Company Profile “Construction by all its true meanings”
Transcript

www.s tark-egypt .com Company Profile

“Construction by all its true meanings”

www.s tark-egypt .com

Index..About us

Board of directors

Our projects

BanksArab Investment Bank

ResidentialDr.Hisham Mansour Villa

Dr.Ashraf EL- Feky Villa

SchoolsInternational QMM shcools

Safety Policy

Quality PolicyExperience Certificates

Contact us

AdministrativeMIST Headquarters

EGY-GATE HeadquartersDr- Mohamed Sleim AL-AWA Headquarters

FactoriesLESAFFRE- EGYPT yeast Factory

VINAVIL- EGYPT Acrylic Emulsion factory

HospitalsAbo Al-Rish Children’s Hosiptal renovation

Dr.Hatem Badran Villa

www.s tark-egypt .com

Who are we ?

www.s tark-egypt .com

Who are we ?We are group of engineers with an average of 20 to 25 years experience. We decided to Make our own construction company on March 2009, named it STARK construction which means “Construction by all its true meanings”” hoping to eliminate and avoid any mistakes that we faced during our work life time in other companies .

STARK Strength points

- We target to finish our projects in its dedicated time schedule with high quality, and stakeholders satisfaction “Client, Engineer, subcontractors and Employees”.

- we believe that High coordination gives Zero re-work, High precautions gives zero injuries.

www.s tark-egypt .com

About us

Board of directors

Mohamed Abdel Ghany , MBA,PMP

C.E.O

Abdel Aziz Haroun Electro - Mech.

manager Ayman Zaky

Projects Director

Khaled Tolba Mechanical manager

Ashraf Sherif C.F.O

www.s tark-egypt .com

Mohamed Abdel Ghany , MBA,PMPC.E.O

1- Develop a strategic plan to advance the company’s mission and objectives

and to promote revenue, profitability, and growth as an organization.

2- Oversee company operations and construction progress to insure work

efficiency, quality, Time,and cost-effective management of resources.

3- Plan, develop, and implement strategies for generating resources and/or

revenues for the company.

4-”Approve company operational procedures, policies, and standards.

5- Review activity reports and financial statements to determine progress and

status in attaining objectives and revise objectives and plans in accordance with

current conditions.

6- Evaluate performance of executives for compliance with established policies

and objectives of the company and contributions in attaining objectives.

7- Present company report at Annual Stockholder and Board of Director meetings.

8- Direct company planning and policy-making committees.

Responsibilities :

www.s tark-egypt .com

No. Project name Job Title Owner Consultant Value

1MB1 & MB2 & MB4 Admin.

BuildingsTechnical Sector

HeadMinistry of

CommunicationECG 210 M

2 NOVOTEL Airport HotelTechnical Sector

HeadNovotel EHAF 55 M

3 LYCEE-SchoolTechnical Sector

HeadLYCEE WASF 75 M

4 VIP Lounge -AirportTechnical Sector

HeadCairo -Airport ECG 20 M

5 Cairo American CollegeTechnical Sector

HeadCAC R.M.C 75 M

6 Domiatec H.OTechnical Sector

HeadDomiaty Group ECG 52 M

7 ASWAR CompoundTechnical Sector

HeadUnited Group AL-AMAR 60 M

8 Intercontinental City Stars HotelTechnical Sector

HeadIntercontinental Dr/ Shakr 35 M

9NPC Admin . Building -Smart

VillageTechnical Sector

HeadNPC Company ECG 100 M

10ECG Admin . Building –Smart

VillageTechnical Sector

HeadECG ECG 60 M

11B-2215 Admin . Building – Smart

VillageTechnical Sector

HeadSmart Village ECG 91M

12 Smart villages Co. H.OTechnical Sector

HeadS.V.C ECG 35 M

13Elnour Admin . Building – Smart

VillageTechnical Sector

HeadElnour Company Dr/ Shakr 35M

14 AMARANTI El-Nile Hotel Tendering Manager Alex Group A & P 120 M

15 Mena House Hotel Tendering Manager EGOTTH ECG 60 M

16 Pyramisa Hurghada Hotel Tendering Manager Misr For Hotels DECOR 45 M

17 Millennium Tiran Hotel Tendering Manager El-Montazah Dar El Omara 26 M

Mohamed Abdel Ghany , MBA,PMPC.E.O

Past Experience

www.s tark-egypt .com

Abdel Aziz HarounElectro-Mechanical manager

Managing both site and office electromechanical issues , coordinate with construction

division in order to finish the project according to planned time schedule and budget .

