13
8/9/2018 CONSTRUCTION MANAGER’S REPORT July 2018 Page 1 Safety Integrity Mentoring People Legacy Excellence Project Owner CONSTRUCTION MANAGER’S REPORT Construction Progress It is a fundamental value of Spence Brothers that safety always be a primary consideration. It is a top priority to do all in our power to provide a safe work place for all workers and to mandate the use of good safety practices. Interlochen Public Library July 2018 Project Safety
Transcript

8/9/2018

CONSTRUCTION MANAGER’S REPORT

July 2018 Page 1

Safety

Integrity

Mentoring

People

Legacy

Excellence

Project Owner

CONSTRUCTION MANAGER’S REPORT

Construction Progress

It is a fundamental value of Spence Brothers that safety

always be a primary consideration. It is a top priority to

do all in our power to provide a safe work place for all

workers and to mandate the use of good safety

practices.

Interlochen Public Library

July 2018

Project Safety

8/9/2018

CONSTRUCTION MANAGER’S REPORT

July 2018 Page 2

Week of July 1, 2018

Installation of pergola

Continuing with insulation and drywall in Study Room

8/9/2018

CONSTRUCTION MANAGER’S REPORT

July 2018 Page 3

Finishing drywall in the Community Room

Permanent power installation

8/9/2018

CONSTRUCTION MANAGER’S REPORT

July 2018 Page 4

Starting parking lot dirt work

Week of July 8, 2018Drain field installation

8/9/2018

CONSTRUCTION MANAGER’S REPORT

July 2018 Page 5

Force main installation from dosing tank to drain field

Installation of cedar brackets

8/9/2018

CONSTRUCTION MANAGER’S REPORT

July 2018 Page 6

Cedar brackets and columns installed at front entrance

Metal roof installation on north side of building

8/9/2018

CONSTRUCTION MANAGER’S REPORT

July 2018 Page 7

Installation of cedar brackets at Study Room

Week of July 15, 2018Pouring and forming sidewalk

8/9/2018

CONSTRUCTION MANAGER’S REPORT

July 2018 Page 8

Parking lot prep work

Installation of siding on Study Room Walls

8/9/2018

CONSTRUCTION MANAGER’S REPORT

July 2018 Page 9

Pouring sidewalks

Framing up bulkheads

8/9/2018

CONSTRUCTION MANAGER’S REPORT

July 2018 Page 10

Finishing drywall in Clerestory

Finishing drywall in Donor’s Hall

8/9/2018

CONSTRUCTION MANAGER’S REPORT

July 2018 Page 11

Week of July 22, 2018Pouring sidewalk on south side

Kitchen hood installation

8/9/2018

CONSTRUCTION MANAGER’S REPORT

July 2018 Page 12

Framing for the fireplace

Finishing drywall for the circulation desk

8/9/2018

CONSTRUCTION MANAGER’S REPORT

July 2018 Page 13

Gravel base for parking lot

Upcoming Construction Tasks

• Priming and painting

• Framing for acoustical ceilings

• Installation of permanent lighting


Recommended