+ All Categories
Home > Documents > Construction & Major Maintenance Projects; EH&S; and Maintenance & Operations Facilities & Planning.

Construction & Major Maintenance Projects; EH&S; and Maintenance & Operations Facilities & Planning.

Date post: 11-Jan-2016
Category:
Upload: solomon-oneal
View: 223 times
Download: 0 times
Share this document with a friend
Popular Tags:
20
Construction & Major Maintenance Projects; EH&S; and Maintenance & Operations Facilities & Planning
Transcript
Page 1: Construction & Major Maintenance Projects; EH&S; and Maintenance & Operations Facilities & Planning.

Construction & Major Maintenance Projects;EH&S; and Maintenance & Operations

Facilities & Planning

Page 2: Construction & Major Maintenance Projects; EH&S; and Maintenance & Operations Facilities & Planning.
Page 3: Construction & Major Maintenance Projects; EH&S; and Maintenance & Operations Facilities & Planning.

College Station Housing

•A PSU project with American Campus Communities (ACC) to increase student residential facilities at PSU•Walsh Construction, Contractor•368,612 GSF, 16 Floors, 978 Beds

•Building to have student housing, three general pool classrooms, a lecture hall, ground floor retail

•Construction is anticipated to start in early December 2010 and continue through Summer of 2012

•Sidewalks and parking adjacent to the property will be closed throughout the project. Max Green Line service continues

•PSU Project Rep: Jennifer Sharp

University Point

Page 4: Construction & Major Maintenance Projects; EH&S; and Maintenance & Operations Facilities & Planning.

•Located at OHSU Schnitzer Campus

•New building anticipated to collaboratively house OHSU, PSU, OSU, and private partners

•12-story – approx 650,000 GSF (Includes OHSU’s new spaces in Phases I & 2, Skourtes Tower)

•Building program is in refinement and includes: part of PSU Chemistry & Biology program, life sciences education & research, ground floor retail, & parking

•Design process continuing

•Estimated construction starting October 2011

•PSU occupancy September 2013

•Overall completion winter 2014

•PSU Project representative, Kate Vance

•Current tracking LEED Gold, potentially achieving LEED Platinum

OUS/OHSU Life Science Collaborative Building at South Waterfront

Life Science Collaborative Building

Page 5: Construction & Major Maintenance Projects; EH&S; and Maintenance & Operations Facilities & Planning.

State Deferred Maintenance $29.2 million

•Main part of project completed in late August 2010. Building re-opened for use for Fall Term 2010 with Fine & Performing Arts and General Pool classrooms re-opened

•New Broadway Entry construction began late Spring 2011, with completion scheduled for Fall 2011

•Installation of Photovoltaic panels began late Spring 2011, with completion & start-up scheduled for fall 2011

•PSU Project Manager, Joanna Evenson

Page 6: Construction & Major Maintenance Projects; EH&S; and Maintenance & Operations Facilities & Planning.

● Formerly Science Building 2

● Building infrastructure upgrades and the expansion and modernization of labs and teaching space. State Limitation $45.3 M, various funding sources including General fund, grants, gifts, COPs, and bonds. $26.3 Deferred Maintenance infrastructure project completed last winter term.

● $2 Million CLEE research labs completed this summer.

● $2 Million EDA Grant to replace or add 71 fume hoods completed.

● $600,000 lobby upgrade completed. Construction was partially funded by student fees.

● Hoffman Construction will demobilize and be offsite starting Jan 2012.

● PSU Project Manager, Mark Fujii.

Science Research & Teaching Center & Hazardous Waste Facility (SRTC)

Page 7: Construction & Major Maintenance Projects; EH&S; and Maintenance & Operations Facilities & Planning.

● Oregon Economic Stimulus Funded Project $17.5 million

● To improve and expand the network of heating and cooling piping throughout campus that forms our Campus Loop

● Leading to energy savings, more reliable service and increased capacity to heat and cool campus buildings . Estimated energy savings over $300,000 per year

● Geothermal cooling of a new heat pump and chiller in SB2

● Federal Grant of $1 M awarded to use more of the heat in the geothermal wells

● Completion of project Fall 2011

● PSU Project Manager, Mark Fujii

Campus Steam & Chilled Water Loop

Page 8: Construction & Major Maintenance Projects; EH&S; and Maintenance & Operations Facilities & Planning.

● Overall construction budget $614,000.

● Renovation of the Computer Lab

● Newly remodeled space, updated finishes, new computer workstations with integrated cable management.

● New "Sandbox Area" is a multi-use area defined by an innovative partition system, where students will have casual, impromptu work configurations while exploring integrated multi-media technology.

● Projected project completion Nov 15th

● PSU Project Managers: Francis McBride & Tracy Prose.