No. Project name Job Title Owner Consultant Value

1MB1 & MB2 & MB4 Admin.

BuildingsElectrical Section Head

Ministry of Communication

ECG 210 M

2 NOVOTEL Airport Hotel Electrical Section Head Novotel EHAF 55 M

3 LYCEE-School Electrical Section Head LYCEE WASF 75 M

4 VIP Lounge -Airport Electrical Section Head Cairo -Airport ECG 20 M

5 Cairo American College Electrical Section Head CAC R.M.C 75 M

6 Domiatec H.O Electrical Section Head Domiaty Group ECG 52 M

7 ASWAR Compound Electrical Section Head United Group AL-AMAR 60 M

8Intercontinental City Stars

HotelElectrical Section Head Intercontinental Dr/ Shakr Office 35 M

9NPC Admin . Building -Smart

VillageElectrical Section Head NPC Company ECG 100 M

10ECG Admin . Building –Smart

VillageElectrical Section Head ECG ECG 60 M

11B-2215 Admin . Building –

Smart VillageElectrical Section Head Smart Village ECG 91M

12 El Napela Resort Hurghada Project Manager El Napela GroupDr/ Hasa El

Bakry110 M

13Elnour Admin . Building –

Smart VillageProject Manager Elnour Company Dr/ Shakr Office 35M

14EMCO Medical Factory 10th of

RamadanSite Engineer Dr/ Samy Elhampoly

Magdi Kamal Office

5M

15 El Khamael City Site Engineer Ministry of InteriorDr/ Ahmed Abd

El Wareth9M

Responsibilities :

Past Experience

www.s tark-egypt .com

Ayman ZakyProjects Director

Responsibilities :1. Developing projects plan.2. Managing projects stakeholders, Time schedule, Budget and conflicts.3. Agreeing projects objectives.4. Representing the client’s interest.5. Organizing the various professional people working on a project.6. Risk assessment.7. Making sure that all the aims of the project are met.8. Making sure the quality standards are met.9. Using the latest IT to keep track of people and progress10. Recruiting specialists and sub-contractors11. Monitoring sub-contractors to ensure guidelines are maintained12. Accounting, costing and billing.

No. Project name Job Title Owner Consultant Value

1Lesaffre Egypt Factory at

Al Nubaria city Projects director Lesaffre Egypt ECG 35 M

2Abo el-Rish children’s Hospital Renovations

Projects directorAbo el Rish Hospitals

Qasr el-Ainy Engineering Department

7 M

3Arab Bank for Economic

Development in Africa - El- Khartom - Sudan

Project ManagerArab Bank

for Economic Development

Moharam-Bakhoom Consultant

22 M USD

4The Grove Residential

CompoundProject Manager

Kuwait Egyptian company

Al-Amar Consulting co 56 M

5Cairo American College

(CAC) - Maadi, CairoConstruction

ManagerCairo American

CollegeRaafat Milar (RMC)

Consultant102 M

6ALnahda Univeristy IN Beni

Seuf cityProject Manager ALnahda Univeristy (T.H.E) Consultant 39 M

7Beverly hills Housing

projectSenior site engineer

/ CoordinatorSodic

Moharam-Bakhoom Consultant co

72 M

8 Helwan university projects Site Engineer Helwan universityEngineering department of

Helwan University60 M

91500 Housing building in

AlgeriaConstruction

ManagerQatar Development

BankMoharam-Bakhoom

Consultant co30 M USD

10Waste water pipes network for AL Motamaddia village

and Bolak Dakror area

Senior site engineer / Quality Control /

Material Control

Water and Sewage Company

Sabbour Associates 8 M

Past Experience

www.s tark-egypt .com

Khaled TolbaMechanical manager

Managing both site and office mechanical issues , coordinate with Electromechanical

section head and construction division in order to finish the project according to

planned time schedule and budget .

