAC –Study usage ... Maximo Interconnects. 11 Data Sources •APS bills on net metering, but has two AMI meters

APS System

3

• 1600 radial feeders

• 1.2 million customers

• 35 thousand square miles

• Demand: 60% residential, 40% C&I

• 29 thousand miles of distribution lines

• 6 thousand miles transmission lines

• 6.5 GW owned generation fleet

Page 4: Considering DER Concepts at Arizona Public Service€¦ · Smart HVAC –Study usage ... Maximo Interconnects. 11 Data Sources •APS bills on net metering, but has two AMI meters

APS System Load

4

0

1000

2000

3000

4000

5000

6000

7000

8000

0 50 100 150 200 250

Syst

em

Lo

ad (

MW

)

Time of Day (5-min intervals)

Summer Peak Day

Low Load Day

Min = ~2400 MW @ 3:30AM

Max = ~7400 MW @ 5:30PM

These two conditions occur only 2-3 months apart

Page 5: Considering DER Concepts at Arizona Public Service€¦ · Smart HVAC –Study usage ... Maximo Interconnects. 11 Data Sources •APS bills on net metering, but has two AMI meters

APS System Load

5

Page 6: Considering DER Concepts at Arizona Public Service€¦ · Smart HVAC –Study usage ... Maximo Interconnects. 11 Data Sources •APS bills on net metering, but has two AMI meters

6

APS Renewable Integration

• Approximate installed capacity– Wind: 100 MW

– Utility scale solar: 400+ MW

– Rooftop solar: 350+ MW

• Growth rate:

– 2000 applications / month

– 14 MW / month

– 175 MW / year

• Renewables growth rates

– From 2013 to 2015

• Nameplate increased by 73 %

• Capacity at peak increased by 213 %*

*http://www.csp-alliance.org/solana-abengoa/

Page 7: Considering DER Concepts at Arizona Public Service€¦ · Smart HVAC –Study usage ... Maximo Interconnects. 11 Data Sources •APS bills on net metering, but has two AMI meters

DER Pilot Programs at APS

• Sandvig High Penetration Solar Deployment in Flagstaff

– APS-owned solar and advanced metering

• Solar Innovation Study

– Install advanced tech on 75 homes

• Solar, battery, load controller, pool pump, Smart HVAC

– Study usage patterns

• Solar Partners Program

– Install utility-operated

solar on 1500 homes

– Customers get $30/mo credit

7

Page 8: Considering DER Concepts at Arizona Public Service€¦ · Smart HVAC –Study usage ... Maximo Interconnects. 11 Data Sources •APS bills on net metering, but has two AMI meters

8

Challenge: Managing 350MW Generation

Page 9: Considering DER Concepts at Arizona Public Service€¦ · Smart HVAC –Study usage ... Maximo Interconnects. 11 Data Sources •APS bills on net metering, but has two AMI meters

Creating the DER team

• New department formed spring 2016

• 4 Engineers and an Engineering Leader

• Studying system aggregate impact of DERs

• Long term vision is to roll up to the bulk electric system

9

Page 10: Considering DER Concepts at Arizona Public Service€¦ · Smart HVAC –Study usage ... Maximo Interconnects. 11 Data Sources •APS bills on net metering, but has two AMI meters

Where is the data?

10

DER Integration Engineering

DER Integration Engineering

GISCIS

CYME

DA

EMS PiTLM

AMI

Maximo

Interconnects

Page 11: Considering DER Concepts at Arizona Public Service€¦ · Smart HVAC –Study usage ... Maximo Interconnects. 11 Data Sources •APS bills on net metering, but has two AMI meters

11

Data Sources

• APS bills on net metering, but has two AMI meters per customer with DER

– Billing meter

– Production meter

• Allows APS to study disaggregated data

– Pull out production

– Determine gross load Credit: EPRI/APS Solar Partner Program: June 2016 Update

Page 12: Considering DER Concepts at Arizona Public Service€¦ · Smart HVAC –Study usage ... Maximo Interconnects. 11 Data Sources •APS bills on net metering, but has two AMI meters

12

Source: kathleendeery.com

Challenges Using Data

Page 13: Considering DER Concepts at Arizona Public Service€¦ · Smart HVAC –Study usage ... Maximo Interconnects. 11 Data Sources •APS bills on net metering, but has two AMI meters

13

Data Sources

• Assessment

– All the right data is available

– Under-utilized

– Coordinated processes required

• Challenges

– Pertinent data not linked

– Difficult to make actionable decisions

– Quality and accuracy verification

Page 14: Considering DER Concepts at Arizona Public Service€¦ · Smart HVAC –Study usage ... Maximo Interconnects. 11 Data Sources •APS bills on net metering, but has two AMI meters