Millar Library Learning Grounds

Page 9: Construction & Major Maintenance Projects; EH&S; and Maintenance & Operations Facilities & Planning.

• $7M Blumel Hall Remodel is funded by Article XI-F bonds to upgrade the building infrastructure. Bonds will be issued in Spring 2012.

• Early funding is being considered to expedite the design and construction process.  PSU Auxiliaries wishes the construction to begin Fall 2012 and complete by Summer 2013.

• The upgrade will include replacing the roof, fixing the problem of water leaks in the units, and installing better heating controls and energy efficient lighting in the rooms

• Modernization of the rooms will be considered if funds are available.  This may include kitchen cabinets, appliances, counter, flooring and painting.

• PSU Project Manager: Mark Fujii; PSU In-House Architect: Tom Arnich; PSU In-House Mech. Engineer: Quinn Soifer.

Joseph C. Blumel Hall Repipe Remodel

Page 10: Construction & Major Maintenance Projects; EH&S; and Maintenance & Operations Facilities & Planning.

If you have a potential remodeling project in your plans contact our team and we will:

• schedule a brief meeting to discuss scope• verify if project is feasible, or work with you to make it feasible• determine best delivery system – PSU crews or outside contractor, or consultant• manage design, permitting and estimating• oversee construction and completion of the project

Francis McBrideConstructionProject [email protected]

Ron BlajAssistant DirectorCapital Project [email protected]

Page 11: Construction & Major Maintenance Projects; EH&S; and Maintenance & Operations Facilities & Planning.

Ernest Tipton:[email protected]

Ron Blaj:[email protected]

Kate [email protected]

Mark Fujii:[email protected]

Facilities & Planning - Reception503-725-3738

Jennifer [email protected]

Quinn [email protected]

Kay Byrne [email protected]

Francis Mcbride [email protected]

Page 12: Construction & Major Maintenance Projects; EH&S; and Maintenance & Operations Facilities & Planning.

Our Role:• Help employees to work safely.• Help supervisors provide employees with the

information, skills, & tools they need to work safely

• Help administration to provide a safe workplace• Help maintain compliance with environmental

health & safety regulations (DEQ, OSHA and others)

Environmental Health & Safety

Page 13: Construction & Major Maintenance Projects; EH&S; and Maintenance & Operations Facilities & Planning.

• Requesting Service from EH&S:

• Chemical Spill Emergency: 5-4404 (CPSO)

• Odor Reports: Call Facilities at 5-3738

• Please submit a Work Order for all other service requests, including:

• - Ergonomic Assessments• - Hazardous Waste Pick-Up• http://www.fap.pdx.edu/workorder

Environmental Health & Safety

Page 14: Construction & Major Maintenance Projects; EH&S; and Maintenance & Operations Facilities & Planning.

Announcing our New Environmental Health and Safety Manager:

Heather Randol

(503) 725-9948

[email protected]

Environmental Health and Safety

Page 15: Construction & Major Maintenance Projects; EH&S; and Maintenance & Operations Facilities & Planning.

Environmental Health & Safety

Fire Marshal Inspections• All buildings are on an inspection schedule

– FAP will notify building occupants

• Re-inspections if violations are found– Departments notified of any violations– If corrected in 40 days: No charge– If not corrected in 40 days: $$$ fees will

be charged to the occupant’s department

Page 16: Construction & Major Maintenance Projects; EH&S; and Maintenance & Operations Facilities & Planning.

Environmental Health & Safety

Common Fire Code Violations• Unsafe chemical

storage

• Blocked exits

• Materials stored in corridors

Page 17: Construction & Major Maintenance Projects; EH&S; and Maintenance & Operations Facilities & Planning.

Environmental Health & Safety

Common Fire Code Violations• Extension cords

used instead of permanent wiring

• Ganged surge protectors

Page 18: Construction & Major Maintenance Projects; EH&S; and Maintenance & Operations Facilities & Planning.

Environmental Health & Safety

Common Fire Code Violations

If violations are found, don’t wait!Contact FAP for assistance.

503-725-2FIX or http://www.pdx.edu/fap/

Page 19: Construction & Major Maintenance Projects; EH&S; and Maintenance & Operations Facilities & Planning.

Our team provides the following campus services:

• Electrical• HVAC&R•Plumbing •Carpentry•Energy Management•Keys & Lockshop•Grounds Maintenance•Signs & Way Finding

Rick ViaeneChief Building [email protected]

Gerry Gadberry Assistant [email protected]

Bob FolkertsBuilding Automation [email protected]

Michael [email protected]

Page 20: Construction & Major Maintenance Projects; EH&S; and Maintenance & Operations Facilities & Planning.

• New telephone number:

725-2FIX (503-725-2349)

• FAP on the web:

http://www.pdx.edu/fap

Facilities Work Order System


Recommended