No. Project name Job Title Owner Consultant Value

1MB4 Administration

BuildingMechanical Section Head

Ministry of Communication

ECG 135 M

2 NOVOTEL Airport Hotel Mechanical Section Head Novotel EHAF 55 M

3 LYCEE-School Mechanical Section Head LYCEE WASF 75 M

4 VIP Lounge -Airport Mechanical Section Head Cairo -Airport ECG 20 M

6 Domiatec H.O Mechanical Section Head Domiaty Group ECG 52 M

7 ASWAR Compound Mechanical Section Head United Group AL-AMAR 60 M

8 El-Naeem H.O – Smart Village

Mechanical Section Head Elnaeem Company Crown Home 97M

9 EMAC Building Mechanical Section Head Elkhorafy Hatem Hasan 60M

10Abo Ghazala H.O- Smart

VillageMechanical Section Head

Talal Abo Ghazala Group

Mast Group 91M

11 Vodafone Building Bani Suief Project Manager Vodafone Company Crown Home 20M

12 Elfuttaim Villas Project Manager Elfotaem Company E.C.H 27M

13East Foreign Production

FactoryProject Manager

Elsharkia LlDokhan Company

Dr/ Mohamed Rabea

250M

14West Foreign Production

FactoryProject Manager

Elsharkia LlDokhan Company

INFRA Group 250M

15 Grand Hotel Sharm El-Sheikh Project Manager Red Sea Hotels groupEngineering

Office for group120M

16 Zeina For Paper products WProject Manager Ziena Infra Group 75

17Misr Lltamen Company

BuildingProject Manager

Misr Lltamen Company

Dr/ Samer Rabea

28M

Responsibilities :

Past Experience

www.s tark-egypt .com

Ashraf SherifC.F.O

1- Providing and interpreting financial information.

2- Monitoring and interpreting cash flows and predicting future trends.

3- Analyzing change and advising accordingly.

4- Researching and reporting on factors influencing business performance.

5- Conducting reviews and evaluations for cost-reduction opportunities.

6- Managing a company’s financial accounting, monitoring and reporting systems.

7- Liaising with auditors to ensure annual monitoring is carried out.

8- Developing external relationships with appropriate contacts, e.g. auditors, solicitors,

bankers and statutory organizations such as the Inland Revenue.

9- Producing accurate financial reports to specific deadlines.

10- Managing budgets.

11- Arranging new sources of finance for a company’s debt facilities.

12- Keeping abreast of changes in financial regulations and legislation.

22 years Experience in all financial management reports in multinational

construction companies by providing and monitoring cash flows ,analyzing

all financial changes in costing and accounts receivables/payables to specific

deadlines. Preparing budgets by coordination with all departments heads

and study the differences by the accurate.

Responsibilities :

Past Experience

www.s tark-egypt .com

Our prOjects

www.s tark-egypt .com

www.s tark-egypt .com

Assignment:

Project DescriptionProject Type Factory

Location Nubaria Cairo /Alex road

Owner LESAFFRE - Egypt

Consultant ECG

Duration 12 Month

Completion Date Oct , 2016

LESAFFRE- EGYPT yeast Factory

Fac

tori

es

| New water treatment 4000 m2 plant including concrete, insulation, finishes and mechanical fixations.

| Loading platform including Steel structure, metal cladding, dock leveler and all relevant civil works.

| All concrete works for chemical and yeast tanks foundations and production area slab on grade including surface chemical flooring finishes.

| All flooring types including (Heavy duty ceramic, epoxy , U-Crete ,paving, interlock and etc).

| Cooling units for cold stores.

| Fence and landscaping.

| Drainage stainless steel piping and trenches network for all the factory areas.

www.s tark-egypt .com

www.s tark-egypt .com

Assignment:

Project DescriptionProject Type Factory

Location Suez - Egypt

Owner VINAVIL Egypt for chemicals

Consultant ECG

Duration 5 Month

Completion Date August , 2016

VINAVIL- EGYPT Acrylic Emulsion factory

Fac

tori

es

| Demolishing the administration building, underground water tank, electrical room, security room and fences

| Site grading of the new purchased land including cut and fill.