Distribution Planning: Current state

14

Page 15: Considering DER Concepts at Arizona Public Service€¦ · Smart HVAC –Study usage ... Maximo Interconnects. 11 Data Sources •APS bills on net metering, but has two AMI meters

15

DER Operating Challenges

• Thermal issues– Masked load skews historical data

• Voltage– Rise with low daytime load– Drop with heavy load/no solar

• Feeder switching– ‘True’ load on line sections– Installed capacity insufficient– Interaction (solar + load) is critical– Auto-transfer schemes

Page 16: Considering DER Concepts at Arizona Public Service€¦ · Smart HVAC –Study usage ... Maximo Interconnects. 11 Data Sources •APS bills on net metering, but has two AMI meters

16

DER Operating Challenges

• Protection Coordination

– Relay desensitization

– Reverse flows, unbalance, mis-coordination

• Advanced Grid systems

– Self-healing

– IVVC

– SCADA-controlled line switches

Page 17: Considering DER Concepts at Arizona Public Service€¦ · Smart HVAC –Study usage ... Maximo Interconnects. 11 Data Sources •APS bills on net metering, but has two AMI meters

17

Distribution Planning Challenges

• Thermal issues– Probabilistic assessment of coincident load/solar

at feeder level

• Voltage rise/drop– Forecasting/simulating voltage problem areas

• Feeder switching– Operational planning

• Model validation– Verifying GIS model parameters

– Running power flow / protection coordination studies

Page 18: Considering DER Concepts at Arizona Public Service€¦ · Smart HVAC –Study usage ... Maximo Interconnects. 11 Data Sources •APS bills on net metering, but has two AMI meters

Distribution Planning: Future state

18

Page 19: Considering DER Concepts at Arizona Public Service€¦ · Smart HVAC –Study usage ... Maximo Interconnects. 11 Data Sources •APS bills on net metering, but has two AMI meters

19

Transition to Integrated DER planning

• Data aggregation– Assimilate data to see system layer impacts

• Data visualization– Automate routine studies– Easily view and act upon information

• Modeling and simulation– Simulate existing conditions, and mitigation– Enhance Distribution and Transmission planning processes– Disaggregate true load from solar

• Verification from operations– Engage operators and field personnel

Hub

Data

Data

Data

Page 20: Considering DER Concepts at Arizona Public Service€¦ · Smart HVAC –Study usage ... Maximo Interconnects. 11 Data Sources •APS bills on net metering, but has two AMI meters

DER Integration Challenges

• How do you forecast DER growth?

• What conditions drive immediate system upgrades?

– Voltage exceptions

– Impact to duration of outages (SAIDI)

• What conditions drive scheduled system upgrades?

– Gross demand causes feeder overload

• What % and how long? Still TBD

20

Page 21: Considering DER Concepts at Arizona Public Service€¦ · Smart HVAC –Study usage ... Maximo Interconnects. 11 Data Sources •APS bills on net metering, but has two AMI meters

DER Integration Challenges

• How do different DER sources impact utility-scale decisions?– Energy Efficiency

– EV’s

– PV/solar

– Batteries

• Screening process for interconnections– Based on FERC SGIP?

– Deny applications on problem feeders?

– Short and long term hosting capacity studies

21

Page 22: Considering DER Concepts at Arizona Public Service€¦ · Smart HVAC –Study usage ... Maximo Interconnects. 11 Data Sources •APS bills on net metering, but has two AMI meters

Current studies under way

• Identify net and gross demand per feeder• Reminder – this is in reference not only to installed

capacity, but actual production values

• Study load duration curves

• Voltage profile visualization

• ID candidate feeders for additional DER

• Collaborate with all internal departments involved with some form of DER

• New modeling and visualization software22

Page 23: Considering DER Concepts at Arizona Public Service€¦ · Smart HVAC –Study usage ... Maximo Interconnects. 11 Data Sources •APS bills on net metering, but has two AMI meters

Lessons Learned

• Scattered data sources complicate feeder studies

• Validate models and real-world conditions with AMI data

• PV orientation matters– For SPP feeders, peak reduction 22% (avg) vs 62% (west-

only)– For more typical feeder, 10-30% of installed capacity at

peak

• Predominant DER is PV and does not yet have much value in deferring projects

• Voltage is a major concern23

Page 24: Considering DER Concepts at Arizona Public Service€¦ · Smart HVAC –Study usage ... Maximo Interconnects. 11 Data Sources •APS bills on net metering, but has two AMI meters

Questions?

24

Stephen Kerr, PEArizona Public [email protected]