37
keller.com Constructability Problems and Solutions in Ground Improvements: Grand Island Tank Case Study
Transcript
Page 1: Constructability Problems and Solutions in Ground ...

keller.com

Constructability Problems and Solutions in Ground Improvements: Grand Island Tank Case Study

Page 2: Constructability Problems and Solutions in Ground ...

2

All accidentsare preventable

No repeatoccurrences

SafetyStandards

Job site Daily Task Analysis Meeting to review safety issues

related to the day’s tasks.

All Incidents investigated, corrective actions implemented

and shared in the Weekly Safety Update for awareness.

Safety Standards Document

Goal: Zero Injuries

Page 3: Constructability Problems and Solutions in Ground ...

3

THINK SAFE WORK SAFE GO HOME SAFE

Page 4: Constructability Problems and Solutions in Ground ...

4

Don’t be this guy!

Page 5: Constructability Problems and Solutions in Ground ...

5

Grand Island, NE

Page 6: Constructability Problems and Solutions in Ground ...

6

Grand Island Water Storage Tank• 2,000,000 Gal Storage• 6,000psf required

bearing capacity• 1” Total Allowable

Settlement

Page 7: Constructability Problems and Solutions in Ground ...

7

SoilProfile

Page 8: Constructability Problems and Solutions in Ground ...

8

Soil Profile

• 0’-5’ Surface CL Clay material

• 5’ – 15’ Poorly Graded Sand

• 15’ - 20’ Sandy Clay

Page 9: Constructability Problems and Solutions in Ground ...

9

• Design Depth of 26ft FGS

Page 10: Constructability Problems and Solutions in Ground ...

10

Design Layout

Page 11: Constructability Problems and Solutions in Ground ...

11

Partial Pre-Drill – Vibro Pier

Page 12: Constructability Problems and Solutions in Ground ...

12

Page 13: Constructability Problems and Solutions in Ground ...

13

Modulus Test

• Rounded Rock• 150% Design Load

Page 14: Constructability Problems and Solutions in Ground ...

14

Problems Start

• Red – Less than 12’• Yellow – 14’-18’• Green – 19’ or Greater

Page 15: Constructability Problems and Solutions in Ground ...

15

Page 16: Constructability Problems and Solutions in Ground ...

16

Page 17: Constructability Problems and Solutions in Ground ...

17

Page 18: Constructability Problems and Solutions in Ground ...

18

Problem: Clean Upper Sand Layer

Page 19: Constructability Problems and Solutions in Ground ...

19

Solution

• Compaction Grouting• 9% Area Replacement

below the Stone Column supported area

Page 20: Constructability Problems and Solutions in Ground ...

20

Process - Grout Mix

Page 21: Constructability Problems and Solutions in Ground ...

21

• Aggregate (Soil)

− Sand

− Gravel

− Silt

• Portland Cement

• Water

• Additives and Admixtures (optional)

Typical LMG MaterialsPrimary ingredients include:

Page 22: Constructability Problems and Solutions in Ground ...

22

Page 23: Constructability Problems and Solutions in Ground ...

23

Examples: Extracted Grout Column

Page 24: Constructability Problems and Solutions in Ground ...

24

PAST PROJECT: Dakota Mill & Grain – Presho, SD

Page 25: Constructability Problems and Solutions in Ground ...

25

Dakota Mill & Grain – Presho, SD

Page 26: Constructability Problems and Solutions in Ground ...

26

Dakota Mill & Grain – Presho, SD

Page 27: Constructability Problems and Solutions in Ground ...

27

Dakota Mill & Grain – Presho, SD

Page 28: Constructability Problems and Solutions in Ground ...

28

Dakota Mill & Grain – Presho, SD

Page 29: Constructability Problems and Solutions in Ground ...

29

Dakota Mill & Grain – Presho, SD

Page 30: Constructability Problems and Solutions in Ground ...

30

Dakota Mill & Grain – Presho, SD

Page 31: Constructability Problems and Solutions in Ground ...

31

Dakota Mill & Grain – Presho, SD

Page 32: Constructability Problems and Solutions in Ground ...

32

Page 33: Constructability Problems and Solutions in Ground ...

33

Solution

• Compaction Grouting• 44 locations• + 2 Test Locations

Page 34: Constructability Problems and Solutions in Ground ...

34

Grand Island: Compaction Grouting

• 8cf/ft• 28ft to 16ft FGS• Minimum 200psi CG

Page 35: Constructability Problems and Solutions in Ground ...

35

Results

• Compaction Grout

• Secondary – Test Locations (Dotted Line)

Vibro Zone

Page 36: Constructability Problems and Solutions in Ground ...

36

Lessons Learned• 30% Area

Replacement Ratio• Rounded Rock • Ground improvement

combinations - successful

Page 37: Constructability Problems and Solutions in Ground ...

37


Recommended