| all above packages includes all type of works Architectural, Structural, Electrical ,Light current ,Plumbing & Fire-fighting ,Grading, Infrastructure and piping

| Construction of 300 M.l concrete fence, steel gate and guard room.

| Construction of an underground tunnel between Vinavil East side part of factory and Vinavil west side part of factory crossing the external main road. Work includes excavation in the road between the two parts of vinavil factory, laying of external protecting carbon steel pipes fully assembled with the internal stainless steel AISI 316 process pipes.

www.s tark-egypt .com

www.s tark-egypt .com

Assignment: | Replacing all the sewage and water supply networks for all risers with about 3000 meter length.

| Renovation of existing floors for the next works :

All types of finishing works including (gypsum , wood, glass, porcelain and ceramic tiles, epoxy, vinyl and marble)

All electromechanical works including Electrical, fire alarm, CCTV, Plumbing, Fire-fighting and HVAC works.

Project DescriptionProject Type Hospital

Location Cairo - Egypt

Owner Abo Al-Rish Hospital

Consultant Qasr Al-Ainy Engineering Department

Duration 6 Month

Completion Date Sep , 2016

Abo Al-Rish Children’s Hosiptal renovations

Hosp

ital

www.s tark-egypt .com

Abo Al-Rish Children’s Hosiptal renovations

www.s tark-egypt .com

Assignment:Our assignment was all finishing works of the first floor of 250 m2, gypsum partitions , glass partitions , carpet tiles, ceilings (wood, gypsum, etc.), doors, , also all electro-mechanical works (HVAC, electric, fire alarm, fire fighting, plumbing, telephone and data) the specs of the work are according to the standard specs of the Smart village company.

Project Description

Project Type Administrative

Location Smart Village - Cairo / Alex Road

Owner MIST

Consultant ECG - Engineering Consultants Group

Completion Date June 2013

MIST Headquarters

Adm

inis

trAt

ive

www.s tark-egypt .com

www.s tark-egypt .com

Assignment:Our assignment was as the following : all finishing works of 400 m2, gypsum partitions , glass partitions , Porcelain tiles, ceilings (wood, gypsum, etc.), doors, , also all electro-mechanical works (HVAC, electric, Access control, CCTV, plumbing, telephone and data) the specs of the work are according to the standard specs of the IATA [ International Air Transport Association ] regulations.

Project Description

Project Type Administrative

Location Mustafa AL- Nahas - Nasr City - Cairo

Owner EGY-Gate Tourism Company

Consultant Dr. Asharf El-Ezaby

Completion Date Sep 2013

EGY-GATE Headquarters

Adm

inis

trAt

ive

www.s tark-egypt .com

www.s tark-egypt .comwww.s tark-egypt .com

Assignment:Our assignment was as the following : all finishing works of 600 m2, masonry works , gypsum partitions , glass partitions , Marble tiles, ceilings (wood, gypsum, Plexi glass , etc.), doors, wall cladding ( Stone , Wood, wall paper , Decorative painting , etc.) ,fixed and loose furniture , also all electro-mechanical works (HAVC, electric, fire fighting, plumbing,CCTV , telephone and data).

Project Description

Project Type Administrative Building

Location New Cairo - Cairo

Owner Dr . Mohamed Sleim Al-AWA

Duration 9 Month

Completion Date Nov 2014

Dr- Mohamed Sleim AL-AWA Headquarters

Adm

inis

trAt

ive

www.s tark-egypt .com

www.s tark-egypt .com

Assignment:Our assignment is renovate the data center floor for Arab investment bank as the following : finishes and all MEP works of one floor of 1200 m2 raised flooring, ceilings (wood, gypsum, etc.), doors, also all electro-mechanical works (HVAC, electric, fire alarm, fire fighting, plumbing, telephone and data).

