Date post: | 27-Jan-2016 |
Category: |
Documents |
Upload: | manuel-antunes-luis |
View: | 228 times |
Download: | 4 times |
04/21/23
1Point Engineering Ltd.
04/21/23
2Point Engineering Ltd.
con·sult·an·cy• A professional practice that gives expert
advice within a particular field – in our case, by providing engineering EPC services.
• The work of offering such service
04/21/23
3Point Engineering Ltd.
Point Engineering Consultancy Point Engineering Limited has a broad range of capabilities
in the design and construction of many types of structures either with steel or reinforced concrete materials.
Point Engineering’s practice in the oil and gas engineering services dates back to the turn of the century. Some of the most notable projects among many are:
Total’s O.U.R. pipeline design and construction consultancy
Shell’s Trans-Niger Pipeline Loopline design Total’s USAN subsea manifold design Seplat 50,000-barrel buffer tanks design and
construction expert services Total Control Station Construction Supervision NPDC Dual Lane Concrete Bridge (for Heavy Truck
Traffic) Design MPN’s Post Underwater Inspection Risk Assessment of
79 platforms for Fitness for Purpose and Continuity of Use
And many more....
04/21/23
4Point Engineering Ltd.
Point Engineering Ltd. - Experience
04/21/23
5Point Engineering Ltd.
Point Engineering Proposal for Services
Point Engineering Limited are happy to propose to perform the following tasks during the construction phase of the 17-storey reinforced concrete building project:Pre-Construction Planning and Assurance
Review the building design and applicable Bill(s) of Quantities (BOQ).
Define/Verify precedence relationships among activities (to determine the Critical Path during the construction phase)
Estimate/Review estimate of activity durations
Review/Check/Write applicable construction scope(s) or work.
04/21/23
6Point Engineering Ltd.
Point Engineering Proposal for Services
Point Engineering Limited are happy to propose to perform the following tasks during the construction phase of the 17-storey reinforced concrete building project:Construction Management and Supervision
Construction project management.Management of construction subcontractors and scheduling.Coordinate specialized laboratory testing and inspections (i.e. concrete cube tests for crushing strength conformity to standards).Coordinate field reviews.Respond if special circumstances ariseAssurance of compliance with design documents
04/21/23
7Point Engineering Ltd.
What is Required Original Civil Design
Approved construction drawings - complete set Final (and approved) Bill of Quantities Final (and approved) list of standards and
specifications Final reinforcement schedule(s). Pre-Construction
Job directive information, i.e. mission, location, time schedule, manpower, equipment, materials, priorities, reports and special instructions
Site survey(s) Construction works schedule and milestones
Any additional items elucidated during initial discussions.
04/21/23
8Point Engineering Ltd.
Activity-On-The-Node (AON) Format
AON format is recommended for successful construction project management for the following reasons:
Eliminates confusion, and allows PM to adjust for problems that may arise during the construction phase.
AON format is "activity" oriented.
This is the primary format used for planning military construction, and especially used for large projects, which means it has a proven track history.
04/21/23
9Point Engineering Ltd.
Activity-On-The-Node Uses:
Construction planning.
Maintenance planning.
Project Design.
Logistics planning.
04/21/23
10Point Engineering Ltd.
AON Advantages
Reduces risk of overlooking essential tasks.
Provides a blueprint for long-range planning.
Shows activity inter-relationships.
Focuses attention on critical activities.
Allows PM to make timely decisions.
Allows PM to manage manpower, material, and equipment resources more effectively.
04/21/23
11Point Engineering Ltd.
AON Disadvantages
The AON format does not solve engineering problems that may occur.
Does not make planning decisions for you.
Does not provide anything substantial to the actual construction of the project itself.
04/21/23
12Point Engineering Ltd.
End of Presentation
Thank You !