Project Description

Project Type Banks

Location Down town – CAIRO – EGYPT

Owner Arab Investment bank

Consultant ECG - Engineering Consultants Group

Completion Date Apr 2013

Arab Investment Bank

Ban

ks

www.s tark-egypt .com

www.s tark-egypt .comwww.s tark-egypt .com

Assignment:Our assignment is all finishing works of five typical floors of area 6500 m2 including facades finishes (stone, painting, Aluminum windows and structural glazing), marble pattern flooring, false ceilings , doors, and all roof layers finishes, also all electro-mechanical works (HVAC, electric, plumbing).

Project Description

Project Type Schools

Location Al-Meraaj - New Maadi

Owner QMM

Consultant Dr. Bhaa Mahmoud

Completion Date March 2013

International QMM schools

Scho

olS

www.s tark-egypt .com

www.s tark-egypt .com

Assignment:Our assignment was the all finishing works of the basement of 600 m2 and three typical floors of area 490 m2 / Floor including facades finishes (stone,painting,glass block), marble pattern flooring, ceilings (wood, gypsum, etc.), fixed joinery, doors, and all roof layers finishes, also all electro-mechanical works (HVAC, electric, plumbing, telephone and data) .

Project Description

Project Type Residential

Location Elyasmeen compound – Shikh Zayed

Owner Elyasmeen compound – Shikh Zayed

Consultant Albonian Consultant Engineers

Completion Date July 2013

Dr.Hisham Mansour Villa

Resi

den

tia

l

www.s tark-egypt .com

www.s tark-egypt .com

Assignment:Our assignment was the concrete Skeleton and all finishing works of one basement of 450 m2 and five typical floors of area 450 m2/floor including facades finishes (stone, painting,glass block), marble pattern flooring, ceilings (wood, gypsum, etc.), fixed joinery, doors, and all roof layers finishes, also all electro-mechanical works (HVAC, electric, plumbing, telephone and data) .

Project Description

Project Type Residential

Location AUC Compound - New cairo

Owner Dr.Ashraf El -Feky

Consultant Dr.Magdy Shaban

Completion Date July 2012

Dr.Ashraf EL- Feky Villa

Resi

den

tia

l

www.s tark-egypt .com

www.s tark-egypt .com

Assignment:Our assignment was the all concrete , finishing, landscape and interior works of the ground , 2 typical floors and penthouse of total area 600 m2 including facades finishes (stone,painting,slate), flooring (Marble, ceramic , HDF, etc.) , ceilings (wood, gypsum, etc.), fixed joinery, doors, and all roof layers finishes, also all electro-mechanical works (HVAC, electric, plumbing, CCTV ,telephone and data) .

Project Description

Project Type Residential

Location Ro’ya Compound – 6th of october

Owner Dr.Hatem Badran

Design & build STARK

Duration 8 Month

Completion Date Jan 2015

Dr.Hatem Badran Villa

Resi

den

tia

l

www.s tark-egypt .com

www.s tark-egypt .com

Accidents don’t just happen, they are caused and it usually crop up due to one’s negligence. When accident happen, it entails considerable damages to the company more so on the part of the worker who was hurt and to his family. Hence, the best way to remedy the cause is through strict observance of the precautionary measures and continuous consciousness of Safety.

PURPOSE :

It is the Policy of STARK to provide and maintain a safe and healthy working environment in accordance with best industry practice.

SCOPE :

All permanent and temporary employees as well as others who may be affected by activities in the company project worksite and facilities, including; clients, visitors, contractors and members of the public .

Duties and Responsibilities :

Each employee will be made aware of the company Environment, Health and Safety Policy towards the control of accidents, damage to property and fire and, as an individual, must perform to achieve this end. This section specifies the duties and responsibilities of Management, supervisors, and employees. It is expected that everyone must satisfactorily discharge the duties and responsibilities allocated to him.

Safety Policy

www.s tark-egypt .com

www.s tark-egypt .com

Quality Policy

STARK Quality Statement is to ensure “Customer driven” approach that meets Customer expectations through effective management and performance, excellent co-ordination, increased productivity and greater focus on business objectives .The Project aims to continuously improve its performance by effective involvement of all levels of staff, providing staff with the training, techniques and authority needed to identify and resolve problems and by the establishment, monitoring and periodic review of objectives in relevant areas for the Project team members during the next activities :

* Documents and Data Control.* Purchasing.* Handling, Storage, Packaging and Delivery.* Process Control.* Corrective and Preventive actions.* Inspection and Testing.* Control of inspection, measuring and test equipment.* Training.* Quality Records and Inspection Reports.

www.s tark-egypt .com

www.s tark-egypt .com

Documents and Data Control :

This is to establish the rules and outline the methods to be adopted for ensuring that incoming and outgoing documents, which require traceability, are adequately controlled, so that documents can be appropriately identified, registered, distributed and filed to ensure that the nominated parties receive the current revisions, or information in a known status. Records shall be maintained to demonstrate the traceability of documents.

* Project controlled documents* Method of Implementation* Incoming controlled documents* Stamping of Incoming documents* Receipt Distribution* Identification* Registration* Master copy* Outgoing Documents* Project Controlled Forms* Archiving.

purchasing :

The Project Manager shall issue Material Requisitions on behalf of the Project. The Material Requisition shall be filled in and signed by the Project team member who requests the material specified in the Material Requisition and then signed approved by the Project Manager. The Material Requisition will have full information specifying the required material, quantities required, specifications requirement and the nominated supplier (if nominated in the contract documents) and shall attach all the technical data (if needed) , Consultant Approval to enable the Purchasing Department to make the purchase procedures easily and as mentioned in their purchasing procedures in STARK Quality Plan.

Handling, Storage, Packaging and Delivery

The Project Manager shall make sure that a suitable site store has been constructed within the site office facilities to keep material in a safe condition. Its area shall be enough for storage of material in a safe and correct way to prevent damage or deterioration. Air conditioning shall be provided to the store, if needed, to keep the material at the required temperature as recommended by the manufacturer.

Quality Policy

www.s tark-egypt .com

Process Control:

The Site Engineers shall make sure that site work processes are carried out in a manner that will demonstrate the achievement of Project quality requirements. The following procedures outline the methods to be adopted for the control of site work processes.

* Planning* Workshop drawings* Material Submittal* Working under controlled conditions* Variations/Changes to the work* Verification of completed works

Corrective and Preventive actions

Corrective action shall be carried out for customer’s complaint, reported non-conformance and audit findings.

Preventive actions

Use of appropriate sources of information i.e. process and work operation which affect product quality, internal audit report, rejection analysis, non-conformance report (N.C.R) and customer’s complaint, to detect, analyze and eliminate potential causes of non conformities.

Inspection and Testing.

Inspection and testing shall be carried out to ensure that purchased material conforms to specified requirements in accordance with the Project technical specifications and the International standard specifications.

Control of inspection, measuring and test equipment :

Control of the calibration of the equipment, devices and tools will be done and recorded by the QC – Personnel and a Calibration record shall be maintained as per the quality plan manual.Calibration of measuring and test equipment shall be done internally at the Project site wherever possible following the relevant standard. Unless externally at approved third partyCalibration result & certificates shall be submitted to the consultant for acknowledgement.

www.s tark-egypt .com

Quality Policy

Training

Initial training in the implementation of the quality plan shall be performed by QC-Department to the Project personnel having co-ordination responsibilities. QC department shall ensure that all assigned personnel are qualified by training them to perform the tasks assigned.

Quality Records and Inspection Reports

Records and inspection reports shall be compiled and collated as the works is performed throughout the duration of contract in order to provide objective evidence of the quality verification of work performed.

Records and inspection reports shall be indexed, filed and protected to prevent damage and deterioration or loss.

Experience Certificates

www.s tark-egypt .com

Experience Certificates

www.s tark-egypt .com

Experience Certificates

www.s tark-egypt .com

Experience Certificates

www.s tark-egypt .com

Experience Certificates

www.s tark-egypt .com

Experience Certificates

Experience Certificates

www.s tark-egypt .com

www.s tark-egypt .com

Contact us

Address : 31 th Ebad El-Rahman Towers , Behind shooting club - maadi.

Telephone : +202 27252137 / 38

Fax : +202 27252138

Email : [email protected]

Website : www.stark-egypt.com

w w w . s t a r k - e g y p t . c o m